Attachment 8 - Construction Drawings 508-25-107.pdf

PDF 13 MB Posted

Attached to
Y1DA--508-21-107 | Inpatient Pharmacy IV Compounding Room
Solicitation number
36C24725R0046
Issued by

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

/2

/2

:2

:1

P

M C

U s e rs

\g s c o tt \D o c u m e n ts

\A

-3

-V

A A tl a n ta

H E

P A

R g s c o tt a c g -p a .c o m

.r v t

G-001

COVER

1 6OKM

HEPA FILTER INSTALLATION

PHARMACY CLEANROOM

SUITE

ATLANTA VA HEALTH CARE SYSTEM

1670 CLAIRMONT ROAD

DECATUR, GA 30033 SEPTEMBER 27, 2024

100% CONSTRUCTION DOCUMENTS

508-21-10720-384

BUILDING C

HEPA FILTER INSTALLATION PHARMACY

CLEANROOM SUITE

ATLANTA VA HEALTH CARE SYSTEM

1670 CLAIRMONT ROAD

DECATUR, GA 30033

VA PROJECT #: 508-21-107

GTS

DRAWING LIST

GENERAL

G-001 COVER 1 6

G-002 GENERAL INFORMATION 2 6

G-003 CODE SUMMARY - NFPA 3 6

G-004 ICRA INFORMATION AND DETAILS 4 6

G-101 GROUND FLOOR CONSTRUCTION ACCESS PLAN 5 6

G-102 SECOND AND THIRD FLOOR CONSTRUCTION ACCESS PLANS 6 6

STRUCTURAL

S-001 STRUCTURAL SYMBOLS, ABBREVIATIONS, SCHEDULES, AND NOTES 1 5

S-101 ROOF PLAN (PENTHOUSE CRAWLSPACE) & PLATFORM FRAMING PLAN 2 5

S-102 PLATFORM WALL FRAMING PLAN & PLATFORM ROOF FRAMING PLAN 3 5

S-201 SECTIONS & TYPICAL METAL STUD ELEVATION 4 5

S-301 STRUCTURAL DETAILS 5 5

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 11

AD101 GROUND FLOOR DEMOLITION PLAN AND REFLECTED CEILING PLAN 2 11

AD102 FIRST FLOOR ROOF DEMOLITION PLAN (SECOND FLOOR) 3 11

A-101 GROUND FLOOR PHARMACY PLANS 4 11

A-102 FIRST FLOOR ROOF PLAN (SECOND FLOOR) 5 11

A-103 MECHANICAL PENTHOUSE PLANS (SECOND FLOOR) 6 11

A-201 MECHANICAL PENTHOUSE EXTERIOR ELEVATIONS 7 11

A-301 MECHANICAL PENTHOUSE BUILDING AND WALL SECTIONS 8 11

A-401 ENLARGED GROUND FLOOR PHARMACY PLANS AND SECTION DETAILS 9 11

A-501 MECHANICAL PENTHOUSE DETAILS 10 11

A-601 DOOR AND WINDOW SCHEDULES AND DETAILS 11 11

INTERIORS

I-101 GROUND FLOOR FINISH PLAN 1 1

FIRE SUPPRESSION

FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 3

FX101 GROUND FLOOR FIRE SUPPRESSION PLAN 2 3

FX102 ROOF FIRE SUPPRESSION PLAN 3 3

PLUMBING

P-001 PLUMBING GENERAL INFORMATION 1 4

P-101 GROUND FLOOR PLUMBING PLAN 2 4

P-102 ROOF PLUMBING PLAN 3 4

P-501 PLUMBING DETAILS 4 4

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 11

MD101 GROUND FLOOR MECHANICAL DEMOLITION PLAN 2 11

MD102 ROOF MECHANICAL DEMOLITION PLAN 3 11

M-101 GROUND FLOOR MECHANICAL PLAN 4 11

M-102 GROUND FLOOR MECHANICAL DUCTWORK PLAN 5 11

M-103 ROOF MECHANICAL PLAN 6 11

M-501 MECHANICAL DETAILS 7 11

M-502 MECHANICAL DETAILS 8 11

M-503 MECHANICAL CONTROLS 9 11

M-504 MECHANICAL CONTROLS 10 11

M-601 MECHANICAL SCHEDULES 11 11

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 8

E-002 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 2 8

ED101 GROUND FLOOR ELECTRICAL DEMOLITION PLANS 3 8

EP101 GROUND FLOOR ELECTRICAL PLANS 4 8

EP102 FIRST FLOOR ELECTRICAL PLAN 5 8

EP103 PENTHOUSE ELECTRICAL PLANS 6 8

E-501 ELECTRICAL DETAILS 7 8

E-601 ELECTRICAL SINGLE LINES AND SCHEDULES 8 8

FIRE ALARM

FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 2

FA101 GROUND FLOOR AND PENTHOUSE FIRE ALARM PLANS 2 2

NN

Docusign Envelope ID: 10D15297-DAF2-437F-900C-353675C867E5

9/26/2024

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

VIEW NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTHNORTH

0 4 8 16

BLDG - C

BLDG - B

BLDG - D

PARKING LOT-M

LOADING DOCK-A

PARKING

LOT-J

PARKING

LOT-J1

P A

R K

IN

G

L O

T -H

PARKING

LOT-I

PARKING

LOT-G

PARKING

LOT-F

LOADING

DOCK-B

PEDESTRIAN

BRIDGE

PUMP HOUSE

WATER

TANK

PARKING LOT-C

PARKING

LOT-B

VBA

PEDESTRIAN

BRIDGE

"NORTH ENTRANCE ENTER HERE"

CLAIRMONT ROAD

DECK - E

DECK - DDECK - F

DECK - K

DECK - L

BLDG - A

RESEARCH

BUILDING - 13

SITE PLAN GRAPHIC LEGEND

BLDG IN SCOPE

BLDG NOT IN SCOPE

BLDG

- M

OFFICE TRAILER

& DUMPSTER

LOCATIONS AT

PARKING LOT-C

DUMPSTER

LOCATION AT

LOADING DOCK-B

VERIFY WITH COR:

1. CONTRACTOR ACCESS AND MATERIAL DELIVERY ROUTE.

2. CONTRACTOR LAY DOWN AREAS.

3. CONTRACTOR VEHICLE PARKING LOCATIONS.

4. CRANE SCHEDULE AND LOCATION.

5. INTERNAL ROUTE TO PHARMACY.

6. DUMPSTER LOCATION.

7. WORKING HOURS AND DAYS OF THE WEEK.

GENERAL AREA OF WORK AT GROUND FLOOR

CRANE LOCATION

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:1

P

M

G-002

GENERAL INFORMATION

2 6OKM

HEPA FILTER INSTALLATION

PHARMACY CLEANROOM

SUITE

ATLANTA VA HEALTH CARE SYSTEM

1670 CLAIRMONT ROAD

DECATUR, GA 30033 SEPTEMBER 27, 2024

100% CONSTRUCTION DOCUMENTS

508-21-10720-384

BUILDING C

GTS

GENERAL SYMBOL LEGEND

Scale: No Scale

SITE PLAN

N

DESIGNER FIRM NAME LIC.# PHONE#

EXTERIOR WALLS -(PENTHOUSE):

ROOF/CEILING ASSEMBLY - (PENTHOUSE):

ENERGY SUMMARY

THERMAL ENVELOPE

METHOD OF COMPLIANCE

FLOOR OVER UNCONDITIONED SPACE

EXISTING BUILDING DATA (NFPA 220):

FIRE DISTRICT:

SPRINKLERS:

CONSTRUCTION TYPE:

LEAD DESIGN PROFESSIONALS:

FLOOR SLAB ON GRADE

WALLS BELOW GRADE STANDPIPES:

HAZARDOUS AREAS (NFPA 101 8.7 AND OCCUPANCY CHAPTER):

CLIMATE ZONE

LOW E REQUIRED, IF APPLICABLE

OPENINGS (WINDOWS OR DOORS WITH GLAZING)

R-VALUE OF INSULATION:

PROJECTION FACTOR

U-VALUE OF ASSEMBLY

SHADING COOEFFICIENT

U-VALUE OF TOTAL ASSEMBLY:

DOOR R-VALUES

TOTAL SQUARE FOOTAGE OF SKYLIGHTS IN EACH ASS'Y

SKYLIGHTS IN EACH ASSEMBLY:

R-VALUE OF INSULATION:

U-VALUE OF TOTAL ASSEMBLY:

U-VALUE OF SKYLIGHT

DESCRIPTION OF ASSEMBLY:

PRESCRIPTIVE (IECC) PERFORMANCE (COMCheck)

PRESCRIPTIVE (ASHRAE 90.1)

IV (2HH)

I (442)

III (211)

II (222)I (332)

III (200)

II (111)

V (111)

FIRE

PROTECTION:

STRUCTURAL:

MECHANICAL:

ELECTRICAL:

FIRE ALARM:

PLUMBING:

CODE ENFORCEMENT JURISDICTION:

ARCHITECTURAL:

OWNER OR

OWNED BY: FEDERAL CITY/COUNTY PRIVATE STATE

NAME OF PROJECT:

PROPOSED USE:

ADDRESS:

DESCRIPTION OF ASSEMBLY:

HORIZONTAL/VERTICAL REQUIREMENT

DESCRIPTION OF ASSEMBLY:

U-VALUE OF TOTAL ASSEMBLY:

R-VALUE OF INSULATION:

R-VALUE OF INSULATION:

U-VALUE OF TOTAL ASSEMBLY:

SLAB HEATED

DESCRIPTION OF ASSEMBLY:

U-VALUE OF TOTAL ASSEMBLY:

R-VALUE OF INSULATION:

NO NFPA 13YES NFPA 13R NFPA 13D

NO CLASSYES

NO YES

STATE

COUNTY

NFPA 13 NFPA 13R NFPA 13D

MECHANICAL SUMMARY - SEE MECHANICAL DRAWINGS

ELECTRICAL SUMMARY - SEE ELECTRICAL DRAWINGS

DESCRIPTION OF ASSEMBLY:

HEPA FILTER INSTALLATION PHARMACY CLEANROOM SUITE

ATLANTA VA HEALTH CARE SYSTEM

1670 CLAIRMONT ROAD DECATUR, GA ZIP CODE: 30033

HEALTHCARE

CITY

APOGEE CONSULTING GILLIAN SCOTT 16607 (919) 858-7420

APOGEE CONSULTING

NEW CONSTRUCTION ADDITION UPFIT

RECONSTRUCTION ALTERATION REPAIR RENOVATION

BOILER AND FUEL-FIRED HEATER ROOMS IN HEALTHCARE OCCUPANCY

CENTRAL/BULK LAUNDRIES OVER 100 SF IN HEALTHCARE OCCUPANCY

PAINT SHOPS IN HEALTHCARE OCCUPANCIES

PHYSICAL PLANT MAINTENANCE SHOPS IN HEALTHCARE OCCUPANCIES

SOILED LINEN ROOMS IN HEALTHCARE OCCUPANCY

WASTE COLLECTION ROOMS IN HEALTHCARE OCCUPANCY

STORAGE ROOM OVER 100 SF IN HEALTHCARE OCCUPANCY

LABORATORIES WITH FLAMMABLE/COMBUSTABLE MATERIALS (SMOKE PARTITION)

STORAGE ROOMS OVER 50 SF IN HEALTHCARE OCCUPANCY (SMOKE PARTITION)

MEDICAL GAS STORAGE

PERFORMANCE (ASHRAE 90.1)

3 4 5

STRUCTURAL DESIGN - SEE STRUCTURAL DRAWINGS

EMERGENCY LIGHTING:

EXIT SIGNS:

FIRE ALARM:

SMOKE DETECTION SYSTEMS:

PANIC HARDWARE:

LIFE SAFETY SYSTEM REQUIREMENTS

NO YES

NO YES

NO YES

NO YES

NO YES

PARTIAL

UNITED STATES DEPARTMENT OF VETERANS AFFAIRS

(919) 858-7420

FEDERAL DEPT OF VETERAN AFFAIRS

APOGEE CONSULTING (919) 858-7420

APOGEE CONSULTING SILAS GEORGE (919) 858-7420043181

APOGEE CONSULTING (919) 858-7420

APOGEE CONSULTING (919) 858-7420

HOSSEIN DORMOHAMMADI 052983

SCOPE TYPE:

II (000)

V (000)

AREAS WITH HAZARD GREATER THAN PRIMARY OCCUPANCY

COOKING FACILITIES

INTERIOR DESIGN: APOGEE CONSULTING (919) 858-7420

APOGEE CONSULTING (919) 858-7420

JOHN KEVIN MASON PA 085263

SILAS GEORGE 043181

SILAS GEORGE 043181

JOHN KEVIN MASON PA 085263

STRUCTURAL DESIGN

IMPORTANCE FACTORS:

DESIGN LOADS:

LIVE LOADS:

SNOW LOAD:

WIND LOAD:

SEISMIC DESIGN CATEGORY A

SEISMIC DESIGN CATEGORY B, C, & D

SEISMIC RISK CATEGORY

SPECTRAL RESPONSE ACCELERATION S %g S %g

SITE CLASSIFICATION

BASIC STRUCTURAL SYSTEM (CHECK ONE)

SEISMIC BASE SHEAR Vx= Vy=

ANALYSIS PROCEDURE

ARCHITECTURAL, MECHANICAL, COMPONENTS ANCHORED?

LATERAL DESIGN CONTROL:

SOIL BEARING CAPACITIES:

WIND (I W)

SNOW (I S)

SEISMIC (I E)

PENTHOUS ROOF

MEZZANINE

PENTHOUSE FLOOR

PSF

PSF

PSF

PSF

BASIC WIND SPEED

EXPOSURE CATEGORY

WIND BASE SHEARS Vx=

MPH (ASCE 7-10)

COMPLIANCE WITH SECTION 1616.4 ONLY? NOYES

PROVIDE THE FOLLOWING SEISMIC DESIGN PARAMETERS:

BEARING WALL

BUILDING FRAME

MOMENT FRAME

DUAL W/SPECIAL MOMENT FRAME

DUAL W/INTERMEDIATE R/C OR SPECIAL STEEL

INVERTED PENDULUM

S 1

EARTHQUAKE

FIELD TEST (PROVIDE COPY OF TEST REPORT)

PRESUMPTIVE BEARING CAPACITY

PILE SIZE, TYPE, AND CAPACITY

PSF

PSF

N/A

IV

25 9.4

D

YES

N/A

2,500

Vy=

WIND

EQUIVALENET LATERAL FORCE

N/A

1.5

N/A

B

8 KIPS 14 KIPS

GILLIAN SCOTT 16607

43.1.1 CLASSIFICATION OF REHABILITATION WORK RENOVATION

43.4.2 CAPACITY OF MEANS OF EGRESS. THIS PROJECT DOES NOT CHANGE OR ALTER

EXISTING OCCUPANT LOAD OR MEANS OF EGRESS. THE EGRESS CAPACITY SHALL HAVE

BEEN PREVIOUSLY APPROVED AS BEING ADEQUATE.

NFPA 101 - CHAPTER 43 BUILDING REHABILITATION:

PHARMACY RENOVATION DESIGNED, AND TO BE CONSTRUCTED AND TESTED TO ADHERE

TO USP 797/800 V. NOV 2022.

USP 797 & USP 800 (V. NOV 2022):

GENERAL/PHARMACY PHARMACY PENTHOUSE

NFPA 2021 CODE SUMMARY - ATLANTA VA HEALTH CARE SYSTEM

BUILDING DATA (NFPA 220):

FIRE DISTRICT:

SPRINKLERS:

CONSTRUCTION TYPE:

STANDPIPES:

IV (2HH)

I (442)

III (211)

II (222)I (332)

III (200)

II (111)

V (111)

NO NFPA 13YES NFPA 13R NFPA 13D

NO CLASSYES

NO YES

NFPA 13 NFPA 13R NFPA 13D

II (000)

V (000)

STANDING SEAM METAL ROOF WITH THERMAL

SPACER BLOCKS

N/A

N/A

STANDING SEAM METAL PANEL ON CONTINUOUS

RIGID INSULATION ON METAL STUDS

R-13 CI + R-13 BATT

R-25 CI

0.082

0.075

N/A

N/A

N/A

N/A

43.1.1 CLASSIFICATION OF REHABILITATION WORK

RENOVATION

43.4.2 CAPACITY OF MEANS OF EGRESS. THIS PROJECT

DOES NOT CHANGE OR ALTER EXISTING

OCCUPANT LOAD OR MEANS OF EGRESS. THE

EGRESS CAPACITY SHALL HAVE BEEN

PREVIOUSLY APPROVED AS BEING ADEQUATE.

NFPA 101 - CHAPTER 43

BUILDING REHABILITATION

PHARMACY RENOVATION DESIGNED, AND TO BE

CONSTRUCTED AND TESTEDTO ADHERE TO USP 797/800 V.

NOV 2022.

USP 797 & USP 800 (V. NOV 2022)

A. SEE STRUCTURAL DRAWINGS FOR FRAMING INFORMATION &

FRAMING DIMENSIONS. ALL DIMENSIONS ARE FOR

REFERENCE ONLY- VERIFY ALL FRAMING WITH STRUCTURAL

DRAWINGS.

B. REFER TO PLUMBING DRAWINGS FOR INFORMATION

CONCERNING PLUMBING FIXTURES AND PIPING SYSTEM(S).

C. REFER TO MECHANICAL DRAWINGS FOR INFORMATION

CONCERNING HVAC SYSTEM(S).

