This document is a plumbing narrative for the EHRM Infrastructure Upgrades project at the Cincinnati and Ft. Thomas VA campuses with project number 539-21-701. The narrative outlines the fire protection and plumbing scope of work, which includes demolishing existing sprinkler piping and fixtures in spaces becoming new telecommunications rooms. It also calls for installing new sprinkler systems compliant with NFPA 13 and VA standards in the new telecommunications rooms, as well as a new clean agent fire suppression system for a fourth floor data room. Additional requirements include providing drip pans, floor drains, and water sensors for protection from leaks.

View the file

Other files

File Type Posted
36C77623B0005 0004 - Extension 3-10-23.pdf PDF
Technical Questions and Answers - Cincinnati EHRM.pdf PDF
36C77623B0005 0003.pdf PDF
36C77623B0005 0002 - EHRM Infrastructure Upgrades - Cincinnati.pdf PDF
Site Visit Sign-In Sheet - 36C77632B0005 EHRM Infrastructure Construction - Cincinnati VAMC.pdf PDF
ATTACHMENT 24 - Construction Wage Rates - Hamilton 01-13-2023.pdf PDF
36C77623B0005 0001 - EHRM Infrastructure Upgrades - Cincinnati.pdf PDF
Site Visit Memorandum.pdf PDF
ATTACHMENT 4 - Drawings 3 of 13.pdf PDF
ATTACHMENT 23 - Contractor Safety - Environmental Form.pdf PDF
ATTACHMENT 6 - Drawings 5 of 13.pdf PDF
ATTACHMENT 18 - Technology Narrative.pdf PDF
ATTACHMENT 13 - Drawings 12 of 13.pdf PDF
ATTACHMENT 19 - Hazardous Materials Inspection Report.pdf PDF
ATTACHMENT 24 - Construction Wage Rates - Hamilton 1-13-2022.pdf PDF
ATTACHMENT 21 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 14 - Drawings 13 of 13.pdf PDF
ATTACHMENT 20 - Brand Name Justification.pdf PDF
ATTACHMENT 22 - Limitations on Subcontracting - Nov 2022.pdf PDF
ATTACHMENT 9 - Drawings 8 of 13.pdf PDF
ATTACHMENT 10 - Drawings 9 of 13.pdf PDF
ATTACHMENT 16 - Mechanical Narrative.pdf PDF
ATTACHMENT 7 - Drawings 6 of 13.pdf PDF
ATTACHMENT 3 - Drawings 2 of 13.pdf PDF
ATTACHMENT 17 - Electrical Narrative.pdf PDF
ATTACHMENT 2 - Drawings 1 of 13.pdf PDF
ATTACHMENT 25 - Site Visit Instructions.pdf PDF
ATTACHMENT 8 - Drawings 7 of 13.pdf PDF
ATTACHMENT 11 - Drawings 10 of 13.pdf PDF
ATTACHMENT 12 - Drawings 11 of 13.pdf PDF
ATTACHMENT 5 - Drawings 4 of 13.pdf PDF
36C77623B0005 Solicitation - Cincinnati EHRM.pdf PDF
ATTACHMENT 1 - Specifications.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CINCINNATI AND FT. THOMAS EHRM INFRASTRUCTURE UPGRADES

PROJECT #539-21-701

CINCINNATI VAMC, CINCINNATI, OH

1 | P a g e

DIVISION 21 FIRE PROTECTION/DIVISION 22 PLUMBING

1. GENERAL

A. The following design development narrative describes the fire protection and plumbing requirements for the EHRM Infrastructure Upgrades project at Cincinnati and Ft. Thomas VA campuses based on our understanding of the project scope and applicable codes, criteria, and regulatory standards.

2. DESIGN CONDITIONS AND APPLICABLE CODES

A. VA OIT - Infrastructure Standard for Telecommunications Spaces, Version 3.1

B. ASHRAE 90.1, 2013

C. NFPA 13 – Standard for the Installation of Sprinkler Systems D. NFPA 75 – Standard for the Fire Protection of Information Technology

Equipment E. VA Fire Protection Design Manual, 8th Edition.

3. DEMOLITION SCOPE

A. All existing sprinkler piping and heads currently serving the space that will become a new Telecommunications Room shall be demolished/reworked as required for the new room layout.

B. All existing plumbing and medical gas and vacuum piping that is just passing above the new TR space is to remain and will not be re-routed.

C. All existing plumbing fixtures currently located in the new Telecommunications Room shall be demolished as shown on the drawings.

D. Existing FM-200 Clean Agent system shall be demolished in its entirety.

4. NEW SCOPE

A. Install new sprinkler heads for each new TR room that complies with NFPA #13 and VA fire suppression requirements. Piping to be reworked as required for the new room layout.

B. New Tele Rooms in the TE and TB Trailers, along with Building 8 and the Parking Garage will not be provided with a wet type sprinkler system as these building do not have a sprinkler system.

C. Install a new clean agent fire suppression system for the 4th floor Data Room, A437C. Install new wet fire suppression system for the Data Room with shutoff valve and flow switch. Duct penetrations through data room shall require motorized dampers. Emergency lighting and emergency power off switches shall be provided. The CRAC units shall be capable of being shut off prior to the activation of the clean agent system.

D. Drip pans shall be provided for wet piping remaining in the new Telecom Rooms and Data Room.

E. Floor drain shall be provided in the floor of the data room with trap seal primer connection.

F. Water sensers shall be provided for all drip pans and the below the raised floor of the new data room.