ATTACHMENT 2 - Drawings 1 of 13.pdf
PDF 12 MB Posted
- Solicitation number
- 36C77623B0005
About this file
This document provides details on a federal solicitation and related file. The solicitation number 36C77623B0005 is for the Construction of the EHRM Infrastructure Upgrades at the Cincinnati VAMC, Project #539-21-701. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin for an opportunity type of Solicitation. Attachment 2 is a drawing file with 13 pages related to the project, which involves upgrades to infrastructure at the Cincinnati VA Medical Center. The solicitation appears to be currently open with no specified response or award dates provided in the given information.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANAGEMENT,
ARCHITECTURE, & TECHNOLOGY
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
539-21-701
4-MAY-2022
100% CONSTRUCTION
DOCUMENTS
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST., CINCINNATI, OH
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
ETS
T
TA
GE
S
R I
E T E X
FO
T
CE
TI
H
AS
DER CRA
F. BIAN
C
OJ
O
SE
P
H
7 6 22 1
5/4/22
CINCINNATI VAMC
3200 VINE ST.
CINCINNATI, OH 45220
CINCINNATI VAMC EHRM INFRASTRUCTURE UPGRADES
PROJECT # 539-21-701
GI-000
COVER SHEET
RAC
IAR, JFB
TECHNOLOGY, SECURITY & MEP
6 S. Old Orchard Ave.
Webster Groves, MO 63119
Phone: 314-918-8383 www.rossbar.com
ABATEMENT
8000 IH 10 W, Ste 600 San Antonio, Texas 78230
Phone: (661)203-8172 www.Desert-Concepts.com
10/18/22 18-OCT-2221-OCT-225/4/22
INDEX OF DRAWINGS
ABATEMENT
HA-101 HAZARDOUS MATERIALS - ASBESTOS
HA-102 HAZARDOUS MATERIALS - ASBESTOS
HA-103 HAZARDOUS MATERIALS - ASBESTOS
HA-104 HAZARDOUS MATERIALS - ASBESTOS
HA-105 HAZARDOUS MATERIALS - ASBESTOS
HA-106 HAZARDOUS MATERIALS - ASBESTOS
HA-107 HAZARDOUS MATERIALS - ASBESTOS
ARCHITECTURAL
GI-000 COVER
GI-010 INDEX OF DRAWINGS
GI-011 INDEX OF DRAWINGS
GI-020 GENERAL INFORMATION, SYMBOLS, & LOCATION MAP
GI-030 ABBREVIATIONS
GI-040 ACCESSIBILITY STANDARDS
GI-041 ACCESSIBILITY STANDARDS
GI-042 ACCESSIBILITY STANDARDS
GI-043 ACCESSIBILITY STANDARDS
GI-044 ACCESSIBILITY STANDARDS
AD-100-C.1.B ENLARGED FLOOR PLANS - BASEMENT - DEMOLITION
AD-101-C.1.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION
AD-102-C.1.2 ENLARGED FLOOR PLANS - 2ND FLOOR - DEMOLITION
AD-103-C.1.3 ENLARGED FLOOR PLANS - 3RD FLOOR - DEMOLITION
AD-104-C.1.4 ENLARGED FLOOR PLANS - 4TH FLOOR - DEMOLITION
AD-105-C.1.5 ENLARGED FLOOR PLANS - 5TH FLOOR - DEMOLITION
AD-106-C.1.6 ENLARGED FLOOR PLANS - 6TH FLOOR - DEMOLITION
AD-107-C.1.7 ENLARGED FLOOR PLANS - 7TH FLOOR - DEMOLITION
AD-108-C.1.8 ENLARGED FLOOR PLANS - 8TH FLOOR - DEMOLITION
AD-109-C.1.9 ENLARGED FLOOR PLANS - 9TH FLOOR - DEMOLITION
AD-140-C.2.B ENLARGED FLOOR PLANS - BASEMENT - DEMOLITION
AD-141-C.2.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION
AD-142-C.2.2 ENLARGED FLOOR PLANS - 2ND FLOOR - DEMOLITION
AD-150-C.3.B ENLARGED FLOOR PLANS - BASEMENT - DEMOLITION
AD-160-C.8.2 ENLARGED FLOOR PLANS - 2ND FLOOR - DEMOLITION
AD-180-C.15.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION
AD-190-C.TB.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION
AD-200-C.TE.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION
AD-210-FT.64.B ENLARGED FLOOR PLANS - BASEMENT - DEMOLITION
AD-211-FT.64.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION
AD-212-FT.64.2 ENLARGED FLOOR PLANS - 2ND FLOOR - DEMOLITION
AD-213-FT.64.3 ENLARGED FLOOR PLANS - 3RD FLOOR - DEMOLITION
AD-220-FT.117.1 ENLARGED FLOOR PLANS - 1ST FLOOR - DEMOLITION
AS-100-C.1.SB OVERALL FLOOR PLAN - SUB-BASEMENT - AREA 1
AS-101-C.1.SB OVERALL FLOOR PLAN - SUB-BASEMENT - AREA 2
AS-102-C.1.SB OVERALL FLOOR PLAN - SUB-BASEMENT - AREA 3
AS-103-C.1.B OVERALL FLOOR PLAN - BASEMENT - AREA 1
AS-104-C.1.B OVERALL FLOOR PLAN - BASEMENT - AREA 2
AS-105-C.1.B OVERALL FLOOR PLAN - BASEMENT - AREA 3
AS-106-C.1.B OVERALL FLOOR PLAN - BASEMENT - AREA 4
AS-107-C.1.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 1
AS-108-C.1.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 2
AS-109-C.1.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 3
AS-110-C.1.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 4
AS-111-C.1.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 1
AS-112-C.1.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 2
AS-113-C.1.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 3
AS-114-C.1.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 4
AS-115-C.1.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 1
AS-116-C.1.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 2
AS-117-C.1.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 3
AS-118-C.1.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 4
AS-119-C.1.4 OVERALL FLOOR PLAN - FOURTH FLOOR - AREA 1
AS-120-C.1.4 OVERALL FLOOR PLAN - FOURTH FLOOR - AREA 2
AS-121-C.1.4 OVERALL FLOOR PLAN - FOURTH FLOOR - AREA 3
AS-122-C.1.4 OVERALL FLOOR PLAN - FOURTH FLOOR - AREA 4
AS-123-C.1.5 OVERALL FLOOR PLAN - FIFTH FLOOR - AREA 1
AS-124-C.1.5 OVERALL FLOOR PLAN - FIFTH FLOOR - AREA 2
AS-125-C.1.5 OVERALL FLOOR PLAN - FIFTH FLOOR - AREA 3
AS-126-C.1.6 OVERALL FLOOR PLAN - SIXTH FLOOR - AREA 1
AS-127-C.1.6 OVERALL FLOOR PLAN - SIXTH FLOOR - AREA 2
AS-128-C.1.6 OVERALL FLOOR PLAN - SIXTH FLOOR - AREA 3
AS-129-C.1.7 OVERALL FLOOR PLAN - SEVENTH FLOOR - AREA 1
AS-130-C.1.7 OVERALL FLOOR PLAN - SEVENTH FLOOR - AREA 2
AS-131-C.1.7 OVERALL FLOOR PLAN - SEVENTH FLOOR - AREA 3
AS-132-C.1.8 OVERALL FLOOR PLAN - EIGHTH FLOOR - AREA 1
AS-133-C.1.8 OVERALL FLOOR PLAN - EIGHTH FLOOR - AREA 2
AS-134-C.1.9 OVERALL FLOOR PLAN - NINTH FLOOR - AREA 1
AS-135-C.1.9 OVERALL FLOOR PLAN - NINTH FLOOR - AREA 2
AS-140-C.2.B OVERALL FLOOR PLAN - BASEMENT - AREA 1
AS-141-C.2.B OVERALL FLOOR PLAN - BASEMENT - AREA 2
AS-142-C.2.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 1
AS-143-C.2.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 2
AS-144-C.2.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 1
AS-145-C.2.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 2
AS-150-C.3.B OVERALL FLOOR PLAN - BASEMENT
AS-151-C.3.1 OVERALL FLOOR PLAN - FIRST FLOOR
AS-152-C.3.2 OVERALL FLOOR PLAN - SECOND FLOOR
AS-160-C.8.1 OVERALL FLOOR PLAN - FIRST FLOOR
AS-161-C.8.2 OVERALL FLOOR PLAN - SECOND FLOOR
AS-162-C.8.4 OVERALL FLOOR PLAN - FOURTH FLOOR
AS-180-C.15.B OVERALL FLOOR PLAN - BASEMENT
AS-181-C.15.1 OVERALL FLOOR PLAN - FIRST FLOOR
AS-182-C.15.2 OVERALL FLOOR PLAN - SECOND FLOOR
AS-183-C.15.3 OVERALL FLOOR PLAN - THIRD FLOOR
AS-184-C.15.4 OVERALL FLOOR PLAN - FOURTH FLOOR
AS-190-C.TB.1 OVERALL FLOOR PLAN - FIRST FLOOR
AS-200-C.TE.1 OVERALL FLOOR PLAN - FIRST FLOOR
AS-210-FT.64.B OVERALL FLOOR PLAN - BASEMENT - AREA 1
AS-211-FT.64.B OVERALL FLOOR PLAN - BASEMENT - AREA 2
AS-212-FT.64.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 1
AS-213-FT.64.1 OVERALL FLOOR PLAN - FIRST FLOOR - AREA 2
AS-214-FT.64.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 1
AS-215-FT.64.2 OVERALL FLOOR PLAN - SECOND FLOOR - AREA 2
AS-216-FT.64.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 1
AS-217-FT.64.3 OVERALL FLOOR PLAN - THIRD FLOOR - AREA 2
AS-220-FT.117.1 OVERALL FLOOR PLAN - FIRST FLOOR
AS-300 ROOF PLAN - BUILDING 1
AS-301 ROOF PLANS - BUILDINGS 2, 3, 8, 15, & 64
AS-310 ROOF DETAILS
AS-400-C.1.B ENLARGED FLOOR PLANS - BASEMENT - RENOVATION
AS-401-C.1.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION
ARCHITECTURAL (CONTINUED)
AS-402-C.1.2 ENLARGED FLOOR PLANS - 2ND FLOOR - RENOVATION
AS-403-C.1.3 ENLARGED FLOOR PLANS - 3RD FLOOR - RENOVATION
AS-404-C.1.4 ENLARGED FLOOR PLANS - 4TH FLOOR - RENOVATION
AS-405-C.1.5 ENLARGED FLOOR PLANS - 5TH FLOOR - RENOVATION
AS-406-C.1.6 ENLARGED FLOOR PLANS - 6TH FLOOR - RENOVATION
AS-407-C.1.7 ENLARGED FLOOR PLANS- 7TH FLOOR - RENOVATION
AS-408-C.1.8 ENLARGED FLOOR PLANS - 8TH FLOOR - RENOVATION
AS-409-C.1.9 ENLARGED FLOOR PLANS - 9TH FLOOR - RENOVATION
AS-440-C.2.B ENLARGED FLOOR PLANS - BASEMENT - RENOVATION
AS-441-C.2.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION
AS-442-C.2.2 ENLARGED FLOOR PLANS - 2ND FLOOR - RENOVATION
AS-450-C.3.B ENLARGED FLOOR PLANS - BASEMENT - RENOVATION
AS-460-C.8.2 ENLARGED FLOOR PLANS - 2ND FLOOR - RENOVATION
AS-480-C.15.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION
AS-490-C.TB.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION
AS-500-C.TE.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION
AS-510-FT.64.B ENLARGED FLOOR PLANS - BASEMENT - RENOVATION
AS-511-FT.64.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION
AS-512-FT.64.2 ENLARGED FLOOR PLANS - 2ND FLOOR - RENOVATION
AS-513-FT.64.3 ENLARGED FLOOR PLANS - 3RD FLOOR - RENOVATION
AS-520-FT.117.1 ENLARGED FLOOR PLANS - 1ST FLOOR - RENOVATION
AS-530 INTERIOR ELEVATIONS & EXISTING ROOM PHOTOS
AS-600 PARTITION TYPES
AS-700 DOOR SCHEDULE, DOOR & FRAME TYPES
AS-710 DOOR & MISCELLANEOUS DETAILS
AS-720 ROOM FINISH SCHEDULE & MATERIAL SCHEDULE
FIRE PROTECTION
FP-000 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS
FP-110-C.1.B FIRE PROTECTION BASEMENT OVERALL PLAN
FP-120-C.1.1 FIRE PROTECTION FIRST FLOOR OVERALL PLAN
FP-130-C.1.2 FIRE PROTECTION SECOND FLOOR OVERALL PLAN
FP-140-C.1.3 FIRE PROTECTION THIRD FLOOR OVERALL PLAN
FP-150-C.1.4 FIRE PROTECTION FOURTH FLOOR OVERALL PLAN
FP-160-C.1.5 FIRE PROTECTION FIFTH FLOOR OVERALL PLAN
FP-170-C.1.6 FIRE PROTECTION SIXTH FLOOR OVERALL PLAN
FP-180-C.1.7 FIRE PROTECTION SEVENTH FLOOR OVERALL PLAN
FP-190-C.1.8 FIRE PROTECTION EIGHTH FLOOR OVERALL PLAN
FP-200-C.1.9 FIRE PROTECTION NINTH FLOOR OVERALL PLAN
FP-201-C.1.B THRU 3 FIRE PROTECTION DEMOLITION ENLARGED PLANS
FP-202-C.1.4 THRU 9 FIRE PROTECTION DEMOLITION ENLARGED PLANS
FP-203-C.1.B THRU 3 FIRE PROTECTION ENLARGED PLANS
FP-204-C.1.4 THRU 9 FIRE PROTECTION ENLARGED PLANS
FP-205-C.1.4 FIRE PROTECTION FOURTH FLOOR CLEAN AGENT PLAN
FP-210-C.2.B FIRE PROTECTION BASEMENT OVERALL & ENLARGED PLANS
FP-211-C.2.1 FIRE PROTECTION FIRST FLOOR OVERALL & ENLARGED PLANS
FP-212-C.2.2 FIRE PROTECTION SECOND FLOOR OVERALL & ENLARGED PLANS
FP-230-C.3.B FIRE PROTECTION BASEMENT OVERALL & ENLARGED PLANS
FP-260-C.15.1 FIRE PROTECTION FIRST FLOOR OVERALL & ENLARGED PLANS
FP-300-FT.64.B FIRE PROTECTION BASEMENT OVERALL & ENLARGED PLANS
FP-301-FT.64.1 FIRE PROTECTION FIRST FLOOR OVERALL & ENLARGED PLANS
FP-302-FT.64.2 FIRE PROTECTION SECOND FLOOR OVERALL & ENLARGED PLANS
FP-303-FT.64.3 FIRE PROTECTION THIRD FLOOR OVERALL & ENLARGED PLANS
FP-710 DETAILS
FA-206.C.1.3 FIRE ALARM THIRD FLOOR ENLARGED PLAN
PLUMBING
P-000 PLUMBING SYMBOLS AND ABBREVIATIONS
P-120-C.1.1 PLUMBING FIRST FLOOR OVERALL & ENLARGED PLANS
P-130-C.1.2 PLUMBING SECOND FLOOR OVERALL & ENLARGED PLANS
P-140-C.1.3 PLUMBING THIRD FLOOR OVERALL & ENLARGED PLANS
P-150-C.1.4 PLUMBING FOURTH FLOOR OVERALL & ENLARGED PLANS
P-180-C.1.7 PLUMBING SEVENTH FLOOR OVERALL & ENLARGED PLANS
P-190-C.1.8 PLUMBING EIGHTH FLOOR OVERALL & ENLARGED PLANS
P-200-C.1.9 PLUMBING NINTH FLOOR OVERALL & ENLARGED PLANS
P-210-C.2.B PLUMBING BASEMENT OVERALL & ENLARGED PLANS
P-211-C.2.1 PLUMBING SECOND FLOOR & ENLARGED PLANS
P-240-C.8.2 PLUMBING SECOND FLOOR OVERALL & ENLARGED PLANS
P-260-C.15.1 PLUMBING FIRST FLOOR OVERALL & ENLARGED PLANS
P-300-FT.64.2 PLUMBING SECOND FLOOR OVERALL & ENLARGED PLANS
MECHANICAL
M-000 MECHANICAL SYMBOLS & ABBREVIATIONS
M-101-C.1.B BASEMENT OVERALL HVAC NEW WORK PLAN
M-102-C.1.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN
M-103-C.1.2 SECOND FLOOR OVERALL HVAC NEW WORK PLAN
M-104-C.1.3 THIRD FLOOR OVERALL HVAC NEW WORK PLAN
M-105-C.1.4 FOURTH FLOOR OVERALL HVAC NEW WORK PLAN
M-106-C.1.5 FLOOR PLAN PARTIAL - FIFTH FLOOR
M-107-C.1.6 SIXTH FLOOR OVERALL HVAC NEW WORK PLAN
M-108-C.1.7 SEVENTH FLOOR OVERALL HVAC NEW WORK PLAN
M-109-C.1.8 EIGHTH FLOOR OVERALL HVAC NEW WORK PLAN
M-110-C.1.9 NINTH FLOOR OVERALL HVAC NEW WORK PLAN
M-111-C.1.10 TENTH FLOOR OVERALL HVAC NEW WORK PLAN
M-120-C.2.B BASEMENT OVERALL HVAC NEW WORK PLAN
M-121-C.2.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN
M-122-C.2.2 SECOND FLOOR OVERALL HVAC NEW WORK PLAN
M-130-C.3.B BASEMENT OVERALL HVAC NEW WORK PLAN
M-131-C.3.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN
M-132-C.3.2 SECOND FLOOR OVERALL HVAC NEW WORK PLAN
M-133-C.3.3 THIRD FLOOR OVERALL HVAC NEW WORK PLAN
M-140-C.8.2 SECOND FLOOR OVERALL NEW HVAC WORK PLAN
M-150-C.15.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN
M-151-C.15.2 SECOND FLOOR OVERALL NEW HVAC WORK PLAN
M-160-FT.64.B BASEMENT OVERALL HVAC NEW WORK PLAN
M-161-FT.64.1 FIRST FLOOR OVERALL HVAC NEW WORK PLAN
M-162-FT.64.2 SECOND FLOOR OVERALL HVAC NEW WORK PLAN
M-163-FT.64.3 THIRD FLOOR OVERALL HVAC NEW WORK PLAN
M-164-FT.64.4 ROOF OVERALL HVAC NEW WORK PLAN
MD-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT
MD-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR
MD-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR
MD-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR
MD-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR
MD-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR
MD-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR
MD-408-C.1.7 ENLARGED FLOOR PLAN - SEVENTH FLOOR
MD-409-C.1.8 ENLARGED FLOOR PLAN - EIGHTH FLOOR
MD-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR
MECHANICAL (CONTINUED)
MD-411-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR
MD-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT
MD-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL
MD-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL
MD-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT
MD-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR
MD-450-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR
MD-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT
MD-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR
MD-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR
MD-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR
MD-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR
MD-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR
M-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT
M-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR
M-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR
M-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR
M-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR
M-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR
M-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR
M-408-C.1.7 ENLARGED FLOOR PLANS - SEVENTH FLOOR
M-409-C.1.8 ENLARGED FLOOR PLANS - EIGHTH FLOOR
M-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR
M-411-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR
M-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT
M-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL
M-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL
M-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT
M-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR
M-450-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR
M-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT
M-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR
M-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR
M-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR
M-464-FT.64.4 ENLARGED FLOOR PLANS - ROOF
M-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR
M-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR
M-500 MECHANICAL DETAILS
M-600 MECHANICAL SCHEDULES
M-601 HVAC PIPING DIAGRAMS
M-700 MECHANICAL CONTROLS
M-701 MECHANICAL CONTROLS
ELECTRICAL
E-000 ELECTRICAL SYMBOLS
ED-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT
ED-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR
ED-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR
ED-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR
ED-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR
ED-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR
ED-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR
ED-408-C.1.7 ENLARGED FLOOR PLAN - SEVENTH FLOOR
ED-409-C.1.8 ENLARGED FLOOR PLAN - EIGHTH FLOOR
ED-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR
ED-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT
ED-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL
ED-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL
ED-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT
ED-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR
ED-450-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR
ED-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT
ED-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR
ED-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR
ED-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR
ED-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR
ED-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR
ED-600 ELECTRICAL DEMO - PANELBOARD SCHEDULES ROOM A437C
EL-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT
EL-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EL-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR
EL-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR
EL-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR
EL-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR
EL-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR
EL-408-C.1.7 ENLARGED FLOOR PLAN - SEVENTH FLOOR
EL-409-C.1.8 ENLARGED FLOOR PLAN - EIGHTH FLOOR
EL-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR
EL-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT
EL-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL
EL-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL
EL-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT
EL-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR
EL-440-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EL-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT
EL-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EL-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR
EL-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR
EL-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EL-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EL-500 LIGHT FIXTURE DESCRIPTIONS
EP-100-C.1.SB FLOOR PLAN - PARTIAL - BLDG. 1 - SUB-BSMT - AREA 1
EP-101-C.1.SB FLOOR PLAN - PARTIAL - BLDG. 1 - SUB-BSMT - AREA 2
EP-102-C.1.SB FLOOR PLAN - PARTIAL - BLDG. 1 - SUB-BSMT - AREA 3
EP-103-C.1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 1
EP-104-C.1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 2
EP-105-C.1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 3
EP-106-C.1.B FLOOR PLAN - PARTIAL - BASEMENT - AREA 4
EP-107-C.1.1 FLOOR PLAN - PARTIAL - BLDG. 1 - 1F - AREA 1
EP-108-C.1.1 FLOOR PLAN - PARTIAL - BLDG. 1 - 1F - AREA 2
EP-109-C.1.1 FLOOR PLAN - PARTIAL - BLDG. 1 - 1F - AREA 3
EP-110-C.1.1 FLOOR PLAN - PARTIAL - BLDG. 1 - 1F - AREA 4
EP-111-C.1.2 FLOOR PLAN - PARTIAL - BLDG. 1 - 2F - AREA 1
EP-112-C.1.2 FLOOR PLAN - PARTIAL - BLDG. 1 - 2F - AREA 2
EP-113-C.1.2 FLOOR PLAN - PARTIAL - BLDG. 1 - 2F - AREA 3
EP-114-C.1.2 FLOOR PLAN - PARTIAL - BLDG. 1 - 2F - AREA 4
EP-115-C.1.3 FLOOR PLAN - PARTIAL - BLDG. 1 - 3F - AREA 1
EP-116-C.1.3 FLOOR PLAN - PARTIAL - BLDG. 1 - 3F - AREA 2
ELECTRICAL (CONTINUED)
EP-117-C.1.3 FLOOR PLAN - PARTIAL - BLDG. 1 - 3F - AREA 3
EP-118-C.1.3 FLOOR PLAN - PARTIAL - BLDG. 1 - 3F - AREA 4
EP-119-C.1.4 FLOOR PLAN - PARTIAL - BLDG. 1 - 4F - AREA 1
EP-120-C.1.4 FLOOR PLAN - PARTIAL - BLDG. 1 - 4F - AREA 2
EP-121-C.1.4 FLOOR PLAN - PARTIAL - BLDG. 1 - 4F - AREA 3
EP-122-C.1.4 FLOOR PLAN - PARTIAL - BLDG. 1 - 4F - AREA 4
EP-123-C.1.5 FLOOR PLAN - PARTIAL - BLDG. 1 - 5F - AREA 1
EP-124-C.1.5 FLOOR PLAN - PARTIAL - BLDG. 1 - 5F - AREA 2
EP-125-C.1.5 FLOOR PLAN - PARTIAL - BLDG. 1 - 5F - AREA 3
EP-126-C.1.6 FLOOR PLAN - PARTIAL - BLDG. 1 - 6F - AREA 1
EP-127-C.1.6 FLOOR PLAN - PARTIAL - BLDG. 1 - 6F - AREA 2
EP-128-C.1.6 FLOOR PLAN - PARTIAL - BLDG. 1 - 6F - AREA 3
EP-129-C.1.7 FLOOR PLAN - PARTIAL - BLDG. 1 - 7F - AREA 1
EP-130-C.1.7 FLOOR PLAN - PARITAL - BLDG. 1 - 7F - AREA 2
EP-131-C.1.7 FLOOR PLAN - PARTIAL - BLDG. 1 - 7F - AREA 3
EP-132-C.1.8 FLOOR PLAN - PARTIAL - BLDG. 1 - 8F - AREA 1
EP-133-C.1.8 FLOOR PLAN - PARTIAL - BLDG. 1 - 8F - AREA 2
EP-134-C.1.9 FLOOR PLAN - PARTIAL - BLDG. 1 - 9F - AREA 1
EP-135-C.1.9 FLOOR PLAN - PARTIAL - BLDG. 1 - 9F - AREA 2
EP-136-C.2.B FLOOR PLAN - PARTIAL - BLDG. 2 - BSMT - AREA 1
EP-137-C.2.B FLOOR PLAN - PARTIAL - BLDG. 2 - BSMT - AREA 2
EP-138-C.2.1 FLOOR PLAN - PARTIAL - BLDG. 2 - 1F
EP-139-C.2.1 FLOOR PLAN - PARTIAL - BLDG. 2 - 1F - AREA 2
EP-140-C.2.2 FLOOR PLAN - PARTIAL - BLDG. 2 - 2F
EP-141-C.2.2 FLOOR PLAN - PARTIAL - BLDG. 2 - 2F - AREA 2
EP-142-C.3.B FLOOR PLAN - BLDG. 3 - BASEMENT
EP-143-C.3.1 FLOOR PLAN - BLDG. 3 - 1F
EP-144-C.3.2 FLOOR PLAN - BLDG. 3 - 2F
EP-145-C.3.3 FLOOR PLAN - BLDG. 3 - 3F
EP-146-C.8.1 FLOOR PLAN - BLDG. 8 - 1F
EP-147-C.8.2 FLOOR PLAN - BLDG. 8 - 2F
EP-148-C.14.2 FLOOR PLAN - BLDG. 14 - 2F
EP-149-C.15.B FLOOR PLAN - BLDG. 15 - BSMT
EP-150-C.15.1 FLOOR PLAN - BLDG. 15 - 1F
EP-151-C.15.2 FLOOR PLAN - BLDG. 15 - 2F
EP-152-C.15.3 FLOOR PLAN - BLDG. 15 - 3F
EP-153-C.15.4 FLOOR PLAN - BLDG. 15 - 3F
EP-154-FT.64.B FLOOR PLAN - BLDG. 64 - BSMT - AREA 1
EP-155-FT.64.B FLOOR PLAN - PARTIAL - BLDG. 64 - BSMT - AREA 2
EP-156-FT.64.1 FLOOR PLAN - PARTIAL - BLDG. 64 - 1F - AREA 1
EP-157-FT.64.1 FLOOR PLAN - PARTIAL - BLDG. 64 - 1F - AREA 2
EP-158-FT.64.2 FLOOR PLAN - PARTIAL - BLDG. 64 - 2F - AREA 1
EP-159-FT.64.2 FLOOR PLAN - PARTIAL - BLDG. 64 - 2F - AREA 2
EP-160-FT.64.3 FLOOR PLAN - PARTIAL - BLDG. 64 - 3F - AREA1
EP-161-FT.64.3 FLOOR PLAN - PARTIAL - BLDG. 64 - 3F - AREA 2
EP-162-FT.64.4 FLOOR PLAN - PARTIAL - BLDG. 64 - ROOF - AREA 1
EP-163-FT.64.4 FLOOR PLAN - PARTIAL - BLDG. 64 - ROOF - AREA 2
EP-401-C.1.B ENLARGED FLOOR PLANS - BASEMENT
EP-402-C.1.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EP-403-C.1.2 ENLARGED FLOOR PLANS - SECOND FLOOR
EP-404-C.1.3 ENLARGED FLOOR PLANS - THIRD FLOOR
EP-405-C.1.4 ENLARGED FLOOR PLANS - FOURTH FLOOR
EP-406-C.1.5 ENLARGED FLOOR PLANS - FIFTH FLOOR
EP-407-C.1.6 ENLARGED FLOOR PLANS - SIXTH FLOOR
EP-408-C.1.7 ENLARGED FLOOR PLAN - SEVENTH FLOOR
EP-409-C.1.8 ENLARGED FLOOR PLAN - EIGHTH FLOOR
EP-410-C.1.9 ENLARGED FLOOR PLANS - NINTH FLOOR
EP-420-C.2.B ENLARGED FLOOR PLANS - BASEMENT
EP-421-C.2.1 ENLARGED FLOOR PLANS - FIRST LEVEL
EP-422-C.2.2 ENLARGED FLOOR PLANS - SECOND LEVEL
EP-430-C.3.B ENLARGED FLOOR PLANS - BASEMENT
EP-440-C.8.2 ENLARGED FLOOR PLANS - SECOND FLOOR
EP-450-C.15.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EP-460-FT.64.B ENLARGED FLOOR PLANS - BASEMENT
EP-461-FT.64.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EP-462-FT.64.2 ENLARGED FLOOR PLANS - SECOND FLOOR
EP-463-FT.64.3 ENLARGED FLOOR PLANS - THIRD FLOOR
EP-480-C.TB.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EP-490-C.TE.1 ENLARGED FLOOR PLANS - FIRST FLOOR
EP-601-C.1 BUILDING 1 - ELECTRICAL DIAGRAMS
EP-602-C.1 BUILDING 1 - ELECTRICAL DIAGRAMS
EP-603-C.1 BUILDING 1 - ELECTRICAL DIAGRAMS
EP-604-C.1 BUILDING 1 - ELECTRICAL DIAGRAMS
EP-610-C.1 BUILDING 1 - ELECTRICAL SCHEDULE
EP-611-C.1 BUILDING 1 - ELECTRICAL SCHEDULE
EP-612.C.1 BUILDING 1 - ELECTRICAL SCHEDULE
EP-613-C.1 BUILDING 1 - ELECTRICAL SCHEDULE
EP-614-C.1 BUILDING 1 - ELECTRICAL SCHEDULE
EP-615-C.1 BUILDING 1 - ELECTRICAL SCHEDULE
EP-616-C.1 BUILDING 1 - ELECTRICAL SCHEDULE
EP-617-C.1 TN AND TC CONDUIT FEEDER ROUTE SCHEDULE
EP-620-C.2 BUILDING 2 - ELECTRICAL DIAGRAMS
EP-621-C.2 BUILDING 2 - ELECTRICAL SCHEDULE
EP-625-C.3 BUILDING 3 - ELECTRICAL SCHEDULE AND DIAGRAMS
EP-630-C.8 BUILDING 8 - ELECTRICAL SCHEDULE AND DIAGRAMS
EP-640-C.15 BUILDING 15 - ELECTRICAL DIAGRAMS
EP-641-C.15 BUILDING 15 - ELECTRICAL SCHEDULE
EP-650-FT.64 BUILDING 64 - ELECTRICAL DIAGRAMS
EP-651-FT.64 BUILDING 64 - ELECTRICAL SCHEDULE
EP-652-FT.64 BUILDING 64 - ELECTRICAL SCHEDULE
EP-660-C.PK BUILDING 64 - ELECTRICAL SCHEDULE AND DIAGRAMS
EP-665-C.TB BUILDING TB - ELECTRICAL SCHEDULE AND DIAGRAMS
EP-670-C.TE BUILDING TE - ELECTRICAL SCHEDULE AND DIAGRAMS
EP-680 ELECTRICAL DIAGRAM
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
539-21-701
4-MAY-2022
100% CONSTRUCTION
DOCUMENTS
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST., CINCINNATI, OH
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
ETS
T
TA
GE
S
R I
E T E X
FO
T
CE
TI
H
AS
DER CRA
F. BIAN
C
OJ
O
SE
P
H
7 6 22 1
5/4/22
GI-010
INDEX OF DRAWINGS
RAC
IAR, JFB
INDEX OF DRAWINGS
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
539-21-701
4-MAY-2022
100% CONSTRUCTION
DOCUMENTS
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST., CINCINNATI, OH
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
ETS
T
TA
GE
S
R I
E T E X
FO
T
CE
TI
H
AS
DER CRA
F. BIAN
C
OJ
O
SE
P
H
7 6 22 1
5/4/22
GI-011
INDEX OF DRAWINGS
RAC
IAR, JFB
TECHNOLOGY
T-000 TELECOMMUNICATIONS GENERAL INFORMATION
T-001 RESPONSIBILITY AND PREFERRED PRODUCTS MATRIX
TD-100-C.1.SB TECHNOLOGY DEMOLITION SUB BASEMENT OVERALL PLAN
TD-101-C.1.SB TECHNOLOGY DEMOLITION SUB BASEMENT PARTIAL PLAN - A
TD-102-C.1.SB TECHNOLOGY DEMOLITION SUB BASEMENT PARTIAL PLAN - B
TD-110-C.1.B TECHNOLOGY DEMOLITION BASEMENT OVERALL PLAN
TD-111-C.1.B TECHNOLOGY DEMOLITION BASEMENT PARTIAL PLAN - A
TD-112-C.1.B TECHNOLOGY DEMOLITION BASEMENT PARTIAL PLAN - B
TD-113-C.1.B TECHNOLOGY DEMOLITION BASEMENT PARTIAL PLAN - C
TD-114-C.1.B TECHNOLOGY DEMOLITION BASEMENT PARTIAL PLAN - D
TD-120-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR OVERALL PLAN
TD-121-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR PARTIAL PLAN - A
TD-122-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR PARTIAL PLAN - B
TD-123-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR PARTIAL PLAN - C
TD-124-C.1.1 TECHNOLOGY DEMOLITION FIRST FLOOR PARTIAL PLAN - D
TD-130-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR OVERALL PLAN
TD-131-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR PARTIAL PLAN - A
TD-132-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR PARTIAL PLAN - B
TD-133-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR PARTIAL PLAN - C
TD-134-C.1.2 TECHNOLOGY DEMOLITION SECOND FLOOR PARTIAL PLAN - D
TD-140-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR OVERALL PLAN
TD-141-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR PARTIAL PLAN - A
TD-142-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR PARTIAL PLAN - B
TD-143-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR PARTIAL PLAN - C
TD-144-C.1.3 TECHNOLOGY DEMOLITION THIRD FLOOR PARTIAL PLAN - D
TD-150-C.1.4 TECHNOLOGY DEMOLITION FOURTH FLOOR OVERALL PLAN
TD-151-C.1.4 TECHNOLOGY DEMOLITION FOURTH FLOOR PARTIAL PLAN - A
TD-152-C.1.4 TECHNOLOGY DEMOLITION FOURTH FLOOR PARTIAL PLAN - B
TD-153-C.1.4 TECHNOLOGY DEMOLITION FOURTH FLOOR PARTIAL PLAN - D
TD-160-C.1.5 TECHNOLOGY DEMOLITION FIFTH FLOOR OVERALL PLAN
TD-161-C.1.5 TECHNOLOGY DEMOLITION FIFTH FLOOR PARTIAL PLAN - A
TD-162-C.1.5 TECHNOLOGY DEMOLITION FIFTH FLOOR PARTIAL PLAN - B
TD-163-C.1.5 TECHNOLOGY DEMOLITION FIFTH FLOOR PARTIAL PLAN - D
TD-170-C.1.6 TECHNOLOGY DEMOLITION SIXTH FLOOR OVERALL PLAN
TD-171-C.1.6 TECHNOLOGY DEMOLITION SIXTH FLOOR PARTIAL PLAN - A
TD-172-C.1.6 TECHNOLOGY DEMOLITION SIXTH FLOOR PARTIAL PLAN - B
TD-173-C.1.6 TECHNOLOGY DEMOLITION SIXTH FLOOR PARTIAL PLAN - D
TD-180-C.1.7 TECHNOLOGY DEMOLITION SEVENTH FLOOR OVERALL PLAN
TD-181-C.1.7 TECHNOLOGY DEMOLITION SEVENTH FLOOR PARTIAL PLAN - A
TD-182-C.1.7 TECHNOLOGY DEMOLITION SEVENTH FLOOR PARTIAL PLAN - B
TD-183-C.1.7 TECHNOLOGY DEMOLITION SEVENTH FLOOR PARTIAL PLAN - D
TD-190-C.1.8 TECHNOLOGY DEMOLITION EIGHTH FLOOR OVERALL PLAN
TD-191-C.1.8 TECHNOLOGY DEMOLITION EIGHTH FLOOR PARTIAL PLAN - A
TD-192-C.1.8 TECHNOLOGY DEMOLITION EIGHTH FLOOR PARTIAL PLAN - B
TD-193-C.1.8 TECHNOLOGY DEMOLITION EIGHTH FLOOR PARTIAL PLAN - D
TD-200-C.1.9 TECHNOLOGY DEMOLITION NINTH FLOOR OVERALL PLAN
TD-201-C.1.9 TECHNOLOGY DEMOLITION NINTH FLOOR PARTIAL PLAN - A
TD-202-C.1.9 TECHNOLOGY DEMOLITION NINTH FLOOR PARTIAL PLAN - B
TD-203-C.1.9 TECHNOLOGY DEMOLITION NINTH FLOOR PARTIAL PLAN - D
TD-210-C.2.BN BLDG. 2 - BASEMENT - NORTH TECHNOLOGY DEMO PLAN
TD-210-C.2.BS BLDG. 2 - BASEMENT - SOUTH TECHNOLOGY DEMO PLAN
TD-211-C.2.1N BLDG. 2 - FIRST FLOOR - NORTH TECHNOLOGY DEMO PLAN
TD-211-C.2.1S BLDG. 2 - FIRST FLOOR - SOUTH TECHNOLOGY DEMO PLAN
TD-212-C.2.2N BLDG. 2 - SECOND FLOOR - NORTH TECHNOLOGY DEMO PLAN
TD-212-C.2.2S BLDG. 2 - SECOND FLOOR - SOUTH TECHNOLOGY DEMO PLAN
TD-220-C.3.B BLDG. 3 - BASEMENT TECHNOLOGY DEMO PLAN
TD-221-C.3.1 BLDG. 3 - FIRST FLOOR - TECHNOLOGY DEMO PLAN
TD-222-C.3.2 BLDG. 3 - SECOND FLOOR - TECHNOLOGY DEMO PLAN
TD-223-C.3.3 BLDG. 3 - THIRD FLOOR - TECHNOLOGY DEMO PLAN
TD-231-C.8.1 BLDG. 8 - FIRST FLOOR - TECHNOLOGY DEMO PLAN
TD-232-C.8.2 BLDG. 8 - SECOND FLOOR - TECHNOLOGY DEMO PLAN
TD-233-C.8.3 BLDG. 8 - THIRD FLOOR - TECHNOLOGY DEMO PLAN
TD-234-C.8.4 BLDG. 8 - FOURTH FLOOR - TECHNOLOGY DEMO PLAN
TD-250-C.15.B BLDG. 15 - BASEMENT - TECHNOLOGY DEMO PLAN
TD-251-C.15.1 BLDG. 15 - FIRST FLOOR - TECHNOLOGY DEMO PLAN
TD-252-C.15.2 BLDG. 15 - SECOND FLOOR - TECHNOLOGY DEMO PLAN
TD-253-C.15.3 BLDG. 15 - THIRD FLOOR - TECHNOLOGY DEMO PLAN
TD-254-C.15.4 BLDG. 15 - FOURTH FLOOR - TECHNOLOGY DEMO PLAN
TD-270-F.64.BN BLDG. 64 - BASEMENT - TECHNOLOGY DEMO PLAN
TD-270-F.64.BS BLDG. 64 - BASEMENT - SOUTH TECHNOLOGY DEMO PLAN
TD-271-F.64.1N BLDG. 64 - FIRST FLOOR - NORTH TECHNOLOGY DEMO PLAN
TD-271-F.64.1S BLDG. 64 - FIRST FLOOR - SOUTH TECHNOLOGY DEMO PLAN
TD-272-F.64.2N BLDG. 64 - SECOND FLOOR - NORTH TECHNOLOGY DEMO PLAN
TD-272-F.64.2S BLDG. 64 - SECOND FLOOR - SOUTH TECHNOLOGY DEMO PLAN
TD-273-F.64.3N BLDG. 64 - THIRD FLOOR - NORTH TECHNOLOGY DEMO PLAN
TD-273-F.64.3S BLDG. 64 - THIRD FLOOR - SOUTH TECHNOLOGY DEMO PLAN
TD-275-F.117.1 BLDG. 117 - FIRST FLOOR - TECHNOLOGY DEMO PLAN
TD-280-C.TB.1 BLDG. TB - EDUCATION TRAILER - TECHNOLOGY DEMO PLAN
TD-282-C.TE.1 BLDG. TE - RESEARCH TRAILER - TECHNOLOGY DEMO PLAN
TD-600-C.1 TECHNOLOGY EXISTING FIBER BACKBONE DIAGRAM
TN-100-C.1.SB TECHNOLOGY SUB BASEMENT OVERALL PLAN
TN-101-C.1.SB TECHNOLOGY SUB BASEMENT PARTIAL PLAN - A
TN-102-C.1.SB TECHNOLOGY SUB BASEMENT PARTIAL PLAN - B
TN-110-C.1.B TECHNOLOGY BASEMENT OVERALL PLAN
TN-111-C.1.B TECHNOLOGY BASEMENT PARTIAL PLAN - A
TN-112-C.1.B TECHNOLOGY BASEMENT PARTIAL PLAN - B
TN-113-C.1.B TECHNOLOGY BASEMENT PARTIAL PLAN - C
TN-114-C.1.B TECHNOLOGY BASEMENT PARTIAL PLAN - D
TN-120-C.1.1 TECHNOLOGY FIRST FLOOR OVERALL PLAN
TN-121-C.1.1 TECHNOLOGY FIRST FLOOR PARTIAL PLAN - A
TN-122-C.1.1 TECHNOLOGY FIRST FLOOR PARTIAL PLAN - B
TN-123-C.1.1 TECHNOLOGY FIRST FLOOR PARTIAL PLAN - C
TN-124-C.1.1 TECHNOLOGY FIRST FLOOR PARTIAL PLAN - D
TN-130-C.1.2 TECHNOLOGY SECOND FLOOR OVERALL PLAN
TN-131-C.1.2 TECHNOLOGY SECOND FLOOR PARTIAL PLAN - A
TN-132-C.1.2 TECHNOLOGY SECOND FLOOR PARTIAL PLAN - B
TN-133-C.1.2 TECHNOLOGY SECOND FLOOR PARTIAL PLAN - C
TN-134-C.1.2 TECHNOLOGY SECOND FLOOR PARTIAL PLAN - D
TN-140-C.1.3 TECHNOLOGY THIRD FLOOR OVERALL PLAN
TN-141-C.1.3 TECHNOLOGY THIRD FLOOR PARTIAL PLAN - A
TN-142-C.1.3 TECHNOLOGY THIRD FLOOR PARTIAL PLAN - B
TN-143-C.1.3 TECHNOLOGY THIRD FLOOR PARTIAL PLAN - C
TN-144-C.1.3 TECHNOLOGY THIRD FLOOR PARTIAL PLAN - D
TN-150-C.1.4 TECHNOLOGY FOURTH FLOOR OVERALL PLAN
TN-151-C.1.4 TECHNOLOGY FOURTH FLOOR PARTIAL PLAN - A
TN-152-C.1.4 TECHNOLOGY FOURTH FLOOR PARTIAL PLAN - B
TN-153-C.1.4 TECHNOLOGY FOURTH FLOOR PARTIAL PLAN - D
TN-160-C.1.5 TECHNOLOGY FIFTH FLOOR OVERALL PLAN
TN-161-C.1.5 TECHNOLOGY FIFTH FLOOR PARTIAL PLAN - A
TN-162-C.1.5 TECHNOLOGY FIFTH FLOOR PARTIAL PLAN - B
TN-163-C.1.5 TECHNOLOGY FIFTH FLOOR PARTIAL PLAN - D
TECHNOLOGY (CONTINUED)
TN-170-C.1.6 TECHNOLOGY SIXTH FLOOR OVERALL PLAN
TN-171-C.1.6 TECHNOLOGY SIXTH FLOOR PARTIAL PLAN - A
TN-172-C.1.6 TECHNOLOGY SIXTH FLOOR PARTIAL PLAN - B
TN-173-C.1.6 TECHNOLOGY SIXTH FLOOR PARTIAL PLAN - D
TN-180-C.1.7 TECHNOLOGY SEVENTH FLOOR OVERALL PLAN
TN-181-C.1.7 TECHNOLOGY SEVENTH FLOOR PARTIAL PLAN - A
TN-182-C.1.7 TECHNOLOGY SEVENTH FLOOR PARTIAL PLAN - B
TN-183-C.1.7 TECHNOLOGY SEVENTH FLOOR PARTIAL PLAN - D
TN-190-C.1.8 TECHNOLOGY EIGHTH FLOOR OVERALL PLAN
TN-191-C.1.8 TECHNOLOGY EIGHTH FLOOR PARTIAL PLAN - A
TN-192-C.1.8 TECHNOLOGY EIGHTH FLOOR PARTIAL PLAN - B
TN-193-C.1.8 TECHNOLOGY EIGHTH FLOOR PARTIAL PLAN - D
TN-200-C.1.9 TECHNOLOGY NINTH FLOOR OVERALL PLAN
TN-201-C.1.9 TECHNOLOGY NINTH FLOOR PARTIAL PLAN - A
TN-202-C.1.9 TECHNOLOGY NINTH FLOOR PARTIAL PLAN - B
TN-203-C.1.9 TECHNOLOGY NINTH FLOOR PARTIAL PLAN - D
TN-210-C.2.BN BLDG. 2 - BASEMENT - NORTH TECHNOLOGY DATA OUTLET PLAN
TN-210-C.2.BS BLDG. 2 - BASEMENT - SOUTH TECHNOLOGY DATA OUTLET PLAN
TN-211-C.2.1N BLDG. 2 - FIRST FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN
TN-211-C.2.1S BLDG. 2 - FIRST FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN
TN-212-C.2.2N BLDG. 2 - SECOND FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN
TN-212-C.2.2S BLDG. 2 - SECOND FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN
TN-220-C.3.B BLDG. 3 - BASEMENT - TECHNOLOGY DATA OUTLET PLAN
TN-221-C.3.1 BLDG. 3 - FIRST FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-222-C.3.2 BLDG. 3 - SECOND FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-223-C.3.3 BLDG. 3 - THIRD FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-231-C.8.1 BLDG. 8 - FIRST FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-232-C.8.2 BLDG. 8 - SECOND FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-233-C.8.3 BLDG. 8 - THIRD FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-234-C.8.4 BLDG. 8 - FOURTH FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-250-C.15.B BLDG. 15 - BASEMENT - TECHNOLOGY DATA OUTLET PLAN
TN-251-C.15.1 BLDG. 15 - FIRST FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-252-C.15.2 BLDG. 15 - SECOND FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-253-C.15.3 BLDG. 15 - THIRD FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-254-C.15.4 BLDG. 15 - FOURTH FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-270-F.64.BN BLDG. 64 - BASEMENT TECHNOLOGY DATA OUTLET PLAN
TN-270-F.64.BS BLDG. 64 - BASEMENT - SOUTH TECHNOLOGY DATA OUTLET PLAN
TN-271-F.64.1N BLDG. 64 - FIRST FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN
TN-271-F.64.1S BLDG. 64 - FIRST FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN
TN-272-F.64.2N BLDG. 64 - SECOND FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN
TN-272-F.64.2S BLDG. 64 - SECOND FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN
TN-273-F.64.3N BLDG. 64 - THIRD FLOOR - NORTH TECHNOLOGY DATA OUTLET PLAN
TN-273-F.64.3S BLDG. 64 - THIRD FLOOR - SOUTH TECHNOLOGY DATA OUTLET PLAN
TN-275-F.117.1 BLDG. 117 - FIRST FLOOR - TECHNOLOGY DATA OUTLET PLAN
TN-280-C.TB.1 BLDG. TB - EDUCATION TRAILER - TECHNOLOGY DATA OUTLET PLAN
TN-282-C.TE.1 BLDG. TE - RESEARCH TRAILER - TECHNOLOGY DATA OUTLET PLAN
TN-401-C.1.B BLDG. 1 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN
TN-402-C.1.B BLDG. 1 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN
TN-403-C.1.B BLDG. 1 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN
TN-405-C.1.1 BLDG. 1 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-406-C.1.1 BLDG. 1 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-407-C.1.1 BLDG. 1 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-410-C.1.2 BLDG. 1 - SECOND FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-411-C.1.2 BLDG. 1 - SECOND FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-412-C.1.2 BLDG. 1 - SECOND FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-415-C.1.3 BLDG. 1 - THIRD FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-416-C.1.3 BLDG. 1 - THIRD FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-417-C.1.3 BLDG. 1 - THIRD FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-420-C.1.4 BLDG. 1 - FOURTH FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-421-C.1.4 ENLARGED TDR PLANS
TN-422-C.1.4 ENLARGED TDR PLANS
TN-423-C.1.4 POWER ELEVATION AND SCHEMATIC - LEVEL REDUNDANCY
TN-425-C.1.5 BLDG. 1 - FIFTH FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-430-C.1.6 BLDG. 1 - SIXTH FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-435-C.1.7 BLDG. 1 - SEVENTH FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-440-C.1.8 BLDG. 1 - EIGHTH FLOOR - TECHNOLOGY ROOM PLAN
TN-455-C.1.9 BLDG. 1 - NINTH FLOOR TECHNOLOGY TELECOM ROOM PLAN
TN-470-C.2.BN BLDG. 2 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN
TN-471-C.2.1 BLDG. 2 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-472-C.2.2 BLDG. 2 - SECOND FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-473-C.3.B BLDG. 3 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN
TN-474-C.8.2 BLDG. 8 - SECOND FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-479-C.15.1 BLDG. 15 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-480-F.64.B BLDG. 64 - BASEMENT - TECHNOLOGY TELECOM ROOM PLAN
TN-481-F.64.1 BLDG. 64 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-482-F.64.2 BLDG. 64 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-483-F.64.3 BLDG. 64 - THIRD FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-484-F.117.1 BLDG. 117 - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-490-C.TB.1 BLDG. TB - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-492-C.TE.1 BLDG. TE - FIRST FLOOR - TECHNOLOGY TELECOM ROOM PLAN
TN-500 TECHNOLOGY - TYPICAL DETAILS
TN-501 TECHNOLOGY - TYPICAL DETAILS
TN-503 TECHNOLOGY - TYPICAL DETAILS
TN-504 TECHNOLOGY - TYPICAL DETAILS
TN-505 TECHNOLOGY - TYPICAL DETAILS
TN-506 TECHNOLOGY - TYPICAL DETAILS
TN-600-C.1 TECHNOLOGY NEW FIBER BACKBONE DIAGRAM
TN-601 TECHNOLOGY RISER PLAN - BLDGS. 2, 3, 8, 14, 15, 64, 117, TB, & TE
TN-602 TECHNOLOGY BONDING RISER PLAN - BLDGS. 2, 3, 8, 15, 64, 117, TB, & TE
TN-603-C.1 GROUNDING AND BONDING RISER DIAGRAM
TS-000 SECURITY LEGEND
TS-110-C.1.B SECURITY BASEMENT OVERALL PLAN
TS-120-C.1.1 SECURITY FIRST FLOOR OVERALL PLAN
TS-130-C.1.2 SECURITY SECOND FLOOR OVERALL PLAN
TS-140-C.1.3 SECURITY THIRD FLOOR OVERALL PLAN
TS-150-C.1.4 SECURITY FOURTH FLOOR OVERALL PLAN
TS-160-C.1.5 SECURITY FIFTH FLOOR OVERALL PLAN
TS-170-C.1.6 SECURITY SIXTH FLOOR OVERALL PLAN
TS-180-C.1.7 SECURITY SEVENTH FLOOR OVERALL PLAN
TS-190-C.1.8 SECURITY EIGHTH FLOOR OVERALL PLAN
TS-200-C.1.9 SECURITY NINTH FLOOR OVERALL PLAN
TS-210-C.2.B BLDG. 2 - SECURITY BASEMENT OVERALL PLAN
TS-211-C.2.1 BLDG. 2 - SECURITY FIRST FLOOR OVERALL PLAN
TS-212-C.2.2 BLDG. 2 - SECURITY SECOND FLOOR OVERALL PLAN
TS-220-C.3.B BLDG. 3 - SECURITY BASEMENT OVERALL PLAN
TS-230-C.8.2 BLDG. 8 - SECURITY SECOND FLOOR OVERALL PLAN
TS-240-C.15.1 BLDG. 15 - SECURITY FIRST FLOOR OVERALL PLAN
TS-250-F.64.B BLDG. 64 - SECURITY BASEMENT OVERALL PLAN
TS-251-F.64.1 BLDG. 64 - SECURITY FIRST FLOOR OVERALL PLAN
TS-252-F.64.2 BLDG. 64 - SECURITY SECOND FLOOR OVERALL PLAN
TS-253-F.64.3 BLDG. 64 - SECURITY THIRD FLOOR OVERALL PLAN
TS-260-F.117.1 BLDG. 117 - SECURITY FIRST FLOOR OVERALL PLAN
TECHNOLOGY (CONTINUED)
TS-270-C.TB.1 BLDG. TB - SECURITY FIRST FLOOR OVERALL PLAN
TS-280-C.TE.1 BLDG. TE - SECURITY FIRST FLOOR OVERALL PLAN
TS-400-C.1.B SECURITY ENLARGED TDR PLANS
TS-401-C.1.1 SECURITY ENLARGED TDR PLANS
TS-402-C.1.2 SECURITY ENLARGED TDR PLANS
TS-403-C.1.3 SECURITY ENLARGED TDR PLANS
TS-404-C.1.4 SECURITY ENLARGED TDR PLANS
TS-405-C.1.5 SECURITY ENLARGED TDR PLANS
TS-406-C.1.6 SECURITY ENLARGED TDR PLANS
TS-407-C.1.7 SECURITY ENLARGED TDR PLANS
TS-408-C.1.8 SECURITY ENLARGED TDR PLANS
TS-409-C.1.9 SECURITY ENLARGED TDR PLANS
TS-410-C.2.B BLDG. 2 - SECURITY ENLARGED TDR PLANS
TS-411-C.2.1 BLDG. 2 - SECURITY ENLARGED TDR PLANS
TS-412-C.2.2 BLDG. 2 - SECURITY ENLARGED TDR PLANS
TS-420-C.3.B BLDG. 3 - SECURITY ENLARGED TDR PLANS
TS-430-C.8.2 BLDG. 8 - SECURITY ENLARGED TDR PLANS
TS-440-C.15.1 BLDG. 15 - SECURITY ENLARGED TDR PLANS
TS-450-F.64.B BLDG. 64 - SECURITY ENLARGED TDR PLANS
TS-451-F.64.1 BLDG. 64 - SECURITY ENLARGED TDR PLANS
TS-452-F.64.2 BLDG. 64 - SECURITY ENLARGED TDR PLANS
TS-453-F.64.3 BLDG. 64 - SECURITY ENLARGED TDR PLANS
TS-460-F.117.1 BLDG. 117 - SECURITY ENLARGED TDR PLANS
TS-470-C.TB.1 BLDG. TB - SECURITY ENLARGED TDR PLANS
TS-480-C.TE.1 BLDG. TE - SECURITY ENLARGED TDR PLANS
TS-500 SECURITY - TYPICAL DETAILS
TS-501 SECURITY - TYPICAL DETAILS
UNLESS NOTED AS EXISTING, ALL MATERIALS, EQUIPMENT, MANUFACTURED
ITEMS AND ASSEMBLIES INCORPORATED INTO THE WORK SHALL BE NEW.
1.
UNLESS NOTED TO BE REMOVED AND DISPOSED, ALL EXISTING ITEMS ARE TO
REMAIN. THEY SHALL BE PROTECTED FROM DAMAGE DUE TO CONSTRUCTION
ACTIVITIES. ANY EXISTING ITEMS TO REMAIN THAT BECOME DAMAGED DUE
TO CONSTRUCTION ACTIVITIES SHALL BE REPAIRED OR REPLACED TO MATCH
EXISTING AT NO ADDITIONAL COST TO THE OWNER..
2.
NOTATIONS FOR ITEMS OF WORK APPLY TO EACH AND EVERY GRAPHICAL
INDICATION SHOWN ON THE DRAWINGS, WHETHER OR NOT NOTED.
3.
ALL ITEMS NOTED TO HAVE PAINT FINISH SHALL BE THOROUGHLY CLEANED
AND PROPERLY PREPARED IN ACCORDANCE WITH THE SPECIFICATIONS
PRIOR TO THE APPLICATION OF PRIMER AND PAINT.
4.
THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE
DEMOLITION AND WORK SCOPE AND SATISFY THAT ALL REQUIREMENTS
FOR SUPPORT, FLOOR, WALL AND ROOF OPENINGS, FLASHINGS AND CURBS,
ETC. ARE IMPLEMENTED. THE ARCHITECT SHALL BE NOTIFIED OF CONFLICTS
OR DISCREPANCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION.
5.
CONTRACTOR TO REPLACE & ACCURATELY LOCATE ALL EXISTING SIGNAGE
AND LABELS NOTING RATED WALL ASSEMBLIES AND SMOKE PARTITIONS
6.
THE GENERAL CONTRACTOR SHALL VISIT THE SITE, VERIFY FIELD
CONDITIONS AND CAREFULLY COMPARE SUCH FIELD CONDITIONS AND
OTHER INFORMATION KNOWN TO THE CONTRACTOR WITH CONTRACT
DOCUMENTS.
7.
THE GENERAL CONTRACTOR SHALL REPORT ANY UNFORESEEN FIELD
CONDITIONS, ERRORS, INCONSISTENCIES, OR OMISSIONS DISCOVERED AT
ANY TIME DURING THE WORK, UPON SUCH DISCOVERY, THE CONTRACTOR
SHALL IMMEDIATELY CONTACT THE CONTRACT OFFICER FOR CLARIFICATION
BEFORE PROCEEDING OR CONTINUING WITH THAT PORTION OF THE WORK
OR ANY PORTION RELATED THERE TO.
8.
ALL WORK SHALL CONFORM TO MOST CURRENT VERSION OF ALL APPLICABLE
CODES AND STANDARDS INCLUDING THE INTERNATIONAL BUILDING CODE, VA
MASTER SPECIFICATIONS, AND LATEST ADOPTED NFPA.
9.
THE GENERAL CONTRACTOR SHALL NOTIFY THE CONTRACT OFFICER,
CONTRACTING OFFICER'S REPRESENTATIVE, AND ARCHITECT OF ANY
DISCREPANCIES BETWEEN THE DRAWINGS, NOTES AND ACTUAL FIELD
CONDITIONS BEFORE BIDDING AND COMMENCING ANY WORK, AND REQUEST
CLARIFICATION IN WRITING.
10.
WHEN UNANTICIPATED ARCHITECTURAL, STRUCTURAL ,MECHANICAL, ELECTRICAL,
PLUMBING, TECHNOLOGY, ETC. ELEMENTS THAT CONFLICT WITH THE INTENDED
FUNCTION OR DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE THE NATURE
AND EXTENT OF THE CONFLICT. PROMPTLY SUBMIT A WRITTEN REPORT TO THE
CONTRACT OFFICER.
11.
WHERE MOUNTING HEIGHTS ARE NOT INDICATED, INSTALL COMPONENTS
USING MANUFACTURER'S OR INDUSTRY STANDARDS. WHERE STANDARDS
DO NOT EXIST, NOTIFY THE ARCHITECT FOR CLARIFICATION.
12.
CONTRACTOR SHALL NOT BARRICADE / BARRIER EMERGENCY EGRESS TO OR
FROM THIS AREA. CONTRACTOR SHALL MAINTAIN EXIT TO EXTERIOR DURING
THE WORK PROCESS.
PROVIDE ACCESS TO THE WORK AS DIRECTED BY THE C.O.R. SECURE
ACCESS POINT AS SPECIFIED AND DIRECTED BY THE COR PROJECT
ENGINEER. PROVIDE WALK-OFF MATS TO MEET FACILITY INFECTION
CONTROL GUIDELINES AT EACH ACCESS POINT WHERE REQUIRED.
13.
14.
ALL EXISTING WALL MOUNTED ITEMS AND DEVICES ARE TO BE REMOVED
PRIOR TO DEMOLITION WORK, FULLY REFURBISHED, AND REINSTALLED IN
THE NEW WALL ASSEMBLY. LOCATION TO BE VERIFIED BY COR. ITEMS MAY
INCLUDE: DOOR STOPS, HAND SANITIZER DISPENSERS, FIRE STROBES,
SWITCHES, ELECTRIC COVER PLATES, FIRE ALARM PULL BOXES, ELECTRIC
OUTLETS, SIGNAGE, BULLETIN BOARDS, MILLWORK, CARD READERS,
CLOCK, DATA OUTLET, PUSH BUTTON, FIRE CONTROL BOX, PHONE AND
ROOM SIGNAGE, ETC.
15.
ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, TECHNOLOGY, ETC.
16. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR LEGAL DISPOSAL OF ALL
DEBRIS.
17. OWNER SHALL HAVE THE RIGHT OF FIRST REFUSAL ON ITEMES INDICATED TO
BE SALVAGED.
18. EXISTING SPRAYED-ON FIREPROOFING SHALL BE MAINTAINED THROUGH THE
DURATION OF CONSTRUCTION ACTIVITIES AND THE CONTRACTOR SHALL REPAIR
ANY COMPROMISE OF EXISTING FIREPROOFING.
19. ALL BUILDINGS WILL BE OCCUPIED AT ALL TIMES THROUGH THE DURATION OF
CONSTRUCTION.
INTERIOR ELEVATION
ELEVATION PAGE NUMBER
ELEVATION DETAIL NUMBER
WALL TYPE TAGF
PATIENT ROOM
ROOM NAME
ROOM NUMBER
ROOM TITLE
2 3
AS-101
DRAWINGS FOR THE FOLLOWING DISCIPLINES ARE
CONTAINED IN THE DOCUMENT. THE DISCIPLINES ARE
IDENTIFIED BY THE REFERENCE WHICH IS
INCORPORATED INTO THE SHEET TITLE.
EACH DRAWING IS NUMBERED ACCORDING TO IT'S
LOCATION ON THE SHEET. THE DRAWING TITLE
APPEARS ABOVE THE DEMARCATION LINE AND,
APPROPRIATE THE SCALE IS LOCATED BELOW THE
DEMARCATION LINE IN THE LOWER LEFT-HAND
QUADRANT OF THE KEY. THE DRAWING CAN BE
REFERENCED BACK TO IT'S ORIGINAL SHEET AND
DRAWING BY THE DRAWING REFERENCE LOCATION
IN THE LOWER RIGHT-HAND QUADRANT.
SHEET NUMBER
DRAWING NUMBER ON SHEET BY
LOCATION
REFERENCE
DISCIPLINE REFERENCES
DRAWING NUMBERING
DRAWING REFERENCE
GENERAL NOTES
REF. 1/1-A1
BUILDING SECTION
RE: 1/AS-101
SHEET NUMBER
DIMENSIONING CONVENTIONSARCHITECTURAL FLOOR PLAN SYMBOLS
A
COLUMN GRID
NORTH ARROW
REVISION NUMBER AND EXTENT
KEYED NOTE MARK
-SEE CORRESPONDING
NUMBERED KEY NOTE ON SHEET
WHERE REFERENCE OCCURS
REVISION NUMBER - SEE
REVISION HISTORY ON THE
TITLE BLOCK OF EACH SHEET
EXTENT OF CURRENT REVISION
STUD WALLS
CONCRETE
MASONRY (CMU)
BUILDING INTERIOR
(EXISTING)
MATERIAL GRAPHICS (NEW U.N.O.)
GYP BD
CL
DEMOLITION LINE
ELEVATION INDICATOR
CENTER LINE INDICATOR
EXISTING TO REMAIN LINE
FEATURES ABOVE LINE INDICATOR
BREAK, ROUND (USER DEFINES SIZE)
BREAK, STRAIGHT (SEE SECTION
INDICATORS,
BUILDING, WITH BREAK
STANDARDS)
DIMENSION LINE
CENTER LINE
LOCATION MAP
GI GENERAL INFORMATION
A ARCHITECTURAL
P PLUMBING
M MECHANICAL
E ELECTRICAL
T TECHNOLOGY
AS-101
DISCIPLINE SHEET NUMBER
PROJECT INFORMATION
CONSTRUCTION LIMITS
EXCEPT WHERE DIRECTED TO PLACE ITEMS OF THE WORK AT THE
"APPROXIMATE LOCATION SHOWN." DO NOT SCALE DRAWINGS FOR
DIMENSIONAL INFORMATION
1.
ALL ELEMENTS OF THE DOCUMENTS MAY NOT BE DRAWN TO EXACT SCALE.
ALL DIMENSIONS REQUESTED ARE SHOWN (OR MAY BE DERIVED FROM THOSE
SHOWN OR NOTED) ON THE FLOOR PLANS. DETAIL PLANS, ELEVATIONS,
SECTIONS, SCHEDULES, CONFIGURATION DETAILS, AND SPECIFICATIONS. SEE
THE NOTES BELOW AND SYMBOLS FOR DIMENSIONING CONVENTIONS USED
ON THIS PROJECT.
2.
EXCEPT WHERE SPECIFICALLY NOTED TO THE CONTRARY, ALL DIMENSIONS
SHOWN ON THE ARCHITECTURAL DRAWINGS CONFORM TO THE FOLLOWING
CONVENTIONS.
3.
DIMENSIONS UTILIZING THE "CENTERLINE" SYMBOL ARE MEASURED TO:
· CENTERLINE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED
FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH
WALLS) AT PARTITIONS FRAMED WITH METAL STUDS. REFER TO
"PARTITION SCHEDULE" TO DETERMINE THICKNESS OF EACH
PARTITION TYPE.
· CENTERLINE OF DOOR, WINDOW, OR LOUVER OPENING.
· CENTERLINE OF OTHER FEATURES AS INDICATED.
A.
ALL DIMENSIONS ARE MEASURED FROM FACE OF PARTITION ASSEMBLY:
· FACE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED
FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH WALL)
AS DEFINED BY THE PARTITION SCHEDULE. UNLESS NOTED AS A
"FACE OF FINISH" OR "CLEAR" DIMENSION, DIMENSIONS ARE NOT
MEASURED TO THE FACE OF APPLIED FINISH BUT RATHER TO THE
FACE OF THE CORE STRUCURE (STUD, CMU, ETC...). REFER TO THE
"PARTITION SCHEDULE" TO DETERMINE THE THICKNESS OF EACH
PARTITION TYPE.
A.
WHERE "EQUAL" DIMENSIONS ARE USED ON REFLECTED CEILING PLANS TO
LOCATE CEILING GRID WORK POINTS, MEASURE DIMENSIONS TO:
· EDGE OF THE INDICATED CEILING AT THE FACE OF THE ADJACENT
APPLIED FINISH MEASURED AT THE PLANE OF THE CEILING.
· CAUTION: DUE TO THE POSSIBLE APPLICATION OF APPLIED FINISHES -
THICKNESS OF WHICH MAY VARY BETWEEN FLOOR AND CEILING AND
IS NOT ACCOUNTED FOR (EXCEPT AS INDICATED BY "FOF" OR
"CLEAR") BY THE DIMENSION SHOWN ON THE FLOOR PLANS - THE
CONTRACTOR MUST ADJUST AS NECESSARY, THE FLOOR PLAN
DIMENSIONS TO REFLECT THE ACTUAL DIMENSIONS FOUND AT PLANE
OF THE CEILING.
C.
WHERE WALLS AND/OR PARTITIONS OF UNEQUAL THICKNESS ABUT,
ALIGN EXPOSED FACES, UNLESS OTHERWISE NOTED.
ALIGN
DIMENSION, WHEN OCCURS
WHERE OPENINGS IN WALLS (SUCH AS INTERIOR WINDOWS OR DOORS) ARE
NOT DIMENSIONED BUT SHOWN AS BEING IN THE CENTER OF A GIVEN WALL
SURFACE, LOCATE OPENINGS AS GRAPHICALLY REPRESENTED.
5.
NTS
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
PROJECT MANAGEMENTCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
539-21-701
4-MAY-2022
100% CONSTRUCTION
DOCUMENTS
CINCINNATI VAMC EHRM
INFRASTRUCTURE UPGRADES
3200 VINE ST., CINCINNATI, OH
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
ETS
T
TA
GE
S
R I
E T E X
FO
T
CE
TI
H
AS
DER CRA
F. BIAN
C
OJ
O
SE
P
H
7 6 22 1
5/4/22
AD-100-C.1.B
DISCIPLINE BUILDING FLOOR
SHEET NUMBER BUILDING NUMBER
CITY
2 HR. WALL (NEW OR EXISTING)
1 HR. WALL (NEW OR EXISTING)
GI-020
GENERAL INFORMATION,
SYMBOLS, & LOCATION MAP
VV
IAR, JFB
TRUE NORTH
PLAN
NORTH
NORTH ARROW
TRUE NORTH
2018 NFPA 101 LIFE SAFETY CODE
OCCUPANCY: Group 'I-2' Condition 2
TYPE OF CONSTRUCTION: II-A
PROJECT AREA:
HEALTHCARE, CHAPTER 19
PROTECTED, TYPE II-A, FULLY SPRINKLERED
CINCINNATI VAMC EHRM INFRASTRUCTURE UPGRADES
CODES: 2018 IBC or later version
DESIGN MANUALS:
- PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS
- PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES
- PG-18-5 EQUIPMENT LIST GUIDES
- PG-18-8 SEISMIC DESIGN HANDBOOK
- PG-18-10 DESIGN MANUALS
- VA ARCHITECTURAL DESIGN MANUAL
- VA MECHANICAL DESIGN MANUAL
- VA ELECTRICAL DESIGN MANUAL
- VA PLUMBING DESIGN MANUAL
- VA FIRE PROTECTION DESIGN MANUAL
APPLICABLE CODES AND REGULATIONS:
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL CURRENT APPLICABLE CODES AND STANDARDS.
IN ADDITION TO ALL DEPARTMENT OF VETERANS AFFAIRS, LOCAL, AND STATE CODES, ALL WORK SHALL COMPLY WITH THE ACCESSIBILITY REQUIREMENTS OF THE STATE OF MISSOURI AND THE DEPARTMENT OF VETERANS AFFAIRS GUIDELINES, ABA (ARCHITECTURAL BARRIERS ACT) ACCESSIBILITY STANDARD FOR
FEDERAL FACILITIES.
APPLICABLE CODES AND STANDARDS (LATEST EDITIONS) INCLUDE:
- ADA ACCESSIBILITY STANDARDS
- NFPA 101, "LIFE SAFETY CODE"
- NFPA 10, "PORTABLE FIRE EXTINGUISHERS"
- NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS"
- NFPA 70, "NATIONAL ELECTRICAL CODE (NEC)"
- NFPA 72, "NATIONAL FIRE ALARM CODE"
- NFPA 90A, "INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS"
- NFPA 99, "INSTALLATION FOR HEALTH CARE FACILITIES"
- NFPA 220, "TYPES OF BUILDING CONSTRUCTION"
- NFPA 241, "STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS"
- INTERNATIONAL BUILDING CODE (IBC)
- INTERNATIONAL MECHANICAL CODE (IMC)
- INTERNATIONAL PLUMBING CODE (IPC)
- INTERNATIONAL ENERGY CONSERVATION CODE
SITE
PHASING PLAN
REFERENCE SPECIFICATIONS SECTION 00 00 20 FOR GENERAL PROJECT INFORMATION.
THE GENERAL PROJECT SCOPE AND PHASING SEQUENCE IS LISTED BELOW. SEE SEPARATE DISCIPLINE DESIGN DRAWINGS FOR FURTHER PHASING NOTES AND DETAILS.
TECHNOLOGY PHASING
· PHASE A: NEW TR ROOMS - ALL WORK ASSOCIATED WITH NEW TR ROOMS IS A NECESSARY PREDECESSOR FOR WORK TO PROCEED TO PHASE B. THE CONTRACTING OFFICER, LOCAL FACILITIES ENGINEERING, AND THE DESIGNATED OIT REPRESENTATIVE MUST SIGN OFF ON COMPLETION OF THE NEW TR ROOMS PRIOR TO MOVING WORK INTO PHASE B.
· PHASE B: ROOM A437 PHASE 1 - TECHNOLOGY DRAWINGS INDICATE ROOM A437 TO BE CONSTRUCTED IN THREE PHASES. 'PHASE 1' ON SHEET TN-442-C.1.4 DEPICTS THE
COMPLETED STATE OF THE PHASED CONVERSION OF THIS ROOM. ROOM A437 PHASE 1 COMPLETION INCLUDES 11 CABINETS AND ASSUMES THEY ARE FULLY OPERATIONAL AND
COORDINATED WITH ALL TRADES.
1. ANY WORKS IN THIS ROOM SHALL BE COORDINATED IN ADVANCE AND ALL STAFF ENTERING THIS SPACE WILL REQUIRE ESCORTS UNLESS OTHERWISE AGREED UPON BY OIT
MANAGEMENT. ALL EQUIPMENT IN THIS SPACE IS SENSITIVE AND CARE SHALL BE TAKEN TO MINIMIZE ANY DISRUPTION TO PATIENT CARE.
2. IT IS INTENDED THAT ALL ASSOCIATED WORK TO ENABLE THESE ELEVEN RACKS ARE COMPLETED PRIOR TO MOVING TO PHASE D AND MUST BE SIGNED OFF WITH THE
CONTRACTING OFFICER, LOCAL FACILITIES ENGINEERING, AND THE DESIGNATED OIT REPRESENTATIVE.
3. ANY REQUIRED ACTIVITY BY VA STAFF TO SUPPORT THIS PROJECT MUST BE AGREED TO NO LESS THAN 4 WEEKS IN ADVANCE OF ANY REQUIRED ACTIVITY. DELAYS CAUSED
BY FAILING TO IDENTIFY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .