This is a Price Schedule Breakdown template for a fixed-price construction contract to upgrade Air Handling Units (AHUs) 18, 20, and 22 at Mann-Granstaff VA Medical Center in Spokane, Washington, under solicitation 36C26026R0044_1. The document provides a standardized pricing structure organized by Construction Specification Institute (CSI) divisions across four subgroups: General Facility Construction (Divisions 1-14), Facility Services (Divisions 21-28), Site & Infrastructure (Divisions 31-35), and Process Equipment (Divisions 40-48). All line items in the template are currently populated with $0.00 values, indicating this is a blank form for contractors to complete during proposal submission.

The instructions establish that awardees are responsible for formula accuracy and total calculations, clarify that the division structure corresponds to architect-provided specification documents, and note that the contract line item breakdown is for informational purposes only and does not create separate billable deliverables. The template includes cost categories for general requirements, field office overhead, general conditions, insurance, bonds, taxes, operations and maintenance manuals, overhead, subcontract markup, profit, and other miscellaneous items. All pricing under this contract is fixed-price, and field office overhead and general conditions are treated as a single cost category applied only once to the base contract and any potential changes.

View the file

Other files

File Type Posted
36C26026R0044 0009.docx DOCX document
52.212-4 Terms and Conditions-Commercial Products and Commercial Services.docx DOCX document
VA Specific Special Contract Clause.docx DOCX document
Revised Information Regarding Bidding Material Bid Guarantee and Bonds.docx DOCX document
36C26026R0044 0008.docx DOCX document
36C26026R0044 0007.docx DOCX document
36C26026R0044 0006.docx DOCX document
Wage Determination Spokane County Revised 5-18-2026.pdf PDF
36C26026R0044 0005.docx DOCX document
Attachment 11 - RFI Questions REV 1.docx DOCX document
36C26026R0044 0002.docx DOCX document
36C26026R0044 0003.docx DOCX document
36C26026R0044 0001.docx DOCX document
Attachment 11 RFI Questions.docx DOCX document
36C26026R0044 0004.docx DOCX document
Attachment 12 Specs Section 078100.pdf PDF
Attachment 6 - Contractor Rules of Behavior - 668-21-100 AHU 18 20 22.pdf PDF
Attachment 2 - Drawings - 668-21-100 AHU 18 20 22.pdf PDF
Attachment 10 - VA Site Visit Campus Map - Bldg 5.pdf PDF
Attachment 1 - SOW - 668-21-100 AHU 18 20 22.pdf PDF
Attachment 4 - Environmental Report - 668-21-100 AHU 18 20 22.pdf PDF
Attachment 5 - Past Performance Questionnaire - 668-21-100 AHU 18 20 22.docx DOCX document
Attachment 8 - Limitations on Subcontracting - 668-21-100 AHU 18 20 22.pdf PDF
Attachment 3 - Specs - 668-21-100 AHU 18 20 22.pdf PDF
Attachment 9 - Wage Determination Spokane - 668-21-100 AHU 18 20 22.pdf PDF
36C26026R0044_1.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN
668-21-100

Upgrade AHUs 18, 20, 22 Mann-Granstaff VA Medical Center, Spokane, WA

Site & Infrastructure Subgroup
RatesBase Item
General Requirements & Facility ConstructionPrice
Division Item 1 General Requirements (furnish and install)N/A$0.00
Division Item 2 Existing Conditions (furnish and install)N/A$0.00
Division Item 3 Concrete (furnish and install)N/A$0.00
Division Item 4 Masonry (furnish and install)N/A$0.00
Division Item 5 Metals (furnish and install)N/A$0.00
Division Item 6 Woods, Plastic and Composites (furnish and install)N/A$0.00
Division Item 7 Thermal and Moisture Protection (furnish and install)N/A$0.00
Division Item 8 Openings (furnish and install)N/A$0.00
Division Item 9 Finishes (furnish and install or state included in Division 5)N/A$0.00
Division Item 10 Specialties (furnish and install)N/A$0.00
Division Item 11 Equipment (furnish and install)N/A$0.00
Division Item 12 Furnishes (furnish and install)N/A$0.00
Division Item 13 Special Construction (furnish and install)N/A$0.00
Division Item 14 Conveying Equipment (furnish and install)N/A$0.00
Facility Services Subgroup
Division Item 21 Fire Suppression (furnish and install)N/A$0.00
Division Item 22 Plumbing (furnish and install)N/A$0.00
Division Item 23 Heating, Ventilating and A/C (furnish and install)N/A$0.00
Division Item 25 Integrated AutomationN/A$0.00
Division Item 26 ElectricN/A$0.00
Division Item 27 CommunicationsN/A$0.00
Division Item 28 Electronic Safety & SecurityN/A$0.00
Site & Infrastructure Subgroup
Division Item 31 EarthworkN/A$0.00
Division Item 32 Exterior ImprovmentsN/A$0.00
Division Item 33 UtilitiesN/A$0.00
Division Item 34 TransportationN/A$0.00
Division Item 35 Waterway & Marine ConstructionN/A$0.00
Process Equipment Subgroup$0.00
Division Item 40 Process InterconnectionsN/A$0.00
Division Item 41 Material Processing & Handling EquipmentN/A$0.00
Division Item 42 Process Heating, Cooling, & Drying EquipmentN/A$0.00
Division Item 43 Process Gas & Liquid HandlingN/A$0.00
Division Item 44 Pollution & Waste Control EquipmentN/A$0.00
Division Item 45 Industry Specific Mfg. EquipmentN/A$0.00
Division Item 46 Water & Wastewater EquipmentN/A$0.00
Division Item 48 Electrical Power GenerationN/A$0.00

TOTAL DIVISIONS $0.00

Insurance / Bonds$0.00
Taxes / Other Fees (provide itemized list)$0.00
O&M Manuals and Red Line Drawings$0.00
Overhead$0.00
SubContract Mark-Up$0.00
Profit$0.00
SubTotals$0.00

Other Items not Requested Above (provide itemized list) $0.00

CONTRACT TOTALS$0.00
TOAL$0.00