Attachment 7 Detailed Cost Proposal.xlsx
XLSX spreadsheet 31 KB Posted
- Attached to
- Rehabilitate the Lippincott Cottage Roof
- Solicitation number
- 140P2120R0028
About this file
This detailed cost proposal provides a line item breakdown for rehabilitating the roof of the Lippincott Cottage located in St. Michael, Pennsylvania. The work includes temporary construction and site restoration, roof assembly, framing repairs, and masonry repairs. For each task, the proposal lists material, labor, and equipment costs. However, all cost figures are blank, indicating this is a template used to submit finalized pricing. The related federal contract opportunity is solicitation number 140P2120R0028 issued by the National Park Service within the Department of the Interior to rehabilitate the roof of the Lippincott Cottage. No further details are provided on response dates, award dates, or other contractual terms.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Basic Requirement Summary
| REHABILITATE LIPPINCOTT COTTAGE ROOF |
| DETAILED COST PROPOSAL |
| Description | Total Material Cost | Total Labor Cost | Total Equipment Cost | Total Direct Costs | |
| Temporary Construction and Site Restoration | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Roof Assembly | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Framing Repairs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Masonry Repairs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Direct Construction Costs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| General Conditions | 0.00% | $ - 0 | |||
| Subtotal NET Construction Costs | $ - 0 | ||||
| Overhead | 0.00% | $ - 0 | |||
| Profit | 0.00% | $ - 0 | |||
| Estimated NET Construction Cost | $ - 0 | ||||
| Bonds and Permits: | 0.00% | $ - 0 | |||
| Total Cost of Construction | $ - 0 |
Page &P of &N
Temp Constr & Site Restor
| REHABILITATE LIPPINCOTT COTTAGE ROOF |
| DETAILED COST PROPOSAL |
| BASIC REQUIREMENT | Description | Quantity | Unit | MATERIAL | INSTALLATION | EQUIPMENT | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | ||||
| TEMPORARY CONSTRUCTION AND SITE RESTORATION | |||||||||||
| Construct and Uninstall Fencing | 300 | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Construct and Uninstall Scaffold | 2 | MO | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Dumpster | 3 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Site Restoration including grading and seeding | 2400 | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SUBTOTAL | TEMPORARY CONSTRUCTION AND SITE RESTORATION | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Page &P of &N
Roof Assembly
| REHABILITATE LIPPINCOTT COTTAGE ROOF |
| DETAILED COST PROPOSAL |
| BASIC REQUIREMENT | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | ||||
| ROOF ASSEMBLY | |||||||||||
| Roofing Demolition | |||||||||||
| Remove Shingles | 4,400 | S.F. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Selective demolition, thermal and moisture protection, roofing, roofing felt, #30 | 46.32 | Sq. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Selective demolition, wood framing, sheathing, 3/4", from roof | 4,000 | S.F. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Remove gutters and downspouts | 164 | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| New Roofing | |||||||||||
| Sheathing | 4,400 | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Asphalt shingles, premium, class A, 260-300 lb/sq | 46 | Sq. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| #30 felt underlayment | 46 | Sq. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Self adhering polyethylene and rubberized asphalt underlayment | 2 | Sq. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| #30 felt Roofing | 2 | Sq. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Ridge vents, flexible | 125 | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Sheet metal flashing, Detail 3/A-500, 4/A-500 and 1/A-500 | 405 | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Sheet metal flashing, aluminum, .050" thick, Sheet 501 | 430 | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Gutter | 164 | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Downspout | 100 | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Snow guards, fastened with nails | 600 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SUBTOTAL | ROOF ASSEMBLY | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Page &P of &N
Framing Repairs
| REHABILITATE LIPPINCOTT COTTAGE ROOF |
| DETAILED COST PROPOSAL |
| BASIC REQUIREMENT | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | ||||
| FRAMING REPAIRS | |||||||||||
| New Replacement Truss | 16 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Sister Rafters | 64 | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Associated Painting | 64 | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SUBTOTAL | FRAMING REPAIRS | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Masonry Repairs
| REHABILITATE LIPPINCOTT COTTAGE ROOF |
| DETAILED COST PROPOSAL |
| BASIC REQUIREMENT | Description | Quantity | Unit | MATERIAL | LABOR | EQUIPMENT | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Total Cost/Unit | Total Cost | ||||
| MASONRY REPAIRS | |||||||||||
| Mortar analysis | 1 | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Chimney point up over room 208 at 8 ft tall | 80 | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Chimney point up, roof repair at 3 ft tall | 24 | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SUBTOTAL | MASONRY REPAIRS | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
File details come from the government source that posted it. Updated .