This submittal register outlines required submissions for a federal construction contract to improve pavement, infrastructure, and drainage at Fort Johnson in Louisiana. Key details include a firm fixed price IDIQ contract estimated between $26-100 million, set aside for an 8(a) small business, to provide repairs and new construction of pavement, infrastructure, and drainage at various locations. The contractor must furnish all labor, materials, and equipment and comply with applicable laws and regulations. Submissions are grouped into preconstruction, shop drawings, product data, samples, design data, test reports, certificates, manufacturer instructions, and O&M data categories. Notable required submissions include a project schedule, stormwater pollution prevention plan, waste management plan, mix designs, testing results, certifications, and record drawings.

View the file

Other files for this federal contract opportunity

Other files attached to Fort Johnson Paving and Drainage, newest first.
File Type Posted
Conformed Copy Solicitation Amendment 3 W9124E-24-B-0002.pdf PDF
Amendment 3 - W9124E-24-B-0002.pdf PDF
Technical Exhibit A - Ft. Johnson Statement of Work Rev1, 25Jan24.pdf PDF
Amendment 2 - W9124E-24-B-0002.pdf PDF
Conformed Copy Solicitation Amendment 2 W9124E-24-B-0002.pdf PDF
Technical Exhibit G Davis Bacon WD LA20240014 dtd 5 Jan 2024.pdf PDF
Technical Exhibit B Pavement Infrastructure Specs 25Jan24.pdf PDF
Amendment 1 W9124E-24-B-0002.pdf PDF
Site Visit Attendance Roster W9124E-24-B-0002.pdf PDF
Conformed Copy - Solicitation W9124E-24-B-0002.pdf PDF
Technical Exhibit C - Ft. Johnson Drawings_Specifications, 19Oct23.pdf PDF
Attachment 1 Ft Johnson Bid Schedule Base Period.xlsx XLSX spreadsheet
Attachment 8 - Maks Airfield Construction Safety Phasing Plan (CSPP).pdf PDF
Technical Exhibit F - Peason Ridge Map 19Oct23.pdf PDF
Attachment 5 Ft. Johnson Bid Schedule Ordering Period 4.xlsx XLSX spreadsheet
Technical Exhibit A - Ft. Johnson Statement of Work, 27Dec23.pdf PDF
Technical Exhibit D - Ft. Johnson Vicinity Map, 19Oct23.pdf PDF
Technical Exhibit G - Davis Bacon WD LA20230014 dtd 6Jan23.pdf PDF
Attachment 2 Ft. Johnson Bid Schedule Ordering Period 1.xlsx XLSX spreadsheet
Attachment 3 Ft. Johnson Bid Schedule Ordering Period 2.xlsx XLSX spreadsheet
W9124E-24-B-0002 Fort Johnson Paving and Drainage Solicitation.pdf PDF
Technical Exhibit B - Pavement Infrastructure Specs 19Oct23.pdf PDF
Technical Exhibit E - Ft. Johnson Range Map, 19Oct23.pdf PDF
Attachment 4 Ft. Johnson Bid Schedule Ordering Period 3.xlsx XLSX spreadsheet
Attachment 6 Ft. Johnson COMBINED Bid Schedule.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 13 PAGES

01 30 00 SD-01 Preconstruction Submittals

1.2 GView location map

1.3 GProgress and completion pictures

01 32 01.00 10 SD-01 Preconstruction Submittals

3.4 GProject Schedule

01 33 00 SD-01 Preconstruction Submittals

1.9 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.6 G AAccident Prevention Plan (APP)

1.7 G AActivity Hazard Analysis (AHA)

SD-06 Test Reports

1.11Notifications and Reports

1.11.2Accident Reports

SD-07 Certificates

1.8Confined Space Entry Permit

1.8Hot work permit

1.13License Certificates

01 50 00 SD-01 Preconstruction Submittals

1.4 GConstruction site plan

3.3.1 GTraffic control plan

SD-06 Test Reports

2.2.5 GBackflow Preventer Tests

SD-07 Certificates

1.5.1 GBackflow Tester

1.5Backflow Preventers

01 57 20.00 10 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Fort Johnson Pavement and Infrastructure

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 13 PAGES

01 57 20.00 10 1.7 GEnvironmental Protection Plan

01 57 23 SD-01 Preconstruction Submittals

1.3.2Storm Water Pollution Prevention

Plan

1.3.2Storm Water Notice of Intent

SD-06 Test Reports

Storm Water Inspection Reports for General Permit

1.3Erosion and Sediment Controls

SD-07 Certificates

2.1.3Mill Certificate or Affidavit

01 74 19 SD-01 Preconstruction Submittals

1.4 GWaste Management Plan

01 78 00 SD-03 Product Data

1.6.1Warranty Management Plan

SD-08 Manufacturer’s Instructions

1.4Preventative Maintenance

1.4Condition Monitoring (Predictive

Testing)

1.4Inspection

1.6.1Instructions

SD-10 Operation and Maintenance

Data

1.7Operation and Maintenance

Manuals

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Fort Johnson Pavement and Infrastructure

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 13 PAGES

01 78 00 1.3.1Record Drawings

1.9 GInterim Form DD1354

1.9 GChecklist for Form DD1354

02 32 00 SD-02 Shop Drawings

3.6 GDrilling Log

SD-03 Product Data

1.5Permits, Certifications, and

Licenses

1.3.2.1 GSchedule of Drilling, Sampling, and Testing

02 41 00 SD-01 Preconstruction Submittals

1.10 GExisting Conditions

03 11 13.00 10 SD-02 Shop Drawings

2.2.1 GFormwork

3.1.1 GFormwork

SD-03 Product Data

2.2Form Materials

SD-04 Samples

2.2.4 GFiber Voids

SD-05 Design Data

2.1Calculations

SD-06 Test Reports

3.2Inspection

03 20 00.00 10 SD-01 Preconstruction Submittals

3.1.3.2 GButt-Splices

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Fort Johnson Pavement and Infrastructure

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 13 PAGES

03 20 00.00 10 3.1 GReinforcement

SD-03 Product Data

2.3.1 GMechanical Butt-Splices

2.3 GReinforcing Steel

SD-06 Test Reports

2.7 GTests, Inspections, and

Verifications

SD-07 Certificates

2.3Reinforcing Steel

1.4.1Qualified Welders

1.4.2Qualification of Steel Bar

Butt-Splicers

03 31 01.00 10 SD-03 Product Data

1.3 GConcrete Mix Designs

3.1.4 GConstruction Joint Treatment

3.2.1 GCold-Weather Requirements

3.2.2 GHot-Weather Requirements

2.1.5Nonshrink Grout

SD-06 Test Reports

2.1.2 GAggregates

2.1Mill Test Reports

3.3Tests and Inspections

3.3.2.3 GQuality of Aggregates

2.1.4Water

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

Fort Johnson Pavement and Infrastructure

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 13 PAGES

03 31 01.00 10 1.5Concrete Field Testing

Technicians

1.5Concrete Construction Inspector

(CCI)

SD-08 Manufacturer’s Instructions

1.5.1Curing Compound

31 00 00 SD-01 Preconstruction Submittals

1.5.2 GBlasting

SD-06 Test Reports

3.16Testing

2.1Borrow Site Testing

SD-07 Certificates

3.16Testing

31 23 00.00 20 SD-06 Test Reports

1.5 GBorrow Site Testing

3.15.2.1Fill and backfill

3.15.2.2Select material

3.15.2.3Density tests

3.15.2.4Moisture Content Tests

32 01 11.51 SD-07 Certificates

1.7.1Schedule of work

1.8.1High-pressure rubber and paint removal equipment

32 01 17.16 SD-03 Product Data

3.3Installation of Sealant

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Fort Johnson Pavement and Infrastructure

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 13 PAGES

32 01 17.16 GMaterials

SD-06 Test Reports

1.4Test Requirements

32 01 19 SD-03 Product Data

GManufacturer's

Recommendations

1.2Equipment

SD-04 Samples

1.4.2 GMaterials

SD-06 Test Reports

1.4.2 GCertified copies of the test reports

32 11 23 SD-06 Test Reports

1.5 GSampling and Testing

1.5.2.4 GField Density Tests

32 11 29 SD-03 Product Data

1.4.2Plant, Equipment, Machines, and

Tools

2.2 GMix Design

SD-06 Test Reports

3.5Sampling and Testing

3.6.3Field Density

SD-07 Certificates

2.1.2Bituminous Material

2.1.1Lime

2.2Laboratory

32 11 33 SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Fort Johnson Pavement and Infrastructure

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 13 PAGES

32 11 33 2.5Mix design

2.5Job-mix formula

SD-06 Test Reports

2.2.1Sieve analysis

2.4.1Compressive strength

2.4.1Compressive strength

2.5moisture-density

3.7.2.1Liquid limit

3.7.2.1Plasticity index

3.7.2.1Sieve analysis of combined material

3.7.2.6Optimum moisture content and maximum density

SD-07 Certificates

2.1cement

32 12 10 SD-06 Test Reports

3.5Sampling and Testing

32 12 15.13 SD-02 Shop Drawings

1.2 GPlacement Plan

SD-03 Product Data

2.3 GMix Design

3.1 GContractor Quality Control

SD-06 Test Reports

2.1 GAggregates

3.1.3.10QC Monitoring

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Fort Johnson Pavement and Infrastructure

