Attachment 7 - Chillicothe EHRM IU Tier 2 - Part-2.pdf
PDF 9 MB Posted
- Solicitation number
- 36C77626B0018
About this file
This document is a comprehensive set of construction drawings and specifications for Building 018 at VA Chillicothe Medical Center's Electronic Health Records Modernization (EHRM) Infrastructure Upgrades project (Program 538-21-705). The project involves significant infrastructure improvements including HVAC system upgrades, fire protection modifications, electrical system enhancements, and telecommunications infrastructure work.
The architectural scope encompasses demolition and renovation of ground and first floor spaces, including fire-rated partition installations, ceiling system restoration, and coordination of work across telecommunications rooms and data center areas. Fire protection work includes modifications to existing sprinkler systems, conversion from pendent to upright sprinkler configurations, and integration of a clean agent suppression system for the main computer room. The fire suppression system must comply with NFPA 13, NFPA 2001, and NFPA 75 standards. HVAC upgrades involve installation of new computer room air conditioning (CRAC) units with three Liebert PX029DA1 units for the data center, coordination of temporary cooling units during construction phases, and integration with existing underfloor air distribution systems. Electrical work includes new panel connections, feeder installation, equipment disconnects for mechanical units, and coordination with fire alarm systems. Telecommunications infrastructure improvements focus on the ground floor telecommunications room and data center spaces with proper fire-rated construction and sprinkler system coordination. The project requires strict adherence to infection control protocols during construction, hazardous materials abatement (including asbestos remediation), and mold and lead paint abatement in basement areas. Construction is phased to maintain N+1 cooling throughout demolition and installation activities, with coordination required between mechanical, electrical, architectural, and telecommunications contractors.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
018-A-301
F4
MECH
APPS
BUSS SYS
SERVER ADMIN
OIT OFFICE
HAC
CORR
CORR
HAC
111A
TOILET
COPY RM
APPS
TELECOM
STOR
110A
PRG SUPP
ADV SUPP
CUST SUP
CONF RM
OPS SPC
CUST SUPP
CUST SER
MGR IT OPP
TOILET
107A
CIO
Room
011FF
NETWORK ADMIN
STAIR
WAITING
COMPUTER EQ
WEB ADMIN
TOILET
M A
T C
H
LI
N E
TELE BATTERIES
TELEPHONE EQUIPMENT
TOILET
WATCH / CMDR.
CORRIDOR
WORK ROOM
ROOM
CORRIDOR
ROOM
INTERVIEW / CONFG.
MECHANICAL EQUIPMENT
WORK ROOM WORK ROOM
HOLDING CELL
COURT RM
WAITING
005B
JURY RM
005APIV OFFICE
TOILET
TOILET
CORR
MECH
014A
ARMS RM
MECH
007B
POLICE CHIEF
007A
SECRETARY
LOCKERS
008LAB
009A
PHOTO ID
OPS OFFICER
CORR
016A
STAIR
HAC
STOR
ELECTRICAL
" M A
T C
H
LI
N E
GENERAL NOTES ARCHITECTURAL
1.GA THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY
TIME DUE TO NOISE AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE
OF THE FACILITY.
2.GA PROVIDE UL LISTED FIRESTOP SYSTEM AT ALL PENETRATIONS THROUGH FIRE
AND/OR SMOKE RATED ASSEMBLIES.
3.GA USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT
LIMITING ABILITY TO ADD OR REMOVE CABLES WITHOUT RESEALING.
4.GA ALL DUCT OPENINGS IN CONSTRUCTION AREAS SHALL BE COMPLETELY
SEALED TO PREVENT AIR CIRCULATION BETWEEN CONSTRUCTION ZONE AND
OCCUPIED AREAS VIA THE BUILDING HVAC SYSTEM.
5.GA REFER TO SHEET A-500 FOR PARTITION TYPES.
6.GA CONTRACTOR TO PROVIDE APPROVAL SUBMITTAL FOR THE FIRE SPRINKLER
SYSTEM MODIFICATIONS IN EXISTING AND NEW TELECOMMUNICATION ROOMS
AND TELECOMMUNICATION SPACES. RELOCATE OR ADD NEW HEADS WHERE
REQUIRED, SPRINKLER HEADS TO BE WITHIN 12" OF THE CONCRETE
FLOOR/ROOF DECK ABOVE IN COMPLIANCE WITH NFPA13. COORDINATE
SPRINKLER SYSTEM SHUTDOWN/SCHEDULE WITH VA C.O.R. AND LOCAL FIRE
DEPARTMENT/AUTHORITY HAVING JURISDICTION.
GENERAL NOTES INFECTION CONTROL
1.GI CONTRACTOR TO COORDINATE WITH VA INFECTION PREVENTION PERSONNEL
AND COR TO DETERMINE AND FILL OUT ICRA' CLASSIFICATION PLAN AND
ACCEPTANCE FOR EACH WORK AREA AS CONSTRUCTION PROGRESSES.
2.GI ALL WORK TO BE CONDUCTED IN DESIGNATED CLASS IV AREAS AS INDICATED
IN VA INFECTION CONTROL PLANS IS TO BE COORDINATED FOURTEEN (14)
DAYS AHEAD OF SCHEDULED WORK WITH INFECTION PREVENTION STAFF AND
COR.
3.GI REFER TO SPECIFICATIONS AND SHEETS AG-030 AND AG-031 FOR INFECTION
CONTROL INFORMATION.
GENERAL NOTES HAZARDOUS MATERIALS
1.GH REMOVAL OF ASBESTOS CONTAINING AND OTHER POTENTIALLY HAZARDOUS
MATERIALS FROM THE BUILDING MUST FOLLOW STATE AND FEDERAL
REGULATIONS, AS WELL AS LOCAL LAWS WHEN APPLICABLE. REFER TO
MECHANICAL, ELECTRICAL AND TELECOM DRAWINGS FOR PROPOSED
SYSTEMS ROUTING AND PENETRATION LOCATIONS. CONTRACTOR SHALL
DETERMINE MITIGATION QUANTITIES BASED ON THEIR SELECTED
PENETRATION LOCATIONS AND SIZES.
2.GH CONTRACTOR MAY ROUTE CONDUIT PATHS TO AVOID POTENTIAL ASBESTOS
CONTAINING MATERIAL PROVIDED PATHWAY DOES NOT INCREASE THE
PLANNED LENGTH OF ANY CAT6A CABLING BY MORE THAN 10%.
3.GH REFER TO ARCHITECTURAL, MECHANICAL, ELECTRICAL AND TELECOM
DRAWINGS FOR SPECIFIC SCOPE OF DEMOLITION REQUIRED. WORK INCLUDES,
BUT IS NOT LIMITED TO WALLS, PLASTER CEILINGS, FLOORING, AND
EQUIPMENT. REFER TO HAZARDOUS MATERIALS SURVEYS FOR EXPECTED
PRESCENCE OF HAZARDOUS MATERIALS. ABATE AS REQUIRED.
4.GH THE CONTRACTOR SHALL BE RESPONSIBILE FOR HAZARDOUS MATERIAL
SAMPLING WITHIN THE PROJECT WORK LIMITS. THE CONTRACTOR MUST
NOTIFY THE GOVERNMENT OF ANY ADDITIONAL MATERIALS REQUIRING
ABATEMENT THAT ARE NOT IDENTIFIED IN THE HAZMAT REPORT PREPARED BY
AET.
PARTITION GRAPHIC LEGEND
GRAPHIC DESCTIPTION PRIORITY
2 HR SMOKE / FIRE
2 HR SHAFT 2
NON RATED PARTITION
NEW CONSTRUCTION
EXISTING PARTITION
TO BE DEMOLISHED
1 HR SMOKE / FIRE 4
1 HR FIRE 5
HAZARDOUS 6
2 HR FIRE
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
35% SCHEMATIC DESIGN 10/27/2023
CONSULTANT
CONSULTANT: A/E:
04/07/2025
FULLY
SPRINKLERED
65% DESIGN DEVELOPMENT
10% BASIS OF DESIGN 09/27/2023
GDM-AE, Inc.
1308 NE 134th ST. SUITE A
VANCOUVER, WA 98685
P: 541.436.4723
WWW.GDM-AE.COM
06/12/202595% CONSTRUCTION DOCUMENTS
09/15/202595% CONSTRUCTION DOCUMENTS - REV 1
NOT FOR CONSTRUCTION
FOR OFFICIAL USE ONLY (FOUO)
RYAN JETER
STATION
A u to d e sk D o cs
/2
-0
V
A C h ill ic o th e E
H R
M T
/2
-0
V
A C h ill ic o th e -A rc h M o d e l_
B ld g .0
.r vt
018-A-101
OVERALL PLANS
ES GS
VA CHILLICOTHE (EHRM) ELECTRONIC
HEALTH RECORDS MODERNIZATION
INFRASTRUCTURE UPGRADES
100% CONSTRUCTION
DOCUMENT
538-21-705
17273 STATE ROUTE 104
CHILLICOTHE, OH 45601-9715
100% CONSTRUCTION DOCUMENTS 10/20/2025
10/20/2025
ERIC SHREEVE
1/8" = 1'-0"F4
OVERALL FLOOR PLAN - FIRST FLOOR 0' 4' 8' 16'
1/8" = 1'-0"C4
OVERALL FLOOR PLAN - GROUND FLOOR 0' 4' 8' 16'
NORTH
NORTH
Revisions: Date:
eshreve Stamp eshreve Text Box 10-20-25
TOILET
012C
WATCH / CMDR.
012B CORRIDOR
012H
WORK ROOM
011D
OPERATIONS
DESK
011C
CORRIDOR
Tele ops
INTERVIEW /
CONFG.
011G
MECHANICAL
011F
EVIDENCE
011B
WATCH CMDR
011A
HOLDING CELL
011D
LAB
009A
PHOTO ID
OPS OFFICER
HAC
STOR
CORR
012E
Telephone Room 012A
S E
E
-A
-1
25R
23R
23R 25R 25R
23R
24R
12R
12R
GENERAL SHEET NOTES
1.GA THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY
TIME DUE TO NOISE AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE
OF THE FACILITY.
2.GA PROVIDE UL LISTED FIRESTOP SYSTEM AT ALL PENETRATIONS THROUGH FIRE
AND/OR SMOKE RATED ASSEMBLIES.
3.GA USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT
LIMITING ABILITY TO ADD OR REMOVE CABLES WITHOUT RESEALING.
4.GA ALL DUCT OPENINGS IN CONSTRUCTION AREAS SHALL BE COMPLETELY
SEALED TO PREVENT AIR CIRCULATION BETWEEN CONSTRUCTION ZONE AND
OCCUPIED AREAS VIA THE BUILDING HVAC SYSTEM.
5.GA REFER TO SHEET A-500 FOR PARTITION TYPES.
6.GA CONTRACTOR TO PROVIDE APPROVAL SUBMITTAL FOR THE FIRE SPRINKLER
SYSTEM MODIFICATIONS IN EXISTING AND NEW TELECOMMUNICATION ROOMS
AND TELECOMMUNICATION SPACES. RELOCATE OR ADD NEW HEADS WHERE
REQUIRED, SPRINKLER HEADS TO BE WITHIN 12" OF THE CONCRETE
FLOOR/ROOF DECK ABOVE IN COMPLIANCE WITH NFPA13. COORDINATE
SPRINKLER SYSTEM SHUTDOWN/SCHEDULE WITH VA C.O.R. AND LOCAL FIRE
DEPARTMENT/AUTHORITY HAVING JURISDICTION.
