ATTACHMENT 2 - Drawings 1 of 13.pdf

PDF 12 MB Posted

Attached to
36C77623B0005 EHRM Infrastructure Upgrades - Cincinnati Project #539-21-701
Solicitation number
36C77623B0005
Issued by

About this file

This document provides details on a federal solicitation and related file. The solicitation number 36C77623B0005 is for the Construction of the EHRM Infrastructure Upgrades at the Cincinnati VAMC, Project #539-21-701. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin for an opportunity type of Solicitation. Attachment 2 is a drawing file with 13 pages related to the project, which involves upgrades to infrastructure at the Cincinnati VA Medical Center. The solicitation appears to be currently open with no specified response or award dates provided in the given information.

View the file

Other files

File Type Posted
36C77623B0005 0004 - Extension 3-10-23.pdf PDF
Technical Questions and Answers - Cincinnati EHRM.pdf PDF
36C77623B0005 0003.pdf PDF
36C77623B0005 0002 - EHRM Infrastructure Upgrades - Cincinnati.pdf PDF
Site Visit Sign-In Sheet - 36C77632B0005 EHRM Infrastructure Construction - Cincinnati VAMC.pdf PDF
ATTACHMENT 24 - Construction Wage Rates - Hamilton 01-13-2023.pdf PDF
36C77623B0005 0001 - EHRM Infrastructure Upgrades - Cincinnati.pdf PDF
Site Visit Memorandum.pdf PDF
ATTACHMENT 4 - Drawings 3 of 13.pdf PDF
ATTACHMENT 23 - Contractor Safety - Environmental Form.pdf PDF
ATTACHMENT 6 - Drawings 5 of 13.pdf PDF
ATTACHMENT 18 - Technology Narrative.pdf PDF
ATTACHMENT 13 - Drawings 12 of 13.pdf PDF
ATTACHMENT 15 - Plumbing Narrative.pdf PDF
ATTACHMENT 19 - Hazardous Materials Inspection Report.pdf PDF
ATTACHMENT 24 - Construction Wage Rates - Hamilton 1-13-2022.pdf PDF
ATTACHMENT 21 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 14 - Drawings 13 of 13.pdf PDF
ATTACHMENT 20 - Brand Name Justification.pdf PDF
ATTACHMENT 22 - Limitations on Subcontracting - Nov 2022.pdf PDF
ATTACHMENT 9 - Drawings 8 of 13.pdf PDF
ATTACHMENT 10 - Drawings 9 of 13.pdf PDF
ATTACHMENT 16 - Mechanical Narrative.pdf PDF
ATTACHMENT 7 - Drawings 6 of 13.pdf PDF
ATTACHMENT 3 - Drawings 2 of 13.pdf PDF
ATTACHMENT 17 - Electrical Narrative.pdf PDF
ATTACHMENT 25 - Site Visit Instructions.pdf PDF
ATTACHMENT 8 - Drawings 7 of 13.pdf PDF
ATTACHMENT 11 - Drawings 10 of 13.pdf PDF
ATTACHMENT 12 - Drawings 11 of 13.pdf PDF
ATTACHMENT 5 - Drawings 4 of 13.pdf PDF
36C77623B0005 Solicitation - Cincinnati EHRM.pdf PDF
ATTACHMENT 1 - Specifications.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANAGEMENT,

