ATTACHMENT 7 - Total Cost Breakdown Mod add item 7.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
19SP1025Q0002 - Modification Adding Duress Button
Solicitation number
19SP1025Q0002-Modification0001
Issued by

About this file

This document is a detailed Total Cost Breakdown spreadsheet for a Department of State solicitation (19SP1025Q0002-Modification0001) involving the installation of a prefabricated container and duress button system. The cost breakdown is structured across six main categories: General Requirements, Site Preparation and Civil Works, Prefabricated Container Fabrication, On-site Installation, Final Cleanup & Handover, and Contingency & Overhead. A seventh section was added to specifically address duress button line installation, which includes labor and materials for approximately 17m of trench and 26m of conduit.

The solicitation modification requests contractors to update their pricing documents to include the new duress button installation details. The proposal submission deadline is Monday, July 14, 2025, at 17:30 local time, with no further questions accepted after July 7. The project involves creating a two-room, ISO-standard prefabricated container with specific requirements including electrical wiring, HVAC, ventilation, interior finishes, lighting, power systems, and a duress system interface. While the total cost is not filled in on the spreadsheet, the document provides a comprehensive breakdown of expected expenses with a 21% VAT applied to the final total.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet2

1. General Requirements
ItemDescriptionUNITEstimated Cost (EUR)
PASite Visit & SurveyPre-award measurements, geotechnical study, utilities identification1
PAPermitting & CoordinationLocal authority permits, embassy coordination1
PASafety & Work Plan SubmittalsAHA, CPM, samples, product data, shop drawings, schedule1
PAEngineering & DesignStructural, MEP, and stamped drawings1
PAOther1
SUBTOTAL 1€ 0
2. Site Preparation and Civil Works
ItemDescriptionEstimated Cost (EUR)
PAArea Isolation & FencingTemporary barrier, signage1
PADemolitionPavement, curbs, mortar, old screen, trenches1
PAExcavationFor slab foundation and utilities (2m depth)1
PAConcrete FoundationOn-site RFC slab for container1
PAAccess Path15 cm concrete path to container1
PAWood FencingWood fence and new doors1
PAOther1
SUBTOTAL 2€ 0
3. Prefabricated Container Fabrication
ItemDescriptionEstimated Cost (EUR)
PAContainer UnitTwo-room, ISO-standard, prefabricated, fully finished (per SOW)1
PAFactory PrewiringElectrical, lighting, duress button, preinstalled1
PAHVAC UnitsSplit units, R32 refrigerant, 2 rooms1
PAVentilation SystemTransfer fan, backdraft damper, louver1
PAInterior FinishesWalls, vinyl flooring, doors, paint, cove base1
PALighting & PowerWaterproof/dustproof LED fixtures, switches, outlets, panels1
PADuress System InterfaceRough-in wiring, coordination (device provided by Post)1
PALifting Eyes, Anchoring PlatesFactory installed1
PAOther1
SUBTOTAL 3€ 0
4. On-site Installation
ItemDescriptionEstimated Cost (EUR)
PATransportationContainer delivery via crane truck1
PAAnchoringBolt and plate anchoring to slab1
PAElectrical TrenchingDitching, conduit installation (6 pipes)1
PAElectrical ConnectionsFeeder wires, breaker panel, connections1
PADuress WiringPulling wire, fitting panels1
PAFinal TestingPower, HVAC, lighting, duress pre-check1
PAOther1
SUBTOTAL 4€ 0
5. Final Cleanup & Handover
PAItemDescriptionEstimated Cost (EUR)
PARepair/Touch-upPaint, flooring repair as needed1
PADebris DisposalDaily removal and site cleanup1
PAAs-Built DocumentationDrawings, specs, digital submittal1
PACloseout ReviewEmbassy walk-through, punch list1
PAOther
SUBTOTAL 5€ 0
6. Contingency & Overhead
ItemDescriptionEstimated Cost (EUR)
PAContractor Overhead & Profit1
PAContingency (Design Changes, Delays, etc.)1
PAOther1€ 0
SUBTOTAL 6€ 0
SUB-TOTAL 1€ 0
SUB-TOTAL 2€ 0
SUB-TOTAL 3€ 0
SUB-TOTAL 4€ 0
SUB-TOTAL 5€ 0
SUB-TOTAL 6€ 0
SUBTOTAL 1 THROUGH 6€ 0
PAVAT21%1€ 0
TOTAL€ 0
Contractor may include other items in accordance with their technical proposal. If a thorough explanation is required, please include it in the Technical Proposal
7. Dures Button line installation
ItemDescriptionEstimated Cost (EUR)
PALabor for an approximate 17m length trench and 26 m conduit1
PAMaterials for an approximate 17m length trench and 26 m conduit1
PAVAT21%1€ 0
TOTAL€ 0