This document is Section 23 82 00 "Convection Heating and Cooling Units" specification for the Atlanta VA Health Care System HEPA Filter Installation Pharmacy Cleanroom Suite project (Project No: 508-21-107).
The specification details requirements for room fan-coil units, including construction standards, performance criteria, and installation requirements. Key technical requirements include: galvanized steel chassis with acoustic/thermal insulation, minimum 1.3mm steel cabinet with factory-baked enamel finish, centrifugal fans with 3-speed motors operating at max 1200 RPM, copper tube cooling/heating coils with minimum 10mm inside diameter, MERV 7 air filters, and two-way modulating control valves. Units must meet AHRI 440 certification, NEC compliance, UL listing, and specific noise level criteria not exceeding 5 dB above specified levels. The specification also covers installation procedures, operational testing, commissioning requirements, and mandates 4 hours of manufacturer training for VA personnel. All work must comply with referenced standards including NFPA, UL, and ANSI/AHRI specifications.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Atlanta VA Health Care System September 27, 2024 HEPA Filter Installation Pharmacy Cleanroom Suite 100% Bid Documents Add. 1 Atlanta, GA 30024 Project No: 508-21-107
23 82 00 - 1
SECTION 23 82 00
CONVECTION HEATING AND COOLING UNITS
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies room fan-coil units.
1.2 RELATED WORK
A. Section 01 00 00, GENERAL REQUIREMENTS.
B. Section 01 09 00, GENERAL COMMISSIONING REQUIREMENTS C. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES D. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL
COMPONENTS: Seismic restraints for equipment.
E. Section 23 05 11, COMMON WORK RESULTS FOR HVAC: General mechanical requirements and items, which are common to more than one section of
Division 23.
F. Section 23 05 41, NOISE and VIBRATION CONTROL FOR HVAC PIPING and EQUIPMENT: Noise requirements.
G. Section 23 05 93, TESTING, ADJUSTING, and BALANCING FOR HVAC: Flow rates adjusting and balancing.
H. Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS: Requirements for commissioning, systems readiness checklists, and training.
I. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC: Valve operators.
J. Section 23 21 13, HYDRONIC PIPING: Heating hot water and chilled water piping.
K. Section 23 31 00, HVAC DUCTS and CASINGS: Ducts and flexible connectors.
L. Section 23 82 16, AIR COILS: Additional coil requirements.
1.3 QUALITY ASSURANCE
A. Refer to Paragraph, QUALITY ASSURANCE, in Section 23 05 11, COMMON WORK RESULTS FOR HVAC. Provide guarantee in accordance with FAR clause
52.246-21
1.4 1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES.
B. Manufacturer's Literature and Data:
1. Room Fan-Coil units.
C. Certificates:
23 82 00 - 2
1. Compliance with Article, QUALITY ASSURANCE.
2. Compliance with specified standards.
D. Operation and Maintenance Manuals: Submit in accordance with Article, INSTRUCTIONS, in Section 01 00 00, GENERAL REQUIREMENTS.
E. Completed System Readiness Checklists provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS.
1.5 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. American National Standards Institute / Air Conditioning, Heating and Refrigeration Institute (ANSI/AHRI):
440 I-P-2019.........Performance Rating of Room Fan Coils
C. National Fire Protection Association (NFPA):
90A-2021.............Standard for the Installation of Air
Conditioning and Ventilating Systems
70-2020(2020e).......National Electrical Code
D. Underwriters Laboratories, Inc. (UL):
181-2013(R2017)......Standard for Factory-Made Air Ducts and Air
Connectors
1995-2015(R2018).....Heating and Cooling Equipment
PART 2 - PRODUCTS
2.1 ROOM FAN-COIL UNITS
A. Capacity Certification: AHRI 440.
B. Safety Compliance: NEC compliant and UL listed.
C. Noise Levels: Operating at full cooling capacity, sound power level shall not exceed by more than 5 dB the numerical value of sound pressure levels associated with noise criteria specified in Section
Select units at intermediate speed, for compliance with the noise criteria.
D. Chassis: Galvanized steel, acoustically and thermally insulated to attenuate noise and prevent condensation.
E. Cabinet: Minimum 1.3 mm (l8 gage) steel reinforced and braced. Arrange components and provide adequate space for installation of piping
23 82 00 - 3 package and control valves. Finish shall be factory-baked enamel in manufacturer's standard color on all exposed surfaces.
1. Horizontal Unit: Provide Exposed type as shown. Provide supports and vibration isolators for horizontal units as recommended by the manufacturer.
a. Exposed Units: Fully enclosed cabinet with hinged bottom access panel with cam-lock fasteners. Provide stamped integral inlet and discharged grilles in front of cabinet.
F. Fans: Centrifugal, forward curved, double width type wheels, galvanized steel or polyester resin construction, statically and dynamically balanced, direct driven.
1. Motors: Premium efficiency, 3-speed permanent split capacitor type with integral thermal overload protection, for operation at not more than l200 RPM.
2. Provide a fan speed selector switch, with off, low, medium, and high positions. Switch shall have a set of auxiliary contacts which are open when the switch is in the "off" position and closed when the switch in any of the other positions. On vertical units, mount switch in a junction box in the cabinet of each unit. On ceiling-suspended horizontal and concealed units, switch shall be wall mounted.
G. Cooling and Heating Coils:
1. Hydronic (two separate coils for cooling and heating): Copper tubes, 10 mm (three-eighths inch) minimum inside diameter, not less than
4.3 mm (0.0l7 inch) thick with copper or aluminum fins. Coils shall be pressure tested for bursting and strength in accordance with
Underwriters Laboratories, Inc., requirements for pressure tested coils, and shall be designed to provide adequate heat transfer capacity. Provide manual air vent at high point of each coil and drain at each low point.
H. Piping Package: Factory furnished with unit by the manufacturer or field-installed by the contractor to fit control valves provided by the controls’ supplier. Submit manufacturer's detailed drawings of the piping in the end compartments for approval prior to fabrication of the piping packages. Provide ball stop valves on the supply and return pipes and balancing fittings on the return pipes.
23 82 00 - 4
I. Drain pans: Furnish galvanized steel with solderless drain connections and molded polystyrene foam insulating liner:
1. Auxiliary drain pan: Located under control valve and piping within the unit enclosure to prevent dripping.
J. Air Filter: Manufacturer's standard throwaway type, not less than 25 mm (1 inch) thick, MERV 7, supported to be concealed from sight and be tight fitting to prevent air by-pass. Filters shall have slide out frames and be easily replaced without removing enclosure or any part thereof.
K. Control valves and remote wall mounted space thermostats are to be field installed. Provide two-way modulating control valves unless shown or specified otherwise.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Work shall be installed as shown and according to the manufacturer’s diagrams and recommendations.
B. Handle and install units in accordance with manufacturer's written instructions.
C. Support units rigidly so they always remain stationary. Cross-bracing or other means of stiffening shall be provided as necessary. Method of support shall be such that distortion and malfunction of units cannot occur.
D. Install fiberglass blanket insulation with a minimum R value of 8 above hydronic radiant panels.
3.2 OPERATIONAL TEST
A. Refer to Section 23 05 11, COMMON WORK RESULTS FOR HVAC.
3.3 STARTUP AND TESTING
A. The Commissioning Agent will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with the COR and Commissioning Agent. Provide a minimum of 7 days prior notice.
3.4 COMMISSIONING
A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS for all inspection, start up, and contractor testing required above and required by the
System Readiness Checklist provided by the Commissioning Agent.
23 82 00 - 5
B. Components provided under this section of the specification will be tested as part of a larger system. Refer to Section 23 08 00 –
COMMISSIONING OF HVAC SYSTEMS and related sections for contractor responsibilities for system commissioning.
3.5 DEMONSTRATION AND TRAINING
A. Provide services of manufacturer’s technical representative for four hours to instruct VA personnel in operation and maintenance of units.
B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS.
- - - E N D - - -
23 82 00 - 6
-INTENTIONALLY BLANK-
| PART 1 - GENERAL |
| 1.2 RELATED WORK |
| 1.3 QUALITY ASSURANCE |
| 1.4 1.4 SUBMITTALS |
| 1.5 APPLICABLE PUBLICATIONS |
| PART 2 - PRODUCTS |
| 2.1 ROOM FAN-COIL UNITS |
| PART 3 - EXECUTION |
| 3.1 INSTALLATION |
| 3.2 OPERATIONAL TEST |
| 3.3 STARTup and testing |
| 3.4 COmmissioning |
| 3.5 demonstration and training |