Attachment 8 - Construction Drawings 508-25-107.pdf
PDF 13 MB Posted
- Solicitation number
- 36C24725R0046
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/2
/2
:2
:1
P
M C
U s e rs
\g s c o tt \D o c u m e n ts
\A
-3
-V
A A tl a n ta
H E
P A
R g s c o tt a c g -p a .c o m
.r v t
G-001
COVER
1 6OKM
HEPA FILTER INSTALLATION
PHARMACY CLEANROOM
SUITE
ATLANTA VA HEALTH CARE SYSTEM
1670 CLAIRMONT ROAD
DECATUR, GA 30033 SEPTEMBER 27, 2024
100% CONSTRUCTION DOCUMENTS
508-21-10720-384
BUILDING C
HEPA FILTER INSTALLATION PHARMACY
CLEANROOM SUITE
ATLANTA VA HEALTH CARE SYSTEM
1670 CLAIRMONT ROAD
DECATUR, GA 30033
VA PROJECT #: 508-21-107
GTS
DRAWING LIST
GENERAL
G-001 COVER 1 6
G-002 GENERAL INFORMATION 2 6
G-003 CODE SUMMARY - NFPA 3 6
G-004 ICRA INFORMATION AND DETAILS 4 6
G-101 GROUND FLOOR CONSTRUCTION ACCESS PLAN 5 6
G-102 SECOND AND THIRD FLOOR CONSTRUCTION ACCESS PLANS 6 6
STRUCTURAL
S-001 STRUCTURAL SYMBOLS, ABBREVIATIONS, SCHEDULES, AND NOTES 1 5
S-101 ROOF PLAN (PENTHOUSE CRAWLSPACE) & PLATFORM FRAMING PLAN 2 5
S-102 PLATFORM WALL FRAMING PLAN & PLATFORM ROOF FRAMING PLAN 3 5
S-201 SECTIONS & TYPICAL METAL STUD ELEVATION 4 5
S-301 STRUCTURAL DETAILS 5 5
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 11
AD101 GROUND FLOOR DEMOLITION PLAN AND REFLECTED CEILING PLAN 2 11
AD102 FIRST FLOOR ROOF DEMOLITION PLAN (SECOND FLOOR) 3 11
A-101 GROUND FLOOR PHARMACY PLANS 4 11
A-102 FIRST FLOOR ROOF PLAN (SECOND FLOOR) 5 11
A-103 MECHANICAL PENTHOUSE PLANS (SECOND FLOOR) 6 11
A-201 MECHANICAL PENTHOUSE EXTERIOR ELEVATIONS 7 11
A-301 MECHANICAL PENTHOUSE BUILDING AND WALL SECTIONS 8 11
A-401 ENLARGED GROUND FLOOR PHARMACY PLANS AND SECTION DETAILS 9 11
A-501 MECHANICAL PENTHOUSE DETAILS 10 11
A-601 DOOR AND WINDOW SCHEDULES AND DETAILS 11 11
INTERIORS
I-101 GROUND FLOOR FINISH PLAN 1 1
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 3
FX101 GROUND FLOOR FIRE SUPPRESSION PLAN 2 3
FX102 ROOF FIRE SUPPRESSION PLAN 3 3
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 4
P-101 GROUND FLOOR PLUMBING PLAN 2 4
P-102 ROOF PLUMBING PLAN 3 4
P-501 PLUMBING DETAILS 4 4
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 11
MD101 GROUND FLOOR MECHANICAL DEMOLITION PLAN 2 11
MD102 ROOF MECHANICAL DEMOLITION PLAN 3 11
M-101 GROUND FLOOR MECHANICAL PLAN 4 11
M-102 GROUND FLOOR MECHANICAL DUCTWORK PLAN 5 11
M-103 ROOF MECHANICAL PLAN 6 11
M-501 MECHANICAL DETAILS 7 11
M-502 MECHANICAL DETAILS 8 11
M-503 MECHANICAL CONTROLS 9 11
M-504 MECHANICAL CONTROLS 10 11
M-601 MECHANICAL SCHEDULES 11 11
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 8
E-002 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 2 8
ED101 GROUND FLOOR ELECTRICAL DEMOLITION PLANS 3 8
EP101 GROUND FLOOR ELECTRICAL PLANS 4 8
EP102 FIRST FLOOR ELECTRICAL PLAN 5 8
EP103 PENTHOUSE ELECTRICAL PLANS 6 8
E-501 ELECTRICAL DETAILS 7 8
E-601 ELECTRICAL SINGLE LINES AND SCHEDULES 8 8
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 2
FA101 GROUND FLOOR AND PENTHOUSE FIRE ALARM PLANS 2 2
NN
Docusign Envelope ID: 10D15297-DAF2-437F-900C-353675C867E5
9/26/2024
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
BLDG - C
BLDG - B
BLDG - D
PARKING LOT-M
LOADING DOCK-A
PARKING
LOT-J
PARKING
LOT-J1
P A
R K
IN
G
L O
T -H
PARKING
LOT-I
PARKING
LOT-G
PARKING
LOT-F
LOADING
DOCK-B
PEDESTRIAN
BRIDGE
PUMP HOUSE
WATER
TANK
PARKING LOT-C
PARKING
LOT-B
VBA
PEDESTRIAN
BRIDGE
"NORTH ENTRANCE ENTER HERE"
CLAIRMONT ROAD
DECK - E
DECK - DDECK - F
DECK - K
DECK - L
BLDG - A
RESEARCH
BUILDING - 13
SITE PLAN GRAPHIC LEGEND
BLDG IN SCOPE
BLDG NOT IN SCOPE
BLDG
- M
OFFICE TRAILER
& DUMPSTER
LOCATIONS AT
PARKING LOT-C
DUMPSTER
LOCATION AT
LOADING DOCK-B
VERIFY WITH COR:
1. CONTRACTOR ACCESS AND MATERIAL DELIVERY ROUTE.
2. CONTRACTOR LAY DOWN AREAS.
3. CONTRACTOR VEHICLE PARKING LOCATIONS.
4. CRANE SCHEDULE AND LOCATION.
5. INTERNAL ROUTE TO PHARMACY.
6. DUMPSTER LOCATION.
7. WORKING HOURS AND DAYS OF THE WEEK.
GENERAL AREA OF WORK AT GROUND FLOOR
CRANE LOCATION
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:1
P
M
G-002
GENERAL INFORMATION
2 6OKM
HEPA FILTER INSTALLATION
PHARMACY CLEANROOM
SUITE
ATLANTA VA HEALTH CARE SYSTEM
1670 CLAIRMONT ROAD
DECATUR, GA 30033 SEPTEMBER 27, 2024
100% CONSTRUCTION DOCUMENTS
508-21-10720-384
BUILDING C
GTS
GENERAL SYMBOL LEGEND
Scale: No Scale
SITE PLAN
N
DESIGNER FIRM NAME LIC.# PHONE#
EXTERIOR WALLS -(PENTHOUSE):
ROOF/CEILING ASSEMBLY - (PENTHOUSE):
ENERGY SUMMARY
THERMAL ENVELOPE
METHOD OF COMPLIANCE
FLOOR OVER UNCONDITIONED SPACE
EXISTING BUILDING DATA (NFPA 220):
FIRE DISTRICT:
SPRINKLERS:
CONSTRUCTION TYPE:
LEAD DESIGN PROFESSIONALS:
FLOOR SLAB ON GRADE
WALLS BELOW GRADE STANDPIPES:
HAZARDOUS AREAS (NFPA 101 8.7 AND OCCUPANCY CHAPTER):
CLIMATE ZONE
LOW E REQUIRED, IF APPLICABLE
OPENINGS (WINDOWS OR DOORS WITH GLAZING)
R-VALUE OF INSULATION:
PROJECTION FACTOR
U-VALUE OF ASSEMBLY
SHADING COOEFFICIENT
U-VALUE OF TOTAL ASSEMBLY:
DOOR R-VALUES
TOTAL SQUARE FOOTAGE OF SKYLIGHTS IN EACH ASS'Y
SKYLIGHTS IN EACH ASSEMBLY:
R-VALUE OF INSULATION:
U-VALUE OF TOTAL ASSEMBLY:
U-VALUE OF SKYLIGHT
DESCRIPTION OF ASSEMBLY:
PRESCRIPTIVE (IECC) PERFORMANCE (COMCheck)
PRESCRIPTIVE (ASHRAE 90.1)
IV (2HH)
I (442)
III (211)
II (222)I (332)
III (200)
II (111)
V (111)
FIRE
PROTECTION:
STRUCTURAL:
MECHANICAL:
ELECTRICAL:
FIRE ALARM:
PLUMBING:
CODE ENFORCEMENT JURISDICTION:
ARCHITECTURAL:
OWNER OR
OWNED BY: FEDERAL CITY/COUNTY PRIVATE STATE
NAME OF PROJECT:
PROPOSED USE:
ADDRESS:
DESCRIPTION OF ASSEMBLY:
HORIZONTAL/VERTICAL REQUIREMENT
DESCRIPTION OF ASSEMBLY:
U-VALUE OF TOTAL ASSEMBLY:
R-VALUE OF INSULATION:
R-VALUE OF INSULATION:
U-VALUE OF TOTAL ASSEMBLY:
SLAB HEATED
DESCRIPTION OF ASSEMBLY:
U-VALUE OF TOTAL ASSEMBLY:
R-VALUE OF INSULATION:
NO NFPA 13YES NFPA 13R NFPA 13D
NO CLASSYES
NO YES
STATE
COUNTY
NFPA 13 NFPA 13R NFPA 13D
MECHANICAL SUMMARY - SEE MECHANICAL DRAWINGS
ELECTRICAL SUMMARY - SEE ELECTRICAL DRAWINGS
DESCRIPTION OF ASSEMBLY:
HEPA FILTER INSTALLATION PHARMACY CLEANROOM SUITE
ATLANTA VA HEALTH CARE SYSTEM
1670 CLAIRMONT ROAD DECATUR, GA ZIP CODE: 30033
HEALTHCARE
CITY
APOGEE CONSULTING GILLIAN SCOTT 16607 (919) 858-7420
APOGEE CONSULTING
NEW CONSTRUCTION ADDITION UPFIT
RECONSTRUCTION ALTERATION REPAIR RENOVATION
BOILER AND FUEL-FIRED HEATER ROOMS IN HEALTHCARE OCCUPANCY
CENTRAL/BULK LAUNDRIES OVER 100 SF IN HEALTHCARE OCCUPANCY
PAINT SHOPS IN HEALTHCARE OCCUPANCIES
PHYSICAL PLANT MAINTENANCE SHOPS IN HEALTHCARE OCCUPANCIES
SOILED LINEN ROOMS IN HEALTHCARE OCCUPANCY
WASTE COLLECTION ROOMS IN HEALTHCARE OCCUPANCY
STORAGE ROOM OVER 100 SF IN HEALTHCARE OCCUPANCY
LABORATORIES WITH FLAMMABLE/COMBUSTABLE MATERIALS (SMOKE PARTITION)
STORAGE ROOMS OVER 50 SF IN HEALTHCARE OCCUPANCY (SMOKE PARTITION)
