ATTACHMENT 7 - Drawings 6 of 13.pdf

PDF 19 MB Posted

Attached to
36C77623B0005 EHRM Infrastructure Upgrades - Cincinnati Project #539-21-701
Solicitation number
36C77623B0005
Issued by

About this file

This document provides details on a federal solicitation and related file. The solicitation number 36C77623B0005 is for the Construction of the EHRM Infrastructure Upgrades at the Cincinnati VAMC, Project #539-21-701, issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The opportunity type is a solicitation for construction services to upgrade infrastructure at the Cincinnati VA Medical Center. Attachment 7 appears to include drawings related to the project scope of work. No further information is provided on pricing, response dates, or other contractual requirements.

View the file

Other files

File Type Posted
36C77623B0005 0004 - Extension 3-10-23.pdf PDF
Technical Questions and Answers - Cincinnati EHRM.pdf PDF
36C77623B0005 0003.pdf PDF
36C77623B0005 0002 - EHRM Infrastructure Upgrades - Cincinnati.pdf PDF
Site Visit Sign-In Sheet - 36C77632B0005 EHRM Infrastructure Construction - Cincinnati VAMC.pdf PDF
ATTACHMENT 24 - Construction Wage Rates - Hamilton 01-13-2023.pdf PDF
36C77623B0005 0001 - EHRM Infrastructure Upgrades - Cincinnati.pdf PDF
Site Visit Memorandum.pdf PDF
ATTACHMENT 4 - Drawings 3 of 13.pdf PDF
ATTACHMENT 23 - Contractor Safety - Environmental Form.pdf PDF
ATTACHMENT 6 - Drawings 5 of 13.pdf PDF
ATTACHMENT 18 - Technology Narrative.pdf PDF
ATTACHMENT 13 - Drawings 12 of 13.pdf PDF
ATTACHMENT 15 - Plumbing Narrative.pdf PDF
ATTACHMENT 19 - Hazardous Materials Inspection Report.pdf PDF
ATTACHMENT 24 - Construction Wage Rates - Hamilton 1-13-2022.pdf PDF
ATTACHMENT 21 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 14 - Drawings 13 of 13.pdf PDF
ATTACHMENT 20 - Brand Name Justification.pdf PDF
ATTACHMENT 22 - Limitations on Subcontracting - Nov 2022.pdf PDF
ATTACHMENT 9 - Drawings 8 of 13.pdf PDF
ATTACHMENT 10 - Drawings 9 of 13.pdf PDF
ATTACHMENT 16 - Mechanical Narrative.pdf PDF
ATTACHMENT 3 - Drawings 2 of 13.pdf PDF
ATTACHMENT 17 - Electrical Narrative.pdf PDF
ATTACHMENT 2 - Drawings 1 of 13.pdf PDF
ATTACHMENT 25 - Site Visit Instructions.pdf PDF
ATTACHMENT 8 - Drawings 7 of 13.pdf PDF
ATTACHMENT 11 - Drawings 10 of 13.pdf PDF
ATTACHMENT 12 - Drawings 11 of 13.pdf PDF
ATTACHMENT 5 - Drawings 4 of 13.pdf PDF
36C77623B0005 Solicitation - Cincinnati EHRM.pdf PDF
ATTACHMENT 1 - Specifications.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

COMP. RM. 134 - DEMO

MD-461-FT.64.1

CL / KW

ENLARGED FLOOR PLANS - FIRST

FLOOR

1. DEMOLISH DIFFUSERS BACK TO MAINS AND CAP.

WHERE LINETYPE INDICATES DEMOLITION; DEMOLISH THE MECHANICAL DUCTWORK, PIPING, AND EQUIPMENT AS INDICATED. DEMOLITION SHALL BE COMPLETE AND INCLUDE: CONTROLS, INSULATION, HANGERS, AND SUPPORTS.

1.

REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

2.

/2

8/

UP

DN

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

WORKOUT 220 - DEMO

MD-462-FT.64.2

CL / KW

ENLARGED FLOOR PLANS - SECOND

FLOOR

1. DEMOLISH THERMOSTAT AND RETAIN FOR INSTALLATION

AS SHOWN ON M-462-FT.64.2.

2. MEASURE AIRFLOW OF SUPPLY DIFFUSER ON THIS

SYSTEM PRIOR TO CONSTRUCTION. RE-BALANCE

EXISTING SUPPLY DIFFUSER IN ITS NEW LOCATION TO

MATCH THE PRE-CONSTRUCTION DIFFUSER AIRFLOW.

SEE M-462-FT.64.2 FOR RELOCATED DIFFUSER LOCATION.

WHERE LINETYPE INDICATES DEMOLITION; DEMOLISH THE MECHANICAL DUCTWORK, PIPING, AND EQUIPMENT AS INDICATED. DEMOLITION SHALL BE COMPLETE AND INCLUDE: CONTROLS, INSULATION, HANGERS, AND SUPPORTS.

1.

REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

2.

/2

8/

VAV

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

NURSES STATION 313 - DEMO

MD-463-FT.64.3

CL / KW

ENLARGED FLOOR PLANS - THIRD

FLOOR

1. DEMOLISH THERMOSTAT AND RETAIN FOR INSTALLATION

IN NEW OFFICE 313A AS SHOWN ON M-463-FT.64.3.

2. DEMO BACK TO MAIN AND CAP.

3. MEASURE AIRFLOW OF EXISTING DIFFUSER TO REMAIN

PRIOR TO CONSTRUCTION. ADJUST VAV AIRFLOW TO

CFM OF DIFFUSER TO REMAIN.

WHERE LINETYPE INDICATES DEMOLITION; DEMOLISH THE MECHANICAL DUCTWORK, PIPING, AND EQUIPMENT AS INDICATED. DEMOLITION SHALL BE COMPLETE AND INCLUDE: CONTROLS, INSULATION, HANGERS, AND SUPPORTS.

1.

REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

2.

/2

8/

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

BUILDING TB - DEMO

MD-480-C.TB.1

TB

CL / KW

ENLARGED FLOOR PLANS - FIRST

FLOOR

KEYED NOTES

1. DEMOLISH DIFFUSER BACK TO MAIN AND CAP AIR TIGHT.

2. DEMOLISH RETURN GRILLE AND DUCT BACK TO MAIN

AND CAP AIR TIGHT. SAVE RETURN GRILLE FOR

INSTALLATION AS SHOWN ON M-480-C.TB.1. MEASURE

RETURN GRILLE AIRFLOW PRIOR TO REMOVING TO

BALANCE THE GRILLE CORRECTLY ON THE NEW

INSTALLATION.

3. MEASURE AIRFLOWS OF ALL SUPPLY DIFFUSERS ON

THIS SYSTEM PRIOR TO CONSTRUCTION. EVENLY

RE-BALANCE EXISTING SUPPLY DIFFUSERS TO REMAIN

TO MATCH THE PRE-CONSTRUCTION TOTAL SYSTEM

AIRFLOW.

WHERE LINETYPE INDICATES DEMOLITION; DEMOLISH THE MECHANICAL DUCTWORK, PIPING, AND EQUIPMENT AS INDICATED. DEMOLITION SHALL BE COMPLETE AND INCLUDE: CONTROLS, INSULATION, HANGERS, AND SUPPORTS.

1.

REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

2.