ARCHITECTURE, & TECHNOLOGY

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

4-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

ETS

T

TA

GE

S

R I

E T E X

FO

T

CE

TI

H

AS

DER CRA

F. BIAN

C

OJ

O

SE

P

H

7 6 22 1

5/4/22

CINCINNATI VAMC

3200 VINE ST.

CINCINNATI, OH 45220

CINCINNATI VAMC EHRM INFRASTRUCTURE UPGRADES

PROJECT # 539-21-701

GI-000

COVER SHEET

RAC

IAR, JFB

TECHNOLOGY, SECURITY & MEP

6 S. Old Orchard Ave.

Webster Groves, MO 63119

Phone: 314-918-8383 www.rossbar.com

ABATEMENT

8000 IH 10 W, Ste 600 San Antonio, Texas 78230

Phone: (661)203-8172 www.Desert-Concepts.com

10/18/22 18-OCT-2221-OCT-225/4/22

INDEX OF DRAWINGS

ABATEMENT

HA-101 HAZARDOUS MATERIALS - ASBESTOS

HA-102 HAZARDOUS MATERIALS - ASBESTOS

HA-103 HAZARDOUS MATERIALS - ASBESTOS

HA-104 HAZARDOUS MATERIALS - ASBESTOS

HA-105 HAZARDOUS MATERIALS - ASBESTOS

HA-106 HAZARDOUS MATERIALS - ASBESTOS

HA-107 HAZARDOUS MATERIALS - ASBESTOS

ARCHITECTURAL

GI-000 COVER

GI-010 INDEX OF DRAWINGS

GI-011 INDEX OF DRAWINGS

GI-020 GENERAL INFORMATION, SYMBOLS, & LOCATION MAP

GI-030 ABBREVIATIONS

GI-040 ACCESSIBILITY STANDARDS

GI-041 ACCESSIBILITY STANDARDS

GI-042 ACCESSIBILITY STANDARDS

GI-043 ACCESSIBILITY STANDARDS

GI-044 ACCESSIBILITY STANDARDS

AD-100-C.1.B ENLARGED FLOOR PLANS - BASEMENT - DEMOLITION

AD-101-C.1.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION

AD-102-C.1.2 ENLARGED FLOOR PLANS - 2ND FLOOR - DEMOLITION

AD-103-C.1.3 ENLARGED FLOOR PLANS - 3RD FLOOR - DEMOLITION

AD-104-C.1.4 ENLARGED FLOOR PLANS - 4TH FLOOR - DEMOLITION

AD-105-C.1.5 ENLARGED FLOOR PLANS - 5TH FLOOR - DEMOLITION

AD-106-C.1.6 ENLARGED FLOOR PLANS - 6TH FLOOR - DEMOLITION

AD-107-C.1.7 ENLARGED FLOOR PLANS - 7TH FLOOR - DEMOLITION

AD-108-C.1.8 ENLARGED FLOOR PLANS - 8TH FLOOR - DEMOLITION

AD-109-C.1.9 ENLARGED FLOOR PLANS - 9TH FLOOR - DEMOLITION

AD-140-C.2.B ENLARGED FLOOR PLANS - BASEMENT - DEMOLITION

AD-141-C.2.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION

AD-142-C.2.2 ENLARGED FLOOR PLANS - 2ND FLOOR - DEMOLITION

AD-150-C.3.B ENLARGED FLOOR PLANS - BASEMENT - DEMOLITION

AD-160-C.8.2 ENLARGED FLOOR PLANS - 2ND FLOOR - DEMOLITION

AD-180-C.15.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION

AD-190-C.TB.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION

AD-200-C.TE.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION

AD-210-FT.64.B ENLARGED FLOOR PLANS - BASEMENT - DEMOLITION

AD-211-FT.64.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION

AD-212-FT.64.2 ENLARGED FLOOR PLANS - 2ND FLOOR - DEMOLITION

AD-213-FT.64.3 ENLARGED FLOOR PLANS - 3RD FLOOR - DEMOLITION

AD-220-FT.117.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION

AS-100-C.1.SB OVERALL FLOOR PLAN - SUB-BASEMENT - AREA 1

AS-101-C.1.SB OVERALL FLOOR PLAN - SUB-BASEMENT - AREA 2

AS-102-C.1.SB OVERALL FLOOR PLAN - SUB-BASEMENT - AREA 3

AS-103-C.1.B OVERALL FLOOR PLAN - BASEMENT - AREA 1

AS-104-C.1.B OVERALL FLOOR PLAN - BASEMENT - AREA 2

AS-105-C.1.B OVERALL FLOOR PLAN - BASEMENT - AREA 3

AS-106-C.1.B OVERALL FLOOR PLAN - BASEMENT - AREA 4

AS-107-C.1.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 1

AS-108-C.1.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 2

AS-109-C.1.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 3

AS-110-C.1.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 4

AS-111-C.1.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 1

AS-112-C.1.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 2

AS-113-C.1.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 3

AS-114-C.1.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 4

AS-115-C.1.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 1

AS-116-C.1.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 2

AS-117-C.1.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 3

AS-118-C.1.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 4

AS-119-C.1.4 OVERALL FLOOR PLAN - FOURTH FLOOR - AREA 1

AS-120-C.1.4 OVERALL FLOOR PLAN - FOURTH FLOOR - AREA 2

AS-121-C.1.4 OVERALL FLOOR PLAN - FOURTH FLOOR - AREA 3

AS-122-C.1.4 OVERALL FLOOR PLAN - FOURTH FLOOR - AREA 4

AS-123-C.1.5 OVERALL FLOOR PLAN - FIFTH FLOOR - AREA 1

AS-124-C.1.5 OVERALL FLOOR PLAN - FIFTH FLOOR - AREA 2

AS-125-C.1.5 OVERALL FLOOR PLAN - FIFTH FLOOR - AREA 3

AS-126-C.1.6 OVERALL FLOOR PLAN - SIXTH FLOOR - AREA 1

AS-127-C.1.6 OVERALL FLOOR PLAN - SIXTH FLOOR - AREA 2

AS-128-C.1.6 OVERALL FLOOR PLAN - SIXTH FLOOR - AREA 3

AS-129-C.1.7 OVERALL FLOOR PLAN - SEVENTH FLOOR - AREA 1

AS-130-C.1.7 OVERALL FLOOR PLAN - SEVENTH FLOOR - AREA 2

AS-131-C.1.7 OVERALL FLOOR PLAN - SEVENTH FLOOR - AREA 3

AS-132-C.1.8 OVERALL FLOOR PLAN - EIGHTH FLOOR - AREA 1

AS-133-C.1.8 OVERALL FLOOR PLAN - EIGHTH FLOOR - AREA 2

AS-134-C.1.9 OVERALL FLOOR PLAN - NINTH FLOOR - AREA 1

AS-135-C.1.9 OVERALL FLOOR PLAN - NINTH FLOOR - AREA 2

AS-140-C.2.B OVERALL FLOOR PLAN - BASEMENT - AREA 1

AS-141-C.2.B OVERALL FLOOR PLAN - BASEMENT - AREA 2

AS-142-C.2.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 1

AS-143-C.2.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 2

AS-144-C.2.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 1

AS-145-C.2.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 2

AS-150-C.3.B OVERALL FLOOR PLAN - BASEMENT

AS-151-C.3.1 OVERALL FLOOR PLAN - FIRST FLOOR

AS-152-C.3.2 OVERALL FLOOR PLAN - SECOND FLOOR

AS-160-C.8.1 OVERALL FLOOR PLAN - FIRST FLOOR

AS-161-C.8.2 OVERALL FLOOR PLAN - SECOND FLOOR

AS-162-C.8.4 OVERALL FLOOR PLAN - FOURTH FLOOR

AS-180-C.15.B OVERALL FLOOR PLAN - BASEMENT

AS-181-C.15.1 OVERALL FLOOR PLAN - FIRST FLOOR

AS-182-C.15.2 OVERALL FLOOR PLAN - SECOND FLOOR

AS-183-C.15.3 OVERALL FLOOR PLAN - THIRD FLOOR

AS-184-C.15.4 OVERALL FLOOR PLAN - FOURTH FLOOR

AS-190-C.TB.1 OVERALL FLOOR PLAN - FIRST FLOOR

AS-200-C.TE.1 OVERALL FLOOR PLAN - FIRST FLOOR

AS-210-FT.64.B OVERALL FLOOR PLAN - BASEMENT - AREA 1

AS-211-FT.64.B OVERALL FLOOR PLAN - BASEMENT - AREA 2

AS-212-FT.64.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 1

AS-213-FT.64.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 2

AS-214-FT.64.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 1

AS-215-FT.64.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 2

AS-216-FT.64.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 1

AS-217-FT.64.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 2

AS-220-FT.117.1 OVERALL FLOOR PLAN - FIRST FLOOR

AS-300 ROOF PLAN - BUILDING 1

AS-301 ROOF PLANS - BUILDINGS 2, 3, 8, 15, & 64

AS-310 ROOF DETAILS

AS-400-C.1.B ENLARGED FLOOR PLANS - BASEMENT - RENOVATION

AS-401-C.1.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION

ARCHITECTURAL (CONTINUED)