MEDICAL GAS STORAGE
PERFORMANCE (ASHRAE 90.1)
3 4 5
STRUCTURAL DESIGN - SEE STRUCTURAL DRAWINGS
EMERGENCY LIGHTING:
EXIT SIGNS:
FIRE ALARM:
SMOKE DETECTION SYSTEMS:
PANIC HARDWARE:
LIFE SAFETY SYSTEM REQUIREMENTS
NO YES
NO YES
NO YES
NO YES
NO YES
PARTIAL
UNITED STATES DEPARTMENT OF VETERANS AFFAIRS
(919) 858-7420
FEDERAL DEPT OF VETERAN AFFAIRS
APOGEE CONSULTING (919) 858-7420
APOGEE CONSULTING SILAS GEORGE (919) 858-7420043181
APOGEE CONSULTING (919) 858-7420
APOGEE CONSULTING (919) 858-7420
HOSSEIN DORMOHAMMADI 052983
SCOPE TYPE:
II (000)
V (000)
AREAS WITH HAZARD GREATER THAN PRIMARY OCCUPANCY
COOKING FACILITIES
INTERIOR DESIGN: APOGEE CONSULTING (919) 858-7420
APOGEE CONSULTING (919) 858-7420
JOHN KEVIN MASON PA 085263
SILAS GEORGE 043181
SILAS GEORGE 043181
JOHN KEVIN MASON PA 085263
STRUCTURAL DESIGN
IMPORTANCE FACTORS:
DESIGN LOADS:
LIVE LOADS:
SNOW LOAD:
WIND LOAD:
SEISMIC DESIGN CATEGORY A
SEISMIC DESIGN CATEGORY B, C, & D
SEISMIC RISK CATEGORY
SPECTRAL RESPONSE ACCELERATION S %g S %g
SITE CLASSIFICATION
BASIC STRUCTURAL SYSTEM (CHECK ONE)
SEISMIC BASE SHEAR Vx= Vy=
ANALYSIS PROCEDURE
ARCHITECTURAL, MECHANICAL, COMPONENTS ANCHORED?
LATERAL DESIGN CONTROL:
SOIL BEARING CAPACITIES:
WIND (I W)
SNOW (I S)
SEISMIC (I E)
PENTHOUS ROOF
MEZZANINE
PENTHOUSE FLOOR
PSF
PSF
PSF
PSF
BASIC WIND SPEED
EXPOSURE CATEGORY
WIND BASE SHEARS Vx=
MPH (ASCE 7-10)
COMPLIANCE WITH SECTION 1616.4 ONLY? NOYES
PROVIDE THE FOLLOWING SEISMIC DESIGN PARAMETERS:
BEARING WALL
BUILDING FRAME
MOMENT FRAME
DUAL W/SPECIAL MOMENT FRAME
DUAL W/INTERMEDIATE R/C OR SPECIAL STEEL
INVERTED PENDULUM
S 1
EARTHQUAKE
FIELD TEST (PROVIDE COPY OF TEST REPORT)
PRESUMPTIVE BEARING CAPACITY
PILE SIZE, TYPE, AND CAPACITY
PSF
PSF
N/A
IV
25 9.4
D
YES
N/A
2,500
Vy=
WIND
EQUIVALENET LATERAL FORCE
N/A
1.5
N/A
B
8 KIPS 14 KIPS
GILLIAN SCOTT 16607
43.1.1 CLASSIFICATION OF REHABILITATION WORK RENOVATION
43.4.2 CAPACITY OF MEANS OF EGRESS. THIS PROJECT DOES NOT CHANGE OR ALTER
EXISTING OCCUPANT LOAD OR MEANS OF EGRESS. THE EGRESS CAPACITY SHALL HAVE
BEEN PREVIOUSLY APPROVED AS BEING ADEQUATE.
NFPA 101 - CHAPTER 43 BUILDING REHABILITATION:
PHARMACY RENOVATION DESIGNED, AND TO BE CONSTRUCTED AND TESTED TO ADHERE
TO USP 797/800 V. NOV 2022.
USP 797 & USP 800 (V. NOV 2022):
GENERAL/PHARMACY PHARMACY PENTHOUSE
NFPA 2021 CODE SUMMARY - ATLANTA VA HEALTH CARE SYSTEM
BUILDING DATA (NFPA 220):
FIRE DISTRICT:
SPRINKLERS:
CONSTRUCTION TYPE:
STANDPIPES:
IV (2HH)
I (442)
III (211)
II (222)I (332)
III (200)
II (111)
V (111)
NO NFPA 13YES NFPA 13R NFPA 13D
NO CLASSYES
NO YES
NFPA 13 NFPA 13R NFPA 13D
II (000)
V (000)
STANDING SEAM METAL ROOF WITH THERMAL
SPACER BLOCKS
N/A
N/A
STANDING SEAM METAL PANEL ON CONTINUOUS
RIGID INSULATION ON METAL STUDS
R-13 CI + R-13 BATT
R-25 CI
0.082
0.075
N/A
N/A
N/A
N/A
43.1.1 CLASSIFICATION OF REHABILITATION WORK
RENOVATION
43.4.2 CAPACITY OF MEANS OF EGRESS. THIS PROJECT
DOES NOT CHANGE OR ALTER EXISTING
OCCUPANT LOAD OR MEANS OF EGRESS. THE
EGRESS CAPACITY SHALL HAVE BEEN
PREVIOUSLY APPROVED AS BEING ADEQUATE.
