Attachment 7. Cost Breakdown.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Modification002 - 19SP1026Q0002 Emergency Exit repairs - Q&As num2.
Solicitation number
19SP1026Q0002
Issued by

About this file

This is a cost breakdown template for emergency exit repairs at the U.S. Consulate General in Barcelona, Spain, under Solicitation 19SP1026Q0002 issued by the Department of State. The spreadsheet outlines thirteen line items for the base scope of work, including mobilization and demobilization, site protection and access control, structural investigation and demolition of the slab underside, reinforcement and concrete repairs to the ceiling/roof slab, soil excavation, waterproofing system installation, perforated drainage pipe system, surface restoration (paving and landscaping), drainage system reorganization, stairwell wall preparation and moisture mitigation treatment, a stair landing security partition wall with fire and smoke rating specifications, testing and commissioning, and documentation and handover activities. The template incorporates a structured cost calculation methodology with subtotal direct construction costs, contractor overhead and profit marked at twelve percent, contingency at five percent, and value-added tax at twenty-one percent.

The cost breakdown also includes one optional line item for a wood shelter design, materials, and installation, with the same overhead, contingency, and VAT percentages applied separately. The solicitation seeks a firm fixed-price contract award to the responsible company whose offer is most advantageous to the Government, and all offerors must demonstrate possession of required permits and licenses to conduct business in Spain. While specific cost figures are not populated in this template, the structure establishes the Government's independent government cost estimate framework for evaluating contractor proposals against this baseline.

View the file

Other files

File Type Posted
Questions and Answers.2 - 19SP1026Q0002.pdf PDF
Questions and Answers - 19SP1026Q0002.pdf PDF
01.Picture.jpg JPG image
02.Picture.jpg JPG image
07.Picture.jpg JPG image
10.Picture.jpg JPG image
12.Picture.jpg JPG image
13.Picture.jpg JPG image
03.Picture.jpg JPG image
04.Picture.jpg JPG image
09.Picture.jpg JPG image
11.Picture.jpg JPG image
Attachment 6. Drawings.pdf PDF
Invitation Letter 19SP1026Q0002.pdf PDF
Attachment 5. SOW.pdf PDF
RFQ No. 19SP1026Q0016.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Item No.DescriptionEst. Cost (EUR)
1Mobilization and Demobilization
2Site Protection, Isolation, and Access Control (incl. egress management)
3Structural Investigation, Chipping, and Demolition (Slab Underside)
4Reinforcement Repair and Concrete Repairs (Ceiling/Roof Slab)
5Soil Excavation and Handling Above Slab
6Waterproofing System over Slab (Materials & Installation)
7Perforated Drainage Pipe System (Materials & Installation)
8Surface Restoration (Paving, Landscaping, etc.)
9Reorganization / Improvement of Drainage System (Surface & Subsurface)
10Stairwell Wall Preparation and Moisture-Mitigation Treatment
11Stair Landing Security Partition Wall (FE/BR 15-minute, incl. duct penetration)
12Testing, Adjustments, Commissioning (e.g., water tests, drain checks)
13Documentation, As-Builts, Training, and Handover
Subtotal – Direct Construction Costs
Contractor Overhead & Profit (12%)
Contingency (5%)
VAT (21%)
TOTAL IGCE – BASE SCOPE (Items 1–13)
O-1OPTIONAL – Wood Shelter (Design, Materials, Installation)
Subtotal – Direct Construction Costs
Contractor Overhead & Profit (12%)
Contingency (5%)
VAT (21%)
TOTAL IGCE – Item - O-1

TOTAL IGCE – INCLUDING OPTION (Base + O‑1)