D. REFER TO ELECTRICAL DRAWINGS FOR INFORMATION

CONCERNING POWER, LIGHTING AND COMMUNICATION

SYSTEM(S).

E. REFER TO ELECTRICAL DRAWING FOR FIRE ALARM

NOTIFICATION AND EMERGENCY EGRESS LIGHTING

LOCATIONS.

F. REFER TO PARTITION TYPES FOR FURTHER FIRE

SEPARATION REQUIREMENTS.

G. CONTRACTOR TO PROVIDE ALL ADDITIONAL FRAMING

NECESSARY FOR ALL OPENINGS AND SUPPLEMENTAL

FRAMING ABOVE PARTITIONS.

H. ALL FIRE RATED ASSEMBLIES SHALL BE INSTALLED IN STRICT

ACCORDANCE WITH TESTED ASSEMBLIES INDICATED.

I. EXTEND FIRE RATED PARTITIONS, BARRIERS, AND OTHER

SEPARATIONS TO BOTTOM OF ROOF/FLOOR DECK ABOVE

(OR AS DIRECTED BY UL ASSEMBLY) AND TO EXTERIOR

WALL. SEAL JOINT BETWEEN EDGES OF PARTITION WITH

FIRE RATED SEALANT AND/OR INTUMESCENT ASSEMBLY.

J. ALL PENETRATIONS OF FIRE-RATED ASSEMBLIES SHALL BE

FIRE-SEALED IN ACCORDANCE WITH APPROVED

MANUFACTURER'S DETAIL FOR LOCATION, TYPE OF

CONSTRUCTION, PENETRATING ITEM AND RATING REQUIRED.

K. ALL DUCTWORK, DIFFUSERS AND GRILLES PENETRATING

FIRE-RATED WALLS, CEILINGS AND FLOORS SHALL HAVE THE

APPROPRIATE TYPE OF FIRE/SMOKE DAMPER IN

ACCORDANCE WITH THE TYPE OF CONSTRUCTION BEING

PENETRATED AND THE FIRE/SMOKE RATING REQUIRED.

L. ALL LIGHT FIXTURES AND ELECTRICAL DEVICES

PENETRATING FIRE-RATED ASSEMBLIES SHALL BE UL-LISTED

FOR INSTALLATION IN THE ASSEMBLY OR SHALL BE

INSTALLED SUCH THAT THE FIRE-RATING IS NOT

COMPROMISED.

M. SMOKE RESISTANT CONSTRUCTION SHALL MEET THE

REQUIREMENTS OF ALL APPLICABLE CODES. AREA SHALL BE

SEPARATED FROM THE REMAINDER OF THE BUILDING BE

CONSTRUCTION CAPABLE OF RESISTING THE PASSAGE OF

SMOKE. THE PARTITIONS SHALL EXTEND FROM THE FLOOR

TO THE UNDERSIDE OF THE FLOOR OR ROOF ASSEMBLY

ABOVE. DOORS SHALL BE SELF OR AUTOMATIC CLOSING.

DOORS SHALL NOT HAVE AIR TRANSFER OPENINGS AND

SHALL NOT BE UNDERCUT IN EXCESS OF CLEARANCE

PERMITTED WITH ACCORDANCE TO NFPA 80.

N. STORAGE OF ANY FLAMMABLE OR COMBUSTIBLE LIQUIDS IS

UNDERSTOOD TO NOT BE WITHIN THE BUILDING. STORAGE

OF ANY MATERIAL IS TO BE IN COMPLIANCE WITH ALL

APPLICABLE CODES AND AUTHORITIES HAVING

JURISDICTION.

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:1

P

M

G-003

CODE SUMMARY - NFPA

3 6DC

HEPA FILTER INSTALLATION

PHARMACY CLEANROOM

SUITE

ATLANTA VA HEALTH CARE SYSTEM

1670 CLAIRMONT ROAD

DECATUR, GA 30033 SEPTEMBER 27, 2024

100% CONSTRUCTION DOCUMENTS

508-21-10720-384

BUILDING C

GTS

LIFE SAFETY GENERAL NOTES

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

ILSM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

[ATLANTA PHARMACY RENOVATION]

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

DUST CONTROL PLAN NOTES

1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION

FOR THIS PROJECT ARE LEVELS II AND V FOR THE CLASS OF PRECAUTIONS OR

LEVEL OF INFECTION CONTROL ACTIVITIES. HARD SURFACE BARRIERS SHALL

BE USED EXCEPT IN THE AREA INDICATED ON THE PHASING PLAN WITH

PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK AREA AS

LONG AS THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.

2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES

(PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR THE

PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM. THEY

SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND LEAVING THE

CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE

MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS.

ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE

CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PHASE,

DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF

DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN

PLACE BEFORE REMOVAL OF A PERMANENT BARRIER. [AFTER EACH PHASE,

PERFORM TASKS STATED IN CONTAMINATION OF PATIENT ROOMS, SUPPLIES,

EQUIPMENT AND RELATED AREAS NOTE 2.

3. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER ENTRANCE

SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS

NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS INTO ADJACENT

CLEAN SPACE.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL

1. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.

2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE

DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS; DESIGNATED

ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND ONLY

AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE

CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY

FROM THE CONSTRUCTION AREA AND MATERIALS.

3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION

MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED; THE

NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND THE

CONSTRUCTION STAGING/PREP AREA.

4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY

FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE

MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT

DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL BE REMOVED DAILY

AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT

DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED

NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE

SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE

BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR

SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE COR.

5. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION

FROM ANY ADJACENT EXCAVATION DEBRIS.

6. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS SHALL BE

COVERED AND PROTECTED PRIOR STARTING EACH CONSTRUCTION PHASE.

VENTILATION AND ENVIRONMENTAL CONTROLS

1. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE CONTRACTOR

WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-

CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS COVERED AS

NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO

DIRTY AREAS.

2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE

NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION

OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE

SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL PASS AIR THROUGH

AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION

RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR

DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED

INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE

USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.

3. FOR EXHAUST DUCT ROUTING THRU CORRIDOR: INSTALL HARD DUCT WITH

NON-FLANGE HANGER HUNG FROM CEILING ABOVE, BOTTOM OF DUCT SHALL

BE A MINIMUM OF 7'-2" A.F.F.

4. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT

CEILING SHALL BE VERIFIED DAILY.

5. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND

CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS

NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-

CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA

ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE PROJECT

IN THE FREQUENCY AS IDENTIFIED BY THE COR.

CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS

1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE

OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF

PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR AND

HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE DUST

FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL

IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM

FOR CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA. ALL

EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED THROUGH

OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY

VACUUMING AND WET WIPING BEFORE THEIR REMOVAL FROM THE

CONSTRUCTION ZONE OR WORK AREA.

2. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC

ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS

STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS DISEASE

CONTROL HAS INSPECTED AND APPROVED THE CLEANING.

ICRA NOTES

IIILOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

I

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 V

V

IV

V

IV

III

IV

II

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects Includes, but is not limited to:

• Removal or replacement of building system component(s).

• Removal/installation of drywall partitions.

• Invasive large-scale new building construction.

• Renovation work in two or more rooms.

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:

• Removal of preexisting floor covering, walls, casework or other building components.

• New drywall placement.

• Renovation work in a single room.

• Nonexisting cable pathway or invasive electrical work above ceilings.

• The removal of drywall where a moderate amount of dust and debris is created.

• Dry sanding where a moderate amount of dust and debris is created.

• Work creating significant vibration and/or noise.

• Any activity that cannot be completed in a single work shift.

Small scale, short duration activities which create minimal dust Includes, but is not limited to:

• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).

• Fan shutdown/startup.

• Installation of electrical devices or new flooring that produces minimal dust and debris.

• The removal of drywall where minimal dust and debris is created.

• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.

Inspection and Non-Invasive Activities Includes, but is not limited to:

• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.

• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.

• Clean plumbing activity limited in nature.

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

• Physical Therapy

• Radiology departments

• All patient waiting rooms

• All outpatient clinics

• Research Areas

• Respiratory Therapy

• Office areas (non-clinical)

• FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

• Emergency Room

• Clinical Laboratories (specimen)

• Same Day Surgery

• Pharmacy

• Nutrition and Food

Service/Canteen

• Procedural Areas (GI)

• Inpatient Mental Health

• Any area caring for immunocompromised patients

• Cardiac Cath Lab/IR

• Central Sterile Supply

• Sterile Processing Service

• Intensive Care Units

IIII

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

C

LA

S S

IV

During Construction Project Upon Completion of Project

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.

7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.

13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

14. Contain all trash and debris in the work area.

15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

16. Worker clothing must be clean and free of visible dust before leaving the work area.

HEPA vacuuming of clothing or use of cover suites is acceptable.

17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.

18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

• Medical/Surgical Units

• Negative pressure isolation rooms

• Outpatient Chemotherapy

Areas

• Operating rooms

• Post Anesthesia Care Unit

• Dialysis

• Dental

C

LA

S S

V

1. Includes all activities required by Class IV

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).

6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.

7. Personnel will be required to wear coveralls at all times during Class V work activities.

Coveralls must be removed before leaving the anteroom.

8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.

14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

15. Contain all trash and debris in the work area.

16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.

18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).

Damaged shoe covers must be immediately changed.

19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

During Construction Project

C

LA

S S

I

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

Upon Completion of Project

1. Execute work by methods to minimize raising dust from construction operations.

2. Perform noninvasive work activity as to not block or interrupt patient care.

3. Perform noninvasive work activities in areas that are not directly occupied with patients.

4. Perform noninvasive work activity in a manner that does not create dust.

5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.

C

LA

S S

II

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

1. Includes all activities required by Class I

2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.

3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.

4. This Class of Precautions must never be used for construction or renovation activities.

5. Provide active means to prevent airborne dust from dispersing into atmosphere.

6. Water mist work surfaces to control dust while cutting.

7. Seal unused doors with duct tape.

8. Block off and seal air vents.

9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

C

LA

S S

II

I

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Provide active means to prevent airborne dust dispersion into the occupied areas.

4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.

5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.

6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,

7. If work area is contained, then it must be neutrally to negatively pressurized at all times.

8. Seal all doors with tape that will not leave residue.

9. Contain all trash and debris in the work area.

10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.

13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.

For Type C activities, follow procedures for Class IV.

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

SEE SHEETS G-101 AND G-102 FOR LOCATIONS

FIRE EXTINGUISHER ON

PORTABLE FLOOR BRACKET

(ILSM MAY REQUIRE MORE

THAN ONE).

PROVIDE STICKY MATS

(CHANGED END OF SHIFT OR

MORE IF NECESSARY TO

MAINTAIN CLEANLINESS).

HEPA NEGATIVE

AIR UNIT

BARRIER WALLS TO

BE TYPE A

FLEX DUCT

POST ICRA, ILSM, FIRE

INSPECTION SHEETS VISIBLE

TO PUBLIC

FIRE PULL

STATION WITH

AUDIO / VISUAL

EXIST WALL

A S

D E

T E

R M

IN

E

D I N

F

IE

L D

ISOLATE AND COVER ALL

SUPPLY DIFFUSERS NOT IN

OPERATION DURING PROJECT -

COORDINATE W/ COR.

COVER ALL RETURNS AT THE

GRATE/DIFFUSERS

G-004 _____ 4

G-004

EXHAUST LOCATION -

SEE NOTE A

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

NOTE:

A. TURN UP EXHAUST ON EXTERIOR ON SIDE.

CONTRACTOR SHALL VERIFY LOCATION OF AIR

INTAKES ARE AT THE PROPER DISTANCE FROM

EXHAUST. VERIFY LOCAL JURISDICTION CODE

AND VA REQUIREMENTS FOR DISTANCE PRIOR

TO STARTING WORK.

A P

P R

O X

A .F

.F

CEILING

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

UNDERSIDE OF

STRUCTURE ABOVE

ICRA ENCLOSURE TO

UNDERSIDE OF

STRUCTURE ABOVE

WITH DOOR

HEPA NEGATIVE AIR UNIT

FINISHED FLOORING TO BE

KEPT CLEAN. FLOORS NOT

BEING REPLACED MUST

BE PROTECTED. COVER

WITH CONSTRUCTION

GRADE TEMPORARY

FLOOR PROTECTION.

RUN EXHAUST AIR TO

EXTERIOR OR VA

APPROVED LOCATION

PROVIDE SINGLE USE

DAMPER IN HEPA UNIT

DUCT WHERE DUCT

PENETRATES A RATED

WALL. DAMPER TO

MATCH RATING OF

WALL, NOT LESS THAN

1 HR

EXISTING CEILING

VERIFY HEIGHT

BARRIER TYPE A

A 1-HR RATED

U.L. DESIGN NO. U419

B PLASTIC SHEET BARRIER

NON RATED

PLASTIC SHEET

BARRIER

EXISTING WALL

ASSEMBLY

EXISTING CEILING

BOTTOM SEALING

RUNNER

TOP SEALING

RUNNER

SUPPORT POLES,

QUANTITY PER

MANUF.

RECOMMENDATIONS

REQU.

AS

3 5/8" INSULATED WALL WITH

METAL STUDS @ 16" O.C.

WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

5"

FIRE RESISTANT SEALANT,

BOTH SIDES

5/8" GYPSUM BOARD - BOTH

SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

/2

5"

3 5/8" METAL STUDS @ 16"

O.C. WALL TO EXTEND TO

UNDERSIDE OF DECK

SEALANT, BOTH SIDES

NON RATEDC

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:1

P

M

G-004

ICRA INFORMATION AND DETAILS

4 6OKM

HEPA FILTER INSTALLATION

PHARMACY CLEANROOM

SUITE

ATLANTA VA HEALTH CARE SYSTEM

1670 CLAIRMONT ROAD

DECATUR, GA 30033 SEPTEMBER 27, 2024

100% CONSTRUCTION DOCUMENTS

508-21-10720-384

BUILDING C

GTS

Scale: No Scale

ILSM CONSTRUCTION EGRESS SIGNAGE

Scale: No Scale

TYPICAL ICRA RATED ENCLOSURE

Scale: No Scale

ROOM ELEVATION

Scale: No Scale

CROSS SECTION 'A'

Scale: No Scale

ICRA BARRIER WALL TYPES

C-1C-1C-1

U P

RAMP UP

RAMP UP

DN

UP DN

DN

UP

DN

DN

DN

U P

RAMP UP

RAMP UP

DN

UP DN

DN

UP

DN

DN

DN

U P

RAMP UP

RAMP UP

DN

UP DN

DN

UP

DN

DN

DN

R O L L

IN

G

S H U T T E R

R O L L

IN

G

S H U T T E R

R O L L

IN

G

S H U T T E R

R O L L

IN

G

S H U T T E R

R O L L

IN

G

S H U T T E R

R O L L

IN

G

S H U T T E R

TO UPPER

FLOORS

CONSTRUCTION ACCESS DISTANCE = 407'-0"

DESIGNATED

ELEVATOR #P-3

LOADING DOCK

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE BARRIER

2 HR - FIRE BARRIER

SMOKE RESISTIVE HAZARDOUS AREA/

20 MIN.

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/2

/2

:2

:1

P

M

G-101

GROUND FLOOR CONSTRUCTION

ACCESS PLAN

5 6OKM

HEPA FILTER INSTALLATION

PHARMACY CLEANROOM

SUITE

ATLANTA VA HEALTH CARE SYSTEM

1670 CLAIRMONT ROAD

DECATUR, GA 30033 SEPTEMBER 27, 2024

100% CONSTRUCTION DOCUMENTS

508-21-10720-384

BUILDING C

GTS

Scale: 1/16" = 1'-0"

GROUND FLOOR CONSTRUCTION ACCESS PLAN

AREA OF WORK

N

AREA OF WORK

KEY PLAN

NO SCALE

A. CONTRACTOR TO COORDINATE PARKING AND

EXTERIOR STAGING WITH VA COR.

B. CONSTRUCTION ROUTE ACCESS PATH SHOWN AS AN

OPTION FOR REFERENCE ONLY. FINAL PATH

SEQUENCE AND SCHEDULE TO BE COORDINATED

WITH VA COR PRIOR TO CONSTRUCTION AND

EQUIPMENT DELIVERIES.

C. COORDINATE ALL SHUTDOWNS WITH VA COR TWO

WEEKS IN ADVANCE AND CONFIRM 48 HOURS PRIOR

TO WORK.

D. CONTRACTOR TO ENSURE ALL TEMPORARY ICRA

BARRIERS TO PROVIDE ALL NECESSARY

CLEARANCES THROUGHOUT CONSTRUCTION.

CONSTRUCTION TYPE D, RISK GROUP IV

N O

R T H0 8 16 32

CONSTRUCTION TYPE B, RISK GROUP I

(INSIDE PHARMACY CONSTRUCTION)

(OUTSIDE PHARMACY CONSTRUCTION)

AHU-11

RECEPTION

CONFERENCE

2C266

2C286A

2C265

OFFICE

ELEC.

WAITING

ON-CALL

ON-CALL

TLT

TLT

STORAGE

CONFERENCE

OFFICE

PATIENT RM.

PATIENT RM. PATIENT RM.

PATIENT RM.

PATIENT RM.

PATIENT RM.

PATIENT RM.

PATIENT RM.

PATIENT RM.PATIENT RM.PATIENT RM.PATIENT RM.CLEAN

SOILED

CLEAN

MEDS

OFFICE

LOUNGE

SIGNAL

OFFICE

ELEC.

STORAGE

ELEC.

SIG.

H.K.

TLT(MEN)

TLT(WOMEN)

O.R. 1

PHARM.

DARK RM.

ELEC.

MECH. RM.

LINENHAC

STORAGE

BLOOD BANK

TLT. TLT.

LAB WAITING

PROCESSING

DATA PROCESSING

BLOOD/SPECIMEN

DOOR OPER.

PAD

2C104

2C101 2C103

2C129

2C127

2C171

2C184

2C185

2C180

2C200

2C220

2C221

2C225

2C172

2C170

2C267

2C268

2C250

2C290

2C288

2C286

2C252 2C251

2C253

2C286B

2C254

2C224

2C264

2C263

2C282 2C261 2C260

2C255

2C257

2C256

2C259 2C258

DN

2B161

2B170C

2B162

2B164

2B160

2B170D

BLOOD BANK

2B168

2B170D

2B171B

2B170B

STORAGE

2B171A

OFFICE

2B170A

SPECIAL CHEMISTRY

MECHANICAL

2B175

ELECT.

FLOW CYTOMETRY

2B163B

2B163

2B167

2B165 2B166 COMM.

RECEPTION/

2B102

OFFICE

EXAM/

2B103D

TLT CONTROL

2B103E

2B218

2B216 PRINTERS

2B103

OFFICE

CYTOLOGY STAINING

2B214

2B217

OFFICE

MICROSCOPE

2B219

2B212

SIGNAL CLS.

2B169

CHEMISTRY LAB

2B170

CONFERENCE

2B227

2B224

STORAGE

2B223

HEMATOLOGY

SPECIAL

STORAGE

2B172

2B173

ELECT.

2B188

SIGNAL

2B223

COOLER

TLT(MEN)

2B187

HISTOLOGY

2B226

HISTOLOGY

2B222

2B199A

HISTOLOGY

2B199B

DARK ROOMFILM PROC.

2B221

HISTOLOGY

2B201

HISTOLOGY

2B199

MICROSCOPE

2B186A

CYTOLOGY

OFFICE

2B190

2B186

MICROSCOPE

STORAGE

2B184F

2B191

PCR

STORAGE

2B180

HEMATOLOGY

2B174

TLT(FEMALE)

2B185

LOUNGE

2B183

SIGNAL CLS.

2B179

HAC

ELECT.

2B181

2B179A

FLAMMABLE STORAGE

2B176 OFFICE

2B178

2B 4E

M

IC

RO

SC

O

PE

PREP AREA

2B182

MICROBIOLOGY

2B184

STERILIZER

2B182A MYCOBACTORIA

2B184A

F.E.C.

F.E.C.

F.E.C.

U P

DN

FD

FD

FD

DN UP

2B163A

2B103A

WAITING

O.H.

EXISTING EXHAUST

DUCT ENCLOSURE

DN

DN

STAIR 6

ELEV P-9

ELEV P-8

ELEV S-7

STAIR 5

FEC

FEC

ALTERNATING

TREAD STAIR TO

ROOF HATCH

FEC

S S

S S

S

S

SS

S S

S

S S

S

SSS

S S

OPENING AT SLAB (TYP)

AREA OF WORK

AREA OF WORK

AREA OF WORK

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE BARRIER

2 HR - FIRE BARRIER

SMOKE RESISTIVE HAZARDOUS AREA/

20 MIN.

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/2

/2

:2

:1

P

M

G-102

SECOND AND THIRD FLOOR

CONSTRUCTION ACCESS PLANS

6 6OKM

HEPA FILTER INSTALLATION

PHARMACY CLEANROOM

SUITE

ATLANTA VA HEALTH CARE SYSTEM

1670 CLAIRMONT ROAD

DECATUR, GA 30033 SEPTEMBER 27, 2024

100% CONSTRUCTION DOCUMENTS

508-21-10720-384

BUILDING C

GTS

Scale: 1/16" = 1'-0"

SECOND FLOOR CONSTRUCTION ACCESS PLAN

Scale: 1/16" = 1'-0"

THIRD FLOOR CONSTRUCTION ACCESS PLAN

Scale: 1/16" = 1'-0"

THIRD FLOOR ROOF CONSTRUCTION ACCESS PLAN

N

AREA OF WORK

KEY PLAN

NO SCALE

CONSTRUCTION TYPE B, RISK GROUP I

ICRA NOT REQUIRED FOR EXTERIOR WORK

A. CONTRACTOR TO COORDINATE PARKING AND

EXTERIOR STAGING WITH VA COR.

B. CONSTRUCTION ROUTE ACCESS PATH SHOWN AS

AN OPTION FOR REFERENCE ONLY. FINAL PATH

SEQUENCE AND SCHEDULE TO BE COORDINATED

WITH VA COR PRIOR TO CONSTRUCTION AND

EQUIPMENT DELIVERIES.

C. COORDINATE ALL SHUTDOWNS WITH VA COR TWO

WEEKS IN ADVANCE AND CONFIRM 48 HOURS

PRIOR TO WORK.

D. CONTRACTOR TO ENSURE ALL TEMPORARY ICRA

BARRIERS TO PROVIDE ALL NECESSARY

CLEARANCES THROUGHOUT CONSTRUCTION.

N O

R T H0 8 16 32

N O

R T H0 8 16 32

N O

R T H0 8 16 32

(CORRIDORS AND ELECTRICAL ROOMS)

ICRA NOT REQUIRED FOR EXTERIOR WORK

MARK STUD SIZE SPACING NOTES

NOTES:

1.) SEE "TYPICAL METAL STUD WALL CONSTRUCTION" DETAIL 4/S-201

FOR ADDITIONAL REQUIREMENTS.

600S162-43 (18Ga) 16" o.c. 1W1

W2

BLOCKING

48" o.c.

BRIDGING/

362S162-43 (18Ga) 16" o.c. 48" o.c.

WALL SCHEDULE

NOTES:

1.) ALL HEADERS 16Ga. (54mils) AND THICKER TO BE 50ksi MINIMUM.

2.) PUNCHED HOLES IN HEADERS IS NOT PERMITTED.

3.) JAMB STUDS TO BE FULL HEIGHT. JACK STUDS UNDER HEADERS NOT REQUIRED w/ TSN "STIFFCLIP HE" CONNECTORS.

SEE DETAIL 4/S-301 FOR TSN "STIFFCLIP HE" DETAILS. REFER TO MANUFACTURER'S WRITTEN INSTRUCTIONS FOR

INSTALLATION PROCEDURES.

4.) SEE BELOW FOR CONFIGURATION TYPES.

MARK

MEMBERS

HEADER

H1

MAX SPAN

6'-0

SILL

CONNECTIONS

HEADER SILL

2 ~ 600S162-43 w/ 2 ~ 600T125-43 TRACK

600T125-43

SIZE MAX SPANSIZE

TYPE

H4

CONFIG.

TYPE

CONFIG.

6'-0 S1

JAMB STUDS

MAX HEIGHTSIZE

TYPE

CONFIG.

12'-0 J32 ~ 600S162-43 w/ ONE ~ 600T125-43 TRACK

4B/S-3014A/S-301

METAL STUD WALL OPENING SCHEDULE

(TYP)

#12 SCREWS EA. FLANGE

@ 16" o.c.

TOP & BOTT.

SEE SCHEDULE

O P

E N

IN

G

#12 SCREWS EA. STUD

(TYP)

OPENING

#12 SCREWS EA. FLANGE

(TYP)

2 ~ #12 SCREWS

@ 16" o.c.

@ 16" o.c. (VERTICAL SPACING)

SEE SCHEDULE

SEE SCHEDULE

O P

E N

IN

G

(TYP)

#12 SCREWS EA. FLANGE

EA. STUD

WALL

HEADER TYPE "H4" JAMB STUD TYPE "J3"

SILL

SILL TYPE "S1"

WALL

AFF ABOVE FINISHED FLOOR

ALT ALTERNATE

B/O BOTTOM OF

BLKG BLOCKING

BOT BOTTOM

BRG BEARING

CENTERLINE

C/C CENTER TO CENTER

CJ CONTROL JOINT

CMU CONCRETE MASONRY UNIT

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

CTR CENTER(ED)

DEG DEGREE

DEMO DEMOLITION

DET/DTL DETAIL

DIA DIAMETER

DIM DIMENSION

EJ EXPANSION JOINT

EW EACH WAY

EA EACH

EIFS EXTERIOR INSULATION

FINISH SYSTEM

EL ELEVATION

ELEV ELEVATOR

EOD EDGE OF DECK

EOS EDGE OF SLAB

EQ EQUAL

EQUIP EQUIPMENT

EXIST EXISTING

EXT EXTERIOR

FD FLOOR DRAIN

FFE FINISH FLOOR ELEVATION

FV FIELD VERIFY

FDN FOUNDATION

FIN FINISH

FLR FLOOR

FRMG FRAMING

FT FOOT/FEET

FTG FOOTING

GC GENERAL CONTRACTOR

GA GAUGE

GALV GALVANIZED

HOR HORIZONTAL

ID INSIDE DIAMETER

IN INCH

INCL INCLUDING

INT INTERIOR

JT JOINT

LB(S) POUND(S)

MO MASONRY OPENING

MAS MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MIN MINIMUM

MISC MISCELLANEOUS

N NORTH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NOM NOMINAL

OC ON CENTER

OD OUTSIDE DIAMETER

O TO O OUT TO OUT

OPNG OPENING

OPP OPPOSITE

OVHD OVERHEAD

PEB PRE-ENGINEERED BUILDING

PT PRESSURE TREATED

PL PLATE

PLYWD PLYWOOD

RD ROOF DRAIN

RO ROUGH OPENING

RAD RADIUS

REC RECESSED

REINF REINFORCED

REQ'D REQUIRED

REV REVISED (REVISION)

S SOUTH

SF SQUARE FEET

SS STAINLESS STEEL

SIM SIMILAR

SPEC SPECIFICATIONS

SQ SQUARE

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

T&G TONGUE AND GROOVE

T/O TOP OF

TS TUBE STEEL

TYP TYPICAL

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

VIF VERIFY IN FIELD

W WEST

W/ WITH

W/O WITHOUT

WWF WELDED WIRE FABRIC

WT WEIGHT

CL

WALL SECTION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

VIEW NORTH ARROW

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

S8.1

S8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

S8.1

S8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

S8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTHNORTH

0 4 8 16

TYPICAL KEYNOTE# MOMENT CONNECTION

GENERAL CONSTRUCTION SPECIFICATION

1. THE FOLLOWING DOCUMENTS ARE THE PROPERTY OF APOGEE CONSULTING GROUP. FOR USE SOLELY FOR THIS PROJECT AND SHALL NOT BE REPRODUCED, COPIED, OR USED FOR OTHER PURPOSES WITHOUT

WRITTEN PERMISSION FROM APOGEE CONSULTING GROUP.

2. NO OTHER PARTY MAY REVISE, ALTER, OR DELETE THESE CONSTRUCTION DOCUMENTS WITHOUT WRITTEN

PERMISSION FROM APOGEE CONSULTING GROUP.

3. THIS STRUCTURE IS ONLY STABLE IN ITS COMPLETED FORM. THE CONTRACTOR SHALL PROVIDE ALL REQUIRED TEMPORARY BRACING DURING CONSTRUCTION TO STABILIZE THE STRUCTURE. TEMPORARY SHORING AND BRACING METHODS ARE NOT THE RESPONSIBILITY OF APOGEE CONSULTING GROUP AND ARE

BEYOND THE SCOPE OF THESE DRAWINGS.

4. THE SER IS NOT RESPONSIBLE FOR CONSTRUCTION SEQUENCES, METHODS, OR TECHNIQUES IN CONNECTION WITH THE CONSTRUCTION OF THIS STRUCTURE.