NFPA 101 - CHAPTER 43
BUILDING REHABILITATION
PHARMACY RENOVATION DESIGNED, AND TO BE
CONSTRUCTED AND TESTEDTO ADHERE TO USP 797/800 V.
NOV 2022.
USP 797 & USP 800 (V. NOV 2022)
A. SEE STRUCTURAL DRAWINGS FOR FRAMING INFORMATION &
FRAMING DIMENSIONS. ALL DIMENSIONS ARE FOR
REFERENCE ONLY- VERIFY ALL FRAMING WITH STRUCTURAL
DRAWINGS.
B. REFER TO PLUMBING DRAWINGS FOR INFORMATION
CONCERNING PLUMBING FIXTURES AND PIPING SYSTEM(S).
C. REFER TO MECHANICAL DRAWINGS FOR INFORMATION
CONCERNING HVAC SYSTEM(S).
D. REFER TO ELECTRICAL DRAWINGS FOR INFORMATION
CONCERNING POWER, LIGHTING AND COMMUNICATION
SYSTEM(S).
E. REFER TO ELECTRICAL DRAWING FOR FIRE ALARM
NOTIFICATION AND EMERGENCY EGRESS LIGHTING
LOCATIONS.
F. REFER TO PARTITION TYPES FOR FURTHER FIRE
SEPARATION REQUIREMENTS.
G. CONTRACTOR TO PROVIDE ALL ADDITIONAL FRAMING
NECESSARY FOR ALL OPENINGS AND SUPPLEMENTAL
FRAMING ABOVE PARTITIONS.
H. ALL FIRE RATED ASSEMBLIES SHALL BE INSTALLED IN STRICT
ACCORDANCE WITH TESTED ASSEMBLIES INDICATED.
I. EXTEND FIRE RATED PARTITIONS, BARRIERS, AND OTHER
SEPARATIONS TO BOTTOM OF ROOF/FLOOR DECK ABOVE
(OR AS DIRECTED BY UL ASSEMBLY) AND TO EXTERIOR
WALL. SEAL JOINT BETWEEN EDGES OF PARTITION WITH
FIRE RATED SEALANT AND/OR INTUMESCENT ASSEMBLY.
J. ALL PENETRATIONS OF FIRE-RATED ASSEMBLIES SHALL BE
FIRE-SEALED IN ACCORDANCE WITH APPROVED
MANUFACTURER'S DETAIL FOR LOCATION, TYPE OF
CONSTRUCTION, PENETRATING ITEM AND RATING REQUIRED.
K. ALL DUCTWORK, DIFFUSERS AND GRILLES PENETRATING
FIRE-RATED WALLS, CEILINGS AND FLOORS SHALL HAVE THE
APPROPRIATE TYPE OF FIRE/SMOKE DAMPER IN
ACCORDANCE WITH THE TYPE OF CONSTRUCTION BEING
PENETRATED AND THE FIRE/SMOKE RATING REQUIRED.
L. ALL LIGHT FIXTURES AND ELECTRICAL DEVICES
PENETRATING FIRE-RATED ASSEMBLIES SHALL BE UL-LISTED
FOR INSTALLATION IN THE ASSEMBLY OR SHALL BE
INSTALLED SUCH THAT THE FIRE-RATING IS NOT
COMPROMISED.
M. SMOKE RESISTANT CONSTRUCTION SHALL MEET THE
REQUIREMENTS OF ALL APPLICABLE CODES. AREA SHALL BE
SEPARATED FROM THE REMAINDER OF THE BUILDING BE
CONSTRUCTION CAPABLE OF RESISTING THE PASSAGE OF
SMOKE. THE PARTITIONS SHALL EXTEND FROM THE FLOOR
TO THE UNDERSIDE OF THE FLOOR OR ROOF ASSEMBLY
ABOVE. DOORS SHALL BE SELF OR AUTOMATIC CLOSING.
DOORS SHALL NOT HAVE AIR TRANSFER OPENINGS AND
SHALL NOT BE UNDERCUT IN EXCESS OF CLEARANCE
PERMITTED WITH ACCORDANCE TO NFPA 80.
N. STORAGE OF ANY FLAMMABLE OR COMBUSTIBLE LIQUIDS IS
UNDERSTOOD TO NOT BE WITHIN THE BUILDING. STORAGE
OF ANY MATERIAL IS TO BE IN COMPLIANCE WITH ALL
APPLICABLE CODES AND AUTHORITIES HAVING
JURISDICTION.
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:1
P
M
G-003
CODE SUMMARY - NFPA
3 6DC
HEPA FILTER INSTALLATION
PHARMACY CLEANROOM
SUITE
ATLANTA VA HEALTH CARE SYSTEM
1670 CLAIRMONT ROAD
DECATUR, GA 30033 SEPTEMBER 27, 2024
100% CONSTRUCTION DOCUMENTS
508-21-10720-384
BUILDING C
GTS
LIFE SAFETY GENERAL NOTES
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
ILSM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
[ATLANTA PHARMACY RENOVATION]
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION
FOR THIS PROJECT ARE LEVELS II AND V FOR THE CLASS OF PRECAUTIONS OR
LEVEL OF INFECTION CONTROL ACTIVITIES. HARD SURFACE BARRIERS SHALL
BE USED EXCEPT IN THE AREA INDICATED ON THE PHASING PLAN WITH
PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK AREA AS
LONG AS THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.
2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES
(PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR THE
PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM. THEY
SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND LEAVING THE
CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE
MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS.
ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE
CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PHASE,
DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF
DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN
PLACE BEFORE REMOVAL OF A PERMANENT BARRIER. [AFTER EACH PHASE,
PERFORM TASKS STATED IN CONTAMINATION OF PATIENT ROOMS, SUPPLIES,
EQUIPMENT AND RELATED AREAS NOTE 2.
3. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER ENTRANCE
SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS
NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS INTO ADJACENT
CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
1. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE
DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS; DESIGNATED
ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND ONLY
AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE
CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY
FROM THE CONSTRUCTION AREA AND MATERIALS.
3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION
MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED; THE
NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND THE
CONSTRUCTION STAGING/PREP AREA.
4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY
FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE
MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT
DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL BE REMOVED DAILY
AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT
DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED
NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE
SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE
BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR
SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE COR.
5. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION
FROM ANY ADJACENT EXCAVATION DEBRIS.
6. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS SHALL BE
COVERED AND PROTECTED PRIOR STARTING EACH CONSTRUCTION PHASE.
VENTILATION AND ENVIRONMENTAL CONTROLS
1. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE CONTRACTOR
WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-
CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS COVERED AS
NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO
DIRTY AREAS.
2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE
NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION
OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE
SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL PASS AIR THROUGH
AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION
RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR
DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED
INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE
USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.
3. FOR EXHAUST DUCT ROUTING THRU CORRIDOR: INSTALL HARD DUCT WITH
NON-FLANGE HANGER HUNG FROM CEILING ABOVE, BOTTOM OF DUCT SHALL
BE A MINIMUM OF 7'-2" A.F.F.
4. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT
CEILING SHALL BE VERIFIED DAILY.
5. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND
CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS
NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-
CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA
ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE PROJECT
IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS
1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE
OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF
PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR AND
HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE DUST
FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL
IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM
FOR CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA. ALL
EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED THROUGH
OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY
VACUUMING AND WET WIPING BEFORE THEIR REMOVAL FROM THE
CONSTRUCTION ZONE OR WORK AREA.
2. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC
ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS
STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS DISEASE
CONTROL HAS INSPECTED AND APPROVED THE CLEANING.
ICRA NOTES
IIILOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 V
V
IV
V
IV
III
IV
II
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects Includes, but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
• Removal of preexisting floor covering, walls, casework or other building components.
• New drywall placement.
• Renovation work in a single room.
• Nonexisting cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Inspection and Non-Invasive Activities Includes, but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
• Physical Therapy
• Radiology departments
• All patient waiting rooms
• All outpatient clinics
• Research Areas
• Respiratory Therapy
• Office areas (non-clinical)
• FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
• Emergency Room
• Clinical Laboratories (specimen)
• Same Day Surgery
• Pharmacy
• Nutrition and Food
Service/Canteen
• Procedural Areas (GI)
• Inpatient Mental Health
• Any area caring for immunocompromised patients
• Cardiac Cath Lab/IR
• Central Sterile Supply
• Sterile Processing Service
• Intensive Care Units
IIII
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
During Construction Project Upon Completion of Project
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
14. Contain all trash and debris in the work area.
15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
16. Worker clothing must be clean and free of visible dust before leaving the work area.
HEPA vacuuming of clothing or use of cover suites is acceptable.
17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
• Medical/Surgical Units
• Negative pressure isolation rooms
• Outpatient Chemotherapy
Areas
• Operating rooms
• Post Anesthesia Care Unit
• Dialysis
• Dental
C
LA
S S
V
1. Includes all activities required by Class IV
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
7. Personnel will be required to wear coveralls at all times during Class V work activities.
Coveralls must be removed before leaving the anteroom.
8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
15. Contain all trash and debris in the work area.
16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).
Damaged shoe covers must be immediately changed.
19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project
C
LA
S S
I
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Upon Completion of Project
1. Execute work by methods to minimize raising dust from construction operations.
2. Perform noninvasive work activity as to not block or interrupt patient care.
3. Perform noninvasive work activities in areas that are not directly occupied with patients.
4. Perform noninvasive work activity in a manner that does not create dust.
5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
C
LA
S S
II
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
1. Includes all activities required by Class I
2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
4. This Class of Precautions must never be used for construction or renovation activities.
5. Provide active means to prevent airborne dust from dispersing into atmosphere.
6. Water mist work surfaces to control dust while cutting.
7. Seal unused doors with duct tape.
8. Block off and seal air vents.
9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
C
LA
S S
II
I
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Provide active means to prevent airborne dust dispersion into the occupied areas.
4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
7. If work area is contained, then it must be neutrally to negatively pressurized at all times.
8. Seal all doors with tape that will not leave residue.
9. Contain all trash and debris in the work area.
10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.
For Type C activities, follow procedures for Class IV.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
SEE SHEETS G-101 AND G-102 FOR LOCATIONS
FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET
(ILSM MAY REQUIRE MORE
THAN ONE).
PROVIDE STICKY MATS
(CHANGED END OF SHIFT OR
MORE IF NECESSARY TO
MAINTAIN CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
BARRIER WALLS TO
BE TYPE A
FLEX DUCT
POST ICRA, ILSM, FIRE
INSPECTION SHEETS VISIBLE
TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
EXIST WALL
A S
D E
T E
R M
IN
E
D I N
F
IE
L D
ISOLATE AND COVER ALL
SUPPLY DIFFUSERS NOT IN
OPERATION DURING PROJECT -
COORDINATE W/ COR.
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS
G-004 _____ 4
G-004
EXHAUST LOCATION -
SEE NOTE A
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
NOTE:
A. TURN UP EXHAUST ON EXTERIOR ON SIDE.
CONTRACTOR SHALL VERIFY LOCATION OF AIR
INTAKES ARE AT THE PROPER DISTANCE FROM
EXHAUST. VERIFY LOCAL JURISDICTION CODE
AND VA REQUIREMENTS FOR DISTANCE PRIOR
TO STARTING WORK.
A P
P R
O X
A .F
.F
CEILING
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
UNDERSIDE OF
STRUCTURE ABOVE
ICRA ENCLOSURE TO
UNDERSIDE OF
STRUCTURE ABOVE
WITH DOOR
HEPA NEGATIVE AIR UNIT
FINISHED FLOORING TO BE
KEPT CLEAN. FLOORS NOT
BEING REPLACED MUST
BE PROTECTED. COVER
WITH CONSTRUCTION
GRADE TEMPORARY
FLOOR PROTECTION.
RUN EXHAUST AIR TO
EXTERIOR OR VA
APPROVED LOCATION
PROVIDE SINGLE USE
DAMPER IN HEPA UNIT
DUCT WHERE DUCT
PENETRATES A RATED
WALL. DAMPER TO
MATCH RATING OF
WALL, NOT LESS THAN
1 HR
EXISTING CEILING
VERIFY HEIGHT
BARRIER TYPE A
A 1-HR RATED
U.L. DESIGN NO. U419
B PLASTIC SHEET BARRIER
NON RATED
PLASTIC SHEET
BARRIER
EXISTING WALL
ASSEMBLY
EXISTING CEILING
BOTTOM SEALING
RUNNER
TOP SEALING
RUNNER
SUPPORT POLES,
QUANTITY PER
MANUF.
RECOMMENDATIONS
REQU.
AS
3 5/8" INSULATED WALL WITH
METAL STUDS @ 16" O.C.
WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
5"
FIRE RESISTANT SEALANT,
BOTH SIDES
5/8" GYPSUM BOARD - BOTH
SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
5"
3 5/8" METAL STUDS @ 16"
O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
SEALANT, BOTH SIDES
NON RATEDC
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:1
P
M
G-004
ICRA INFORMATION AND DETAILS
4 6OKM
HEPA FILTER INSTALLATION
PHARMACY CLEANROOM
SUITE
ATLANTA VA HEALTH CARE SYSTEM
1670 CLAIRMONT ROAD
DECATUR, GA 30033 SEPTEMBER 27, 2024
100% CONSTRUCTION DOCUMENTS
508-21-10720-384
BUILDING C
GTS
Scale: No Scale
ILSM CONSTRUCTION EGRESS SIGNAGE
Scale: No Scale
TYPICAL ICRA RATED ENCLOSURE
Scale: No Scale
ROOM ELEVATION
Scale: No Scale
CROSS SECTION 'A'
Scale: No Scale
ICRA BARRIER WALL TYPES
C-1C-1C-1
U P
RAMP UP
RAMP UP
DN
UP DN
DN
UP
DN
DN
DN
U P
RAMP UP
RAMP UP
DN
UP DN
DN
UP
DN
DN
DN
U P
RAMP UP
RAMP UP
DN
UP DN
DN
UP
DN
DN
DN
R O L L
IN
G
S H U T T E R
R O L L
IN
G
S H U T T E R
R O L L
IN
G
S H U T T E R
R O L L
IN
G
S H U T T E R
R O L L
IN
G
S H U T T E R
R O L L
IN
G
S H U T T E R
TO UPPER
FLOORS
CONSTRUCTION ACCESS DISTANCE = 407'-0"
DESIGNATED
ELEVATOR #P-3
LOADING DOCK
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE BARRIER
2 HR - FIRE BARRIER
SMOKE RESISTIVE HAZARDOUS AREA/
20 MIN.
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:2
:1
P
M
G-101
GROUND FLOOR CONSTRUCTION
ACCESS PLAN
5 6OKM
HEPA FILTER INSTALLATION
PHARMACY CLEANROOM
SUITE
ATLANTA VA HEALTH CARE SYSTEM
1670 CLAIRMONT ROAD
DECATUR, GA 30033 SEPTEMBER 27, 2024
100% CONSTRUCTION DOCUMENTS
508-21-10720-384
BUILDING C
GTS
Scale: 1/16" = 1'-0"
GROUND FLOOR CONSTRUCTION ACCESS PLAN
AREA OF WORK
N
AREA OF WORK
KEY PLAN
NO SCALE
A. CONTRACTOR TO COORDINATE PARKING AND
EXTERIOR STAGING WITH VA COR.
B. CONSTRUCTION ROUTE ACCESS PATH SHOWN AS AN
OPTION FOR REFERENCE ONLY. FINAL PATH
SEQUENCE AND SCHEDULE TO BE COORDINATED
WITH VA COR PRIOR TO CONSTRUCTION AND
EQUIPMENT DELIVERIES.
C. COORDINATE ALL SHUTDOWNS WITH VA COR TWO
WEEKS IN ADVANCE AND CONFIRM 48 HOURS PRIOR
TO WORK.
D. CONTRACTOR TO ENSURE ALL TEMPORARY ICRA
BARRIERS TO PROVIDE ALL NECESSARY
CLEARANCES THROUGHOUT CONSTRUCTION.
CONSTRUCTION TYPE D, RISK GROUP IV
N O
R T H0 8 16 32
CONSTRUCTION TYPE B, RISK GROUP I
(INSIDE PHARMACY CONSTRUCTION)
(OUTSIDE PHARMACY CONSTRUCTION)
AHU-11
RECEPTION
CONFERENCE
2C266
2C286A
2C265
OFFICE
ELEC.
WAITING
ON-CALL
ON-CALL
TLT
TLT
STORAGE
CONFERENCE
OFFICE
PATIENT RM.
PATIENT RM. PATIENT RM.
PATIENT RM.
PATIENT RM.
PATIENT RM.
PATIENT RM.
PATIENT RM.
PATIENT RM.PATIENT RM.PATIENT RM.PATIENT RM.CLEAN
SOILED
CLEAN
MEDS
OFFICE
LOUNGE
SIGNAL
OFFICE
ELEC.
STORAGE
ELEC.
SIG.
H.K.
TLT(MEN)
TLT(WOMEN)
O.R. 1
PHARM.
DARK RM.
ELEC.
MECH. RM.
LINENHAC
STORAGE
BLOOD BANK
TLT. TLT.
LAB WAITING
PROCESSING
DATA PROCESSING
BLOOD/SPECIMEN
DOOR OPER.
PAD
2C104
2C101 2C103
2C129
2C127
2C171
2C184
2C185
2C180
2C200
2C220
2C221
2C225
2C172
2C170
2C267
2C268
2C250
2C290
2C288
2C286
2C252 2C251
2C253
2C286B
2C254
2C224
2C264
2C263
2C282 2C261 2C260
2C255
2C257
2C256
2C259 2C258
DN
2B161
2B170C
2B162
2B164
2B160
2B170D
BLOOD BANK
2B168
2B170D
2B171B
2B170B
STORAGE
2B171A
OFFICE
2B170A
SPECIAL CHEMISTRY
MECHANICAL
2B175
ELECT.
FLOW CYTOMETRY
2B163B
2B163
2B167
2B165 2B166 COMM.
RECEPTION/
2B102
OFFICE
EXAM/
2B103D
TLT CONTROL
2B103E
2B218
2B216 PRINTERS
2B103
OFFICE
CYTOLOGY STAINING
2B214
2B217
OFFICE
MICROSCOPE
2B219
2B212
SIGNAL CLS.
2B169
CHEMISTRY LAB
2B170
CONFERENCE
2B227
2B224
STORAGE
2B223
HEMATOLOGY
SPECIAL
STORAGE
2B172
2B173
ELECT.
2B188
SIGNAL
2B223
COOLER
TLT(MEN)
2B187
HISTOLOGY
2B226
HISTOLOGY
2B222
2B199A
HISTOLOGY
2B199B
DARK ROOMFILM PROC.
2B221
HISTOLOGY
2B201
HISTOLOGY
2B199
MICROSCOPE
2B186A
CYTOLOGY
OFFICE
2B190
2B186
MICROSCOPE
STORAGE
2B184F
2B191
PCR
STORAGE
2B180
HEMATOLOGY
2B174
TLT(FEMALE)
2B185
LOUNGE
2B183
SIGNAL CLS.
2B179
HAC
ELECT.
2B181
2B179A
FLAMMABLE STORAGE
2B176 OFFICE
2B178
2B 4E
M
IC
RO
SC
O
PE
PREP AREA
2B182
MICROBIOLOGY
2B184
STERILIZER
2B182A MYCOBACTORIA
2B184A
F.E.C.
F.E.C.
F.E.C.
U P
DN
FD
FD
FD
DN UP
2B163A
2B103A
WAITING
O.H.
EXISTING EXHAUST
DUCT ENCLOSURE
DN
DN
STAIR 6
ELEV P-9
ELEV P-8
ELEV S-7
STAIR 5
FEC
FEC
ALTERNATING
TREAD STAIR TO
ROOF HATCH
FEC
S S
S S
S
S
SS
S S
S
S S
S
SSS
S S
OPENING AT SLAB (TYP)
AREA OF WORK
AREA OF WORK
AREA OF WORK
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE BARRIER
2 HR - FIRE BARRIER
SMOKE RESISTIVE HAZARDOUS AREA/
20 MIN.
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:2
:1
P
M
G-102
SECOND AND THIRD FLOOR
CONSTRUCTION ACCESS PLANS
6 6OKM
HEPA FILTER INSTALLATION
PHARMACY CLEANROOM
SUITE
ATLANTA VA HEALTH CARE SYSTEM
1670 CLAIRMONT ROAD
DECATUR, GA 30033 SEPTEMBER 27, 2024
100% CONSTRUCTION DOCUMENTS
508-21-10720-384
BUILDING C
GTS
Scale: 1/16" = 1'-0"
SECOND FLOOR CONSTRUCTION ACCESS PLAN
Scale: 1/16" = 1'-0"
THIRD FLOOR CONSTRUCTION ACCESS PLAN
Scale: 1/16" = 1'-0"
THIRD FLOOR ROOF CONSTRUCTION ACCESS PLAN
N
AREA OF WORK
KEY PLAN
NO SCALE
CONSTRUCTION TYPE B, RISK GROUP I
ICRA NOT REQUIRED FOR EXTERIOR WORK
A. CONTRACTOR TO COORDINATE PARKING AND
EXTERIOR STAGING WITH VA COR.
B. CONSTRUCTION ROUTE ACCESS PATH SHOWN AS
AN OPTION FOR REFERENCE ONLY. FINAL PATH
SEQUENCE AND SCHEDULE TO BE COORDINATED
WITH VA COR PRIOR TO CONSTRUCTION AND
EQUIPMENT DELIVERIES.
C. COORDINATE ALL SHUTDOWNS WITH VA COR TWO
WEEKS IN ADVANCE AND CONFIRM 48 HOURS
PRIOR TO WORK.
D. CONTRACTOR TO ENSURE ALL TEMPORARY ICRA
BARRIERS TO PROVIDE ALL NECESSARY
CLEARANCES THROUGHOUT CONSTRUCTION.
N O
R T H0 8 16 32
N O
R T H0 8 16 32
N O
R T H0 8 16 32
(CORRIDORS AND ELECTRICAL ROOMS)
ICRA NOT REQUIRED FOR EXTERIOR WORK
MARK STUD SIZE SPACING NOTES
NOTES:
1.) SEE "TYPICAL METAL STUD WALL CONSTRUCTION" DETAIL 4/S-201
FOR ADDITIONAL REQUIREMENTS.
600S162-43 (18Ga) 16" o.c. 1W1
W2
BLOCKING
48" o.c.
BRIDGING/
362S162-43 (18Ga) 16" o.c. 48" o.c.
WALL SCHEDULE
NOTES:
1.) ALL HEADERS 16Ga. (54mils) AND THICKER TO BE 50ksi MINIMUM.
2.) PUNCHED HOLES IN HEADERS IS NOT PERMITTED.
3.) JAMB STUDS TO BE FULL HEIGHT. JACK STUDS UNDER HEADERS NOT REQUIRED w/ TSN "STIFFCLIP HE" CONNECTORS.
SEE DETAIL 4/S-301 FOR TSN "STIFFCLIP HE" DETAILS. REFER TO MANUFACTURER'S WRITTEN INSTRUCTIONS FOR
INSTALLATION PROCEDURES.
4.) SEE BELOW FOR CONFIGURATION TYPES.
MARK
MEMBERS
HEADER
H1
MAX SPAN
6'-0
SILL
CONNECTIONS
HEADER SILL
2 ~ 600S162-43 w/ 2 ~ 600T125-43 TRACK
600T125-43
SIZE MAX SPANSIZE
TYPE
H4
CONFIG.
TYPE
CONFIG.
6'-0 S1
JAMB STUDS
MAX HEIGHTSIZE
TYPE
CONFIG.
12'-0 J32 ~ 600S162-43 w/ ONE ~ 600T125-43 TRACK
4B/S-3014A/S-301
METAL STUD WALL OPENING SCHEDULE
(TYP)
#12 SCREWS EA. FLANGE
@ 16" o.c.
TOP & BOTT.
SEE SCHEDULE
O P
E N
IN
G
#12 SCREWS EA. STUD
(TYP)
OPENING
#12 SCREWS EA. FLANGE
(TYP)
2 ~ #12 SCREWS
@ 16" o.c.
@ 16" o.c. (VERTICAL SPACING)
SEE SCHEDULE
SEE SCHEDULE
O P
E N
IN
G
(TYP)
#12 SCREWS EA. FLANGE
EA. STUD
WALL
HEADER TYPE "H4" JAMB STUD TYPE "J3"
SILL
SILL TYPE "S1"
WALL
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
B/O BOTTOM OF
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CMU CONCRETE MASONRY UNIT
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CTR CENTER(ED)
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEV ELEVATOR
EOD EDGE OF DECK
EOS EDGE OF SLAB
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
FD FLOOR DRAIN
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FDN FOUNDATION
FIN FINISH
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
HOR HORIZONTAL
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INT INTERIOR
JT JOINT
LB(S) POUND(S)
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MIN MINIMUM
MISC MISCELLANEOUS
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PT PRESSURE TREATED
PL PLATE
PLYWD PLYWOOD
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
S SOUTH
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
T&G TONGUE AND GROOVE
T/O TOP OF
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VIF VERIFY IN FIELD
W WEST
W/ WITH
W/O WITHOUT
WWF WELDED WIRE FABRIC
WT WEIGHT
CL
WALL SECTION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
VIEW NORTH ARROW
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
S8.1
S8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
S8.1
S8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
S8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
TYPICAL KEYNOTE# MOMENT CONNECTION
GENERAL CONSTRUCTION SPECIFICATION
1. THE FOLLOWING DOCUMENTS ARE THE PROPERTY OF APOGEE CONSULTING GROUP. FOR USE SOLELY FOR THIS PROJECT AND SHALL NOT BE REPRODUCED, COPIED, OR USED FOR OTHER PURPOSES WITHOUT
WRITTEN PERMISSION FROM APOGEE CONSULTING GROUP.
2. NO OTHER PARTY MAY REVISE, ALTER, OR DELETE THESE CONSTRUCTION DOCUMENTS WITHOUT WRITTEN
PERMISSION FROM APOGEE CONSULTING GROUP.
3. THIS STRUCTURE IS ONLY STABLE IN ITS COMPLETED FORM. THE CONTRACTOR SHALL PROVIDE ALL REQUIRED TEMPORARY BRACING DURING CONSTRUCTION TO STABILIZE THE STRUCTURE. TEMPORARY SHORING AND BRACING METHODS ARE NOT THE RESPONSIBILITY OF APOGEE CONSULTING GROUP AND ARE
BEYOND THE SCOPE OF THESE DRAWINGS.
4. THE SER IS NOT RESPONSIBLE FOR CONSTRUCTION SEQUENCES, METHODS, OR TECHNIQUES IN CONNECTION WITH THE CONSTRUCTION OF THIS STRUCTURE.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .