ATTACHMENT 6 - Drawings 5 of 13.pdf
PDF 11 MB Posted
- Solicitation number
- 36C77623B0005
About this file
This document provides details on a federal solicitation opportunity and an associated file attachment. The solicitation number is 36C77623B0005 for the EHRM Infrastructure Upgrades - Cincinnati Project #539-21-701 opportunity. The Department of Veterans Affairs Technology Acquisition Center Austin is seeking construction services for infrastructure upgrades at the Cincinnati VAMC. Attachment 6 appears to include drawings related to the project scope, which involves EHRM infrastructure improvements. The response deadline and award date are not stated, nor are any pricing, set-aside, or incumbent details provided.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ex. Toilet A702A
Bath A711A
Soil. Util.
A712
Tele.
A713
Elec.
A714
S.R.
A715
Clean
Linen A716
S.R.
A717
S.R.
A718
Bed Room A719
Ex. Group A720
Bath A719A
Bed Room A722
Q.R.
A723
T.L.T.
A723A
T.L.T.
A722A
T.L.T.
A715A
Ante A711
Dining/Group
Room A705
Nurse
Station A705A
S.R.
A706
Bath A706A
Bath A707A
T.R.
A707
T.R.
A708
Bath A708A
Bath A709B
Ante A709
Obser.
A710
S.R.
A709A
Exist.
Seclusion A711B
Stair 2 S*7*2
Nurse
Station
Meds A725A
Stor.
A724
Nurse
Station A725
Nurse
Station
Work/Conference A725B
Break
Room A726
Corridor C*7*2
Storage A740
Waiting A774
Office #14 A743
Office #13 A744
Stair 5 S*7*5
Ex.
SensoryTherapy
Room A704
Storage A704B
Interview
Room A702
Nurse Off.
A701
Chief Nurse
Off.
A700
Exam Rm.
A776
Office #18 A775
Reception A773
Training (6) A746 Stor.
A747
S. Office
#11A A748
S. Office
#11A A749
Office #12 A750
Group #2
(10-12) A751Office #10
A752
Tlt.
A753
Office #9 A754
Office #8 A755
Office #7 A756
Office #6 A757
Elec.
A758
Elec.
A759
HAC
A760
Ante A761
Office A762
Office #5 A763
Office #5A A764
Office #5B A765
Group #1
(12-20) A766
Office A767A
Office #2 A768
Office #3 A769
Testing A770
Vis. Bath A771
Copy Rm.
A773A
Staff Office A767
Lockers A727B
Service
Elev. Lobby A727
Laundry A728A
Trash
Chute A727A
Staff Tlt.
A736
Sig. Clos.
A734
Stair 1 S*7*1
HAC
A735
Stor.
A735A
Elec.
A739
Occupational
Therapy A732
Corridor C*7*1
DB Wtr.
A729
Storage A728CSocial
Worker A728D
Group
Room A728
Elec.
A728B
Soc.
Worker A730
O/T Off.
A731
Tlt.
A730A
Social
Worker B733A
Psych. Res.
B734
Tlt.
B734A
Waiting B705
Stat.
B704
Nurse Man.
B703
Soc.
Worker B702
Intake
Coor.
B701
Off.
B733
Off.
B733B
HAC
B732
Stor.
B731
Stor.
B719
Reception B705C
Elec B706
Break
Room B705D
Staff Tlt.
B705E
Signal
Closet B705F
Stair 3 S*7*3
Office B708
Office B709
Office B710
Office B711A
Tobacco &
Acohol
Research
Center B712
Group Rm.
B713
Off.
B714
Off.
B715A
Off.
B716A
Off.
B717
Off.
B715B
Off.
B714A
Off.
B721
Off.
B722
Off.
B723
Off.
B724
Group
Room B725
Off.
B726
Off.
B727
Wash
Room B728
Off.
B729
KLT
B730
Adm. Asst.
B716B
Bath B721A
Tlt.
B723A
Tlt.
B722A
Elec.
B720
Group
Room B725B
Tlt.
B726A
Off.
B711
Tlt.
B729A
Closet A728E
Clos.
A772
Office A741
Office A742
A/C Shaft
A/C Shaft A/C Shaft
Telecom
Room A732A
DN UP DNUP
DN UP
DN
UP
Ex. Toilet A702A
Ex.
SensoryTherapy
Room A704
Storage A704B
Interview
Room
P-180-C.1.7
REMOVE PLUMBING
FIXTURES, TRIM, AND CAP
EXISTING UTILITIES IN THE
WALL OR BELOW THE FLOOR.
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
FULLY SPRINKLED
6 SOUTH OLD ORCHARD
WEBSTER GROVES, MO. 63119
T: 314.918.8383 F: 314.918.17664
/2 /2
:0 :5
A
M
P-180-C.1.7
PLUMBING SEVENTH FLOOR
OVERALL & ENLARGED PLANS
04-MAY-2022
DDPJDB
CINCINNATI VAMC EHRM
INFASTRUCTURE UPGRADES
539-21-701
3200 VINE ST. CINCINNATI, OH.
100% CONSTRUCTION
DOCUMENTS
1/16" = 1'-0"
PLUMBING - BUILDING #1 - OVERALL
SEVENTH FLOOR PLAN
1/4" = 1'-0"
THERAPY ROOM A704 - SEVENTH FLOOR -
PLUMBING PLAN
/2
8/
A/C Shaft A/C Shaft
A/O Office B830
Elec.
B818
Soil Util.
B817
Surgery B811
Soiled
Utility B808
Equipment
Mech
Room B807
Group
Room #1 A821
Stor.
A800A
Charting
Room A800B
Staff Tlt.
A800C
Phys. Off.
A801
Exam A802
Off.
A803
Psych. Off.
A804
Off.
A805
Off.
A806
Off.
A807
Stor.
A808
Off.
A809
Off.
A810
Group Rm.
A811
QI
Research
Director A812
Off.
A813
Bath A814
Off.
A815
ANT
A817
Elec.
A818
Counsel
Off.
A819
Group
Room #2 A820
Stair 2 S*8*2
HAC
A823
Stor.
A824
Off.
A825
Direc. Off.
A826
Coor. Off.
A827
Off.
A821A
Off.
A821B
Clos.
A825A
Tlt.
A825B
Clos.
A826A
Stor.
A828
Lin. Chute A816
Tlt.
A809A
Tlt.
A810A
Tlt.
A811A
Tlt.
A811B
Tlt.
A812A
Corridor C*8*2 Tlt.
A801A
Trash
Chute A829A
Nurses
Station A800
Stor.
A846A
Stor.
A846B
Off.
A846C
Kit.
A846D
Day Room /
Dining A846
Stair 5 S*8*5
Lndry A848
Clos.
A849
Addict.
Ther.
A850
Shower /
Tlt.
A851
Music /
Quiet
Room A852
Group
Room A853
Thera Off.
A854
Thera. Off.
A855
Head
Nurse
Office A856
Off.
A857
Elec.
A858
Elec.
A859
HAC
A860
Cl. Lin.
A861
Off.
A862
3 Bed
Room A863
6 Bed Rm.
A864
6 Bed Rm.
A865
3 Bed Rm A866
Hndcap
S.R.
A867
Group
Room A868
Women
Bath A867A
Restroom A869
SPS
Storage B806A
Clean
Supply B806
Closet B802A
Opteratory B823
Stair 3 S*8*3
Reception B803
Special
Needs
Operatory B824
X-Ray B804
Dermatology A838
Waiting B801
Conf.
A839
Sig. Clos.
A844
Stor.
A841
HAC
A842
Stor.
A840
Corridor C*8*1
Corridor C*8*5
Tech. Off.
A829B
Service
Lobby A829
Off.
A830
Stat. Off.
A831
Off.
A832
Alcohol
Research A833
Research
Lab A833A
Elec.
A830A
Omnicell A857A
Elec.
A845
Stair 1 S*8*1
UP
UP
DN UP DNUP
DN UP
DN
FP-190-C.1.8
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
FULLY SPRINKLED
6 SOUTH OLD ORCHARD
WEBSTER GROVES, MO. 63119
T: 314.918.8383 F: 314.918.17664
/2 /2
:0 :5
A
M
P-190-C.1.8
PLUMBING EIGHTH FLOOR OVERALL
& ENLARGED PLANS
04-MAY-2022
AuthorApprover
CINCINNATI VAMC EHRM
INFASTRUCTURE UPGRADES
539-21-701
3200 VINE ST. CINCINNATI, OH.
100% CONSTRUCTION
DOCUMENTS
1/16" = 1'-0"
PLUMBING - BUILDING #1 - OVERALL
EIGHTH FLOOR PLAN
/2
8/
A/C ShaftA/C Shaft
Psych. Off A903
Psych. Lab.
A903A
Psych. Lab.
A903B
AFGE
A904Psych.
A904A
Clos.
A904B
Elec.
A904C
Vol. Serv.
Office A905
AFGE
A905A
AFGE
A906
Entry A906A
Clos.
A906B
Bath A906C
Clos.
A907
Office A908
Break
Room A909
Stair 2 S*9*2
Vol. Serv.
Storage A911
Office A912 Office
A913 Office A914
Office A915
Serv.
Lobby A916Tlt.
A909A
ONA Local
A911A
Clos.
A912A
HAC
A915B
Trash
Chute A915A
A916A
Psych. Off.
A919
Psych. Off.
A919A
Psych. Off.
A919B
Clos.
A919C
Adm. Asst.
A920
Chief
Psych.
A921
Psych. Off.
A922
D. Wtr.
Mech. Area A923
Clerk A924
Sdm. Off.
A925
Adm. Asst.
A926
Chief
Psych. Off.
A927
Stair 1 S*9*1
Sig. Clos.
A929
Lin.
A918
Electrical
Closet A931A
Off.
A945
F. Tlt.
A946
M. Tlt.
A901 Dir. Off.
A946A Psych. Off.
A901A Psych. Off.
A902
HAC
A917
Stor.
A918A
Stor.
A918B
Office B901
Psych. Off.
B902
Psych.
Conf. Rm.
B903
Fan Rm.
B904
Copy Room B905
Psych. Off.
B906
Psych. Off.
B907
Corridor C*9*1
Corridor C*9*2
Elec.
A916D
Res.
B905A
Sleep 6 A938C
Sleep 4 A939A
Tlt.
A939B
Sleep 3 A939C
Tlt.
A939D
Control
Rm.
A940
Shower A939E
Clst.
A941C
Break
Room A941
Soiled
Utility A941A
Elec.
A941B
Clean
Supply A942
Exam 2 A943
Chief Office A944
Waiting A932
Exam 1 A933
Sleep Phy.
A934
Sleep
Nurses/Fellows A935
Stair 5 S*9*5
Sleep 1 A937A
Tlt.
A937B
Sleep 2 A937C
Tlt.
A937D
Lead
Tech./2nd
Tech.
A935A
Crash Cart C-9-3A
Sleep 5 A938A
Toilet A938B
Toilet A938D
Entry A938
Telecom Room
DN DN
DN UP
Stor. Rm.
164 SF
P-200-C.1.9
HOSE BIBB
MOP SINK
CW PIPING
REMOVE ALL ASSOCIATED PIPING,
PLUMBING FIXTURES AND CAP
SERVICES BACK AT ACTIVE MAIN.
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
FULLY SPRINKLED
6 SOUTH OLD ORCHARD
WEBSTER GROVES, MO. 63119
T: 314.918.8383 F: 314.918.17664
/2 /2
:0 :0
A
M
P-200-C.1.9
PLUMBING NINTH FLOOR OVERALL &
ENALRGED PLANS
04-MAY-2022
DDPJDB
CINCINNATI VAMC EHRM
INFASTRUCTURE UPGRADES
539-21-701
3200 VINE ST. CINCINNATI, OH.
100% CONSTRUCTION
DOCUMENTS
1/16" = 1'-0"
PLUMBING - BUILDING #1 - OVERALL NINTH
FLOOR PLAN
1/4" = 1'-0"
STORAGE ROOM 916A - NINTH FLOOR PLAN
- PLUMBING DEMOLITION
/2
8/
AA.0
AA.1
AB.0
AB.1
AB.2
AC.0
AC.2
AD.0
AE.0
AF.0
D2.0 D3.0 D4.0
A1.0
A1.0
BB.0
BB.0
BD.0
BD.0
B0.0
B1.0
B2.0
B2.1
B3.0
B4.0
BD.1
BD.1
A7.0 A7.1
A8.0 B6.1
B7.0
B7.1
B7.2
A1.1 A2.0 A3.0 A3.1 A4.0 A4.1 A5.0 A5.1 A5.2 A6.0
AC.1
CE.0
AD.1
BA.0
BA.1
BB.1
BB.2
BC.1
AG.0
AG.1
AH.0
CA.0
B6.0
B5.0
BB.3
E0.1 E1.0
E1.0
F1.0
F1.0
F2.0
F2.0
F2.1
F2.1
F3.0
F3.0
F4.0
F4.0
F5.0
F5.0
F5.1
F5.1
F6.0
F6.0
FC.0
FB.0
FA.3
EF.0
EE.0
ED.0
EC.2
EC.0
EB.2
EB.1
EB.0
EE.1
EA.0
E1.1
E2.0
E2.0
E3.0
E3.0
E3.1
E3.1
E4.0
E4.0
E4.1
E4.1
E5.0
E5.0
E5.1
E5.1
E5.2 E6.0
E6.0
EC.1
FA.0
FA.1
FA.2UP
P-210-C.2.B
MV MA
O2 MEDICAL GAS PIPING
PROVIDE DRIP PAN WITH WATER SENSOR
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
FULLY SPRINKLED
6 SOUTH OLD ORCHARD
WEBSTER GROVES, MO. 63119
T: 314.918.8383 F: 314.918.17664
/2 /2
:0 :0
A
M
P-210-C.2.B
PLUMBING BASEMENT OVERALL &
ENLARGED PLANS
04-MAY-2022
DDPJDB
CINCINNATI VAMC EHRM
INFASTRUCTURE UPGRADES
539-21-701
3200 VINE ST. CINCINNATI, OH.
100% CONSTRUCTION
DOCUMENTS
1/16" = 1'-0"
PLUMBING - BUILDING #2 - OVERALL
BASEMENT PLAN
1/4" = 1'-0"
STORAGE 0001 - PLUMBING - BASEMENT
PLAN
/2
8/
SOILED
UTILITY
STORAGE
LAUNDRY
CLEAN
UTILITY
KITCHEN &
PANTRY
LOUNGE
SPECIAL
CARE
RESIDENT
ROOM
SPECIAL
CARE
BATHROOM
BATHROOM
BEDROOM
BEDROOM
BATHROOM
BATHROOM
BEDROOM
BEDROOM
BATHROOM
BEDROOM
BATHROOM
BEDROOM
BATHROOM
BEDROOM
BATHROOM
BEDROOM
BATHROOM
BEDROOM
BATHROOM
BEDROOM
BATHROOM
BEDROOM
BATHROOM
BEDROOM
BATHROOM
BEDROOM
BATHROOM
BEDROOM
NURSES'
STATION
LIVING
ROOM
DEN
BATHROOM
BATHROOM
BEDROOM
STAFF
WOMEN'S
RESTROOM
STAFF
MEN'S
RESTROOM
WORK
ROOM
CHARTING
TECH
CLOSET
CORRIDOR
ELECTRIC
CLOSET
LINEN
CLOSET
CLOSET
HAC CORRIDOR
NURSES
SUB-STATION
CLOSET
CLOSET
CLOSET
CLOSET
SUPPLY
S. MEN
S. WOMEN
RN MGR
ADMIN
SUPPORT
SHARED
MEDICAL
DIRECTOR
NURSING
HOME
ADMIN.
RESTOR.
RN
MDS RNSOCIAL
WORKER
MD/NP
SHARED
OFFICE
VSO
SHARED
DIET./SUPRV
CORRIDOR
WAITING
RECEPTION
VESTIBULE
CORRIDOR
V. MEN
V. WOMEN
CORRIDOR
WORK
ROOM
BATHING
SUITE
LOBBY
Omnicells
CORRIDOR
Chapel
LEISURE
ACTIVITIES
GROUP
ROOMBARBER
SHOP
TECH
CLOSET
BATHING
SUITE
SOILED
UTILITY
COMP.
CLOSET CLEAN
SUPPLY KITCHEN &
PANTRY
WORK
ROOM
NURSES
STATION
SHORT
TERM
REHAB GYM
SPECIAL
CARE
RESIDENT
ROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOMBEDROOMBEDROOMBEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
LAUNDRY
OXYGEN
STORAGE
STAFF
MEN'S
STAFF
WOMEN'S
BATHROOM
WHEELCHAIR
STORAGE
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM BATHROOM BATHROOM BATHROOM
BATHROOM
BATHROOM
BATHROOM
SPECIAL
CARE
BATHROOM
CORRIDOR
CORRIDOR
CLOSET
LINEN
CLOSET
DEN
NURSE'S
STATION
CORRIDOR
MED
CLOSET
LINEN
CLOSET
HAC
ELECTRIC
CLOSET
STAIR 3
Telecom Room
1040A
1008A
1009A
1011A
1010A
1012A
1013A
1014A
1015A
1017A
1016A
1018A
1019A
1020A
1021A
1029A
1022A
1023A
1032 1031
1029B
1029C
DINING
ROOM
C*1*2
CORRIDOR
C*1*3
STAIR 1
S*1*1
C*1*4
CONNECTOR
C-1-1035
1025A
C*1*7
C*1*6
C*1*8
STAIR 2
S*1*2
CORRIDOR
C*1*1
C*1*5
CORRIDOR
C*1*8
1106B
1106A
1113111411151116
1123A
1122A
1121A
1120A
1119A
1118A
1116A
1117A
1115A 1114A 1113A 1112A
1110A
1111A
1109A
1108A
C*1*9
DINING
ROOM
C*1*11
COAT
C*1*10
S*1*3
AA.0
AA.1
AB.0
AB.1
AB.2
AC.0
AC.2
AD.0
AE.0
AF.0
D2.0 D3.0 D4.0 A1.0
BB.0
BD.0
B0.0 B1.0
B2.0
B2.1
B3.0
B4.0
BD.1
A7.0 A7.1
A8.0 B6.1
B7.0
B7.1
B7.2
A1.1 A2.0 A3.0 A3.1 A4.0 A4.1 A5.0 A5.1 A5.2 A6.0
AC.1
CE.0
AD.1
BA.0
BA.1
BB.1
BB.2
BC.1
AG.0
AG.1
AH.0
CA.0
C1.1 C2.1
B6.0
B5.0
BB.3
E0.1
E1.0
F1.0
F2.0
F2.1 F3.0
F4.0
F5.0
F5.1
F6.0
FC.0
FB.0
FA.3
EF.0
EE.0
ED.0
EC.2
EC.0
EB.2
EB.1
EB.0
EE.1
EA.0
E1.1
E2.0 E3.0 E3.1 E4.0 E4.1 E5.0 E5.1
E5.2
E6.0
EC.1
FA.0
FA.1
FA.2
DN
DN
LOUNGE
CHARTING
Omnicells
Telecom Room
1040A
1029C
P-211-C.2.1
ST
ST
EX. 4"
PROVIDE DRIP PAN
WITH WATER SENSOR
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
FULLY SPRINKLED
6 SOUTH OLD ORCHARD
WEBSTER GROVES, MO. 63119
T: 314.918.8383 F: 314.918.17664
/2 /2
:0 :0
A
M
P-211-C.2.1
PLUMBING SECOND FLOOR OVERALL
& ENLARGED PLANS
04-MAY-2022
DDPJDB
CINCINNATI VAMC EHRM
INFASTRUCTURE UPGRADES
539-21-701
3200 VINE ST. CINCINNATI, OH.
100% CONSTRUCTION
DOCUMENTS
1/16" = 1'-0"
PLUMBING - BUILDING #2 - OVERALL FIRST
FLOOR PLAN
1/4" = 1'-0"
TELE ROOM 1040A - PLUMBING - FIRST
FLOOR PLAN
/2
8/
Storage
Office
Toilet
Office
Upper Level of Catwalk
Corridor
C-2-1
Stairs
S-2-1
Lift Platform
Telecom Room
UP
UP
UP
UP
UP
Kitchen
UP
P-240-C.8.2
REMOVE EXISTING SINK AND
RELATED UTILITIES BACK TO
ACTIVE MAIN AND CAP.
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
FULLY SPRINKLED
6 SOUTH OLD ORCHARD
WEBSTER GROVES, MO. 63119
T: 314.918.8383 F: 314.918.17664
/2 /2
:0 :1
A
M
P-240-C.8.2
PLUMBING SECOND FLOOR OVERALL
& ENLARGED PLANS
04-MAY-2022
DDPJDB
CINCINNATI VAMC EHRM
INFASTRUCTURE UPGRADES
539-21-701
3200 VINE ST. CINCINNATI, OH.
100% CONSTRUCTION
DOCUMENTS
1/16" = 1'-0"
PLUMBING - BUILDING #8 - OVERALL
SECOND FLOOR PLAN
1/4" = 1'-0"
KITCHEN 205 - SECOND FLOOR PLAN -
PLUMBING DEMOLITION
/2
8/
Telecom Room
Corridor
C*1*100G
Corridor
C*1*100H
Clean Storage
Corridor
C*1*115
Dry Storage
115A
Cage Dump
Cage Wash
104A
Animal Room
Dry Storage
Clean Procedure
Room
Animal Room
Clean Procedure
Room
111A
Bottle Wash
Necropsy
Dirty Corridor
C*1*3
Mechanical Room
Animal Room
Animal Room
Animal Room
Animal Room
Animal Room
Animal Room
Animal Room
Clean Corridor
C*1*117
Vestibule
117A
Cage Set Up
103A
Clean Corridor
C*1*2
Sterilizer
103B
Lobby
Clean Vestibule
C*1*119A
Corridor
C*1*116
Rack Set-up
H.A.C.
104B
Toilet
104C
Stair 2
S*1*2
Stair #1
S*1*1
Closet
116A
Closet, Telephone
DNUPUP
Animal Room
Corridor
P-260-C.15.1
FD
FD
FD
SPRINKLER HEAD
SPRINKLER HEAD
FLUSH VALVES &
SUPPLIES THROUGH
FLOOR
PLUGGED PIPE
SINK
PIPING SHALL BE PLUGGED FOR
FLOOR DRAINS BEING REMOVED.
(TYP. 3)
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
FULLY SPRINKLED
6 SOUTH OLD ORCHARD
WEBSTER GROVES, MO. 63119
T: 314.918.8383 F: 314.918.17664
/2 /2
:0 :1
A
M
P-260-C.15.1
PLUMBING FIRST FLOOR OVERALL &
ENLARGED PLANS
04-MAY-2022
DDPJDB
CINCINNATI VAMC EHRM
INFASTRUCTURE UPGRADES
539-21-701
3200 VINE ST. CINCINNATI, OH.
100% CONSTRUCTION
DOCUMENTS
1/16" = 1'-0"
PLUMBING - BUILDING #15 - OVERALL FIRST
FLOOR PLAN
1/4" = 1'-0"
ANIMAL ROOM 101 - FIRST FLOOR PLAN -
PLUMBING DEMOLITION
A. ALL EXISTING WATER PIPING ABOVE THE HARD CEILING
TO BE EITHER REMOVED IF NOT BEING USED, OR
RELOCATED IF BEING USED. CONTRACTOR TO VERIFY
EXACT AMOUNT OF WORK AFTER CEILING DEMOLITION.
B. ALL WATER AND OTHER SERVICES BEING REMOVED
SHALL BE REMOVED BACK TO ACTIVE MAIN.
GENERAL SHEET NOTES
/2
8/
Stair #1
S*2*1
Stair #5
S*2*5
2 Bedroom
2 Bedroom
Corridor
C*2*1
Bath
281A Bath
278A Clos.
Bath
280A
2 Bedroom
Office
Office
2 Bedroom
Clos.
277B Corridor
C*2*2
Clos.
285A
Signal Closet
Group Room
Office
Elec.
Linen
Stair Entry
F2
Stair #2
S*2*2
Office
HAC
Tlt.
Laundry
Office
Bath
277A Bath
275A
2 Bedroom
TV Room
2 Bedroom
Clos.
Bath
271A
Office
Corridor
C*2*5
2 Bedroom
Bath
259A
Bath
257A
Tlt.
258C
2 Bedroom
Soiled UT
Bath
254A
Bath
258A
2 Bedroom
Clos.
254B
Mech.
256A
2 Bedroom
Office
213A
2 Bedroom
Bath
255A
Clos.
214B
Office
214A
Office
Office
Office
215A
Office
Office
Office
217A
Office
Office
Office
Clos.
223B
Computer
221A
Office
223A
Group Room
Signal
Elec.
Office
Soc. Worker
Sec'y
Office
Chapel
Group/ Conf.
Eucharist
Snack
209Chaplain
Waiting
216A Corridor
C*2*6
Recep/ Volunteers
Stair #3
S*2*3
History & Phys.
Tlt.
218A Corridor
C*2*13
Mech.
251B
Office
Dr. Chard
Office
Office
229A
Tlt.
227A Clos.
232A
Office
Office
226A
Office
228C
Office
Office
228A
Tlt.
228B
Corridor
C*2*14
Clos.
Elec.
Stair #4
S*2*4
Stair Entry
F4
Dom Asst.
H.A.C.
Tlt.
Soiled UT
Office
Group Room
Linen
Laundry
Mech.
251A
Signal
242D
Office
Clos.
238B
Bath
238A
2 Bedroom
TV Room
2 Bedroom
Bath
242A
Bath
244A
2 Bedroom
2 Bedroom
Clos.
246B
Bath
248ABath
246A
Clos.
248B
2 Bedroom
Office
249A
Clos.
249B
Office
Office
Office
Linen Chute
218C
Corridor
C-2-203A
Closet
282A
Mech.
218B
Telecom Room
B232
DN
DN UP
UP
UP DN UP DN
UPDN
Telecom Room
B232
P-300-FT.64.2
PROVIDE DRIP PAN
WITH WATER SENSOR
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
FULLY SPRINKLED
6 SOUTH OLD ORCHARD
WEBSTER GROVES, MO. 63119
T: 314.918.8383 F: 314.918.17664
/2 /2
:0 :1
A
M
P-300-FT.64.2
PLUMBING SECOND FLOOR OVERALL
& ENLARGED PLANS
04-MAY-2022
DDPJDB
CINCINNATI VAMC EHRM
INFASTRUCTURE UPGRADES
539-21-701
3200 VINE ST. CINCINNATI, OH.
100% CONSTRUCTION
DOCUMENTS
1/16" = 1'-0"
PLUMBING - BUILDING #64 - OVERALL
SECOND FLOOR PLAN
1/4" = 1'-0"
TELE ROOM B232 - PLUMBING - SECOND
FLOOR PLAN
/2
8/
M-000
N/A
CL / KW
MECHANICAL SYMBOLS &
ABBREVIATIONS
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
539-21-701
04-MAY-2022
100% CONSTRUCTION
DOCUMENTS
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST., CINCINNATI, OH
6 SOUTH OLD ORCHARD
WEBSTER GROVES, MO. 63119
T: 314.918.8383
F: 314.918.1766
BUILDING NUMBER
EQUIPMENT DESIGNATION
TYPE OF SERVICE: S = SUPPLY
R = RETURN
E = EXHAUST
T = TRANSFER
AIR QUANTITY
IN CFM
SCHEDULED
DEVICE NO
UNIT NUMBER
DAMPER TYPE DESIGNATION
AIRFLOW MEASURING STATION
EXISTING EQUIPMENT DESIGNATION
S-1
FSD
AHU-1
ID-#
HVAC SENSOR
SENSOR TYPE
OPTIONS
SPECIALTY SENSOR TYPE
I = INSULATED BASE
G= PROVIDE GUARD
CO = CARBON MONOXIDE
CO2= CARBON DIOXIDE
NG = NATURAL GAS
T = TEMPERATURE SENSOR
H = HUMIDITY SENSOR
O = OCCUPANCY SENSOR
R = REFRIGERANT SENSOR
P = PRESSURE SENSOR
MECHANICAL SYMBOLS
ASSOCIATED UNIT
X
Y
Z
ACCESS PANEL, TOP OR SIDE
TURNING VANES
MOTORIZED DAMPER
GRAVITY BACKDRAFT DAMPER
MANUAL VOLUME DAMPER
FIRE DAMPER
SMOKE DAMPER
FIRE/SMOKE DAMPER
FLOW ARROW DOWNSTREAM OF FAN
FLOW ARROW UPSTREAM OF FAN
SUPPLY DIFFUSER AS SCHEDULED. ARROWS INDICATE
DIRECTION OF AIR DISCHARGE. IF NO ARROWS ARE
SHOWN ON PLAN, DEFAULT IS A 4-WAY THROW
RETURN GRILLE OR REGISTER AS SCHEDULED
EXHAUST GRILLE OR REGISTER AS SCHEDULED
SLOT DIFFUSER AS SCHEDULED. ARROWS INDICATE DIRECTION
OF AIR DISCHARGE. IF NO ARROWS ARE SHOWN ON PLAN,
DEFAULT IS 2-WAY THROW
SIDEWALL DIFFUSER AS SCHEDULED
SIDEWALL RETURN OR EXHAUST AS SCHEDULED
DUCT SYSTEM SYMBOLS
12x12
12ø
12x10ø
FLEXIBLE DUCT
ROUND DUCT SIZE, (ACTUAL SIZE INDICATED)
CHANGE OF ELEVATION - RISE (R) OR DROP (D)
FLEXIBLE DUCT CONNECTION
SUPPLY AND OUTSIDE AIR SECTION UP
RETURN AIR SECTION UP
SPIRAL FLAT-OVAL DUCT SIZE, FIRST FIGURE
IS SIDE SHOWN (ACTUAL SIZE INDICATED)
R
DUCT SIZE, FIRST FIGURE IS SIDE
SHOWN (CLEAR INSIDE, ADJUST FOR
LINER)
SUPPLY AND OUTSIDE AIR SECTION DOWN
RETURN AIR SECTION DOWN
EXHAUST AIR SECTION UP
EXHAUST AIR SECTION DOWN
X
M
T
PIPE LINE SYMBOLS
SHUT OFF VALVE (SEE
SPECIFICATION FOR TYPE)
GATE VALVE
BALL VALVE
BUTTERFLY VALVE
VALVE IN RISE (SEE SPECIFICATION FOR TYPE)
MULTI-PURPOSE PUMP DISCHARGE VALVE
CHECK VALVE
SOLENOID VALVE
PRESSURE REDUCING VALVE (HYDRONIC)
PRESSURE REGULATING VALVE (STEAM)
CALIBRATED - ORIFICE BALANCING VALVE
ACTIVE FLOW-LIMITING VALVE
PLUG VALVE
IN-LINE PUMP
Y-PATTERN STRAINER
Y-PATTERN STRAINER W/ BLOWDOWN VALVE
UNION
AIR VENT (M - MANUAL, A - AUTOMATIC)
RELIEF VALVE
VACUUM BREAKER
PRESSURE AND TEMPERATURE TEST PORT
THERMOMETER
PRESSURE GAGE WITH COCK
FLEX PIPE COUPLING
PIPE ANCHOR
PIPE GUIDE
PITCH DOWN IN DIRECTION OF ARROW
WATER METER
STEAM TRAP
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
MOTORIZED BUTTER FLY VALVE
GLOBE VALVE
A
COMMON PIPING SYMBOLS &
ABBREVIATIONS
NOT ALL SYMBOLS ARE USED FOR THIS PROJECT
DIRECTION OF FLOW
BRANCH CONNECTION, BOTTOM
BRANCH CONNECTION, TOP
ELBOW, TURNED DOWN
ELBOW TURNED UP
SHUTOFF VALVE
CHECK VALVE
PRESSURE REDUCING VALVE
PRESSURE GAUGE
UNION
PIPING CAP
CONCENTRIC REDUCER
RISER DESIGNATION
ABOVE FINISH FLOOR
AUTHORITIES HAVING JURISDICTION
ACCESS PANEL
BOTTOM OF PIPE
DIAMETER
DOWN
EXISTING
FINISHED FLOOR ELEVATION
GALLONS PER HOUR
GALLONS PER MINUTE
HORSEPOWER
INVERT ELEVATION
NORMALLY CLOSED
NOT TO SCALE
POUNDS PER SQUARE INCH
REVOLUTIONS PER MINUTE
ROUGH-IN
SHUTOFF VALVE
TOTAL DYNAMIC HEAD
VERIFY IN FIELD
AFF
AHJ
AP
BOP
DIA
DN
EX OR EXIST
FFE
GPH
GPM
HP
IE OR INV. ELEV
NC
NTS
PSI
RPM
RI
SOV
TDH
VIF
REFRIGERANT VENT
RV
CHEMICAL FEED
CF
V
VENT
NATURAL GAS
G
LPG
LIQUEFIED PETROLEUM GAS
CW
COLD WATER, DOMESTIC
CWS
CA
CWR
GLS
FOV
FOR
FOS
CR
CS
GLYCOL SUPPLY
FUEL OIL VENT
FUEL OIL RETURN
FUEL OIL SUPPLY
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
CHILLED WATER RETURN
CHILLED WATER SUPPLY
COMPRESSED AIR
CHR
CHS
LPS
HWS
HWR
HPR
HPS
GLR
LPR
HG
RS
RL
PC
CHILLED/HOT WATER RETURN
CHILLED/HOT WATER SUPPLY
REFRIGERANT HOT GAS
REFRIGERANT SUCTION
REFRIGERANT LIQUID
PUMPED CONDENSATE
LOW PRESSURE CONDENSATE RETURN (15 PSIG)
LOW PRESSURE STEAM SUPPLY (15 PSIG)
HEATING WATER SUPPLY
HEATING WATER RETURN
HIGH PRESSURE CONDENSATE RETURN (100 PSIG)
HIGH PRESSURE STEAM SUPPLY (100 PSIG)
GLYCOL RETURN
SRV
STEAM RELIEF VENT
PUMP DISCHARGE
DRAIN
D
PD
FUEL OIL FILL
FOF
E
EQUALIZING LINE
DOMESTIC HOT WATER
HW
MU
MAKE-UP WATER (NON-POTABLE)
PRIMARY CHILLED WATER RETURN
PCWR
PRIMARY CHILLED WATER SUPPLY
PCWS
PRIMARY HEATING WATER SUPPLY
PRIMARY HEATING WATER RETURN
PHWS
PHWR
SHWS
SECONDARY HEATING WATER SUPPLY
SECONDARY HEATING WATER RETURN
SHWR
SECONDARY CHILLED WATER SUPPLY
SECONDARY CHILLED WATER RETURN
SCWS
SCWR
BLOW DOWN
BD
CD
CONDENSATE (STEAM) DRAIN
MPS
MPR
MEDIUM PRESSURE CONDENSATE
RETURN (60 PSIG)
MEDIUM PRESSURE STEAM SUPPLY (60PSIG)
PIPE SYSTEM ABBREVIATIONS
MECH MAIN GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
ALL ELBOWS, FITTINGS, ETC., IN PIPING AND DUCTWORK REQUIRED
TO CLEAR ALL JOB OBSTRUCTIONS ARE NOT NECESSARILY
INDICATED. ALL NECESSARY TRANSITIONS, FITTINGS AND OFFSETS
ARE REQUIRED WHETHER SHOWN OR NOT.
BECAUSE OF THE LIMITED SPACE AVAILABLE TO INSTALL ALL OF THE
MECHANICAL WORK, COORDINATION BETWEEN THE VARIOUS
TRADES IS OF THE UTMOST IMPORTANCE.
THE CONTRACTOR SHALL COORDINATE STAGING AND SCHEDULING
WITH THE OWNER'S REPRESENTATIVE.
EXISTING CONDITIONS ARE BASED ON INFORMATION OBTAINED
FROM PREVIOUS CONSTRUCTION DOCUMENTS AND INFORMAL
FIELD OBSERVATION AND SHALL NOT BE CONSTITUTED AS "AS
BUILT." THE CONTRACTOR SHALL FIELD-VERIFY EXISTING
CONDITIONS BEFORE THE ONSET OF CONSTRUCTION.
DEMOLISH ALL PIPING, DUCTWORK EQUIPMENT, ETC., SHOWN TO BE
REMOVED, IN ITS ENTIRETY, INCLUDING ALL HANGERS AND
SUPPORTS.
WHERE CONTRACTOR IS REQUIRED TO CONCEAL NEW WORK,
REMOVE OR MODIFY EXISTING CONSTRUCTION OR EQUIPMENT, OR
ATTACH TO EXISTING CONSTRUCTION, THE CONTRACTOR SHALL
REPAIR OR REPLACE EXISTING CONSTRUCTION AND MATERIALS TO
MATCH CONDITIONS AT THE ONSET OF CONSTRUCTION. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO REMOVE AND REPLACE
EXISTING CEILINGS AND WALLS REQUIRED FOR INSTALLATION OF
MECHANICAL SYSTEMS.
THE OWNER SHALL MAINTAIN ALL SALVAGE RIGHTS OF EQUIPMENT
AND MATERIALS REMOVED. ALL EQUIPMENT AND MATERIALS NOT
CLAIMED BY THE OWNER SHALL BE REMOVED FROM THE PREMISES
BY THIS CONTRACTOR.
ALL WORK SHALL BE INSTALLED PER THE REFERENCE DETAILS,
REGARDLESS OF WHETHER OR NOT THE DETAILS ARE CALLED OUT
ON THE PLANS.
9.
10.
11.
12.
13.
14.
15.
16.
THE CONTRACTOR SHALL VERIFY ALL REFRIGERANT PIPE SIZING
AND ROUTINGS WITH THE EQUIPMENT MANUFACTURER. THE
CONTRACTOR SHALL ALSO PROVIDE ALL REQUIRED REFRIGERANT
ACCESSORIES AS RECOMMENDED BY THE EQUIPMENT
MANUFACTURER FOR COMPLETE AND FULLY FUNCTIONAL SYSTEMS.
DO NOT SCALE THE LOCATION OF HVAC CEILING ELEMENTS, SUCH
AS AIR INLETS AND OUTLETS, FROM THE M-SERIES DRAWINGS. SEE
ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT HVAC
CEILING ELEMENT LOCATIONS. REFLECTED CEILING PLANS GOVERN
THE LOCATION OF DIFFUSERS, REGISTERS, AND GRILLES. M-SERIES
DRAWINGS GOVERN TYPE, STYLE, AND SIZE OF DIFFUSERS,
REGISTERS, AND GRILLES.
ALL DUCTWORK SHALL COMPLY WITH "HVAC DUCT CONSTRUCTION
STANDARDS - METAL AND FLEXIBLE," 3RD EDITION, SMACNA 2005,
EXCEPT WHERE MORE RESTRICTIVE REQUIREMENTS ARE
SPECIFIED. ANY PLAN REFERENCES TO "SMACNA FIGURE ---"
REFERS TO THIS STANDARD. SEE SPECIFICATIONS FOR SCHEDULE
OF DUCT PRESSURE CLASS AND SEAL CLASS.
IN GENERAL, THE FINAL FLEX DUCT RUNOUT TO EACH DIFFUSER,
REGISTER, OR GRILLE IS NOT SIZED ON PLANS. FLEX DUCT RUNOUT
SIZE SHALL MATCH AIR OUTLET NECK SIZE, UNO.
IT IS THE INTENT OF THESE DRAWINGS THAT A MANUAL BALANCING
DAMPER BE PROVIDED AT EVERY INDIVIDUAL DUCTED CONNECTION
TO AN AIR DEVICE, UNLESS A BALANCING DAMPER IS SCHEDULED
TO BE FURNISHED WITH AIR DEVICE. VAV BOXES WITH SINGLE
DIFFUSERS ARE NOT REQUIRED TO HAVE A BALANCING DAMPER.
ALL NEW DUCTWORK SIZES SHOWN ON PLANS ARE CLEAR INSIDE
DIMENSIONS. CONTRACTOR SHALL ADJUST SHEET METAL SIZES AS
NECESSARY TO ACCOMMODATE INTERNAL DUCT LINER, IF
SPECIFIED.
ALL EXISTING TEMPERATURE CONTROLS THAT ARE BEING
DEMOLISHED OR DISABLED AS WORK OF THIS CONTRACT SHALL BE
COMPLETELY REMOVED FROM BUILDING.
THE CONTRACTOR SHALL CONNECT THE NEW HVAC SYSTEM TO THE
OWNER'S EXISTING BUILDING CONTROL SYSTEM. REFER TO THE
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
17.
18.
19.
20.
CONTRACTOR SHALL HAVE THE DOCUMENTS REVIEWED
COMPLETELY BY A CERTIFIED BALANCING CONTRACTOR FOR THE
INCLUSION OF THE NECESSARY ADDITIONAL AIR AND HYDRONIC
SYSTEM BALANCING DEVICES NOT SHOWN IN THESE DOCUMENTS
FOR COMPLETE HVAC SYSTEM BALANCING. REFER TO
SPECIFICATION SECTION 230593 FOR CONSTRUCTION DOCUMENT
EXAMINATION REPORT.
IT SHOULD BE NOTED THAT SOME SYSTEMS (I.E. GENERAL AND
ISOLATION EXHAUST) ARE REQUIRED TO BE BALANCED MORE THAN
ONCE TO ASSURE DESIGN AIRFLOWS ARE PROVIDED.
FOR ALL SUSPENDED HVAC EQUIPMENT THAT WEIGHS 31 LBS OR
MORE, LOCATED IN OR ABOVE OCCUPIED SPACES, THE
CONTRACTOR SHALL SUPPORT THE EQUIPMENT TO PREVENT IT
FROM FALLING FROM OR THROUGH THE CEILING IN THE EVENT OF A
TERRORIST ATTACK (EXPLOSION). THIS SHALL INCLUDE BUT IS NOT
LIMITED TO ALL VAV BOXES, ETC. SUPPORTS SHALL BE THE
CONTRACTOR'S RESPONSIBILITY AND SHALL BE SUBMITTED TO THE
ARCHITECT FOR REVIEW. SUPPORTS SHALL CONFORM TO THE
REQUIREMENTS OF UFC 4-010-01 - DOD MINIMAL ANTI-TERRORISM
STANDARDS FOR BUILDINGS.
THESE PLANS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR
SHALL BE PREPARED TO MAKE SOME ALTERATIONS TO THE EXACT
LOCATION OF DUCTWORK, PIPING AND EQUIPMENT FROM THE
LOCATION INDICATED ON THESE DRAWINGS TO FIT ACTUAL JOB
CONDITIONS.
MECHANICAL ABBREVIATIONS
A AIR OR AMP (PER CONTEXT)
ACC ACCESSORIES
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFS AIR FLOW SWITCH
AHRI AIR CONDITIONING, HEATING, AND
REFRIGERATION INSTITUTE
AI ANALOG SIGNAL INPUT
AMB AMBIENT
AO ANALOG SIGNAL OUTPUT
AP ACCESS PANEL
APD AIR PRESSURE DROP
APLV APPLICATION PART LOAD VALUE
APPROX APPROXIMATE
ARCH ARCHITECTURE/ARCHITECT
AUX AUXILIARY
AV AUTOMATIC VENT
AVG AVERAGE
BDD BACK DRAFT DAMPER
BFC BELOW FINISHED CEILING
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BI BINARY SIGNAL INPUT
BMS BUILDING MANAGEMENT SYSTEM
BO BINARY SIGNAL OUTPUT
BOB BOTTOM OF BEAM
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BS BEAM SPACE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNITS PER HOUR
BWE BAKED WHITE ENAMEL
CAP CAPACITY
CAV CONSTANT AIR VOLUME
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CLG COOLING DUCT (COLD DUCT)
CO CLEAN OUT
COMP COMPRESSOR
CONC CONCRETE
CCD CONDENSATE
CONN CONNECTION
CORR CORRIDOR
CV CONTROL VALVE
D DEPTH
DB DRY BULB
DBA A-WEIGHTED DECIBELS
DEFL DEFLECTION
DEG DEGREES
DEG F DEGREES FAHRENHEIT
DES DESIGN
DIA DIAMETER
DIM DIMENSION
DISCH DISCHARGE
DIV DIVISION
DN DOWN
DP DIFFERENTIAL PRESSURE SENSOR
DPS DIFFERENTIAL PRESSURE SWITCH
DPT DIFFERENTIAL PRESSURE TRANSMITTER
DTL DETAIL
DWG(S) DRAWING(S)
EA EXHAUST AIR OR EACH (PER CONTEXT)
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENT RATIO
EFF EFFICIENCY
ELEC ELECTRIC
ELEV ELEVATION
EQ EQUAL
ESP EXTERNAL STATIC PRESSURE
EWB ENTERING AIR WET BULB TEMPERATURE
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST, EX EXISTING
EXT EXTERNAL
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FC FLEXIBLE CONNECTION
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FIN FINISHED
FLR FLOOR
FPF FINS PER FOOT
FPM FEET PER MINUTE
FS FLOW SWITCH
FT FEET
FT-HD HEAD IN FEET
GA GAUGE
GAL GALLONS
GALV GALVANIZED
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
H HEIGHT
HD HEAD
HEV HOSE END VALVE
HORIZ HORIZONTAL
HP HORSEPOWER
HR HOUR
HTG HEATING DUCT (HOT DECK)
HVAC HEATING, VENTILATING & AIR
CONDITIONING
HW HOT WATER
HZ HERTZ
IB INVERTED BUCKET
IE INVERT ELEVATION
IN INCH/INCHES
INDIC INDICATOR
IPLV INTEGRATED PART-LOAD VALUE
ISP INTERNAL STATIC PRESSURE
JS JOIST SPACE
KW KILOWATTS
L LENGTH
LAT LEAVING AIR TEMPERATURE
LB(S) POUNDS
LF LINEAR FEET
LRA LOCKED ROTOR AMPS
LS LIGHT SPACE
LVL LEVEL
LWT LEAVING WATER TEMPERATURE
MAN MANUAL
MANU MANUFACTURER
MAX MAXIMUM
MBH THOUSAND BRITISH THERMAL UNITS PER
HOUR
MCA MINIMUM CIRCUIT AMPS
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MERV MINIMUM EFFICIENCY REPORTING VALUE
(ASHRAE 52.2)
MFR MANUFACTURER
MIN MINIMUM OR MINUTE (PER CONTEXT)
MTD MOUNTED
MTL METAL
MV MANUAL VENT
NC NORMALLY CLOSED OR NOISE CRITERIA
(PER CONTEXT)
NIC NOT IN CONTRACT
NO NORMALLY OPEN OR NUMBER (PER CONTEXT)
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER
OT OIL TRAP
PA PIPE ANCHOR
PBD PARALLEL BLADE DAMPER
PD PRESSURE DROP
PENT PENTHOUSE
PH PHASE
PHC PREHEAT COIL
PLBG PLUMBING
PNEU PNEUMATIC
PPH POUNDS PER HOUR
PRESS PRESSURE
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
QTY QUANTITY
RA RETURN AIR
RAD RADIATED
RD ROOF DRAIN
REFR REFRIGERANT
REQ REQUIRED
RH RELATIVE HUMIDITY
RLA RUNNING LOAD AMPS
RM ROOM
RND ROUND
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SAN SANITARY
SEC'N SECTION
SEER SEASONAL ENERGY EFFICIENCY RATIO
SENS SENSIBLE
SF SQUARE FOOT
SH SENSIBLE HEAT
SHT SHEET
SND SOUND
SOL SOLENOID
SP STATIC PRESSURE
SPD STATIC PRESSURE DIFFERENTIAL
SPT STATIC PRESSURE TRANSMITTER
SQ SQUARE
SST STAINLESS STEEL
STL STEEL
STM STEAM
T&P TEMPERATURE AND PRESSURE
TC TEMPERATURE CONTROL
TD THERMODYNAMIC OR TEMPERATURE
DIFFERENTIAL (PER CONTEXT)
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TOT TOTAL
TPD TOTAL PRESSURE DROP
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UC UNDERCUT DOOR
UG UNDERGROUND
UNO UNLESS NOTED OTHERWISE
V VOLTS
VAC VACUUM
VD VOLUME DAMPER (MANUAL)
VEL VELOCITY
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
VTR VENT THRU ROOF
W WATT OR WIDTH (PER CONTEXT)
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER COLUMN
WG WATER GAUGE
WPD WATER PRESSURE DIFFERENTIAL
WT WEIGHT
MECH EQUIPMENT DESIGNATION
MECH EQUIPMENT DESIGNATION
AC AIR CURTAIN
ACC AIR COOLED CONDENSER
ACU AIR CONDITIONING UNIT
ACV AIR CONTROL VALVE
AF AIR FILTER
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
ATU AIR TERMINAL UNIT
B BOILER
BCU BLOWER COIL UNIT
BS BASKET STRAINER
BT BUFFER TANK
CAV CONSTANT AIR VOLUME
CB CHILLED BEAM
CC COOLING COIL
CFP CHEMICAL FEED PUMP
CH CHILLER
CP CONDENSER WATER PUMP
CRAC COMPUTER ROOM AIR CONDITIONING UNIT
CRP CONDENSATE RETURN PUMP
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CTF COOLING TOWER FILTER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CVR CONVECTOR
CWP CHILLED WATER PUMP
DFH DEAERATING FEEDWATER HEATER
DHU DESSICANT DEHUMIDIFICATION UNIT
DMC DUCT MOUNTED COIL
EAV EXHAUST AIR VALVE
EF EXHAUST FAN
EJ EXPANSION JOINT
ERU ENERGY RECOVERY UNIT
ET EXPANSION TANK
EVC EVAPORATIVE COOLER
F FAN
FAV FUME AIR VALVE
FC FLUID COOLER
FCU FAN COIL UNIT
FD FIRE DAMPER
FFU FAN FILTER UNIT
FSD COMBINATION FIRE/SMOKE DAMPER
FT FLASH TANK
FTR FIN-TUBE RADIATION
FTU FAN TERMINAL UNIT
FUR GAS FIRED FURNACE (*NEED APPROVAL)
GMU GLYCOL MAKEUP UNIT (*NEED APPROVAL)
GP GLYCOL PUMP
GV GRAVITY VENTILATOR
H HUMIDIFIER
HC HEATING COIL
HEV HOOD EXHAUST VALVE
HPU HEAT PUMP UNIT
HRU HEAT RECOVERY UNIT
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
L LOUVER
MAU MAKE-UP AIR UNIT
MD MOTORIZED DAMPER
P PUMP
PAC PACKAGED AIR CONDITIONING UNIT
PCWP PRIMARY CHILLED WATER PUMP
PG PIPE GUIDE
PHWP PRIMARY HEATING WATER PUMP
PHX PLATE HEAT EXCHANGER
PRV PRESSURE REGULATING VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
RF RETURN FAN
RHC TERMINAL REHEAT COIL
RP RADIANT PANEL
RTU ROOFTOP UNIT
RV ROOF VENTILATOR (*NEED APPROVAL)
SA SOUND ATTENUATOR
SAV SUPPLY AIR VALVE
SCWP SECONDARY CHILLED WATER PUMP
SD SMOKE DAMPER
SF SUPPLY FAN
SHWP SECONDARY HEATING WATER PUMP
SPP STEAM PRESSURE PUMP
SSCU SPLIT SYSTEM CONDENSING UNIT (*NEED APPROVAL)
SSFU SPLIT SYSTEM FAN/COIL UNIT (*NEED APPROVAL)
ST STEAM TRAP
T TANK
TCP TEMPERATURE CONTROL PANEL
UH UNIT HEATER
VAV VARIABLE AIR VOLUME BOX
VFD VARIABLE FREQUENCY DRIVE
VI VIBRATION ISOLATION
VRF VRF INDOOR UNIT
VRHU VRF HEAT RECOVERY UNIT (*NEED APPROVAL)
WCC WATER COOLED CONDENSER
WSHP WATER SOURCE HEAT PUMP
PLAN MARK
EQUIPMENT NUMBER
SHEET NUMBER
LINE TYPE LEGEND
DRAWING REFERENCES
NEW WORK BY THIS CONTRACTOR
(DARK, SOLID LINE)
EXISTING TO REMAIN OR NEW WORK BY OTHERS
(LIGHT, SOLID LINE)
EXISTING TO BE REMOVED BY THIS CONTRACTOR
(DARK, DASHED LINE, DEMOLITION PLANS)
NEW WORK BY THIS CONTRACTOR TO BE
INSTALLED UNDERGROUND, OR BELOW FLOOR
(DARK, LONG DASHED LINE)
NORTH ARROW
PLAN DETAIL REFERENCE TITLE
KEYED NOTE DESIGNATION
PLAN MARK
EQUIPMENT NUMBER
EQUIPMENT DESIGNATION REFER TO MEP
SCHEDULE FOR CIRCUITING AND DEVICE
REQUIREMENTS AND FLOOR PLANS FOR
LOCATIONS
ENLARGED PLAN REFERENCE
PLAN MARK
SHEET NUMBER
A101
SIM
TITLE
SCALE
PLAN
NORTH
TRUE
NORTH
INTERFACE, EXISTING TO NEW
EXTENT OF DEMOLITION
SECTION
MATCHLINE
REVISION TAG
AD888
BLDG # - ACU #
BLDG # - CU #
X
21. WHERE MECHANICAL WORK IS REQUIRED ABOVE CEILINGS, REMOVE
AND REPLACE EXISTING CEILINGS AS REQUIRED.
COND CONDENSING UNIT
/2
8/
UP
DN
UP
UP
UP UP
UP
UP
DN
UP
UP
DN
UP
UP
UP
DN
UP
UP
UP
DN
UP
DN
UPDN
UP
DN
UP
UP
UP
UP
Office
C002A
Office
C002C
Telephone
Triage
C002B
Electrical
Closet
A0004
Dietetics
Kitchen
A0011
Clothing
Rm.
A033B
Autopsy
A004B
M. Tlt.
A004C
HAC
A004D
F. Tlt.
A004E
Storage
A004F
Gross
Specimen
Storage
A004G
Transfer
Room
A004A
Viewing
Room
A004
Gas Stor.
A005A
Gas Stor.
A005B
Pest
Control
A005C
Corridor
C*B*13
Stor.
A007A
Hazard
Chem.
Stor.
A007B
Elec.
A003
Soil Linen
A002
Drug Stor.
A001A
Alc. Vault
A001B
Narc. Vault
A001C
Elec.
A001D
Mech.
Room
A005D
Stair 2
S*B*2
Corridor
C*B*2
Mech. Stor.
A013
Ref. Equip.
Rm.
A013A
Mech. Rm
A013B
Forms Rm.
A013D
Service
Lobby
A010
Shred Rm.
A011
Nuclear
Stor.
A015
Stor.
A016
PM&R Stor.
A018
Elec.
A019
Loading
Dock
A017
Distribution
A014
Warehouse
Receiving&Check-in
A014A
Office
A014B
Canteen
Stor.
A014C
Mail Rm.
B022
Clerk Office
B022A
Receiving
& Breakout
A021
Stor.
A021A
Stor.
A022C
Office
A022B
Ref. Eq.
B020
Subsistence
A022
Elec.
A022A
Supply
Storage
A020
Emergency
Generator
B013
Transformer
Room
B013B
Electric
Room
B013A
Elec. Shop
B001
Elec. Office
B001A
Elec. Shop
B001B
BioMed
Chief
B001C
BioMed
Rep. Shop
B004
Biomedical
Engineering
B005
Stair 4
S*B*4
Biomedical
Eng.
B005A
BioMed
Work Area
B006
BioMed
Stor.
B006A
Super. Fee
Service
B006B
Stor.
B007B
Authoriz.
Clerk
B007A
Elec.
B001D
Corridor
C*B*4
Lead, Voucher
C&P Clerks
B007
F. Tlt.
B008
M&R Stor.
B008A
Fitness
Center
B011
C&P
B012
Comp. &
Pension
B014
M. Tlt.
B010
Stair 3
S*B*3
Sig
B008B
Tele.
B008C
Soil. Linen
B016
Library
B015
Library
B017
Elec.
B016A
Engineering
Office
B018
Storage
B017B
Eng. Stor.
B019
Fire Alarm
Control
B019A
Off.
C005B
Off.
C005C
Stair 7
S*B*7
Pharmacy
Stor.
C005
Corridor
C*B*5
Mechanical
Room
C003
Silver
Rcvry.
C004
Electric
Switchgear
C003A
Mechanical
Room
C003B
Mech. Stor
C010
Medical
Record
Stor.
C002
Corridor
C*B*6
Elec. Rm.
C008
Pharm
Cache Rm.
C009
PBS
Storage
C009A
Stair 6
S*B*6
Audiology
Waiting
C011
Mech.
C013
Toilet
C016
Toilet
C017
Storage
C019
Exam
C023
Exam
C024
Exam
C025
Clean
Supplies
C026
Ent. Minor
C022
Workroom
C020
Nurse
C018
Office
C014
Ent. Chk
In/Out
C012
Exam
C027
Stor.
C028
Exam
C029
Speech
C030
Hrng Aid
Repair
C031
Hrng Aid
Fitting
C032
Off.
C033
Sig.
C034
Office
C035
Office
C036
Aud Booth
C037
Aud. booth
C038a
Office
C041
Office
C042
Office
C043
Aud Booth
C040
Aud Booth
C039a
Mechanical
Room
C015
Stair 9
S*B*9
Chief
A047C
Files
A047D
Health
Information
Management
A047
Asst.
A047A
Office
A047B
Chief
Police
Service
A046A
Tlt.
A044
Off.
A045A
Adm. Asst.
A046
Elev. Mech.
Rm
A043
Storage
A042
Off.
A031F
Off.
A040
Chief EMS
Office
A031
Break
Room
A032A
EMS Cart
Rm.
A033E
IRM
Storage
A034
Elec.
A032E
Case Man.
A031D
EMS Super
Off.
A031C
Chief EMS
Off.
A031B
EMS Off.
A031A
Canteen
Stor.
A030
Fan Rm.
A028
F. Tlt.
A026B
Locker
Room
A026A
Non-Res.
Lounge
A026
Controlled
Substance
Program
Manager
A031E
Stair 5
S*B*5
Office
A047F
Coding
Department
A045
M. Tlt.
C006
F. Tlt.
C007
Eng. Stor.
A023A
Stair 1
S*B*1
Tlt.
A025
Corridor
C*B*1
Freezer
A0012
Freezer
A0007
Freezer
A0008
Freezer
A0015
Freezer
A0014
Misc.
Kitchen
A0023
Freezer
A0010
HAC
A0021
HAC
A0019
HAC
A0018
Exist. Tele.
Equip. Rm.
A035
Dry
Goods/Paper
Storage
A036
Office
A0001
Male Toilet
A0003
Female
Toilet
A0002
Assistant
Office
A0017
Chief Office
A0017A
Office
A0016
Break
Room
A0006
Supply
Warehouse
A001
Aud Booth
C038
Aud Booth
C037a
Aud Booth
C039
Aud Booth
C040a
A/C
B014A
Stair
A017A
Tele.
A025A
HAC
A027
Elec.
A032F
Office
A0013
Office
A0022
Elevator
Equipment
Room
C010A
Gas Meter
Room
A001e
Soil Lin
A032G
Office
A033D
Office
A033H
Office
A033J
Gen. Stor.
A033
EMS
Storage
A032
Supply
Warehouse
A033C
Storage
A033G
Office
A047E
Storage
B017A
Stair 11
S*B*11
Transformer
Room
A023
Misc.
Kitchen
A0020
Mechanical
Room
A001f
Storage
A041
ACS
Specialty
Care
Waiting
C011
BIOMED
STORAGE
B010
Canteen
Storage
C009B
Tele Room
BO21
Exist.
Elec. Closet
A0005
MD
MD
Scale: 1/16" = 1'
BASEMENT HVAC PLAN
M-101-C.1.B
CL / KW
BASEMENT OVERALL HVAC NEW
WORK PLAN
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
539-21-701
04-MAY-2022
100% CONSTRUCTION
DOCUMENTS
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST., CINCINNATI, OH
6 SOUTH OLD ORCHARD
WEBSTER GROVES, MO. 63119
T: 314.918.8383
F: 314.918.1766
PLAN
NORTH
TRUE
NORTH
/2
8/
DN
DN
DN
DN
UP
UP
UP
UP
DN
UP
UP
DN
DN
DN
DN
DN
UP
DN
UP
DN
DN
UP
DN
UP
DN
DN
Mens
Restroom
Dir.
Conference
Room
A102
Office
A103
Office
A104
Secretary
Office
A105
Associate
Dir. Office
A106
Director's
Office
A107
Chief of
Staff
A108
Sec. Chief of Staff
A109
Adm Asst.
A110
HAC
A111
Adm Asst.
A112
QA
Manager
A113
Sec. &
Waiting
A114
Risk
Management
A115
Asst Chief
Social
Work
A116
S.W. Off.
A117
S.W. Off.
A118
Staff Dir.
Asst.
A119
Stor
A120
Public
Affairs
A118A
Adm. Asst.
A114A
Chief Soc.
Work
A115A
Tele
A119A
Director
Public
Affairs
Office
A113A
Med Staff
Coor.
A112A
Staff Dir.
Asst.
A119C
Clos
A105A
Elec.
A111A
Clos
A102A
Office
B105
Office
B106
Exam
B107
SCI
Pharmacy
B108
SCI Social
Worker
B109
Office
B110
Toilet
B111
Exam
B112
Stor
B113
Storage
B114
Exam
B115
Stair 4
S*1*4
Exam
B117
Waiting
Area
B118
Corridor
C*1*7
Stor
B114A
Tele Clos
B107A
Secretary
B119
Off.
B127
Off.
B128
Off.
B129
Off.
B130
Off.
B131
Occ.
Therapy
B132
Kit.
Multi-Purpose
B133
Off.
B134
Off.
B135
Group Rm.
B137
Group
Room
B132B
Adm. Asst.
B125
Office
B125A
Stor.
B127A
Stor.
B137A
Stor.
B137B
Men's
Restroom
A121
Stair 2
S*1*2
Quality
Assurance
A123
AACOS
A124
F. Tlt.
A125
Service
Lobby
A126
KIT.
A127
Food
Service
A128
Volunteer
A1035
Dry Storage
A127B
Walk-In
Ref.
A127C
Walk-In
Ref.
A127D
HAC
A126B
Trash
Chute
A126A
Corridor
C*1*2
Elec.
A126C
Dry Stor.
A127A
Pizza Shop
A131
Canteen
Dining
A130
HAC
A133
Retail Store
B101
Mech.
B101B
Office
B103
Clerical
B102
Elec.
B103A
Stockroom
B101A
Telecom
Room
A134A
Audiology
Clinic
B123
F. Tlt.
B104
Tlt.
B124
Tele.
B124A
RN Intake
B139
Oxygen
B140
Physical
Therapy/Occupational
Therapy
B143
Speech
Pathology
B144
Speech
Pathology
B145
Neuropsychology
B146
Electrical
Closet
B141
Nave
B163
Vestry
B163B
Stor
B163C
Chancel
B163A
Chap. Clin.
Pastoral
Education
B163G
Chaplain
Assistant
B163H
Chief
B163J
Chaplain
B163K
Chaplain
B163L
Corridor
C*1*8
Corridor
C*1*6
Pharmacy
Specialist
B156
Storage
B157
NP / Exam
B158
Social
Work
B159
Physician/Exam
B160
Reception
B162A
Waiting
B162
Storage
B161
Stor.
B150A
SVC.
Officer
B147
SVC.
Officer
B148
SVC.
Officer
B148A
SVC.
Officer
B150B
SVC.
Officer
B149
SVC.
Officer
B149A
Waiting
Room
B150
Audiology
C141
Corridor
C*1*5
Corridor
C*1*14
Off.
C134A
Adm. Asst.
C134B
Off.
C134C
Off.
C134D
Off.
C134E
Procedure
C134F
Receiving
C134G
Pharmacy
C140
Off.
C129
Secure
Dispensing
C133
Vault
C143
Waiting
C125
Consult
C125A
Elec.
C126
Pharmacy
C140B
Dispensing
C125B
Sec.
C137
Voluntary
Service
Office
B162C
Storage
C162D
Agent
Cashier
C162E
Agent
Cashier
C162F
Agent
Cashier
C162G
Transport
C135
Voluntary
Service
C137A
Corridor
C*1*1
Volunteer
Office
A1039
Volunteer
Office
A1038
Sig.
A141A
Stair 1
S*1*1
Decedent
Affairs
A144
A144A
Nurse
Pract.
A144B
Nurse
Pract.
A144C
Eligibility
Off.
A140
Clos
A139
Clos.
A140A
F. Tlt.
A139A
Personnel
Health
A139B
Personal
Health
C132A
Person.
Hlth.
C132B
Off.
C130D
Off.
C130C
Social
Work SVC
C130
Off.
C130A
Exam
C130B
Signal
C128
Tele.
C127
Stair 5
S*1*5
M. Tlt.
A174 Nursing
Lounge
A158
Elec.
A161A
HAC
A160
F. Tlt.
A161
Phys.
A162
Phys.
A163
Phys.
A164
Phys.
A165
Nurse
Manager
A166
Chief Nurse
Office
A167
Chief Office
A168
Prog. Asst.
A169
Waiting
A170
Physician
Office
A171
Phys.
A172
Stor.
A173
Elec.
A143
Tlt.
A158A
Stair 9
S*1*9
On Call
A155
Tlt.
A155A
Sig.
A147A
Cl. Stor.
A147D
Cl. Lin.
A147C
Pub. Tlt.
A147B
Emergency
A147
Secl.
A154
Secl.
A152
Minor
Surgery
A153
Triage
C120
Chief Off.
A151
Soil. Util.
A157
PCMM
Coordinator
A146A
Quality
Manager
A146B
Squad Stor.
A146
Heart Exam
A148
Heart Exam
A149
Restroom
A149A
Heart Exam
A150
Corridor
C*1*3
M. Tlt.
C124
F. Tlt.
C123
Employee
Health
C122A
Conference
Room
C122
Office
C121
Exam
C122D
Exam
C122C
Police
C119
Employee
I.D.
C119A
Off.
C119B
Off.
C119C
Lkrs.
C119D
Tlt
C119E
Evidence
C119F
Armory
C119G
Stor.
C119H
Waiting
C116
PEC
C116A
PEC
C116B
PEC
C116C
Off.
C116D
PEC
C116E
Holding
C119K
M. Tlt.
C117
F. Tlt.
C118
Holding
C119I
Corridor
C*1*11
Stair 6
S*1*6
Clerk
C102
Waiting
Room
C103
Exam
Room
C104
HAC
C105
PEA
C106
Exam
C107
Exam
C108 Elec.
C109
Exam
C110
Alcove
C111
Exam
C112
Exam
C113
Exam
C114
Exam
C115
Tlt
C104A
Stor
C104B
Corridor
C101
PIV
Registrar
B156A
Pain
School
B156B
Elec.
B155
Elec.
B155A
Compund
C140A
Stair 7
S*1*7
Tlt.
C1012
Work Rm.
C1013
Clinical
Pharm.
C1014
RN
C1015
Exam
C1018
Exam
C1019
Exam
C1020
Exam
C1021
Exam
C1022
Exam
C1023
Exam
C1024
Exam
C1025
Exam
C1026
Meds
C1027
Exam
C1028
Exam
C1029
Exam
C1030
Office
C1032
Clinicians
Break Rm.
C1033
Women's
Lockers
C1033A
F. Tlt.
C1033B
Men's
Lockers
C1033C
M. Tlt.
C1033D
Program
Assistant
C1017
Care
Coordination
C1013A
Pharmacist
Counselor
C1034
Changing
Room-MRI
C1035
Reception
C1036
Social
Worker
C1037
RN
C1038
Tlt.
C1039
Office
C1040
Exam
C1041
Wrk. St.
C1042
HAC
C1043
Exam
C1044
Neg. Press.
C1045
Exam
C1046
Exam
C1047
Exam
C1048
Neg. Press.
C1049
Exam
C1050
Exam
C1051
Exam
C1052
Ante
C1053
Procedure
C1054
Elec.
C1055
Stor.
C1057
Tele.
C1059
Neg. Press.
C1061Soiled
Utility
C1063
Exam
C1000
Exam
C1001
Exam
C1002
Exam
C1003
Exam
C1004
Office
C1005
Exam
C1006
Exam
C1007
Exam
C1008
Procedure
C1009
Office
C1010
Office
C1011
Storage
B153
Work Area
C1038A
Pharmacist
Counselor
C165
Reception
C167
Clinical
Pharm.
C168
RN
C169
Nutrition
C170
Office
C171
Exam
C172
Work St.
C173
Tlt.
C174
Exam
C175
Elec.
C176
Exam
C177
Exam
C178
Exam
C179
Exam
C180
Exam
C181
Exam
C182
Meds
C183
Elec.
C184
Exam
C185
Linen
C186
Procedure
C187
HAC
C188
Exam
C189
Tele.
C190
Exam
C191
Stor.
C192
Voluntary
Service
C147
Mech.
C149
ATM
C150
Break
Room
C151
Office
C152
Office
C153
Office
C154
Exam
C155
Exam
C156
Exam
C157
Exam
C158
Exam
C159
Tlt.
C160
Office
C161
Office
C162
Exam
C163
Office
C164
Work Area
C164A
Clos.
C163A
Info
C166A
Office
C166
F. Tlt.
C146
Storage
C195
Blood Draw
Rm.
C193
RN
C194
Work Area
C169A
Intake
C196
Exam
C197
Exam
C198
Exam
C199
Corridor
C*1*12
Waiting
Room
C145
Entry
C-1-10L
Corridor
C*1*15
Corridor
C*1*19
Corridor
C*1*16
Corridor
C*1*17
Corridor
C*1*18
Corridor
C*1*20
Vestibule
C144
Stair 10
S*1*10
Kit.
B152
Corridor
C*1*23
Waiting
Area
C100
Waiting
Room
C100D
Stair 3
S*1*3
Corridor
C*1*4
Sig
B124B
Storage
B132A
Recreation
B151
Stor.
B151L
Office
B125B
Conference
B163D
Blessed
Sacrament
B163E
Office
C122B
Interview
Room
C119J
Storage
C135A
Entry
A158B
M. Med.
Stor.
B151E
Elec.
B151K
M. Med.
Stor.
B151D
M. Med.
Stor.
B151C
Stor.
B151B
Med. Media
B151A
Toilet
B151I
Storage
B151F
Film Room
B151G
Medical
Illust.
B151H
Closet
B163F
Storage
C162H
Entry
C151A
HAC
A1028
Stair 11
S*1*11
Stair 8
S*1*8
Clerical
B102A
Decon
Trailer
A147E
Water
Treatment
A101B
Shared
Office
A1030
Office
C1005A
PEC
C116H
PEC
C116F
Closet
C119L
Volunteer
Storage
A1036
Trailer
C148
Desk
A175C
Corridor
C*1*21
Corridor
C*1*22
Corridor
C*1*9
Corridor
C*1*13
Corridor
C*1*10
Pharmacist
Counselor
C145
PIV
Registrar
C116G
Vending
A134
Telecom
Room
2" RL UP/DN
8" RS UP/DN
M-102-C.1.1
CL / KW
FIRST FLOOR OVERALL HVAC NEW
WORK PLAN
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
539-21-701
04-MAY-2022
100% CONSTRUCTION
DOCUMENTS
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST., CINCINNATI, OH
6 SOUTH OLD ORCHARD
WEBSTER GROVES, MO. 63119
T: 314.918.8383
F: 314.918.1766
Scale: 1/16" = 1'
FIRST FLOOR HVAC PLAN
PLAN
NORTH
TRUE
NORTH
/2
8/
DN
DN
DN
DN
UP
DN
UP
UP
DN UP DN
DN UP
UP
DN
UP
UP
Stair 10
S*2*10
Lab
B211
Recep.
A202
Imaging
Recep.
A201
Stor.
A202A
Digital
Chest Rm.
A203
Dressing
Rm.
A203A
Speech
Pathlgy.
A204
Rehab
Care Line
A205
Man Rehab
Care Line
A206
Staff
A207
Occupational
Therapy
A208
EMG Lab
A209
Rehab
Exam
A210
Rehab
Exam
A211
Elec.
A212
HAC
A213
Staff Tlt.
A214
PT Storage
A215
Hydrotheraphy
A216
Exam/Treatment
/ Exercise
Room
A217
Physical
Ther.
Supervisor
A218
Adl. Clinic
A208A
EMG Lab
A209A
Elec.
A217A
Corridor
C*2*2
Light Box
Room
A215B
SCI Exam
A215A
Stor.
A218A
Stair 2
S*2*2
Oxygen
Storage
A221
Therapy
Supervisor
A222
Ante Room
A223
Stor.
A210A
Equip
Wash
A222B
Compressor
Room
A222D
Equipment
Storage and Testing
A228A
Storage
A228B
Eto. Room
B208A
Mech
A228C
Office
A230
Dressing
Rm.
A227B
Office
A231
LKRS.
A227A
Shower
A227
Elec.
A225B
Service
Lobby
A225
Trash
Chute
A225A
Lounge
A226
Training
Room
A224
HAC
A225C
Office
A232
Nuclear
Med. Sec.
C200
Waiting
C201
Reading
C202
Work Rm.
C203
CAT Scan
Room
C204
Gamma
Camera
C205
Uptake
Prep Bay
C204A
Uptake
Area
C204B
Uptake
Prep Room
C204C
PET/CT
Scanner
C204D
Echo Room
C252
Echo Room
C251
Echo Rm
C250
Cath Lab
C216O
Stor.
C216P
I.V. Prep
Rm.
C207
Elec.
C209
Control
Room
C204E
Tlt.
C204F
Tele.
C208
File Rm.
C200B
Chief Off.
C200A
Reading
Rm.
C250A
Chief Off.
C200C
Break
Room
A240
Stair 1
S*2*1
Signal
Closet
A239
M. Tlt.
A236
Tlt.
A235
G.P.
Radiography
A242
Control
A243
Storage
A243A
Stair 5
S*2*5
Reading
Room
A245
Gamma
Camera
C210
Hot Lab
C212
Stor.
C213
X-Ray
Room
A246
Control
A246A
Clos
A243B
Clos
A243C
Ultrasound
A266
Corridor
C*2*1
Elec.
A246B
Corridor
C*2*3
Viewing
A256
Reading
Room
A257
Reading
Room
A258
Adm.
A259
Chief
Radiology
A260
Adm. Asst.
A261
Off.
A262
Resident
Reading
Room
A263
Reading
Room
A264
Reading
Room
A262A
Tlt.
A260A
Pat. Rm.
A266B
Ultrasound
A265
Stor
A255 Tlt.
A253B
Break Rm.
A253
Elec.
A253A
HAC
A254
Digital
Radiography
A252
Control
A252A
Student
Off.
A251
Office
A251B
Patient
Toilet
A249C
Control
A249B
BE
Fluororoom
A249
Storage
A249A
Work Rm.
A250A
Cl. Supp.
A296
Clean
Equipment
A295
Sig. Clos.
A250
Clean
Supply
Room
A251A
M. Lkrs.
A270
Tlt.
A270A
Staff
Lounge
A269
F. Lkrs.
A271
Tlt.
A271A
Conf.
A272
RN
Manager
A273
Elec.
A275
HAC
A274
On Call
A276
Tlt.
A276A
Stair 9
S*2*9
Off.
A268
Off.
A267
Pat. Room
A280
Pat. Room
A281
Pat. Room
A282
Pat Rm.
Pressure
A283
Pat Rm.
Neg.
Pressure
A284
Pat Rm.
Neg.
Pressure
A285
Pat. Rm.
Neg.
Pressure
A286
Pat. Rm
A287
Pat. Rm.
A288
Pat. Rm.
Neg.
Pressure
A289
Pat. Rm.
A290
Pat. Rm.
A291
Pat. Rm.
A292
Grieve/
Consult.
A293
Off.
A298
Meds.
A277
Nurse
Station
A279
Staff Tlt.
A297
Lin.
A294
G.P.
Radiography
A248
Tlt.
A248A
Trans.
A248B
Soil.
A278
Stair 4
S*2*4
Anatomic
Pathology
Gross
Room
B215
Cytology
B216
Special
Staining
B217
Histology
Processing
B218
Supervisor
B219
Histology
B220
Sig. Clos.
B221
Tele.
B222
Off.
B223
Sec.
B224
Operatory
B225
Operatory
B226
Dental Lab
B227
Stor.
B228
Dental
Operatory
B229
Dental
Hygeine
B230
Oral Surg.
B231
Off.
B233
Corridor
C*2*24
Lab Office
B235
TB/ MYC
Lab
B210B
TB/ MYC.
Lab
B210C
ISO
B210D
ISO
B210E
Tele.
B210A
Lab
B211A
Cold Rm.
B211B
Ante
A235A
Dispatch
Area
A236A
Clean
Supplies
B201
F. Tlt.
B203A
M. Lkrs.
B202
Slide Stor.
B202A
F. Lkrs.
B203
Dir. Off.
B205
Off.
B207A
Elec.
B206
Corridor
C*2*17
Off.
B207B
Off.
B207C
Pathology
Off.
B209
Micro
Reading
B208
Break
Room
B210
HAC
B204
Corridor
C*2*5
Corridor
C*2*4
Stair 3
S*2*3
Waiting
Rm.
B224A
Oral Surg.
B231A
Off.
B233A
Stor.
B233B
Elec.
B233C
Off.
B235A
Tele.
B221C
Office
B234A
Lab
B234B
Lab
B234C
Off.
B234D
Cancer
Registry
B234E
Chief
B234F
Off.
B234G
Prep Rm.
C214
Control
C215
Cardiac
Cath Lab
C216
Tlt.
C217
Waiting
C218
Stair 6
S*2*6
Tele.
C220
Stor.
C221
Elec.
C222
Lockers
C223
Lab Lounge
C224
Hemo Stor.
C225
Mech.
C226
Lkrs.
C228
Chemistry
Hemotology
Lab
C229
Blood Draw
C230
Blood Bank
C231
Storage
C232
HAC
C234
Storage
C235
Conference
Rm.
C236
Off.
C237
Break Rm.
C238
HAC
C239
Off.
C240
Off.
C241
Off.
C242
Off.
C243
Off.
C244
Stor.
C245
Exam
C246
EKG Rm.
C247
Tlt.
C248
Scope
Wash
C216A
Soil Ut.
C216B
Clean
Linen
C216C
Observ.
C216D
Transfer
C216E
Radiology
Spec Rm.
C216F
Scrub Area
C216G
Cath Lab
C216H
Control
C216I
Equip
C216J
Prep Mon
C216K
Sterile
Supply
C216L
Vestibule
C216M
Control
Rm.
C216N
Bone
Density Lab
C211
Tlt.
C216Q
Tlt.
C214A
CT
Scanner
C214B
Sec.
C229A
Off.
C229B
Off.
C229C
Chief Off.
C229D
Clos
C229E
Files
C229F
Mech.
C229I
Special
Chem.
C229J
Toxicology
C229K
Tele
C229L
Elec.
C229M
Stor.
C229N
Shwr
C228A
Tlt.
C228B
Off.
C229G
Off.
C229H
Soiled Ut.
C229O
Cold Stor.
C229P
Stair 8
S*2*8
Womens
C2001
Mens
C2003
Elec.
C2004
Blood Draw
C2005
Work Rm.
C2007
HAC
C2008
Exam
C2009
Intake
C2010
Exam
C2011
Stor.
C2012
Exam
C2013
Stor.
C2014
Exam
C2015
Exam
C2016
Exam
C2017
Exam
C2018
Exam
C2019
Waiting
Alcove
C2020
Exam
C2021
Exam
C2023
Exam
C2025
Tlt.
C2027
Gas Stor
C2029
Lin.
C2031
Supply
C2033 Staff Tlt.
C2035
Soil
C2037
Exam
C2039
Tlt.
C2041
Exam
C2043
Exam
C2044
Exam
C2045
Exam
C2047
Exam
C2048
Exam
C2049
Exam
C2051
Exam
C2052
Exam
C2053
Exam
C2054
Exam
C2055
Exam
C2056
Signal
C2057
Office
C2059
Exam
C2069
Exam
C2071
Exam
C2072
Exam
C2073
Exam
C2074
Exam
C2075
Exam
C2076
Exam
C2077
Work
Alcove
C2078
Work
Alcove
C2079
Exam
C2080
Exam
C2081
Exam
C2082
Lin
C2036
Break Rm.
C2038
Soiled
Utility
A299
Elec.
A239A
Corridor
C*2*25
Corridor
C*2*12
Utility
Room
B229A
Office
B235B
Reception
C2063
Waiting
C2061
Storage
C2067
Mech
B208B
Stair
C229R
Closet
C216R
CT Room
#2
A2013
Stair 11
S*2*11
Clean
Supply
A2011
Storage
A2010
PACS
Read
A2008
S.P.
Control
A2009
Special
Procedures
A2015
MRI
Component
A2007
MRI Room
A2001A
MRI
A2001
Equipment
Storage
A2023
MRI
Equipment
A2001B
MRI EMS
A2025
Corridor
C*2*15
Waiting
A2000
Dressing
Room
A2002
Chage
Area
A2002A
Toilet
A2002B
Elec.
A2006
Signal
A2005
Men Staff
A2004
Women
Staff
A2003
CT Control
A2014
Adm.
Equip.
A2016A
CT Room
#1
A2016
S.P.
Equipment
A2021
CT Prep
A2017
Toilet
A2018
Storage
A2020
Office
A2022
IR Reading
A2024
Office
A208A
CT Office
A2019
Toilet
A2024A
Storage
A2026
A/C Shaft
A/C Shaft
A/C Shaft
Mechanical
C232A
Telecom
Room
B232
Telecom
Room
C236A
Telecom
Room
A2006A
VAV
M-103-C.1.2
CL / KW
SECOND FLOOR OVERALL HVAC
NEW WORK PLAN
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
539-21-701
04-MAY-2022
100% CONSTRUCTION
DOCUMENTS
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST., CINCINNATI, OH
6 SOUTH OLD ORCHARD
WEBSTER GROVES, MO. 63119
T: 314.918.8383
F: 314.918.1766
Scale: 1/16" = 1'
SECOND FLOOR HVAC PLAN
PLAN
NORTH
TRUE
NORTH
/2
8/
UP
UP
UP
UP
UP
UP
DN
DN
DN
DNUP
DN UP
DN
UP
UPDN
DN
Isolation
Procedure
Rm.
C3024
Fluoro
Procedure
Rm.
C3023
Corridor
C*3*14
Procedure
Rm.
C3021
Wash
Room
C3020
Physician
Work Room
C3019
Scope
Storage
C3017
Ante Rm.
C3016
Scope
Cleaning
C3016A
Procedure
Rm.
C3025
Procedure
Rm.
C3026
Prep/Recovery
Rm.
C3027
Clean
Supply
C3014
Isolation
Prep/Recovery
Rm.
C3013
Prep/Rec…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .