ATTACHMENT 5 - Drawings 4 of 13.pdf

PDF 18 MB Posted

Attached to
36C77623B0005 EHRM Infrastructure Upgrades - Cincinnati Project #539-21-701
Solicitation number
36C77623B0005
Issued by

About this file

This document provides details on a federal solicitation opportunity and an associated file. The solicitation number is 36C77623B0005 for the EHRM Infrastructure Upgrades - Cincinnati Project #539-21-701. The opportunity type is a solicitation from the Department of Veterans Affairs Technology Acquisition Center Austin for construction services to upgrade the infrastructure at the Cincinnati VAMC. The associated file is a drawing attachment without further description. The solicitation is for infrastructure upgrade construction at the Cincinnati VA Medical Center for Project 539-21-701.

View the file

Other files

File Type Posted
36C77623B0005 0004 - Extension 3-10-23.pdf PDF
Technical Questions and Answers - Cincinnati EHRM.pdf PDF
36C77623B0005 0003.pdf PDF
36C77623B0005 0002 - EHRM Infrastructure Upgrades - Cincinnati.pdf PDF
Site Visit Sign-In Sheet - 36C77632B0005 EHRM Infrastructure Construction - Cincinnati VAMC.pdf PDF
ATTACHMENT 24 - Construction Wage Rates - Hamilton 01-13-2023.pdf PDF
36C77623B0005 0001 - EHRM Infrastructure Upgrades - Cincinnati.pdf PDF
Site Visit Memorandum.pdf PDF
ATTACHMENT 4 - Drawings 3 of 13.pdf PDF
ATTACHMENT 23 - Contractor Safety - Environmental Form.pdf PDF
ATTACHMENT 6 - Drawings 5 of 13.pdf PDF
ATTACHMENT 18 - Technology Narrative.pdf PDF
ATTACHMENT 13 - Drawings 12 of 13.pdf PDF
ATTACHMENT 15 - Plumbing Narrative.pdf PDF
ATTACHMENT 19 - Hazardous Materials Inspection Report.pdf PDF
ATTACHMENT 24 - Construction Wage Rates - Hamilton 1-13-2022.pdf PDF
ATTACHMENT 21 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 14 - Drawings 13 of 13.pdf PDF
ATTACHMENT 20 - Brand Name Justification.pdf PDF
ATTACHMENT 22 - Limitations on Subcontracting - Nov 2022.pdf PDF
ATTACHMENT 9 - Drawings 8 of 13.pdf PDF
ATTACHMENT 10 - Drawings 9 of 13.pdf PDF
ATTACHMENT 16 - Mechanical Narrative.pdf PDF
ATTACHMENT 7 - Drawings 6 of 13.pdf PDF
ATTACHMENT 3 - Drawings 2 of 13.pdf PDF
ATTACHMENT 17 - Electrical Narrative.pdf PDF
ATTACHMENT 2 - Drawings 1 of 13.pdf PDF
ATTACHMENT 25 - Site Visit Instructions.pdf PDF
ATTACHMENT 8 - Drawings 7 of 13.pdf PDF
ATTACHMENT 11 - Drawings 10 of 13.pdf PDF
ATTACHMENT 12 - Drawings 11 of 13.pdf PDF
36C77623B0005 Solicitation - Cincinnati EHRM.pdf PDF
ATTACHMENT 1 - Specifications.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F1

F3

F1

F1

F

F1

F

F

DN

Service

Lobby

IRM

Storage

(Hdwr)

Stor.

A436A

Elec.

A436B

Comp. Rm.

A437C

Stor.

A444A

Corridor C*4*1

A

M

A

M

FEC

UNDERFLOOR PIPING

ABOVEFLOOR PIPING

ABOVEFLOOR NOZZLE (TYP.)

UNDERFLOOR NOZZLE (TYP.)

FEC

10 9

TO CRAC

UNITS

SEQUENCE OF OPERATIONS

THE CLEAN AGENT EXTINGUISHING FIRE EXTINGUISHING SYSTEM SHALL

OPERATE AS FOLLOWS:

1. ACTIVATION OF ANY SINGLE SMOKE DETECTOR SHALL:

A. ENERGIZE AN ALARM LED LAMP ON THE ACTIVATED DETECTOR

AND CLEAN AGENT CONTROL PANEL.

B. TRANSMIT AN ALARM SIGNAL TO THE BUILDING’S FIRE ALARM

SYSTEM.

2. ACTIVATION OF A SECOND SMOKE DETECTOR SHALL:

A. ENERGIZE AN ALARM LED LAMP ON THE ACTIVATOR DETECTOR.

B. ACTIVATE PRE-DISCHARGE BELL NOTIFICATION APPLIANCE AND

PREDISCHARGE STROBE NOTIFICATION APPLIANCE.

C. SHUT DOWN POWER TO ELECTRONIC EQUIPMENT WITHIN THE

PROTECTED SPACE, CLOSE DAMPERS, RELEASE DOOR HOLD

OPEN DEVICES, AND SHUT DOWN AIR HANDLING UNITS SERVING

THE PROTECTED SPACE.

D. INITIATE A PROGRAMMABLE 30-SECOND TIME DELAY (AGENT

RELEASE) SEQUENCE.

3. ACTIVATION OF A MANUAL ACTIVATION STATION SHALL:

A. ENERGIZE AN ALARM LED LAMP ON THE CLEAN AGENT CONTROL

PANEL.

B. ACTIVATE PRE-DISCHARGE BELL NOTIFICATION APPLIANCE AND

PRE-DISCHARGE STROBE NOTIFICATION APPLIANCE.

C. SHUT DOWN POWER TO ELECTRONIC EQUIPMENT WITHIN THE

PROTECTED SPACE, CLOSE DAMPERS, RELEASE DOOR HOLD

OPEN DEVICES, AND SHUT DOWN AIR HANDLING UNITS SERVING

THE PROTECTED SPACE.

D. TRANSMIT AN ALARM SIGNAL TO THE BUILDING’S FIRE ALARM

SYSTEM.

E. INITIATE A PROGRAMMABLE 20-SECOND TIME DELAY (AGENT

RELEASE) SEQUENCE.

4. ACTIVATION OF THE ABORT SWITCH SHALL:

A. CEASE THE TIME DELAY. ONCE THE ABORT SWITCH IS RELEASED,

THE TIME DELAY COUNTDOWN SHALL RESUME FROM WHERE IT

CEASED. THE TIME DELAY SHALL NOT RESET.

B. TRANSMIT A TROUBLE SIGNAL TO THE BUILDING’S FIRE ALARM

SYSTEM.

5. UPON COMPLETION OF THE TIME DELAY, THE SYSTEM SHALL:

A. DE-ENERGIZE THE PRE-DISCHARGE BELL AND PRE-DISCHARGE

STROBE NOTIFICATION APPLIANCE.

B. ACTIVATE A DISCHARGE STROBE NOTIFICATION APPLIANCE

INSIDE AND OUTSIDE OF THE PROTECTED AREA.

C. ENERGIZE VALVE ACTUATOR FOR AGENT CYLINDERS RELEASING

GASEOUS AGENT INTO THE PROTECTED AREA.

6. ACTIVATION OF THE LOW AGENT TANK PRESSURE SWITCH AND

MAINTENANCE LOCK-OUT SWITCH SHALL:

A. ENERGIZE A SUPERVISORY LED LAMP ON THE CLEAN AGENT

CONTROL PANEL.

B. TRANSMIT A SUPERVISORY ALARM SIGNAL TO THE BUILDING’S

FIRE ALARM SYSTEM.

7. PRESENCE OF ANY FAULT, BYPASS FUNCTION, OR REMOVAL OF THE

ELECTRIC VALVE ACTUATOR SHALL:

A. ENERGIZE A TROUBLE LED LAMP ON THE CLEAN AGENT CONTROL

PANEL.

B. TRANSMIT A TROUBLE SIGNAL TO THE BUILDING’S FIRE ALARM

SYSTEM.

8. ACTIVATION OF DUCT DETECTOR OR SMOKE DETECTOR WITHIN A

COMPUTER ROOM AIR CONDITION UNIT SHALL ENERGIZE A SUPERVISORY

SIGNAL LED LAMP ON THE CLEAN AGENT CONTROL PANEL AND

SHUTDOWN CRAC UNITS.

CLEAN AGENT GENERAL NOTES

1. NOVEC 1230 SYSTEMS SHALL BE INSTALLED AND TESTED IN

ACCORDANCE WITH NFPA 2001, CLEAN AGENT FIRE EXTINGUISHING

SYSTEMS, MANUFACTURER'S CURRENT PRINTED RECOMMENDATIONS,

CODES, AND STANDARDS ADOPTED BY THE LOCAL AUTHORITY HAVING

JURISDICTION.

2. NOVEC 1230 SYSTEM INSTALLATION SHALL BE PERFORMED OR

SUPERVISED BY THOSE SKILLED IN CLEAN AGENT FIRE EXTINGUISHING

SYSTEMS TECHNOLOGY.

3. ALL DEVICES, APPLIANCES, AND EQUIPMENT USED IN THE NOVEC 1230

EXTINGUISHING SYSTEM SHALL BE LISTED AND APPROVED BY UL AND FM

GLOBAL.

4. PIPING:

A. PIPING SHALL CONFORM WITH THE REQUIREMENTS SET FORTH IN

NFPA 2001, CLEAN AGENT FIRE EXTINGUISHING SYSTEMS.

B. PIPING SHALL BE BLACK STEEL PIPE CONFORMING TO ASTM-A-53

OR A-106, SCHEDULE 40 OR 80, WITH AN INTERNAL WORKING

PRESSURE OF 620 PSIG.

C. ORDINARY CAST-IRON PIPE, STEEL PIPE CONFORMING TO ASTM

A-120 , OR NONMETALLIC PIPE SHALL NOT BE USED.

D. EACH PIPE SECTION SHALL BE REAMED, BLOWN CLEAR, AND

CLEANED INTERNALLY AFTER PREPARATION AND BEFORE

ASSEMBLY BY MEANS OF SWABBING UTILIZING A SUITABLE,

NONFLAMMABLE CLEANER SUCH AS TRICHLORETHANE, ETC.

E. THE PIPING NETWORK SHALL BE FREE OF PARTICULATE MATTER

AND OIL RESIDUE BEFORE INSTALLATION OF DISCHARGE

NOZZLES.

F. STENCILED PIPE IDENTIFICATION SHALL NOT BE PAINTED OVER,

CONCEALED, OR REMOVED PRIOR TO APPROVAL OF THE LOCAL

AUTHORITY HAVING JURISDICTION.

G. PIPING NETWORK SHALL BE INSTALLED IN STRICT ACCORDANCE

TO SYSTEM PLANS AND PIPING ISOMETRICS PREPARED BY

CONTRACTOR. ANY PIPING CHANGES SHALL BE APPROVED BY

ROSS & BARUZZINI PRIOR TO FABRICATION OR INSTALLATION OF

MATERIALS.

5. FITTINGS

A. FITTINGS SHALL CONFORM WITH THE REQUIREMENTS SET FORTH

IN NFPA 2001, CLEAN AGENT FIRE EXTINGUISHING SYSTEMS.

B. MALLEABLE IRON FITTINGS SHALL BE 300 LB. CLASS CONFORMING

TO ASTM A-197.

C. 150 LB. CLASS, ORDINARY CAST IRON FITTINGS, AND HOLE-CUT

FITTINGS OR SIMILAR SHALL NOT BE USED. VICTAULIC TYPE

FITTINGS SHALL BE STYLE 75 OR 77.

D. UL LISTED VICTAULIC OR OTHER LISTED GROOVED PIPE FITTINGS

CAN BE USED.

E. PIPE JOINTS OTHER THAN THREADED, WELDED, BRAZED, FLARED,

COMPRESSION, OR FLANGED TYPE SHALL BE LISTED OR

APPROVED. ALL THREADS USED IN JOINTS AND FITTINGS SHALL

CONFORM TO ANSI B1.20.1

F. JOINT COMPOUND, PIPE TAPE, OR THREAD LUBRICANT SHALL BE

APPLIED ONLY TO THE MALE THREADS OF THE JOINT.

6. PIPING SUPPORT

A. PIPING SHALL BE SUPPORTED BY A COMBINATION NETWORK

COMPRISED OF PIPE HANGERS AND RIGID PIPE SUPPORT

RACKETS.

B. PIPE HANGERS SHALL BE USED TO SUPPORT THE "DEAD LOAD"

OF THE PIPING SYSTEM AND SHALL BE SPACED AT INTERVALS

NOT EXCEEDING 15 FEET.

C. RIGID PIPE SUPPORTS SHALL BE USED TO SUPPORT THE "LIVE

LOAD”OF THE PIPING SYSTEM DURING DISCHARGE. RIGID

BRACING IS REQUIRED AT EACH DIRECTIONAL CHANGE FITTING,

TEE, AND NOZZLE.

D. ALL DROPS TO 180 DEGREE NOZZLES REQUIRE BACK BRACING IN

THE OPPOSITE DIRECTION OF THE DISCHARGE.

E. EARTHQUAKE BRACING SHALL BE USED WHEN REQUIRED BY

LOCAL CODES. REFER TO ANSI B31.1, POWER PIPING CODE, FOR

FURTHER GUIDANCE ON SUPPORTING PIPING.

7. TESTING

A. THE COMPLETED SYSTEM SHALL BE REVIEWED AND TESTED BY

QUALIFIED FIELD ENGINEERING TECHNICIAN IN ACCORDANCE

WITH NFPA 2001 AND AS REQUIRED TO MEET THE APPROVAL OF

THE LOCAL AUTHORITY HAVING JURISDICTION.

B. PIPING NETWORK SHALL BE INSPECTED TO DETERMINE THAT IT IS

IN COMPLIANCE WITH THE DESIGN AND INSTALLATION

DOCUMENTS.

C. MEANS OF PIPE REDUCTION AND ATTITUDES OF TEES SHALL BE

CHECKED FOR CONFORMANCE TO THE DESIGN.

D. PIPING JOINTS, DISCHARGE NOZZLES, AND PIPING SUPPORTS

SHALL BE SECURELY FASTENED TO PREVENT UNACCEPTABLE

VERTICAL OR LATERAL MOVEMENT DURING DISCHARGE.

E. DISCHARGE NOZZLES SHALL BE INSTALLED IN SUCH A MANNER

THAT PIPING CANNOT BECOME DETACHED DURING DISCHARGE.

F. ALL AGENT STORAGE CONTAINERS SHALL BE PROPERLY

LOCATED IN ACCORDANCE WITH AN APPROVED SET OF SYSTEM

DRAWINGS.

G. ALL CONTAINERS AND MOUNTING BRACKETS SHALL BE

FASTENED SECURELY IN ACCORDANCE WITH THE

MANUFACTURER'S REQUIREMENTS.

H. THE PIPING NETWORK SHALL BE PNEUMATICALLY TESTED IN A

CLOSED CIRCUIT FOR A PERIOD OF 10 MINUTES AT 40 PSIG. AT

THE END OF 10 MINUTES, THE PRESSURE DROP SHALL NOT

EXCEED 20 PERCENT OF THE TEST PRESSURE.

I. A FLOW TEST USING COMPRESSED AIR SHALL BE PERFORMED ON

THE PIPING NETWORK TO VERIFY THAT FLOW IS CONTINUOUS,

AND THAT THE PIPING AND NOZZLES ARE UNOBSTRUCTED.

J. PROTECTED ENCLOSURE SHALL BE EXAMINED AND DOOR FAN

TESTED TO LOCATE AND THEN EFFECTIVELY SEAL ANY

SIGNIFICANT AIR LEAKS THAT COULD RESULT IN A FAILURE OF

THE ENCLOSURE TO HOLD THE SPECIFIED AGENT

CONCENTRATION LEVEL FOR THE HOLDING PERIOD. SEALING OF

THE ROOM SHALL BE BY OTHERS.

8. ALL PERSONNEL WHO WILL BE WORKING IN THE NOVEC 1230 PROTECTED

ENCLOSURE SHALL RECEIVE TRAINING REGARDING EXTINGUISHING

SYSTEM OPERATION AND AGENT SAFETY

9. COORDINATE LOCATIONS OF NOZZLES WITH HOT/COLD AISLE

CONTAINMENT TO PRODUCE THE REQUIRED CONCENTRATION

THROUGHOUT THE VOLUME SERVED.

10. COORDINATE THE SMOKE DETECTORS, INCLUDING AIR0ASPIRATING

SYSTEM WITH HOT/COLD AISLE CONTAINMENT TO PROVIDE COVERAGE IN

ACCORDANCE WITH MANFACTURER'S INSTRUCTIONS.

DEMOLITION KEYED NOTES

1. EXISTING SUPPRESSION PANEL TO BE REMOVED. CAP POWER SUPPLY

BACK TO SOURCE.

2. REMOVE EXISTING SMOKE DETECTORS AND ASSOCIATED WIRING IN

CEILING AND IN RAISED FLOOR CONNECTED TO CLEAN AGENT PANEL.

3. REMOVE EXISTING CLEAN AGENT STROBE/SPEAKERS. VIF.

4. REMOVE EXISTING CLEAN AGENT CYLINDERS, NOZZLES, PIPING, AND

SUPPORTS IN CEILING AND IN RAISED FLOOR.

5. REMOVE EXISTING ABORT SWITCH, MANUAL RELEASE AND MAINTENANCE

SWITCH IN ITS ENTIRETY.

1 5

A

M

SD

SD

SD

SD

SD SD

SD

SD

SD

SD

F

F

F

A

M

A M

CLEAN AGENT NOTES AND SYMBOLS

1. REFER TO SPECIFICATIONS SECTION 283000 FOR ADDITIONAL

INFORMATION PERTAINING TO THE FIRE ALARM SYSTEM.

2. SIGNALING LINE CIRCUITS SHALL BE ROUTED IN A CLASS B

CONFIGURATION

3. NOTIFICATION APPLIANCE CIRCUITS SHALL BE ROUTED IN A CLASS B

CONFIGURATION.

4. FIRE ALARM CIRCUITS SHALL BE ROUTED IN CONDUIT.

5. FOR VISUAL DEVICES, THE '#' WITHIN THE SYMBOL CORRESPONDS TO

THE CANDELA RATING OF THE DEVICE: 1=15cd, 3=30cd, 5=75cd, 7=177cd.

6. WALL MOUNTED NOTIFICATION DEVICES SHALL BE MOUNTED WITH THE

TOP OF THE DEVICE +90" A.F.F. OR 6" BELOW THE CEILING, WHICHEVER IS

LOWER.

7. PROVIDE ADDITIONAL APPPURTANCES AS REQUIRED TO CONNECT

CLEAN AGENT SUPPRESSION PANEL TO EXISTING FIRE ALARM CONTROL

PANEL.

A

M

CLEAN AGENT ABORT SWITCH: +48" A.F.F. TO CENTERLINE

MANUAL AGENT ABORT SWITCH: +48" A.F.F. TO CENTERLINE

WALL MOUNTED BELLF

WALL MOUNTED BELL WITH STROBEF#

CLEAN AGENT PIPING ABOVE RAISED FLOOR

CLEAN AGENT PIPING BELOW RAISED FLOOR

DUCT MOUNTED SMOKE DETECTOR : PHOTOELECTRIC TYPEDS

NEW WORK KEYED NOTES

1. NOVEC 1230 TANK LOCATION. SECURE TO WALL WITH WALL MOUNTED

TANK SUPPORTS. SYSTEM REQUIRES 740 LBS OF CLEAN AGENT FOR

APPROXIMATELY 1275 SF ROOM. ROOM DIMENSIONS SHALL BE VERIFIED IN

FIELD AND AGENT QUANITITY SHALL BE ADJUSTED BASED ON EXISTING

CONDITIONS.

2. PROVIDE NEW DOOR SEALS FOR THE DOORS IN THE ROOM.

3. CAULK BASEBOARD OPENINGS AND PENETRATIONS AROUND ROOM

PERIMETER, FLOORS, AND UNDERSIDE OF SLAB OF FLOOR ABOVE.

EXISTING OPENINGS SHALL BE SEALED AIRTIGHT WITH FIRE-RATED

SEALANT

4. AIR-ASPIRATING SMOKE DETECTOR APPARATUS. ONE SYSTEM SHALL

MONITOR THE RETURN AIR OF THE CRAC UNITS. THE OTHER SHALL

PROTECT THE RAISED FLOOR AND CEILING. SYSTEMS SHALL BE DESIGNED

AND INSTALLED BY MANUFACTURER.

5. A DUAL ACTION MANUAL PULL STATION WITH IDENTIFICATION INDICATING

AGENT RELEASE WITHIN PROTECTED ROOM, CLEAN AGENT ABORT SWITCH

AND SIGN MOUNTED 48" AFF DESCRIBING OPERATIONAL SEQUENCE OF THE

SYSTEM.

6. NEW CLEAN AGENT PANEL WITH SEPARATE MAINTENANCE KEYED SWITCH.

FIRE ALARM CONTRACTOR TO PROVIDE ALARM, SUPERVISORY, AND

TROUBLE CONTACTS FOR CLEAN AGENT SYSTEM. PROVIDE ADDITIONAL

APPPURTANCES AS REQUIRED TO CONNECT CLEAN AGENT SYSTEM TO

EXISTING FIRE ALARM CONTROL PANEL.

7. VERIFY PIPE ROUTING IN FIELD. NOZZLES SHALL BE INSTALLED WITHIN 12"

OF THE CEILING OR BOTTOM OF OBSTRUCTIONS. COORDINATE CLEAN

AGENT PIPING WITH CABLE TRAYS, RACKS, AND PLASTIC CURTAIN

SEPARATION.

8. PRESSURE RELIEF VENT TO BE INSTALLED IN A SUITABLE LOCATION TO

EQUALIZE PRESSURE IN THE ROOM UPON DISCHARGE OF AGENT. FINAL

SIZE AND LOCATION SHALL BE DETERMINED BY THE CLEAN AGENT

CONTRACTOR.

9. PROVIDE SIGNAGE FOR PREDISCHARGE STROBES AND BELLS IN

ACCORDANCE WITH SPECIFICATIONS.

10. PROVIDE SIGNAGE FOR DISCHARGE STROBES IN ACCORDANCE WITH

SPECIFICATIONS.

11. PROVIDE FM-200 FIRE EXTINGUISHER CABINET. FIRE EXTINGUISHER RATING

SHALL BE 2A:10B:C. COORDINATE WITH ARCHITECT.

12. NEW SMOKE DETECTORS TO REPLACE EXISTING AT CEILING AND RAISED

FLOOR. DETECTORS AT RAISED FLOOR ARE TO BE MOUNTED SIDEWAYS

WITH STEEL ANGLE SUPPORT. COORDINATE LOCATIONS WITH HOT AND

COLD AISLE, DUCTS, CABLE TRAY ETC.

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved: Project Director

ARCHITECT/ENGINEER OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

FULLY SPRINKLED

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383 F: 314.918.17666

/1 /2

:0

:0

P

M FP-205-C.1.4

FIRE PROTECTION FOURTH FLOOR

CLEAN AGENT PLAN

15-JUN-2022

RFJA

CINCINNATI VAMC EHRM

INFASTRUCTURE UPGRADES

539-21-701

3200 VINE ST. CINCINNATI, OH.

100% CONSTRUCTION

DOCUMENTS

1/4" = 1'-0"

CLEAN AGENT NEW WORK A437C

1/4" = 1'-0"

CLEAN AGENT DEMO WORK A437C

CLEAN AGENT PIPING DOWN TO

RAISED FLOOR

DN

796 SF

CORRIDOR

420 SF

CORRIDOR

762 SF

COURTYARD

BELOW

CRASH CART

MED CLOSET

NURSE STATION

QUIET ROOM

LINEN CLOSET

HAC

BATHROOM

248A

BATHROOM

247A

BEDROOM

BATHROOM

246A

BATHROOM

245A

BEDROOM

BEDROOM

BATHROOM

244A

BATHROOM

243A

BEDROOM

BEDROOM

BEDROOM

(NEGATIVE

PRESSURE)

BATHROOM

241A

BATHROOM

242A

BEDROOM

BEDROOM

(NEGATIVE

PRESSURE)

BATHROOM

240A

BATHROOM

239A

BEDROOM

ELECTRIC

CLOSET

BEDROOM

BATHROOM

238A

BATHROOM

237A

BEDROOM

BEDROOM

BATHROOM

236A

BATHROOM

235A

BEDROOM

BATHROOM

234A

SPECIAL CARE

BATHROOM

233A

SPECIAL CARE

RESIDENT

ROOM

68 SF

STAIR 1

S2.1

NURSE STATION

SOILED UTILITY

BATHING SUITE

COMP. CLOSET

KITCHEN

DINING ROOM

LIVING ROOM

WORK ROOM

211A

CLEAN SUPPLY

Redundant Room

CORRIDOR

229A

BEDROOM

02 STORAGE

315 SF

Room

232 SF

Room

STAFF

WOMEN'S

BEDROOM

1023 SF

CORRIDOR

STAFF MEN'S

STORAGE

STORAGE

TECH CLOSET

297 SF

LOBBY

LAUNDRY

Redundant Room

CORRIDOR

ROOF GARDEN

WORK ROOM

STORAGE

STORAGE

TECH CLOSET

297 SF

LOBBY

STORAGE

STORAGE

TECH CLOSET

297 SF

LOBBY

FP-212-C.2.2

FP-212-C.2.2

REMOVE/REWORK SPRINKLER HEADS

AND PIPING. REFER TO NEW WORK PLAN

3 ON THIS SHEET.

SPRINKLER CONTRACTOR SHALL PROVIDE

A FULLY COMPLIANT WET SPRINKLER

SYSTEM. CONTRACTOR SHALL VERIFY

EXISTING CONDITIONS AND REMOVE,

REWORK OR EXTEND EXISTING SPRINKLER

SYSTEM FOR NEW TELE ROOM. COMPLY

WITH VA AND NFPA #13 FIRE SUPPRESSION

REQUIREMENTS.

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved: Project Director

ARCHITECT/ENGINEER OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

FULLY SPRINKLED

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383 F: 314.918.17664

/2 /2

:1 :3

P

M

FP-212-C.2.2

FIRE PROTECTION SECOND FLOOR

OVERALL & ENLARGED PLANS

04-MAY-2022

DDPJA

CINCINNATI VAMC EHRM

INFASTRUCTURE UPGRADES

539-21-701

3200 VINE ST. CINCINNATI, OH.

100% CONSTRUCTION

DOCUMENTS

1/16" = 1'-0"

FIRE PROTECTION - BUILDING #2 - PARTIAL

SECOND FLOOR PLAN

1/4" = 1'-0"

STORAGE 204 - SECOND FLOOR PLAN -

DEMOLITION

1/4" = 1'-0"

STORAGE 204 - SECOND FLOOR PLAN -

NEW WORK

EQ EQ

EQ EQ

EQ EQ

36" 12"

36" 12"

E Q

E Q

E Q

E Q

E Q

E Q

E Q

E Q

E Q

E Q

24" X 48"

CEILING TILE

12" X 48"

CEILING TILE

12" X 12" / 24" X 24"

CEILING TILE

12" X 48"

CEILING TILE

24" X 48"

CEILING TILE

NOTE:

INDICATES CENTERLINE OF SPRINKLER HEAD

TYPICAL SPRINKLER BRANCH

LINE WITH ONE (1) INCH

OUTLET TEES

ONE (1) INCH RISER NIPPLE

LENGTH AS REQUIRED

1" X 1/2" REDUCING

COUPLING

UPRIGHT SPRINKLER HEAD

1/2" MAX.

RECESSED SPRINKLER HEAD

1" X 1/2" REDUCING

COUPLING

ONE (1) INCH

DROP - LENGTH

AS REQUIRED

ONE (1) INCH

DROP - LENGTH

AS REQUIRED

ONE (1) INCH

DROP - LENGTH

AS REQUIRED

TYP SPRINKLER

BRANCH LINE

WITH ONE (1) INCH

OUTLET TEES

S E

Q U

E N

C E

O F

O P

E R

A T

IO

N

E N

E R

G

IZ

E A

L A

R M

L E

D L

A M

P O

N D

E T

E C

T O

R

A C

T

IV

A T

E S

U P

E R

V

IS

O R

Y I N

D

IC

A T

IO

N

A C

T

IV

A T

E T

R O

U B

L E

I N

D

IC

A T

IO

N

P R

E -D

IS

C

H A

R G

E B

E L L A

N D

S T

R O

B E

S H

U T

D O

W N

P O

W E

R O

F E

L E

C T

R

IC

A L E

Q U

IP

M

E N

T

C L O

S E

D A

M P

E R

S

R E

L E

A S

E D

O O

R H

O L D

O P

E N

S H

U T

D O

W N

C R

A C

U N

IT

S

IN

IT

IA

T

E

S E

C O

N D

T

IM

E D

E L A

Y

IN

IT

IA

T

E

S E

C O

N D

T

IM

E D

E L A

Y

R E

S U

M E

C O

U N

T D

O W

N

D E

-E N

E R

G

IZ

E P

R E

-D

IS

C H

A R

G E

B E

L L A

N D

S T

R O

B E

A C

T

IV

A T

E D

IS

C

H A

R G

E S

T R

O B

E N

O T

IF

IC

A T

IO

N

A P

P L

IA

N C

E S

B U

IL

D

IN

G

S Y

S T

E M

A L A

R M

B U

IL

D

IN

G

S Y

S T

E M

T R

O U

B L E

B U

IL

D

IN

G

S Y

S T

E M

S U

P E

R V

IS

O

R Y

SYSTEM INPUT

1ST ALARM (1% OBS./FT)

2ND ALARM (4% OBS./FT)

CLEAN AGENT MANUAL RELEASE ACTIVATES

C E

A S

E T

IM

E

D E

L A

Y

ABORT ACTIVE

ABORT RELEASE

TIME DELAY COMPLETION

LOW AGENT TANK PRESSURE

SWITCH ACTIVATES

CIRCUIT TROUBLES

(FAULTS, REMOVAL OF ELECTRIC ACTUATOR)

DUCT DETECTOR OR SMOKE

DETECTOR IN DUCT ACTIVATES

A C

T

IV

A T

E A

L A

R M

I N

D

IC

A T

IO

N

E N

E R

G

IZ

E V

A L V

E A

C T

U A

T O

R F

O R

A G

E N

T C

Y L

IN

D E

R S

R E

L E

A S

E

PRE-ALARM (0.2% OBS./FT)

CLEAN AGENT

RELEASING PANEL

MAINTENANCE

DISCONNECT SWITCH

CLEAN AGENT

RELEASING SOLENOID

STROBE

SYNCHRONIZATION

MODULE

H/S H/S

HORN/STROBE

NOTIFICATION

FIRE ALARM

CONTROL

PANEL

MM

A M

ABORT SUPERVISION

MODULE

A M

ABORT SUPERVISION

MODULE

SUPERVISORY,

ACTION LEVEL

*SCHEMATIC SHOWN FOR REFERENCE ONLY.

REFER TO INSTALLATION INSTURUCTIONS FOR

DETAILED WIRING INFORMATION

MM

TROUBLE,

SUPERVISORY LEVELMM

ALARM, ACTION

LEVEL

H/S H/S H/S H/S H/S H/S

DS

AIR ASIPIRATING

DEVICE SMOKE

DETECTOR

MM

DS

MM

DS

MMMONITORING MODULE, (TYP.)

EXISTING DUCT

SMOKE DETECTORS

(TYP.)

ASD ASD

SUPERVISORY, ACTION

LEVEL (TYP. FOR

MONITORING DUCT

SMOKE DETECTORS)

MOTORIZED

DAMPER

CM

MOTORIZED

DAMPER

CM

MOTORIZED

DAMPER

CM

EMERGENCY

POWER OFF

CM CM

EMERGENCY

POWER OFF

CONTROL

MODULE

CM

EMERGENCY

POWER OFF

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved: Project Director

ARCHITECT/ENGINEER OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

FULLY SPRINKLED

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383 F: 314.918.17666

/1 /2

:3

:3

A

M FP-710

DETAILS

15-JUM-2022

RFJA

CINCINNATI VAMC EHRM

INFASTRUCTURE UPGRADES

539-21-701

3200 VINE ST. CINCINNATI, OH.

100% CONSTRUCTION

DOCUMENTS

NONE

SPRINKLER HEAD LOCATION IN NEW

CEILING PANELS

NONE

UPRIGHT SPRINKLER HEAD

NONE

RECESSED SPRINKLER HEAD

NO SCALE

CLEAN AGENT SEQUENCE OF OPERATIONS

NONE

CLEAN AGENT RELEASING PANEL

SD

F1

F1

SD

SMOKE ALARM SHALL NOT INITIATE FIRE

ALARM SYSTEM

CONNECT SPEAKER/STROBE TO EXISTING

FIRE ALARM SYSTEM

SMOKE ALARM ACTIVATED STROBE

SD

F#

FIRE ALARM SYSTEMS

SMOKE ALARM

CEILING MOUNTED SPEAKER WITH STROBE

1. REFER TO SPECIFICATIONS SECTION 283000 FOR ADDITIONAL

INFORMATION PERTAINING TO THE FIRE ALARM SYSTEM.

2. SIGNALING LINE CIRCUITS SHALL BE ROUTED IN A CLASS B

CONFIGURATION

3. NOTIFICATION APPLIANCE CIRCUITS SHALL BE ROUTED IN A CLASS B

CONFIGURATION.

4. FIRE ALARM CIRCUITS SHALL BE ROUTED IN CONDUIT.

5. FOR VISUAL DEVICES, THE '#' WITHIN THE SYMBOL CORRESPONDS TO

THE CANDELA RATING OF THE DEVICE: 1=15cd, 3=30cd, 5=75cd, 7=177cd.

6. WALL MOUNTED NOTIFICATION DEVICES SHALL BE MOUNTED WITH THE

TOP OF THE DEVICE +90" A.F.F. OR 6" BELOW THE CEILING, WHICHEVER IS

LOWER.

7. PROVIDE ADDITIONAL APPPURTANCES AS REQUIRED TO CONNECT

SMOKE DETECTOR TO EXISTING FIRE ALARM CONTROL PANEL.

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved: Project Director

ARCHITECT/ENGINEER OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

FULLY SPRINKLED

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383 F: 314.918.17664

/2 /2

:1 :5

P

M

FA-206.C.1.3

FIRE ALARM THIRD FLOOR

ENLARGED PLAN

04-MAY-2022

AuthorApprover

CINCINNATI VAMC EHRM

INFASTRUCTURE UPGRADES

539-21-701

3200 VINE ST. CINCINNATI, OH.

100% CONSTRUCTION

DOCUMENTS

1/4" = 1'-0"

RESIDENT OFFICE OVERNIGHT C383A -

THIRD FLOOR PLAN - NEW WORK

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved: Project Director

ARCHITECT/ENGINEER OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

FULLY SPRINKLED

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383 F: 314.918.17664

/2 /2

:0 :3

A

M

P-000

PLUMBING SYMBOLS AND

ABBREVIATIONS

04-MAY-2022

DDPJDB

CINCINNATI VAMC EHRM

INFASTRUCTURE UPGRADES

539-21-701

3200 VINE ST. CINCINNATI, OH.

100% CONSTRUCTION

DOCUMENTS

PLUMBING GENERAL NOTES

1. THIS CONTRACTOR SHALL VISIT THE PROJECT SITE AND VERIFY LOCATIONS, ELEVATIONS

AND SIZES OF ALL UTILITIES AT SITE PRIOR TO PROCEEDING WITH WORK. EXISTING

SYSTEMS AND STRUCTURE SHALL BE INVESTIGATED FOR BEST POSSIBLE ROUTING OF

COLD WATER, HOT WATER, SANITARY WASTE AND VENT, STORM AND MEDICAL

LABORATORY GAS PIPING.

2. THESE PLANS ARE DIAGRAMMATIC IN NATURE SINCE THE ONLY AVAILABLE INFORMATION

HAS BEEN OBTAINED FROM EXISTING PLANS, SPECIFICATIONS, AND FIELD SURVEYS. THE

EXACT LOCATION OF PIPING, FIXTURES AND EQUIPMENT MAY DEVIATE FROM THE

LOCATION INDICATED ON THESE DRAWINGS. EXTREME ACCURACY IS NOT GUARANTEED.

THIS CONTRACTOR SHALL BE PREPARE TO MAKE ALTERATIONS TO NEW AND/OR

EXISTING SERVICES TO FIT JOB CONDITIONS. THIS CONTRACTOR SHALL FURNISH A

COMPLETE CODE COMPLYING SYSTEM. THIS CONTRACTOR SHALL REPORT, IN WRITING,

ANY DISCREPANCIES WHICH PREVENT THE INSTALLATION OF WORK AS SHOWN.

3. IF THIS CONTRACTOR DOES NOT CLEARLY UNDERSTAND THESE PLANS OR IS NOT

COMPLETELY SURE OF THEIR MEANING, THIS CONTRACTOR SHOULD OBTAIN THE

ENGINEER'S WRITTEN EXPLANATION AND/OR INTERPRETATION PRIOR TO SUBMITTING

BIDS, SINCE THIS CONTRACTOR WILL BE HELD RIGIDLY TO THE INTERPRETATION OF THE

ENGINEER.

4. IT IS THE RESPONSIBILITY OF THIS CONTRACTOR TO REPAIR THE EXISTING SURFACES TO

REMAIN WHERE THEIR WORK HAS BEEN COMPLETED. REPAIR SHALL INCLUDE, BUT NOT

LIMITED TO, ANY EXISTING WALL, CEILING OR FLOOR THAT IS SCHEDULED TO REMAIN.

REPAIR, PAINTING, AND PATCHING SHALL BE COMPLETED BY AN APPROPRIATE

CONTRACTOR QUALIFIED FOR THIS TYPE OF WORK.

5. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION OPERATIONS, THE

CONTRACTOR WILL NOTIFY BUILDING OWNER OF THE HAZARDOUS MATERIAL.

6. TEMPORARY CONNECTION SHALL BE PROVIDED BY RESPECTIVE PLUMBING

CONTRACTOR WHEN EXTENDED INTERRUPTIONS OF SERVICES AND UTILITIES SUCH AS

WATER, WASTE AND FIRE PROTECTION WHICH SERVE OTHER AREAS ARE NECESSARY.

7. COORDINATE WITH MAINTENANCE PERSONNEL AS TO SOURCE OF UTILITIES AND

TEMPORARILY DISCONNECT OR SHUT OFF SERVICES OR UTILITIES AT NEAREST MAIN.

TEMPORARY AND ACCESSIBLE ISOLATION VALVES SHALL BE INSTALLED CLOSE TO THIS

POINT OF WORK.

8. IT IS ESSENTIAL THAT BUILDING OPERATIONS CONTINUE WITH MINIMAL INTERRUPTIONS.

IT IS NECESSARY THAT OPERATION OF EXISTING SYSTEMS BE INTERFACED WITH AS

LITTLE DISRUPTION AS POSSIBLE EXCEPT IN AREAS VACATED FOR CONSTRUCTION

WORK. WORK WHICH WILL INTERFERE WITH OPERATION OF EXISTING FIRE SUPPRESSION

AND PLUMBING SYSTEMS OR WHICH REQUIRE DOWNTIME WILL BE SCHEDULED ONLY

AFTER CONSULTATION WITH AND PERMISSION GIVEN BY THE OWNER. ALLOW 10 DAYS

PRIOR TO ANTICIPATED INTERRUPTION OF SYSTEMS. WORK MAY BE REQUIRED TO BE

PERFORMED OUTSIDE NORMAL WORKING HOURS.

9. ARCHITECTURAL, TECHNOLOGY, MECHANICAL, AND ELECTRICAL DEMOLITION, AND NEW

WORK DRAWINGS AND SPECIFICATIONS SHALL BE READ IN CONJUNCTION WITH THESE

DRAWINGS.

10. ALL PIPING HANGERS AND SUPPORTS SHALL BE REMOVED ALONG WITH PIPING BEING

REMOVED.

11. THE CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH PROJECT'S PHASING

SCHEDULE PRIOR TO COMMENCEMENT OF ANY WORK.

12. USE CAUTION WHEN SAW-CUTTING THROUGH EXISTING CONCRETE FLOOR OR WALL

CONSTRUCTION FOR THE INSTALLATION OF PLUMBING SYSTEMS TO AVOID CUTTING

REBAR AT EDGE OF OPENING.

13. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY REVISIONS, TRANSITIONS, OFFSETS,

ETC., TO AVOID DUCTWORK, PIPING, EQUIPMENT OR STRUCTURE NEW OR EXISTING AND

TO MAKE A COMPLETE AND FUNCTIONING SYSTEM.

14. REMOVE ALL PORTIONS OF THE BUILDING (CEILING TILES, WALLS, SPRINKLER HEADS,

SPRINKLER HEAD ESCUTCHEON, ECT.) AS REQUIRED TO COMPLETE THE SCOPE

INDICATED IN THE CONSTRUCTION DOCUMENTS (SEE ARCHITECTURAL, TECHNOLOGY,

MECHANICAL, ELECTRICAL, AND FIRE PROTECTION DRAWINGS). REPLACE, REINSTALL, OR

COORDINATE REINSTALLATION WITH OTHER TRADES FOR ALL ITEMS REMOVED TO

ACCOMMODATE THE INSTALLATION/ REMOVALS OF ANY PLUMBING PIPE, FIXTURE,

EQUIPMENT, OR OTHER TRADES WORK, USING WORKERS QUALIFIED IN THE

APPROPRIATE TRADE. REPLACE CEILING TILES DAMAGED WITH THIS WORK TO MATCH,

REPAIR WALLS BACK TO THE ORIGINAL FINISH.

PLUMBING ABBREVIATIONS

NOT ALL SYMBOLS ARE USED FOR THIS PROJECT

ADA

AP

BP

BT

BTC

BV

CI

CO

CSS

DCVA

DS

DW

DWH

EEW

ESEW

ESH

ET

EWC

FCO

GCO

GD

HB

HWRP

HWST

IM

IW

LA

MB

NIC

OB

RD

RPZ

S

S/S

SH

SK

SP

SS

SSK

SW

TMV

UR

V

VB

VS

VTR

W

WC

WCO

WD

WH

WHA

WM

WS

WSV

YCO

AMERICANS WITH DISABILITIES ACT

ACCESS PANEL

BOOSTER PUMP

BATHTUB

BRANCH TO CONNECTION

BALANCE VALVE

CAST IRON

CLEANOUT

CLINICAL SERVICE SINK

DOUBLE CHECK VALVE ASSEMBLY

DOWNSPOUT

DISHWASHER

DOMESTIC WATER HEATER

EMERGENCY EYE WASH

EMERGENCY SHOWER & EYE WASH

EMERGENCY SHOWER

EXPANSION TANK

ELECTRIC WATER COOLER

FLOOR CLEAN OUT

GRADE CLEANOUT

GARBAGE DISPOSAL

HOSE BIBB

HOT WATER RETURN PUMP

HOT WATER STORAGE TANK

ICE MAKER

INDIRECT WASTE

LAVATORY

MOP BASIN

NOT IN CONTRACT

OUTLET BOX

ROOF DRAIN

REDUCED PRESSURE BACKFLOW PREVENTER

SANITARY

STAINLESS STEEL

SHOWER

SINK

SUMP PUMP

SANITARY STACK

SHOP SINK

SOFT WATER

THERMOSTATIC MIXING VALVE

URINAL

VENT

VACUUM BREAKER

VENT STACK

VENT THRU ROOF

WASTE

WATER CLOSET

WALL CLEANOUT

WASHER DRAIN

WALL HYDRANT

WATER HAMMER ARRESTOR

WATER METER

WASTE STACK

WASTE STACK VENT

YARD CLEANOUT

COMMON PFP SYMBOLS & ABBREVIATIONS

NOT ALL SYMBOLS ARE USED FOR THIS PROJECT

X

P501

DIRECTION OF FLOW

BRANCH CONNECTION, BOTTOM

BRANCH CONNECTION, TOP

ELBOW, TURNED DOWN

ELBOW TURNED UP

SHUTOFF VALVE

CHECK VALVE

PRESSURE REDUCING VALVE

PRESSURE GAUGE

UNION

PIPING CAP

EXISTING PIPING TO BE REMOVED

MATCH LINE

CONNECTION TO EXISTING

DETAIL DESIGNATION

RISER DESIGNATION

KEYED NOTE

REVISION NOTE

ABOVE FINISH FLOOR

AUTHORITIES HAVING JURISDICTION

ACCESS PANEL

BOTTOM OF PIPE

DIAMETER

DOWN

EXISTING

FINISHED FLOOR ELEVATION

GALLONS PER HOUR

GALLONS PER MINUTE

HORSEPOWER

INVERT ELEVATION

NORMALLY CLOSED

NOT TO SCALE

POUNDS PER SQUARE INCH

REVOLUTIONS PER MINUTE

ROUGH-IN

SHUTOFF VALVE

TOTAL DYNAMIC HEAD

VERIFY IN FIELD

AFF

AHJ

AP

BOP

DIA

DN

EX OR EXIST

FFE

GPH

GPM

HP

IE OR INV. ELEV

NC

NTS

PSI

RPM

RI

SOV

TDH

VIF

PLUMBING SYMBOLS & ABBREVIATIONS

NOT ALL SYMBOLS ARE USED FOR THIS PROJECT

TRAPPED CONNECTION

STRAINER

BALANCING VALVE

CLEANOUT (CO)

OS & Y GATE VALVE

TEMPERATURE GAUGE

THERMOSTATIC MIXING VALVE

REDUCED PRESSURE BACKFLOW PREVENTER

HOSE BIBB/WALL HYDRANT

ACID VENT

ACID WASTE

DRAIN PIPING

DEIONIZED WATER PIPING

REVERSE OSMOSIS PIPING (RO)

DOMESTIC COLD WATER PIPING (CW)

DOMESTIC HOT WATER PIPING (HW)

DOMESTIC HOT WATER RETURN PIPING (HWR)

NON-POTABLE WATER PIPING

PUMP DISCHARGE PIPING

SANITARY PIPING

SUBSOIL DRAINAGE PIPING

STORM PIPING

OVERFLOW STORM PIPING

TEMPERED WATER

VENT PIPING

EXISTING FIXTURE TO BE REMOVED

EXISTING FIXTURE

NEW FIXTURE

FLEXIBLE CONNECTION

FLOOR DRAIN/FLOOR SINK (FD/FS)

CIRCULATION PUMP

AV

AW

D

DI

RO

NP

PD

SSD

ST

OST

TW

S

/2

8/

Mens

Restroom

Dir.

Conference

Room A102

Office A103

Office A104

Secretary

Office A105

Associate

Dir. Office A106

Director's

Office A107

Chief of

Staff A108

Sec. Chief of Staff A109

Adm Asst.

A110

HAC

A111

Adm Asst.

A112

QA

Manager A113

Sec. &

Waiting A114

Risk

Management A115

Asst Chief

Social

Work A116

S.W. Off.

A117

S.W. Off.

A118

Staff Dir.

Asst.

A119

Stor A120

Public

Affairs A118A

Adm. Asst.

A114A

Chief Soc.

Work A115A

Tele A119A

Director

Public

Affairs

Office A113A

Med Staff

Coor.

A112A

Staff Dir.

Asst.

A119C

Clos A105A

Elec.

A111A

Clos A102A

Office B105

Office B106

Exam B107

SCI

Pharmacy B108

SCI Social

Worker B109

Office B110

Toilet B111

Exam B112

Stor B113

Storage B114

Exam B115

Stair 4 S*1*4

Exam B117

Waiting

Area B118

Corridor C*1*7

Stor B114A

Tele Clos B107A

Secretary B119

Off.

B127

Off.

B128

Off.

B129

Off.

B130

Off.

B131

Occ.

Therapy B132

Kit.

Multi-Purpose B133

Off.

B134

Off.

B135

Group Rm.

B137

Group

Room B132B

Adm. Asst.

B125

Office B125A

Stor.

B127A

Stor.

B137A

Stor.

B137B

Men's

Restroom A121

Stair 2 S*1*2

Quality

Assurance A123

AACOS

A124

F. Tlt.

A125

Service

Lobby A126

KIT.

A127

Food

Service A128

Volunteer A1035

Dry Storage A127B

Walk-In

Ref.

A127C

Walk-In

Ref.

A127D

HAC

A126B

Trash

Chute A126A

Corridor C*1*2

Elec.

A126C

Dry Stor.

A127A

Pizza Shop A131

Canteen

Dining A130

HAC

A133

Retail Store B101

Mech.

B101B

Office B103

Clerical B102

Elec.

B103A Stockroom

B101ATelecom Room

A134A

Audiology

Clinic B123

F. Tlt.

B104

Tlt.

B124

Tele.

B124A

RN Intake B139

Oxygen B140

Physical

Therapy/Occupational

Therapy B143

Speech

Pathology B144

Speech

Pathology B145

Neuropsychology B146

Electrical

Closet B141

Nave B163

Vestry B163B

Stor B163C

Chancel B163A

Chap. Clin.

Pastoral

Education B163G

Chaplain

Assistant B163H

Chief B163J

Chaplain B163K

Chaplain B163L

Corridor C*1*8

Corridor C*1*6

Pharmacy

Specialist B156

Storage B157

NP / Exam B158

Social

Work B159

Physician/Exam B160

Reception B162A

Waiting B162

Storage B161

Stor.

B150A

SVC.

Officer B147

SVC.

Officer B148

SVC.

Officer B148A

SVC.

Officer B150B

SVC.

Officer B149

SVC.

Officer B149A

Waiting

Room B150

Audiology C141

Corridor C*1*5

Corridor C*1*14

Off.

C134A

Adm. Asst.

C134B

Off.

C134C

Off.

C134D

Off.

C134E

Procedure C134FReceiving

C134G

Pharmacy C140

Off.

C129

Secure

Dispensing C133

Vault C143

Waiting C125

Consult C125A

Elec.

C126

Pharmacy C140B

Dispensing C125B

Sec.

C137

Voluntary

Service

Office B162C

Storage C162D

Agent

Cashier C162E

Agent

Cashier C162F

Agent

Cashier C162G

Transport C135

Voluntary

Service C137A

Corridor C*1*1

Volunteer

Office A1039

Volunteer

Office A1038

Sig.

A141A

Stair 1 S*1*1

Decedent

Affairs A144 A144A

Nurse

Pract.

A144B

Nurse

Pract.

A144C

Eligibility

Off.

A140

Clos A139

Clos.

A140A

F. Tlt.

A139A

Personnel

Health A139B

Personal

Health C132A

Person.

Hlth.

C132B

Off.

C130D

Off.

C130C

Social

Work SVC C130

Off.

C130A

Exam C130B

Signal C128

Tele.

C127

Stair 5 S*1*5

M. Tlt.

A174 Nursing

Lounge A158

Elec.

A161A

HAC

A160

F. Tlt.

A161

Phys.

A162

Phys.

A163

Phys.

A164

Phys.

A165

Nurse

Manager A166

Chief Nurse

Office A167

Chief Office A168

Prog. Asst.

A169

Waiting A170

Physician

Office A171

Phys.

A172

Stor.

A173

Elec.

A143

Tlt.

A158A

Stair 9 S*1*9

On Call A155

Tlt.

A155A

Sig.

A147A

Cl. Stor.

A147D

Cl. Lin.

A147C

Pub. Tlt.

A147B

Emergency A147

Secl.

A154

Secl.

A152

Minor

Surgery A153

Triage C120

Chief Off.

A151

Soil. Util.

A157

PCMM

Coordinator A146A

Quality

Manager A146B

Squad Stor.

A146

Heart Exam

A148

Heart Exam

A149

Restroom A149A

Heart Exam

A150

Corridor C*1*3

M. Tlt.

C124

F. Tlt.

C123

Employee

Health C122A

Conference

Room C122

Office C121

Exam C122D

Exam C122C

Police C119

Employee

I.D.

C119A

Off.

C119B

Off.

C119C

Lkrs.

C119D

Tlt C119E

Evidence C119F

Armory C119G Stor.

C119H

Waiting C116

PEC

C116A PEC

C116B

PEC

C116C

Off.

C116D

PEC

C116E

Holding C119K

M. Tlt.

C117

F. Tlt.

C118Holding

C119I

Corridor C*1*11

Stair 6 S*1*6

Clerk C102

Waiting

Room C103

Exam

Room C104

HAC

C105

PEA

C106

Exam C107

Exam C108 Elec.

C109

Exam C110

Alcove C111

Exam C112

Exam C113

Exam C114Exam

C115

Tlt C104A

Stor C104B

Corridor C101

PIV

Registrar B156A

Pain

School B156B

Elec.

B155

Elec.

B155A

Compund C140A

Stair 7 S*1*7

Tlt.

C1012

Work Rm.

C1013

Clinical

Pharm.

C1014

RN

C1015

Exam C1018

Exam C1019

Exam C1020

Exam C1021

Exam C1022

Exam C1023

Exam C1024

Exam C1025

Exam C1026

Meds C1027

Exam C1028

Exam C1029

Exam C1030

Office C1032

Clinicians

Break Rm.

C1033

Women's

Lockers C1033A

F. Tlt.

C1033B

Men's

Lockers C1033C

M. Tlt.

C1033D

Program

Assistant C1017

Care

Coordination C1013A

Pharmacist

Counselor C1034

Changing

Room-MRI C1035

Reception C1036

Social

Worker C1037

RN

C1038

Tlt.

C1039

Office C1040

Exam C1041

Wrk. St.

C1042

HAC

C1043

Exam C1044

Neg. Press.

C1045

Exam C1046

Exam C1047

Exam C1048

Neg. Press.

C1049

Exam C1050

Exam C1051

Exam C1052

Ante C1053

Procedure C1054

Elec.

C1055

Stor.

C1057

Tele.

C1059

Neg. Press.

C1061Soiled

Utility C1063

Exam C1000

Exam C1001

Exam C1002

Exam C1003

Exam C1004

Office C1005

Exam C1006

Exam C1007

Exam C1008

Procedure C1009

Office C1010

Office C1011

Storage B153

Work Area C1038A

Pharmacist

Counselor C165

Reception C167

Clinical

Pharm.

C168

RN

C169

Nutrition C170

Office C171

Exam C172

Work St.

C173

Tlt.

C174

Exam C175

Elec.

C176

Exam C177

Exam C178

Exam C179

Exam C180

Exam C181

Exam C182

Meds C183

Elec.

C184

Exam C185

Linen C186

Procedure C187

HAC

C188

Exam C189

Tele.

C190

Exam C191

Stor.

C192

Voluntary

Service C147

Mech.

C149

ATM

C150

Break

Room C151

Office C152

Office C153

Office C154

Exam C155

Exam C156

Exam C157

Exam C158

Exam C159

Tlt.

C160

Office C161

Office C162 Exam

C163

Office C164

Work Area C164A

Clos.

C163A

Info C166A

Office C166

F. Tlt.

C146

Storage C195

Blood Draw

Rm.

C193

RN

C194

Work Area C169A

Intake C196

Exam C197

Exam C198

Exam C199

Corridor C*1*12

Waiting

Room C145

Entry C-1-10L

Corridor C*1*15

Corridor C*1*19

Corridor C*1*16

Corridor C*1*17

Corridor C*1*18

Corridor C*1*20

Vestibule C144

Stair 10 S*1*10

Kit.

B152

Corridor C*1*23

Waiting

Area C100

Waiting

Room C100D

Stair 3 S*1*3

Corridor C*1*4

Sig B124B

Storage B132A

Recreation B151

Stor.

B151L

Office B125B

Conference B163D

Blessed

Sacrament B163E

Office C122B

Interview

Room C119J

Storage C135A

Entry A158B

M. Med.

Stor.

B151E

Elec.

B151K

M. Med.

Stor.

B151D

M. Med.

Stor.

B151C

Stor.

B151B

Med. Media B151A

Toilet B151I

Storage B151F Film Room

B151G Medical

Illust.

B151H

Closet B163F

Storage C162H

Entry C151A

HAC

A1028

Stair 11 S*1*11

Stair 8 S*1*8

Clerical B102A

Decon

Trailer A147E

Water

Treatment A101B

Shared

Office A1030

Office C1005A

PEC

C116H

PEC

C116F

Closet C119L

Volunteer

Storage A1036

Trailer C148

Desk A175C

Corridor C*1*21

Corridor C*1*22

Corridor C*1*9

Corridor C*1*13

Corridor C*1*10

Pharmacist

Counselor C145

PIV

Registrar C116G

Vending A134

Telecom Room

DN

UP

UP

DN DN

DN

UP

UP

UP

UP

DN

UP

UP

DN

DN

DN

DN DN

UPDN UP

DN

DN UP

DN

UP

DN

DN

A144A

Telecom Room

Telecom Room

A134A

Vending A134

P-120-C.1.1

P-120-C.1.1

PROVIDE DRIP PAN

WITH WATER SENSOR

S 4"

2"

S S

S

EX. CW & HW PIPING

PROVIDE DRIP PAN

PROVIDE WATER

SENSOR

PROVIDE WATER

SENSOR

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved: Project Director

ARCHITECT/ENGINEER OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

FULLY SPRINKLED

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383 F: 314.918.17664

/2 /2

:0 :4

A

M

P-120-C.1.1

PLUMBING FIRST FLOOR OVERALL &

ENLARGED PLANS

04-MAY-2022

DDPJDB

CINCINNATI VAMC EHRM

INFASTRUCTURE UPGRADES

539-21-701

3200 VINE ST. CINCINNATI, OH.

100% CONSTRUCTION

DOCUMENTS

1/16" = 1'-0"

PLUMBING - BUILDING #1 - OVERALL FIRST

FLOOR PLAN

1/4" = 1'-0"

CONF. ROOM A144A - FIRST FLOOR

PLUMBING PLAN

1/4" = 1'-0"

VENDING A134 - FIRST FLOOR PLUMBING

PLAN

/2

8/

Conference

Rm.

C236

Telecom Room

B232

Telecom Room

C236A

Telecom Room

A2006A

Stair 10 S*2*10

Lab B211

Recep.

A202

Imaging

Recep.

A201

Stor.

A202ADigital

Chest Rm.

A203

Dressing

Rm.

A203A

Speech

Pathlgy.

A204

Rehab

Care Line A205

Man Rehab

Care Line A206

Staff A207

Occupational

Therapy A208

EMG Lab A209

Rehab

Exam A210

Rehab

Exam A211

Elec.

A212

HAC

A213

Staff Tlt.

A214

PT Storage A215

Hydrotheraphy A216

Exam/Treatment

/ Exercise

Room A217

Physical

Ther.

Supervisor A218

Adl. Clinic A208A

EMG Lab A209A

Elec.

A217A

Corridor C*2*2

Light Box

Room A215B

SCI Exam A215A

Stor.

A218A

Stair 2 S*2*2

Oxygen

Storage A221

Therapy

Supervisor A222

Ante Room A223

Stor.

A210A

Equip

Wash A222B

Compressor

Room A222D

Equipment

Storage and Testing A228A

Storage A228B

Eto. Room B208A

Mech A228C

Office A230

Dressing

Rm.

A227B

Office A231

LKRS.

A227A

Shower A227

Elec.

A225B

Service

Lobby A225

Trash

Chute A225A

Lounge A226Training

Room A224

HAC

A225C

Office A232

Nuclear

Med. Sec.

C200

Waiting C201

Reading C202

Work Rm.

C203

CAT Scan

Room C204

Gamma

Camera C205

Uptake

Prep Bay C204A

Uptake

Area C204B

Uptake

Prep Room C204C

PET/CT

Scanner C204D

Echo Room C252 Echo Room

C251 Echo Rm

C250

Cath Lab C216O

Stor.

C216P

I.V. Prep

Rm.

C207

Elec.

C209

Control

Room C204E

Tlt.

C204F Tele.

C208

File Rm.

C200B

Chief Off.

C200A

Reading

Rm.

C250A

Chief Off.

C200C

Break

Room A240

Stair 1 S*2*1

Signal

Closet A239

M. Tlt.

A236

Tlt.

A235

G.P.

Radiography A242

Control A243

Storage A243A

Stair 5 S*2*5

Reading

Room A245

Gamma

Camera C210

Hot Lab C212

Stor.

C213

X-Ray

Room A246

Control A246A

Clos A243B

Clos A243C

Ultrasound A266

Corridor C*2*1

Elec.

A246B

Corridor C*2*3

Viewing A256

Reading

Room A257

Reading

Room A258

Adm.

A259

Chief

Radiology A260

Adm. Asst.

A261

Off.

A262

Resident

Reading

Room A263

Reading

Room A264

Reading

Room A262A

Tlt.

A260A

Pat. Rm.

A266B

Ultrasound A265

Stor A255 Tlt.

A253B

Break Rm.

A253

Elec.

A253A

HAC

A254

Digital

Radiography A252

Control A252A

Student

Off.

A251

Office A251B

Patient

Toilet A249C

Control A249B

BE

Fluororoom A249

Storage A249A

Work Rm.

A250A

Cl. Supp.

A296

Clean

Equipment A295

Sig. Clos.

A250

Clean

Supply

Room A251A

M. Lkrs.

A270

Tlt.

A270A

Staff

Lounge A269

F. Lkrs.

A271

Tlt.

A271A

Conf.

A272

RN

Manager A273

Elec.

A275

HAC

A274

On Call A276

Tlt.

A276A

Stair 9 S*2*9

Off.

A268

Off.

A267

Pat. Room A280

Pat. Room A281

Pat. Room A282

Pat Rm.

Pressure A283

Pat Rm.

Neg.

Pressure A284

Pat Rm.

Neg.

Pressure A285

Pat. Rm.

Neg.

Pressure A286

Pat. Rm A287

Pat. Rm.

A288

Pat. Rm.

Neg.

Pressure A289

Pat. Rm.

A290

Pat. Rm.

A291

Pat. Rm.

A292

Grieve/

Consult.

A293

Off.

A298 Meds.

A277

Nurse

Station A279

Staff Tlt.

A297

Lin.

A294

G.P.

Radiography A248

Tlt.

A248A

Trans.

A248B

Soil.

A278

Stair 4 S*2*4

Anatomic

Pathology

Gross

Room B215

Cytology B216

Special

Staining B217

Histology

Processing B218

Supervisor B219

Histology B220

Sig. Clos.

B221

Tele.

B222

Off.

B223

Sec.

B224

Operatory B225

Operatory B226

Dental Lab B227

Stor.

B228

Dental

Operatory B229

Dental

Hygeine B230

Oral Surg.

B231

Off.

B233

Corridor C*2*24

Lab Office B235

TB/ MYC

Lab B210B

TB/ MYC.

Lab B210C

ISO

B210D

ISO

B210E

Tele.

B210A

Lab B211A

Cold Rm.

B211B

Ante A235A

Dispatch

Area A236A

Clean

Supplies B201

F. Tlt.

B203A

M. Lkrs.

B202

Slide Stor.

B202A

F. Lkrs.

B203

Dir. Off.

B205

Off.

B207A

Elec.

B206

Corridor C*2*17

Off.

B207BOff.

B207C

Pathology

Off.

B209

Micro

Reading B208

Break

Room B210

HAC

B204

Corridor C*2*5

Corridor C*2*4

Stair 3 S*2*3

Waiting

Rm.

B224A

Oral Surg.

B231A

Off.

B233A

Stor.

B233B

Elec.

B233C

Off.

B235A

Tele.

B221C

Office B234A

Lab B234B

Lab B234C

Off.

B234D

Cancer

Registry B234E

Chief B234F

Off.

B234G

Prep Rm.

C214

Control C215

Cardiac

Cath Lab C216

Tlt.

C217

Waiting C218 Stair 6

S*2*6

Tele.

C220

Stor.

C221

Elec.

C222

Lockers C223

Lab Lounge C224

Hemo Stor.

C225

Mech.

C226

Lkrs.

C228

Chemistry

Hemotology

Lab C229

Blood Draw C230

Blood Bank C231

Storage C232

HAC

C234Storage

C235

Off.

C237

Break Rm.

C238

HAC

C239

Off.

C240

Off.

C241

Off.

C242

Off.

C243

Off.

C244

Stor.

C245

Exam C246

EKG Rm.

C247

Tlt.

C248

Scope

Wash C216A

Soil Ut.

C216B

Clean

Linen C216C

Observ.

C216D

Transfer C216E

Radiology

Spec Rm.

C216F

Scrub Area C216G

Cath Lab C216H

Control C216I

Equip C216J

Prep Mon C216K

Sterile

Supply C216L

Vestibule C216M

Control

Rm.

C216N

Bone

Density Lab C211

Tlt.

C216Q

Tlt.

C214A

CT

Scanner C214B

Sec.

C229A

Off.

C229B

Off.

C229C

Chief Off.

C229D

Clos C229E

Files C229F

Mech.

C229I

Special

Chem.

C229J

Toxicology C229K

Tele C229L

Elec.

C229M

Stor.

C229N

Shwr C228A

Tlt.

C228B

Off.

C229G

Off.

C229H

Soiled Ut.

C229O

Cold Stor.

C229P

Stair 8 S*2*8

Womens C2001

Mens C2003

Elec.

C2004

Blood Draw C2005

Work Rm.

C2007

HAC

C2008

Exam C2009

Intake C2010

Exam C2011

Stor.

C2012

Exam C2013

Stor.

C2014

Exam C2015

Exam C2016

Exam C2017

Exam C2018

Exam C2019

Waiting

Alcove C2020

Exam C2021

Exam C2023

Exam C2025

Tlt.

C2027

Gas Stor C2029

Lin.

C2031

Supply C2033Staff Tlt.

C2035

Soil C2037

Exam C2039

Tlt.

C2041

Exam C2043

Exam C2044

Exam C2045

Exam C2047 Exam

C2048

Exam C2049

Exam C2051

Exam C2052

Exam C2053

Exam C2054

Exam C2055

Exam C2056

Signal C2057

Office C2059

Exam C2069

Exam C2071

Exam C2072

Exam C2073

Exam C2074

Exam C2075

Exam C2076

Exam C2077

Work

Alcove C2078

Work

Alcove C2079

Exam C2080

Exam C2081

Exam C2082

Lin C2036

Break Rm.

C2038

Soiled

Utility A299

Elec.

A239A

Corridor C*2*25

Corridor C*2*12

Utility

Room B229A

Office B235B

Reception C2063

Waiting C2061

Storage C2067

Mech B208B

Stair C229R

Closet C216R

CT Room

#2 A2013

Stair 11 S*2*11

Clean

Supply A2011

Storage A2010

PACS

Read A2008

S.P.

Control A2009

Special

Procedures A2015

MRI

Component A2007

MRI Room A2001A

MRI

A2001

Equipment

Storage A2023

MRI

Equipment A2001B

MRI EMS

A2025

Corridor C*2*15

Waiting A2000

Dressing

Room A2002

Chage

Area A2002A

Toilet A2002B

Elec.

A2006

Signal A2005

Men Staff A2004

Women

Staff A2003

CT Control A2014

Adm.

Equip.

A2016A

CT Room

#1 A2016

S.P.

Equipment A2021

CT Prep A2017

Toilet A2018

Storage A2020

Office A2022

IR Reading A2024

Office A208A

CT Office A2019

Toilet A2024A

Storage A2026

Mechanical C232A

A/C Shaft

A/C Shaft

A/C Shaft

UP

DN

DN

DN

DN

UP

DN

UP

UP

DN UP DN

DN UP

UP

DN

UP

UP

Telecom Room

B232

B233A Stor.

P-130-C.1.2

ST

PROVIDE DRIP PAN

WITH WATER SENSOR

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved: Project Director

ARCHITECT/ENGINEER OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

FULLY SPRINKLED

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383 F: 314.918.17664

/2 /2

:0 :4

A

M

P-130-C.1.2

PLUMBING SECCOND FLOOR

OVERALL & ENLARGED PLANS

04-MAY-2022

DDPJDB

CINCINNATI VAMC EHRM

INFASTRUCTURE UPGRADES

539-21-701

3200 VINE ST. CINCINNATI, OH.

100% CONSTRUCTION

DOCUMENTS

1/16" = 1'-0"

PLUMBING - BUILDING #1 - OVERALL

SECOND FLOOR PLAN

1/4" = 1'-0"

DENTAL ROOM B232 - SECOND FLOOR

PLUMBING PLAN

/2

8/

S

A/C Shaft

BB

CC

G

K

L

H

F

AA

A.6A.6

SD

SP

Telecom Room

B312D

Telecom Room

Telecom Room

C305

C3008

/4

1/4" / 12"

1/4" / 12"

1/4" / 12"

1/4" / 12"

/4

" / 1

/4

" / 1

/4

" / 1

/4

" / 1

DN

ABOVE

DN TYP.

Isolation

Procedure

Rm.

C3024

Fluoro

Procedure

Rm.

C3023

Corridor C*3*14

Procedure

Rm.

C3021

Wash

Room C3020

Physician

Work Room C3019

Scope

Storage C3017

Ante Rm.

C3016

Scope

Cleaning C3016A

Procedure

Rm.

C3025

Procedure

Rm.

C3026

Prep/Recovery

Rm.

C3027

Clean

Supply C3014

Isolation

Prep/Recovery

Rm.

C3013Prep/Recovery

Rm.

C3028

Prep/Recovery

Rm.

C3029

Isolation

Prep/Recovery

Rm.

C3012

Prep/Recovery

Rm.

C3011

Prep/Recovery

Rm.

C3030

Prep/Recovery

Rm.

C3010

Staff Break

Rm.

C3009

Staff Toilet C3009A

Patient

Toilet Rm.

C3008

Storage C3007A

Signal

Clos.

C3035

Patient

Toilet Rm.

C3037

Prep/Recovery

Rm.

C3038

Prep/Recovery

Rm.

C3039

Post-Op C3040

Elec.

C3036A

Consult.

C3005

Lobby C3001

Waiting C3002

Staff

Lounge C326 Stair 10

S*3*10

Staff Work

Rm.

C3007

SPD Case

Cart C3034

O.R. #7 C329

O.R.

Storage C339

Anesthesia

Work Rm.

C337

Men's

Locker C324B

O.R. 1 C354

O.R. 2 C353

O.R.

Alcove C352

O.R.

Alcove C352A

O.R.

Alcove C352B

Light Rm.

C352C

O.R. 3 C351

O.R. 4 C350

Clean Core C340

Elec.

C338A

O.R. 5 C349

O.R. 6 C348

Mech.

C342

Corridor C*3*7

Women's

Locker C322

HAC

C346

Office C330

Cysto O.R.

C332

Cysto O.R.

C347

M. Shower C324AW. Shower

C322A

Sub-Waiting C3036

Work Rm.

C3004A

Nurse

Station C3031

Sterile Core C347A

Frozen

Section C316 Utility

C320

Office C318 Elec.

C335

Tele.

C333

Corridor C*3*9

Entry C324

A/C Shaft C337A

Soiled

Utility C3032

Men's C3002A

Women's C3002B

Pat. Tlt.

C3022

Reception C3004

Dr. Office C315

Office C317

Office C319

Office C321

Office C323

Office C325

Stair 6 S*3*6

Anesthesia

Tech.

C328

Cleaning

Supply C3016B

Temp.

Control C3005A

Oxygen

Storage C369

Vestibule C322B

Vestibule C324C

HAC

C3033

Patient

Room A387A

Patient

Room A387B

Patient

Room A387C

Patient

Room A387D

Patient

Room A387E

Patient

Room A387F

Patient

Room A387G

Shower A387H

Patient

Room A387I

Patient

Room A387J

Patient

Room A387K

Nurse

Station A387

Service

Lobby A338

M. Locker A339

F. Locker A340

Corridor C*3*19

RO DI

Water A343

De-Gown A342

Gowning

Rm.

A341

De-Con B303Prep/Pack

B307C

HAC

B303A

HAC

B307D

Office B305B

Office B305A

Office B305C

Conf Rm.

B305D

Vendor

Drop Off B304

Cool Down

Cart B307B

Steam

Equip Rm.

B307A

Open

Office B305

Ante Rm/

Clean Exit B307

Elec B306

Vasc. Lab A300

Vascular

Lab A301

Chief Diet.

A302

Diet Sec.

A303

Diet Off.

A305F. Tlt.

A306A

Waiting A307

Exam A308

Exam A309

Storage A310

Lab A311

Machine A311A

Plaster A312

CAD/CAM

A313

Off.

A314

Elec.

A315

M. Tlt.

A316

Stor.

A317

HAC

A318

Asst. Chief A319

Pros. Adm.

Asst.

A320

Clos.

A320A

Chief Off.

A321

Ward Adm.

Off.

A323

Adm. Asst.

A324

Office A324A

Office A324B

Office A324C

Chief PBS A324D

Office A324E

Office A324G

Stor.

A324F

Stor.

A324H

Elec.

A331A

Pros. Stor.

A330

Pros. Off.

A332

Stair 2 S*3*2 Stor.

A335

Stor.

A336

Asst. Chief

Diet.

A337

Corridor C*3*2

F. Tlt.

A341

M. Tlt.

A342

Stair 1 S*3*1

Stor.

A344

Sig.

A345

Stor.

A344A

Tlt.

A347A

Vasc. Lab A347

Elec.

A350

Mech.

A351

Adm. Asst.

A352

Off.

A353

Conf.

A354

Chief of

Surgery A355

Off.

A356

Off.

A357

Off.

A358

Off.

A359

Off.

A360

Off.

A361

Corridor C*3*3

Off.

A355A

Physician

Review A355B

Linen Clos.

A389

Nurse Off.

A390

Soil Utility A391

Equip. Stor.

A392

HVAC

A394

Elec.

A395

Sig.

A396

Clean

Supply A397

Vasc. Lab A379

HAC

A378

HAC

A380

Lounge A382

Tlt.

A382A

M. Lock.

A382BFemale

Locker A382C

Soc. Wrk.

A383

Respiratory

Therapy A384

Conference

Room A385

Pharm.

A386

On Call A381

Tlt.

A381A

Patient

Advocate A348

Off.

A349

Stair 5 S*3*5

Off.

A350B

Off.

A350D

Off.

A350A

Off.

A350C

Corridor C*3*1

Elect.

A346

Classroom B308

Nurse

Educator B309Stor.

B310

Office B311

Office B310A

Conf.

B310B

Off.

B311A

Off.

B311B

Lounge B311C

Asst. Ch.

B311D

Asst. Ch.

B311E

Adm. Off.

B311F

Word Proc.

B311G

Off.

B311H

Chief Nurse B311I

Research

Off.

B312

Off.

B312A

Sig.

B312B

Elec.

B312C

Stair 3 S*3*3

Nursing

Conf.

B314

F. Tlt.

B315

Stor.

B316

Eq. Stor.

B317

Res. Stor.

B318

Stor.

B319

Classroom B320

Office B321

Off.

B319A

Off.

B319B

Off.

B319C

Off.

B319D

Stor.

B321A

Classroom B321B

Work Area B320A

Stor.

B320B

Stor.

B320C

HAC

B319E

Stair 4 S*3*4

Stor.

B311M

Corridor C*3*5

Learning

Exchange B322

Work Area B322A

Work Area B322B

Elec.

B322C

Pat. Dining B325

Family

Waiting B326

Reception B327

Office C300

Consult C301

Break Rm.

C302

Patient Tlt.

C303

PACU

C304

C305 Office C306

Acute Care C307

Storage C308

Corridor C*3*6

Patient Rm.

C304A

Patient Rm C304B

Patiet Rm C304C

Meds.

C304D

Clean

Supp.

C304E

Patient Rm.

C304F

Patient Rm.

C304G

Patient Rm.

C304H

Patient Rm.

C304IPatient Tlt.

C304J

Patient Rm.

C304K

Patient Rm.

C304L

Patient Rm.

C304M

Patient Rm.

C304N

Patient Rm.

C304O

EMS

C360Off.

C361

Clean

Stretcher

Stor.

C355

Anaesthetics C356

Soil C357

Storage C358

HAC

C359

Electrical C309

Family

Wtng.

C310

Tele C311

Lactation C312

Grieve

Consult C313

ICU Dir.

Off.

C314

Corridor C*3*17

Adm. Asst.

A307A

Stor.

A324I

Tlt.

A388

Stair 9 S*3*9

HAC

B301

Db. Wtr B302

Tlt.

C302A

Tr. Ch.

A338A

Stair 8 S*3*8

Elec A338B

Linen Clost.

C3015

Corridor C*3*11

Corridor C*3*12

Corridor C*3*13

Corridor C*3*16

Corridor C*3*15

Corridor C*3*18

Room B303B

Room B307E

Storage B308A

Mechanical

A3002

Areaway

AW-1

Areaway

AW-2

Stair #11

A3001

Vestibule

A3003

A3004

A/C Shaft

A/C Shaft

UP

UP

UP

UP

UP

UP

UP

UP

DN

DN

DN

DNUP

DN UP

DN

UP

UPDN

DN

UP

T

P-140-C.1.3

REMOVE EXISTING FIXTURES

AND ASSOCIATED PIPING, CAP

BACK TO AN ACTIVE MAIN

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved: Project Director

ARCHITECT/ENGINEER OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

FULLY SPRINKLED

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383 F: 314.918.17664

/2 /2

:0 :5

A

M

P-140-C.1.3

PLUMBING THIRD FLOOR OVERALL &

ENLARGED PLANS

04-MAY-2022

AuthorApprover

CINCINNATI VAMC EHRM

INFASTRUCTURE UPGRADES

539-21-701

3200 VINE ST. CINCINNATI, OH.

100% CONSTRUCTION

DOCUMENTS

1/16" = 1'-0"

PLUMBING - BUILDING #1 - OVERALL THIRD

FLOOR PLAN

1/4" = 1'-0"

FAMILY WAITING ROOM C310 -THIRD

FLOOR - PLUMBING DEMOLITON PLAN

/2

8/

A/C ShaftA/C Shaft

A/C Shaft

DN

Reception A400

Interview A401

Interview A401A

Reception A401BInterview

A402A

HAC

A403

Stor.

A404

Med Room A405

Exam Rm.

A406

Exam Rm.

A407

Exam Rm.

A408

Exam Rm.

A409

Exam Rm.

A410

Exam Rm.

A411

Exam Rm.

A412

Exam Rm.

A413

Exam Rm.

A414

Exam Rm.

A415

Exam Rm.

A416

Exam Rm.

A417

Stor.

A418

Elec.

A418A

Stor.

A420

Staff Tlt.

A421

HSRD

Office A422

Dr's

Off.

A423

HSRD

Off.

A424

Oncology

Pharmacy

Sattelite A425

Chemo

Prep.

A425A

IRM Office A427

Stair 2 S*4*2

HSRD

Off.

A424A

Comp.

Training A430

Comp.

Specialist

Off.

A431

Service

Lobby A436

IRM

Network

Operation

Center A437

Comp.

Programmer

Off.

A439

Computer

Off.

A440

A441

Res. Off.

A442

Stair 1 S*4*1

IRM

Storage

(Hdwr) A444

Elec.

A445

Toilet A446

Toilet A446A

IRM

Storage

(Comm) A445A

Infusion A449

Tlt.

A449A

Stair 5 S*4*5

Sub. Lab.

A453 Pharm.

A454

Exam A455

Elec.

A456

Stor.

A457A

S.B.

A457B

Tlt.

A457C

D.B.

A457D

Proc.

A457E

Nurse

Station A457F

Lab.

A457G

Exam A458

Exam A458A

Exam A458B

Exam A458C

Elec.

A459

Stor.

A460

Soil. Util.

A461

CL. Lin.

A462

Exam A463

Exam 2 A464

Exam 4 A465

Exam 6 A466

Exam 8 A467

Exam 10 A468

Exam 9 A469

Exam 7 A470

Exam 5 A471

Exam 3 A472

Exam 1 A473

Exam A474

KIT.

A475

Supp.

A476

HAC

A477

Waiting A478

GCRC

Corridor A457

Tlt.

A457H

Tlt.

A474A

Waiting A402B

Trash

Chute A435

Stor.

A436A

Elec.

A436B

Comp. Rm.

A437C

Stor.

A444A

Tlt.

A464A

Tlt.

A473A

Tlt.

A465A

Tlt.

A471A

Tlt.

A467A

Tlt.

A470A

Corridor C*4*2

HSRD

Off.

A424E

HSRD

Off.

A424D

Common

Area A424C

Dir.

Off.

A424B

Dr's

Off.

A423A

Social

Worker A422A

Tlt.

A406A

HSRD

Off.

A424F

HSRD

Off.

A424G

A442A

Corridor C*4*1

Elec.

A424H

Tlt.

A416A

Tlt.

A414A

Tlt.

A413A

Tlt.

A410A

Tlt.

A408A

Tlt.

A407A

Tlt.

A463A

Tlt.

A439A

Staff

Physician B403A

Neuro

Office B439

Regular

E.E.G B403B

E.E.G.

Control &

Observation B403

F. Tlt.

B406

M. Tlt.

B407

Auto-Clave

Dishwasher B408

HAC

B409

Elec.

B410

LAB.

Procedure

Rm B411

W. Lab.

B412

Ram Lab.

B412A

Tissue

Culture B412B

Office B412C

Stair 4 S*4*4

Electrophoresis

Core B413A

RAM Lab.

B413B

Corridor C*4*5

Infectious

Disease

Lab B414

Hazardous

Compounding B414B

Non-Hazardous

Compounding B414D Office

B415

Cold Rm.

B415A

Freez.

B415B

Sig. Clos.

B416

Elec.

B417

Stair 3 S*4*3

Research

Adm. Off.

B420

Adm. Off.

B420B

CFBRE Off.

B421

Conf.

B425

Clos.

B425A

Office B426A

Associate

Chief of

Staff/Research B426

Office B427

Office B428

HAC

B429

Refrig.

B430

Elec.

B431

Lab B432

Tissue

Culture B433A

Mic Rotomy B435

Microscope

Core B436

Office B437

Evoked

Potential

Lab B438

Copier

Room B437A

Corridor B429A

Director's

Office B429B

Mech

Room A456E

Hazardous

Storage B414A

Work

Station

Area B414

Ante Room B414C

Telecom Room

DN

UP DNUP

DN

UP

DN

UP

UP

DN

IRMStor.

Elec.

A436B

Comp. Rm.

A437C

Stor.

A444A

Corridor C*4*1

P-150-C.1.4

WS-1

WS-1

WS-1 WS-1

WS-1 WS-1

12' CABLE WITH WATER

SENSORS (TYP.)

WATER SENSOR (WS-1)

(TYP. 6 LOCATIONS) P.C.

TO PROVIDE AND THE

MECHANICAL CONTROLS

CONTRACTOR TO

CONNECT TO BAS.

INSTALLED BELOW

RAISED FLOOR.

CONNECT 1/2"

CW TO WATER

SUPPLY OF EWC

IN CORRIDOR.

ETP-1

SHUT OFF VALVE

1/2" CW-DN

PROVIDE AND INSTALL A 3"FD-1

FLOOR DRAIN WITH DEEP SEAL

TRAP AND P-TRAP WITH TRAP

PRIMER CONNECTION

DRAIN FROM FLOOR DRAIN TO

TERMINATE INDIRECTLY 1"

ABOVE THE RIM OF THE MOP

BASIN ON THE 3RD FLOOR

DIRECTLY BELOW.

A W

PROVIDE DRIP

PAN WITH

WATER SENSOR

(WS-1)

3" ACID WASTE

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project TitlePhaseDrawing Title

Approved: Project Director

ARCHITECT/ENGINEER OF RECORDCONSULTANT

Revisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784

San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

FULLY SPRINKLED

6 SOUTH OLD ORCHARD

WEBSTER GROVES, MO. 63119

T: 314.918.8383 F: 314.918.17664

/2 /2

:0 :5

A

M

P-150-C.1.4

PLUMBING FOURTH FLOOR OVERALL

& ENLARGED PLANS

04-MAY-2022

DDPJDB

CINCINNATI VAMC EHRM

INFASTRUCTURE UPGRADES

539-21-701

3200 VINE ST. CINCINNATI, OH.

100% CONSTRUCTION

DOCUMENTS

1/16" = 1'-0"

PLUMBING - BUILDING #1 - OVERALL

FOURTH FLOOR PLAN

1/4" = 1'-0"

COMPUTER ROOM A 437C - FOURTH FLOOR

NEW WORK PLAN - PLUMBING

PLUMBING MATERIAL SPECIFICATIONS

1. FLOOR DRAIN (FD-1) SHALL BE J.R. SMITH 2005-NB-P050 OR EQUAL.

2. WATER SENSOR (WS-1) SHALL BE A WATER ALERT DETECTOR XSS-5 WITH TWO SC-12 SENSOR CABLES AND WITH POWER

OPTION "VOLTAGE MODULE" AS MANUFACTURED BY DORLEN PRODUCTS IN. OR EQUAL.

3. ELECTRONIC TRAP PRIMER (ETP-1) SHALL BE PPP INC. ELECTRONIC TRAP PRIMER MODEL 695-ES01 OR EQUAL.

4. COLD WATER PIPING SHALL BE 1/2" TYPE "L" HARD DRAWN COPPER PIPE WITH SOLDERED FITTING. SOLDER SHALL BE LEAD-FREE LEAD FREE WATER SOLUBLE PASTE FLUX SHALL BE USED FORR JOINING FITTINGS AND COUPLINGS.

5. COLD WATER PIPING SHALL BE INSULATED WITH 1/2: THICK 25/50 ARMAFLEX OR EQUAL.

6. SHUT OFF VALVES SHALL BE APOLLO 77CLF LEAD FREE BRONZE BALL VALVE OR EQUAL.

7. WASTE PIPING SHALL BE SERVICE WEIGHT CAST IRON PIPE WITH HEAVY DUTY NO-HUB COUPLINGS.

/2

8/

FP-203-C.1 .B THRU 3 - FIRE PROTECTION ENLARGED PLANS
FP-204-C.1.4 THRU 9 - FIRE PROTECTION ENLARGED PLANS
FP-205-C.1.4 - FIRE PROTECTION FOURTH FLOOR CLEAN AGENT PLAN

This is the start of the file's text. The full file is on GovTribe.