ATTACHMENT 1 - Specifications.pdf

PDF 9 MB Posted

Attached to
36C77623B0005 EHRM Infrastructure Upgrades - Cincinnati Project #539-21-701
Solicitation number
36C77623B0005
Issued by

About this file

This document is a set of specifications for the EHRM Infrastructure Upgrades project at the Cincinnati VAMC. The project involves general construction, alterations, and MEP and IT work at multiple buildings on the Cincinnati and Fort Thomas campuses. Key requirements include technology upgrades to telecom rooms and data centers, cable plant work, and electrical system improvements. The specifications provide guidance on operations and storage areas, security protocols, phasing plans to minimize disruptions, warranty management, and Resident Engineer's office specifications. The work is to be completed under Solicitation Number 36C77623B0005 with the Department of Veterans Affairs as the agency.

View the file

Other files

File Type Posted
36C77623B0005 0004 - Extension 3-10-23.pdf PDF
Technical Questions and Answers - Cincinnati EHRM.pdf PDF
36C77623B0005 0003.pdf PDF
36C77623B0005 0002 - EHRM Infrastructure Upgrades - Cincinnati.pdf PDF
Site Visit Sign-In Sheet - 36C77632B0005 EHRM Infrastructure Construction - Cincinnati VAMC.pdf PDF
ATTACHMENT 24 - Construction Wage Rates - Hamilton 01-13-2023.pdf PDF
36C77623B0005 0001 - EHRM Infrastructure Upgrades - Cincinnati.pdf PDF
Site Visit Memorandum.pdf PDF
ATTACHMENT 4 - Drawings 3 of 13.pdf PDF
ATTACHMENT 23 - Contractor Safety - Environmental Form.pdf PDF
ATTACHMENT 6 - Drawings 5 of 13.pdf PDF
ATTACHMENT 18 - Technology Narrative.pdf PDF
ATTACHMENT 13 - Drawings 12 of 13.pdf PDF
ATTACHMENT 15 - Plumbing Narrative.pdf PDF
ATTACHMENT 19 - Hazardous Materials Inspection Report.pdf PDF
ATTACHMENT 24 - Construction Wage Rates - Hamilton 1-13-2022.pdf PDF
ATTACHMENT 21 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 14 - Drawings 13 of 13.pdf PDF
ATTACHMENT 20 - Brand Name Justification.pdf PDF
ATTACHMENT 22 - Limitations on Subcontracting - Nov 2022.pdf PDF
ATTACHMENT 9 - Drawings 8 of 13.pdf PDF
ATTACHMENT 10 - Drawings 9 of 13.pdf PDF
ATTACHMENT 16 - Mechanical Narrative.pdf PDF
ATTACHMENT 7 - Drawings 6 of 13.pdf PDF
ATTACHMENT 3 - Drawings 2 of 13.pdf PDF
ATTACHMENT 17 - Electrical Narrative.pdf PDF
ATTACHMENT 2 - Drawings 1 of 13.pdf PDF
ATTACHMENT 25 - Site Visit Instructions.pdf PDF
ATTACHMENT 8 - Drawings 7 of 13.pdf PDF
ATTACHMENT 11 - Drawings 10 of 13.pdf PDF
ATTACHMENT 12 - Drawings 11 of 13.pdf PDF
ATTACHMENT 5 - Drawings 4 of 13.pdf PDF
36C77623B0005 Solicitation - Cincinnati EHRM.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Veterans Affairs

Cincinnati & Ft. Thomas EHRM Infrastructure Upgrades Cincinnati VAMC, Cincinnati, OH Project No. 539-21-701

100% Construction Documents Specifications Volume 1 4 May 2022

Prime Contractor: Health Facilities Solutions, 8718 Botts Ln., San Antonio, TX 78217

CINCINNATI AND FT. THOMAS EHRM INFRASTRUCTURE UPGRADES

PROJECT #539-21-701

CINCINNATI VAMC, CINCINNATI, OH 10-01-18

00 01 10-1

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 SPECIAL SECTIONS

00 01 10 List of Specifications 10-18

00 01 15 List of Drawing Sheets 05-20

00 00 20 Phasing 02-22

DIVISION 01 GENERAL REQUIREMENTS

01 00 00 General Requirements 01-21

01 00 10 Requirements

01 33 23 Shop Drawings, Product Data, & Samples 05-17

01 35 26 Safety Requirements 07-20

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 29 Testing Laboratory Services 11-18

01 57 19 Temporary Environmental Controls 01-21

01 74 19 Construction Waste Management 01-21

01 81 13 Sustainable Construction Requirements 10-17

DIVISION 02 EXISTING CONDITIONS

02 41 00 Demolition 08-17

02 82 13.13 Glovebag Asbestos Abatement 01-21

02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21

02 83 33.13 Lead Base Paint Removal and Disposal 01-21

DIVISION 03 CONCRETE (NOT USED)

DIVISION 04 MASONRY

04 05 13 Masonry Mortaring 10-17

04 05 16 Masonry Grouting 01-21

04 20 00 Unit Masonry 08-17

DIVISION 05 METALS

05 40 00 Cold-Formed Metal Framing 05-16

05 50 00 Metal Fabrications 08-18

DIVISION 06 WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

06 20 00 Finish Carpentry 08-16

00 01 10-2

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 21 13 Thermal Insulation 01-21

07 60 00 Flashing and Sheet Metal 01-21

07 84 00 Firestopping 02-16

07 92 00 Joint Sealants 10-17

DIVISION 08 OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 14 00 Interior Wood Doors 02-16

08 71 00 Door Hardware 01-21

08 90 00 Louvers and Vents 01-21

DIVISION 09 FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15

09 06 00 Schedule for Finishes 01-21

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 51 00 Acoustical Ceilings 12-18

09 65 13 Resilient Base and Accessories 01-21

09 65 19 Resilient Tile Flooring 06-14

09 69 00 Access Flooring 01-21

09 91 00 Painting 01-21

DIVISION 10 SPECIALTIES

10 14 00 Signage 01-21

DIVISION 11 EQUIPMENT (NOT USED)

DIVISION 12 FURNISHINGS (NOT USED)

DIVISION 13 SPECIAL CONSTRUCTION (NOT USED)

DIVISION 14 CONVEYING EQUIPEMENT (NOT USED)

DIVISION 21 FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression Systems 06-15

21 13 13 Wet-Pipe Sprinkler Systems 06-15

21 22 00 Clean Agent Fire Suppression Systems 05-15

DIVISION 22 PLUMBING

22 05 11 Common Work Results for Plumbing 09-20

00 01 10-3

DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING

23 05 11 Common Work Results for HVAC 02-20

23 05 12 General Motor Requirements: HVAC and Steam Generation

Equipment

02-20

23 05 41 Noise & Vibration Control for HVAC Piping & Equipment 02-20

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20

23 07 11 HVAC 02-20

23 08 00 Commissioning of HVAC Systems 02-20

23 09 23 Direct-Digital Control System for HVAC 02-20

23 21 13 Hydronic Piping 02-20

23 23 00 Refrigerant Piping 02-20

23 31 00 HVAC Ducts and Casings 02-20

23 37 00 Air Outlets and Inlets 02-20

23 81 00 Unitary HVAC Equipment 02-20

23 81 23 Computer Room Air Conditioners 08-21

DIVISION 25 INTEGRATED AUTOMATION

25 10 10 Advanced Utility Metering System 02-10

DIVISION 26 ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 01-18

26 05 73 Overcurrent Protective Device Coordination Study 01-17

26 09 23 Lighting Controls 01-18

26 22 00 Low-Voltage Transformers 01-18

26 24 16 Panelboards 01-18

26 27 26 Wiring Devices 01-18

26 33 53 Static Uninterruptible Power Supply 01-17

26 36 23 Automatic Transfer Switches 01-17

26 43 13 Surge Protective Devices 01-17

26 51 00 Interior Lighting 01-18

DIVISION 27 COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communication Systems 06-15

27 05 33 Raceways and Bonding for Communication Systems 10-18

27 08 00 Commissioning of Communication Systems 11-16

27 10 00 Control, Communication, and Signal Wiring 06-15

27 11 00 Communications Equipment Room Fittings 06-15

27 11 20 Data Center Cabinets 01-17

27 15 00 Communications Structured Cabling 01-16

00 01 10-4

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

28 13 00 Access Control Systems 02-20

28 23 00 Video Surveillance System 02-20

28 31 00 Fire Detection and Alarm 09-21

DIVISION 32 EXTERIOR IMPROVEMENTS (NOT USED)

DIVISION 33 UTILITIES (NOT USED)

DIVISION 34 TRANSPORTATION (NOT USED)

DIVISION 48 ELECTRICAL POWER GENERATION (NOT USED)

CINCINNATI VAMC, CINCINNATI, OH 05-01-10

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWINGS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

ABATEMENT

HA-101 HAZARDOUS MATERIALS - ASBESTOS

HA-102 HAZARDOUS MATERIALS - ASBESTOS

HA-103 HAZARDOUS MATERIALS - ASBESTOS

HA-104 HAZARDOUS MATERIALS - ASBESTOS

HA-105 HAZARDOUS MATERIALS - ASBESTOS

HA-106 HAZARDOUS MATERIALS - ASBESTOS

HA-107 HAZARDOUS MATERIALS - ASBESTOS

ARCHITECTURAL

GI-000 COVER

GI-010 INDEX OF DRAWINGS

GI-011 INDEX OF DRAWINGS

GI-020 GENERAL INFORMATION, SYMBOLS, & LOCATION MAP

GI-030 ABBREVIATIONS

GI-040 ACCESSIBILITY STANDARDS

GI-041 ACCESSIBILITY STANDARDS

GI-042 ACCESSIBILITY STANDARDS

GI-043 ACCESSIBILITY STANDARDS

GI-044 ACCESSIBILITY STANDARDS

AD-100-C.1.B ENLARGED FLOOR PLANS - BASEMENT - DEMOLITION

AD-101-C.1.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION

AD-102-C.1.2 ENLARGED FLOOR PLANS - 2ND FLOOR - DEMOLITION

AD-103-C.1.3 ENLARGED FLOOR PLANS - 3RD FLOOR - DEMOLITION

AD-104-C.1.4 ENLARGED FLOOR PLANS - 4TH FLOOR - DEMOLITION

AD-105-C.1.5 ENLARGED FLOOR PLANS - 5TH FLOOR - DEMOLITION

AD-106-C.1.6 ENLARGED FLOOR PLANS - 6TH FLOOR - DEMOLITION

AD-107-C.1.7 ENLARGED FLOOR PLANS - 7TH FLOOR - DEMOLITION

AD-108-C.1.8 ENLARGED FLOOR PLANS - 8TH FLOOR - DEMOLITION

AD-109-C.1.9 ENLARGED FLOOR PLANS - 9TH FLOOR - DEMOLITION

AD-140-C.2.B ENLARGED FLOOR PLANS - BASEMENT - DEMOLITION

AD-141-C.2.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION

00 01 15 - 2

AD-142-C.2.2 ENLARGED FLOOR PLANS - 2ND FLOOR - DEMOLITION

AD-150-C.3.B ENLARGED FLOOR PLANS - BASEMENT - DEMOLITION

AD-160-C.8.2 ENLARGED FLOOR PLANS - 2ND FLOOR - DEMOLITION

AD-180-C.15.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION

AD-190-C.TB.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION

AD-200-C.TE.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION

AD-210-FT.64.B ENLARGED FLOOR PLANS - BASEMENT - DEMOLITION

AD-211-FT.64.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION

AD-212-FT.64.2 ENLARGED FLOOR PLANS - 2ND FLOOR - DEMOLITION

AD-213-FT.64.3 ENLARGED FLOOR PLANS - 3RD FLOOR - DEMOLITION

AD-220-FT.117.1 ENLARGED FLOOR PLANS - 1ST FLOOR – DEMOLITION

AS-100-C.1.SB OVERALL FLOOR PLAN - SUB-BASEMENT - AREA 1

AS-101-C.1.SB OVERALL FLOOR PLAN - SUB-BASEMENT - AREA 2

AS-102-C.1.SB OVERALL FLOOR PLAN - SUB-BASEMENT - AREA 3

AS-103-C.1.B OVERALL FLOOR PLAN - BASEMENT - AREA 1

AS-104-C.1.B OVERALL FLOOR PLAN - BASEMENT - AREA 2

AS-105-C.1.B OVERALL FLOOR PLAN - BASEMENT - AREA 3

AS-106-C.1.B OVERALL FLOOR PLAN - BASEMENT - AREA 4

AS-107-C.1.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 1

AS-108-C.1.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 2

AS-109-C.1.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 3

AS-110-C.1.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 4

AS-111-C.1.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 1

AS-112-C.1.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 2

AS-113-C.1.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 3

AS-114-C.1.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 4

AS-115-C.1.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 1

AS-116-C.1.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 2

AS-117-C.1.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 3

AS-118-C.1.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 4

AS-119-C.1.4 OVERALL FLOOR PLAN - FOURTH FLOOR - AREA 1

AS-120-C.1.4 OVERALL FLOOR PLAN - FOURTH FLOOR - AREA 2

AS-121-C.1.4 OVERALL FLOOR PLAN - FOURTH FLOOR - AREA 3

AS-122-C.1.4 OVERALL FLOOR PLAN - FOURTH FLOOR - AREA 4

AS-123-C.1.5 OVERALL FLOOR PLAN - FIFTH FLOOR - AREA 1

AS-124-C.1.5 OVERALL FLOOR PLAN - FIFTH FLOOR - AREA 2

00 01 15 - 3

AS-125-C.1.5 OVERALL FLOOR PLAN - FIFTH FLOOR - AREA 3

AS-126-C.1.6 OVERALL FLOOR PLAN - SIXTH FLOOR - AREA 1

AS-127-C.1.6 OVERALL FLOOR PLAN - SIXTH FLOOR - AREA 2

AS-128-C.1.6 OVERALL FLOOR PLAN - SIXTH FLOOR - AREA 3

AS-129-C.1.7 OVERALL FLOOR PLAN - SEVENTH FLOOR - AREA 1

AS-130-C.1.7 OVERALL FLOOR PLAN - SEVENTH FLOOR - AREA 2

AS-131-C.1.7 OVERALL FLOOR PLAN - SEVENTH FLOOR - AREA 3

AS-132-C.1.8 OVERALL FLOOR PLAN - EIGHTH FLOOR - AREA 1

AS-133-C.1.8 OVERALL FLOOR PLAN - EIGHTH FLOOR - AREA 2

AS-134-C.1.9 OVERALL FLOOR PLAN - NINTH FLOOR - AREA 1

AS-135-C.1.9 OVERALL FLOOR PLAN - NINTH FLOOR - AREA 2

AS-140-C.2.B OVERALL FLOOR PLAN - BASEMENT - AREA 1

AS-141-C.2.B OVERALL FLOOR PLAN - BASEMENT - AREA 2

AS-142-C.2.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 1

AS-143-C.2.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 2

AS-144-C.2.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 1

AS-145-C.2.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 2

AS-150-C.3.B OVERALL FLOOR PLAN - BASEMENT

AS-151-C.3.1 OVERALL FLOOR PLAN - FIRST FLOOR

AS-152-C.3.2 OVERALL FLOOR PLAN - SECOND FLOOR

AS-160-C.8.1 OVERALL FLOOR PLAN - FIRST FLOOR

AS-161-C.8.2 OVERALL FLOOR PLAN - SECOND FLOOR

AS-162-C.8.4 OVERALL FLOOR PLAN - FOURTH FLOOR

AS-180-C.15.B OVERALL FLOOR PLAN - BASEMENT

AS-181-C.15.1 OVERALL FLOOR PLAN - FIRST FLOOR

AS-182-C.15.2 OVERALL FLOOR PLAN - SECOND FLOOR

AS-183-C.15.3 OVERALL FLOOR PLAN - THIRD FLOOR

AS-184-C.15.4 OVERALL FLOOR PLAN - FOURTH FLOOR

AS-190-C.TB.1 OVERALL FLOOR PLAN - FIRST FLOOR

AS-200-C.TE.1 OVERALL FLOOR PLAN - FIRST FLOOR

AS-210-FT.64.B OVERALL FLOOR PLAN - BASEMENT - AREA 1

AS-211-FT.64.B OVERALL FLOOR PLAN - BASEMENT - AREA 2

AS-212-FT.64.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 1

AS-213-FT.64.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 2

AS-214-FT.64.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 1

AS-215-FT.64.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 2

AS-216-FT.64.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 1

00 01 15 - 4

AS-217-FT.64.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 2

AS-220-FT.117.1 OVERALL FLOOR PLAN - FIRST FLOOR

AS-300 ROOF PLAN – BUILDING 1

AS-301 ROOF PLANS – BUILDINGS 2, 3, 8, 15, & 64

AS-310 ROOF DETAILS

AS-400-C.1.B ENLARGED FLOOR PLANS - BASEMENT - RENOVATION

AS-401-C.1.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION

AS-402-C.1.2 ENLARGED FLOOR PLANS - 2ND FLOOR - RENOVATION

AS-403-C.1.3 ENLARGED FLOOR PLANS - 3RD FLOOR - RENOVATION

AS-404-C.1.4 ENLARGED FLOOR PLANS - 4TH FLOOR - RENOVATION

AS-405-C.1.5 ENLARGED FLOOR PLANS - 5TH FLOOR - RENOVATION

AS-406-C.1.6 ENLARGED FLOOR PLANS - 6TH FLOOR - RENOVATION

AS-407-C.1.7 ENLARGED FLOOR PLANS- 7TH FLOOR - RENOVATION

AS-408-C.1.8 ENLARGED FLOOR PLANS - 8TH FLOOR - RENOVATION

AS-409-C.1.9 ENLARGED FLOOR PLANS - 9TH FLOOR - RENOVATION

AS-440-C.2.B ENLARGED FLOOR PLANS - BASEMENT - RENOVATION

AS-441-C.2.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION

AS-442-C.2.2 ENLARGED FLOOR PLANS - 2ND FLOOR - RENOVATION

AS-450-C.3.B ENLARGED FLOOR PLANS - BASEMENT - RENOVATION

AS-460-C.8.2 ENLARGED FLOOR PLANS - 2ND FLOOR - RENOVATION

AS-480-C.15.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION

AS-490-C.TB.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION

AS-500-C.TE.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION

AS-510-FT.64.B ENLARGED FLOOR PLANS - BASEMENT - RENOVATION

AS-511-FT.64.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION

AS-512-FT.64.2 ENLARGED FLOOR PLANS - 2ND FLOOR - RENOVATION

AS-513-FT.64.3 ENLARGED FLOOR PLANS - 3RD FLOOR - RENOVATION

AS-520-FT.117.1 ENLARGED FLOOR PLAN S- 1ST FLOOR – RENOVATION

AS-530 INTERIOR ELEVATIONS & EXISTING ROOM PHOTOS

AS-600 PARTITION TYPES

AS-700 DOOR SCHEDULE, DOOR & FRAME TYPES

AS-710 DOOR & MISCELLANEOUS DETAILS

AS-720 ROOM FINISH SCHEDULE & MATERIAL SCHEDULE

FIRE PROTECTION

FP-000 FIRE PROTECTION SYMBOLS & ABBREVIATIONS

FP-110-C.1.B FIRE PROTECTION BASEMENT OVERALL PLAN

00 01 15 - 5

FP-120-C.1.1 FIRE PROTECTION FIRST FLOOR OVERALL PLAN

FP-130-C.1.2 FIRE PROTECTION SECOND FLOOR OVERALL PLAN

FP-140-C.1.3 FIRE PROTECTION THIRD FLOOR OVERALL PLAN

FP-150-C.1.4 FIRE PROTECTION FOURTH FLOOR OVERALL PLAN

FP-160-C.1.5 FIRE PROTECTION FIFTH FLOOR OVERALL PLAN

FP-170-C.1.6 FIRE PROTECTION SIXTH FLOOR OVERALL PLAN

FP-180-C.1.7 FIRE PROTECTION SEVENTH FLOOR OVERALL PLAN

FP-190-C.1.8 FIRE PROTECTION EIGHTH FLOOR OVERALL PLAN

FP-200-C.1.9 FIRE PROTECTION NINTH FLOOR OVERALL PLAN

FP-201-C.1.B THRU 3 FIRE PROTECTION DEMOLITION ENLARGED PLANS

FP-202-C.1.4 THRU 9 FIRE PROTECTION DEMOLITION ENLARGED PLANS

FP-203-C.1.B THRU 3 FIRE PROTECTION ENLARGED PLANS

FP-204-C.1.4 THRU 9 FIRE PROTECTION ENLARGED PLANS

FP-205-C.1.4 FIRE PROTECTION FOURTH FLOOR CLEAN AGENT PLAN

FP-210-C.2.B FIRE PROTECTION BASEMENT OVERALL & ENLARGED PLANS

FP-211-C.2.1 FIRE PROTECTION FIRST FLOOR OVERALL & ENLARGED PLANS

FP-212-C.2.2 FIRE PROTECTION SECOND FLOOR OVERALL & ENLARGED PLANS

FP-230-C.3.B FIRE PROTECTION BASEMENT OVERALL & ENLARGED PLANS

FP-260-C.15.1 FIRE PROTECTION FIRST FLOOR OVERALL & ENLARGED PLANS

FP-300-FT.64.B FIRE PROTECTION BASEMENT OVERALL & ENLARGED PLANS

FP-301-FT.64.1 FIRE PROTECTION FIRST FLOOR OVERALL & ENLARGED PLANS

FP-302-FT.64.2 FIRE PROTECTION SECOND FLOOR OVERALL & ENLARGED PLANS

FP-303-FT.64.3 FIRE PROTECTION THIRD FLOOR OVERALL & ENLARGED PLANS

FP-710 DETAILS

FA-206-C.1.3 FIRE ALARM THIRD FLOOR ENLARGED PLAN

PLUMBING

P-000 PLUMBING SYMBOLS AND ABBREVIATIONS

P-120-C.1.1 PLUMBING FIRST FLOOR OVERALL & ENLARGED PLANS

P-130-C.1.2 PLUMBING SECOND FLOOR OVERALL & ENLARGED PLANS

P-140-C.1.3 PLUMBING THIRD FLOOR OVERALL & ENLARGED PLANS

P-150-C.1.4 PLUMBING FOURTH FLOOR OVERALL & ENLARGED PLANS

P-180-C.1.7 PLUMBING SEVENTH FLOOR OVERALL & ENLARGED PLANS

P-190-C.1.8 PLUMBING EIGHTH FLOOR OVERALL & ENLARGED PLANS

P-200-C.1.9 PLUMBING NINTH FLOOR OVERALL & ENLARGED PLANS

P-210-C.2.B PLUMBING BASEMENT OVERALL & ENLARGED PLANS

00 01 15 - 6

P-211-C.2.1 PLUMBING SECOND FLOOR & ENLARGED PLANS

P-240-C.8.2 PLUMBING SECOND FLOOR OVERALL & ENLARGED PLANS

P-260-C.15.1 PLUMBING FIRST FLOOR OVERALL & ENLARGED PLANS

P-300-FT.64.2 PLUMBING SECOND FLOOR OVERALL & ENLARGED PLANS

MECHANICAL

M-000 MECHANICAL SYMBOLS & ABBREVIATIONS

M-101-C.1.B BASEMENT OVERALL HVAC NEW WORK PLAN

M-102-C.1.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN

M-103-C.1.2 SECOND FLOOR OVERALL HVAC NEW WORK PLAN

M-104-C.1.3 THIRD FLOOR OVERALL HVAC NEW WORK PLAN

M-105-C.1.4 FOURTH FLOOR OVERALL HVAC NEW WORK PLAN

M-106-C.1.5 FLOOR PLAN PARTIAL - FIFTH FLOOR

M-107-C.1.6 SIXTH FLOOR OVERALL HVAC NEW WORK PLAN

M-108-C.1.7 SEVENTH FLOOR OVERALL HVAC NEW WORK PLAN

M-109-C.1.8 EIGHTH FLOOR OVERALL HVAC NEW WORK PLAN

M-110-C.1.9 NINTH FLOOR OVERALL HVAC NEW WORK PLAN

M-111-C.1.10 TENTH FLOOR OVERALL HVAC NEW WORK PLAN

M-120-C.2.B BASEMENT OVERALL HVAC NEW WORK PLAN

M-121-C.2.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN

M-122-C.2.2 SECOND FLOOR OVERALL HVAC NEW WORK PLAN

M-130-C.3.B BASEMENT OVERALL HVAC NEW WORK PLAN

M-131-C.3.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN

M-132-C.3.2 SECOND FLOOR OVERALL HVAC NEW WORK PLAN

M-133-C.3.3 THIRD FLOOR OVERALL HVAC NEW WORK PLAN

M-140-C.8.2 SECOND FLOOR OVERALL NEW HVAC WORK PLAN

M-150-C.15.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN

M-151-C.15.2 SECOND FLOOR OVERALL NEW HVAC WORK PLAN

M-160-FT.64.B BASEMENT OVERALL HVAC NEW WORK PLAN

M-161-FT.64.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN

M-162-FT.64.2 SECOND FLOOR OVERALL HVAC NEW WORK PLAN

M-163-FT.64.3 THIRD FLOOR OVERALL HVAC NEW WORK PLAN

M-164-FT.64.4 ROOF OVERALL HVAC NEW WORK PLAN

MD-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT

MD-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR

MD-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR

00 01 15 - 7

MD-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR

MD-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR

MD-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR

MD-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR

MD-408-C.1.7 ENLARGED FLOOR PLAN - SEVENTH FLOOR

MD-409-C.1.8 ENLARGED FLOOR PLAN - EIGHTH FLOOR

MD-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR

MD-411-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR

MD-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT

MD-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL

MD-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL

MD-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT

MD-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR

MD-450-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR

MD-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT

MD-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR

MD-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR

MD-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR

MD-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR

MD-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR

M-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT

M-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR

M-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR

M-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR

M-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR

M-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR

M-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR

M-408-C.1.7 ENLARGED FLOOR PLANS - SEVENTH FLOOR

M-409-C.1.8 ENLARGED FLOOR PLANS - EIGHTH FLOOR

M-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR

M-411-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR

M-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT

M-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL

M-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL

M-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT

M-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR

00 01 15 - 8

M-450-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR

M-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT

M-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR

M-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR

M-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR

M-464-FT.64.4 ENLARGED FLOOR PLANS - ROOF

M-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR

M-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR

M-500 MECHANICAL DETAILS

M-600 MECHANICAL SCHEDULES

M-601 HVAC PIPING DIAGRAMS

M-700 MECHANICAL CONTROLS

M-701 MECHANICAL CONTROLS

ELECTRICAL

E-000 ELECTRICAL SYMBOLS

ED-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT

ED-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR

ED-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR

ED-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR

ED-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR

ED-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR

ED-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR

ED-408-C.1.7 ENLARGED FLOOR PLAN - SEVENTH FLOOR

ED-409-C.1.8 ENLARGED FLOOR PLAN - EIGHTH FLOOR

ED-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR

ED-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT

ED-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL

ED-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL

ED-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT

ED-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR

ED-450-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR

ED-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT

ED-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR

ED-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR

ED-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR

00 01 15 - 9

ED-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR

ED-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR

ED-600 ELECTRICAL DEMO - PANELBOARD SCHEDULES ROOM A437C

EL-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT

EL-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EL-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR

EL-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR

EL-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR

EL-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR

EL-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR

EL-408-C.1.7 ENLARGED FLOOR PLAN - SEVENTH FLOOR

EL-409-C.1.8 ENLARGED FLOOR PLAN - EIGHTH FLOOR

EL-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR

EL-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT

EL-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL

EL-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL

EL-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT

EL-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR

EL-440-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EL-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT

EL-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EL-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR

EL-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR

EL-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EL-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EL-500 LIGHT FIXTURE DESCRIPTIONS

EP-100-C.1.SB FLOOR PLAN - PARTIAL - BLDG. 1 - SUB-BSMT - AREA 1

EP-101-C.1.SB FLOOR PLAN - PARTIAL - BLDG. 1 - SUB-BSMT - AREA 2

EP-102-C.1.SB FLOOR PLAN - PARTIAL - BLDG. 1 - SUB-BSMT - AREA 3

EP-103-C.1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 1

EP-104-C.1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 2

EP-105-C.1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 3

EP-106-C.1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 4

EP-107-C.1.1 FLOOR PLAN - PARTIAL - BLDG. 1 - 1F - AREA 1

EP-108-C.1.1 FLOOR PLAN - PARTIAL - BLDG. 1 - 1F - AREA 2

00 01 15 - 10

EP-109-C.1.1 FLOOR PLAN - PARTIAL - BLDG. 1 - 1F - AREA 3

EP-110-C.1.1 FLOOR PLAN - PARTIAL - BLDG. 1 - 1F - AREA 4

EP-111-C.1.2 FLOOR PLAN - PARTIAL - BLDG. 1 - 2F - AREA 1

EP-112-C.1.2 FLOOR PLAN - PARTIAL - BLDG. 1 - 2F - AREA 2

EP-113-C.1.2 FLOOR PLAN - PARTIAL - BLDG. 1 - 2F - AREA 3

EP-114-C.1.2 FLOOR PLAN - PARTIAL - BLDG. 1 - 2F - AREA 4

EP-115-C.1.3 FLOOR PLAN - PARTIAL - BLDG. 1 - 3F - AREA 1

EP-116-C.1.3 FLOOR PLAN - PARTIAL - BLDG. 1 - 3F - AREA 2

EP-117-C.1.3 FLOOR PLAN - PARTIAL - BLDG. 1 - 3F - AREA 3

EP-118-C.1.3 FLOOR PLAN - PARTIAL - BLDG. 1 - 3F - AREA 4

EP-119-C.1.4 FLOOR PLAN - PARTIAL - BLDG. 1 - 4F - AREA 1

EP-120-C.1.4 FLOOR PLAN - PARTIAL - BLDG. 1 - 4F - AREA 2

EP-121-C.1.4 FLOOR PLAN - PARTIAL - BLDG. 1 - 4F - AREA 3

EP-122-C.1.4 FLOOR PLAN - PARTIAL - BLDG. 1 - 4F - AREA 4

EP-123-C.1.5 FLOOR PLAN - PARTIAL - BLDG. 1 - 5F - AREA 1

EP-124-C.1.5 FLOOR PLAN - PARTIAL - BLDG. 1 - 5F - AREA 2

EP-125-C.1.5 FLOOR PLAN - PARTIAL - BLDG. 1 - 5F - AREA 3

EP-126-C.1.6 FLOOR PLAN - PARTIAL - BLDG. 1 - 6F - AREA 1

EP-127-C.1.6 FLOOR PLAN - PARTIAL - BLDG. 1 - 6F - AREA 2

EP-128-C.1.6 FLOOR PLAN - PARTIAL - BLDG. 1 - 6F - AREA 3

EP-129-C.1.7 FLOOR PLAN - PARTIAL - BLDG. 1 - 7F - AREA 1

EP-130-C.1.7 FLOOR PLAN - PARITAL - BLDG. 1 - 7F - AREA 2

EP-131-C.1.7 FLOOR PLAN - PARTIAL - BLDG. 1 - 7F - AREA 3

EP-132-C.1.8 FLOOR PLAN - PARTIAL - BLDG. 1 - 8F - AREA 1

EP-133-C.1.8 FLOOR PLAN - PARTIAL - BLDG. 1 - 8F - AREA 2

EP-134-C.1.9 FLOOR PLAN - PARTIAL - BLDG. 1 - 9F - AREA 1

EP-135-C.1.9 FLOOR PLAN - PARTIAL - BLDG. 1 - 9F - AREA 2

EP-136-C.2.B FLOOR PLAN - PARTIAL - BLDG. 2 - BSMT - AREA 1

EP-137-C.2.B FLOOR PLAN - PARTIAL - BLDG. 2 - BSMT - AREA 2

EP-138-C.2.1 FLOOR PLAN - PARTIAL - BLDG. 2 - 1F

EP-139-C.2.1 FLOOR PLAN - PARTIAL - BLDG. 2 - 1F - AREA 2

EP-140-C.2.2 FLOOR PLAN - PARTIAL - BLDG. 2 - 2F

EP-141-C.2.2 FLOOR PLAN - PARTIAL - BLDG. 2 - 2F - AREA 2

EP-142-C.3.B FLOOR PLAN - BLDG. 3 - BASEMENT

EP-143-C.3.1 FLOOR PLAN - BLDG. 3 - 1F

EP-144-C.3.2 FLOOR PLAN - BLDG. 3 - 2F

EP-145-C.3.3 FLOOR PLAN - BLDG. 3 - 3F

00 01 15 - 11

EP-146-C.8.1 FLOOR PLAN - BLDG. 8 - 1F

EP-147-C.8.2 FLOOR PLAN - BLDG. 8 - 2F

EP-148-C.14.2 FLOOR PLAN - BLDG. 14 - 2F

EP-149-C.15.B FLOOR PLAN - BLDG. 15 - BSMT

EP-150-C.15.1 FLOOR PLAN - BLDG. 15 - 1F

EP-151-C.15.2 FLOOR PLAN - BLDG. 15 - 2F

EP-152-C.15.3 FLOOR PLAN - BLDG. 15 - 3F

EP-153-C.15.4 FLOOR PLAN - BLDG. 15 - 3F

EP-154-FT.64.B FLOOR PLAN - BLDG. 64 - BSMT - AREA 1

EP-155-FT.64.B FLOOR PLAN - PARTIAL - BLDG. 64 - BSMT - AREA 2

EP-156-FT.64.1 FLOOR PLAN - PARTIAL - BLDG. 64 - 1F - AREA 1

EP-157-FT.64.1 FLOOR PLAN - PARTIAL - BLDG. 64 - 1F - AREA 2

EP-158-FT.64.2 FLOOR PLAN - PARTIAL - BLDG. 64 - 2F - AREA 1

EP-159-FT.64.2 FLOOR PLAN - PARTIAL - BLDG. 64 - 2F - AREA 2

EP-160-FT.64.3 FLOOR PLAN - PARTIAL - BLDG. 64 - 3F - AREA1

EP-161-FT.64.3 FLOOR PLAN - PARTIAL - BLDG. 64 - 3F - AREA 2

EP-162-FT.64.4 FLOOR PLAN - PARTIAL - BLDG. 64 - ROOF - AREA 1

EP-163-FT.64.4 FLOOR PLAN - PARTIAL - BLDG. 64 - ROOF - AREA 2

EP-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT

EP-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EP-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR

EP-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR

EP-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR

EP-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR

EP-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR

EP-408-C.1.7 ENLARGED FLOOR PLAN - SEVENTH FLOOR

EP-409-C.1.8 ENLARGED FLOOR PLAN - EIGHTH FLOOR

EP-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR

EP-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT

EP-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL

EP-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL

EP-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT

EP-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR

EP-450-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EP-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT

EP-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EP-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR

00 01 15 - 12

EP-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR

EP-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EP-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EP-601-C.1 BUILDING 1 - ELECTRICAL DIAGRAMS

EP-602-C.1 BUILDING 1 - ELECTRICAL DIAGRAMS

EP-603-C.1 BUILDING 1 - ELECTRICAL DIAGRAMS

EP-604-C.1 BUILDING 1 - ELECTRICAL DIAGRAMS

EP-610-C.1 BUILDING 1 - ELECTRICAL SCHEDULE

EP-611-C.1 BUILDING 1 - ELECTRICAL SCHEDULE

EP-612.C.1 BUILDING 1 - ELECTRICAL SCHEDULE

EP-613-C.1 BUILDING 1 - ELECTRICAL SCHEDULE

EP-614-C.1 BUILDING 1 - ELECTRICAL SCHEDULE

EP-615-C.1 BUILDING 1 - ELECTRICAL SCHEDULE

EP-616-C.1 BUILDING 1 – ELECTRICAL SCHEDULE

EP-617-C.1 TN AND TC CONDUIT FEEDER ROUTE SCHEDULE

EP-620-C.2 BUILDING 2 - ELECTRICAL DIAGRAMS

EP-621-C.2 BUILDING 2 - ELECTRICAL SCHEDULE

EP-625-C.3 BUILDING 3 - ELECTRICAL SCHEDULE AND DIAGRAMS

EP-630-C.8 BUILDING 8 - ELECTRICAL SCHEDULE AND DIAGRAMS

EP-640-C.15 BUILDING 15 - ELECTRICAL DIAGRAMS

EP-641-C.15 BUILDING 15 - ELECTRICAL SCHEDULE

EP-650-FT.64 BUILDING 64 - ELECTRICAL DIAGRAMS

EP-651-FT.64 BUILDING 64 - ELECTRICAL SCHEDULE

EP-652-FT.64 BUILDING 64 - ELECTRICAL SCHEDULE

EP-660-C.PK BUILDING 64 - ELECTRICAL SCHEDULE AND DIAGRAMS

EP-665-C.TB BUILDING TB - ELECTRICAL SCHEDULE AND DIAGRAMS

EP-670-C.TE BUILDING TE - ELECTRICAL SCHEDULE AND DIAGRAMS

EP-680 ELECTRICAL DIAGRAM

TECHNOLOGY

T-000 TELECOMMUNICATIONS GENERAL INFORMATION

T-001 RESPONSIBILITY AND PREFERRED PRODUCTS MATRIX

TD-100-C.1.SB TECHNOLOGY DEMOLITION SUB BASEMENT OVERALL PLAN

TD-101-C.1.SB TECHNOLOGY DEMOLITION SUB BASEMENT PARTIAL PLAN - A

TD-102-C.1.SB TECHNOLOGY DEMOLITION SUB BASEMENT PARTIAL PLAN - B

TD-110-C.1.B TECHNOLOGY DEMOLITION BASEMENT OVERALL PLAN

00 01 15 - 13

TD-111-C.1.B TECHNOLOGY DEMOLITION BASEMENT PARTIAL PLAN - A

TD-112-C.1.B TECHNOLOGY DEMOLITION BASEMENT PARTIAL PLAN - B

TD-113-C.1.B TECHNOLOGY DEMOLITION BASEMENT PARTIAL PLAN - C

TD-114-C.1.B TECHNOLOGY DEMOLITION BASEMENT PARTIAL PLAN - D

TD-120-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR OVERALL PLAN

TD-121-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR PARTIAL PLAN - A

TD-122-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR PARTIAL PLAN - B

TD-123-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR PARTIAL PLAN - C

TD-124-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR PARTIAL PLAN - D

TD-130-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR OVERALL PLAN

TD-131-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR PARTIAL PLAN - A

TD-132-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR PARTIAL PLAN - B

TD-133-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR PARTIAL PLAN - C

TD-134-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR PARTIAL PLAN - D

TD-140-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR OVERALL PLAN

TD-141-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR PARTIAL PLAN - A

TD-142-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR PARTIAL PLAN - B

TD-143-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR PARTIAL PLAN - C

TD-144-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR PARTIAL PLAN - D

TD-150-C.1.4 TECHNOLOGY DEMOLITION FOURTH FLOOR OVERALL PLAN

TD-151-C.1.4 TECHNOLOGY DEMOLITION FOURTH FLOOR PARTIAL PLAN - A

TD-152-C.1.4 TECHNOLOGY DEMOLITION FOURTH FLOOR PARTIAL PLAN - B

TD-153-C.1.4 TECHNOLOGY DEMOLITION FOURTH FLOOR PARTIAL PLAN - D

TD-160-C.1.5 TECHNOLOGY DEMOLITION FIFTH FLOOR OVERALL PLAN

TD-161-C.1.5 TECHNOLOGY DEMOLITION FIFTH FLOOR PARTIAL PLAN - A

TD-162-C.1.5 TECHNOLOGY DEMOLITION FIFTH FLOOR PARTIAL PLAN - B

TD-163-C.1.5 TECHNOLOGY DEMOLITION FIFTH FLOOR PARTIAL PLAN - D

TD-170-C.1.6 TECHNOLOGY DEMOLITION SIXTH FLOOR OVERALL PLAN

TD-171-C.1.6 TECHNOLOGY DEMOLITION SIXTH FLOOR PARTIAL PLAN - A

TD-172-C.1.6 TECHNOLOGY DEMOLITION SIXTH FLOOR PARTIAL PLAN - B

TD-173-C.1.6 TECHNOLOGY DEMOLITION SIXTH FLOOR PARTIAL PLAN - D

TD-180-C.1.7 TECHNOLOGY DEMOLITION SEVENTH FLOOR OVERALL PLAN

TD-181-C.1.7 TECHNOLOGY DEMOLITION SEVENTH FLOOR PARTIAL PLAN - A

TD-182-C.1.7 TECHNOLOGY DEMOLITION SEVENTH FLOOR PARTIAL PLAN - B

TD-183-C.1.7 TECHNOLOGY DEMOLITION SEVENTH FLOOR PARTIAL PLAN - D

TD-190-C.1.8 TECHNOLOGY DEMOLITION EIGHTH FLOOR OVERALL PLAN

TD-191-C.1.8 TECHNOLOGY DEMOLITION EIGHTH FLOOR PARTIAL PLAN - A

00 01 15 - 14

TD-192-C.1.8 TECHNOLOGY DEMOLITION EIGHTH FLOOR PARTIAL PLAN - B

TD-193-C.1.8 TECHNOLOGY DEMOLITION EIGHTH FLOOR PARTIAL PLAN - D

TD-200-C.1.9 TECHNOLOGY DEMOLITION NINTH FLOOR OVERALL PLAN

TD-201-C.1.9 TECHNOLOGY DEMOLITION NINTH FLOOR PARTIAL PLAN - A

TD-202-C.1.9 TECHNOLOGY DEMOLITION NINTH FLOOR PARTIAL PLAN - B

TD-203-C.1.9 TECHNOLOGY DEMOLITION NINTH FLOOR PARTIAL PLAN - D

TD-210-C.2.BN BLDG. 2 - BASEMENT - NORTH TECHNOLOGY DEMO PLAN

TD-210-C.2.BS BLDG. 2 - BASEMENT - SOUTH TECHNOLOGY DEMO PLAN

TD-211-C.2.1N BLDG. 2 - FIRST FLOOR - NORTH TECHNOLOGY DEMO PLAN

TD-211-C.2.1S BLDG. 2 - FIRST FLOOR - SOUTH TECHNOLOGY DEMO PLAN

TD-212-C.2.2N BLDG. 2 - SECOND FLOOR - NORTH TECHNOLOGY DEMO PLAN

TD-212-C.2.2S BLDG. 2 - SECOND FLOOR - SOUTH TECHNOLOGY DEMO PLAN

TD-220-C.3.B BLDG. 3 - BASEMENT TECHNOLOGY DEMO PLAN

TD-221-C.3.1 BLDG. 3 - FIRST FLOOR - TECHNOLOGY DEMO PLAN

TD-222-C.3.2 BLDG. 3 - SECOND FLOOR - TECHNOLOGY DEMO PLAN

TD-223-C.3.3 BLDG. 3 - THIRD FLOOR - TECHNOLOGY DEMO PLAN

TD-231-C.8.1 BLDG. 8 - FIRST FLOOR - TECHNOLOGY DEMO PLAN

TD-232-C.8.2 BLDG. 8 - SECOND FLOOR - TECHNOLOGY DEMO PLAN

TD-233-C.8.3 BLDG. 8 - THIRD FLOOR - TECHNOLOGY DEMO PLAN

TD-234-C.8.4 BLDG. 8 - FOURTH FLOOR - TECHNOLOGY DEMO PLAN

TD-250-C.15.B BLDG. 15 - BASEMENT - TECHNOLOGY DEMO PLAN

TD-251-C.15.1 BLDG. 15 - FIRST FLOOR - TECHNOLOGY DEMO PLAN

TD-252-C.15.2 BLDG. 15 - SECOND FLOOR - TECHNOLOGY DEMO PLAN

TD-253-C.15.3 BLDG. 15 - THIRD FLOOR - TECHNOLOGY DEMO PLAN

TD-254-C.15.4 BLDG. 15 - FOURTH FLOOR - TECHNOLOGY DEMO PLAN

TD-270-F.64.BN BLDG. 64 - BASEMENT - TECHNOLOGY DEMO PLAN

TD-270-F.64.BS BLDG. 64 - BASEMENT - SOUTH TECHNOLOGY DEMO PLAN

TD-271-F.64.1N BLDG. 64 - FIRST FLOOR - NORTH TECHNOLOGY DEMO PLAN

TD-271-F.64.1S BLDG. 64 - FIRST FLOOR - SOUTH TECHNOLOGY DEMO PLAN

TD-272-F.64.2N BLDG. 64 - SECOND FLOOR - NORTH TECHNOLOGY DEMO PLAN

TD-272-F.64.2S BLDG. 64 - SECOND FLOOR - SOUTH TECHNOLOGY DEMO PLAN

TD-273-F.64.3N BLDG. 64 - THIRD FLOOR - NORTH TECHNOLOGY DEMO PLAN

TD-273-F.64.3S BLDG. 64 - THIRD FLOOR - SOUTH TECHNOLOGY DEMO PLAN

TD-275-F.117.1 BLDG. 117 - FIRST FLOOR - TECHNOLOGY DEMO PLAN

TD-280-C.TB.1 BLDG. TB - EDUCATION TRAILER - TECHNOLOGY DEMO PLAN

TD-282-C.TE.1 BLDG. TE - RESEARCH TRAILER - TECHNOLOGY DEMO PLAN

TD-600-C.1 TECHNOLOGY EXISTING FIBER BACKBONE DIAGRAM

00 01 15 - 15

TN-100-C.1.SB TECHNOLOGY SUB BASEMENT OVERALL PLAN

TN-101-C.1.SB TECHNOLOGY SUB BASEMENT PARTIAL PLAN - A

TN-102-C.1.SB TECHNOLOGY SUB BASEMENT PARTIAL PLAN - B

TN-110-C.1.B TECHNOLOGY BASEMENT OVERALL PLAN

TN-111-C.1.B TECHNOLOGY BASEMENT PARTIAL PLAN - A

TN-112-C.1.B TECHNOLOGY BASEMENT PARTIAL PLAN - B

TN-113-C.1.B TECHNOLOGY BASEMENT PARTIAL PLAN - C

TN-114-C.1.B TECHNOLOGY BASEMENT PARTIAL PLAN - D

TN-120-C.1.1 TECHNOLOGY FIRST FLOOR OVERALL PLAN

TN-121-C.1.1 TECHNOLOGY FIRST FLOOR PARTIAL PLAN - A

TN-122-C.1.1 TECHNOLOGY FIRST FLOOR PARTIAL PLAN - B

TN-123-C.1.1 TECHNOLOGY FIRST FLOOR PARTIAL PLAN - C

TN-124-C.1.1 TECHNOLOGY FIRST FLOOR PARTIAL PLAN - D

TN-130-C.1.2 TECHNOLOGY SECOND FLOOR OVERALL PLAN

TN-131-C.1.2 TECHNOLOGY SECOND FLOOR PARTIAL PLAN - A

TN-132-C.1.2 TECHNOLOGY SECOND FLOOR PARTIAL PLAN - B

TN-133-C.1.2 TECHNOLOGY SECOND FLOOR PARTIAL PLAN - C

TN-134-C.1.2 TECHNOLOGY SECOND FLOOR PARTIAL PLAN - D

TN-140-C.1.3 TECHNOLOGY THIRD FLOOR OVERALL PLAN

TN-141-C.1.3 TECHNOLOGY THIRD FLOOR PARTIAL PLAN - A

TN-142-C.1.3 TECHNOLOGY THIRD FLOOR PARTIAL PLAN - B

TN-143-C.1.3 TECHNOLOGY THIRD FLOOR PARTIAL PLAN - C

TN-144-C.1.3 TECHNOLOGY THIRD FLOOR PARTIAL PLAN - D

TN-150-C.1.4 TECHNOLOGY FOURTH FLOOR OVERALL PLAN

TN-151-C.1.4 TECHNOLOGY FOURTH FLOOR PARTIAL PLAN - A

TN-152-C.1.4 TECHNOLOGY FOURTH FLOOR PARTIAL PLAN - B

TN-153-C.1.4 TECHNOLOGY FOURTH FLOOR PARTIAL PLAN - D

TN-160-C.1.5 TECHNOLOGY FIFTH FLOOR OVERALL PLAN

TN-161-C.1.5 TECHNOLOGY FIFTH FLOOR PARTIAL PLAN - A

TN-162-C.1.5 TECHNOLOGY FIFTH FLOOR PARTIAL PLAN - B

TN-163-C.1.5 TECHNOLOGY FIFTH FLOOR PARTIAL PLAN – D

TN-170-C.1.6 TECHNOLOGY SIXTH FLOOR OVERALL PLAN

TN-171-C.1.6 TECHNOLOGY SIXTH FLOOR PARTIAL PLAN - A

TN-172-C.1.6 TECHNOLOGY SIXTH FLOOR PARTIAL PLAN - B

TN-173-C.1.6 TECHNOLOGY SIXTH FLOOR PARTIAL PLAN - D

TN-180-C.1.7 TECHNOLOGY SEVENTH FLOOR OVERALL PLAN

TN-181-C.1.7 TECHNOLOGY SEVENTH FLOOR PARTIAL PLAN - A

00 01 15 - 16

TN-182-C.1.7 TECHNOLOGY SEVENTH FLOOR PARTIAL PLAN - B

TN-183-C.1.7 TECHNOLOGY SEVENTH FLOOR PARTIAL PLAN - D

TN-190-C.1.8 TECHNOLOGY EIGHTH FLOOR OVERALL PLAN

TN-191-C.1.8 TECHNOLOGY EIGHTH FLOOR PARTIAL PLAN - A

TN-192-C.1.8 TECHNOLOGY EIGHTH FLOOR PARTIAL PLAN - B

TN-193-C.1.8 TECHNOLOGY EIGHTH FLOOR PARTIAL PLAN - D

TN-200-C.1.9 TECHNOLOGY NINTH FLOOR OVERALL PLAN

TN-201-C.1.9 TECHNOLOGY NINTH FLOOR PARTIAL PLAN - A

TN-202-C.1.9 TECHNOLOGY NINTH FLOOR PARTIAL PLAN - B

TN-203-C.1.9 TECHNOLOGY NINTH FLOOR PARTIAL PLAN - D

TN-210-C.2.BN BLDG. 2 - BASEMENT - NORTH TECHNOLOGY DATA OUTLET PLAN

TN-210-C.2.BS BLDG. 2 - BASEMENT - SOUTH TECHNOLOGY DATA OUTLET PLAN

TN-211-C.2.1N BLDG. 2 - FIRST FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN

TN-211-C.2.1S BLDG. 2 - FIRST FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN

TN-212-C.2.2N BLDG. 2 - SECOND FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN

TN-212-C.2.2S BLDG. 2 - SECOND FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN

TN-220-C.3.B BLDG. 3 - BASEMENT - TECHNOLOGY DATA OUTLET PLAN

TN-221-C.3.1 BLDG. 3 - FIRST FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-222-C.3.2 BLDG. 3 - SECOND FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-223-C.3.3 BLDG. 3 - THIRD FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-231-C.8.1 BLDG. 8 - FIRST FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-232-C.8.2 BLDG. 8 - SECOND FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-233-C.8.3 BLDG. 8 - THIRD FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-234-C.8.4 BLDG. 8 - FOURTH FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-250-C.15.B BLDG. 15 - BASEMENT - TECHNOLOGY DATA OUTLET PLAN

TN-251-C.15.1 BLDG. 15 - FIRST FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-252-C.15.2 BLDG. 15 - SECOND FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-253-C.15.3 BLDG. 15 - THIRD FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-254-C.15.4 BLDG. 15 - FOURTH FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-270-F.64.BN BLDG. 64 - BASEMENT TECHNOLOGY DATA OUTLET PLAN

TN-270-F.64.BS BLDG. 64 - BASEMENT - SOUTH TECHNOLOGY DATA OUTLET PLAN

TN-271-F.64.1N BLDG. 64 - FIRST FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN

TN-271-F.64.1S BLDG. 64 - FIRST FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN

TN-272-F.64.2N BLDG. 64 - SECOND FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN

TN-272-F.64.2S BLDG. 64 - SECOND FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN

TN-273-F.64.3N BLDG. 64 - THIRD FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN

TN-273-F.64.3S BLDG. 64 - THIRD FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN

00 01 15 - 17

TN-275-F.117.1 BLDG. 117 - FIRST FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-280-C.TB.1 BLDG. TB - EDUCATION TRAILER - TECHNOLOGY DATA OUTLET PLAN

TN-282-C.TE.1 BLDG. TE - RESEARCH TRAILER - TECHNOLOGY DATA OUTLET PLAN

TN-401-C.1.B BLDG. 1 – BASEMENT – TECHNOLOGY TELECOM ROOM PLAN

TN-402-C.1.B BLDG. 1 – BASEMENT – TECHNOLOGY TELECOM ROOM PLAN

TN-403-C.1.B BLDG. 1 – BASEMENT – TECHNOLOGY TELECOM ROOM PLAN

TN-405-C.1.1 BLDG. 1 – FIRST FLOOR – TECHNOLOGY TELECOM ROOM PLAN

TN-406-C.1.1 BLDG. 1 – FIRST FLOOR – TECHNOLOGY TELECOM ROOM PLAN

TN-407-C.1.1 BLDG. 1 – FIRST FLOOR – TECHNOLOGY TELECOM ROOM PLAN

TN-410-C.1.2 BLDG. 1 – SECOND FLOOR – TECHNOLOGY TELECOM ROOM PLAN

TN-411-C.1.2 BLDG. 1 – SECOND FLOOR – TECHNOLOGY TELECOM ROOM PLAN

TN-412-C.1.2 BLDG. 1 – SECOND FLOOR – TECHNOLOGY TELECOM ROOM PLAN

TN-415-C.1.3 BLDG. 1 – THIRD FLOOR – TECHNOLOGY TELECOM ROOM PLAN

TN-416-C.1.3 BLDG. 1 – THIRD FLOOR – TECHNOLOGY TELECOM ROOM PLAN

TN-417-C.1.3 BLDG. 1 – THIRD FLOOR – TECHNOLOGY TELECOM ROOM PLAN

TN-420-C.1.4 BLDG. 1 – FOURTH FLOOR – TECHNOLOGY TELECOM ROOM PLAN

TN-421-C.1.4 ENLARGED TDR PLANS

TN-422-C.1.4 ENLARGED TDR PLANS

TN-423-C.1.4 POWER ELEVATION AND SCHEMATIC – LEVEL REDUNDANCY

TN-425-C.1.5 BLDG. 1 – FIFTH FLOOR – TECHNOLOGY TELECOM ROOM PLAN

TN-430-C.1.6 BLDG. 1 – SIXTH FLOOR – TECHNOLOGY TELECOM ROOM PLAN

TN-435-C.1.7 BLDG. 1 – SEVENTH FLOOR – TECHNOLOGY TELECOM ROOM PLAN

TN-440-C.1.8 BLDG. 1 – EIGHTH FLOOR – TECHNOLOGY TELECOM ROOM PLAN

TN-455-C.1.9 BLDG. 1 – NINTH FLOOR – TECHNOLOGY TELECOM ROOM PLAN

TN-470-C.2.BN BLDG. 2 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN

TN-471-C.2.1 BLDG. 2 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-472-C.2.2 BLDG. 2 - SECOND FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-473-C.3.B BLDG. 3 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN

TN-474-C.8.2 BLDG. 8 - SECOND FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-479-C.15.1 BLDG. 15 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-480-F.64.B BLDG. 64 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN

TN-481-F.64.1 BLDG. 64 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-482-F.64.2 BLDG. 64 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-483-F.64.3 BLDG. 64 - THIRD FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-484-F.117.1 BLDG. 117 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-490-C.TB.1 BLDG. TB - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-492-C.TE.1 BLDG. TE - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN

00 01 15 - 18

TN-500 TECHNOLOGY - TYPICAL DETAILS

TN-501 TECHNOLOGY - TYPICAL DETAILS

TN-503 TECHNOLOGY - TYPICAL DETAILS

TN-504 TECHNOLOGY - TYPICAL DETAILS

TN-505 TECHNOLOGY - TYPICAL DETAILS

TN-506 TECHNOLOGY - TYPICAL DETAILS

TN-600-C.1 TECHNOLOGY NEW FIBER BACKBONE DIAGRAM

TN-601 TECHNOLOGY RISER PLAN - BLDGS. 2,3,8,15,14,64,117,TB,& TE

TN-602 TECHNOLOGY BONDING RISER PLAN - BLDGS. 2,3,8,15,64,117,TB,& TE

TS-000 SECURITY LEGEND

TS-110-C.1.B SECURITY BASEMENT OVERALL PLAN

TS-120-C.1.1 SECURITY FIRST FLOOR OVERALL PLAN

TS-130-C.1.2 SECURITY SECOND FLOOR OVERALL PLAN

TS-140-C.1.3 SECURITY THIRD FLOOR OVERALL PLAN

TS-150-C.1.4 SECURITY FOURTH FLOOR OVERALL PLAN

TS-160-C.1.5 SECURITY FIFTH FLOOR OVERALL PLAN

TS-170-C.1.6 SECURITY SIXTH FLOOR OVERALL PLAN

TS-180-C.1.7 SECURITY SEVENTH FLOOR OVERALL PLAN

TS-190-C.1.8 SECURITY EIGHTH FLOOR OVERALL PLAN

TS-200-C.1.9 SECURITY NINTH FLOOR OVERALL PLAN

TS-210-C.2.B BLDG. 2 - SECURITY BASEMENT OVERALL PLAN

TS-211-C.2.1 BLDG. 2 - SECURITY FIRST FLOOR OVERALL PLAN

TS-212-C.2.2 BLDG. 2 - SECURITY SECOND FLOOR OVERALL PLAN

TS-220-C.3.B BLDG. 3 - SECURITY BASEMENT OVERALL PLAN

TS-230-C.8.2 BLDG. 8 - SECURITY SECOND FLOOR OVERALL PLAN

TS-240-C.15.1 BLDG. 15 - SECURITY FIRST FLOOR OVERALL PLAN

TS-250-F.64.B BLDG. 64 - SECURITY BASEMENT OVERALL PLAN

TS-251-F.64.1 BLDG. 64 - SECURITY FIRST FLOOR OVERALL PLAN

TS-252-F.64.2 BLDG. 64 - SECURITY SECOND FLOOR OVERALL PLAN

TS-253-F.64.3 BLDG. 64 - SECURITY THIRD FLOOR OVERALL PLAN

TS-260-F.117.1 BLDG. 117 - SECURITY FIRST FLOOR OVERALL PLAN

TS-270-C.TB.1 BLDG. TB - SECURITY FIRST FLOOR OVERALL PLAN

TS-280-C.TE.1 BLDG. TE - SECURITY FIRST FLOOR OVERALL PLAN

TS-400-C.1.B SECURITY ENLARGED TDR PLANS

TS-401-C.1.1 SECURITY ENLARGED TDR PLANS

TS-402-C.1.2 SECURITY ENLARGED TDR PLANS

00 01 15 - 19

TS-403-C.1.3 SECURITY ENLARGED TDR PLANS

TS-404-C.1.4 SECURITY ENLARGED TDR PLANS

TS-405-C.1.5 SECURITY ENLARGED TDR PLANS

TS-406-C.1.6 SECURITY ENLARGED TDR PLANS

TS-407-C.1.7 SECURITY ENLARGED TDR PLANS

TS-408-C.1.8 SECURITY ENLARGED TDR PLANS

TS-409-C.1.9 SECURITY ENLARGED TDR PLANS

TS-410-C.2.B BLDG. 2 - SECURITY ENLARGED TDR PLANS

TS-411-C.2.1 BLDG. 2 - SECURITY ENLARGED TDR PLANS

TS-412-C.2.2 BLDG. 2 - SECURITY ENLARGED TDR PLANS

TS-420-C.3.B BLDG. 3 - SECURITY ENLARGED TDR PLANS

TS-430-C.8.2 BLDG. 8 - SECURITY ENLARGED TDR PLANS

TS-440-C.15.1 BLDG. 15 - SECURITY ENLARGED TDR PLANS

TS-450-F.64.B BLDG. 64 - SECURITY ENLARGED TDR PLANS

TS-451-F.64.1 BLDG. 64 - SECURITY ENLARGED TDR PLANS

TS-452-F.64.2 BLDG. 64 - SECURITY ENLARGED TDR PLANS

TS-453-F.64.3 BLDG. 64 - SECURITY ENLARGED TDR PLANS

TS-460-F.117.1 BLDG. 117 - SECURITY ENLARGED TDR PLANS

TS-470-C.TB.1 BLDG. TB - SECURITY ENLARGED TDR PLANS

TS-480-C.TE.1 BLDG. TE - SECURITY ENLARGED TDR PLANS

TS-500 SECURITY - TYPICAL DETAILS

TS-501 SECURITY - TYPICAL DETAILS

- - - E N D - - -

00 01 15 - 20

THIS PAGE LEFT INTENTIONALLY BLANK

CINCINNATI AND FORT THOMAS EHRM INFRASTRUCTURE UPGRADES

CINCINNATI VAMC, CINCINNATI OH 04-08-2022

00 00 20 - 1

SECTION 00 00 20

PHASING

The project is to address the EHRM Infrastructure Upgrades at Buildings 1, 2, 3, 8, 14, 15, and Trailers TB & TE within the Cincinnati Medical Center campus as well as select portions of the Fort Thomas campus.

The project scope includes telecom rooms, cable plant, and data center with the work following a phase sequence performed in the least disruptive manner possible and in accordance with infection control policies and requirements.

The submitted design was developed through a survey of existing conditions, existing documentation provided by the VA as well as a review of VA Guidelines. Multiple Space layout iterations were developed and presented to the Contracting Officer Representatives (COR) as well as the Integrated Project Team.

These meetings further developed the design for, a) functional areas/relationships, b) room sizing /Configurations, and c) circulation routes.

Reference specification Section 01 00 00 General Requirements 1.6 Operations & Storage Areas (FAR 52.236-10) Item I Phasing.

Methods of work and outages: Contractor shall comply with the following in addition to phasing as noted in later paragraphs:

In general, power outages shall NOT be allowed during standard facility hours of operation and shall be conducted on premium time. Specific time frame and schedule of all outages shall be approved by the Owner.

Temporary power shall be provided as required for any systems required for use during normal facility operating hours that is being interrupted to perform electrical work. Temporary power shall include extending circuits from adjacent distribution and by means of providing temporary generators, fuel and distribution. Temporary power shall be set up and installed so no power outage will be required during normal facility hours of operation.

Emergency power outages on life safety, critical or equipment branch systems may not take place at the same time as a normal power outage.

The General Contractor shall coordinate proper phasing of work for all disciplines as outlined in this document and noted in the design documents. In addition, the General Contractor shall conduct phasing meetings and coordinate phasing plan with the Owner. The below is provided to give general guidance and not to supersede any requirement for the contractor to provide a full detailed schedule.

The general project scope and phasing sequence is listed below. See Design drawings for further phasing notes and details.

Technology Phasing

Phase A: New TR Rooms – All work associated with new TR Rooms is a necessary predecessor for work to proceed to Phase B. The Contracting Officer, local facilities engineering, and the designated OIT representative must sign off on completion of the New TR Rooms prior to moving work into Phase B.

CINCINNATI VAMC, CINCINNATI OH 04-08-2022

00 00 20 - 2

Phase B: Room A437 Phase 1 – Technology Drawings indicate Room A437 to be constructed in three phases. ‘Phase 1’ on sheet TN-442-C.1.4 depicts the completed state of the phased conversion of this room. Room A437 Phase 1 completion includes 11 Cabinets and assumes they are fully operational and coordinated with all trades.

1. Any works in this room shall be coordinated in advance and all staff entering this space will require escorts unless otherwise agreed upon by OIT management. All equipment in this space is sensitive and care shall be taken to minimize any disruption to patient care.

2. It is intended that all associated work to enable these eleven racks are completed prior to moving to Phase D and must be signed off with the Contracting Officer, local facilities engineering, and the designated OIT representative.

3. ANY required activity by VA Staff to support this project MUST be agreed to NO LESS than 4 weeks in advance of any required activity. Delays caused by failing to identify these activities and gain acceptance of the scheduled requirement shall be borne by the contractor. No change orders for schedule will be accepted for a failure to schedule VA support in a timely fashion.

4. It is intended that the ‘Phase 1’ state of this room is to remain the temporary state until Phase D is underway minimally. This should allow sufficient time for OIT to migrate any hardware.

5. The cabinet indicated as “PHILIPS BIOMED” contains non-OIT fiber optic cabling. Special care must be taken not to damage this cabling and care was taken in selecting an immediately adjacent location for the cabinet. This system’s cabling is not part of the scope of the project but must remain intact in the equipment’s adjusted location.

6. OIT staff will require significant lead times and coordination of equipment movement within this space. Some of the equipment is leased and must be scheduled moves outside of the direct control of OIT staff. Progression of this room’s build out of this phase is at OIT’s discretion and cost of delay shall not be borne by VA if less than 4 weeks notice is not given for any required action by same.

7. Devices printed in dashed line types are shown in their current location while solid lines indicate their new/permanent location.

Phase C: Pathways and Risers – Installation of major pathways for vertical and horizontal distribution of cabling. It is intended that all associated work on pathways and risers are completed prior to moving to Phase D and must be signed off with the Contracting Officer, local facilities engineering, and the designated OIT representative.

1. Cable Tray and Pathways Demolition of old Cable Tray (J-Hook supports installed on existing threaded rods previously supporting cable tray for temporary support) Installation of new Cable Tray/Fire Sleeves in accordance with the Technology

Overall Sheets.

2. Fiber Optic Distribution :

Phase C0: Install all Fiber Optics in accordance with Sheet TN-600-C.1 terminating in “New Fiber Tree” locations indicated on sheet TN-442-C.1.4.

Phase C1: Building 2 hallway connector, install new conduit and fiber to serve the 3 TRs in Building 2 (basement, first floor, and second floor)

Phase C2: Building 1 and Building 3 existing conduit underground, can’t achieve diversity, pull next to/parallel to existing. One TR schedule for Building 3.

CINCINNATI VAMC, CINCINNATI OH 04-08-2022

00 00 20 - 3

Phase C2: Building 8 one TR scheduled to be relocated. Existing TR location is directly behind the main door to the room as is constantly being banged into.

Phase C3: Trailer TE and TB Phase C4: Fort Thomas Building 64 and Building 117. Existing TRs (one at each end of the trailer) are quite narrow and long spaces. Two additional TRs are scheduled while maintaining pathways at the ends.

Phase C5: Building 3 existing TR is located within an existing mechanical room.

New TR to be created in the west end of a conference room.

Phase C6: Building 15 has a bridge and basement connector to Building 1. One TR scheduled for first floor location.

Building 14: de-scoped/ yet not part of the project scope Building 16: not part of the project scope

Phase D: Migration and Horizontal Cabling – This phase is intended to happen cyclically as noted below.

1. Phase D0: Installation of Horizontal Cabling from TR to Zone Enclosure. Upon completion of a Zone Enclosure, Phase D1 can proceed for that ZE.

2. Phase D1: Installation of Cabling from Zone Enclosure to Work Area Outlets and Migration of data switches.

This phase must be coordinated with OIT staff and is intended to be completed one or two active TR rooms at a time cyclically until all rooms in the scope are completed.

This phase requires OIT switches to be positioned and programmed by VA Staff.

ANY required activity by VA Staff to support this project MUST be agreed to NO

LESS than 4 weeks in advance of any required activity. Delays caused by failing to identify these activities and gain acceptance of the scheduled requirement shall be borne by the contractor. No change orders for schedule will be accepted for a failure to schedule VA support in a timely fashion.

Phase D1a: Demo Cabling (as previously scheduled with VA) in the room(s) to the cable tray. Coordinate with OIT the rooms to be cut over to the New TR.

Phase D1b: Install and terminate cabling from Zone Enclosure to Work Area Outlets for the room(s)

Phase D1c: Test cabling, reinstall patch cables at Work Area Outlet, and install TR Room Patch cabling in coordination with OIT Switch programming. Validate devices have re-established connectivity.

Phase D1d: Complete demolition of the, now abandoned, horizontal cabling to the point of origin (local signals closets).

Phase E: Room A437 Phase 2

1. Technology Drawings indicate Room A437 to be constructed in three phases. ‘Phase 2’ on sheet TN-442-C.1.4 depicts the completed state of the phased conversion of this room.

2. This phase, ‘Room A437 Phase 2’, is intended to begin construction as soon as Phase B is accepted AND ‘Fiber Tree 2’ (existing fiber distribution rack) can be moved out of the way to allow the remaining phasing to continue.

3. It is not required that the entirety of the old fiber in ‘Fiber Tree 2’ to be removed prior to this phase progressing. Rather, it can and should be temporarily accommodated in place while the other phases remove connections from this rack. This rack and the fiber therein shall be removed as part of Phase G.

CINCINNATI VAMC, CINCINNATI OH 04-08-2022

00 00 20 - 4

Phase F: Room A437

1. Technology Drawings indicate Room A437 to be constructed in three phases. The Room’s final state is depicted on sheet TN-442-C.1.5 Detail 1.

2. This phase is intended to begin construction as soon as Phase E is accepted.

Phase G: Demolition

1. Any cabling that is unused/abandoned because of this project shall be removed…

This is the start of the file's text. The full file is on GovTribe.