AS-402-C.1.2 ENLARGED FLOOR PLANS - 2ND FLOOR - RENOVATION

AS-403-C.1.3 ENLARGED FLOOR PLANS - 3RD FLOOR - RENOVATION

AS-404-C.1.4 ENLARGED FLOOR PLANS - 4TH FLOOR - RENOVATION

AS-405-C.1.5 ENLARGED FLOOR PLANS - 5TH FLOOR - RENOVATION

AS-406-C.1.6 ENLARGED FLOOR PLANS - 6TH FLOOR - RENOVATION

AS-407-C.1.7 ENLARGED FLOOR PLANS- 7TH FLOOR - RENOVATION

AS-408-C.1.8 ENLARGED FLOOR PLANS - 8TH FLOOR - RENOVATION

AS-409-C.1.9 ENLARGED FLOOR PLANS - 9TH FLOOR - RENOVATION

AS-440-C.2.B ENLARGED FLOOR PLANS - BASEMENT - RENOVATION

AS-441-C.2.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION

AS-442-C.2.2 ENLARGED FLOOR PLANS - 2ND FLOOR - RENOVATION

AS-450-C.3.B ENLARGED FLOOR PLANS - BASEMENT - RENOVATION

AS-460-C.8.2 ENLARGED FLOOR PLANS - 2ND FLOOR - RENOVATION

AS-480-C.15.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION

AS-490-C.TB.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION

AS-500-C.TE.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION

AS-510-FT.64.B ENLARGED FLOOR PLANS - BASEMENT - RENOVATION

AS-511-FT.64.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION

AS-512-FT.64.2 ENLARGED FLOOR PLANS - 2ND FLOOR - RENOVATION

AS-513-FT.64.3 ENLARGED FLOOR PLANS - 3RD FLOOR - RENOVATION

AS-520-FT.117.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION

AS-530 INTERIOR ELEVATIONS & EXISTING ROOM PHOTOS

AS-600 PARTITION TYPES

AS-700 DOOR SCHEDULE, DOOR & FRAME TYPES

AS-710 DOOR & MISCELLANEOUS DETAILS

AS-720 ROOM FINISH SCHEDULE & MATERIAL SCHEDULE

FIRE PROTECTION

FP-000 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS

FP-110-C.1.B FIRE PROTECTION BASEMENT OVERALL PLAN

FP-120-C.1.1 FIRE PROTECTION FIRST FLOOR OVERALL PLAN

FP-130-C.1.2 FIRE PROTECTION SECOND FLOOR OVERALL PLAN

FP-140-C.1.3 FIRE PROTECTION THIRD FLOOR OVERALL PLAN

FP-150-C.1.4 FIRE PROTECTION FOURTH FLOOR OVERALL PLAN

FP-160-C.1.5 FIRE PROTECTION FIFTH FLOOR OVERALL PLAN

FP-170-C.1.6 FIRE PROTECTION SIXTH FLOOR OVERALL PLAN

FP-180-C.1.7 FIRE PROTECTION SEVENTH FLOOR OVERALL PLAN

FP-190-C.1.8 FIRE PROTECTION EIGHTH FLOOR OVERALL PLAN

FP-200-C.1.9 FIRE PROTECTION NINTH FLOOR OVERALL PLAN

FP-201-C.1.B THRU 3 FIRE PROTECTION DEMOLITION ENLARGED PLANS

FP-202-C.1.4 THRU 9 FIRE PROTECTION DEMOLITION ENLARGED PLANS

FP-203-C.1.B THRU 3 FIRE PROTECTION ENLARGED PLANS

FP-204-C.1.4 THRU 9 FIRE PROTECTION ENLARGED PLANS

FP-205-C.1.4 FIRE PROTECTION FOURTH FLOOR CLEAN AGENT PLAN

FP-210-C.2.B FIRE PROTECTION BASEMENT OVERALL & ENLARGED PLANS

FP-211-C.2.1 FIRE PROTECTION FIRST FLOOR OVERALL & ENLARGED PLANS

FP-212-C.2.2 FIRE PROTECTION SECOND FLOOR OVERALL & ENLARGED PLANS

FP-230-C.3.B FIRE PROTECTION BASEMENT OVERALL & ENLARGED PLANS

FP-260-C.15.1 FIRE PROTECTION FIRST FLOOR OVERALL & ENLARGED PLANS

FP-300-FT.64.B FIRE PROTECTION BASEMENT OVERALL & ENLARGED PLANS

FP-301-FT.64.1 FIRE PROTECTION FIRST FLOOR OVERALL & ENLARGED PLANS

FP-302-FT.64.2 FIRE PROTECTION SECOND FLOOR OVERALL & ENLARGED PLANS

FP-303-FT.64.3 FIRE PROTECTION THIRD FLOOR OVERALL & ENLARGED PLANS

FP-710 DETAILS

FA-206.C.1.3 FIRE ALARM THIRD FLOOR ENLARGED PLAN

PLUMBING

P-000 PLUMBING SYMBOLS AND ABBREVIATIONS

P-120-C.1.1 PLUMBING FIRST FLOOR OVERALL & ENLARGED PLANS

P-130-C.1.2 PLUMBING SECOND FLOOR OVERALL & ENLARGED PLANS

P-140-C.1.3 PLUMBING THIRD FLOOR OVERALL & ENLARGED PLANS

P-150-C.1.4 PLUMBING FOURTH FLOOR OVERALL & ENLARGED PLANS

P-180-C.1.7 PLUMBING SEVENTH FLOOR OVERALL & ENLARGED PLANS

P-190-C.1.8 PLUMBING EIGHTH FLOOR OVERALL & ENLARGED PLANS

P-200-C.1.9 PLUMBING NINTH FLOOR OVERALL & ENLARGED PLANS

P-210-C.2.B PLUMBING BASEMENT OVERALL & ENLARGED PLANS

P-211-C.2.1 PLUMBING SECOND FLOOR & ENLARGED PLANS

P-240-C.8.2 PLUMBING SECOND FLOOR OVERALL & ENLARGED PLANS

P-260-C.15.1 PLUMBING FIRST FLOOR OVERALL & ENLARGED PLANS

P-300-FT.64.2 PLUMBING SECOND FLOOR OVERALL & ENLARGED PLANS

MECHANICAL

M-000 MECHANICAL SYMBOLS & ABBREVIATIONS

M-101-C.1.B BASEMENT OVERALL HVAC NEW WORK PLAN

M-102-C.1.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN

M-103-C.1.2 SECOND FLOOR OVERALL HVAC NEW WORK PLAN

M-104-C.1.3 THIRD FLOOR OVERALL HVAC NEW WORK PLAN

M-105-C.1.4 FOURTH FLOOR OVERALL HVAC NEW WORK PLAN

M-106-C.1.5 FLOOR PLAN PARTIAL - FIFTH FLOOR

M-107-C.1.6 SIXTH FLOOR OVERALL HVAC NEW WORK PLAN

M-108-C.1.7 SEVENTH FLOOR OVERALL HVAC NEW WORK PLAN

M-109-C.1.8 EIGHTH FLOOR OVERALL HVAC NEW WORK PLAN

M-110-C.1.9 NINTH FLOOR OVERALL HVAC NEW WORK PLAN

M-111-C.1.10 TENTH FLOOR OVERALL HVAC NEW WORK PLAN

M-120-C.2.B BASEMENT OVERALL HVAC NEW WORK PLAN

M-121-C.2.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN

M-122-C.2.2 SECOND FLOOR OVERALL HVAC NEW WORK PLAN

M-130-C.3.B BASEMENT OVERALL HVAC NEW WORK PLAN

M-131-C.3.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN

M-132-C.3.2 SECOND FLOOR OVERALL HVAC NEW WORK PLAN

M-133-C.3.3 THIRD FLOOR OVERALL HVAC NEW WORK PLAN

M-140-C.8.2 SECOND FLOOR OVERALL NEW HVAC WORK PLAN

M-150-C.15.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN

M-151-C.15.2 SECOND FLOOR OVERALL NEW HVAC WORK PLAN

M-160-FT.64.B BASEMENT OVERALL HVAC NEW WORK PLAN

M-161-FT.64.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN

M-162-FT.64.2 SECOND FLOOR OVERALL HVAC NEW WORK PLAN

M-163-FT.64.3 THIRD FLOOR OVERALL HVAC NEW WORK PLAN

M-164-FT.64.4 ROOF OVERALL HVAC NEW WORK PLAN

MD-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT

MD-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR

MD-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR

MD-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR

MD-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR

MD-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR

MD-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR

MD-408-C.1.7 ENLARGED FLOOR PLAN - SEVENTH FLOOR

MD-409-C.1.8 ENLARGED FLOOR PLAN - EIGHTH FLOOR

MD-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR

MECHANICAL (CONTINUED)

MD-411-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR

MD-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT

MD-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL

MD-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL

MD-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT

MD-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR

MD-450-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR

MD-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT

MD-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR

MD-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR

MD-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR

MD-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR

MD-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR

M-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT

M-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR

M-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR

M-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR

M-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR

M-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR

M-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR

M-408-C.1.7 ENLARGED FLOOR PLANS - SEVENTH FLOOR

M-409-C.1.8 ENLARGED FLOOR PLANS - EIGHTH FLOOR

M-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR

M-411-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR

M-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT

M-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL

M-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL

M-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT

M-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR

M-450-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR

M-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT

M-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR

M-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR

M-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR

M-464-FT.64.4 ENLARGED FLOOR PLANS - ROOF

M-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR

M-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR

M-500 MECHANICAL DETAILS

M-600 MECHANICAL SCHEDULES

M-601 HVAC PIPING DIAGRAMS

M-700 MECHANICAL CONTROLS

M-701 MECHANICAL CONTROLS

ELECTRICAL

E-000 ELECTRICAL SYMBOLS

ED-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT

ED-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR

ED-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR

ED-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR

ED-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR

ED-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR

ED-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR

ED-408-C.1.7 ENLARGED FLOOR PLAN - SEVENTH FLOOR

ED-409-C.1.8 ENLARGED FLOOR PLAN - EIGHTH FLOOR

ED-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR

ED-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT

ED-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL

ED-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL

ED-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT

ED-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR

ED-450-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR

ED-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT

ED-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR

ED-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR

ED-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR

ED-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR

ED-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR

ED-600 ELECTRICAL DEMO - PANELBOARD SCHEDULES ROOM A437C

EL-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT

EL-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EL-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR

EL-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR

EL-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR

EL-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR

EL-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR

EL-408-C.1.7 ENLARGED FLOOR PLAN - SEVENTH FLOOR

EL-409-C.1.8 ENLARGED FLOOR PLAN - EIGHTH FLOOR

EL-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR

EL-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT

EL-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL

EL-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL

EL-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT

EL-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR

EL-440-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EL-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT

EL-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EL-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR

EL-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR

EL-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EL-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EL-500 LIGHT FIXTURE DESCRIPTIONS

EP-100-C.1.SB FLOOR PLAN - PARTIAL - BLDG. 1 - SUB-BSMT - AREA 1

EP-101-C.1.SB FLOOR PLAN - PARTIAL - BLDG. 1 - SUB-BSMT - AREA 2

EP-102-C.1.SB FLOOR PLAN - PARTIAL - BLDG. 1 - SUB-BSMT - AREA 3

EP-103-C.1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 1

EP-104-C.1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 2

EP-105-C.1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 3

EP-106-C.1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 4

EP-107-C.1.1 FLOOR PLAN - PARTIAL - BLDG. 1 - 1F - AREA 1

EP-108-C.1.1 FLOOR PLAN - PARTIAL - BLDG. 1 - 1F - AREA 2

EP-109-C.1.1 FLOOR PLAN - PARTIAL - BLDG. 1 - 1F - AREA 3

EP-110-C.1.1 FLOOR PLAN - PARTIAL - BLDG. 1 - 1F - AREA 4

EP-111-C.1.2 FLOOR PLAN - PARTIAL - BLDG. 1 - 2F - AREA 1

EP-112-C.1.2 FLOOR PLAN - PARTIAL - BLDG. 1 - 2F - AREA 2

EP-113-C.1.2 FLOOR PLAN - PARTIAL - BLDG. 1 - 2F - AREA 3

EP-114-C.1.2 FLOOR PLAN - PARTIAL - BLDG. 1 - 2F - AREA 4

EP-115-C.1.3 FLOOR PLAN - PARTIAL - BLDG. 1 - 3F - AREA 1

EP-116-C.1.3 FLOOR PLAN - PARTIAL - BLDG. 1 - 3F - AREA 2

ELECTRICAL (CONTINUED)

EP-117-C.1.3 FLOOR PLAN - PARTIAL - BLDG. 1 - 3F - AREA 3

EP-118-C.1.3 FLOOR PLAN - PARTIAL - BLDG. 1 - 3F - AREA 4

EP-119-C.1.4 FLOOR PLAN - PARTIAL - BLDG. 1 - 4F - AREA 1

EP-120-C.1.4 FLOOR PLAN - PARTIAL - BLDG. 1 - 4F - AREA 2

EP-121-C.1.4 FLOOR PLAN - PARTIAL - BLDG. 1 - 4F - AREA 3

EP-122-C.1.4 FLOOR PLAN - PARTIAL - BLDG. 1 - 4F - AREA 4

EP-123-C.1.5 FLOOR PLAN - PARTIAL - BLDG. 1 - 5F - AREA 1

EP-124-C.1.5 FLOOR PLAN - PARTIAL - BLDG. 1 - 5F - AREA 2

EP-125-C.1.5 FLOOR PLAN - PARTIAL - BLDG. 1 - 5F - AREA 3

EP-126-C.1.6 FLOOR PLAN - PARTIAL - BLDG. 1 - 6F - AREA 1

EP-127-C.1.6 FLOOR PLAN - PARTIAL - BLDG. 1 - 6F - AREA 2

EP-128-C.1.6 FLOOR PLAN - PARTIAL - BLDG. 1 - 6F - AREA 3

EP-129-C.1.7 FLOOR PLAN - PARTIAL - BLDG. 1 - 7F - AREA 1

EP-130-C.1.7 FLOOR PLAN - PARITAL - BLDG. 1 - 7F - AREA 2

EP-131-C.1.7 FLOOR PLAN - PARTIAL - BLDG. 1 - 7F - AREA 3

EP-132-C.1.8 FLOOR PLAN - PARTIAL - BLDG. 1 - 8F - AREA 1

EP-133-C.1.8 FLOOR PLAN - PARTIAL - BLDG. 1 - 8F - AREA 2

EP-134-C.1.9 FLOOR PLAN - PARTIAL - BLDG. 1 - 9F - AREA 1

EP-135-C.1.9 FLOOR PLAN - PARTIAL - BLDG. 1 - 9F - AREA 2

EP-136-C.2.B FLOOR PLAN - PARTIAL - BLDG. 2 - BSMT - AREA 1

EP-137-C.2.B FLOOR PLAN - PARTIAL - BLDG. 2 - BSMT - AREA 2

EP-138-C.2.1 FLOOR PLAN - PARTIAL - BLDG. 2 - 1F

EP-139-C.2.1 FLOOR PLAN - PARTIAL - BLDG. 2 - 1F - AREA 2

EP-140-C.2.2 FLOOR PLAN - PARTIAL - BLDG. 2 - 2F

EP-141-C.2.2 FLOOR PLAN - PARTIAL - BLDG. 2 - 2F - AREA 2

EP-142-C.3.B FLOOR PLAN - BLDG. 3 - BASEMENT

EP-143-C.3.1 FLOOR PLAN - BLDG. 3 - 1F

EP-144-C.3.2 FLOOR PLAN - BLDG. 3 - 2F

EP-145-C.3.3 FLOOR PLAN - BLDG. 3 - 3F

EP-146-C.8.1 FLOOR PLAN - BLDG. 8 - 1F

EP-147-C.8.2 FLOOR PLAN - BLDG. 8 - 2F

EP-148-C.14.2 FLOOR PLAN - BLDG. 14 - 2F

EP-149-C.15.B FLOOR PLAN - BLDG. 15 - BSMT

EP-150-C.15.1 FLOOR PLAN - BLDG. 15 - 1F

EP-151-C.15.2 FLOOR PLAN - BLDG. 15 - 2F

EP-152-C.15.3 FLOOR PLAN - BLDG. 15 - 3F

EP-153-C.15.4 FLOOR PLAN - BLDG. 15 - 3F

EP-154-FT.64.B FLOOR PLAN - BLDG. 64 - BSMT - AREA 1

EP-155-FT.64.B FLOOR PLAN - PARTIAL - BLDG. 64 - BSMT - AREA 2

EP-156-FT.64.1 FLOOR PLAN - PARTIAL - BLDG. 64 - 1F - AREA 1

EP-157-FT.64.1 FLOOR PLAN - PARTIAL - BLDG. 64 - 1F - AREA 2

EP-158-FT.64.2 FLOOR PLAN - PARTIAL - BLDG. 64 - 2F - AREA 1

EP-159-FT.64.2 FLOOR PLAN - PARTIAL - BLDG. 64 - 2F - AREA 2

EP-160-FT.64.3 FLOOR PLAN - PARTIAL - BLDG. 64 - 3F - AREA1

EP-161-FT.64.3 FLOOR PLAN - PARTIAL - BLDG. 64 - 3F - AREA 2

EP-162-FT.64.4 FLOOR PLAN - PARTIAL - BLDG. 64 - ROOF - AREA 1

EP-163-FT.64.4 FLOOR PLAN - PARTIAL - BLDG. 64 - ROOF - AREA 2

EP-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT

EP-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EP-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR

EP-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR

EP-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR

EP-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR

EP-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR

EP-408-C.1.7 ENLARGED FLOOR PLAN - SEVENTH FLOOR

EP-409-C.1.8 ENLARGED FLOOR PLAN - EIGHTH FLOOR

EP-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR

EP-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT

EP-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL

EP-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL

EP-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT

EP-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR

EP-450-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EP-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT

EP-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EP-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR

EP-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR

EP-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EP-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR

EP-601-C.1 BUILDING 1 - ELECTRICAL DIAGRAMS

EP-602-C.1 BUILDING 1 - ELECTRICAL DIAGRAMS

EP-603-C.1 BUILDING 1 - ELECTRICAL DIAGRAMS

EP-604-C.1 BUILDING 1 - ELECTRICAL DIAGRAMS

EP-610-C.1 BUILDING 1 - ELECTRICAL SCHEDULE

EP-611-C.1 BUILDING 1 - ELECTRICAL SCHEDULE

EP-612.C.1 BUILDING 1 - ELECTRICAL SCHEDULE

EP-613-C.1 BUILDING 1 - ELECTRICAL SCHEDULE

EP-614-C.1 BUILDING 1 - ELECTRICAL SCHEDULE

EP-615-C.1 BUILDING 1 - ELECTRICAL SCHEDULE

EP-616-C.1 BUILDING 1 - ELECTRICAL SCHEDULE

EP-617-C.1 TN AND TC CONDUIT FEEDER ROUTE SCHEDULE

EP-620-C.2 BUILDING 2 - ELECTRICAL DIAGRAMS

EP-621-C.2 BUILDING 2 - ELECTRICAL SCHEDULE

EP-625-C.3 BUILDING 3 - ELECTRICAL SCHEDULE AND DIAGRAMS

EP-630-C.8 BUILDING 8 - ELECTRICAL SCHEDULE AND DIAGRAMS

EP-640-C.15 BUILDING 15 - ELECTRICAL DIAGRAMS

EP-641-C.15 BUILDING 15 - ELECTRICAL SCHEDULE

EP-650-FT.64 BUILDING 64 - ELECTRICAL DIAGRAMS

EP-651-FT.64 BUILDING 64 - ELECTRICAL SCHEDULE

EP-652-FT.64 BUILDING 64 - ELECTRICAL SCHEDULE

EP-660-C.PK BUILDING 64 - ELECTRICAL SCHEDULE AND DIAGRAMS

EP-665-C.TB BUILDING TB - ELECTRICAL SCHEDULE AND DIAGRAMS

EP-670-C.TE BUILDING TE - ELECTRICAL SCHEDULE AND DIAGRAMS

EP-680 ELECTRICAL DIAGRAM

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

4-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

ETS

T

TA

GE

S

R I

E T E X

FO

T

CE

TI

H

AS

DER CRA

F. BIAN

C

OJ

O

SE

P

H

7 6 22 1

5/4/22

GI-010

INDEX OF DRAWINGS

RAC

IAR, JFB

INDEX OF DRAWINGS

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

4-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

ETS

T

TA

GE

S

R I

E T E X

FO

T

CE

TI

H

AS

DER CRA

F. BIAN

C

OJ

O

SE

P

H

7 6 22 1

5/4/22

GI-011

INDEX OF DRAWINGS

RAC

IAR, JFB

TECHNOLOGY

T-000 TELECOMMUNICATIONS GENERAL INFORMATION

T-001 RESPONSIBILITY AND PREFERRED PRODUCTS MATRIX

TD-100-C.1.SB TECHNOLOGY DEMOLITION SUB BASEMENT OVERALL PLAN

TD-101-C.1.SB TECHNOLOGY DEMOLITION SUB BASEMENT PARTIAL PLAN - A

TD-102-C.1.SB TECHNOLOGY DEMOLITION SUB BASEMENT PARTIAL PLAN - B

TD-110-C.1.B TECHNOLOGY DEMOLITION BASEMENT OVERALL PLAN

TD-111-C.1.B TECHNOLOGY DEMOLITION BASEMENT PARTIAL PLAN - A

TD-112-C.1.B TECHNOLOGY DEMOLITION BASEMENT PARTIAL PLAN - B

TD-113-C.1.B TECHNOLOGY DEMOLITION BASEMENT PARTIAL PLAN - C

TD-114-C.1.B TECHNOLOGY DEMOLITION BASEMENT PARTIAL PLAN - D

TD-120-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR OVERALL PLAN

TD-121-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR PARTIAL PLAN - A

TD-122-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR PARTIAL PLAN - B

TD-123-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR PARTIAL PLAN - C

TD-124-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR PARTIAL PLAN - D

TD-130-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR OVERALL PLAN

TD-131-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR PARTIAL PLAN - A

TD-132-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR PARTIAL PLAN - B

TD-133-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR PARTIAL PLAN - C

TD-134-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR PARTIAL PLAN - D

TD-140-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR OVERALL PLAN

TD-141-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR PARTIAL PLAN - A

TD-142-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR PARTIAL PLAN - B

TD-143-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR PARTIAL PLAN - C

TD-144-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR PARTIAL PLAN - D

TD-150-C.1.4 TECHNOLOGY DEMOLITION FOURTH FLOOR OVERALL PLAN

TD-151-C.1.4 TECHNOLOGY DEMOLITION FOURTH FLOOR PARTIAL PLAN - A

TD-152-C.1.4 TECHNOLOGY DEMOLITION FOURTH FLOOR PARTIAL PLAN - B

TD-153-C.1.4 TECHNOLOGY DEMOLITION FOURTH FLOOR PARTIAL PLAN - D

TD-160-C.1.5 TECHNOLOGY DEMOLITION FIFTH FLOOR OVERALL PLAN

TD-161-C.1.5 TECHNOLOGY DEMOLITION FIFTH FLOOR PARTIAL PLAN - A

TD-162-C.1.5 TECHNOLOGY DEMOLITION FIFTH FLOOR PARTIAL PLAN - B

TD-163-C.1.5 TECHNOLOGY DEMOLITION FIFTH FLOOR PARTIAL PLAN - D

TD-170-C.1.6 TECHNOLOGY DEMOLITION SIXTH FLOOR OVERALL PLAN

TD-171-C.1.6 TECHNOLOGY DEMOLITION SIXTH FLOOR PARTIAL PLAN - A

TD-172-C.1.6 TECHNOLOGY DEMOLITION SIXTH FLOOR PARTIAL PLAN - B

TD-173-C.1.6 TECHNOLOGY DEMOLITION SIXTH FLOOR PARTIAL PLAN - D

TD-180-C.1.7 TECHNOLOGY DEMOLITION SEVENTH FLOOR OVERALL PLAN

TD-181-C.1.7 TECHNOLOGY DEMOLITION SEVENTH FLOOR PARTIAL PLAN - A

TD-182-C.1.7 TECHNOLOGY DEMOLITION SEVENTH FLOOR PARTIAL PLAN - B

TD-183-C.1.7 TECHNOLOGY DEMOLITION SEVENTH FLOOR PARTIAL PLAN - D

TD-190-C.1.8 TECHNOLOGY DEMOLITION EIGHTH FLOOR OVERALL PLAN

TD-191-C.1.8 TECHNOLOGY DEMOLITION EIGHTH FLOOR PARTIAL PLAN - A

TD-192-C.1.8 TECHNOLOGY DEMOLITION EIGHTH FLOOR PARTIAL PLAN - B

TD-193-C.1.8 TECHNOLOGY DEMOLITION EIGHTH FLOOR PARTIAL PLAN - D

TD-200-C.1.9 TECHNOLOGY DEMOLITION NINTH FLOOR OVERALL PLAN

TD-201-C.1.9 TECHNOLOGY DEMOLITION NINTH FLOOR PARTIAL PLAN - A

TD-202-C.1.9 TECHNOLOGY DEMOLITION NINTH FLOOR PARTIAL PLAN - B

TD-203-C.1.9 TECHNOLOGY DEMOLITION NINTH FLOOR PARTIAL PLAN - D

TD-210-C.2.BN BLDG. 2 - BASEMENT - NORTH TECHNOLOGY DEMO PLAN

TD-210-C.2.BS BLDG. 2 - BASEMENT - SOUTH TECHNOLOGY DEMO PLAN

TD-211-C.2.1N BLDG. 2 - FIRST FLOOR - NORTH TECHNOLOGY DEMO PLAN

TD-211-C.2.1S BLDG. 2 - FIRST FLOOR - SOUTH TECHNOLOGY DEMO PLAN

TD-212-C.2.2N BLDG. 2 - SECOND FLOOR - NORTH TECHNOLOGY DEMO PLAN

TD-212-C.2.2S BLDG. 2 - SECOND FLOOR - SOUTH TECHNOLOGY DEMO PLAN

TD-220-C.3.B BLDG. 3 - BASEMENT TECHNOLOGY DEMO PLAN

TD-221-C.3.1 BLDG. 3 - FIRST FLOOR - TECHNOLOGY DEMO PLAN

TD-222-C.3.2 BLDG. 3 - SECOND FLOOR - TECHNOLOGY DEMO PLAN

TD-223-C.3.3 BLDG. 3 - THIRD FLOOR - TECHNOLOGY DEMO PLAN

TD-231-C.8.1 BLDG. 8 - FIRST FLOOR - TECHNOLOGY DEMO PLAN

TD-232-C.8.2 BLDG. 8 - SECOND FLOOR - TECHNOLOGY DEMO PLAN

TD-233-C.8.3 BLDG. 8 - THIRD FLOOR - TECHNOLOGY DEMO PLAN

TD-234-C.8.4 BLDG. 8 - FOURTH FLOOR - TECHNOLOGY DEMO PLAN

TD-250-C.15.B BLDG. 15 - BASEMENT - TECHNOLOGY DEMO PLAN

TD-251-C.15.1 BLDG. 15 - FIRST FLOOR - TECHNOLOGY DEMO PLAN

TD-252-C.15.2 BLDG. 15 - SECOND FLOOR - TECHNOLOGY DEMO PLAN

TD-253-C.15.3 BLDG. 15 - THIRD FLOOR - TECHNOLOGY DEMO PLAN

TD-254-C.15.4 BLDG. 15 - FOURTH FLOOR - TECHNOLOGY DEMO PLAN

TD-270-F.64.BN BLDG. 64 - BASEMENT - TECHNOLOGY DEMO PLAN

TD-270-F.64.BS BLDG. 64 - BASEMENT - SOUTH TECHNOLOGY DEMO PLAN

TD-271-F.64.1N BLDG. 64 - FIRST FLOOR - NORTH TECHNOLOGY DEMO PLAN

TD-271-F.64.1S BLDG. 64 - FIRST FLOOR - SOUTH TECHNOLOGY DEMO PLAN

TD-272-F.64.2N BLDG. 64 - SECOND FLOOR - NORTH TECHNOLOGY DEMO PLAN

TD-272-F.64.2S BLDG. 64 - SECOND FLOOR - SOUTH TECHNOLOGY DEMO PLAN

TD-273-F.64.3N BLDG. 64 - THIRD FLOOR - NORTH TECHNOLOGY DEMO PLAN

TD-273-F.64.3S BLDG. 64 - THIRD FLOOR - SOUTH TECHNOLOGY DEMO PLAN

TD-275-F.117.1 BLDG. 117 - FIRST FLOOR - TECHNOLOGY DEMO PLAN

TD-280-C.TB.1 BLDG. TB - EDUCATION TRAILER - TECHNOLOGY DEMO PLAN

TD-282-C.TE.1 BLDG. TE - RESEARCH TRAILER - TECHNOLOGY DEMO PLAN

TD-600-C.1 TECHNOLOGY EXISTING FIBER BACKBONE DIAGRAM

TN-100-C.1.SB TECHNOLOGY SUB BASEMENT OVERALL PLAN

TN-101-C.1.SB TECHNOLOGY SUB BASEMENT PARTIAL PLAN - A

TN-102-C.1.SB TECHNOLOGY SUB BASEMENT PARTIAL PLAN - B

TN-110-C.1.B TECHNOLOGY BASEMENT OVERALL PLAN

TN-111-C.1.B TECHNOLOGY BASEMENT PARTIAL PLAN - A

TN-112-C.1.B TECHNOLOGY BASEMENT PARTIAL PLAN - B

TN-113-C.1.B TECHNOLOGY BASEMENT PARTIAL PLAN - C

TN-114-C.1.B TECHNOLOGY BASEMENT PARTIAL PLAN - D

TN-120-C.1.1 TECHNOLOGY FIRST FLOOR OVERALL PLAN

TN-121-C.1.1 TECHNOLOGY FIRST FLOOR PARTIAL PLAN - A

TN-122-C.1.1 TECHNOLOGY FIRST FLOOR PARTIAL PLAN - B

TN-123-C.1.1 TECHNOLOGY FIRST FLOOR PARTIAL PLAN - C

TN-124-C.1.1 TECHNOLOGY FIRST FLOOR PARTIAL PLAN - D

TN-130-C.1.2 TECHNOLOGY SECOND FLOOR OVERALL PLAN

TN-131-C.1.2 TECHNOLOGY SECOND FLOOR PARTIAL PLAN - A

TN-132-C.1.2 TECHNOLOGY SECOND FLOOR PARTIAL PLAN - B

TN-133-C.1.2 TECHNOLOGY SECOND FLOOR PARTIAL PLAN - C

TN-134-C.1.2 TECHNOLOGY SECOND FLOOR PARTIAL PLAN - D

TN-140-C.1.3 TECHNOLOGY THIRD FLOOR OVERALL PLAN

TN-141-C.1.3 TECHNOLOGY THIRD FLOOR PARTIAL PLAN - A

TN-142-C.1.3 TECHNOLOGY THIRD FLOOR PARTIAL PLAN - B

TN-143-C.1.3 TECHNOLOGY THIRD FLOOR PARTIAL PLAN - C

TN-144-C.1.3 TECHNOLOGY THIRD FLOOR PARTIAL PLAN - D

TN-150-C.1.4 TECHNOLOGY FOURTH FLOOR OVERALL PLAN

TN-151-C.1.4 TECHNOLOGY FOURTH FLOOR PARTIAL PLAN - A

TN-152-C.1.4 TECHNOLOGY FOURTH FLOOR PARTIAL PLAN - B

TN-153-C.1.4 TECHNOLOGY FOURTH FLOOR PARTIAL PLAN - D

TN-160-C.1.5 TECHNOLOGY FIFTH FLOOR OVERALL PLAN

TN-161-C.1.5 TECHNOLOGY FIFTH FLOOR PARTIAL PLAN - A

TN-162-C.1.5 TECHNOLOGY FIFTH FLOOR PARTIAL PLAN - B

TN-163-C.1.5 TECHNOLOGY FIFTH FLOOR PARTIAL PLAN - D

TECHNOLOGY (CONTINUED)

TN-170-C.1.6 TECHNOLOGY SIXTH FLOOR OVERALL PLAN

TN-171-C.1.6 TECHNOLOGY SIXTH FLOOR PARTIAL PLAN - A

TN-172-C.1.6 TECHNOLOGY SIXTH FLOOR PARTIAL PLAN - B

TN-173-C.1.6 TECHNOLOGY SIXTH FLOOR PARTIAL PLAN - D

TN-180-C.1.7 TECHNOLOGY SEVENTH FLOOR OVERALL PLAN

TN-181-C.1.7 TECHNOLOGY SEVENTH FLOOR PARTIAL PLAN - A

TN-182-C.1.7 TECHNOLOGY SEVENTH FLOOR PARTIAL PLAN - B

TN-183-C.1.7 TECHNOLOGY SEVENTH FLOOR PARTIAL PLAN - D

TN-190-C.1.8 TECHNOLOGY EIGHTH FLOOR OVERALL PLAN

TN-191-C.1.8 TECHNOLOGY EIGHTH FLOOR PARTIAL PLAN - A

TN-192-C.1.8 TECHNOLOGY EIGHTH FLOOR PARTIAL PLAN - B

TN-193-C.1.8 TECHNOLOGY EIGHTH FLOOR PARTIAL PLAN - D

TN-200-C.1.9 TECHNOLOGY NINTH FLOOR OVERALL PLAN

TN-201-C.1.9 TECHNOLOGY NINTH FLOOR PARTIAL PLAN - A

TN-202-C.1.9 TECHNOLOGY NINTH FLOOR PARTIAL PLAN - B

TN-203-C.1.9 TECHNOLOGY NINTH FLOOR PARTIAL PLAN - D

TN-210-C.2.BN BLDG. 2 - BASEMENT - NORTH TECHNOLOGY DATA OUTLET PLAN

TN-210-C.2.BS BLDG. 2 - BASEMENT - SOUTH TECHNOLOGY DATA OUTLET PLAN

TN-211-C.2.1N BLDG. 2 - FIRST FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN

TN-211-C.2.1S BLDG. 2 - FIRST FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN

TN-212-C.2.2N BLDG. 2 - SECOND FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN

TN-212-C.2.2S BLDG. 2 - SECOND FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN

TN-220-C.3.B BLDG. 3 - BASEMENT - TECHNOLOGY DATA OUTLET PLAN

TN-221-C.3.1 BLDG. 3 - FIRST FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-222-C.3.2 BLDG. 3 - SECOND FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-223-C.3.3 BLDG. 3 - THIRD FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-231-C.8.1 BLDG. 8 - FIRST FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-232-C.8.2 BLDG. 8 - SECOND FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-233-C.8.3 BLDG. 8 - THIRD FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-234-C.8.4 BLDG. 8 - FOURTH FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-250-C.15.B BLDG. 15 - BASEMENT - TECHNOLOGY DATA OUTLET PLAN

TN-251-C.15.1 BLDG. 15 - FIRST FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-252-C.15.2 BLDG. 15 - SECOND FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-253-C.15.3 BLDG. 15 - THIRD FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-254-C.15.4 BLDG. 15 - FOURTH FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-270-F.64.BN BLDG. 64 - BASEMENT TECHNOLOGY DATA OUTLET PLAN

TN-270-F.64.BS BLDG. 64 - BASEMENT - SOUTH TECHNOLOGY DATA OUTLET PLAN

TN-271-F.64.1N BLDG. 64 - FIRST FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN

TN-271-F.64.1S BLDG. 64 - FIRST FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN

TN-272-F.64.2N BLDG. 64 - SECOND FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN

TN-272-F.64.2S BLDG. 64 - SECOND FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN

TN-273-F.64.3N BLDG. 64 - THIRD FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN

TN-273-F.64.3S BLDG. 64 - THIRD FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN

TN-275-F.117.1 BLDG. 117 - FIRST FLOOR - TECHNOLOGY DATA OUTLET PLAN

TN-280-C.TB.1 BLDG. TB - EDUCATION TRAILER - TECHNOLOGY DATA OUTLET PLAN

TN-282-C.TE.1 BLDG. TE - RESEARCH TRAILER - TECHNOLOGY DATA OUTLET PLAN

TN-401-C.1.B BLDG. 1 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN

TN-402-C.1.B BLDG. 1 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN

TN-403-C.1.B BLDG. 1 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN

TN-405-C.1.1 BLDG. 1 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-406-C.1.1 BLDG. 1 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-407-C.1.1 BLDG. 1 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-410-C.1.2 BLDG. 1 - SECOND FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-411-C.1.2 BLDG. 1 - SECOND FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-412-C.1.2 BLDG. 1 - SECOND FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-415-C.1.3 BLDG. 1 - THIRD FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-416-C.1.3 BLDG. 1 - THIRD FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-417-C.1.3 BLDG. 1 - THIRD FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-420-C.1.4 BLDG. 1 - FOURTH FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-421-C.1.4 ENLARGED TDR PLANS

TN-422-C.1.4 ENLARGED TDR PLANS

TN-423-C.1.4 POWER ELEVATION AND SCHEMATIC - LEVEL REDUNDANCY

TN-425-C.1.5 BLDG. 1 - FIFTH FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-430-C.1.6 BLDG. 1 - SIXTH FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-435-C.1.7 BLDG. 1 - SEVENTH FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-440-C.1.8 BLDG. 1 - EIGHTH FLOOR - TECHNOLOGY ROOM PLAN

TN-455-C.1.9 BLDG. 1 - NINTH FLOOR TECHNOLOGY TELECOM ROOM PLAN

TN-470-C.2.BN BLDG. 2 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN

TN-471-C.2.1 BLDG. 2 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-472-C.2.2 BLDG. 2 - SECOND FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-473-C.3.B BLDG. 3 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN

TN-474-C.8.2 BLDG. 8 - SECOND FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-479-C.15.1 BLDG. 15 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-480-F.64.B BLDG. 64 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN

TN-481-F.64.1 BLDG. 64 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-482-F.64.2 BLDG. 64 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-483-F.64.3 BLDG. 64 - THIRD FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-484-F.117.1 BLDG. 117 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-490-C.TB.1 BLDG. TB - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-492-C.TE.1 BLDG. TE - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN

TN-500 TECHNOLOGY - TYPICAL DETAILS

TN-501 TECHNOLOGY - TYPICAL DETAILS

TN-503 TECHNOLOGY - TYPICAL DETAILS

TN-504 TECHNOLOGY - TYPICAL DETAILS

TN-505 TECHNOLOGY - TYPICAL DETAILS

TN-506 TECHNOLOGY - TYPICAL DETAILS

TN-600-C.1 TECHNOLOGY NEW FIBER BACKBONE DIAGRAM

TN-601 TECHNOLOGY RISER PLAN - BLDGS. 2, 3, 8, 14, 15, 64, 117, TB, & TE

TN-602 TECHNOLOGY BONDING RISER PLAN - BLDGS. 2, 3, 8, 15, 64, 117, TB, & TE

TN-603-C.1 GROUNDING AND BONDING RISER DIAGRAM

TS-000 SECURITY LEGEND

TS-110-C.1.B SECURITY BASEMENT OVERALL PLAN

TS-120-C.1.1 SECURITY FIRST FLOOR OVERALL PLAN

TS-130-C.1.2 SECURITY SECOND FLOOR OVERALL PLAN

TS-140-C.1.3 SECURITY THIRD FLOOR OVERALL PLAN

TS-150-C.1.4 SECURITY FOURTH FLOOR OVERALL PLAN

TS-160-C.1.5 SECURITY FIFTH FLOOR OVERALL PLAN

TS-170-C.1.6 SECURITY SIXTH FLOOR OVERALL PLAN

TS-180-C.1.7 SECURITY SEVENTH FLOOR OVERALL PLAN

TS-190-C.1.8 SECURITY EIGHTH FLOOR OVERALL PLAN

TS-200-C.1.9 SECURITY NINTH FLOOR OVERALL PLAN

TS-210-C.2.B BLDG. 2 - SECURITY BASEMENT OVERALL PLAN

TS-211-C.2.1 BLDG. 2 - SECURITY FIRST FLOOR OVERALL PLAN

TS-212-C.2.2 BLDG. 2 - SECURITY SECOND FLOOR OVERALL PLAN

TS-220-C.3.B BLDG. 3 - SECURITY BASEMENT OVERALL PLAN

TS-230-C.8.2 BLDG. 8 - SECURITY SECOND FLOOR OVERALL PLAN

TS-240-C.15.1 BLDG. 15 - SECURITY FIRST FLOOR OVERALL PLAN

TS-250-F.64.B BLDG. 64 - SECURITY BASEMENT OVERALL PLAN

TS-251-F.64.1 BLDG. 64 - SECURITY FIRST FLOOR OVERALL PLAN

TS-252-F.64.2 BLDG. 64 - SECURITY SECOND FLOOR OVERALL PLAN

TS-253-F.64.3 BLDG. 64 - SECURITY THIRD FLOOR OVERALL PLAN

TS-260-F.117.1 BLDG. 117 - SECURITY FIRST FLOOR OVERALL PLAN

TECHNOLOGY (CONTINUED)

TS-270-C.TB.1 BLDG. TB - SECURITY FIRST FLOOR OVERALL PLAN

TS-280-C.TE.1 BLDG. TE - SECURITY FIRST FLOOR OVERALL PLAN

TS-400-C.1.B SECURITY ENLARGED TDR PLANS

TS-401-C.1.1 SECURITY ENLARGED TDR PLANS

TS-402-C.1.2 SECURITY ENLARGED TDR PLANS

TS-403-C.1.3 SECURITY ENLARGED TDR PLANS

TS-404-C.1.4 SECURITY ENLARGED TDR PLANS

TS-405-C.1.5 SECURITY ENLARGED TDR PLANS

TS-406-C.1.6 SECURITY ENLARGED TDR PLANS

TS-407-C.1.7 SECURITY ENLARGED TDR PLANS

TS-408-C.1.8 SECURITY ENLARGED TDR PLANS

TS-409-C.1.9 SECURITY ENLARGED TDR PLANS

TS-410-C.2.B BLDG. 2 - SECURITY ENLARGED TDR PLANS

TS-411-C.2.1 BLDG. 2 - SECURITY ENLARGED TDR PLANS

TS-412-C.2.2 BLDG. 2 - SECURITY ENLARGED TDR PLANS

TS-420-C.3.B BLDG. 3 - SECURITY ENLARGED TDR PLANS

TS-430-C.8.2 BLDG. 8 - SECURITY ENLARGED TDR PLANS

TS-440-C.15.1 BLDG. 15 - SECURITY ENLARGED TDR PLANS

TS-450-F.64.B BLDG. 64 - SECURITY ENLARGED TDR PLANS

TS-451-F.64.1 BLDG. 64 - SECURITY ENLARGED TDR PLANS

TS-452-F.64.2 BLDG. 64 - SECURITY ENLARGED TDR PLANS

TS-453-F.64.3 BLDG. 64 - SECURITY ENLARGED TDR PLANS

TS-460-F.117.1 BLDG. 117 - SECURITY ENLARGED TDR PLANS

TS-470-C.TB.1 BLDG. TB - SECURITY ENLARGED TDR PLANS

TS-480-C.TE.1 BLDG. TE - SECURITY ENLARGED TDR PLANS

TS-500 SECURITY - TYPICAL DETAILS

TS-501 SECURITY - TYPICAL DETAILS

UNLESS NOTED AS EXISTING, ALL MATERIALS, EQUIPMENT, MANUFACTURED

ITEMS AND ASSEMBLIES INCORPORATED INTO THE WORK SHALL BE NEW.

1.

UNLESS NOTED TO BE REMOVED AND DISPOSED, ALL EXISTING ITEMS ARE TO

REMAIN. THEY SHALL BE PROTECTED FROM DAMAGE DUE TO CONSTRUCTION

ACTIVITIES. ANY EXISTING ITEMS TO REMAIN THAT BECOME DAMAGED DUE

TO CONSTRUCTION ACTIVITIES SHALL BE REPAIRED OR REPLACED TO MATCH

EXISTING AT NO ADDITIONAL COST TO THE OWNER..

2.

NOTATIONS FOR ITEMS OF WORK APPLY TO EACH AND EVERY GRAPHICAL

INDICATION SHOWN ON THE DRAWINGS, WHETHER OR NOT NOTED.

3.

ALL ITEMS NOTED TO HAVE PAINT FINISH SHALL BE THOROUGHLY CLEANED

AND PROPERLY PREPARED IN ACCORDANCE WITH THE SPECIFICATIONS

PRIOR TO THE APPLICATION OF PRIMER AND PAINT.

4.

THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE

DEMOLITION AND WORK SCOPE AND SATISFY THAT ALL REQUIREMENTS

FOR SUPPORT, FLOOR, WALL AND ROOF OPENINGS, FLASHINGS AND CURBS,

ETC. ARE IMPLEMENTED. THE ARCHITECT SHALL BE NOTIFIED OF CONFLICTS

OR DISCREPANCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION.

5.

CONTRACTOR TO REPLACE & ACCURATELY LOCATE ALL EXISTING SIGNAGE

AND LABELS NOTING RATED WALL ASSEMBLIES AND SMOKE PARTITIONS

6.

THE GENERAL CONTRACTOR SHALL VISIT THE SITE, VERIFY FIELD

CONDITIONS AND CAREFULLY COMPARE SUCH FIELD CONDITIONS AND

OTHER INFORMATION KNOWN TO THE CONTRACTOR WITH CONTRACT

DOCUMENTS.

7.

THE GENERAL CONTRACTOR SHALL REPORT ANY UNFORESEEN FIELD

CONDITIONS, ERRORS, INCONSISTENCIES, OR OMISSIONS DISCOVERED AT

ANY TIME DURING THE WORK, UPON SUCH DISCOVERY, THE CONTRACTOR

SHALL IMMEDIATELY CONTACT THE CONTRACT OFFICER FOR CLARIFICATION

BEFORE PROCEEDING OR CONTINUING WITH THAT PORTION OF THE WORK

OR ANY PORTION RELATED THERE TO.

8.

ALL WORK SHALL CONFORM TO MOST CURRENT VERSION OF ALL APPLICABLE

CODES AND STANDARDS INCLUDING THE INTERNATIONAL BUILDING CODE, VA

MASTER SPECIFICATIONS, AND LATEST ADOPTED NFPA.

9.

THE GENERAL CONTRACTOR SHALL NOTIFY THE CONTRACT OFFICER,

CONTRACTING OFFICER'S REPRESENTATIVE, AND ARCHITECT OF ANY

DISCREPANCIES BETWEEN THE DRAWINGS, NOTES AND ACTUAL FIELD

CONDITIONS BEFORE BIDDING AND COMMENCING ANY WORK, AND REQUEST

CLARIFICATION IN WRITING.

10.

WHEN UNANTICIPATED ARCHITECTURAL, STRUCTURAL ,MECHANICAL, ELECTRICAL,

PLUMBING, TECHNOLOGY, ETC. ELEMENTS THAT CONFLICT WITH THE INTENDED

FUNCTION OR DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE THE NATURE

AND EXTENT OF THE CONFLICT. PROMPTLY SUBMIT A WRITTEN REPORT TO THE

CONTRACT OFFICER.

11.

WHERE MOUNTING HEIGHTS ARE NOT INDICATED, INSTALL COMPONENTS

USING MANUFACTURER'S OR INDUSTRY STANDARDS. WHERE STANDARDS

DO NOT EXIST, NOTIFY THE ARCHITECT FOR CLARIFICATION.

12.

CONTRACTOR SHALL NOT BARRICADE / BARRIER EMERGENCY EGRESS TO OR

FROM THIS AREA. CONTRACTOR SHALL MAINTAIN EXIT TO EXTERIOR DURING

THE WORK PROCESS.

PROVIDE ACCESS TO THE WORK AS DIRECTED BY THE C.O.R. SECURE

ACCESS POINT AS SPECIFIED AND DIRECTED BY THE COR PROJECT

ENGINEER. PROVIDE WALK-OFF MATS TO MEET FACILITY INFECTION

CONTROL GUIDELINES AT EACH ACCESS POINT WHERE REQUIRED.

13.

14.

ALL EXISTING WALL MOUNTED ITEMS AND DEVICES ARE TO BE REMOVED

PRIOR TO DEMOLITION WORK, FULLY REFURBISHED, AND REINSTALLED IN

THE NEW WALL ASSEMBLY. LOCATION TO BE VERIFIED BY COR. ITEMS MAY

INCLUDE: DOOR STOPS, HAND SANITIZER DISPENSERS, FIRE STROBES,

SWITCHES, ELECTRIC COVER PLATES, FIRE ALARM PULL BOXES, ELECTRIC

OUTLETS, SIGNAGE, BULLETIN BOARDS, MILLWORK, CARD READERS,

CLOCK, DATA OUTLET, PUSH BUTTON, FIRE CONTROL BOX, PHONE AND

ROOM SIGNAGE, ETC.

15.

ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, TECHNOLOGY, ETC.

16. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR LEGAL DISPOSAL OF ALL

DEBRIS.

17. OWNER SHALL HAVE THE RIGHT OF FIRST REFUSAL ON ITEMES INDICATED TO

BE SALVAGED.

18. EXISTING SPRAYED-ON FIREPROOFING SHALL BE MAINTAINED THROUGH THE

DURATION OF CONSTRUCTION ACTIVITIES AND THE CONTRACTOR SHALL REPAIR

ANY COMPROMISE OF EXISTING FIREPROOFING.

19. ALL BUILDINGS WILL BE OCCUPIED AT ALL TIMES THROUGH THE DURATION OF

CONSTRUCTION.

INTERIOR ELEVATION

ELEVATION PAGE NUMBER

ELEVATION DETAIL NUMBER

WALL TYPE TAGF

PATIENT ROOM

ROOM NAME

ROOM NUMBER

ROOM TITLE

2 3

AS-101

DRAWINGS FOR THE FOLLOWING DISCIPLINES ARE

CONTAINED IN THE DOCUMENT. THE DISCIPLINES ARE

IDENTIFIED BY THE REFERENCE WHICH IS

INCORPORATED INTO THE SHEET TITLE.

EACH DRAWING IS NUMBERED ACCORDING TO IT'S

LOCATION ON THE SHEET. THE DRAWING TITLE

APPEARS ABOVE THE DEMARCATION LINE AND,

APPROPRIATE THE SCALE IS LOCATED BELOW THE

DEMARCATION LINE IN THE LOWER LEFT-HAND

QUADRANT OF THE KEY. THE DRAWING CAN BE

REFERENCED BACK TO IT'S ORIGINAL SHEET AND

DRAWING BY THE DRAWING REFERENCE LOCATION

IN THE LOWER RIGHT-HAND QUADRANT.

SHEET NUMBER

DRAWING NUMBER ON SHEET BY

LOCATION

REFERENCE

DISCIPLINE REFERENCES

DRAWING NUMBERING

DRAWING REFERENCE

GENERAL NOTES

REF. 1/1-A1

BUILDING SECTION

RE: 1/AS-101

SHEET NUMBER

DIMENSIONING CONVENTIONSARCHITECTURAL FLOOR PLAN SYMBOLS

A

COLUMN GRID

NORTH ARROW

REVISION NUMBER AND EXTENT

KEYED NOTE MARK

-SEE CORRESPONDING

NUMBERED KEY NOTE ON SHEET

WHERE REFERENCE OCCURS

REVISION NUMBER - SEE

REVISION HISTORY ON THE

TITLE BLOCK OF EACH SHEET

EXTENT OF CURRENT REVISION

STUD WALLS

CONCRETE

MASONRY (CMU)

BUILDING INTERIOR

(EXISTING)

MATERIAL GRAPHICS (NEW U.N.O.)

GYP BD

CL

DEMOLITION LINE

ELEVATION INDICATOR

CENTER LINE INDICATOR

EXISTING TO REMAIN LINE

FEATURES ABOVE LINE INDICATOR

BREAK, ROUND (USER DEFINES SIZE)

BREAK, STRAIGHT (SEE SECTION

INDICATORS,

BUILDING, WITH BREAK

STANDARDS)

DIMENSION LINE

CENTER LINE

LOCATION MAP

GI GENERAL INFORMATION

A ARCHITECTURAL

P PLUMBING

M MECHANICAL

E ELECTRICAL

T TECHNOLOGY

AS-101

DISCIPLINE SHEET NUMBER

PROJECT INFORMATION

CONSTRUCTION LIMITS

EXCEPT WHERE DIRECTED TO PLACE ITEMS OF THE WORK AT THE

"APPROXIMATE LOCATION SHOWN." DO NOT SCALE DRAWINGS FOR

DIMENSIONAL INFORMATION

1.

ALL ELEMENTS OF THE DOCUMENTS MAY NOT BE DRAWN TO EXACT SCALE.

ALL DIMENSIONS REQUESTED ARE SHOWN (OR MAY BE DERIVED FROM THOSE

SHOWN OR NOTED) ON THE FLOOR PLANS. DETAIL PLANS, ELEVATIONS,

SECTIONS, SCHEDULES, CONFIGURATION DETAILS, AND SPECIFICATIONS. SEE

THE NOTES BELOW AND SYMBOLS FOR DIMENSIONING CONVENTIONS USED

ON THIS PROJECT.

2.

EXCEPT WHERE SPECIFICALLY NOTED TO THE CONTRARY, ALL DIMENSIONS

SHOWN ON THE ARCHITECTURAL DRAWINGS CONFORM TO THE FOLLOWING

CONVENTIONS.

3.

DIMENSIONS UTILIZING THE "CENTERLINE" SYMBOL ARE MEASURED TO:

· CENTERLINE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED

FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH

WALLS) AT PARTITIONS FRAMED WITH METAL STUDS. REFER TO

"PARTITION SCHEDULE" TO DETERMINE THICKNESS OF EACH

PARTITION TYPE.

· CENTERLINE OF DOOR, WINDOW, OR LOUVER OPENING.

· CENTERLINE OF OTHER FEATURES AS INDICATED.

A.

ALL DIMENSIONS ARE MEASURED FROM FACE OF PARTITION ASSEMBLY:

· FACE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED

FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH WALL)

AS DEFINED BY THE PARTITION SCHEDULE. UNLESS NOTED AS A

"FACE OF FINISH" OR "CLEAR" DIMENSION, DIMENSIONS ARE NOT

MEASURED TO THE FACE OF APPLIED FINISH BUT RATHER TO THE

FACE OF THE CORE STRUCURE (STUD, CMU, ETC...). REFER TO THE

"PARTITION SCHEDULE" TO DETERMINE THE THICKNESS OF EACH

PARTITION TYPE.

A.

WHERE "EQUAL" DIMENSIONS ARE USED ON REFLECTED CEILING PLANS TO

LOCATE CEILING GRID WORK POINTS, MEASURE DIMENSIONS TO:

· EDGE OF THE INDICATED CEILING AT THE FACE OF THE ADJACENT

APPLIED FINISH MEASURED AT THE PLANE OF THE CEILING.

· CAUTION: DUE TO THE POSSIBLE APPLICATION OF APPLIED FINISHES -

THICKNESS OF WHICH MAY VARY BETWEEN FLOOR AND CEILING AND

IS NOT ACCOUNTED FOR (EXCEPT AS INDICATED BY "FOF" OR

"CLEAR") BY THE DIMENSION SHOWN ON THE FLOOR PLANS - THE

CONTRACTOR MUST ADJUST AS NECESSARY, THE FLOOR PLAN

DIMENSIONS TO REFLECT THE ACTUAL DIMENSIONS FOUND AT PLANE

OF THE CEILING.

C.

WHERE WALLS AND/OR PARTITIONS OF UNEQUAL THICKNESS ABUT,

ALIGN EXPOSED FACES, UNLESS OTHERWISE NOTED.

ALIGN

DIMENSION, WHEN OCCURS

WHERE OPENINGS IN WALLS (SUCH AS INTERIOR WINDOWS OR DOORS) ARE

NOT DIMENSIONED BUT SHOWN AS BEING IN THE CENTER OF A GIVEN WALL

SURFACE, LOCATE OPENINGS AS GRAPHICALLY REPRESENTED.

5.

NTS

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

PROJECT MANAGEMENTCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

539-21-701

4-MAY-2022

100% CONSTRUCTION

DOCUMENTS

CINCINNATI VAMC EHRM

INFRASTRUCTURE UPGRADES

3200 VINE ST., CINCINNATI, OH

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

ETS

T

TA

GE

S

R I

E T E X

FO

T

CE

TI

H

AS

DER CRA

F. BIAN

C

OJ

O

SE

P

H

7 6 22 1

5/4/22

AD-100-C.1.B

DISCIPLINE BUILDING FLOOR

SHEET NUMBER BUILDING NUMBER

CITY

2 HR. WALL (NEW OR EXISTING)

1 HR. WALL (NEW OR EXISTING)

GI-020

GENERAL INFORMATION,

SYMBOLS, & LOCATION MAP

VV

IAR, JFB

TRUE NORTH

PLAN

NORTH

NORTH ARROW

TRUE NORTH

2018 NFPA 101 LIFE SAFETY CODE

OCCUPANCY: Group 'I-2' Condition 2

TYPE OF CONSTRUCTION: II-A

PROJECT AREA:

HEALTHCARE, CHAPTER 19

PROTECTED, TYPE II-A, FULLY SPRINKLERED

CINCINNATI VAMC EHRM INFRASTRUCTURE UPGRADES

CODES: 2018 IBC or later version

DESIGN MANUALS:

- PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS

- PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES

- PG-18-5 EQUIPMENT LIST GUIDES

- PG-18-8 SEISMIC DESIGN HANDBOOK

- PG-18-10 DESIGN MANUALS

- VA ARCHITECTURAL DESIGN MANUAL

- VA MECHANICAL DESIGN MANUAL

- VA ELECTRICAL DESIGN MANUAL

- VA PLUMBING DESIGN MANUAL

- VA FIRE PROTECTION DESIGN MANUAL

APPLICABLE CODES AND REGULATIONS:

ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL CURRENT APPLICABLE CODES AND STANDARDS.

IN ADDITION TO ALL DEPARTMENT OF VETERANS AFFAIRS, LOCAL, AND STATE CODES, ALL WORK SHALL COMPLY WITH THE ACCESSIBILITY REQUIREMENTS OF THE STATE OF MISSOURI AND THE DEPARTMENT OF VETERANS AFFAIRS GUIDELINES, ABA (ARCHITECTURAL BARRIERS ACT) ACCESSIBILITY STANDARD FOR

FEDERAL FACILITIES.

APPLICABLE CODES AND STANDARDS (LATEST EDITIONS) INCLUDE:

- ADA ACCESSIBILITY STANDARDS

- NFPA 101, "LIFE SAFETY CODE"

- NFPA 10, "PORTABLE FIRE EXTINGUISHERS"

- NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS"

- NFPA 70, "NATIONAL ELECTRICAL CODE (NEC)"

- NFPA 72, "NATIONAL FIRE ALARM CODE"

- NFPA 90A, "INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS"

- NFPA 99, "INSTALLATION FOR HEALTH CARE FACILITIES"

- NFPA 220, "TYPES OF BUILDING CONSTRUCTION"

- NFPA 241, "STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS"

- INTERNATIONAL BUILDING CODE (IBC)

- INTERNATIONAL MECHANICAL CODE (IMC)

- INTERNATIONAL PLUMBING CODE (IPC)

- INTERNATIONAL ENERGY CONSERVATION CODE

SITE

PHASING PLAN

REFERENCE SPECIFICATIONS SECTION 00 00 20 FOR GENERAL PROJECT INFORMATION.

THE GENERAL PROJECT SCOPE AND PHASING SEQUENCE IS LISTED BELOW. SEE SEPARATE DISCIPLINE DESIGN DRAWINGS FOR FURTHER PHASING NOTES AND DETAILS.

TECHNOLOGY PHASING

· PHASE A: NEW TR ROOMS - ALL WORK ASSOCIATED WITH NEW TR ROOMS IS A NECESSARY PREDECESSOR FOR WORK TO PROCEED TO PHASE B. THE CONTRACTING OFFICER, LOCAL FACILITIES ENGINEERING, AND THE DESIGNATED OIT REPRESENTATIVE MUST SIGN OFF ON COMPLETION OF THE NEW TR ROOMS PRIOR TO MOVING WORK INTO PHASE B.

· PHASE B: ROOM A437 PHASE 1 - TECHNOLOGY DRAWINGS INDICATE ROOM A437 TO BE CONSTRUCTED IN THREE PHASES. 'PHASE 1' ON SHEET TN-442-C.1.4 DEPICTS THE

COMPLETED STATE OF THE PHASED CONVERSION OF THIS ROOM. ROOM A437 PHASE 1 COMPLETION INCLUDES 11 CABINETS AND ASSUMES THEY ARE FULLY OPERATIONAL AND

COORDINATED WITH ALL TRADES.

1. ANY WORKS IN THIS ROOM SHALL BE COORDINATED IN ADVANCE AND ALL STAFF ENTERING THIS SPACE WILL REQUIRE ESCORTS UNLESS OTHERWISE AGREED UPON BY OIT

MANAGEMENT. ALL EQUIPMENT IN THIS SPACE IS SENSITIVE AND CARE SHALL BE TAKEN TO MINIMIZE ANY DISRUPTION TO PATIENT CARE.

2. IT IS INTENDED THAT ALL ASSOCIATED WORK TO ENABLE THESE ELEVEN RACKS ARE COMPLETED PRIOR TO MOVING TO PHASE D AND MUST BE SIGNED OFF WITH THE

CONTRACTING OFFICER, LOCAL FACILITIES ENGINEERING, AND THE DESIGNATED OIT REPRESENTATIVE.

3. ANY REQUIRED ACTIVITY BY VA STAFF TO SUPPORT THIS PROJECT MUST BE AGREED TO NO LESS THAN 4 WEEKS IN ADVANCE OF ANY REQUIRED ACTIVITY. DELAYS CAUSED

BY FAILING TO IDENTIFY…