/2

8/

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

CONFERENCE 105 - DEMO

MD-490-C.TE.1

TE

CL / KW

ENLARGED FLOOR PLANS - FIRST

FLOOR

1. DEMOLISH DIFFUSER AND DUCTWORK BACK TO MAIN

AND CAP AIR TIGHT.

2. MEASURE AIRFLOWS OF ALL SUPPLY DIFFUSERS ON

THIS SYSTEM PRIOR TO CONSTRUCTION. EVENLY

RE-BALANCE EXISTING SUPPLY DIFFUSERS TO REMAIN

TO MATCH THE PRE-CONSTRUCTION TOTAL SYSTEM

AIRFLOW.

WHERE LINETYPE INDICATES DEMOLITION; DEMOLISH THE MECHANICAL DUCTWORK, PIPING, AND EQUIPMENT AS INDICATED. DEMOLITION SHALL BE COMPLETE AND INCLUDE: CONTROLS, INSULATION, HANGERS, AND SUPPORTS.

1.

REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

2.

/2

8/

X8

X1

X8

X8

32X1426X12

X8

8" RS

1'' CCD

1'' CCD

2'' RL

8" RS

2" RL

2" RL UP

1 18" RS UP

2" RL UP

1 18" RS UP

24x22

24x22

MD

MD

1" CCD 1" CCD

8" RS UP

8" RL UP

8" RL

8" RS

1" CCD UP

EX CD

1" CCD

8" RL UP

8" RS UP

8" RS

8" RL

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

TELE. EQUIP. RM. A035 - NEW

M-401-C.1.B

CL / KW

ENLARGED FLOOR PLANS -

BASEMENT

Scale: 1/4" = 1'

TELE. ROOM B021 - NEW

Scale: 1/4" = 1'

ELECTRIC CLOSET A0005 - NEW

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

1. AHU-038 COOLING COIL CONDENSATE.

2. ROUTE CONDENSATE DOWN TO JANITOR'S SINK.

3. ROUTE REFRIGERANT PIPING UP THROUGH FIRST

FLOOR. SEE M-403-C.1.2 FOR CONTINUATION.

4. TIE CONDENSATE INTO EXISTING PUMP AND

CONDENSATE PIPING.

5. ALL SUPPLY DUCT IN A035 SHALL BE INTERNALLY LINED

WITH 1/2" FLEXIBLE ELASTOMERIC INSULATION.

6. ROUTE REFRIGERANT PIPING FROM AIR HANDLING UNIT

UP THROUGH THIRD FLOOR TO CONDENSING UNIT. SEE

M-404-C.1.3 FOR CONTINUATION. ROUTE REFRIGERANT IN

LOCATION OF THE EXISTING REFRIGERANT PIPING THAT

IS SHOWN TO BE DEMOLISHED ON MD-401-C.1.B.

7. TIE EXISTING THERMOSTATS INTO NEW AIR HANDLING

UNITS.

8. ROUTE REFRIGERANT PIPING UP TO FIRST FLOOR. SEE

M-402-C.1.1 FOR CONTINUATION.

9. ENSURE EXISTING AHU-035B IS IN OPERATION AND

EXISTING AHU-035A IS OFF. CLOSE THE MANUAL DAMPER

ON AHU-035A DUCTWORK AND DEMOLISH DUCTWORK AS

NECESSARY BETWEEN AHU-035A AND THE DAMPER.

AHU-035A TO HAVE A TEMPORARY DUCT SETUP TO

BLOW CONDITIONED AIR AROUND THE PLAN SOUTH END

OF THE WALL DIVIDING A035. ONCE TEMPORARY

DUCTWORK IS IN PLACE, AHU-035A SHALL BE IN

OPERATION AND AHU-035B SHALL BE TURNED OFF.

DEMOLISH AHU-035B, ASSOCIATED CONDENSING UNIT,

REFRIGERANT PIPING, AND CONDENSATE PIPING AS

SHOWN. DEMOLISH THE REMAINING EXISTING

DUCTWORK AS SHOWN ON THE PLANS AND NOT

RELATED TO AHU-035B OPERATION. ONCE THE

DEMOLITION OF THESE ITEMS IS COMPLETE, NEW

EQUIPMENT INSTALLATION CAN BEGIN. INSTALL ACU-23,

CU-14, ASSOCIATED REFRIGERANT PIPING AND

CONDENSATE PIPING. INSTALL ALL NEW DUCTWORK PER

THE PLANS. INSTALL DUCTWORK FOR ACU-24 BUT STOP

AFTER THE INSTALLATION OF THE MOTORIZED DAMPER

TO ALLOW FOR THE INSTALLATION OF ACU-24. ENSURE

THE DAMPER FOR ACU-24 IS CLOSED AND THE DAMPER

FOR ACU-23 IS OPEN. ACU-23 AND CU-14 CAN BE

STARTED UP TO PROVIDE COOLING FOR A035. EXISTING

AHU-035A CAN BE TURNED OFF. DEMOLISH AHU-035A,

ASSOCIATED CONDENSING UNIT, ASSOCIATED

REFRRIGERANT PIPING, AND CONDENSATE PIPING.

INSTALL NEW EQUIPMENT AND DUCT AS SHOWN ON THE

PLANS. ONCE INSTALLATION IS COMPLETE, ACU-23 AND

ACU-24 TO OPERATE AS SHOWN ON M600. SEE

MD-401-C.1.B FOR DEMOLITION SCOPE OF WORK

DRAWING FOR A035.

1-ACU 1

1-ACU 2

ALL EXISTING PIPING TO REMAIN IN A NEW TELECOM ROOM SHALL HAVE A CATCH PAN BELOW THE ENTIRE LENGTH OF

PIPE PER DETAIL 1 ON SHEET M-500.

1.

2. ALL NEW PIPING PENETRATIONS THROUGH FLOORS OR ROOFS SHOULD COORDINATE WITH STRUCTURAL. PROVIDE A

SEAL AROUND NEW PENETRATION.

3. LOCATE BOTTOM OF ACUs APPROXIMATELY 1'-0" ABOVE TOP OF DOOR FRAME. COORDINATE FINAL ACU INSTALLATION

HEIGHTS WITH OTHER TRADES.

4. REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

5. REFRIGERANT LINE SIZES AND LENGTHS TO BE CONFIRMED BY THE CONTRACTOR FOR ACTUAL EQUIPMENT BEING

PROVIDED.

6. CONTRACTOR TO COORDINATE LOCATION AND MOUNTING OF MAG LOCK AND DOOR SECURITY PANEL WITH THE

MECHANICAL EQUIPMENT IN THE SPACE.

7. WHERE CONDENSATE PIPING TERMINATES, THE PIPING IS TO BE AIR-GAPPED TO DRAIN.

1-ACU 23

1-ACU 24

S-1

S-1

S-1

S-1

S-1

/2

8/

1" CCD

1" CCD DN

8" RL

8" RS UP

8" RS

8" RL

8" RS

8" RL

4" RS

8" RL UP

8" RS UP

8" RL UP

8" RL

4" RS

1" CCD

1" CCD DN

8" RL

8" RS

8" RS DN

8" RL DN

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

TELECOM ROOM A134A - NEW

M-402-C.1.1

CL / KW

ENLARGED FLOOR PLANS - FIRST

FLOOR

Scale: 1/4" = 1'

TELECOM ROOM A144A - NEW

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

1. INSTALL DEMOLISHED RETURN GRILLE AS SHOWN ON

MD-402-C.1.1. CONNECT FLEXIBLE RETURN DUCT TO

RETURN GRILLE.

2. INSTALL DEMOLISHED SUPPLY DIFFUSER AS SHOWN ON

MD-402-C.1.1. CONNECT SUPPLY DUCT TO SUPPLY

DIFFUSER.

3. INSTALL CATCH PANS. SEE DETAIL 1 ON SHEET M-500.

PROVIDE WITH SMALL CONDENSATE PUMP SIMILAR TO

WHAT IS PROVIDED WITH ACU EQUIPMENT.

4. ROUTE CONDENSATE DOWN TO JANITOR'S SINK.

5. ROUTE REFRIGERANT PIPING UP TO SECOND FLOOR.

SEE M-403-C.1.2 FOR CONTINUATION.

6. ROUTE REFRIGERANT ALONG ROOF AND RISE UP IN THE

CORNER OF THE BUILDING TIGHT TO WALL TO REMAIN

CLEAR OF THE CANTEEN WINDOW AS MUCH AS

POSSIBLE. REFRIGERANT PIPING TO ENTER CEILING

AREA OF THE CANTEEN.

1-ACU 4

1-ACU 6

1-ACU 5

ALL EXISTING PIPING TO REMAIN IN A NEW TELECOM ROOM SHALL HAVE A CATCH PAN BELOW THE ENTIRE LENGTH OF

PIPE PER DETAIL 1 ON SHEET M-500.

1.

2. ALL NEW PIPING PENETRATIONS THROUGH FLOORS OR ROOFS SHOULD COORDINATE WITH STRUCTURAL. PROVIDE A

SEAL AROUND NEW PENETRATION.

3. LOCATE BOTTOM OF ACUs APPROXIMATELY 1'-0" ABOVE TOP OF DOOR FRAME. COORDINATE FINAL ACU INSTALLATION

HEIGHTS WITH OTHER TRADES.

4. REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

5. REFRIGERANT LINE SIZES AND LENGTHS TO BE CONFIRMED BY THE CONTRACTOR FOR ACTUAL EQUIPMENT BEING

PROVIDED.

6. CONTRACTOR TO COORDINATE LOCATION AND MOUNTING OF MAG LOCK AND DOOR SECURITY PANEL WITH THE

MECHANICAL EQUIPMENT IN THE SPACE.

7. WHERE CONDENSATE PIPING TERMINATES, THE PIPING IS TO BE AIR-GAPPED TO DRAIN.

1-CU 3

1-CU 2

/2

8/

1" CCD

EX 1" CCD DN

8" RL

8" RS

8" RS

8" RL

1" CCD

EX 1" CCD DN

8" RS UP

8" RL UP

8" RL UP/DN

8" RS UP/DN

8" RL

8" RS

EXISTING

REFRIGERANT

PIPING

VAV 1" CCD

1" CCD

1" CCD DN

8" RL UP

8'' RS UP

8" RL

8" RS

8" RL

8" RS

8" RS DN

8" RL DN

8" RS UP

8" RL UP

8" RS DN 5

8" RS UP

8" RL DN 3

8" RL UP

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

TELECOM ROOM A2006A - NEW

M-403-C.1.2

CL / KW

ENLARGED FLOOR PLANS - SECOND

FLOOR

Scale: 1/4" = 1'

TELECOM ROOM B232 - NEW

Scale: 1/4" = 1'

TELECOM ROOM C236A - NEW

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

1. INSTALL CATCH PANS. SEE DETAIL 1 ON SHEET M-500.

PROVIDE WITH SMALL CONDENSATE PUMP SIMILAR TO

WHAT IS PROVIDED WITH ACU EQUIPMENT.

2. INSTALL MITERED ELBOW TO EXISTING RETURN AIR

DUCT AND ROUTE NEW DUCT TO NEW RETURN GRILLE

LOCATION. NEW RETURN DUCT SIZE, TYPE AND

PRESSURE CLASS TO MATCH EXISTING DUCTWORK.

INSULATE USING 1.5" THICK FIBERGLASS BLANKET

INSULATION, 1.5 LB DENSITY.

3. INSTALL RETURN GRILLE SAVED FROM DEMOLITION,

SEE MD-403-C.1.2 FOR REFERENCE.

4. ROUTE CONDENSATE DOWN TO JANITOR'S SINK.

5. ROUTE REFRIGERANT PIPING UP THROUGH THIRD

FLOOR. SEE M-405-C.1.4 FOR CONTINUATION.

6. ROUTE REFRIGERANT PIPING DOWN THROUGH FIRST

FLOOR. SEE M-401-C.1.B FOR CONTINUATION. ROUTE

REFRIGERANT PIPING UP TO THIRD FLOOR. SEE

M-404-C.1.3 FOR CONTINUATION.

7. RE-BALANCE DIFFUSER TO AIRFLOW PRIOR TO

CONSTRUCTION. BALANCE VAV TO MATCH (2) SUPPLY

DIFFUSER TOTALS FOR CONFERENCE ROOM. IF VAV

MINIMUM AIRFLOW IS HIGHER THAN TOTAL DIFFUSER

AIRFLOW FOR THAT VAV, INCREASE THE DIFFUSER

AIRFLOWS EVENLY TO MEET THE MINIMUM VAV

AIRFLOW CFM.

8. RE-BALANCE DIFFUSER TO AIRFLOW PRIOR TO

CONSTRUCTION. BALANCE VAV TO MATCH SUPPLY

DIFFUSER TOTAL. IF VAV MINIMUM AIRFLOW IS HIGHER

THAN TOTAL DIFFUSER AIRFLOW FOR THAT VAV,

INCREASE THE DIFFUSER AIRFLOWS EVENLY TO MEET

THE MINIMUM VAV AIRFLOW CFM.

9. BALANCE RETURN GRILLE CFM TO MATCH SUPPLY

DIFFUSER CFM.

1-ACU 7

1-ACU 9

1-ACU 11

ALL EXISTING PIPING TO REMAIN IN A NEW TELECOM ROOM SHALL HAVE A CATCH PAN BELOW THE ENTIRE LENGTH OF

PIPE PER DETAIL 1 ON SHEET M-500.

1.

2. ALL NEW PIPING PENETRATIONS THROUGH FLOORS OR ROOFS SHOULD COORDINATE WITH STRUCTURAL. PROVIDE A

SEAL AROUND NEW PENETRATION.

3. LOCATE BOTTOM OF ACUs APPROXIMATELY 1'-0" ABOVE TOP OF DOOR FRAME. COORDINATE FINAL ACU INSTALLATION

HEIGHTS WITH OTHER TRADES.

4. REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

5. REFRIGERANT LINE SIZES AND LENGTHS TO BE CONFIRMED BY THE CONTRACTOR FOR ACTUAL EQUIPMENT BEING

PROVIDED.

6. CONTRACTOR TO COORDINATE LOCATION AND MOUNTING OF MAG LOCK AND DOOR SECURITY PANEL WITH THE

MECHANICAL EQUIPMENT IN THE SPACE.

7. WHERE CONDENSATE PIPING TERMINATES, THE PIPING IS TO BE AIR-GAPPED TO DRAIN.

8X 8 R

A

1-CU 5

Scale: 1/4" = 1'

A/C SHAFT REFFRIGERANT PIPING - NEW

7 7

/2

8/

EX 1" CCD DN

S-1

VAV

EX

EX

EX

EX

R-1

EX

8" DIA

DN

UP

VAV

1" CCD EX 1" CCD UP/DN

8" RL

8" RS

8" RL UP

8" RS UP

VAV

1" CCD

1" CCD

1" CCD

1" CCD

8" RL UP

8" RS UP

1" CCD

T

MECHANICAL

A3002

8" RL DN

8" RS DN

8'' RL

8'' RS

8'' RL DN

8'' RS DN

4" RS

8" RL

PIPE SUPPORT

PIPE SUPPORT

8" RS

2" RL

2" RL

8'' RS

2" RL

1 18" RS

2" RL

1 18" RS

1" CCD

4" RS UP

8" RL UP

4" RS UP / DN

8" RL UP / DN

8 " RS

8" RL

8 " RS

8" RL

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

TELECOM ROOM B312D - NEW

M-404-C.1.3

CL / KW

ENLARGED FLOOR PLANS - THIRD

FLOOR

Scale: 1/4" = 1'

FAMILY WAITING C310 AND SLEEPING ROOM 383A - NEW

Scale: 1/4" = 1'

TELECOM ROOM C3006 - NEW

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

1-ACU 13

1-ACU 14

1-ACU 16

1. INSTALL CATCH PANS. SEE DETAIL 1 ON SHEET M-500.

COLLECT CATCH PAN AND ACU CONDENSATE BEFORE

CONNECTING TO CONDENSATE PUMP.

2. ROUTE CONDENSATE DOWN TO JANITOR'S SINK.

3. ROUTE REFRIGERANT PIPE ALONG ROOF. ROUTE

PIPING UP ALONG MECHANICAL ROOM WALL AND

ENTER THE MECHANICAL ROOM AT A SIMILAR

ELEVATION TO THE EXISTING REFRIGERANT PIPING.

4. ROUTE REFRIGERANT PIPING DOWN TO SECOND

FLOOR. SEE M-403-C.1.2 FOR CONTINUATION.

5. ROUTE REFRIGERANT PIPING UP TO FOURTH FLOOR.

SEE M-405-C.1.4 FOR CONTINUATION.

6. INSTALL NEW CONDENSING UNIT. ROUTE

REFRIGERANT PIPING FROM CONDENSING UNIT ON

THIRD FLOOR TO AIR HANDING UNIT IN TR A035

BASEMENT. SEE M-401-C.1.B FOR CONTINUATION.

7. SEE M-500 FOR PIPE SUPPORT DETAIL.

8. RE-BALANCE DIFFUSER TO AIRFLOW PRIOR TO

CONSTRUCTION. BALANCE VAV TO MATCH SUPPLY

DIFFUSER TOTAL. IF VAV MINIMUM AIRFLOW IS HIGHER

THAN TOTAL DIFFUSER AIRFLOW FOR THAT VAV,

INCREASE THE DIFFUSER AIRFLOWS EVENLY TO MEET

THE MINIMUM VAV AIRFLOW CFM.

9. RE-INSTALL RETAINED SUPPLY DIFFUSER. SEE

MD-404.C.1.3.

ALL EXISTING PIPING TO REMAIN IN A NEW TELECOM ROOM SHALL HAVE A CATCH PAN BELOW THE ENTIRE LENGTH OF

PIPE PER DETAIL 1 ON SHEET M-500.

1.

2. ALL NEW PIPING PENETRATIONS THROUGH FLOORS OR ROOFS SHOULD COORDINATE WITH STRUCTURAL. PROVIDE A

SEAL AROUND NEW PENETRATION.

3. LOCATE BOTTOM OF ACUs APPROXIMATELY 1'-0" ABOVE TOP OF DOOR FRAME. COORDINATE FINAL ACU INSTALLATION

HEIGHTS WITH OTHER TRADES.

4. REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

5. REFRIGERANT LINE SIZES AND LENGTHS TO BE CONFIRMED BY THE CONTRACTOR FOR ACTUAL EQUIPMENT BEING

PROVIDED.

6. CONTRACTOR TO COORDINATE LOCATION AND MOUNTING OF MAG LOCK AND DOOR SECURITY PANEL WITH THE

MECHANICAL EQUIPMENT IN THE SPACE.

7. WHERE CONDENSATE PIPING TERMINATES, THE PIPING IS TO BE AIR-GAPPED TO DRAIN.

1 1

Scale: 1/4" = 1'

MECHANICAL A3002 - NEW

1-CU 11-CU 6

Scale: 1/4" = 1'

SECOND FLOOR ROOF - NEW

1-CU 14 1-CU 15

Scale: 1/4" = 1'

TELECOM ROOM C305 - NEW

SEE DETAIL #2, THIS SHEET,

FOR CONTINUATION

SEE DETAIL #5, THIS SHEET,

FOR CONTINUATION

1-ACU 15

/2

8/

/2

8/

8" RL DN / UP TO EIGHTH FLOOR

8" RS DN / UP TO EIGHTH FLOOR

8" RL DN

8" RS DN

1" CCD DN

8" RS

8" RL

1" CCD

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

TELECOM ROOM A540 - NEW

M-406-C.1.5

CL / KW

ENLARGED FLOOR PLANS - FIFTH

FLOOR

ALL EXISTING PIPING TO REMAIN IN A NEW TELECOM ROOM SHALL HAVE A CATCH PAN BELOW THE ENTIRE LENGTH OF

PIPE PER DETAIL 1 ON SHEET M-500.

1.

2. ALL NEW PIPING PENETRATIONS THROUGH FLOORS OR ROOFS SHOULD COORDINATE WITH STRUCTURAL. PROVIDE A

SEAL AROUND NEW PENETRATION.

3. LOCATE BOTTOM OF ACUs APPROXIMATELY 1'-0" ABOVE TOP OF DOOR FRAME. COORDINATE FINAL ACU INSTALLATION

HEIGHTS WITH OTHER TRADES.

4. REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

5. REFRIGERANT LINE SIZES AND LENGTHS TO BE CONFIRMED BY THE CONTRACTOR FOR ACTUAL EQUIPMENT BEING

PROVIDED.

6. CONTRACTOR TO COORDINATE LOCATION AND MOUNTING OF MAG LOCK AND DOOR SECURITY PANEL WITH THE

MECHANICAL EQUIPMENT IN THE SPACE.

7. WHERE CONDENSATE PIPING TERMINATES, THE PIPING IS TO BE AIR-GAPPED TO DRAIN.

1. INSTALL CATCH PANS. SEE DETAIL 1 ON SHEET M-500.

PROVIDE WITH SMALL CONDENSATE PUMP SIMILAR TO

WHAT IS PROVIDED WITH ACU EQUIPMENT.

2. ROUTE REFRIGERANT PIPING UP TO EIGHTH FLOOR.

SEE M-409-C.1.8 FOR CONTINUATION.

3. ROUTE REFRIGERANT PIPING DOWN TO FOURTH

FLOOR. SEE M-405-C.1.4 FOR CONTINUATION.

4. ROUTE CONDENSATE PIPING DOWN TO FOURTH

FLOOR. SEE M-405-C.1.4 FOR CONTINUATION.

5. ROUTE PIPING AROUND EXISTING AIR DUCT.

1-ACU 18

/2

8/

DN UP

EX 1" CCD UP/DN

8" RS DN

8" RL DN

8" RS

8" RL

8" RL

8" RS

8" RL UP / DN

8" RS UP / DN

1" CCD UP

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

TELECOM ROOM A643 - NEW

M-407-C.1.6

CL / KW

ENLARGED FLOOR PLANS - SIXTH

FLOOR

1-ACU 19

ALL EXISTING PIPING TO REMAIN IN A NEW TELECOM ROOM SHALL HAVE A CATCH PAN BELOW THE ENTIRE LENGTH OF

PIPE PER DETAIL 1 ON SHEET M-500.

1.

2. ALL NEW PIPING PENETRATIONS THROUGH FLOORS OR ROOFS SHOULD COORDINATE WITH STRUCTURAL. PROVIDE A

SEAL AROUND NEW PENETRATION.

3. LOCATE BOTTOM OF ACUs APPROXIMATELY 1'-0" ABOVE TOP OF DOOR FRAME. COORDINATE FINAL ACU INSTALLATION

HEIGHTS WITH OTHER TRADES.

4. REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

5. REFRIGERANT LINE SIZES AND LENGTHS TO BE CONFIRMED BY THE CONTRACTOR FOR ACTUAL EQUIPMENT BEING

PROVIDED.

6. CONTRACTOR TO COORDINATE LOCATION AND MOUNTING OF MAG LOCK AND DOOR SECURITY PANEL WITH THE

MECHANICAL EQUIPMENT IN THE SPACE.

7. WHERE CONDENSATE PIPING TERMINATES, THE PIPING IS TO BE AIR-GAPPED TO DRAIN.

1. ROUTE REFRIGERANT PIPING DOWN TO FIFTH FLOOR.

SEE M-106-C.1.5 FOR CONTINUATION.

/2

8/

A/C Shaft

8" RL DN TO FOURTH FLOOR

8" RS DN TO FOURTH FLOOR

8" RS

8" RL

1" CCD DN

FCU2-3

CUH CUH

8"Ø

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

TELECOM ROOM A732 - NEW

M-408-C.1.7

CL / KW

ENLARGED FLOOR PLAN - SEVENTH

FLOOR

ALL EXISTING PIPING TO REMAIN IN A NEW TELECOM ROOM SHALL HAVE A CATCH PAN BELOW THE ENTIRE LENGTH OF

PIPE PER DETAIL 1 ON SHEET M-500.

1.

2. ALL NEW PIPING PENETRATIONS THROUGH FLOORS OR ROOFS SHOULD COORDINATE WITH STRUCTURAL. PROVIDE A

SEAL AROUND NEW PENETRATION.

3. LOCATE BOTTOM OF ACUs APPROXIMATELY 1'-0" ABOVE TOP OF DOOR FRAME. COORDINATE FINAL ACU INSTALLATION

HEIGHTS WITH OTHER TRADES.

4. REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

5. REFRIGERANT LINE SIZES AND LENGTHS TO BE CONFIRMED BY THE CONTRACTOR FOR ACTUAL EQUIPMENT BEING

PROVIDED.

6. CONTRACTOR TO COORDINATE LOCATION AND MOUNTING OF MAG LOCK AND DOOR SECURITY PANEL WITH THE

MECHANICAL EQUIPMENT IN THE SPACE.

7. WHERE CONDENSATE PIPING TERMINATES, THE PIPING IS TO BE AIR-GAPPED TO DRAIN.

1. INSTALL CATCH PANS. SEE DETAIL 1 ON SHEET M-500.

PROVIDE WITH SMALL CONDENSATE PUMP SIMILAR TO

WHAT IS PROVIDED WITH ACU EQUIPMENT.

2. ROUTE REFRIGERANT PIPING DOWN TO FOURTH FLOOR.

SEE M-404-C.1.3 FOR CONTINUATION.

3. MEASURE DIFFUSER AIRFLOWS PRIOR TO

CONSTRUCTION. RE-BALANCE DIFFUSER TO MATCH

PRE-CONSTRUCTION AIRFLOW. RE-BALANCE VAV TO

MATCH TOTAL AIRFLOW FROM THE (3) DIFFUSERS.

4. INSTALL SUPPLY DIFFUSER FROM MD-408-C.1.7.

CONNECT SUPPLY DUCT FROM MAIN TO SUPPLY

DIFFUSER.

5. INSTALL EXHAUST GRILLES FROM MD-408-C.1.7.

CONNECT EXHAUST DUCT FROM MAIN TO EXHAUST

GRILLES.

6. INSTALL THERMOSTAT FROM MD-408-C.1.7.

7. CONTRACTOR TO MEASURE EXISTING DIFFUSER AND

GRILLE AIRFLOWS PRIOR TO CONSTRUCTION.

8. S-2 IN ROOM 704A TO BE BALANCED TO 1/3 OF THE

PRE-CONSTRUCTION AIRFLOW OF THE EXISTING

SUPPLY DIFFUSER. THE EXISTING SUPPLY DIFFUSER IN

ROOM 704 TO BE BALANCED TO 2/3 OF THE

PRE-CONSTRUCTION AIRFLOW.

9. CABINET UNIT HEATER IS EXISTING TO REMAIN.

10. INSTALL EXISTING THERMOSTAT IN NEW LOCATION. SEE

MD-408-C.1.7 FOR DETAILS ON REMAINING THERMOSTAT.

Scale: 1/4" = 1'

SOUTH SEVENTH FLOOR REWORK - NEW

1-ACU 20

5 5

S-2

9 9

/2

8/

DN UP

Stor.

A846A

Stor.

A846B

B802A

Dermatology

A838

Conf.

A839

Stor.

A841

HAC

A842

Stor.

A840

Corridor

C*8*1

Stair 1

S*8*1

A/C Shaft

8" RL DN TO FIFTH FLOOR

8" RS DN TO FIFTH FLOOR

8" RS

8" RL

1" CCD

1" CCD

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

TELECOM ROOM A838 - NEW

M-409-C.1.8

CL / KW

ENLARGED FLOOR PLAN - EIGHTH

FLOOR

ALL EXISTING PIPING TO REMAIN IN A NEW TELECOM ROOM SHALL HAVE A CATCH PAN BELOW THE ENTIRE LENGTH OF

PIPE PER DETAIL 1 ON SHEET M-500.

1.

2. ALL NEW PIPING PENETRATIONS THROUGH FLOORS OR ROOFS SHOULD COORDINATE WITH STRUCTURAL. PROVIDE A

SEAL AROUND NEW PENETRATION.

3. LOCATE BOTTOM OF ACUs APPROXIMATELY 1'-0" ABOVE TOP OF DOOR FRAME. COORDINATE FINAL ACU INSTALLATION

HEIGHTS WITH OTHER TRADES.

4. REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

5. REFRIGERANT LINE SIZES AND LENGTHS TO BE CONFIRMED BY THE CONTRACTOR FOR ACTUAL EQUIPMENT BEING

PROVIDED.

6. CONTRACTOR TO COORDINATE LOCATION AND MOUNTING OF MAG LOCK AND DOOR SECURITY PANEL WITH THE

MECHANICAL EQUIPMENT IN THE SPACE.

7. WHERE CONDENSATE PIPING TERMINATES, THE PIPING IS TO BE AIR-GAPPED TO DRAIN.

1. ROUTE CONDENSATE DOWN TO JANITOR'S SINK.

2. INSTALL CATCH PANS. SEE DETAIL 1 ON SHEET M-500.

PROVIDE WITH SMALL CONDENSATE PUMP SIMILAR TO

WHAT IS PROVIDED WITH ACU EQUIPMENT.

3. ROUTE REFRIGERANT PIPING DOWN THROUGH THIRD

FLOOR. SEE M-403-C.1.2 FOR CONTINUATION.

4. ROUTE REFRIGERANT PIPING DOWN INTO TR C311A

BELOW THROUGH EXISTING ABANDONED ROOF CURB.

5. ROUTE REFRIGERANT PIPING UP TO FIFTH FLOOR. SEE

M-106-C.1.5 FOR CONTINUATION.

6. DOWN TO C3006. SEE M-404-C.1.3 FOR CONTINUATION.

7. ROUTE REFRIGERANT PIPING BELOW EXHAUST

DUCTWORK.

8. 1-CU-7 AND REFRIGERANT PIPING TO BE LOCATED

NORTH OF THE LADDER TO THE PENTHOUSE ROOF SO

AS TO NOT IMPEDE ON IT'S USE.

1-ACU 21

/2

8/

1" CCD DN

8" RL UP

8" RS UP

8" RL

8" RS

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

TELECOM ROOM A916A - NEW

M-410-C.1.9

CL / KW

ENLARGED FLOOR PLANS - NINTH

FLOOR

1-ACU 22

1. ROUTE CONDENSATE DOWN TO JANITOR'S SINK.

ALL EXISTING PIPING TO REMAIN IN A NEW TELECOM ROOM SHALL HAVE A CATCH PAN BELOW THE ENTIRE LENGTH OF

PIPE PER DETAIL 1 ON SHEET M-500.

1.

2. ALL NEW PIPING PENETRATIONS THROUGH FLOORS OR ROOFS SHOULD COORDINATE WITH STRUCTURAL. PROVIDE A

SEAL AROUND NEW PENETRATION.

3. LOCATE BOTTOM OF ACUs APPROXIMATELY 1'-0" ABOVE TOP OF DOOR FRAME. COORDINATE FINAL ACU INSTALLATION

HEIGHTS WITH OTHER TRADES.

4. REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

5. REFRIGERANT LINE SIZES AND LENGTHS TO BE CONFIRMED BY THE CONTRACTOR FOR ACTUAL EQUIPMENT BEING

PROVIDED.

6. CONTRACTOR TO COORDINATE LOCATION AND MOUNTING OF MAG LOCK AND DOOR SECURITY PANEL WITH THE

MECHANICAL EQUIPMENT IN THE SPACE.

7. WHERE CONDENSATE PIPING TERMINATES, THE PIPING IS TO BE AIR-GAPPED TO DRAIN.

/2

8/

8" RL

8" RS

8" RS UP

8" RL UP

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

TELECOM ROOM 0001 - NEW

M-420-C.2.B

CL / KW

ENLARGED FLOOR PLANS -

BASEMENT

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

2-ACU 1

1. INSTALL CATCH PANS. SEE DETAIL 1 ON SHEET M-500.

2. TIE CATCH PAN DRAIN INTO SUCTION SIDE OF

CONDENSATE PUMP FOR 2-ACU 1.

3. ROUTE CONDENSATE DOWN TO JANITOR'S SINK.

ALL EXISTING PIPING TO REMAIN IN A NEW TELECOM ROOM SHALL HAVE A CATCH PAN BELOW THE ENTIRE LENGTH OF

PIPE PER DETAIL 1 ON SHEET M-500.

1.

2. ALL NEW PIPING PENETRATIONS THROUGH FLOORS OR ROOFS SHOULD COORDINATE WITH STRUCTURAL. PROVIDE A

SEAL AROUND NEW PENETRATION.

3. LOCATE BOTTOM OF ACUs APPROXIMATELY 1'-0" ABOVE TOP OF DOOR FRAME. COORDINATE FINAL ACU INSTALLATION

HEIGHTS WITH OTHER TRADES.

4. REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

5. REFRIGERANT LINE SIZES AND LENGTHS TO BE CONFIRMED BY THE CONTRACTOR FOR ACTUAL EQUIPMENT BEING

PROVIDED.

6. CONTRACTOR TO COORDINATE LOCATION AND MOUNTING OF MAG LOCK AND DOOR SECURITY PANEL WITH THE

MECHANICAL EQUIPMENT IN THE SPACE.

7. WHERE CONDENSATE PIPING TERMINATES, THE PIPING IS TO BE AIR-GAPPED TO DRAIN.

/2

8/

STORAGE

LAUNDRY

CLEAN

UTILITY

KITCHEN &

PANTRY

LOUNGE

NURSES'

STATION

WORK

ROOM

CHARTING

CORRIDOR

NURSING

HOME

RECEPTION

V. MEN

V. WOMEN

BATHING

SUITE

Omnicells

8" RS UP/DN

8" RL UP/DN

8" RL UP

8" RS UP

8" RS

8" RL

1" CCD

1" CCD

10'' DIA SA

6" DIA SA

FLEX DUCT

EXISTING

STORM PIPING

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

TELECOM ROOM 1040A - NEW

M-421-C.2.1

CL / KW

ENLARGED FLOOR PLANS - FIRST

LEVEL

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

1. INSTALL CATCH PANS. SEE DETAIL 1 ON SHEET M-500.

2. INSTALL EXISTING THERMOSTAT THAT WAS

PREVIOUSLY DEMOLISHED ON MD-421-C.2.1. EXTEND

WIRING AS REQUIRED TO REACH NEW INSTALLATION

LOCATION.

3. TIE CATCH PAN DRAIN INTO SUCTION SIDE OF

CONDENSATE PUMP FOR 2-ACU 2.

4. ROUTE CONDENSATE DOWN TO DRAIN FOR LAUNDRY.

5. INSTALL DIFFUSER THAT IS SHOWN AS DEMO ON

MD-421-C.2.1. INSTALL NEW 10" DIA DUCT AND TIE IN

EXISTING 8" DIA DUCT FOR SLOT DIFFUSER NEAR

WINDOW.

6. MEASURE DIFFUSER AIRFLOWS PRIOR TO

CONSTRUCTION. RE-BALANCE DIFFUSER TO MATCH

PRE-CONSTRUCTION AIRFLOW. RE-BALANCE VAV TO

MATCH TOTAL AIRFLOW FROM THE (3) DIFFUSERS.

ALL EXISTING PIPING TO REMAIN IN A NEW TELECOM ROOM SHALL HAVE A CATCH PAN BELOW THE ENTIRE LENGTH OF

PIPE PER DETAIL 1 ON SHEET M-500.

1.

2. ALL NEW PIPING PENETRATIONS THROUGH FLOORS OR ROOFS SHOULD COORDINATE WITH STRUCTURAL. PROVIDE A

SEAL AROUND NEW PENETRATION.

3. LOCATE BOTTOM OF ACUs APPROXIMATELY 1'-0" ABOVE TOP OF DOOR FRAME. COORDINATE FINAL ACU INSTALLATION

HEIGHTS WITH OTHER TRADES.

4. REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

5. REFRIGERANT LINE SIZES AND LENGTHS TO BE CONFIRMED BY THE CONTRACTOR FOR ACTUAL EQUIPMENT BEING

PROVIDED.

6. CONTRACTOR TO COORDINATE LOCATION AND MOUNTING OF MAG LOCK AND DOOR SECURITY PANEL WITH THE

MECHANICAL EQUIPMENT IN THE SPACE.

7. WHERE CONDENSATE PIPING TERMINATES, THE PIPING IS TO BE AIR-GAPPED TO DRAIN.

6 6

/2

8/

8" RS

8" RL

VAV-4-5

8" RS DN

8" RL DN

8" RL DN

8" RS DN

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

GENERAL NOTES

KEYED NOTES

M-422-C.2.2

CL / KW

ENLARGED FLOOR PLANS - SECOND

LEVEL

1. ROUTE CONDENSATE DOWN TO DRAIN FOR LAUNDRY.

CONDENSATE DRAIN TO BE AN INDIRECT CONNECTION.

2. LOCATE CU ON ROOF ABOVE.

3. ROUTE REFRIGERANT PIPING ALONG ROOF. DROP

DOWN INTO SPACE AS SHOWN.

4. ROUTE REFRIGERANT PIPING ALONG ROOF. DROP

DOWN INTO CHASE AS SHOWN.

ALL EXISTING PIPING TO REMAIN IN A NEW TELECOM ROOM SHALL HAVE A CATCH PAN BELOW THE ENTIRE LENGTH OF

PIPE PER DETAIL 1 ON SHEET M-500.

1.

2. ALL NEW PIPING PENETRATIONS THROUGH FLOORS OR ROOFS SHOULD COORDINATE WITH STRUCTURAL. PROVIDE A

SEAL AROUND NEW PENETRATION.

3. LOCATE BOTTOM OF ACUs APPROXIMATELY 1'-0" ABOVE TOP OF DOOR FRAME. COORDINATE FINAL ACU INSTALLATION

HEIGHTS WITH OTHER TRADES.

4. REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

5. REFRIGERANT LINE SIZES AND LENGTHS TO BE CONFIRMED BY THE CONTRACTOR FOR ACTUAL EQUIPMENT BEING

PROVIDED.

6. CONTRACTOR TO COORDINATE LOCATION AND MOUNTING OF MAG LOCK AND DOOR SECURITY PANEL WITH THE

MECHANICAL EQUIPMENT IN THE SPACE.

7. WHERE CONDENSATE PIPING TERMINATES, THE PIPING IS TO BE AIR-GAPPED TO DRAIN.

2-ACU 3

Scale: 1/4" = 1'

TELECOM ROOM 204 - NEW

Scale: 1/4" = 1'

SECOND FLOOR ROOF - NEW

2-CU 3

2-CU 2

2-CU 1

/2

8/

8" RS UP 3

8" RL UP

8" RS

8" RL

8" RS

8" RL

1" CCD

1" CCD

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

TELECOM ROOM 13A - NEW

M-430-C.3.B

CL / KW

ENLARGED FLOOR PLANS -

BASEMENT

1. INSTALL CATCH PANS. SEE DETAIL 1 ON SHEET M-500.

ONLY INSTALL PAN BELOW PIPING THAT IS LOCATED IN

NEW TR SPACE. CONNECT CONDENSATE PIPING ON

THE SUCTION SIDE OF THE CONDENSATE PUMP FOR

THE ACU.

2. INSTALL DIFFUSER THAT WAS SHOWN AS DEMO ON

MD-430-C.3.B. CONNECT FLEX DUCT TO

DIFFUSER.MEASURE DIFFUSER AIRFLOW PRIOR TO

CONSTRUCTION. BALANCE DIFFUSER TO

PRE-CONSTRUCTION AIRFLOW.

3. INSTALL GRILLE THAT WAS SHOWN AS DEMO ON

MD-430-C.3.B.

4. ROUTE CONDENSATE TO NEAREST FLOOR DRAIN IN

MECHANICAL ROOM 13.

ALL EXISTING PIPING TO REMAIN IN A NEW TELECOM ROOM SHALL HAVE A CATCH PAN BELOW THE ENTIRE LENGTH OF

PIPE PER DETAIL 1 ON SHEET M-500.

1.

2. ALL NEW PIPING PENETRATIONS THROUGH FLOORS OR ROOFS SHOULD COORDINATE WITH STRUCTURAL. PROVIDE A

SEAL AROUND NEW PENETRATION.

3. LOCATE BOTTOM OF ACUs APPROXIMATELY 1'-0" ABOVE TOP OF DOOR FRAME. COORDINATE FINAL ACU INSTALLATION

HEIGHTS WITH OTHER TRADES.

4. REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

5. REFRIGERANT LINE SIZES AND LENGTHS TO BE CONFIRMED BY THE CONTRACTOR FOR ACTUAL EQUIPMENT BEING

PROVIDED.

6. CONTRACTOR TO COORDINATE LOCATION AND MOUNTING OF MAG LOCK AND DOOR SECURITY PANEL WITH THE

MECHANICAL EQUIPMENT IN THE SPACE.

7. WHERE CONDENSATE PIPING TERMINATES, THE PIPING IS TO BE AIR-GAPPED TO DRAIN.

3-ACU 1

/2

8/

UP

1" CCD DN

1" CCD

8" RL

8" RS

8" RL

8" RS

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

TELECOM ROOM 205 - NEW

M-440-C.8.2

CL / KW

ENLARGED FLOOR PLANS - SECOND

FLOOR

1. ROUTE CONDENSATE TO STORAGE ROOM AND ROUTE

CONDENSATE TO DRAIN SERVING EXISTING AIR

HANDLER IN THIS ROOM.

ALL EXISTING PIPING TO REMAIN IN A NEW TELECOM ROOM SHALL HAVE A CATCH PAN BELOW THE ENTIRE LENGTH OF

PIPE PER DETAIL 1 ON SHEET M-500.

1.

2. ALL NEW PIPING PENETRATIONS THROUGH FLOORS OR ROOFS SHOULD COORDINATE WITH STRUCTURAL. PROVIDE A

SEAL AROUND NEW PENETRATION.

3. LOCATE BOTTOM OF ACUs APPROXIMATELY 1'-0" ABOVE TOP OF DOOR FRAME. COORDINATE FINAL ACU INSTALLATION

HEIGHTS WITH OTHER TRADES.

4. REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

5. REFRIGERANT LINE SIZES AND LENGTHS TO BE CONFIRMED BY THE CONTRACTOR FOR ACTUAL EQUIPMENT BEING

PROVIDED.

6. CONTRACTOR TO COORDINATE LOCATION AND MOUNTING OF MAG LOCK AND DOOR SECURITY PANEL WITH THE

MECHANICAL EQUIPMENT IN THE SPACE.

7. WHERE CONDENSATE PIPING TERMINATES, THE PIPING IS TO BE AIR-GAPPED TO DRAIN.

8-ACU 1

8-CU 1

/2

8/

8" RL UP

8" RS UP

8" RL

8" RS

VAV

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

TELECOM ROOM 101 - NEW

M-450-C.15.1

CL / KW

ENLARGED FLOOR PLANS - FIRST

FLOOR

ALL EXISTING PIPING TO REMAIN IN A NEW TELECOM ROOM SHALL HAVE A CATCH PAN BELOW THE ENTIRE LENGTH OF

PIPE PER DETAIL 1 ON SHEET M-500.

1.

2. ALL NEW PIPING PENETRATIONS THROUGH FLOORS OR ROOFS SHOULD COORDINATE WITH STRUCTURAL. PROVIDE A

SEAL AROUND NEW PENETRATION.

3. LOCATE BOTTOM OF ACUs APPROXIMATELY 1'-0" ABOVE TOP OF DOOR FRAME. COORDINATE FINAL ACU INSTALLATION

HEIGHTS WITH OTHER TRADES.

4. REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

5. REFRIGERANT LINE SIZES AND LENGTHS TO BE CONFIRMED BY THE CONTRACTOR FOR ACTUAL EQUIPMENT BEING

PROVIDED.

6. CONTRACTOR TO COORDINATE LOCATION AND MOUNTING OF MAG LOCK AND DOOR SECURITY PANEL WITH THE

MECHANICAL EQUIPMENT IN THE SPACE.

7. WHERE CONDENSATE PIPING TERMINATES, THE PIPING IS TO BE AIR-GAPPED TO DRAIN.

1. ROUTE CONDENSATE DRAIN PIPING DOWN THROUGH

FLOOR TO NEAREST FLOOR DRAIN IN BASEMENT

MECHANICAL ROOM B15. DO NOT ROUTE CONDENSATE

DOWN INTO ELEVATOR EQUIPMENT ROOM.

2. ROUTE REFRIGERANT UP TO ROOF. SEE M-151-C.15.2.

3. MEASURE AIRFLOW OF EXISTING DIFFUSER TO REMAIN

PRIOR TO CONSTRUCTION. ADJUST VAV AIRFLOW TO

CFM OF DIFFUSER TO REMAIN. IF VAV MINIMUM

AIRFLOW IS HIGHER THAN TOTAL DIFFUSER AIRFLOW

FOR THAT VAV, INCREASE THE DIFFUSER AIRFLOWS

EVENLY TO MEET THE MINIMUM VAV AIRFLOW CFM.

15-ACU 1

/2

8/

1" CCD UP

1" CCD

8" RL UP/DN

8" RS UP/DN

8" RL UP

8" RS UP

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

COMP. RM. 134 - NEW

M-461-FT.64.1

CL / KW

ENLARGED FLOOR PLANS - FIRST

FLOOR

ALL EXISTING PIPING TO REMAIN IN A NEW TELECOM ROOM SHALL HAVE A CATCH PAN BELOW THE ENTIRE LENGTH OF

PIPE PER DETAIL 1 ON SHEET M-500.

1.

2. ALL NEW PIPING PENETRATIONS THROUGH FLOORS OR ROOFS SHOULD COORDINATE WITH STRUCTURAL. PROVIDE A

SEAL AROUND NEW PENETRATION.

3. LOCATE BOTTOM OF ACUs APPROXIMATELY 1'-0" ABOVE TOP OF DOOR FRAME. COORDINATE FINAL ACU INSTALLATION

HEIGHTS WITH OTHER TRADES.

4. REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

5. REFRIGERANT LINE SIZES AND LENGTHS TO BE CONFIRMED BY THE CONTRACTOR FOR ACTUAL EQUIPMENT BEING

PROVIDED.

6. CONTRACTOR TO COORDINATE LOCATION AND MOUNTING OF MAG LOCK AND DOOR SECURITY PANEL WITH THE

MECHANICAL EQUIPMENT IN THE SPACE.

7. WHERE CONDENSATE PIPING TERMINATES, THE PIPING IS TO BE AIR-GAPPED TO DRAIN.

64-ACU 2

1. INSTALL CATCH PAN. SEE DETAIL 1 ON M-500 FOR

DETAIL.

2. ROUTE REFRIGERANT PIPING GOING UP AND DOWN IN

A COMPACT ARRANGEMENT TO KEEP PIPING OUT OF

THE WAY OF OTHER TRADES AS MUCH AS POSSIBLE.

/2

8/

8" RL DN

TYP. 2

1" CCD UP/DN

1" CCD

1" CCD

8" RS DN

TYP. 2

8" RL UP

8" RS UP

8" RL UP

TYP. 2

8" RS UP

TYP. 2

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.918.1766

GENERAL NOTES

KEYED NOTES

Scale: 1/4" = 1'

TELECOM ROOM 220 - NEW

M-462-FT.64.2

CL / KW

ENLARGED FLOOR PLANS - SECOND

FLOOR

1. INSTALL CATCH PANS. SEE DETAIL 1 ON SHEET M-500.

2. ROUTE REFRIGERANT PIPING GOING UP AND DOWN IN

A COMPACT ARRANGEMENT TO KEEP PIPING OUT OF

THE WAY OF OTHER TRADES AS MUCH AS POSSIBLE.

3. RELOCATE DIFFUSER THAT WAS NOTED TO BE

RETAINED IN MD-462-FT.64.2. RE-BALANCE EXISTING

SUPPLY DIFFUSER IN ITS NEW LOCATION TO MATCH

THE PRE-CONSTRUCTION DIFFUSER AIRFLOW.

4. INSTALL EXISTING THERMOSTAT IN NEW LOCATION.

SEE MD-462-FT.64.2 FOR DETAILS ON REMAINING

THERMOSTAT. 1

ALL EXISTING PIPING TO REMAIN IN A NEW TELECOM ROOM SHALL HAVE A CATCH PAN BELOW THE ENTIRE LENGTH OF

PIPE PER DETAIL 1 ON SHEET M-500.

1.

2. ALL NEW PIPING PENETRATIONS THROUGH FLOORS OR ROOFS SHOULD COORDINATE WITH STRUCTURAL. PROVIDE A

SEAL AROUND NEW PENETRATION.

3. LOCATE BOTTOM OF ACUs APPROXIMATELY 1'-0" ABOVE TOP OF DOOR FRAME. COORDINATE FINAL ACU INSTALLATION

HEIGHTS WITH OTHER TRADES.

4. REMOVE AND REINSTALL MECHANICAL EQUIPMENT, DUCTWORK, OR PIPING AS REQUIRED FOR CABLE TRAY INSTALLATION. REINSTALL EQUIPMENT, DUCTWORK, OR PIPING TO EXISTING OR BETTER CONDITIONS AS IT WAS

BEFORE REMOVAL. SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY ROUTING.

5. REFRIGERANT LINE SIZES AND LENGTHS TO BE CONFIRMED BY THE CONTRACTOR FOR ACTUAL EQUIPMENT BEING

PROVIDED.

6. CONTRACTOR TO COORDINATE LOCATION AND MOUNTING OF MAG LOCK AND DOOR SECURITY PANEL WITH THE

MECHANICAL EQUIPMENT IN THE SPACE.

7. WHERE CONDENSATE PIPING TERMINATES, THE PIPING IS TO BE AIR-GAPPED TO DRAIN.

64-ACU 3

2 2

/2

8/

1" CCD DN

8" RL UP

TYP. 4

8" RS UP

TYP. 4

8" RS

8" RL

8" RS DN

TYP. 3

8" RL DN

TYP. 3

VAV

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

04-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383

F: 314.