ATTACHMENT 11 - Drawings 10 of 13.pdf
PDF 12 MB Posted
- Solicitation number
- 36C77623B0005
About this file
This document provides details on a federal solicitation opportunity for construction services. The solicitation number is 36C77623B0005 for the EHRM Infrastructure Upgrades - Cincinnati Project #539-21-701, issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The opportunity involves construction of EHRM Infrastructure Upgrades at the Cincinnati VAMC, requiring installation and upgrade of related systems. The attached file is a drawing related to the project scope. The response deadline and award date are not specified.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A/C Shaft
IRM
Network
Operation
Center A437
Comp.
Programmer
Off.
A439
Computer
Tlt.
A439A
Staff
Physician B403A
Neuro
Office B439
Regular
E.E.G B403B
E.E.G.
Control &
Observation B403
F. Tlt.
B406
M. Tlt.
B407
Auto-Clave
Dishwasher B408
HAC
B409
Elec.
B410
LAB.
Procedure
Rm B411
W. Lab.
B412
Ram Lab.
B412A
Tissue
Culture B412B
Office B412C
Stair 4 S*4*4
Electrophoresis
Core B413A
RAM Lab.
B413B
Corridor C*4*5
Infectious
Disease
Lab B414
Hazardous
Compounding B414B
Non-Hazardous
Compounding B414D Office
B415
Cold Rm.
B415A
Freez.
B415B
Sig. Clos.
B416
Elec.
B417
Stair 3 S*4*3
Research
Adm. Off.
B420
Adm. Off.
B420B
CFBRE Off.
B421
Conf.
B425
Clos.
B425A
Office B426A
Associate
Chief of
Staff/Research B426
Office B427
Office B428
HAC
B429
Refrig.
B430
Elec.
B431
Lab B432
Tissue
Culture B433A
Mic Rotomy B435
Microscope
Core B436
Office B437
Evoked
Potential
Lab B438
Copier
Room B437A
Corridor B429A
Director's
Office B429B
Hazardous
Storage B414A
Work
Station
Area B414
Ante Room B414C
DN
DN
UP
UP
2 2
2 2 2
2 2
2 2
2 2
2 2
2 22
TN-421-C.1.4
LOW VOLTAGE/ IT
Ross & Baruzzini Inc.
1600 Riveredge Parkway NW Suite 900 Atlanta, GA 30328
Project Number
Building Number
Drawing Number
Drawn By:Checked By:Issue Date:
Location
Project TitlePhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANT
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
100% CONSTRUCTION
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
Scale:
FULLY SPRINKLERED
1/8" = 1'-0"
TN-151-C.1.4
TECHNOLOGY FOURTH FLOOR
PARTIAL PLAN - A
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST. CINCINNATI, OH. 45220
539-21-701
TL
04-MAY-2022
PR
C1
1/8" = 1'-0"
TECHNOLOGY FOURTH FLOOR PARTIAL PLAN - A
D
B
A
GENERAL NOTES:
KEYED NOTES:
1. EXISTING TELECOMMUNICATIONS ROOM.
2. EXISTING CONDITIONS WERE NOT OBSERVED. DATA SHOWN IN
ROOM IS AN ESTIMATE OF WHAT WILL BE REQUIRED.
TRUE NORTH PLAN NORTH
Description Date
1. REFER TO SHEET T-000 FOR GENERAL NOTES AND LEGENDS.
2. ALL HORIZONTAL CABLING ON THIS FLOOR TO BE TERMINATED IN
TR-4.
3. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES OF THE
SIZE AS INDICATED ON THE PLANS. REFER TO SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING AND SECTION 27 05 33
RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS.
4. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE
DRILLING. CONTRACTOR SHALL COORDINATE WITH THE COR BEFORE
BEGINNING DRILLING.
5. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY SPARE
RISER SLEEVES. REFER TO SECTION 07 84 00 FIRESTOPPING.
6. CONTRACTOR SHALL INSTALL AN VERTICAL LADDER TYPE CABLE
TRAY ON THE WALL ABOVE THE VERTICAL RISER SLEEVES FOR
BACKBONE CABLE SUPPORT AS INDICATED ON THE PLANS. THE
CABLE TRAY SHALL BE SECURELY ANCHORED TO THE WALL
SUFFICIENT TO SUPPORT THE TOTAL WEIGHT OF CABLES AND CABLE
TRAY PLUS 50%.
7. CONTRACTOR SHALL INSTALL CABLE SUPPORTS SUFFICIENT TO
SUPPORT COMMUNICATIONS CABLES ON THE VERTICAL CABLE TRAY
WITHOUT DAMAGING OR DEFORMING THE CABLE.
8. CONTRACTOR SHALL LABEL EACH CABLE AT 42 INCHES A.F.F. ON
EACH FLOOR. REFER TO SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
9. CONTRACTOR SHALL INSTALL NEW J-HOOKS WHERE THERE IS NO
CABLE TRAY OR COMMUNICATIONS CONDUIT UNLESS OTHERWISE
NOTED.
10. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A PATCH PANELS IN
THE TELECOMMUNICATION ROOM AS INDICATED ON RACK
ELEVATIONS.
11. CONTRACTOR SHALL RE-TERMINATE AND TEST CABLING REMOVED
FROM ANY WALL MOUNT EQUIPMENT UNLESS OTHERWISE NOTED.
TESTING SHALL BE PERFORMED BY THE CONTRACTOR DURING
COMMISSIONING.
12. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A
TELECOMMUNICATIONS/DATA OUTLET AS INDICATED. EXISTING
COMMUNICATION OUTLET BOXES AND CONDUITS TO BE REUSED.
13. CONTRACTOR SHALL REPLACE ALL DATA CABLE WITH NEW
CATEGORY 6A CABLE UNLESS OTHERWISE NOTED.
14. CONTRACTOR SHALL TERMINATE COMMUNICATIONS CABLES WITH
NEW CATEGORY MODULAR JACKS TO MATCH THE COMMUNICATION
CABLE PERFORMANCE SPECIFICATIONS. NEW MODULAR JACKS
SHALL BE OF THE SAME MANUFACTURER AS THE FACE PLATES,
PATCH PANELS, AND PATCH CABLES.
15. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A CABLES AND
CONNECTIVITY COMPONENTS THAT ARE OF THE SAME
MANUFACTURER, INCLUDING CABLE, MODULAR JACKS, PATCH
PANELS, FACEPLATES, AND PATCH CABLES.
16. CONTRACTOR SHALL TEST ALL NEW AND EXISTING RE-TERMINATED
CABLES IN ACCORDANCE WITH THE SPECIFICATION 27 08 00.
A/C ShaftA/C Shaft
Reception A400
Interview A401
Interview A401A
Reception A401BInterview
A402A
HAC
A403
Stor.
A404
Med Room A405
Exam Rm.
A406
Exam Rm.
A407
Exam Rm.
A408
Exam Rm.
A409
Exam Rm.
A410
Exam Rm.
A411
Exam Rm.
A412
Exam Rm.
A413
Exam Rm.
A414
Exam Rm.
A415
Exam Rm.
A416
Exam Rm.
A417
Stor.
A418
Elec.
A418A
Stor.
A420
Staff Tlt.
A421
HSRD
Office A422
Dr's
Off.
A423
HSRD
Off.
A424
Oncology
Pharmacy
Sattelite A425
Chemo
Prep.
A425A
IRM Office A427
Stair 2 S*4*2
HSRD
Off.
A424A
Comp.
Training A430
Comp.
Specialist
Off.
A431
Service
Lobby A436
Computer
Off.
A440
A441
Res. Off.
A442
Stair 1 S*4*1
IRM
Storage
(Hdwr) A444
Elec.
A445
Toilet A446
Toilet A446A
IRM
Storage
(Comm) A445A
Infusion A449
Tlt.
A449A
Exam 9 A469
Exam 7 A470
Exam 5 A471
Exam 3 A472
Exam 1 A473
Exam A474
HAC
A477
Waiting A478
Waiting A402B
Trash
Chute A435
Stor.
A436A
Elec.
A436B
Comp. Rm.
A437C
Stor.
A444A
Corridor C*4*2
HSRD
Off.
A424E
HSRD
Off.
A424D
Common
Area A424C
Dir.
Off.
A424B
Dr's
Off.
A423A
Social
Worker A422A
Tlt.
A406A
HSRD
Off.
A424F
HSRD
Off.
A424G
A442A
Corridor C*4*1
Elec.
A424H
Tlt.
A416A
Tlt.
A414A
Tlt.
A413A
Tlt.
A410A
Tlt.
A408A
Tlt.
A407A
Telecom Room
UP
DN
UP
DN
TN-420-C.1.4
2 2
2 2
2 2
TR-4
SR-4
TN-421-C.1.4
LOW VOLTAGE/ IT
Ross & Baruzzini Inc.
1600 Riveredge Parkway NW Suite 900 Atlanta, GA 30328
Project Number
Building Number
Drawing Number
Drawn By:Checked By:Issue Date:
Location
Project TitlePhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANT
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
100% CONSTRUCTION
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
Scale:
FULLY SPRINKLERED
1/8" = 1'-0"
TN-152-C.1.4
TECHNOLOGY FOURTH FLOOR
PARTIAL PLAN - B
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST. CINCINNATI, OH. 45220
539-21-701
TL
04-MAY-2022
PR
C1
1/8" = 1'-0"
TECHNOLOGY FOURTH FLOOR PARTIAL PLAN - B
D B
A
GENERAL NOTES:
KEYED NOTES:
1. EXISTING TELECOMMUNICATIONS ROOM.
2. EXISTING CONDITIONS WERE NOT OBSERVED. DATA SHOWN IN
ROOM IS AN ESTIMATE OF WHAT WILL BE REQUIRED.
3. PROVIDE (4) 4" CONDUITS TO TR ON LEVEL ABOVE.
TRUE NORTH PLAN NORTH
Description Date
1. REFER TO SHEET T-000 FOR GENERAL NOTES AND LEGENDS.
2. ALL HORIZONTAL CABLING ON THIS FLOOR TO BE TERMINATED IN
TR-4.
3. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES OF THE
SIZE AS INDICATED ON THE PLANS. REFER TO SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING AND SECTION 27 05 33
RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS.
4. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE
DRILLING. CONTRACTOR SHALL COORDINATE WITH THE COR BEFORE
BEGINNING DRILLING.
5. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY SPARE
RISER SLEEVES. REFER TO SECTION 07 84 00 FIRESTOPPING.
6. CONTRACTOR SHALL INSTALL AN VERTICAL LADDER TYPE CABLE
TRAY ON THE WALL ABOVE THE VERTICAL RISER SLEEVES FOR
BACKBONE CABLE SUPPORT AS INDICATED ON THE PLANS. THE
CABLE TRAY SHALL BE SECURELY ANCHORED TO THE WALL
SUFFICIENT TO SUPPORT THE TOTAL WEIGHT OF CABLES AND CABLE
TRAY PLUS 50%.
7. CONTRACTOR SHALL INSTALL CABLE SUPPORTS SUFFICIENT TO
SUPPORT COMMUNICATIONS CABLES ON THE VERTICAL CABLE TRAY
WITHOUT DAMAGING OR DEFORMING THE CABLE.
8. CONTRACTOR SHALL LABEL EACH CABLE AT 42 INCHES A.F.F. ON
EACH FLOOR. REFER TO SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
9. CONTRACTOR SHALL INSTALL NEW J-HOOKS WHERE THERE IS NO
CABLE TRAY OR COMMUNICATIONS CONDUIT UNLESS OTHERWISE
NOTED.
10. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A PATCH PANELS IN
THE TELECOMMUNICATION ROOM AS INDICATED ON RACK
ELEVATIONS.
11. CONTRACTOR SHALL RE-TERMINATE AND TEST CABLING REMOVED
FROM ANY WALL MOUNT EQUIPMENT UNLESS OTHERWISE NOTED.
TESTING SHALL BE PERFORMED BY THE CONTRACTOR DURING
COMMISSIONING.
12. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A
TELECOMMUNICATIONS/DATA OUTLET AS INDICATED. EXISTING
COMMUNICATION OUTLET BOXES AND CONDUITS TO BE REUSED.
13. CONTRACTOR SHALL REPLACE ALL DATA CABLE WITH NEW
CATEGORY 6A CABLE UNLESS OTHERWISE NOTED.
14. CONTRACTOR SHALL TERMINATE COMMUNICATIONS CABLES WITH
NEW CATEGORY MODULAR JACKS TO MATCH THE COMMUNICATION
CABLE PERFORMANCE SPECIFICATIONS. NEW MODULAR JACKS
SHALL BE OF THE SAME MANUFACTURER AS THE FACE PLATES,
PATCH PANELS, AND PATCH CABLES.
15. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A CABLES AND
CONNECTIVITY COMPONENTS THAT ARE OF THE SAME
MANUFACTURER, INCLUDING CABLE, MODULAR JACKS, PATCH
PANELS, FACEPLATES, AND PATCH CABLES.
Infusion A449
Stair 5 S*4*5
Sub. Lab.
A453 Pharm.
A454
Exam A455
Elec.
A456
Stor.
A457A
S.B.
A457B
Tlt.
A457C
D.B.
A457D
Proc.
A457E
Nurse
Station A457F
Lab.
A457G
Exam A458
Exam A458A
Exam A458B
Exam A458C
Elec.
A459
Stor.
A460
Soil. Util.
A461
CL. Lin.
A462
Exam A463
Exam 2 A464
Exam 4 A465
Exam 6 A466
Exam 8 A467
Exam 10 A468
Exam 9 A469
Exam 7 A470
Exam 5 A471
Exam 3 A472
Exam 1 A473
Exam A474
KIT.
A475
Supp.
A476
HAC
A477
GCRC
Corridor A457
Tlt.
A457H
Tlt.
A474A
Tlt.
A464A
Tlt.
A473A
Tlt.
A465A
Tlt.
A471A
Tlt.
A467A
Tlt.
A470A
Tlt.
A463A
DNUP
222 2
2 2
2 2
2 2
LOW VOLTAGE/ IT
Ross & Baruzzini Inc.
1600 Riveredge Parkway NW Suite 900 Atlanta, GA 30328
Project Number
Building Number
Drawing Number
Drawn By:Checked By:Issue Date:
Location
Project TitlePhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANT
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
100% CONSTRUCTION
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
Scale:
FULLY SPRINKLERED
1/8" = 1'-0"
TN-153-C.1.4
TECHNOLOGY FOURTH FLOOR
PARTIAL PLAN - D
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST. CINCINNATI, OH. 45220
539-21-701
TL
04-MAY-2022
PR
C1
1/8" = 1'-0"
TECHNOLOGY FOURTH FLOOR PARTIAL PLAN - D
D B
A
GENERAL NOTES:
KEYED NOTES:
1. EXISTING TELECOMMUNICATIONS ROOM.
2. EXISTING CONDITIONS WERE NOT OBSERVED. DATA SHOWN IN
ROOM IS AN ESTIMATE OF WHAT WILL BE REQUIRED.
TRUE NORTH PLAN NORTH
Description Date
1. REFER TO SHEET T-000 FOR GENERAL NOTES AND LEGENDS.
2. ALL HORIZONTAL CABLING ON THIS FLOOR TO BE TERMINATED IN
TR-4.
3. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES OF THE
SIZE AS INDICATED ON THE PLANS. REFER TO SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING AND SECTION 27 05 33
RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS.
4. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE
DRILLING. CONTRACTOR SHALL COORDINATE WITH THE COR BEFORE
BEGINNING DRILLING.
5. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY SPARE
RISER SLEEVES. REFER TO SECTION 07 84 00 FIRESTOPPING.
6. CONTRACTOR SHALL INSTALL AN VERTICAL LADDER TYPE CABLE
TRAY ON THE WALL ABOVE THE VERTICAL RISER SLEEVES FOR
BACKBONE CABLE SUPPORT AS INDICATED ON THE PLANS. THE
CABLE TRAY SHALL BE SECURELY ANCHORED TO THE WALL
SUFFICIENT TO SUPPORT THE TOTAL WEIGHT OF CABLES AND CABLE
TRAY PLUS 50%.
7. CONTRACTOR SHALL INSTALL CABLE SUPPORTS SUFFICIENT TO
SUPPORT COMMUNICATIONS CABLES ON THE VERTICAL CABLE TRAY
WITHOUT DAMAGING OR DEFORMING THE CABLE.
8. CONTRACTOR SHALL LABEL EACH CABLE AT 42 INCHES A.F.F. ON
EACH FLOOR. REFER TO SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
9. CONTRACTOR SHALL INSTALL NEW J-HOOKS WHERE THERE IS NO
CABLE TRAY OR COMMUNICATIONS CONDUIT UNLESS OTHERWISE
NOTED.
10. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A PATCH PANELS IN
THE TELECOMMUNICATION ROOM AS INDICATED ON RACK
ELEVATIONS.
11. CONTRACTOR SHALL RE-TERMINATE AND TEST CABLING REMOVED
FROM ANY WALL MOUNT EQUIPMENT UNLESS OTHERWISE NOTED.
TESTING SHALL BE PERFORMED BY THE CONTRACTOR DURING
COMMISSIONING.
12. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A
TELECOMMUNICATIONS/DATA OUTLET AS INDICATED. EXISTING
COMMUNICATION OUTLET BOXES AND CONDUITS TO BE REUSED.
13. CONTRACTOR SHALL REPLACE ALL DATA CABLE WITH NEW
CATEGORY 6A CABLE UNLESS OTHERWISE NOTED.
14. CONTRACTOR SHALL TERMINATE COMMUNICATIONS CABLES WITH
NEW CATEGORY MODULAR JACKS TO MATCH THE COMMUNICATION
CABLE PERFORMANCE SPECIFICATIONS. NEW MODULAR JACKS
SHALL BE OF THE SAME MANUFACTURER AS THE FACE PLATES,
PATCH PANELS, AND PATCH CABLES.
15. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A CABLES AND
CONNECTIVITY COMPONENTS THAT ARE OF THE SAME
MANUFACTURER, INCLUDING CABLE, MODULAR JACKS, PATCH
PANELS, FACEPLATES, AND PATCH CABLES.
Telecom Room
A540
Elec.
A537A
Work Room A537F
Exam
Room 5 A555
Clos.
A556
Exam
Room 4 A557A
Surgery
Office A557B
Procedure
Room A557C
Procedure
Room A557D
Exam A558
Waiting
Area A559
Clerk A559A
Class Rm.
A564
Exam 7 A566
Exam 6 A567
Exam 5 A568
Elec.
A560
Tele A561
Soil A562
HAC
A562A
Stor.
A563A
Pain Nurse A563
Stor.
A564A
Stor.
A565A
Supp Clos A567A
Corridor C*5*4
Telesurgery
Office A554
Tlt.
A553
Skin and
Wound
Care Clinic A551
Closet A551A
Stor.
A551B
Stair 5 S*5*5
Medical
Service
Office B537
Medical
Service B538
Office B539
Chief Office B540
Adm Asst.
A541
Chief Med.
Svc.
A542
Dirty
Equipment A537B
Db. Wtr.
A539
Storage A537E
Clean
Supply A537D
Oxygen
Storage
Equipment
Room A537C
Office B537A
Med Svc B501
Office B503
Office B504
Conferece
Room B523
Cleric B524
Rolling
Storage B525
IV
Ante-Room B526
IV Prep B526A
IV Buff B526B
Closet B526C
Tlt.
B503A
Storage B506
Conference
Rm.
B507
Office B508
Office B509
Office B510
Office B511
Office B512
Office B513
Office B514
Office B515
Office B516
Office B517
Storage B515A
Closet B507A
Dispensing
Area B536
Office B535C
Stair 3 S*5*3
Storage B505H
Sig. Clos.
B505G
Office B518
Corridor C*5*5
Office B505
Tlt.
B505A
Elec.
B505B
HAC
B521E
Stor.
B518A
Staff Tlt.
B535B
Stor.
B521D
Elec.
B521B
Cart Stor.
B535
Narc. Vault B521A Chief
B522
Compound
Picking B527Unit Dose
B535A
Corridor C*5*1
Closet A554A
MICU
Penthouse B505D
Fan Room B505E
Stair 4 S*5*4
DNUP
DN
UP
DN
N
S.R.
A519
S.R.
A522
Soil. Util.
A515
Nurse Manager
A528
S.R
A512
S.R.
A511
Clean Supply
A5093
Storage
A5087
Storage
A5100
Nourishment
A508
Single Room
A504
Clean Linen
A5083
Staff Toilet
A5085
Nurse Station
A506
Single Room
- Bariatric
A5097
Single Room
- Bariatric
A5098
Single Room
- Bariatric
A5099
Single Room
- Bariatric
A5086
Single Room
- Negative Pressure
A5088Single Room
- Negative Pressure
A5089
Single Room
A5090Single Room
- Negative Pressure
A5091 Single Room
- Bariatric Negative Pressure
A5092
Signals
A5094
Elec.
A5095
HAC
A5084
Family Lounge
A578HUC
A581 Consult
A580
Staff Lounge
A510
Telem.
A509
Elec.
A514
Office
A582
Meds
A505
Physical Therapy
A579
Staff Tlt
A513
D.R.
A501
D.R.
A502
Elec.
A516
D.R.
A517D.R.
A518
D.R.
A520
D.R.
A521
D.R.
A523
Storage
A525
S.R.
A526
S.R.
A527
Bath
A511A
Bath
A512A
Bath
A521A
Bath
A520A
Bath
A522A
Bath
A519A
Corridor
C-5-1
Bath
A523A
Bath
A518A
Bath
A517A
Bath
A526A
Bath
A502A
Bath
A501A
Bath
A527A
Corridor
C-5-2
Storage
A549
Corridor
C-5-1
Corridor
C-5-1
Toilet
A5097A
Toilet
A5098A Toilet
A5099A Toilet
A5086A
Toilet
A5088A Toilet
A5089A
Toilet
A5090A
Toilet
A5091A
Toilet
A5092A
Areaway
A-1
Areaway
A-2
Corridor
C-5-4
Anteroom
A5092B
Anteroom
A5091B
Corridor
C-5-1
Clean Linen
A524
Pgm. Supp.
Asst.
A575
Tlt.
A577
Waiting Area
A550
Office
A574
Staff Physician
A573
Exam 1
A572
Exam 2
A571
Exam 3
A570
Exam 4
A569
Stair #11
A5096
Clean Supply
A503
Bath
A504B
A L
IG
N
UPUP
(2) SS04
(2) SS04
(2) SS04
(2) SS04
TR-5
(4) SS04
LOW VOLTAGE/ IT
Ross & Baruzzini Inc.
1600 Riveredge Parkway NW Suite 900 Atlanta, GA 30328
Project Number
Building Number
Drawing Number
Drawn By:Checked By:Issue Date:
Location
Project TitlePhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANT
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
100% CONSTRUCTION
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
Scale:
FULLY SPRINKLERED
1/16" = 1'-0"
TN-160-C.1.5
TECHNOLOGY FIFTH FLOOR OVERALL
PLAN
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST. CINCINNATI, OH. 45220
539-21-701
TL
04-MAY-2022
PR
C1
1/16" = 1'-0"
TECHNOLOGY FIFTH FLOOR OVERALL PLAN
GENERAL NOTES:
KEYED NOTES:
1. EXISTING TELECOMMUNICATIONS ROOM.
2. PROVIDE (4) 4" CONDUITS TO TR ON LEVEL BELOW.
3. PROVIDE (4) 4" CONDUITS TO TR ON LEVEL ABOVE.
4. 12 INCH X 4 INCH WIRE MESH CABLE TRAY
D B
A
TRUE NORTH PLAN NORTH
1. REFER TO SHEET T-000 FOR GENERAL NOTES AND LEGENDS.
2. ALL HORIZONTAL CABLING ON THIS FLOOR TO BE TERMINATED IN
TR-5.
3. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES OF THE
SIZE AS INDICATED ON THE PLANS. REFER TO SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING AND SECTION 27 05 33
RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS.
4. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE
DRILLING. CONTRACTOR SHALL COORDINATE WITH THE COR BEFORE
BEGINNING DRILLING.
5. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY SPARE
RISER SLEEVES. REFER TO SECTION 07 84 00 FIRESTOPPING.
6. CONTRACTOR SHALL INSTALL AN VERTICAL LADDER TYPE CABLE
TRAY ON THE WALL ABOVE THE VERTICAL RISER SLEEVES FOR
BACKBONE CABLE SUPPORT AS INDICATED ON THE PLANS. THE
CABLE TRAY SHALL BE SECURELY ANCHORED TO THE WALL
SUFFICIENT TO SUPPORT THE TOTAL WEIGHT OF CABLES AND CABLE
TRAY PLUS 50%.
7. CONTRACTOR SHALL INSTALL CABLE SUPPORTS SUFFICIENT TO
SUPPORT COMMUNICATIONS CABLES ON THE VERTICAL CABLE TRAY
WITHOUT DAMAGING OR DEFORMING THE CABLE.
8. CONTRACTOR SHALL LABEL EACH CABLE AT 42 INCHES A.F.F. ON
EACH FLOOR. REFER TO SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
9. CONTRACTOR SHALL INSTALL NEW J-HOOKS WHERE THERE IS NO
CABLE TRAY OR COMMUNICATIONS CONDUIT UNLESS OTHERWISE
NOTED.
10. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A PATCH PANELS IN
THE TELECOMMUNICATION ROOM AS INDICATED ON RACK
ELEVATIONS.
11. CONTRACTOR SHALL RE-TERMINATE AND TEST CABLING REMOVED
FROM ANY WALL MOUNT EQUIPMENT UNLESS OTHERWISE NOTED.
TESTING SHALL BE PERFORMED BY THE CONTRACTOR DURING
COMMISSIONING.
12. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A
TELECOMMUNICATIONS/DATA OUTLET AS INDICATED. EXISTING
COMMUNICATION OUTLET BOXES AND CONDUITS TO BE REUSED.
13. CONTRACTOR SHALL REPLACE ALL DATA CABLE WITH NEW
CATEGORY 6A CABLE UNLESS OTHERWISE NOTED.
14. CONTRACTOR SHALL TERMINATE COMMUNICATIONS CABLES WITH
NEW CATEGORY MODULAR JACKS TO MATCH THE COMMUNICATION
CABLE PERFORMANCE SPECIFICATIONS. NEW MODULAR JACKS
SHALL BE OF THE SAME MANUFACTURER AS THE FACE PLATES,
PATCH PANELS, AND PATCH CABLES.
15. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A CABLES AND
CONNECTIVITY COMPONENTS THAT ARE OF THE SAME
MANUFACTURER, INCLUDING CABLE, MODULAR JACKS, PATCH
PANELS, FACEPLATES, AND PATCH CABLES.
16. CONTRACTOR SHALL TEST ALL NEW AND EXISTING RE-TERMINATED
CABLES IN ACCORDANCE WITH THE SPECIFICATION 27 08 00.
Description Date
ADDENDUM 1 4/29/2022
Medical
Service
Office B537
Medical
Service B538
Office B539
Chief Office
Dirty
Equipment A537B
Db. Wtr.
A539
Oxygen
Storage
Equipment
Room A537C
Office B537A
Med Svc B501
Office B503
Office B504
Conferece
Room B523
Cleric B524
Rolling
Storage B525
IV
Ante-Room B526
IV Prep B526A
IV Buff B526B
Closet B526C
Tlt.
B503A
Storage B506
Conference
Rm.
B507
Office B508
Office B509
Office B510
Office B511
Office B512
Office B513
Office B514
Office B515
Office B516
Office B517
Storage B515A
Closet B507A
Dispensing
Area B536
Office B535C
Stair 3 S*5*3
Storage B505H
Sig. Clos.
B505G
Office B518
Corridor C*5*5
Office B505
Tlt.
B505A
Elec.
B505B
HAC
B521E
Stor.
B518A
Staff Tlt.
B535B
Stor.
B521D
Elec.
B521B
Cart Stor.
B535
Narc. Vault B521A Chief
B522
Compound
Picking B527Unit Dose
B535A
MICU
Penthouse B505D
Fan Room B505E
Stair 4 S*5*4
DN
UP
DN
1 2
2 2
2 2
LOW VOLTAGE/ IT
Ross & Baruzzini Inc.
1600 Riveredge Parkway NW Suite 900 Atlanta, GA 30328
Project Number
Building Number
Drawing Number
Drawn By:Checked By:Issue Date:
Location
Project TitlePhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANT
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
100% CONSTRUCTION
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
Scale:
FULLY SPRINKLERED
1/8" = 1'-0"
TN-161-C.1.5
TECHNOLOGY FIFTH FLOOR PARTIAL
PLAN - A
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST. CINCINNATI, OH. 45220
539-21-701
TL
04-MAY-2022
PR
C1
1/8" = 1'-0"
TECHNOLOGY FIFTH FLOOR PARTIAL PLAN - A
D B
A
GENERAL NOTES:
KEYED NOTES:
1. EXISTING TELECOMMUNICATIONS ROOM.
2. EXISTING CONDITIONS WERE NOT OBSERVED. DATA SHOWN IN
ROOM IS AN ESTIMATE OF WHAT WILL BE REQUIRED.
TRUE NORTH PLAN NORTH
Description Date
1. REFER TO SHEET T-000 FOR GENERAL NOTES AND LEGENDS.
2. ALL HORIZONTAL CABLING ON THIS FLOOR TO BE TERMINATED IN
TR-5.
3. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES OF THE
SIZE AS INDICATED ON THE PLANS. REFER TO SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING AND SECTION 27 05 33
RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS.
4. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE
DRILLING. CONTRACTOR SHALL COORDINATE WITH THE COR BEFORE
BEGINNING DRILLING.
5. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY SPARE
RISER SLEEVES. REFER TO SECTION 07 84 00 FIRESTOPPING.
6. CONTRACTOR SHALL INSTALL AN VERTICAL LADDER TYPE CABLE
TRAY ON THE WALL ABOVE THE VERTICAL RISER SLEEVES FOR
BACKBONE CABLE SUPPORT AS INDICATED ON THE PLANS. THE
CABLE TRAY SHALL BE SECURELY ANCHORED TO THE WALL
SUFFICIENT TO SUPPORT THE TOTAL WEIGHT OF CABLES AND CABLE
TRAY PLUS 50%.
7. CONTRACTOR SHALL INSTALL CABLE SUPPORTS SUFFICIENT TO
SUPPORT COMMUNICATIONS CABLES ON THE VERTICAL CABLE TRAY
WITHOUT DAMAGING OR DEFORMING THE CABLE.
8. CONTRACTOR SHALL LABEL EACH CABLE AT 42 INCHES A.F.F. ON
EACH FLOOR. REFER TO SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
9. CONTRACTOR SHALL INSTALL NEW J-HOOKS WHERE THERE IS NO
CABLE TRAY OR COMMUNICATIONS CONDUIT UNLESS OTHERWISE
NOTED.
10. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A PATCH PANELS IN
THE TELECOMMUNICATION ROOM AS INDICATED ON RACK
ELEVATIONS.
11. CONTRACTOR SHALL RE-TERMINATE AND TEST CABLING REMOVED
FROM ANY WALL MOUNT EQUIPMENT UNLESS OTHERWISE NOTED.
TESTING SHALL BE PERFORMED BY THE CONTRACTOR DURING
COMMISSIONING.
12. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A
TELECOMMUNICATIONS/DATA OUTLET AS INDICATED. EXISTING
COMMUNICATION OUTLET BOXES AND CONDUITS TO BE REUSED.
13. CONTRACTOR SHALL REPLACE ALL DATA CABLE WITH NEW
CATEGORY 6A CABLE UNLESS OTHERWISE NOTED.
14. CONTRACTOR SHALL TERMINATE COMMUNICATIONS CABLES WITH
NEW CATEGORY MODULAR JACKS TO MATCH THE COMMUNICATION
CABLE PERFORMANCE SPECIFICATIONS. NEW MODULAR JACKS
SHALL BE OF THE SAME MANUFACTURER AS THE FACE PLATES,
PATCH PANELS, AND PATCH CABLES.
15. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A CABLES AND
CONNECTIVITY COMPONENTS THAT ARE OF THE SAME
MANUFACTURER, INCLUDING CABLE, MODULAR JACKS, PATCH
PANELS, FACEPLATES, AND PATCH CABLES.
Room
A540
Elec.
A537A
Work Room A537F
Chief Office B540
Adm Asst.
A541
Chief Med.
Svc.
A542
Storage A537E
Clean
Supply A537D
Corridor C*5*1
N
S.R.
A519
S.R.
A522
Soil. Util.
A515
Nurse Manager
A528
S.R
A512
S.R.
A511
Clean Supply
A5093
Storage
A5087
Storage
A5100
Nourishment
A508
Single Room
A504
Clean Linen
A5083
Staff Toilet
A5085
Nurse Station
A506
Single Room
- Bariatric
A5097
Single Room
- Bariatric
A5098
Single Room
- Bariatric
A5099
Single Room
- Bariatric
A5086
Single Room
- Negative Pressure
A5088Single Room
- Negative Pressure
A5089
Single Room
A5090Single Room
- Negative Pressure
A5091 Single Room
- Bariatric Negative Pressure
A5092
Signals
A5094
Elec.
A5095
HAC
A5084
Family Lounge
A578HUC
A581 Consult
A580
Staff Lounge
A510
Telem.
A509
Elec.
A514
Office
A582
Meds
A505
Physical Therapy
A579
Staff Tlt
A513
D.R.
A501
D.R.
A502
Elec.
A516
D.R.
A517D.R.
A518
D.R.
A520
D.R.
A521
D.R.
A523
Storage
A525
S.R.
A526
S.R.
A527
Bath
A511A
Bath
A512A
Bath
A521A
Bath
A520A
Bath
A522A
Bath
A519A
Corridor
C-5-1
Bath
A523A
Bath
A518A
Bath
A517A
Bath
A526A
Bath
A502A
Bath
A501A
Bath
A527A
Corridor
C-5-2
Storage
A549
Corridor
C-5-1
Corridor
C-5-1
Toilet
A5097A
Toilet
A5098A Toilet
A5099A Toilet
A5086A
Toilet
A5088A Toilet
A5089A
Toilet
A5090A
Toilet
A5091A
Toilet
A5092A
Areaway
A-1
Areaway
A-2
Corridor
C-5-4
Anteroom
A5092B
Anteroom
A5091B
Corridor
C-5-1
Clean Linen
A524
Pgm. Supp.
Tlt.
A577
Physician
Exam 1
A572
Exam 2
A571
Exam 3
Exam 4
Stair #11
A5096
Clean Supply
A503
Bath
A504B
A L
IG
N
ALIGN
UPUP
2 2 2
1 1
1 1
1 1
TN-425-C.1.5
TR-5
2 2
2 2
2 2 2
LOW VOLTAGE/ IT
Ross & Baruzzini Inc.
1600 Riveredge Parkway NW Suite 900 Atlanta, GA 30328
Project Number
Building Number
Drawing Number
Drawn By:Checked By:Issue Date:
Location
Project TitlePhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANT
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
100% CONSTRUCTION
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
Scale:
FULLY SPRINKLERED
1/8" = 1'-0"
TN-162-C.1.5
TECHNOLOGY FIFTH FLOOR PARTIAL
PLAN - B
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST. CINCINNATI, OH. 45220
539-21-701
TL
04-MAY-2022
PR
C1
1/8" = 1'-0"
TECHNOLOGY FIFTH FLOOR PARTIAL PLAN - B
D B
A
GENERAL NOTES:
KEYED NOTES:
1. EXISTING TELECOMMUNICATIONS ROOM.
2. EXISTING CONDITIONS WERE NOT OBSERVED. DATA SHOWN IN
ROOM IS AN ESTIMATE OF WHAT WILL BE REQUIRED.
3. PROVIDE (4) 4" CONDUITS TO TR ON LEVEL BELOW.
4. PROVIDE (4) 4" CONDUITS TO TR ON LEVEL ABOVE.
TRUE NORTH PLAN NORTH
Description Date
1. REFER TO SHEET T-000 FOR GENERAL NOTES AND LEGENDS.
2. ALL HORIZONTAL CABLING ON THIS FLOOR TO BE TERMINATED IN
TR-5.
3. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES OF THE
SIZE AS INDICATED ON THE PLANS. REFER TO SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING AND SECTION 27 05 33
RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS.
4. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE
DRILLING. CONTRACTOR SHALL COORDINATE WITH THE COR BEFORE
BEGINNING DRILLING.
5. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY SPARE
RISER SLEEVES. REFER TO SECTION 07 84 00 FIRESTOPPING.
6. CONTRACTOR SHALL INSTALL AN VERTICAL LADDER TYPE CABLE
TRAY ON THE WALL ABOVE THE VERTICAL RISER SLEEVES FOR
BACKBONE CABLE SUPPORT AS INDICATED ON THE PLANS. THE
CABLE TRAY SHALL BE SECURELY ANCHORED TO THE WALL
SUFFICIENT TO SUPPORT THE TOTAL WEIGHT OF CABLES AND CABLE
TRAY PLUS 50%.
7. CONTRACTOR SHALL INSTALL CABLE SUPPORTS SUFFICIENT TO
SUPPORT COMMUNICATIONS CABLES ON THE VERTICAL CABLE TRAY
WITHOUT DAMAGING OR DEFORMING THE CABLE.
8. CONTRACTOR SHALL LABEL EACH CABLE AT 42 INCHES A.F.F. ON
EACH FLOOR. REFER TO SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
9. CONTRACTOR SHALL INSTALL NEW J-HOOKS WHERE THERE IS NO
CABLE TRAY OR COMMUNICATIONS CONDUIT UNLESS OTHERWISE
NOTED.
10. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A PATCH PANELS IN
THE TELECOMMUNICATION ROOM AS INDICATED ON RACK
ELEVATIONS.
11. CONTRACTOR SHALL RE-TERMINATE AND TEST CABLING REMOVED
FROM ANY WALL MOUNT EQUIPMENT UNLESS OTHERWISE NOTED.
TESTING SHALL BE PERFORMED BY THE CONTRACTOR DURING
COMMISSIONING.
12. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A
TELECOMMUNICATIONS/DATA OUTLET AS INDICATED. EXISTING
COMMUNICATION OUTLET BOXES AND CONDUITS TO BE REUSED.
13. CONTRACTOR SHALL REPLACE ALL DATA CABLE WITH NEW
CATEGORY 6A CABLE UNLESS OTHERWISE NOTED.
14. CONTRACTOR SHALL TERMINATE COMMUNICATIONS CABLES WITH
NEW CATEGORY MODULAR JACKS TO MATCH THE COMMUNICATION
CABLE PERFORMANCE SPECIFICATIONS. NEW MODULAR JACKS
SHALL BE OF THE SAME MANUFACTURER AS THE FACE PLATES,
PATCH PANELS, AND PATCH CABLES.
15. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A CABLES AND
CONNECTIVITY COMPONENTS THAT ARE OF THE SAME
MANUFACTURER, INCLUDING CABLE, MODULAR JACKS, PATCH
PANELS, FACEPLATES, AND PATCH CABLES.
Exam
Room 5 A555
Clos.
A556
Exam
Room 4 A557A
Surgery
Office A557B
Procedure
Room A557C
Procedure
Room A557D
Exam A558
Waiting
Area A559
Clerk A559A
Class Rm.
A564
Exam 7 A566
Exam 6 A567
Exam 5 A568
Elec.
A560
Tele A561
Soil A562
HAC
A562A
Stor.
A563A
Pain Nurse A563
Stor.
A564A
Stor.
A565A
Supp Clos A567A
Corridor C*5*4
Telesurgery
Office A554
Tlt.
A553
Skin and
Wound
Care Clinic A551
Closet A551A
Stor.
A551B
Stair 5 S*5*5
Closet A554A
DNUP
Pgm. Supp.
Asst.
A575
Tlt.
A577
Waiting Area
A550
Office
A574
Staff Physician
A573
Exam 1
A572
Exam 2
A571
Exam 3
A570
Exam 4
A569
2 2
2 2
2 2
LOW VOLTAGE/ IT
Ross & Baruzzini Inc.
1600 Riveredge Parkway NW Suite 900 Atlanta, GA 30328
Project Number
Building Number
Drawing Number
Drawn By:Checked By:Issue Date:
Location
Project TitlePhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANT
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
100% CONSTRUCTION
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
Scale:
FULLY SPRINKLERED
1/8" = 1'-0"
TN-163-C.1.5
TECHNOLOGY FIFTH FLOOR PARTIAL
PLAN - D
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST. CINCINNATI, OH. 45220
539-21-701
TL
04-MAY-2022
PR
C1
1/8" = 1'-0"
TECHNOLOGY FIFTH FLOOR PARTIAL PLAN - D
D B
A
GENERAL NOTES:
KEYED NOTES:
1. EXISTING TELECOMMUNICATIONS ROOM.
2. EXISTING CONDITIONS WERE NOT OBSERVED. DATA SHOWN IN
ROOM IS AN ESTIMATE OF WHAT WILL BE REQUIRED.
TRUE NORTH PLAN NORTH
Description Date
1. REFER TO SHEET T-000 FOR GENERAL NOTES AND LEGENDS.
2. ALL HORIZONTAL CABLING ON THIS FLOOR TO BE TERMINATED IN
TR-5.
3. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES OF THE
SIZE AS INDICATED ON THE PLANS. REFER TO SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING AND SECTION 27 05 33
RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS.
4. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE
DRILLING. CONTRACTOR SHALL COORDINATE WITH THE COR BEFORE
BEGINNING DRILLING.
5. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY SPARE
RISER SLEEVES. REFER TO SECTION 07 84 00 FIRESTOPPING.
6. CONTRACTOR SHALL INSTALL AN VERTICAL LADDER TYPE CABLE
TRAY ON THE WALL ABOVE THE VERTICAL RISER SLEEVES FOR
BACKBONE CABLE SUPPORT AS INDICATED ON THE PLANS. THE
CABLE TRAY SHALL BE SECURELY ANCHORED TO THE WALL
SUFFICIENT TO SUPPORT THE TOTAL WEIGHT OF CABLES AND CABLE
TRAY PLUS 50%.
7. CONTRACTOR SHALL INSTALL CABLE SUPPORTS SUFFICIENT TO
SUPPORT COMMUNICATIONS CABLES ON THE VERTICAL CABLE TRAY
WITHOUT DAMAGING OR DEFORMING THE CABLE.
8. CONTRACTOR SHALL LABEL EACH CABLE AT 42 INCHES A.F.F. ON
EACH FLOOR. REFER TO SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
9. CONTRACTOR SHALL INSTALL NEW J-HOOKS WHERE THERE IS NO
CABLE TRAY OR COMMUNICATIONS CONDUIT UNLESS OTHERWISE
NOTED.
10. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A PATCH PANELS IN
THE TELECOMMUNICATION ROOM AS INDICATED ON RACK
ELEVATIONS.
11. CONTRACTOR SHALL RE-TERMINATE AND TEST CABLING REMOVED
FROM ANY WALL MOUNT EQUIPMENT UNLESS OTHERWISE NOTED.
TESTING SHALL BE PERFORMED BY THE CONTRACTOR DURING
COMMISSIONING.
12. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A
TELECOMMUNICATIONS/DATA OUTLET AS INDICATED. EXISTING
COMMUNICATION OUTLET BOXES AND CONDUITS TO BE REUSED.
13. CONTRACTOR SHALL REPLACE ALL DATA CABLE WITH NEW
CATEGORY 6A CABLE UNLESS OTHERWISE NOTED.
14. CONTRACTOR SHALL TERMINATE COMMUNICATIONS CABLES WITH
NEW CATEGORY MODULAR JACKS TO MATCH THE COMMUNICATION
CABLE PERFORMANCE SPECIFICATIONS. NEW MODULAR JACKS
SHALL BE OF THE SAME MANUFACTURER AS THE FACE PLATES,
PATCH PANELS, AND PATCH CABLES.
15. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A CABLES AND
CONNECTIVITY COMPONENTS THAT ARE OF THE SAME
MANUFACTURER, INCLUDING CABLE, MODULAR JACKS, PATCH
PANELS, FACEPLATES, AND PATCH CABLES.
Room
Nurse
Station A600A603A604
A605
HAC
A606
A607
A608
A609
D.R.
A611
S.R.
A612
S.R. (Neg.
Pres.)
A614
Elec.
A615
Soiled
Utility A616
Elec.
A617
CL. Lin.
A618
D.R.
A619
S.R.
A620
S.R. (Neg.
Pres.)
A621
D.R.
A622
D.R.
A623
S.R. (Neg.
Pres.)
A624
CL. Supp.
A625
D.R.
A626
Stair 2 S*6*2
Storage A628
D.R.
A629
Nourish.
A630
D.R.
A631
Service
Lobby A632
Elec.
A632E
Medical
Conf.
A634B
Tlt.
A635
Phys.
Work Rm.
A632D
LKRS.
A637B
HAC
A637A
DB. Wtr.
A639
Research
Pulmonary
Lab.
A640
HHN Off.
A641
Chief
Medical
Res.
A642
A643
Stair 1 S*6*1
Elec.
A645
Equip. Stor.
A646
D.R.
A647
A648
D.R.
A649
Stair 5 S*6*5
A651
A652
A654 A655
A656 A657A658
A659
Elec.
A660
Elec.
A661
Soil. Util.
A662
A663
A663A
A664
A668 A669
A671A
A671
A672
CL. Lin.
A673
HAC
A674
A675A676
Tlt.
A604A
Tlt.
A607A
Tlt.
A611A
Tlt.
A612A
Tlt.
A614A
Tlt.
A619A
Tlt.
A621A
Tlt.
A620A
Tlt.
A622A
Tlt.
A623A
Tlt.
A626ATlt.
A624A
Tlt.
A629A
Tlt.
A631A
Trash
Chute A637
Medical
Conf.
A634C
Meeting
Room A634A
Sig. Clos.
A645A
Tlt.
A647A
Tlt.
A649A
Tlt.
A651A
Tlt.
A654A
Tlt.
A655A
Tlt.
A656A
Toilet A659A
Tlt.
A664A
A667A
A670
Tlt.
A675A
Tlt.
A672A
Corridor C*6*1
Off.
B601
Elec.
B619B
Soiled B619A
Echo.
B604
Storage B605
IV Tech.
Off.
B606
Conf. Rm.
B607
Stair 3 S*6*3
Exam B609
Exam B610
Office B611A
Exam B612A
Exam B612B
Exam B612C
Exam B612D
Toilet B613
Exam B614
Toilet B615
Exam B616
Exam B617
Secretary B618
Elec.
B607A
Sig. Clos.
B606A
Tlt.
B605A
Tlt.
B603
Adm. Asst.
B620
Social
Work Off.
B621
Phys.
B622
Conf.
Room B623
Chief
Admn.
Asst.
B624
Chief Phys.
B625
Phys.
B626
Phys.
B627
Phys.
B628
Phys.
B629
Clos.
B625A
Corridor C*6*5
Stor.
B632
Stor.
B633
Ward Stor.
B635
Pulmonary
Func. LAB B636
HAC
B634
Tlt.
B620A
Corridor C*6*2
Exam B611B
Closet B609A
Storage A646A
A/C Shaft A/C Shaft
A6002A
A6002
A6003AA6003A6004A
A6005
A6005A
A6006
A6006B
A6014A
A6013
A6013AA6012A
A6012
A6009
A6010
A6007B
A6007
A6007A
A6006A
A6004
A6000
A6008
C-6-6
A6001
C-6-6A
AREAWAYAREAWAY
A6011
A667
Tlt.
A666
C-6-3A
A658A
A657A
C-6-3A
A613
C-6-2A Tlt.
A608A
A602 A601
DN UP DNUP
DN UP
DN
UP
A643
(4) SS04
(4) SS04
(2) SS04 (2) SS04
(2) SS04
TR-6
4 4
LOW VOLTAGE/ IT
Ross & Baruzzini Inc.
1600 Riveredge Parkway NW Suite 900 Atlanta, GA 30328
Project Number
Building Number
Drawing Number
Drawn By:Checked By:Issue Date:
Location
Project TitlePhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANT
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
100% CONSTRUCTION
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
Scale:
FULLY SPRINKLERED
1/16" = 1'-0"
TN-170-C.1.6
TECHNOLOGY SIXTH FLOOR OVERALL
PLAN
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST. CINCINNATI, OH. 45220
539-21-701
TL
04-MAY-2022
PR
C1
1/16" = 1'-0"
TECHNOLOGY SIXTH FLOOR OVERALL PLAN
GENERAL NOTES:
KEYED NOTES:
1. EXISTING TELECOMMUNICATIONS ROOM.
2. PROVIDE (4) 4" CONDUITS TO TR ON LEVEL BELOW.
3. PROVIDE (4) 4" CONDUITS TO TR ON LEVEL ABOVE.
4. 12 INCH X 4 INCH WIRE MESH CABLE TRAY
D B
A
TRUE NORTH PLAN NORTH
1. REFER TO SHEET T-000 FOR GENERAL NOTES AND LEGENDS.
2. ALL HORIZONTAL CABLING ON THIS FLOOR TO BE TERMINATED IN
TR-6.
3. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES OF THE
SIZE AS INDICATED ON THE PLANS. REFER TO SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING AND SECTION 27 05 33
RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS.
4. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE
DRILLING. CONTRACTOR SHALL COORDINATE WITH THE COR BEFORE
BEGINNING DRILLING.
5. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY SPARE
RISER SLEEVES. REFER TO SECTION 07 84 00 FIRESTOPPING.
6. CONTRACTOR SHALL INSTALL AN VERTICAL LADDER TYPE CABLE
TRAY ON THE WALL ABOVE THE VERTICAL RISER SLEEVES FOR
BACKBONE CABLE SUPPORT AS INDICATED ON THE PLANS. THE
CABLE TRAY SHALL BE SECURELY ANCHORED TO THE WALL
SUFFICIENT TO SUPPORT THE TOTAL WEIGHT OF CABLES AND CABLE
TRAY PLUS 50%.
7. CONTRACTOR SHALL INSTALL CABLE SUPPORTS SUFFICIENT TO
SUPPORT COMMUNICATIONS CABLES ON THE VERTICAL CABLE TRAY
WITHOUT DAMAGING OR DEFORMING THE CABLE.
8. CONTRACTOR SHALL LABEL EACH CABLE AT 42 INCHES A.F.F. ON
EACH FLOOR. REFER TO SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
9. CONTRACTOR SHALL INSTALL NEW J-HOOKS WHERE THERE IS NO
CABLE TRAY OR COMMUNICATIONS CONDUIT UNLESS OTHERWISE
NOTED.
10. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A PATCH PANELS IN
THE TELECOMMUNICATION ROOM AS INDICATED ON RACK
ELEVATIONS.
11. CONTRACTOR SHALL RE-TERMINATE AND TEST CABLING REMOVED
FROM ANY WALL MOUNT EQUIPMENT UNLESS OTHERWISE NOTED.
TESTING SHALL BE PERFORMED BY THE CONTRACTOR DURING
COMMISSIONING.
12. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A
TELECOMMUNICATIONS/DATA OUTLET AS INDICATED. EXISTING
COMMUNICATION OUTLET BOXES AND CONDUITS TO BE REUSED.
13. CONTRACTOR SHALL REPLACE ALL DATA CABLE WITH NEW
CATEGORY 6A CABLE UNLESS OTHERWISE NOTED.
14. CONTRACTOR SHALL TERMINATE COMMUNICATIONS CABLES WITH
NEW CATEGORY MODULAR JACKS TO MATCH THE COMMUNICATION
CABLE PERFORMANCE SPECIFICATIONS. NEW MODULAR JACKS
SHALL BE OF THE SAME MANUFACTURER AS THE FACE PLATES,
PATCH PANELS, AND PATCH CABLES.
15. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A CABLES AND
CONNECTIVITY COMPONENTS THAT ARE OF THE SAME
MANUFACTURER, INCLUDING CABLE, MODULAR JACKS, PATCH
PANELS, FACEPLATES, AND PATCH CABLES.
16. CONTRACTOR SHALL TEST ALL NEW AND EXISTING RE-TERMINATED
Tlt.
A635
DB. Wtr.
A639
Research
Pulmonary
Lab.
A640
Medical
Conf.
A634C
Off.
B601
Elec.
B619B
Soiled B619A
Echo.
B604
Storage B605
IV Tech.
Off.
B606
Conf. Rm.
B607
Stair 3 S*6*3
Exam B609
Exam B610
Office B611A
Exam B612A
Exam B612B
Exam B612C
Exam B612D
Toilet B613
Exam B614
Toilet B615
Exam B616
Exam B617
Secretary B618
Elec.
B607A
Sig. Clos.
B606A
Tlt.
B605A
Tlt.
B603
Adm. Asst.
B620
Social
Work Off.
B621
Phys.
B622
Conf.
Room B623
Chief
Admn.
Asst.
B624
Chief Phys.
B625
Phys.
B626
Phys.
B627
Phys.
B628
Phys.
B629
Clos.
B625A
Corridor C*6*5
Stor.
B632
Stor.
B633
Ward Stor.
B635
Pulmonary
Func. LAB B636
HAC
B634
Tlt.
B620A
Exam B611B
Closet B609A
DN
UP
2 22
LOW VOLTAGE/ IT
Ross & Baruzzini Inc.
1600 Riveredge Parkway NW Suite 900 Atlanta, GA 30328
Project Number
Building Number
Drawing Number
Drawn By:Checked By:Issue Date:
Location
Project TitlePhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANT
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
100% CONSTRUCTION
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
Scale:
FULLY SPRINKLERED
1/8" = 1'-0"
TN-171-C.1.6
TECHNOLOGY SIXTH FLOOR PARTIAL
PLAN - A
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST. CINCINNATI, OH. 45220
539-21-701
TL
04-MAY-2022
PR
C1
1/8" = 1'-0"
TECHNOLOGY SIXTH FLOOR PARTIAL PLAN - A
D B
A
GENERAL NOTES:
KEYED NOTES:
1. EXISTING TELECOMMUNICATIONS ROOM.
2. EXISTING CONDITIONS WERE NOT OBSERVED. DATA SHOWN IN
ROOM IS AN ESTIMATE OF WHAT WILL BE REQUIRED.
TRUE NORTH PLAN NORTH
Description Date
1. REFER TO SHEET T-000 FOR GENERAL NOTES AND LEGENDS.
2. ALL HORIZONTAL CABLING ON THIS FLOOR TO BE TERMINATED IN
TR-6.
3. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES OF THE
SIZE AS INDICATED ON THE PLANS. REFER TO SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING AND SECTION 27 05 33
RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS.
4. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE
DRILLING. CONTRACTOR SHALL COORDINATE WITH THE COR BEFORE
BEGINNING DRILLING.
5. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY SPARE
RISER SLEEVES. REFER TO SECTION 07 84 00 FIRESTOPPING.
6. CONTRACTOR SHALL INSTALL AN VERTICAL LADDER TYPE CABLE
TRAY ON THE WALL ABOVE THE VERTICAL RISER SLEEVES FOR
BACKBONE CABLE SUPPORT AS INDICATED ON THE PLANS. THE
CABLE TRAY SHALL BE SECURELY ANCHORED TO THE WALL
SUFFICIENT TO SUPPORT THE TOTAL WEIGHT OF CABLES AND CABLE
TRAY PLUS 50%.
7. CONTRACTOR SHALL INSTALL CABLE SUPPORTS SUFFICIENT TO
SUPPORT COMMUNICATIONS CABLES ON THE VERTICAL CABLE TRAY
WITHOUT DAMAGING OR DEFORMING THE CABLE.
8. CONTRACTOR SHALL LABEL EACH CABLE AT 42 INCHES A.F.F. ON
EACH FLOOR. REFER TO SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
9. CONTRACTOR SHALL INSTALL NEW J-HOOKS WHERE THERE IS NO
CABLE TRAY OR COMMUNICATIONS CONDUIT UNLESS OTHERWISE
NOTED.
10. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A PATCH PANELS IN
THE TELECOMMUNICATION ROOM AS INDICATED ON RACK
ELEVATIONS.
11. CONTRACTOR SHALL RE-TERMINATE AND TEST CABLING REMOVED
FROM ANY WALL MOUNT EQUIPMENT UNLESS OTHERWISE NOTED.
TESTING SHALL BE PERFORMED BY THE CONTRACTOR DURING
COMMISSIONING.
12. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A
TELECOMMUNICATIONS/DATA OUTLET AS INDICATED. EXISTING
COMMUNICATION OUTLET BOXES AND CONDUITS TO BE REUSED.
13. CONTRACTOR SHALL REPLACE ALL DATA CABLE WITH NEW
CATEGORY 6A CABLE UNLESS OTHERWISE NOTED.
14. CONTRACTOR SHALL TERMINATE COMMUNICATIONS CABLES WITH
NEW CATEGORY MODULAR JACKS TO MATCH THE COMMUNICATION
CABLE PERFORMANCE SPECIFICATIONS. NEW MODULAR JACKS
SHALL BE OF THE SAME MANUFACTURER AS THE FACE PLATES,
PATCH PANELS, AND PATCH CABLES.
15. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A CABLES AND
CONNECTIVITY COMPONENTS THAT ARE OF THE SAME
MANUFACTURER, INCLUDING CABLE, MODULAR JACKS, PATCH
PANELS, FACEPLATES, AND PATCH CABLES.
Room
Nurse
Station A600A603A604
A605
HAC
A606
A607
A608
A609
D.R.
A611
S.R.
A612
S.R. (Neg.
Pres.)
A614
Elec.
A615
Soiled
Utility A616
Elec.
A617
CL. Lin.
A618
D.R.
A619
S.R.
A620
S.R. (Neg.
Pres.)
A621
D.R.
A622
D.R.
A623
S.R. (Neg.
Pres.)
A624
CL. Supp.
A625
D.R.
A626
Stair 2 S*6*2
Storage A628
D.R.
A629
Nourish.
A630
D.R.
A631
Service
Lobby A632
Elec.
A632E
Medical
Conf.
A634B
A635
Phys.
Work Rm.
A632D
LKRS.
A637B
HAC
A637A
HHN Off.
A641
Chief
Medical
Res.
A642
A643
Stair 1 S*6*1
Elec.
A645
Equip. Stor.
A646
D.R.
A647
A669
A671A
A675A676
Tlt.
A604A
Tlt.
A607A
Tlt.
A611A
Tlt.
A612A
Tlt.
A614A
Tlt.
A619A
Tlt.
A621A
Tlt.
A620A
Tlt.
A622A
Tlt.
A623A
Tlt.
A626ATlt.
A624A
Tlt.
A629A
Tlt.
A631A
Trash
Chute A637
Meeting
Room A634A
Sig. Clos.
A645A
Tlt.
A675A
Tlt.
A672A
Corridor C*6*1
Corridor C*6*2
Storage A646A
A/C Shaft A/C Shaft
A6002A
A6002
A6003AA6003A6004A
A6005
A6005A
A6006
A6006B
A6014A
A6013
A6013AA6012A
A6012
A6009
A6010
A6007B
A6007
A6007A
A6006A
A6004
A6000
A6008
C-6-6
A6001
C-6-6A
AREAWAYAREAWAY
A6011
A613
C-6-2A Tlt.
A608A
A602 A601
DN UP
DN UP
A643
TN-430-C.1.6
2 1
2 2 2 2
1 2
2 2 2 2
TR-6
2 2 2
2 2 2
LOW VOLTAGE/ IT
Ross & Baruzzini Inc.
1600 Riveredge Parkway NW Suite 900 Atlanta, GA 30328
Project Number
Building Number
Drawing Number
Drawn By:Checked By:Issue Date:
Location
Project TitlePhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANT
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
100% CONSTRUCTION
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
Scale:
FULLY SPRINKLERED
1/8" = 1'-0"
TN-172-C.1.6
TECHNOLOGY SIXTH FLOOR PARTIAL
PLAN - B
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST. CINCINNATI, OH. 45220
539-21-701
TL
04-MAY-2022
PR
C1
1/8" = 1'-0"
TECHNOLOGY SIXTH FLOOR PARTIAL PLAN - B
D B
A
GENERAL NOTES:
KEYED NOTES:
1. EXISTING TELECOMMUNICATIONS ROOM.
2. EXISTING CONDITIONS WERE NOT OBSERVED. DATA SHOWN IN
ROOM IS AN ESTIMATE OF WHAT WILL BE REQUIRED.
3. PROVIDE (4) 4" CONDUITS TO TR ON LEVEL BELOW.
4. PROVIDE (4) 4" CONDUITS TO TR ON LEVEL ABOVE.
TRUE NORTH PLAN NORTH
Description Date
1. REFER TO SHEET T-000 FOR GENERAL NOTES AND LEGENDS.
2. ALL HORIZONTAL CABLING ON THIS FLOOR TO BE TERMINATED IN
TR-6.
3. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES OF THE
SIZE AS INDICATED ON THE PLANS. REFER TO SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING AND SECTION 27 05 33
RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS.
4. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE
DRILLING. CONTRACTOR SHALL COORDINATE WITH THE COR BEFORE
BEGINNING DRILLING.
5. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY SPARE
RISER SLEEVES. REFER TO SECTION 07 84 00 FIRESTOPPING.
6. CONTRACTOR SHALL INSTALL AN VERTICAL LADDER TYPE CABLE
TRAY ON THE WALL ABOVE THE VERTICAL RISER SLEEVES FOR
BACKBONE CABLE SUPPORT AS INDICATED ON THE PLANS. THE
CABLE TRAY SHALL BE SECURELY ANCHORED TO THE WALL
SUFFICIENT TO SUPPORT THE TOTAL WEIGHT OF CABLES AND CABLE
TRAY PLUS 50%.
7. CONTRACTOR SHALL INSTALL CABLE SUPPORTS SUFFICIENT TO
SUPPORT COMMUNICATIONS CABLES ON THE VERTICAL CABLE TRAY
WITHOUT DAMAGING OR DEFORMING THE CABLE.
8. CONTRACTOR SHALL LABEL EACH CABLE AT 42 INCHES A.F.F. ON
EACH FLOOR. REFER TO SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
9. CONTRACTOR SHALL INSTALL NEW J-HOOKS WHERE THERE IS NO
CABLE TRAY OR COMMUNICATIONS CONDUIT UNLESS OTHERWISE
NOTED.
10. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A PATCH PANELS IN
THE TELECOMMUNICATION ROOM AS INDICATED ON RACK
ELEVATIONS.
11. CONTRACTOR SHALL RE-TERMINATE AND TEST CABLING REMOVED
FROM ANY WALL MOUNT EQUIPMENT UNLESS OTHERWISE NOTED.
TESTING SHALL BE PERFORMED BY THE CONTRACTOR DURING
COMMISSIONING.
12. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A
TELECOMMUNICATIONS/DATA OUTLET AS INDICATED. EXISTING
COMMUNICATION OUTLET BOXES AND CONDUITS TO BE REUSED.
13. CONTRACTOR SHALL REPLACE ALL DATA CABLE WITH NEW
CATEGORY 6A CABLE UNLESS OTHERWISE NOTED.
14. CONTRACTOR SHALL TERMINATE COMMUNICATIONS CABLES WITH
NEW CATEGORY MODULAR JACKS TO MATCH THE COMMUNICATION
CABLE PERFORMANCE SPECIFICATIONS. NEW MODULAR JACKS
SHALL BE OF THE SAME MANUFACTURER AS THE FACE PLATES,
PATCH PANELS, AND PATCH CABLES.
15. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A CABLES AND
CONNECTIVITY COMPONENTS THAT ARE OF THE SAME
MANUFACTURER, INCLUDING CABLE, MODULAR JACKS, PATCH
PANELS, FACEPLATES, AND PATCH CABLES.
D.R.
A647
A648
D.R.
A649
Stair 5 S*6*5
A651
A652
A654 A655
A656 A657A658
A659
Elec.
A660
Elec.
A661
Soil. Util.
A662
A663
A663A
A664
A668 A669
A671A
A671
A672
CL. Lin.
A673
HAC
A674
Tlt.
A647A
Tlt.
A649A
Tlt.
A651A
Tlt.
A654A
Tlt.
A655A
Tlt.
A656A
Toilet A659A
Tlt.
A664A
A667A
A670
Tlt.
A675A
Tlt.
A672A
A667
Tlt.
A666
C-6-3A
A658A
A657A
C-6-3A
DNUP
2 1
2 2
2 2
LOW VOLTAGE/ IT
Ross & Baruzzini Inc.
1600 Riveredge Parkway NW Suite 900 Atlanta, GA 30328
Project Number
Building Number
Drawing Number
Drawn By:Checked By:Issue Date:
Location
Project TitlePhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANT
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
100% CONSTRUCTION
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
Scale:
FULLY SPRINKLERED
1/8" = 1'-0"
TN-173-C.1.6
TECHNOLOGY SIXTH FLOOR PARTIAL
PLAN - D
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST. CINCINNATI, OH. 45220
539-21-701
TL
04-MAY-2022
PR
C1
1/8" = 1'-0"
TECHNOLOGY SIXTH FLOOR PARTIAL PLAN - D D
B
A
GENERAL NOTES:
KEYED NOTES:
1. EXISTING TELECOMMUNICATIONS ROOM.
2. EXISTING CONDITIONS WERE NOT OBSERVED. DATA SHOWN IN
ROOM IS AN ESTIMATE OF WHAT WILL BE REQUIRED.
TRUE NORTH PLAN NORTH
Description Date
1. REFER TO SHEET T-000 FOR GENERAL NOTES AND LEGENDS.
2. ALL HORIZONTAL CABLING ON THIS FLOOR TO BE TERMINATED IN
TR-6.
3. CONTRACTOR SHALL INSTALL BACKBONE RISER SLEEVES OF THE
SIZE AS INDICATED ON THE PLANS. REFER TO SECTION 27 15 00
COMMUNICATIONS STRUCTURED CABLING AND SECTION 27 05 33
RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS.
4. CONTRACTOR SHALL X-RAY CONCRETE FLOOR BEFORE CORE
DRILLING. CONTRACTOR SHALL COORDINATE WITH THE COR BEFORE
BEGINNING DRILLING.
5. CONTRACTOR SHALL FIRESTOP RISER SLEEVES AND EMPTY SPARE
RISER SLEEVES. REFER TO SECTION 07 84 00 FIRESTOPPING.
6. CONTRACTOR SHALL INSTALL AN VERTICAL LADDER TYPE CABLE
TRAY ON THE WALL ABOVE THE VERTICAL RISER SLEEVES FOR
BACKBONE CABLE SUPPORT AS INDICATED ON THE PLANS. THE
CABLE TRAY SHALL BE SECURELY ANCHORED TO THE WALL
SUFFICIENT TO SUPPORT THE TOTAL WEIGHT OF CABLES AND CABLE
TRAY PLUS 50%.
7. CONTRACTOR SHALL INSTALL CABLE SUPPORTS SUFFICIENT TO
SUPPORT COMMUNICATIONS CABLES ON THE VERTICAL CABLE TRAY
WITHOUT DAMAGING OR DEFORMING THE CABLE.
8. CONTRACTOR SHALL LABEL EACH CABLE AT 42 INCHES A.F.F. ON
EACH FLOOR. REFER TO SECTION 27 15 00 COMMUNICATIONS
STRUCTURED CABLING.
9. CONTRACTOR SHALL INSTALL NEW J-HOOKS WHERE THERE IS NO
CABLE TRAY OR COMMUNICATIONS CONDUIT UNLESS OTHERWISE
NOTED.
10. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A PATCH PANELS IN
THE TELECOMMUNICATION ROOM AS INDICATED ON RACK
ELEVATIONS.
11. CONTRACTOR SHALL RE-TERMINATE AND TEST CABLING REMOVED
FROM ANY WALL MOUNT EQUIPMENT UNLESS OTHERWISE NOTED.
TESTING SHALL BE PERFORMED BY THE CONTRACTOR DURING
COMMISSIONING.
12. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A
TELECOMMUNICATIONS/DATA OUTLET AS INDICATED. EXISTING
COMMUNICATION OUTLET BOXES AND CONDUITS TO BE REUSED.
13. CONTRACTOR SHALL REPLACE ALL DATA CABLE WITH NEW
CATEGORY 6A CABLE UNLESS OTHERWISE NOTED.
14. CONTRACTOR SHALL TERMINATE COMMUNICATIONS CABLES WITH
NEW CATEGORY MODULAR JACKS TO MATCH THE COMMUNICATION
CABLE PERFORMANCE SPECIFICATIONS. NEW MODULAR JACKS
SHALL BE OF THE SAME MANUFACTURER AS THE FACE PLATES,
PATCH PANELS, AND PATCH CABLES.
15. CONTRACTOR SHALL INSTALL NEW CATEGORY 6A CABLES AND
CONNECTIVITY COMPONENTS THAT ARE OF THE SAME
MANUFACTURER, INCLUDING CABLE, MODULAR JACKS, PATCH
PANELS, FACEPLATES, AND PATCH CABLES.
A/C Shaft
A737
Bath A711A
Soil. Util.
A712
A713
Elec.
A714
S.R.
A715
Clean
Linen A716
S.R.
A717
S.R.
A718
Bed Room A719
Ex. Group A720
Bath A719A
Bed Room A722
Q.R.
A723
T.L.T.
A723A
T.L.T.
A722A
T.L.T.
A715A
Ante A711
Dining/Group
Room A705
Nurse
Station A705A
S.R.
A706
Bath A706A
Bath A707A
T.R.
A707
T.R.
A708
Bath A708A
Bath A709B
Ante A709
Obser.
A710
S.R.
A709A
Exist.
Seclusion A711B
Stair 2 S*7*2
Nurse
Station
Meds A725A
Stor.
A724
Nurse
Station A725
Nurse
Station
Work/Conference A725B
Break
Room A726
Corridor C*7*2
Storage A740
Waiting A774
Office #14 A743
Office #13 A744
Stair 5 S*7*5
Sensory
Therapy
Room A704
Storage A704B
Storage A702A
Interview
Room A702
Nurse Off.
A701
Chief Nurse
Off.
A700
Exam Rm.
A776
Office #18 A775
Reception A773
Training (6) A746 Stor.
A747
S. Office
#11A A748
S. Office
#11A A749
Office #12 A750
Group #2
(10-12) A751Office #10
A752 Tlt.
A753 Office #9
A754 Office #8
A755 Office #7
A756 Office #6
A757
Elec.
A758
A759
HAC
A760
Ante A761
Office A762
Office #5 A763
Office #5A A764
Office #5B A765
Group #1
(12-20) A766
Office A767A
Office #2 A768
Office #3 A769
Testing A770
Vis. Bath A771
Copy Rm.
A773A
Staff Office A767
Lockers A727B
Service
Elev. Lobby A727
Laundry A728A
Trash
Chute A727A
Staff Tlt.
A736
Sig. Clos.
A734
Stair 1 S*7*1
HAC
A735
Stor.
A735A
Elec.
Occupational
Therapy A732
Corridor C*7*1
DB Wtr.
A729
Storage A728CSocial
Worker A728D
Group
Room A728
Elec.
A728B
Soc.
Worker A730
O/T Off.
A731
Tlt.
A730A
Social
Worker B733A
Psych. Res.
B734
Tlt.
B734A
Waiting B705
Stat.
B704
Nurse Man.
B703
Soc.
Worker B702
Intake
Coor.
B701
Off.
B733
Off.
B733B
HAC
B732
Stor.
B731
Stor.
B719
Reception B705C
Elec B706
Break
Room B705D
Staff Tlt.
B705E
Signal
Closet B705F
Stair 3 S*7*3
Office B708
Office B709
Office B710
Office B711A
Tobacco &
Acohol
Research
Center B712
Group Rm.
B713
Off.
B714
Off.
B715A
Off.
B716A
Off.
B717
Off.
B715B
Off.
B714A
Off.
B721
Off.
B722
Off.
B723
Off.
B724
Group
Room B725
Off.
B726
Off.
B727
Wash
Room B728
Off.
B729
KLT
B730
Adm. Asst.
B716B
Bath B721A
Tlt.
B723A
Tlt.
B722A
Elec.
B720
Group
Room B725B
Tlt.
B726A
Off.
B711
Tlt.
B729A
Closet A728E
Clos.
A772
Office A741
Office A742
Storage A704A
DN UP DNUP
DN UP
DN
UP
Telecom Room
(2) SS04 (2) SS04 (2) SS04
(2) SS04
(2) SS04
(4) SS04
LOW VOLTAGE/ IT
Ross & Baruzzini Inc.
1600 Riveredge Parkway NW Suite 900 Atlanta, GA 30328
Project Number
Building Number
Drawing Number
Drawn By:Checked By:Issue Date:
Location
Project TitlePhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANT
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
100% CONSTRUCTION
DOCUMENTS
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
Scale:
FULLY SPRINKLERED
1/16" = 1'-0"
TN-180-C.1.7
TECHNOLOGY SEVENTH FLOOR
OVERALL PLAN
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST. CINCINNATI, OH. 45220
539-21-701
TL
04-MAY-2022
PR
C1
1/16" = 1'-0"
TECHNOLOGY SEVENTH FLOOR OVERALL PLAN
D B
A
GENERAL NOTES:
KEYED NOTES:
1. EXISTING TELECOMMUNICATIONS ROOM.
2. PROVIDE (4) 4" CONDUITS TO TR ON…