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 13 PAGES

32 12 15.13 2.2 GAsphalt Cement Binder

3.7Testing Laboratory

32 12 16 SD-03 Product Data

2.3 GMix Design

3.10 GMaterial Acceptance

SD-06 Test Reports

2.1 GAggregates

3.9.3.10QC Monitoring

SD-07 Certificates

2.2 GAsphalt Cement Binder

3.5Testing Laboratory

32 13 11 SD-03 Product Data

2.10Equipment

3.1.2Proposed Techniques

2.8.1 GDowels

2.8.2 GDowel Bar Assemblies

SD-05 Design Data

2.12.2 G EDProportioning Studies

SD-06 Test Reports

1.3.4 G EDSampling and Testing

SD-07 Certificates

1.5.1 G EDContractor Quality Control Staff

1.5.3 G EDLaboratory Accreditation

2.10 G EDNRMCA Certificate of

Conformance

1.5.3 G EDCommercial Laboratory

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Fort Johnson Pavement and Infrastructure

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 13 PAGES

32 13 13.06 SD-03 Product Data

2.1.5Curing materials

2.1.3Admixtures

2.1.4.1Dowel

2.1.4.4 GReinforcement

SD-05 Design Data

2.3 Gmix design

SD-06 Test Reports

2.1.2Aggregate

3.7.2Concrete slump tests

3.7.4Air content tests

3.7.3Flexural strength tests

2.1.1 GCementitious materials

SD-07 Certificates

1.4.1Ready-mixed concrete plant

1.4.4Batch tickets

2.1.1 GCementitious materials

32 13 73 SD-03 Product Data

1.2Equipment

3.1.1Manufacturer's Instructions

SD-04 Samples

2.1 GCompression Seals

SD-06 Test Reports

1.2.3Test Requirements

32 15 00 SD-03 Product Data

1.4.4Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Fort Johnson Pavement and Infrastructure

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 13 PAGES

32 15 00 SD-06 Test Reports

1.4Sampling and Testing

3.11Density Tests

32 16 13 SD-03 Product Data

2.1Concrete

SD-06 Test Reports

3.8Field Quality Control

32 17 24.00 10 SD-03 Product Data

1.3Equipment

2.2.1Composition Requirements

1.5.1Qualifications

SD-06 Test Reports

2.6Sampling and Testing

SD-07 Certificates

2.2.3Volatile Organic Compound

(VOC)

32 31 13.53 SD-03 Product Data

1.3.2Fence Installation

3.1Fence Installation

1.3.2Gate Assembly

2.7.1Gate Assembly

2.7.1Gate Assembly

1.3.2Gate Hardware and Accessories

2.7.3Gate Hardware and Accessories

SD-07 Certificates

2.2.1Chain Link Fence

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Fort Johnson Pavement and Infrastructure

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 13 PAGES

32 31 13.53 1.3.1Reports

1.3.1Zinc Coating

1.3.1aluminum alloy coating

2.1.1Fabric

2.4.2Barbed Wire

2.1.1Stretcher Bars

1.3.2Gate Hardware and Accessories

2.7.3Gate Hardware and Accessories

2.6Concrete

2.9GATE OPERATOR

SD-10 Operation and Maintenance

Data

2.10Electro-Mechanical Locks

2.9Gate Operator

3.7operating and maintenance instructions

32 31 13 SD-03 Product Data

1.3 GFence Assembly

1.3 GGate Assembly

2.16 GGate Hardware and Accessories

2.3 GFabric

2.19 GConcrete

SD-07 Certificates

1.5.2 GCertificates of Compliance

32 32 23 SD-02 Shop Drawings

GShop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Fort Johnson Pavement and Infrastructure

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 13 PAGES

32 32 23 SD-03 Product Data

1.5.1Components and Equipment

1.5.2Supplier Qualifications

1.5.3Manufacturer's Representative

3.8 GSoil Testing

GCalculations

SD-04 Samples

2.1 GSegmental Concrete Units

2.2 GReinforcement

SD-07 Certificates

2.2 GReinforcement

32 92 19 SD-03 Product Data

2.3Fertilizer

SD-06 Test Reports

2.2.3Topsoil composition tests

SD-07 Certificates

2.1seed

SD-08 Manufacturer’s Instructions

2.6Erosion Control Materials

32 92 23 SD-03 Product Data

2.3Fertilizer

SD-06 Test Reports

2.2.3Topsoil composition tests

SD-07 Certificates

2.1sods

33 40 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Fort Johnson Pavement and Infrastructure

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 13 PAGES

33 40 00 3.3Placing Pipe

SD-04 Samples

2.1Pipe for Culverts and Storm

Drains

SD-07 Certificates

2.1.5Resin Certification

3.8Pipeline Testing

2.7Hydrostatic Test on Watertight

Joints

3.7.5Determination of Density

2.3.7Frame and Cover for Gratings

35 31 19.20 SD-02 Shop Drawings

3.2 GBlock Installation

GGeotextile Installation

SD-03 Product Data

2.1 GArticulating Concrete Block

GGeotextile

SD-06 Test Reports

2.1.1.1Flume Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

Fort Johnson Pavement and Infrastructure

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR