This document is a set of specifications for the EHRM Infrastructure Upgrades project at the Cincinnati VAMC. The project involves general construction, alterations, and MEP and IT work at multiple buildings on the Cincinnati and Fort Thomas campuses. Key requirements include technology upgrades to telecom rooms and data centers, cable plant work, and electrical system improvements. The specifications provide guidance on operations and storage areas, security protocols, phasing plans to minimize disruptions, warranty management, and Resident Engineer's office specifications. The work is to be completed under Solicitation Number 36C77623B0005 with the Department of Veterans Affairs as the agency.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs
Cincinnati & Ft. Thomas EHRM Infrastructure Upgrades Cincinnati VAMC, Cincinnati, OH Project No. 539-21-701
100% Construction Documents Specifications Volume 1 4 May 2022
Prime Contractor: Health Facilities Solutions, 8718 Botts Ln., San Antonio, TX 78217
CINCINNATI AND FT. THOMAS EHRM INFRASTRUCTURE UPGRADES
PROJECT #539-21-701
CINCINNATI VAMC, CINCINNATI, OH 10-01-18
00 01 10-1
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 SPECIAL SECTIONS
00 01 10 List of Specifications 10-18
00 01 15 List of Drawing Sheets 05-20
00 00 20 Phasing 02-22
DIVISION 01 GENERAL REQUIREMENTS
01 00 00 General Requirements 01-21
01 00 10 Requirements
01 33 23 Shop Drawings, Product Data, & Samples 05-17
01 35 26 Safety Requirements 07-20
01 42 19 Reference Standards 11-20
01 45 00 Quality Control 02-21
01 45 29 Testing Laboratory Services 11-18
01 57 19 Temporary Environmental Controls 01-21
01 74 19 Construction Waste Management 01-21
01 81 13 Sustainable Construction Requirements 10-17
DIVISION 02 EXISTING CONDITIONS
02 41 00 Demolition 08-17
02 82 13.13 Glovebag Asbestos Abatement 01-21
02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21
02 83 33.13 Lead Base Paint Removal and Disposal 01-21
DIVISION 03 CONCRETE (NOT USED)
DIVISION 04 MASONRY
04 05 13 Masonry Mortaring 10-17
04 05 16 Masonry Grouting 01-21
04 20 00 Unit Masonry 08-17
DIVISION 05 METALS
05 40 00 Cold-Formed Metal Framing 05-16
05 50 00 Metal Fabrications 08-18
DIVISION 06 WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
06 20 00 Finish Carpentry 08-16
00 01 10-2
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 01-21
07 60 00 Flashing and Sheet Metal 01-21
07 84 00 Firestopping 02-16
07 92 00 Joint Sealants 10-17
DIVISION 08 OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21
08 14 00 Interior Wood Doors 02-16
08 71 00 Door Hardware 01-21
08 90 00 Louvers and Vents 01-21
DIVISION 09 FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-15
09 06 00 Schedule for Finishes 01-21
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 04-20
09 51 00 Acoustical Ceilings 12-18
09 65 13 Resilient Base and Accessories 01-21
09 65 19 Resilient Tile Flooring 06-14
09 69 00 Access Flooring 01-21
09 91 00 Painting 01-21
DIVISION 10 SPECIALTIES
10 14 00 Signage 01-21
DIVISION 11 EQUIPMENT (NOT USED)
DIVISION 12 FURNISHINGS (NOT USED)
DIVISION 13 SPECIAL CONSTRUCTION (NOT USED)
DIVISION 14 CONVEYING EQUIPEMENT (NOT USED)
DIVISION 21 FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression Systems 06-15
21 13 13 Wet-Pipe Sprinkler Systems 06-15
21 22 00 Clean Agent Fire Suppression Systems 05-15
DIVISION 22 PLUMBING
22 05 11 Common Work Results for Plumbing 09-20
00 01 10-3
DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING
23 05 11 Common Work Results for HVAC 02-20
23 05 12 General Motor Requirements: HVAC and Steam Generation
Equipment
02-20
23 05 41 Noise & Vibration Control for HVAC Piping & Equipment 02-20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20
23 07 11 HVAC 02-20
23 08 00 Commissioning of HVAC Systems 02-20
23 09 23 Direct-Digital Control System for HVAC 02-20
23 21 13 Hydronic Piping 02-20
23 23 00 Refrigerant Piping 02-20
23 31 00 HVAC Ducts and Casings 02-20
23 37 00 Air Outlets and Inlets 02-20
23 81 00 Unitary HVAC Equipment 02-20
23 81 23 Computer Room Air Conditioners 08-21
DIVISION 25 INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System 02-10
DIVISION 26 ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16
26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17
26 05 26 Grounding and Bonding for Electrical Systems 01-17
26 05 33 Raceway and Boxes for Electrical Systems 01-18
26 05 73 Overcurrent Protective Device Coordination Study 01-17
26 09 23 Lighting Controls 01-18
26 22 00 Low-Voltage Transformers 01-18
26 24 16 Panelboards 01-18
26 27 26 Wiring Devices 01-18
26 33 53 Static Uninterruptible Power Supply 01-17
26 36 23 Automatic Transfer Switches 01-17
26 43 13 Surge Protective Devices 01-17
26 51 00 Interior Lighting 01-18
DIVISION 27 COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19
27 05 26 Grounding and Bonding for Communication Systems 06-15
27 05 33 Raceways and Bonding for Communication Systems 10-18
27 08 00 Commissioning of Communication Systems 11-16
27 10 00 Control, Communication, and Signal Wiring 06-15
27 11 00 Communications Equipment Room Fittings 06-15
27 11 20 Data Center Cabinets 01-17
27 15 00 Communications Structured Cabling 01-16
00 01 10-4
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
28 13 00 Access Control Systems 02-20
28 23 00 Video Surveillance System 02-20
28 31 00 Fire Detection and Alarm 09-21
DIVISION 32 EXTERIOR IMPROVEMENTS (NOT USED)
DIVISION 33 UTILITIES (NOT USED)
DIVISION 34 TRANSPORTATION (NOT USED)
DIVISION 48 ELECTRICAL POWER GENERATION (NOT USED)
CINCINNATI VAMC, CINCINNATI, OH 05-01-10
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWINGS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
ABATEMENT
HA-101 HAZARDOUS MATERIALS - ASBESTOS
HA-102 HAZARDOUS MATERIALS - ASBESTOS
HA-103 HAZARDOUS MATERIALS - ASBESTOS
HA-104 HAZARDOUS MATERIALS - ASBESTOS
HA-105 HAZARDOUS MATERIALS - ASBESTOS
HA-106 HAZARDOUS MATERIALS - ASBESTOS
HA-107 HAZARDOUS MATERIALS - ASBESTOS
ARCHITECTURAL
GI-000 COVER
GI-010 INDEX OF DRAWINGS
GI-011 INDEX OF DRAWINGS
GI-020 GENERAL INFORMATION, SYMBOLS, & LOCATION MAP
GI-030 ABBREVIATIONS
GI-040 ACCESSIBILITY STANDARDS
GI-041 ACCESSIBILITY STANDARDS
GI-042 ACCESSIBILITY STANDARDS
GI-043 ACCESSIBILITY STANDARDS
GI-044 ACCESSIBILITY STANDARDS
AD-100-C.1.B ENLARGED FLOOR PLANS - BASEMENT - DEMOLITION
AD-101-C.1.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION
AD-102-C.1.2 ENLARGED FLOOR PLANS - 2ND FLOOR - DEMOLITION
AD-103-C.1.3 ENLARGED FLOOR PLANS - 3RD FLOOR - DEMOLITION
AD-104-C.1.4 ENLARGED FLOOR PLANS - 4TH FLOOR - DEMOLITION
AD-105-C.1.5 ENLARGED FLOOR PLANS - 5TH FLOOR - DEMOLITION
AD-106-C.1.6 ENLARGED FLOOR PLANS - 6TH FLOOR - DEMOLITION
AD-107-C.1.7 ENLARGED FLOOR PLANS - 7TH FLOOR - DEMOLITION
AD-108-C.1.8 ENLARGED FLOOR PLANS - 8TH FLOOR - DEMOLITION
AD-109-C.1.9 ENLARGED FLOOR PLANS - 9TH FLOOR - DEMOLITION
AD-140-C.2.B ENLARGED FLOOR PLANS - BASEMENT - DEMOLITION
AD-141-C.2.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION
00 01 15 - 2
AD-142-C.2.2 ENLARGED FLOOR PLANS - 2ND FLOOR - DEMOLITION
AD-150-C.3.B ENLARGED FLOOR PLANS - BASEMENT - DEMOLITION
AD-160-C.8.2 ENLARGED FLOOR PLANS - 2ND FLOOR - DEMOLITION
AD-180-C.15.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION
AD-190-C.TB.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION
AD-200-C.TE.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION
AD-210-FT.64.B ENLARGED FLOOR PLANS - BASEMENT - DEMOLITION
AD-211-FT.64.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION
AD-212-FT.64.2 ENLARGED FLOOR PLANS - 2ND FLOOR - DEMOLITION
AD-213-FT.64.3 ENLARGED FLOOR PLANS - 3RD FLOOR - DEMOLITION
AD-220-FT.117.1 ENLARGED FLOOR PLANS - 1ST FLOOR – DEMOLITION
AS-100-C.1.SB OVERALL FLOOR PLAN - SUB-BASEMENT - AREA 1
AS-101-C.1.SB OVERALL FLOOR PLAN - SUB-BASEMENT - AREA 2
AS-102-C.1.SB OVERALL FLOOR PLAN - SUB-BASEMENT - AREA 3
AS-103-C.1.B OVERALL FLOOR PLAN - BASEMENT - AREA 1
AS-104-C.1.B OVERALL FLOOR PLAN - BASEMENT - AREA 2
AS-105-C.1.B OVERALL FLOOR PLAN - BASEMENT - AREA 3
AS-106-C.1.B OVERALL FLOOR PLAN - BASEMENT - AREA 4
AS-107-C.1.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 1
AS-108-C.1.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 2
AS-109-C.1.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 3
AS-110-C.1.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 4
AS-111-C.1.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 1
AS-112-C.1.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 2
AS-113-C.1.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 3
AS-114-C.1.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 4
AS-115-C.1.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 1
AS-116-C.1.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 2
AS-117-C.1.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 3
AS-118-C.1.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 4
AS-119-C.1.4 OVERALL FLOOR PLAN - FOURTH FLOOR - AREA 1
AS-120-C.1.4 OVERALL FLOOR PLAN - FOURTH FLOOR - AREA 2
AS-121-C.1.4 OVERALL FLOOR PLAN - FOURTH FLOOR - AREA 3
AS-122-C.1.4 OVERALL FLOOR PLAN - FOURTH FLOOR - AREA 4
AS-123-C.1.5 OVERALL FLOOR PLAN - FIFTH FLOOR - AREA 1
AS-124-C.1.5 OVERALL FLOOR PLAN - FIFTH FLOOR - AREA 2
00 01 15 - 3
AS-125-C.1.5 OVERALL FLOOR PLAN - FIFTH FLOOR - AREA 3
AS-126-C.1.6 OVERALL FLOOR PLAN - SIXTH FLOOR - AREA 1
AS-127-C.1.6 OVERALL FLOOR PLAN - SIXTH FLOOR - AREA 2
AS-128-C.1.6 OVERALL FLOOR PLAN - SIXTH FLOOR - AREA 3
AS-129-C.1.7 OVERALL FLOOR PLAN - SEVENTH FLOOR - AREA 1
AS-130-C.1.7 OVERALL FLOOR PLAN - SEVENTH FLOOR - AREA 2
AS-131-C.1.7 OVERALL FLOOR PLAN - SEVENTH FLOOR - AREA 3
AS-132-C.1.8 OVERALL FLOOR PLAN - EIGHTH FLOOR - AREA 1
AS-133-C.1.8 OVERALL FLOOR PLAN - EIGHTH FLOOR - AREA 2
AS-134-C.1.9 OVERALL FLOOR PLAN - NINTH FLOOR - AREA 1
AS-135-C.1.9 OVERALL FLOOR PLAN - NINTH FLOOR - AREA 2
AS-140-C.2.B OVERALL FLOOR PLAN - BASEMENT - AREA 1
AS-141-C.2.B OVERALL FLOOR PLAN - BASEMENT - AREA 2
AS-142-C.2.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 1
AS-143-C.2.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 2
AS-144-C.2.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 1
AS-145-C.2.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 2
AS-150-C.3.B OVERALL FLOOR PLAN - BASEMENT
AS-151-C.3.1 OVERALL FLOOR PLAN - FIRST FLOOR
AS-152-C.3.2 OVERALL FLOOR PLAN - SECOND FLOOR
AS-160-C.8.1 OVERALL FLOOR PLAN - FIRST FLOOR
AS-161-C.8.2 OVERALL FLOOR PLAN - SECOND FLOOR
AS-162-C.8.4 OVERALL FLOOR PLAN - FOURTH FLOOR
AS-180-C.15.B OVERALL FLOOR PLAN - BASEMENT
AS-181-C.15.1 OVERALL FLOOR PLAN - FIRST FLOOR
AS-182-C.15.2 OVERALL FLOOR PLAN - SECOND FLOOR
AS-183-C.15.3 OVERALL FLOOR PLAN - THIRD FLOOR
AS-184-C.15.4 OVERALL FLOOR PLAN - FOURTH FLOOR
AS-190-C.TB.1 OVERALL FLOOR PLAN - FIRST FLOOR
AS-200-C.TE.1 OVERALL FLOOR PLAN - FIRST FLOOR
AS-210-FT.64.B OVERALL FLOOR PLAN - BASEMENT - AREA 1
AS-211-FT.64.B OVERALL FLOOR PLAN - BASEMENT - AREA 2
AS-212-FT.64.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 1
AS-213-FT.64.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 2
AS-214-FT.64.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 1
AS-215-FT.64.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 2
AS-216-FT.64.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 1
00 01 15 - 4
AS-217-FT.64.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 2
AS-220-FT.117.1 OVERALL FLOOR PLAN - FIRST FLOOR
AS-300 ROOF PLAN – BUILDING 1
AS-301 ROOF PLANS – BUILDINGS 2, 3, 8, 15, & 64
AS-310 ROOF DETAILS
AS-400-C.1.B ENLARGED FLOOR PLANS - BASEMENT - RENOVATION
AS-401-C.1.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION
AS-402-C.1.2 ENLARGED FLOOR PLANS - 2ND FLOOR - RENOVATION
AS-403-C.1.3 ENLARGED FLOOR PLANS - 3RD FLOOR - RENOVATION
AS-404-C.1.4 ENLARGED FLOOR PLANS - 4TH FLOOR - RENOVATION
AS-405-C.1.5 ENLARGED FLOOR PLANS - 5TH FLOOR - RENOVATION
AS-406-C.1.6 ENLARGED FLOOR PLANS - 6TH FLOOR - RENOVATION
AS-407-C.1.7 ENLARGED FLOOR PLANS- 7TH FLOOR - RENOVATION
AS-408-C.1.8 ENLARGED FLOOR PLANS - 8TH FLOOR - RENOVATION
AS-409-C.1.9 ENLARGED FLOOR PLANS - 9TH FLOOR - RENOVATION
AS-440-C.2.B ENLARGED FLOOR PLANS - BASEMENT - RENOVATION
AS-441-C.2.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION
AS-442-C.2.2 ENLARGED FLOOR PLANS - 2ND FLOOR - RENOVATION
AS-450-C.3.B ENLARGED FLOOR PLANS - BASEMENT - RENOVATION
AS-460-C.8.2 ENLARGED FLOOR PLANS - 2ND FLOOR - RENOVATION
AS-480-C.15.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION
AS-490-C.TB.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION
AS-500-C.TE.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION
AS-510-FT.64.B ENLARGED FLOOR PLANS - BASEMENT - RENOVATION
AS-511-FT.64.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION
AS-512-FT.64.2 ENLARGED FLOOR PLANS - 2ND FLOOR - RENOVATION
AS-513-FT.64.3 ENLARGED FLOOR PLANS - 3RD FLOOR - RENOVATION
AS-520-FT.117.1 ENLARGED FLOOR PLAN S- 1ST FLOOR – RENOVATION
AS-530 INTERIOR ELEVATIONS & EXISTING ROOM PHOTOS
AS-600 PARTITION TYPES
AS-700 DOOR SCHEDULE, DOOR & FRAME TYPES
AS-710 DOOR & MISCELLANEOUS DETAILS
AS-720 ROOM FINISH SCHEDULE & MATERIAL SCHEDULE
FIRE PROTECTION
FP-000 FIRE PROTECTION SYMBOLS & ABBREVIATIONS
FP-110-C.1.B FIRE PROTECTION BASEMENT OVERALL PLAN
00 01 15 - 5
FP-120-C.1.1 FIRE PROTECTION FIRST FLOOR OVERALL PLAN
FP-130-C.1.2 FIRE PROTECTION SECOND FLOOR OVERALL PLAN
FP-140-C.1.3 FIRE PROTECTION THIRD FLOOR OVERALL PLAN
FP-150-C.1.4 FIRE PROTECTION FOURTH FLOOR OVERALL PLAN
FP-160-C.1.5 FIRE PROTECTION FIFTH FLOOR OVERALL PLAN
FP-170-C.1.6 FIRE PROTECTION SIXTH FLOOR OVERALL PLAN
FP-180-C.1.7 FIRE PROTECTION SEVENTH FLOOR OVERALL PLAN
FP-190-C.1.8 FIRE PROTECTION EIGHTH FLOOR OVERALL PLAN
FP-200-C.1.9 FIRE PROTECTION NINTH FLOOR OVERALL PLAN
FP-201-C.1.B THRU 3 FIRE PROTECTION DEMOLITION ENLARGED PLANS
FP-202-C.1.4 THRU 9 FIRE PROTECTION DEMOLITION ENLARGED PLANS
FP-203-C.1.B THRU 3 FIRE PROTECTION ENLARGED PLANS
FP-204-C.1.4 THRU 9 FIRE PROTECTION ENLARGED PLANS
FP-205-C.1.4 FIRE PROTECTION FOURTH FLOOR CLEAN AGENT PLAN
FP-210-C.2.B FIRE PROTECTION BASEMENT OVERALL & ENLARGED PLANS
FP-211-C.2.1 FIRE PROTECTION FIRST FLOOR OVERALL & ENLARGED PLANS
FP-212-C.2.2 FIRE PROTECTION SECOND FLOOR OVERALL & ENLARGED PLANS
FP-230-C.3.B FIRE PROTECTION BASEMENT OVERALL & ENLARGED PLANS
FP-260-C.15.1 FIRE PROTECTION FIRST FLOOR OVERALL & ENLARGED PLANS
FP-300-FT.64.B FIRE PROTECTION BASEMENT OVERALL & ENLARGED PLANS
FP-301-FT.64.1 FIRE PROTECTION FIRST FLOOR OVERALL & ENLARGED PLANS
FP-302-FT.64.2 FIRE PROTECTION SECOND FLOOR OVERALL & ENLARGED PLANS
FP-303-FT.64.3 FIRE PROTECTION THIRD FLOOR OVERALL & ENLARGED PLANS
FP-710 DETAILS
FA-206-C.1.3 FIRE ALARM THIRD FLOOR ENLARGED PLAN
PLUMBING
P-000 PLUMBING SYMBOLS AND ABBREVIATIONS
P-120-C.1.1 PLUMBING FIRST FLOOR OVERALL & ENLARGED PLANS
P-130-C.1.2 PLUMBING SECOND FLOOR OVERALL & ENLARGED PLANS
P-140-C.1.3 PLUMBING THIRD FLOOR OVERALL & ENLARGED PLANS
P-150-C.1.4 PLUMBING FOURTH FLOOR OVERALL & ENLARGED PLANS
P-180-C.1.7 PLUMBING SEVENTH FLOOR OVERALL & ENLARGED PLANS
P-190-C.1.8 PLUMBING EIGHTH FLOOR OVERALL & ENLARGED PLANS
P-200-C.1.9 PLUMBING NINTH FLOOR OVERALL & ENLARGED PLANS
P-210-C.2.B PLUMBING BASEMENT OVERALL & ENLARGED PLANS
00 01 15 - 6
P-211-C.2.1 PLUMBING SECOND FLOOR & ENLARGED PLANS
P-240-C.8.2 PLUMBING SECOND FLOOR OVERALL & ENLARGED PLANS
P-260-C.15.1 PLUMBING FIRST FLOOR OVERALL & ENLARGED PLANS
P-300-FT.64.2 PLUMBING SECOND FLOOR OVERALL & ENLARGED PLANS
MECHANICAL
M-000 MECHANICAL SYMBOLS & ABBREVIATIONS
M-101-C.1.B BASEMENT OVERALL HVAC NEW WORK PLAN
M-102-C.1.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN
M-103-C.1.2 SECOND FLOOR OVERALL HVAC NEW WORK PLAN
M-104-C.1.3 THIRD FLOOR OVERALL HVAC NEW WORK PLAN
M-105-C.1.4 FOURTH FLOOR OVERALL HVAC NEW WORK PLAN
M-106-C.1.5 FLOOR PLAN PARTIAL - FIFTH FLOOR
M-107-C.1.6 SIXTH FLOOR OVERALL HVAC NEW WORK PLAN
M-108-C.1.7 SEVENTH FLOOR OVERALL HVAC NEW WORK PLAN
M-109-C.1.8 EIGHTH FLOOR OVERALL HVAC NEW WORK PLAN
M-110-C.1.9 NINTH FLOOR OVERALL HVAC NEW WORK PLAN
M-111-C.1.10 TENTH FLOOR OVERALL HVAC NEW WORK PLAN
M-120-C.2.B BASEMENT OVERALL HVAC NEW WORK PLAN
M-121-C.2.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN
M-122-C.2.2 SECOND FLOOR OVERALL HVAC NEW WORK PLAN
M-130-C.3.B BASEMENT OVERALL HVAC NEW WORK PLAN
M-131-C.3.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN
M-132-C.3.2 SECOND FLOOR OVERALL HVAC NEW WORK PLAN
M-133-C.3.3 THIRD FLOOR OVERALL HVAC NEW WORK PLAN
M-140-C.8.2 SECOND FLOOR OVERALL NEW HVAC WORK PLAN
M-150-C.15.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN
M-151-C.15.2 SECOND FLOOR OVERALL NEW HVAC WORK PLAN
M-160-FT.64.B BASEMENT OVERALL HVAC NEW WORK PLAN
M-161-FT.64.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN
M-162-FT.64.2 SECOND FLOOR OVERALL HVAC NEW WORK PLAN
M-163-FT.64.3 THIRD FLOOR OVERALL HVAC NEW WORK PLAN
M-164-FT.64.4 ROOF OVERALL HVAC NEW WORK PLAN
MD-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT
MD-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR
MD-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR
00 01 15 - 7
MD-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR
MD-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR
MD-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR
MD-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR
MD-408-C.1.7 ENLARGED FLOOR PLAN - SEVENTH FLOOR
MD-409-C.1.8 ENLARGED FLOOR PLAN - EIGHTH FLOOR
MD-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR
MD-411-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR
MD-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT
MD-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL
MD-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL
MD-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT
MD-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR
MD-450-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR
MD-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT
MD-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR
MD-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR
MD-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR
MD-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR
MD-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR
M-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT
M-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR
M-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR
M-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR
M-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR
M-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR
M-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR
M-408-C.1.7 ENLARGED FLOOR PLANS - SEVENTH FLOOR
M-409-C.1.8 ENLARGED FLOOR PLANS - EIGHTH FLOOR
M-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR
M-411-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR
M-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT
M-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL
M-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL
M-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT
M-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR
00 01 15 - 8
M-450-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR
M-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT
M-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR
M-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR
M-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR
M-464-FT.64.4 ENLARGED FLOOR PLANS - ROOF
M-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR
M-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR
M-500 MECHANICAL DETAILS
M-600 MECHANICAL SCHEDULES
M-601 HVAC PIPING DIAGRAMS
M-700 MECHANICAL CONTROLS
M-701 MECHANICAL CONTROLS
ELECTRICAL
E-000 ELECTRICAL SYMBOLS
ED-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT
ED-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR
ED-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR
ED-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR
ED-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR
ED-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR
ED-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR
ED-408-C.1.7 ENLARGED FLOOR PLAN - SEVENTH FLOOR
ED-409-C.1.8 ENLARGED FLOOR PLAN - EIGHTH FLOOR
ED-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR
ED-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT
ED-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL
ED-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL
ED-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT
ED-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR
ED-450-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR
ED-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT
ED-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR
ED-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR
ED-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR
00 01 15 - 9
ED-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR
ED-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR
ED-600 ELECTRICAL DEMO - PANELBOARD SCHEDULES ROOM A437C
EL-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT
EL-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EL-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR
EL-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR
EL-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR
EL-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR
EL-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR
EL-408-C.1.7 ENLARGED FLOOR PLAN - SEVENTH FLOOR
EL-409-C.1.8 ENLARGED FLOOR PLAN - EIGHTH FLOOR
EL-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR
EL-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT
EL-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL
EL-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL
EL-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT
EL-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR
EL-440-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EL-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT
EL-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EL-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR
EL-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR
EL-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EL-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EL-500 LIGHT FIXTURE DESCRIPTIONS
EP-100-C.1.SB FLOOR PLAN - PARTIAL - BLDG. 1 - SUB-BSMT - AREA 1
EP-101-C.1.SB FLOOR PLAN - PARTIAL - BLDG. 1 - SUB-BSMT - AREA 2
EP-102-C.1.SB FLOOR PLAN - PARTIAL - BLDG. 1 - SUB-BSMT - AREA 3
EP-103-C.1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 1
EP-104-C.1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 2
EP-105-C.1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 3
EP-106-C.1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 4
EP-107-C.1.1 FLOOR PLAN - PARTIAL - BLDG. 1 - 1F - AREA 1
EP-108-C.1.1 FLOOR PLAN - PARTIAL - BLDG. 1 - 1F - AREA 2
00 01 15 - 10
EP-109-C.1.1 FLOOR PLAN - PARTIAL - BLDG. 1 - 1F - AREA 3
EP-110-C.1.1 FLOOR PLAN - PARTIAL - BLDG. 1 - 1F - AREA 4
EP-111-C.1.2 FLOOR PLAN - PARTIAL - BLDG. 1 - 2F - AREA 1
EP-112-C.1.2 FLOOR PLAN - PARTIAL - BLDG. 1 - 2F - AREA 2
EP-113-C.1.2 FLOOR PLAN - PARTIAL - BLDG. 1 - 2F - AREA 3
EP-114-C.1.2 FLOOR PLAN - PARTIAL - BLDG. 1 - 2F - AREA 4
EP-115-C.1.3 FLOOR PLAN - PARTIAL - BLDG. 1 - 3F - AREA 1
EP-116-C.1.3 FLOOR PLAN - PARTIAL - BLDG. 1 - 3F - AREA 2
EP-117-C.1.3 FLOOR PLAN - PARTIAL - BLDG. 1 - 3F - AREA 3
EP-118-C.1.3 FLOOR PLAN - PARTIAL - BLDG. 1 - 3F - AREA 4
EP-119-C.1.4 FLOOR PLAN - PARTIAL - BLDG. 1 - 4F - AREA 1
EP-120-C.1.4 FLOOR PLAN - PARTIAL - BLDG. 1 - 4F - AREA 2
EP-121-C.1.4 FLOOR PLAN - PARTIAL - BLDG. 1 - 4F - AREA 3
EP-122-C.1.4 FLOOR PLAN - PARTIAL - BLDG. 1 - 4F - AREA 4
EP-123-C.1.5 FLOOR PLAN - PARTIAL - BLDG. 1 - 5F - AREA 1
EP-124-C.1.5 FLOOR PLAN - PARTIAL - BLDG. 1 - 5F - AREA 2
EP-125-C.1.5 FLOOR PLAN - PARTIAL - BLDG. 1 - 5F - AREA 3
EP-126-C.1.6 FLOOR PLAN - PARTIAL - BLDG. 1 - 6F - AREA 1
EP-127-C.1.6 FLOOR PLAN - PARTIAL - BLDG. 1 - 6F - AREA 2
EP-128-C.1.6 FLOOR PLAN - PARTIAL - BLDG. 1 - 6F - AREA 3
EP-129-C.1.7 FLOOR PLAN - PARTIAL - BLDG. 1 - 7F - AREA 1
EP-130-C.1.7 FLOOR PLAN - PARITAL - BLDG. 1 - 7F - AREA 2
EP-131-C.1.7 FLOOR PLAN - PARTIAL - BLDG. 1 - 7F - AREA 3
EP-132-C.1.8 FLOOR PLAN - PARTIAL - BLDG. 1 - 8F - AREA 1
EP-133-C.1.8 FLOOR PLAN - PARTIAL - BLDG. 1 - 8F - AREA 2
EP-134-C.1.9 FLOOR PLAN - PARTIAL - BLDG. 1 - 9F - AREA 1
EP-135-C.1.9 FLOOR PLAN - PARTIAL - BLDG. 1 - 9F - AREA 2
EP-136-C.2.B FLOOR PLAN - PARTIAL - BLDG. 2 - BSMT - AREA 1
EP-137-C.2.B FLOOR PLAN - PARTIAL - BLDG. 2 - BSMT - AREA 2
EP-138-C.2.1 FLOOR PLAN - PARTIAL - BLDG. 2 - 1F
EP-139-C.2.1 FLOOR PLAN - PARTIAL - BLDG. 2 - 1F - AREA 2
EP-140-C.2.2 FLOOR PLAN - PARTIAL - BLDG. 2 - 2F
EP-141-C.2.2 FLOOR PLAN - PARTIAL - BLDG. 2 - 2F - AREA 2
EP-142-C.3.B FLOOR PLAN - BLDG. 3 - BASEMENT
EP-143-C.3.1 FLOOR PLAN - BLDG. 3 - 1F
EP-144-C.3.2 FLOOR PLAN - BLDG. 3 - 2F
EP-145-C.3.3 FLOOR PLAN - BLDG. 3 - 3F
00 01 15 - 11
EP-146-C.8.1 FLOOR PLAN - BLDG. 8 - 1F
EP-147-C.8.2 FLOOR PLAN - BLDG. 8 - 2F
EP-148-C.14.2 FLOOR PLAN - BLDG. 14 - 2F
EP-149-C.15.B FLOOR PLAN - BLDG. 15 - BSMT
EP-150-C.15.1 FLOOR PLAN - BLDG. 15 - 1F
EP-151-C.15.2 FLOOR PLAN - BLDG. 15 - 2F
EP-152-C.15.3 FLOOR PLAN - BLDG. 15 - 3F
EP-153-C.15.4 FLOOR PLAN - BLDG. 15 - 3F
EP-154-FT.64.B FLOOR PLAN - BLDG. 64 - BSMT - AREA 1
EP-155-FT.64.B FLOOR PLAN - PARTIAL - BLDG. 64 - BSMT - AREA 2
EP-156-FT.64.1 FLOOR PLAN - PARTIAL - BLDG. 64 - 1F - AREA 1
EP-157-FT.64.1 FLOOR PLAN - PARTIAL - BLDG. 64 - 1F - AREA 2
EP-158-FT.64.2 FLOOR PLAN - PARTIAL - BLDG. 64 - 2F - AREA 1
EP-159-FT.64.2 FLOOR PLAN - PARTIAL - BLDG. 64 - 2F - AREA 2
EP-160-FT.64.3 FLOOR PLAN - PARTIAL - BLDG. 64 - 3F - AREA1
EP-161-FT.64.3 FLOOR PLAN - PARTIAL - BLDG. 64 - 3F - AREA 2
EP-162-FT.64.4 FLOOR PLAN - PARTIAL - BLDG. 64 - ROOF - AREA 1
EP-163-FT.64.4 FLOOR PLAN - PARTIAL - BLDG. 64 - ROOF - AREA 2
EP-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT
EP-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EP-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR
EP-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR
EP-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR
EP-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR
EP-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR
EP-408-C.1.7 ENLARGED FLOOR PLAN - SEVENTH FLOOR
EP-409-C.1.8 ENLARGED FLOOR PLAN - EIGHTH FLOOR
EP-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR
EP-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT
EP-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL
EP-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL
EP-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT
EP-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR
EP-450-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EP-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT
EP-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EP-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR
00 01 15 - 12
EP-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR
EP-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EP-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EP-601-C.1 BUILDING 1 - ELECTRICAL DIAGRAMS
EP-602-C.1 BUILDING 1 - ELECTRICAL DIAGRAMS
EP-603-C.1 BUILDING 1 - ELECTRICAL DIAGRAMS
EP-604-C.1 BUILDING 1 - ELECTRICAL DIAGRAMS
EP-610-C.1 BUILDING 1 - ELECTRICAL SCHEDULE
EP-611-C.1 BUILDING 1 - ELECTRICAL SCHEDULE
EP-612.C.1 BUILDING 1 - ELECTRICAL SCHEDULE
EP-613-C.1 BUILDING 1 - ELECTRICAL SCHEDULE
EP-614-C.1 BUILDING 1 - ELECTRICAL SCHEDULE
EP-615-C.1 BUILDING 1 - ELECTRICAL SCHEDULE
EP-616-C.1 BUILDING 1 – ELECTRICAL SCHEDULE
EP-617-C.1 TN AND TC CONDUIT FEEDER ROUTE SCHEDULE
EP-620-C.2 BUILDING 2 - ELECTRICAL DIAGRAMS
EP-621-C.2 BUILDING 2 - ELECTRICAL SCHEDULE
EP-625-C.3 BUILDING 3 - ELECTRICAL SCHEDULE AND DIAGRAMS
EP-630-C.8 BUILDING 8 - ELECTRICAL SCHEDULE AND DIAGRAMS
EP-640-C.15 BUILDING 15 - ELECTRICAL DIAGRAMS
EP-641-C.15 BUILDING 15 - ELECTRICAL SCHEDULE
EP-650-FT.64 BUILDING 64 - ELECTRICAL DIAGRAMS
EP-651-FT.64 BUILDING 64 - ELECTRICAL SCHEDULE
EP-652-FT.64 BUILDING 64 - ELECTRICAL SCHEDULE
EP-660-C.PK BUILDING 64 - ELECTRICAL SCHEDULE AND DIAGRAMS
EP-665-C.TB BUILDING TB - ELECTRICAL SCHEDULE AND DIAGRAMS
EP-670-C.TE BUILDING TE - ELECTRICAL SCHEDULE AND DIAGRAMS
EP-680 ELECTRICAL DIAGRAM
TECHNOLOGY
T-000 TELECOMMUNICATIONS GENERAL INFORMATION
T-001 RESPONSIBILITY AND PREFERRED PRODUCTS MATRIX
TD-100-C.1.SB TECHNOLOGY DEMOLITION SUB BASEMENT OVERALL PLAN
TD-101-C.1.SB TECHNOLOGY DEMOLITION SUB BASEMENT PARTIAL PLAN - A
TD-102-C.1.SB TECHNOLOGY DEMOLITION SUB BASEMENT PARTIAL PLAN - B
TD-110-C.1.B TECHNOLOGY DEMOLITION BASEMENT OVERALL PLAN
00 01 15 - 13
TD-111-C.1.B TECHNOLOGY DEMOLITION BASEMENT PARTIAL PLAN - A
TD-112-C.1.B TECHNOLOGY DEMOLITION BASEMENT PARTIAL PLAN - B
TD-113-C.1.B TECHNOLOGY DEMOLITION BASEMENT PARTIAL PLAN - C
TD-114-C.1.B TECHNOLOGY DEMOLITION BASEMENT PARTIAL PLAN - D
TD-120-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR OVERALL PLAN
TD-121-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR PARTIAL PLAN - A
TD-122-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR PARTIAL PLAN - B
TD-123-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR PARTIAL PLAN - C
TD-124-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR PARTIAL PLAN - D
TD-130-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR OVERALL PLAN
TD-131-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR PARTIAL PLAN - A
TD-132-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR PARTIAL PLAN - B
TD-133-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR PARTIAL PLAN - C
TD-134-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR PARTIAL PLAN - D
TD-140-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR OVERALL PLAN
TD-141-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR PARTIAL PLAN - A
TD-142-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR PARTIAL PLAN - B
TD-143-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR PARTIAL PLAN - C
TD-144-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR PARTIAL PLAN - D
TD-150-C.1.4 TECHNOLOGY DEMOLITION FOURTH FLOOR OVERALL PLAN
TD-151-C.1.4 TECHNOLOGY DEMOLITION FOURTH FLOOR PARTIAL PLAN - A
TD-152-C.1.4 TECHNOLOGY DEMOLITION FOURTH FLOOR PARTIAL PLAN - B
TD-153-C.1.4 TECHNOLOGY DEMOLITION FOURTH FLOOR PARTIAL PLAN - D
TD-160-C.1.5 TECHNOLOGY DEMOLITION FIFTH FLOOR OVERALL PLAN
TD-161-C.1.5 TECHNOLOGY DEMOLITION FIFTH FLOOR PARTIAL PLAN - A
TD-162-C.1.5 TECHNOLOGY DEMOLITION FIFTH FLOOR PARTIAL PLAN - B
TD-163-C.1.5 TECHNOLOGY DEMOLITION FIFTH FLOOR PARTIAL PLAN - D
TD-170-C.1.6 TECHNOLOGY DEMOLITION SIXTH FLOOR OVERALL PLAN
TD-171-C.1.6 TECHNOLOGY DEMOLITION SIXTH FLOOR PARTIAL PLAN - A
TD-172-C.1.6 TECHNOLOGY DEMOLITION SIXTH FLOOR PARTIAL PLAN - B
TD-173-C.1.6 TECHNOLOGY DEMOLITION SIXTH FLOOR PARTIAL PLAN - D
TD-180-C.1.7 TECHNOLOGY DEMOLITION SEVENTH FLOOR OVERALL PLAN
TD-181-C.1.7 TECHNOLOGY DEMOLITION SEVENTH FLOOR PARTIAL PLAN - A
TD-182-C.1.7 TECHNOLOGY DEMOLITION SEVENTH FLOOR PARTIAL PLAN - B
TD-183-C.1.7 TECHNOLOGY DEMOLITION SEVENTH FLOOR PARTIAL PLAN - D
TD-190-C.1.8 TECHNOLOGY DEMOLITION EIGHTH FLOOR OVERALL PLAN
TD-191-C.1.8 TECHNOLOGY DEMOLITION EIGHTH FLOOR PARTIAL PLAN - A
00 01 15 - 14
TD-192-C.1.8 TECHNOLOGY DEMOLITION EIGHTH FLOOR PARTIAL PLAN - B
TD-193-C.1.8 TECHNOLOGY DEMOLITION EIGHTH FLOOR PARTIAL PLAN - D
TD-200-C.1.9 TECHNOLOGY DEMOLITION NINTH FLOOR OVERALL PLAN
TD-201-C.1.9 TECHNOLOGY DEMOLITION NINTH FLOOR PARTIAL PLAN - A
TD-202-C.1.9 TECHNOLOGY DEMOLITION NINTH FLOOR PARTIAL PLAN - B
TD-203-C.1.9 TECHNOLOGY DEMOLITION NINTH FLOOR PARTIAL PLAN - D
TD-210-C.2.BN BLDG. 2 - BASEMENT - NORTH TECHNOLOGY DEMO PLAN
TD-210-C.2.BS BLDG. 2 - BASEMENT - SOUTH TECHNOLOGY DEMO PLAN
TD-211-C.2.1N BLDG. 2 - FIRST FLOOR - NORTH TECHNOLOGY DEMO PLAN
TD-211-C.2.1S BLDG. 2 - FIRST FLOOR - SOUTH TECHNOLOGY DEMO PLAN
TD-212-C.2.2N BLDG. 2 - SECOND FLOOR - NORTH TECHNOLOGY DEMO PLAN
TD-212-C.2.2S BLDG. 2 - SECOND FLOOR - SOUTH TECHNOLOGY DEMO PLAN
TD-220-C.3.B BLDG. 3 - BASEMENT TECHNOLOGY DEMO PLAN
TD-221-C.3.1 BLDG. 3 - FIRST FLOOR - TECHNOLOGY DEMO PLAN
TD-222-C.3.2 BLDG. 3 - SECOND FLOOR - TECHNOLOGY DEMO PLAN
TD-223-C.3.3 BLDG. 3 - THIRD FLOOR - TECHNOLOGY DEMO PLAN
TD-231-C.8.1 BLDG. 8 - FIRST FLOOR - TECHNOLOGY DEMO PLAN
TD-232-C.8.2 BLDG. 8 - SECOND FLOOR - TECHNOLOGY DEMO PLAN
TD-233-C.8.3 BLDG. 8 - THIRD FLOOR - TECHNOLOGY DEMO PLAN
TD-234-C.8.4 BLDG. 8 - FOURTH FLOOR - TECHNOLOGY DEMO PLAN
TD-250-C.15.B BLDG. 15 - BASEMENT - TECHNOLOGY DEMO PLAN
TD-251-C.15.1 BLDG. 15 - FIRST FLOOR - TECHNOLOGY DEMO PLAN
TD-252-C.15.2 BLDG. 15 - SECOND FLOOR - TECHNOLOGY DEMO PLAN
TD-253-C.15.3 BLDG. 15 - THIRD FLOOR - TECHNOLOGY DEMO PLAN
TD-254-C.15.4 BLDG. 15 - FOURTH FLOOR - TECHNOLOGY DEMO PLAN
TD-270-F.64.BN BLDG. 64 - BASEMENT - TECHNOLOGY DEMO PLAN
TD-270-F.64.BS BLDG. 64 - BASEMENT - SOUTH TECHNOLOGY DEMO PLAN
TD-271-F.64.1N BLDG. 64 - FIRST FLOOR - NORTH TECHNOLOGY DEMO PLAN
TD-271-F.64.1S BLDG. 64 - FIRST FLOOR - SOUTH TECHNOLOGY DEMO PLAN
TD-272-F.64.2N BLDG. 64 - SECOND FLOOR - NORTH TECHNOLOGY DEMO PLAN
TD-272-F.64.2S BLDG. 64 - SECOND FLOOR - SOUTH TECHNOLOGY DEMO PLAN
TD-273-F.64.3N BLDG. 64 - THIRD FLOOR - NORTH TECHNOLOGY DEMO PLAN
TD-273-F.64.3S BLDG. 64 - THIRD FLOOR - SOUTH TECHNOLOGY DEMO PLAN
TD-275-F.117.1 BLDG. 117 - FIRST FLOOR - TECHNOLOGY DEMO PLAN
TD-280-C.TB.1 BLDG. TB - EDUCATION TRAILER - TECHNOLOGY DEMO PLAN
TD-282-C.TE.1 BLDG. TE - RESEARCH TRAILER - TECHNOLOGY DEMO PLAN
TD-600-C.1 TECHNOLOGY EXISTING FIBER BACKBONE DIAGRAM
00 01 15 - 15
TN-100-C.1.SB TECHNOLOGY SUB BASEMENT OVERALL PLAN
TN-101-C.1.SB TECHNOLOGY SUB BASEMENT PARTIAL PLAN - A
TN-102-C.1.SB TECHNOLOGY SUB BASEMENT PARTIAL PLAN - B
TN-110-C.1.B TECHNOLOGY BASEMENT OVERALL PLAN
TN-111-C.1.B TECHNOLOGY BASEMENT PARTIAL PLAN - A
TN-112-C.1.B TECHNOLOGY BASEMENT PARTIAL PLAN - B
TN-113-C.1.B TECHNOLOGY BASEMENT PARTIAL PLAN - C
TN-114-C.1.B TECHNOLOGY BASEMENT PARTIAL PLAN - D
TN-120-C.1.1 TECHNOLOGY FIRST FLOOR OVERALL PLAN
TN-121-C.1.1 TECHNOLOGY FIRST FLOOR PARTIAL PLAN - A
TN-122-C.1.1 TECHNOLOGY FIRST FLOOR PARTIAL PLAN - B
TN-123-C.1.1 TECHNOLOGY FIRST FLOOR PARTIAL PLAN - C
TN-124-C.1.1 TECHNOLOGY FIRST FLOOR PARTIAL PLAN - D
TN-130-C.1.2 TECHNOLOGY SECOND FLOOR OVERALL PLAN
TN-131-C.1.2 TECHNOLOGY SECOND FLOOR PARTIAL PLAN - A
TN-132-C.1.2 TECHNOLOGY SECOND FLOOR PARTIAL PLAN - B
TN-133-C.1.2 TECHNOLOGY SECOND FLOOR PARTIAL PLAN - C
TN-134-C.1.2 TECHNOLOGY SECOND FLOOR PARTIAL PLAN - D
TN-140-C.1.3 TECHNOLOGY THIRD FLOOR OVERALL PLAN
TN-141-C.1.3 TECHNOLOGY THIRD FLOOR PARTIAL PLAN - A
TN-142-C.1.3 TECHNOLOGY THIRD FLOOR PARTIAL PLAN - B
TN-143-C.1.3 TECHNOLOGY THIRD FLOOR PARTIAL PLAN - C
TN-144-C.1.3 TECHNOLOGY THIRD FLOOR PARTIAL PLAN - D
TN-150-C.1.4 TECHNOLOGY FOURTH FLOOR OVERALL PLAN
TN-151-C.1.4 TECHNOLOGY FOURTH FLOOR PARTIAL PLAN - A
TN-152-C.1.4 TECHNOLOGY FOURTH FLOOR PARTIAL PLAN - B
TN-153-C.1.4 TECHNOLOGY FOURTH FLOOR PARTIAL PLAN - D
TN-160-C.1.5 TECHNOLOGY FIFTH FLOOR OVERALL PLAN
TN-161-C.1.5 TECHNOLOGY FIFTH FLOOR PARTIAL PLAN - A
TN-162-C.1.5 TECHNOLOGY FIFTH FLOOR PARTIAL PLAN - B
TN-163-C.1.5 TECHNOLOGY FIFTH FLOOR PARTIAL PLAN – D
TN-170-C.1.6 TECHNOLOGY SIXTH FLOOR OVERALL PLAN
TN-171-C.1.6 TECHNOLOGY SIXTH FLOOR PARTIAL PLAN - A
TN-172-C.1.6 TECHNOLOGY SIXTH FLOOR PARTIAL PLAN - B
TN-173-C.1.6 TECHNOLOGY SIXTH FLOOR PARTIAL PLAN - D
TN-180-C.1.7 TECHNOLOGY SEVENTH FLOOR OVERALL PLAN
TN-181-C.1.7 TECHNOLOGY SEVENTH FLOOR PARTIAL PLAN - A
00 01 15 - 16
TN-182-C.1.7 TECHNOLOGY SEVENTH FLOOR PARTIAL PLAN - B
TN-183-C.1.7 TECHNOLOGY SEVENTH FLOOR PARTIAL PLAN - D
TN-190-C.1.8 TECHNOLOGY EIGHTH FLOOR OVERALL PLAN
TN-191-C.1.8 TECHNOLOGY EIGHTH FLOOR PARTIAL PLAN - A
TN-192-C.1.8 TECHNOLOGY EIGHTH FLOOR PARTIAL PLAN - B
TN-193-C.1.8 TECHNOLOGY EIGHTH FLOOR PARTIAL PLAN - D
TN-200-C.1.9 TECHNOLOGY NINTH FLOOR OVERALL PLAN
TN-201-C.1.9 TECHNOLOGY NINTH FLOOR PARTIAL PLAN - A
TN-202-C.1.9 TECHNOLOGY NINTH FLOOR PARTIAL PLAN - B
TN-203-C.1.9 TECHNOLOGY NINTH FLOOR PARTIAL PLAN - D
TN-210-C.2.BN BLDG. 2 - BASEMENT - NORTH TECHNOLOGY DATA OUTLET PLAN
TN-210-C.2.BS BLDG. 2 - BASEMENT - SOUTH TECHNOLOGY DATA OUTLET PLAN
TN-211-C.2.1N BLDG. 2 - FIRST FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN
TN-211-C.2.1S BLDG. 2 - FIRST FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN
TN-212-C.2.2N BLDG. 2 - SECOND FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN
TN-212-C.2.2S BLDG. 2 - SECOND FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN
TN-220-C.3.B BLDG. 3 - BASEMENT - TECHNOLOGY DATA OUTLET PLAN
TN-221-C.3.1 BLDG. 3 - FIRST FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-222-C.3.2 BLDG. 3 - SECOND FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-223-C.3.3 BLDG. 3 - THIRD FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-231-C.8.1 BLDG. 8 - FIRST FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-232-C.8.2 BLDG. 8 - SECOND FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-233-C.8.3 BLDG. 8 - THIRD FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-234-C.8.4 BLDG. 8 - FOURTH FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-250-C.15.B BLDG. 15 - BASEMENT - TECHNOLOGY DATA OUTLET PLAN
TN-251-C.15.1 BLDG. 15 - FIRST FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-252-C.15.2 BLDG. 15 - SECOND FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-253-C.15.3 BLDG. 15 - THIRD FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-254-C.15.4 BLDG. 15 - FOURTH FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-270-F.64.BN BLDG. 64 - BASEMENT TECHNOLOGY DATA OUTLET PLAN
TN-270-F.64.BS BLDG. 64 - BASEMENT - SOUTH TECHNOLOGY DATA OUTLET PLAN
TN-271-F.64.1N BLDG. 64 - FIRST FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN
TN-271-F.64.1S BLDG. 64 - FIRST FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN
TN-272-F.64.2N BLDG. 64 - SECOND FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN
TN-272-F.64.2S BLDG. 64 - SECOND FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN
TN-273-F.64.3N BLDG. 64 - THIRD FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN
TN-273-F.64.3S BLDG. 64 - THIRD FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN
00 01 15 - 17
TN-275-F.117.1 BLDG. 117 - FIRST FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-280-C.TB.1 BLDG. TB - EDUCATION TRAILER - TECHNOLOGY DATA OUTLET PLAN
TN-282-C.TE.1 BLDG. TE - RESEARCH TRAILER - TECHNOLOGY DATA OUTLET PLAN
TN-401-C.1.B BLDG. 1 – BASEMENT – TECHNOLOGY TELECOM ROOM PLAN
TN-402-C.1.B BLDG. 1 – BASEMENT – TECHNOLOGY TELECOM ROOM PLAN
TN-403-C.1.B BLDG. 1 – BASEMENT – TECHNOLOGY TELECOM ROOM PLAN
TN-405-C.1.1 BLDG. 1 – FIRST FLOOR – TECHNOLOGY TELECOM ROOM PLAN
TN-406-C.1.1 BLDG. 1 – FIRST FLOOR – TECHNOLOGY TELECOM ROOM PLAN
TN-407-C.1.1 BLDG. 1 – FIRST FLOOR – TECHNOLOGY TELECOM ROOM PLAN
TN-410-C.1.2 BLDG. 1 – SECOND FLOOR – TECHNOLOGY TELECOM ROOM PLAN
TN-411-C.1.2 BLDG. 1 – SECOND FLOOR – TECHNOLOGY TELECOM ROOM PLAN
TN-412-C.1.2 BLDG. 1 – SECOND FLOOR – TECHNOLOGY TELECOM ROOM PLAN
TN-415-C.1.3 BLDG. 1 – THIRD FLOOR – TECHNOLOGY TELECOM ROOM PLAN
TN-416-C.1.3 BLDG. 1 – THIRD FLOOR – TECHNOLOGY TELECOM ROOM PLAN
TN-417-C.1.3 BLDG. 1 – THIRD FLOOR – TECHNOLOGY TELECOM ROOM PLAN
TN-420-C.1.4 BLDG. 1 – FOURTH FLOOR – TECHNOLOGY TELECOM ROOM PLAN
TN-421-C.1.4 ENLARGED TDR PLANS
TN-422-C.1.4 ENLARGED TDR PLANS
TN-423-C.1.4 POWER ELEVATION AND SCHEMATIC – LEVEL REDUNDANCY
TN-425-C.1.5 BLDG. 1 – FIFTH FLOOR – TECHNOLOGY TELECOM ROOM PLAN
TN-430-C.1.6 BLDG. 1 – SIXTH FLOOR – TECHNOLOGY TELECOM ROOM PLAN
TN-435-C.1.7 BLDG. 1 – SEVENTH FLOOR – TECHNOLOGY TELECOM ROOM PLAN
TN-440-C.1.8 BLDG. 1 – EIGHTH FLOOR – TECHNOLOGY TELECOM ROOM PLAN
TN-455-C.1.9 BLDG. 1 – NINTH FLOOR – TECHNOLOGY TELECOM ROOM PLAN
TN-470-C.2.BN BLDG. 2 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN
TN-471-C.2.1 BLDG. 2 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-472-C.2.2 BLDG. 2 - SECOND FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-473-C.3.B BLDG. 3 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN
TN-474-C.8.2 BLDG. 8 - SECOND FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-479-C.15.1 BLDG. 15 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-480-F.64.B BLDG. 64 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN
TN-481-F.64.1 BLDG. 64 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-482-F.64.2 BLDG. 64 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-483-F.64.3 BLDG. 64 - THIRD FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-484-F.117.1 BLDG. 117 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-490-C.TB.1 BLDG. TB - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-492-C.TE.1 BLDG. TE - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN
00 01 15 - 18
TN-500 TECHNOLOGY - TYPICAL DETAILS
TN-501 TECHNOLOGY - TYPICAL DETAILS
TN-503 TECHNOLOGY - TYPICAL DETAILS
TN-504 TECHNOLOGY - TYPICAL DETAILS
TN-505 TECHNOLOGY - TYPICAL DETAILS
TN-506 TECHNOLOGY - TYPICAL DETAILS
TN-600-C.1 TECHNOLOGY NEW FIBER BACKBONE DIAGRAM
TN-601 TECHNOLOGY RISER PLAN - BLDGS. 2,3,8,15,14,64,117,TB,& TE
TN-602 TECHNOLOGY BONDING RISER PLAN - BLDGS. 2,3,8,15,64,117,TB,& TE
TS-000 SECURITY LEGEND
TS-110-C.1.B SECURITY BASEMENT OVERALL PLAN
TS-120-C.1.1 SECURITY FIRST FLOOR OVERALL PLAN
TS-130-C.1.2 SECURITY SECOND FLOOR OVERALL PLAN
TS-140-C.1.3 SECURITY THIRD FLOOR OVERALL PLAN
TS-150-C.1.4 SECURITY FOURTH FLOOR OVERALL PLAN
TS-160-C.1.5 SECURITY FIFTH FLOOR OVERALL PLAN
TS-170-C.1.6 SECURITY SIXTH FLOOR OVERALL PLAN
TS-180-C.1.7 SECURITY SEVENTH FLOOR OVERALL PLAN
TS-190-C.1.8 SECURITY EIGHTH FLOOR OVERALL PLAN
TS-200-C.1.9 SECURITY NINTH FLOOR OVERALL PLAN
TS-210-C.2.B BLDG. 2 - SECURITY BASEMENT OVERALL PLAN
TS-211-C.2.1 BLDG. 2 - SECURITY FIRST FLOOR OVERALL PLAN
TS-212-C.2.2 BLDG. 2 - SECURITY SECOND FLOOR OVERALL PLAN
TS-220-C.3.B BLDG. 3 - SECURITY BASEMENT OVERALL PLAN
TS-230-C.8.2 BLDG. 8 - SECURITY SECOND FLOOR OVERALL PLAN
TS-240-C.15.1 BLDG. 15 - SECURITY FIRST FLOOR OVERALL PLAN
TS-250-F.64.B BLDG. 64 - SECURITY BASEMENT OVERALL PLAN
TS-251-F.64.1 BLDG. 64 - SECURITY FIRST FLOOR OVERALL PLAN
TS-252-F.64.2 BLDG. 64 - SECURITY SECOND FLOOR OVERALL PLAN
TS-253-F.64.3 BLDG. 64 - SECURITY THIRD FLOOR OVERALL PLAN
TS-260-F.117.1 BLDG. 117 - SECURITY FIRST FLOOR OVERALL PLAN
TS-270-C.TB.1 BLDG. TB - SECURITY FIRST FLOOR OVERALL PLAN
TS-280-C.TE.1 BLDG. TE - SECURITY FIRST FLOOR OVERALL PLAN
TS-400-C.1.B SECURITY ENLARGED TDR PLANS
TS-401-C.1.1 SECURITY ENLARGED TDR PLANS
TS-402-C.1.2 SECURITY ENLARGED TDR PLANS
00 01 15 - 19
TS-403-C.1.3 SECURITY ENLARGED TDR PLANS
TS-404-C.1.4 SECURITY ENLARGED TDR PLANS
TS-405-C.1.5 SECURITY ENLARGED TDR PLANS
TS-406-C.1.6 SECURITY ENLARGED TDR PLANS
TS-407-C.1.7 SECURITY ENLARGED TDR PLANS
TS-408-C.1.8 SECURITY ENLARGED TDR PLANS
TS-409-C.1.9 SECURITY ENLARGED TDR PLANS
TS-410-C.2.B BLDG. 2 - SECURITY ENLARGED TDR PLANS
TS-411-C.2.1 BLDG. 2 - SECURITY ENLARGED TDR PLANS
TS-412-C.2.2 BLDG. 2 - SECURITY ENLARGED TDR PLANS
TS-420-C.3.B BLDG. 3 - SECURITY ENLARGED TDR PLANS
TS-430-C.8.2 BLDG. 8 - SECURITY ENLARGED TDR PLANS
TS-440-C.15.1 BLDG. 15 - SECURITY ENLARGED TDR PLANS
TS-450-F.64.B BLDG. 64 - SECURITY ENLARGED TDR PLANS
TS-451-F.64.1 BLDG. 64 - SECURITY ENLARGED TDR PLANS
TS-452-F.64.2 BLDG. 64 - SECURITY ENLARGED TDR PLANS
TS-453-F.64.3 BLDG. 64 - SECURITY ENLARGED TDR PLANS
TS-460-F.117.1 BLDG. 117 - SECURITY ENLARGED TDR PLANS
TS-470-C.TB.1 BLDG. TB - SECURITY ENLARGED TDR PLANS
TS-480-C.TE.1 BLDG. TE - SECURITY ENLARGED TDR PLANS
TS-500 SECURITY - TYPICAL DETAILS
TS-501 SECURITY - TYPICAL DETAILS
- - - E N D - - -
00 01 15 - 20
THIS PAGE LEFT INTENTIONALLY BLANK
CINCINNATI AND FORT THOMAS EHRM INFRASTRUCTURE UPGRADES
CINCINNATI VAMC, CINCINNATI OH 04-08-2022
00 00 20 - 1
SECTION 00 00 20
PHASING
The project is to address the EHRM Infrastructure Upgrades at Buildings 1, 2, 3, 8, 14, 15, and Trailers TB & TE within the Cincinnati Medical Center campus as well as select portions of the Fort Thomas campus.
The project scope includes telecom rooms, cable plant, and data center with the work following a phase sequence performed in the least disruptive manner possible and in accordance with infection control policies and requirements.
The submitted design was developed through a survey of existing conditions, existing documentation provided by the VA as well as a review of VA Guidelines. Multiple Space layout iterations were developed and presented to the Contracting Officer Representatives (COR) as well as the Integrated Project Team.
These meetings further developed the design for, a) functional areas/relationships, b) room sizing /Configurations, and c) circulation routes.
Reference specification Section 01 00 00 General Requirements 1.6 Operations & Storage Areas (FAR 52.236-10) Item I Phasing.
Methods of work and outages: Contractor shall comply with the following in addition to phasing as noted in later paragraphs:
In general, power outages shall NOT be allowed during standard facility hours of operation and shall be conducted on premium time. Specific time frame and schedule of all outages shall be approved by the Owner.
Temporary power shall be provided as required for any systems required for use during normal facility operating hours that is being interrupted to perform electrical work. Temporary power shall include extending circuits from adjacent distribution and by means of providing temporary generators, fuel and distribution. Temporary power shall be set up and installed so no power outage will be required during normal facility hours of operation.
Emergency power outages on life safety, critical or equipment branch systems may not take place at the same time as a normal power outage.
The General Contractor shall coordinate proper phasing of work for all disciplines as outlined in this document and noted in the design documents. In addition, the General Contractor shall conduct phasing meetings and coordinate phasing plan with the Owner. The below is provided to give general guidance and not to supersede any requirement for the contractor to provide a full detailed schedule.
The general project scope and phasing sequence is listed below. See Design drawings for further phasing notes and details.
Technology Phasing
Phase A: New TR Rooms – All work associated with new TR Rooms is a necessary predecessor for work to proceed to Phase B. The Contracting Officer, local facilities engineering, and the designated OIT representative must sign off on completion of the New TR Rooms prior to moving work into Phase B.
CINCINNATI VAMC, CINCINNATI OH 04-08-2022
00 00 20 - 2
Phase B: Room A437 Phase 1 – Technology Drawings indicate Room A437 to be constructed in three phases. ‘Phase 1’ on sheet TN-442-C.1.4 depicts the completed state of the phased conversion of this room. Room A437 Phase 1 completion includes 11 Cabinets and assumes they are fully operational and coordinated with all trades.
1. Any works in this room shall be coordinated in advance and all staff entering this space will require escorts unless otherwise agreed upon by OIT management. All equipment in this space is sensitive and care shall be taken to minimize any disruption to patient care.
2. It is intended that all associated work to enable these eleven racks are completed prior to moving to Phase D and must be signed off with the Contracting Officer, local facilities engineering, and the designated OIT representative.
3. ANY required activity by VA Staff to support this project MUST be agreed to NO LESS than 4 weeks in advance of any required activity. Delays caused by failing to identify these activities and gain acceptance of the scheduled requirement shall be borne by the contractor. No change orders for schedule will be accepted for a failure to schedule VA support in a timely fashion.
4. It is intended that the ‘Phase 1’ state of this room is to remain the temporary state until Phase D is underway minimally. This should allow sufficient time for OIT to migrate any hardware.
5. The cabinet indicated as “PHILIPS BIOMED” contains non-OIT fiber optic cabling. Special care must be taken not to damage this cabling and care was taken in selecting an immediately adjacent location for the cabinet. This system’s cabling is not part of the scope of the project but must remain intact in the equipment’s adjusted location.
6. OIT staff will require significant lead times and coordination of equipment movement within this space. Some of the equipment is leased and must be scheduled moves outside of the direct control of OIT staff. Progression of this room’s build out of this phase is at OIT’s discretion and cost of delay shall not be borne by VA if less than 4 weeks notice is not given for any required action by same.
7. Devices printed in dashed line types are shown in their current location while solid lines indicate their new/permanent location.
Phase C: Pathways and Risers – Installation of major pathways for vertical and horizontal distribution of cabling. It is intended that all associated work on pathways and risers are completed prior to moving to Phase D and must be signed off with the Contracting Officer, local facilities engineering, and the designated OIT representative.
1. Cable Tray and Pathways Demolition of old Cable Tray (J-Hook supports installed on existing threaded rods previously supporting cable tray for temporary support) Installation of new Cable Tray/Fire Sleeves in accordance with the Technology
Overall Sheets.
2. Fiber Optic Distribution :
Phase C0: Install all Fiber Optics in accordance with Sheet TN-600-C.1 terminating in “New Fiber Tree” locations indicated on sheet TN-442-C.1.4.
Phase C1: Building 2 hallway connector, install new conduit and fiber to serve the 3 TRs in Building 2 (basement, first floor, and second floor)
Phase C2: Building 1 and Building 3 existing conduit underground, can’t achieve diversity, pull next to/parallel to existing. One TR schedule for Building 3.
CINCINNATI VAMC, CINCINNATI OH 04-08-2022
00 00 20 - 3
Phase C2: Building 8 one TR scheduled to be relocated. Existing TR location is directly behind the main door to the room as is constantly being banged into.
Phase C3: Trailer TE and TB Phase C4: Fort Thomas Building 64 and Building 117. Existing TRs (one at each end of the trailer) are quite narrow and long spaces. Two additional TRs are scheduled while maintaining pathways at the ends.
Phase C5: Building 3 existing TR is located within an existing mechanical room.
New TR to be created in the west end of a conference room.
Phase C6: Building 15 has a bridge and basement connector to Building 1. One TR scheduled for first floor location.
Building 14: de-scoped/ yet not part of the project scope Building 16: not part of the project scope
Phase D: Migration and Horizontal Cabling – This phase is intended to happen cyclically as noted below.
1. Phase D0: Installation of Horizontal Cabling from TR to Zone Enclosure. Upon completion of a Zone Enclosure, Phase D1 can proceed for that ZE.
2. Phase D1: Installation of Cabling from Zone Enclosure to Work Area Outlets and Migration of data switches.
This phase must be coordinated with OIT staff and is intended to be completed one or two active TR rooms at a time cyclically until all rooms in the scope are completed.
This phase requires OIT switches to be positioned and programmed by VA Staff.
ANY required activity by VA Staff to support this project MUST be agreed to NO
LESS than 4 weeks in advance of any required activity. Delays caused by failing to identify these activities and gain acceptance of the scheduled requirement shall be borne by the contractor. No change orders for schedule will be accepted for a failure to schedule VA support in a timely fashion.
Phase D1a: Demo Cabling (as previously scheduled with VA) in the room(s) to the cable tray. Coordinate with OIT the rooms to be cut over to the New TR.
Phase D1b: Install and terminate cabling from Zone Enclosure to Work Area Outlets for the room(s)
Phase D1c: Test cabling, reinstall patch cables at Work Area Outlet, and install TR Room Patch cabling in coordination with OIT Switch programming. Validate devices have re-established connectivity.
Phase D1d: Complete demolition of the, now abandoned, horizontal cabling to the point of origin (local signals closets).
Phase E: Room A437 Phase 2
1. Technology Drawings indicate Room A437 to be constructed in three phases. ‘Phase 2’ on sheet TN-442-C.1.4 depicts the completed state of the phased conversion of this room.
2. This phase, ‘Room A437 Phase 2’, is intended to begin construction as soon as Phase B is accepted AND ‘Fiber Tree 2’ (existing fiber distribution rack) can be moved out of the way to allow the remaining phasing to continue.
3. It is not required that the entirety of the old fiber in ‘Fiber Tree 2’ to be removed prior to this phase progressing. Rather, it can and should be temporarily accommodated in place while the other phases remove connections from this rack. This rack and the fiber therein shall be removed as part of Phase G.
CINCINNATI VAMC, CINCINNATI OH 04-08-2022
00 00 20 - 4
Phase F: Room A437
1. Technology Drawings indicate Room A437 to be constructed in three phases. The Room’s final state is depicted on sheet TN-442-C.1.5 Detail 1.
2. This phase is intended to begin construction as soon as Phase E is accepted.
Phase G: Demolition
1. Any cabling that is unused/abandoned because of this project shall be removed…