REFERENCE KEYNOTES
PARTITION GRAPHIC LEGEND
GRAPHIC DESCTIPTION PRIORITY
2 HR SMOKE / FIRE
2 HR SHAFT 2
NON RATED PARTITION
NEW CONSTRUCTION
EXISTING PARTITION
TO BE DEMOLISHED
1 HR SMOKE / FIRE 4
1 HR FIRE 5
HAZARDOUS 6
2 HR FIRE
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
35% SCHEMATIC DESIGN 10/27/2023
CONSULTANT
CONSULTANT: A/E:
04/07/2025
FULLY
SPRINKLERED
65% DESIGN DEVELOPMENT
10% BASIS OF DESIGN 09/27/2023
GDM-AE, Inc.
1308 NE 134th ST. SUITE A
VANCOUVER, WA 98685
P: 541.436.4723
WWW.GDM-AE.COM
06/12/202595% CONSTRUCTION DOCUMENTS
09/15/202595% CONSTRUCTION DOCUMENTS - REV 1
NOT FOR CONSTRUCTION
FOR OFFICIAL USE ONLY (FOUO)
RYAN JETER
STATION
A u to d e sk D o cs
/2
-0
V
A C h ill ic o th e E
H R
M T
/2
-0
V
A C h ill ic o th e -A rc h M o d e l_
B ld g .0
.r vt
018-A-110
PARTIAL GROUND FLOOR PLAN
ES GS
VA CHILLICOTHE (EHRM) ELECTRONIC
HEALTH RECORDS MODERNIZATION
INFRASTRUCTURE UPGRADES
100% CONSTRUCTION
DOCUMENT
538-21-705
17273 STATE ROUTE 104
CHILLICOTHE, OH 45601-9715
100% CONSTRUCTION DOCUMENTS 10/20/2025
10/20/2025
ERIC SHREEVE
12R EXISTING WALL TO REMAIN, PATCH AND REPAIR ANY DAMAGE. TEXTURE, FINISH
TO MATCH EXISTING ADJACENT WALL AND PAINT, FULL HEIGHT.
23R EXISTING FOUNDATION WALL TO BE TREATED PER MITIGATION PLANS AND
SPECIFICATIONS PRIOR TO SURFACE PREP AND APPLICATION OF INTERIOR
MOISTURE BARRIER,
24R INSTALL 4' x 8' x 3/4" FIRE RATED AC GRADE PLYWOOD, VERTICALLY BEGIN 6"
ABOVE FLOOR. PAINTED W/TWO COATS CLASS A F.R. HIGH GLOSS WHITE PAINT.
DO NOT PAINT OVER PLYWOOD CERTIFICATION STAMPS. ATTACH PLYWOOD TO
7/8" METAL HAT CHANNELS @ 16" O.C. EXTENT OF BACKBOARD AS REQUIRED
FOR RE-MOUNTING OF EXISTING PHONE BLOCKS
25R EXISTING OPENINGS TO BE INFILL WITH 18GA METAL LAMINATED TO RIGID
INSULATION.
1/4" = 1'-0"E4
PARTIAL GROUND FLOOR PLAN
NORTH
0' 2' 4' 8'
Revisions: Date:
eshreve Stamp eshreve
J
GENERAL SHEET NOTES
1.GA THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY
TIME DUE TO NOISE AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE
OF THE FACILITY.
2.GA PROVIDE UL LISTED FIRESTOP SYSTEM AT ALL PENETRATIONS THROUGH FIRE
AND/OR SMOKE RATED ASSEMBLIES.
3.GA USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT
LIMITING ABILITY TO ADD OR REMOVE CABLES WITHOUT RESEALING.
4.GA ALL DUCT OPENINGS IN CONSTRUCTION AREAS SHALL BE COMPLETELY
SEALED TO PREVENT AIR CIRCULATION BETWEEN CONSTRUCTION ZONE AND
OCCUPIED AREAS VIA THE BUILDING HVAC SYSTEM.
5.GA REFER TO SHEET A-500 FOR PARTITION TYPES.
6.GA CONTRACTOR TO PROVIDE APPROVAL SUBMITTAL FOR THE FIRE SPRINKLER
SYSTEM MODIFICATIONS IN EXISTING AND NEW TELECOMMUNICATION ROOMS
AND TELECOMMUNICATION SPACES. RELOCATE OR ADD NEW HEADS WHERE
REQUIRED, SPRINKLER HEADS TO BE WITHIN 12" OF THE CONCRETE
FLOOR/ROOF DECK ABOVE IN COMPLIANCE WITH NFPA13. COORDINATE
SPRINKLER SYSTEM SHUTDOWN/SCHEDULE WITH VA C.O.R. AND LOCAL FIRE
DEPARTMENT/AUTHORITY HAVING JURISDICTION.
REFERENCE KEYNOTES
COURT RM
WAITING
005B
JURY RM
005A
PIV OFFICE
004TOILET
TOILET
CORR
MECH
014A
ARMS RM
MECH
007BPOLICE CHIEF
007A
SECRETARY
007LOCKERS
LAB
009A
PHOTO ID
OPS OFFICER
CORR
016A
STAIR
HAC
STOR
ELECTRICAL
S E
E
-A
-1
31R
31R PARTITION GRAPHIC LEGEND
GRAPHIC DESCTIPTION PRIORITY
2 HR SMOKE / FIRE
2 HR SHAFT 2
NON RATED PARTITION
NEW CONSTRUCTION
EXISTING PARTITION
TO BE DEMOLISHED
1 HR SMOKE / FIRE 4
1 HR FIRE 5
HAZARDOUS 6
2 HR FIRE
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
35% SCHEMATIC DESIGN 10/27/2023
CONSULTANT
CONSULTANT: A/E:
04/07/2025
FULLY
SPRINKLERED
65% DESIGN DEVELOPMENT
10% BASIS OF DESIGN 09/27/2023
GDM-AE, Inc.
1308 NE 134th ST. SUITE A
VANCOUVER, WA 98685
P: 541.436.4723
WWW.GDM-AE.COM
06/12/202595% CONSTRUCTION DOCUMENTS
09/15/202595% CONSTRUCTION DOCUMENTS - REV 1
NOT FOR CONSTRUCTION
FOR OFFICIAL USE ONLY (FOUO)
RYAN JETER
STATION
A u to d e sk D o cs
/2
-0
V
A C h ill ic o th e E
H R
M T
/2
-0
V
A C h ill ic o th e -A rc h M o d e l_
B ld g .0
.r vt
018-A-111
PARTIAL GROUND FLOOR PLAN
ES GS
VA CHILLICOTHE (EHRM) ELECTRONIC
HEALTH RECORDS MODERNIZATION
INFRASTRUCTURE UPGRADES
100% CONSTRUCTION
DOCUMENT
538-21-705
17273 STATE ROUTE 104
CHILLICOTHE, OH 45601-9715
100% CONSTRUCTION DOCUMENTS 10/20/2025
10/20/2025
ERIC SHREEVE
31R INSTALL NEW MR GYPSUM WALL BOARD ON EXISTING WALL FRAMING
NORTH
1/4" = 1'-0"E4
PARTIAL GROUND FLOOR PLAN 0' 2' 4' 8'
Revisions: Date:
eshreve Stamp eshreve
F
F
CB CB
C
WAP
C
WAP
C
WAP
S
45D
45D
8R
S E
E
-A
-1
TOILET
012C
WATCH / CMDR.
012B
CORRIDOR
012H
WORK ROOM
011D
OPERATIONS
DESK
011C
CORRIDOR
Tele ops
INTERVIEW /
CONFG.
011G
MECHANICAL
011F
EVIDENCE
011B
WATCH CMDR
011AHOLDING CELL
011D
OPS OFFICER
CORR
012E
Telephone Room 012A
REFERENCE KEYNOTES
GYP. BD. CEILING SYSTEM
2 X 2 ACOUSTICAL LAY-IN CEILING SYSTEM.
DOWN LIGHT FIXTURE
LEGEND
KEY PLAN
GENERAL SHEET NOTES
1.GR RESTORE CEILINGS TO ORIGINAL CONDITION, REPLACE, CUT-IN AND REPAIR AS
REQUIRED TO FORM COMPLETE INSTALLATION ADJACENT TO NEW
CONSTRUCTION.
2.GR ALL CEILING DEVICES MAY NOT BE SHOWN, SEE MECHANICAL AND ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
3.GR EXTEND EXISTING WALL ASSEMBLIES AROUND TR'S TO THE STRUCTURE
ABOVE AS REQUIRED. DRYWALL REQUIRED FULL HEIGHT OF ROOMS.
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
35% SCHEMATIC DESIGN 10/27/2023
CONSULTANT
CONSULTANT: A/E:
04/07/2025
FULLY
SPRINKLERED
65% DESIGN DEVELOPMENT
10% BASIS OF DESIGN 09/27/2023
GDM-AE, Inc.
1308 NE 134th ST. SUITE A
VANCOUVER, WA 98685
P: 541.436.4723
WWW.GDM-AE.COM
06/12/202595% CONSTRUCTION DOCUMENTS
09/15/202595% CONSTRUCTION DOCUMENTS - REV 1
NOT FOR CONSTRUCTION
FOR OFFICIAL USE ONLY (FOUO)
RYAN JETER
STATION
A u to d e sk D o cs
/2
-0
V
A C h ill ic o th e E
H R
M T
/2
-0
V
A C h ill ic o th e -A rc h M o d e l_
B ld g .0
.r vt
018-A-112
PARTIAL GROUND FLOOR CEILING PLAN
ES GS
VA CHILLICOTHE (EHRM) ELECTRONIC
HEALTH RECORDS MODERNIZATION
INFRASTRUCTURE UPGRADES
100% CONSTRUCTION
DOCUMENT
538-21-705
17273 STATE ROUTE 104
CHILLICOTHE, OH 45601-9715
100% CONSTRUCTION DOCUMENTS 10/20/2025
10/20/2025
ERIC SHREEVE
8R OPEN TO STRUCTURE ABOVE.
45D FIRE SUPPRESSION SYSTEM TO BE MODIFIED AS REQUIRED.
NORTH
1/4" = 1'-0"E4
PARTIAL CEILING PLAN - GROUND FLOOR 0' 2' 4' 8'
Revisions: Date:
eshreve Stamp eshreve
1.GA THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY
TIME DUE TO NOISE AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE
OF THE FACILITY.
2.GA PROVIDE UL LISTED FIRESTOP SYSTEM AT ALL PENETRATIONS THROUGH FIRE
AND/OR SMOKE RATED ASSEMBLIES.
3.GA USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT
LIMITING ABILITY TO ADD OR REMOVE CABLES WITHOUT RESEALING.
4.GA ALL DUCT OPENINGS IN CONSTRUCTION AREAS SHALL BE COMPLETELY
SEALED TO PREVENT AIR CIRCULATION BETWEEN CONSTRUCTION ZONE AND
OCCUPIED AREAS VIA THE BUILDING HVAC SYSTEM.
5.GA REFER TO SHEET A-500 FOR PARTITION TYPES.
6.GA CONTRACTOR TO PROVIDE APPROVAL SUBMITTAL FOR THE FIRE SPRINKLER
SYSTEM MODIFICATIONS IN EXISTING AND NEW TELECOMMUNICATION ROOMS
AND TELECOMMUNICATION SPACES. RELOCATE OR ADD NEW HEADS WHERE
REQUIRED, SPRINKLER HEADS TO BE WITHIN 12" OF THE CONCRETE
FLOOR/ROOF DECK ABOVE IN COMPLIANCE WITH NFPA13. COORDINATE
SPRINKLER SYSTEM SHUTDOWN/SCHEDULE WITH VA C.O.R. AND LOCAL FIRE
DEPARTMENT/AUTHORITY HAVING JURISDICTION.
REFERENCE KEYNOTES
MECH
APPS
BUSS SYS
OIT OFFICE
HAC
CORR
APPS
COMPUTER EQ
WEB ADMIN
TOILET
35R
34R
33R
10R
10R
36R
36R
PARTITION GRAPHIC LEGEND
GRAPHIC DESCTIPTION PRIORITY
2 HR SMOKE / FIRE
2 HR SHAFT 2
NON RATED PARTITION
NEW CONSTRUCTION
EXISTING PARTITION
TO BE DEMOLISHED
1 HR SMOKE / FIRE 4
1 HR FIRE 5
HAZARDOUS 6
2 HR FIRE
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
35% SCHEMATIC DESIGN 10/27/2023
CONSULTANT
CONSULTANT: A/E:
04/07/2025
FULLY
SPRINKLERED
65% DESIGN DEVELOPMENT
10% BASIS OF DESIGN 09/27/2023
GDM-AE, Inc.
1308 NE 134th ST. SUITE A
VANCOUVER, WA 98685
P: 541.436.4723
WWW.GDM-AE.COM
06/12/202595% CONSTRUCTION DOCUMENTS
09/15/202595% CONSTRUCTION DOCUMENTS - REV 1
NOT FOR CONSTRUCTION
FOR OFFICIAL USE ONLY (FOUO)
RYAN JETER
STATION
A u to d e sk D o cs
/2
-0
V
A C h ill ic o th e E
H R
M T
/2
-0
V
A C h ill ic o th e -A rc h M o d e l_
B ld g .0
.r vt
018-A-121
PARTIAL FIRST FLOOR PLAN
ES GS
VA CHILLICOTHE (EHRM) ELECTRONIC
HEALTH RECORDS MODERNIZATION
INFRASTRUCTURE UPGRADES
100% CONSTRUCTION
DOCUMENT
538-21-705
17273 STATE ROUTE 104
CHILLICOTHE, OH 45601-9715
100% CONSTRUCTION DOCUMENTS 10/20/2025
10/20/2025
ERIC SHREEVE
10R WALL BASE, COLOR, SIZE AND TYPE TO MATCH EXISTING.
33R INSTALL NEW RAISED FLOOR SYSTEM TO MATCH EXISTING HEIGHT AND TYPE.
34R INSTALL NEW 1-HOUR RATED INTERIOR PARTITION. 5/8" TYPE X GYPSUM BOARD
ON EACH SIDE OF 3-5/8" METAL STUDS PER UL 465 WITH FULL HEIGHT SOUND
ATTENUATION INSULATION.
35R REMOVE EXISTING SINGLE LAYER DRYWALL ON RENOVATION SIDE AND
REPLACE WITH 2 LAYERS 5/8" TYPE X DRYWALL FULL HEIGHT AS REQUIRED TO
CONFORM TO UL DESIGN V497. FIRE CAULK ALL THROUGH PENETRATIONS AS
REQ'D FOR 1 HOUR ASSEMBLY. ADD SOUND ATTENUATION INSULATION FULL
HEIGHT.
36R TEXTURE AND PAINT NEW GYPSUM BOARD TO MATCH EXISTING ADJACENT
SURFACES. TAPE AND REPAIR WHERE ADJOINS EXISTING WALLS AS REQUIRED.
NORTH
1/4" = 1'-0"E4
PARTIAL FLOOR PLAN - FIRST FLOOR 0' 2' 4' 8'
Revisions: Date:
eshreve Stamp eshreve
REFERENCE KEYNOTES
GYP. BD. CEILING SYSTEM
2 X 2 ACOUSTICAL LAY-IN CEILING SYSTEM.
DOWN LIGHT FIXTURE
LEGEND
KEY PLAN
GENERAL SHEET NOTES
1.GR RESTORE CEILINGS TO ORIGINAL CONDITION, REPLACE, CUT-IN AND REPAIR AS
REQUIRED TO FORM COMPLETE INSTALLATION ADJACENT TO NEW
CONSTRUCTION.
2.GR ALL CEILING DEVICES MAY NOT BE SHOWN, SEE MECHANICAL AND ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
3.GR EXTEND EXISTING WALL ASSEMBLIES AROUND TR'S TO THE STRUCTURE
ABOVE AS REQUIRED. DRYWALL REQUIRED FULL HEIGHT OF ROOMS.
8' - 5"
44R
MECH
APPS
BUSS SYS
OIT OFFICE
HAC
CORR
APPS
COMPUTER EQ
WEB ADMIN
TOILET
8' - 5"
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
35% SCHEMATIC DESIGN 10/27/2023
CONSULTANT
CONSULTANT: A/E:
04/07/2025
FULLY
SPRINKLERED
65% DESIGN DEVELOPMENT
10% BASIS OF DESIGN 09/27/2023
GDM-AE, Inc.
1308 NE 134th ST. SUITE A
VANCOUVER, WA 98685
P: 541.436.4723
WWW.GDM-AE.COM
06/12/202595% CONSTRUCTION DOCUMENTS
09/15/202595% CONSTRUCTION DOCUMENTS - REV 1
NOT FOR CONSTRUCTION
FOR OFFICIAL USE ONLY (FOUO)
RYAN JETER
STATION
A u to d e sk D o cs
/2
-0
V
A C h ill ic o th e E
H R
M T
/2
-0
V
A C h ill ic o th e -A rc h M o d e l_
B ld g .0
.r vt
018-A-122
PARTIAL FIRST FLOOR CEILING PLAN
ES GS
VA CHILLICOTHE (EHRM) ELECTRONIC
HEALTH RECORDS MODERNIZATION
INFRASTRUCTURE UPGRADES
100% CONSTRUCTION
DOCUMENT
538-21-705
17273 STATE ROUTE 104
CHILLICOTHE, OH 45601-9715
100% CONSTRUCTION DOCUMENTS 10/20/2025
10/20/2025
ERIC SHREEVE
NORTH
1/4" = 1'-0"E4
PARTIAL CEILING PLAN - FIRST FLOOR
44R INFILL ACT CEILING TO MATCH EXISTING. EXTEND GRID, ADD WALL ANGLES,
REPLACE EXISTING CUT PERIMETER TILES WITH FULL TILES WHERE
NECESSARY. COLOR, STYLE AND TEXTURE TO MATCH EXISTING.
0' 2' 4' 8'
Revisions: Date:
eshreve Stamp eshreve
1.GA THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY
TIME DUE TO NOISE AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE
OF THE FACILITY.
2.GA PROVIDE UL LISTED FIRESTOP SYSTEM AT ALL PENETRATIONS THROUGH FIRE
AND/OR SMOKE RATED ASSEMBLIES.
3.GA USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT
LIMITING ABILITY TO ADD OR REMOVE CABLES WITHOUT RESEALING.
4.GA ALL DUCT OPENINGS IN CONSTRUCTION AREAS SHALL BE COMPLETELY
SEALED TO PREVENT AIR CIRCULATION BETWEEN CONSTRUCTION ZONE AND
OCCUPIED AREAS VIA THE BUILDING HVAC SYSTEM.
5.GA REFER TO SHEET A-500 FOR PARTITION TYPES.
6.GA CONTRACTOR TO PROVIDE APPROVAL SUBMITTAL FOR THE FIRE SPRINKLER
SYSTEM MODIFICATIONS IN EXISTING AND NEW TELECOMMUNICATION ROOMS
AND TELECOMMUNICATION SPACES. RELOCATE OR ADD NEW HEADS WHERE
REQUIRED, SPRINKLER HEADS TO BE WITHIN 12" OF THE CONCRETE
FLOOR/ROOF DECK ABOVE IN COMPLIANCE WITH NFPA13. COORDINATE
SPRINKLER SYSTEM SHUTDOWN/SCHEDULE WITH VA C.O.R. AND LOCAL FIRE
DEPARTMENT/AUTHORITY HAVING JURISDICTION.
REFERENCE KEYNOTES
SCUPPER
LEADER
LEADERSPLASH BLOCK
C1
018-A-301
C3
018-A-301
TYP
C3
018-A-301
TYP
C3
018-A-301
TYP
C5
018-A-301
REDIRECTED
LEADER
1/4" PER 1'-0"
27' - 3 1/4" 16' - 2 3/4"
17' - 0"
/2
43' - 6"
REPLACE DECKING
AS NEEDED AT
EXISTING ROOF LEAK
EXISTING LEADER TO NEW
STORM DRAIN - SEE CIVIL
EXISTING LEADER TO NEW
STORM DRAIN - SEE CIVIL
/4
P
E R
NEW SINGLE-PLY
ROOFING ON RIGID
INSULATION 1/4"
PER FOOT TO
SCUPPER. FULL
ROOF
3 4 5 6
E
F
BONDING ADHESIVE
MEMBRANE EXTENDED
BELOW ADHESIVE
SHEET-METAL FASCIA CAP
SELF-ADHERED OR
HOT-AIR-WELDED
FLASHING MEMBRANE
(EXTENDED APPROX. 3"
BEYOND CANT)
OPTIONAL: SEAM PLATES
AND FASTENERS
SEALANT (IF REQUIRED
FOR SPECIFIC SYSTEM)
FASTENERS
APPROX. 12" O.C.
WOOD CANT FASTENED
TO WOOD NAILERS
2 X 6 MIN. WOOD NAILER
ATTACHED TO
SUBSTRATE - OVERALL
THICKNESS TO MATCH
INSULATION
CONCRETE INSTALL APPROPRIATE SEALANT
(E.G., POLYURETHANE) AND TOOL
TO FACILITATE WATER RUNOFF
CONCRETE FASTENERS
SHEET-METAL
COUNTERFLASHING
INSTALL COMPRESSIBLE
ELASTOMERIC SEALANT
OR TAPE TO SPAN
IRREGULARITIES
TERMINATION BAR
FASTENED WITH
APPROPRIATE
FASTENERS APPROX.
12" O.C.
ADHERED MEMBRANE FLASHING
BONDING ADHESIVE
HOT-AIR-WELDED SEAM
SEALANT (IF REQUIRED
FOR THE SPECIFIC
SYSTEM)
SEAM PLATES AND
FASTENERS
INSTALL COMPATIBLE SEALANT
OR TAPE BEHIND MEMBRANE
M
IN
IM
U
M
F L A
S H
IN
G
H E
IG
H
T
BONDING ADHESIVE
BONDING ADHESIVE
OPTIONAL: WOOD BLOCKING
TERMINATION OF MEMBRANE
FLASHING WILL VARY
MEMBRANE-COATED SHEET-
METAL SCUPPER SECURED
TO WALL AND DECK AND/OR
OPTIONAL WOOD BLOCKING
HOT-AIR-WELDED
MEMBRANE FLASHING
SEALANT (IF REQUIRED
FOR SPECIFIC SYSTEM)
SEALANT
APPROX. 3"
(TYP.)
SEALANT (IF REQUIRED
FOR SPECIFIC SYSTEM)
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
35% SCHEMATIC DESIGN 10/27/2023
CONSULTANT
CONSULTANT: A/E:
04/07/2025
FULLY
SPRINKLERED
65% DESIGN DEVELOPMENT
10% BASIS OF DESIGN 09/27/2023
GDM-AE, Inc.
1308 NE 134th ST. SUITE A
VANCOUVER, WA 98685
P: 541.436.4723
WWW.GDM-AE.COM
06/12/202595% CONSTRUCTION DOCUMENTS
09/15/202595% CONSTRUCTION DOCUMENTS - REV 1
NOT FOR CONSTRUCTION
FOR OFFICIAL USE ONLY (FOUO)
RYAN JETER
STATION
A u to d e sk D o cs
/2
-0
V
A C h ill ic o th e E
H R
M T
/2
-0
V
A C h ill ic o th e -A rc h M o d e l_
B ld g .0
.r vt
018-A-301
LOWER CANOPY ROOF
ES AM
VA CHILLICOTHE (EHRM) ELECTRONIC
HEALTH RECORDS MODERNIZATION
INFRASTRUCTURE UPGRADES
100% CONSTRUCTION
DOCUMENT
538-21-705
17273 STATE ROUTE 104
CHILLICOTHE, OH 45601-9715
100% CONSTRUCTION DOCUMENTS 10/20/2025
10/20/2025
ERIC SHREEVE
NORTH
1/2" = 1'-0"F4
LOWER ROOF PLAN
N.T.SC1
RAISED PERIMETER EDGE WITH METAL FLASHING
N.T.SC3
FLASHING WITH SURFACE-MOUNTED COUNTERFLASHING
N.T.SC5
BASE FLASHING AT THROUGH-WALL SCUPPER
REDIRECT LEADER TO
GRADE AND NEW STORM
DRAIN - SEE CIVIL
0' 1' 2' 4'
Revisions: Date:
eshreve Stamp eshreve
DESIGN CONTRACT AWARD DATE: 8/24/2023
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 1: FIRE CODE, 2021
NFPA 10: STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2022
NFPA 13: STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS,
NFPA 70: NATIONAL ELECTRICAL CODE, 2020
NFPA 70E: STANDARD FOR ELECTRICAL SAFETY IN THE WORKPLACE, 2021
NFPA 72: NATIONAL FIRE ALARM AND SIGNALING CODE, 2022
NFPA 75: STANDARD FOR THE FIRE PROTECTION OF INFORMATION
TECHNOLOGY EQUIPMENT, 2020
NFPA 101: LIFE SAFETY CODE, 2021
NFPA 241: STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION,
AND DEMOLITION OPERATIONS, 2022
NFPA 291: RECOMMENDED PRACTICE FOR WATER FLOW TESTING AND
MARKING OF HYDRANTS, 2022
NFPA 2001: STANDARD ON CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
DEPARTMENT OF VETERANS AFFAIRS
VA FIRE PROTECTION DESIGN MANUAL, NINTH, NOVEMBER 1ST, 2023
U.S. DEPARTMENT OF VETERANS AFFAIRS OFFICE OF INFORMATION &
TECHNOLOGY (OIT) INFRASTRUCTURE STANDARDS FOR
TELECOMMUNICATIONS SPACES (ISTS) VERSION 4.0 JUNE 1, 2023
CODES AND STANDARDS
1.
A.
TELECOMMUNICATIONS SPACE: AN AREA USED FOR HOUSING THE
INSTALLATION AND TERMINATION OF TELECOMMUNICATIONS EQUIPMENT
AND CABLE. TELECOMMUNICATIONS SPACES INCLUDE ENTRANCE ROOMS,
DATA CENTERS, MAIN COMPUTER ROOMS, HORIZONTAL PATHWAYS,
VERTICAL PATHWAYS, ETC. THE TERM “TELECOMMUNICATIONS SPACES” IS
USED INTERCHANGEABLY WITH THE TERM “IT SUPPORT SPACE.”
THE DATA CENTER ROOM 03 A TELECOMMUNICATION SPACE WITH A
ANSI/TIA-942-B PLANNED RATING OF 3.
PER THE VA AHJ AND HEFP CORRESPONDENCE 9/28/2024: ENTRANCE
ROOMS ARE CLASSIFIED AS NETWORK SUPPORT CENTERS (NSC),
JUST AS A TELECOMMUNICATIONS ROOM (TR). THEREFORE, THEY
ARE BOTH SUBJECT TO FPDM, SECTION 3.7-C, RATING 1. ENTRANCE
ROOMS ARE NOT REQUIRED TO BE PROVIDED WITH FIRE
PROTECTION SUCH AS FIRE RATED WALLS, SMOKE DETECTION, OR A
GASEOUS SUPPRESSION SYSTEM.
DEFINITIONS
1.
2.
3.
PROVIDE QUANTITY 2 NEW CLEAN AGENT OR CO2 EXTINGUISHERS AND
TWO FIRE EXTINGUISHER CABINETS FOR THE MAIN COMPUTER ROOM
WITHIN THE ROOM. WALL MOUNT THE FIRE EXTINGUISHERS.
PROVIDE QUANTITY 1 NEW CLEAN AGENT OR CO2 EXTINGUISHERS AND
TWO FIRE EXTINGUISHER CABINETS FOR THE TELEPHONE ROOM
WITHIN THE ROOM. WALL MOUNT THE FIRE EXTINGUISHER.
PROVIDE FLAG TYPE FIRE EXTINGUISHER SIGNAGE FOR EVERY NEW FIRE
EXTINGUISHER LOCATION. SIGN TYPE SHALL BE 9" HIGH X 9" WIDE,
ACRYLIC PLAQUE WITH ALUMINUM BRACKET FOR FLAG MOUNTING.
GRAPHIC PROCESS SHALL BE DIRECT DIGITAL PRINT ON SECOND SURFACE
OR SILK-SCREENED. SEE SHEET 00-FP-002 FOR ADDITIONAL DETAILS.
FIRE EXTINGUISHERS
1.
2.
3.
4.
5.
6.
THIS VA CAMPUS DOES NOT MAINTAIN FIRE LIFE SAFETY DRAWINGS THAT
IDENTIFY FIRE OR SMOKE RATED WALLS FOR ALL BUILDINGS. FOR THE
BASIS OF BIDDING, THE CONTRACTOR IS TO ASSUME ALL WALL
PENETRATIONS INCLUDING BUT NOT LIMITED TO CABLES, PIPES, DUCTS,
ETC. REQUIRE FIRESTOPPING. CONTRACTOR TO MATCH PENETRATION
RATING TO BARRIER CONSTRUCTION RATINGS AS ENCOUNTERED IN
ACTUAL FIELD CONDITIONS.
AS OUTLINED IN SPECIFICATION 07 84 00, THE CONTRACTOR IS REQUIRED
TO PROVIDE UL OR EQUIVALENT FIRESTOPPING SYSTEMS FOR THE
CLOSURES OF OPENINGS IN WALLS, FLOORS, AND ROOF DECKS AGAINST
PENETRATION OF FLAME, HEAT AND SMOKE OR GASES IN FIRE RESISTANT
RATED CONSTRUCTION.
THE CONTRACTOR IS REQUIRED TO ENGAGE A QUALIFIED THIRD PARTY
INSPECTOR TO PERFORM INSPECTIONS AND FINAL REPORTS OF ALL
FIRESTOPPING SYSTEMS AND FIRE CAULKING.
A UL OR EQUIVALENT LISTED FIRESTOPPING SYSTEM IS REQUIRED FOR ALL
RATED WALLS AND PENETRATIONS THROUGH RATED WALLS, INCLUDING
BUT NOT LIMITED TO: CABLE TRAY PENETRATIONS, OTHER CABLE
PENETRATIONS, PIPE PENETRATIONS, DUCT PENETRATIONS, AND 1 HOUR, 2
HOUR, AND 3 HOUR RATED WALL ASSEMBLIES
THE CONTRACTOR MUST SUBMIT ALL PROPOSED PENETRATIONS
ASSEMBLIES TO THE VA PRIOR TO BEGINNING CONSTRUCTION. THE
CONTRACTOR MUST IDENTIFY THE UL SYSTEM NUMBER PROPOSED FOR
THE PENETRATION ASSEMBLIES. PRODUCT DATA ALONE WILL NOT BE
ACCEPTABLE. THE FIRESTOPPING ASSEMBLY MUST BE INSTALLED AND
INSPECTED ACCORDING TO THE UL SYSTEM NUMBER.
THE CONTRACTOR MUST SEAL ANY PENETRATIONS IN RATED WALLS THAT
ARE ABANDONED DUE TO WORK COMPLETED FOR THIS SCOPE IN
ACCORDANCE WITH A LISTED PENETRATION ASSEMBLY CORRESPONDING
TO THE APPROPRIATE RATING OF THE BARRIER BEING PENETRATED.
FIRESTOPPING OF WALL PENETRATIONS
1.
2.
3.
4.
EXISTING SPRINKLER SYSTEM WILL BE MODIFIED AS NECESSARY TO MAINTAIN PROTECTION DURING ALL CONSTRUCTION, ALTERATION, AND DEMOLITION. SUPPRESSION SYSTEM IS TO BE MAINTAINED AS OPERATIONAL THROUGHOUT
CONSTRUCTION.
IN ACCORDANCE WITH NFPA 241, EITHER TEMPORARY RATED CONSTRUCTION BARRIERS OR CONTINUED FIRE SPRINKLER COVERAGE ARE REQUIRED FOR FIRE SAFETY PROTECTION DURING CONSTRUCTION. CONTINUOUS FIRE SPRINKLER COVERAGE MUST COMPLY AS FOLLOWS: IN AREAS WHERE AN EXISTING DROP CEILING IS REMOVED FOR CONSTRUCTION DUE TO THIS SCOPE OF WORK, NEW UPRIGHT SPRINKLERS ARE REQUIRED TO BE PROVIDED TO MATCH THE DECK HEIGHT ABOVE. DROP CEILINGS THAT ARE TEMPORARILY REMOVED REQUIRE NEW UPRIGHT SPRINKLER HEADS TO BE TEMPORARILY INSTALLED UNTIL THE NEW DROP CEILING IS INSTALLED AND NEW PENDENT SPRINKLERS ARE INSTALLED. ANY SPRINKLER WHICH IS REQUIRED TO REVERT TO PENDENT INSTALLATION MUST BE REPLACED WITH A NEW PENDENT SPRINKLER. SPRINKLERS CANNOT BE REMOVED AND REINSTALLED.
COORDINATE DEMOLITION OF EXISTING DROP CEILINGS WITH FIRE SPRINKLER CONTRACTOR TO AVOID LAPSE IN FIRE SUPPRESSION COVERAGE.
PER NFPA 241-2022 EDITION, 8.7.3.1 - IF AUTOMATIC SPRINKLER PROTECTION IS TO BE PROVIDED, THE INSTALLATION SHALL BE PLACED IN SERVICE AS SOON AS PRACTICABLE
TEMPORARY FIRE SUPPRESSION
1.
2.
A CLEAN AGENT SUPPRESSION SYSTEM WILL BE PROVIDED IN THE MAIN
COMPUTER ROOM AS REQUIRED BY VA FIRE PROTECTION DESIGN MANUAL
SECTION 3.7.B AND WILL COMPLY WITH NFPA 2001.
IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN MANUAL,
TELECOMMUNICATION SPACES SHALL BE PROVIDED WITH COMPLETE WET
PIPE SPRINKLER SYSTEM COVERAGE. SPRINKLERS MUST BE FUSIBLE LINK
SPRINKLERS LISTED AS STANDARD RESPONSE HEADS, INTERMEDIATE
TEMPERATURE, AND PROVIDED LISTED MECHANICAL GUARDS.
FIRE SUPPRESSION SUMMARY FOR
TELECOMMUNICATION SPACES
1. IT IS THE RESPONSIBILITY OF THIS PROJECT'S CONTRACTOR TO PROVIDE A NEW WATER SUPPLY FLOW TEST IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA 13 AND NFPA 291, PRIOR TO SUBMITTING FIRE SPRINKLER SHOP
DRAWINGS.
FLOW TEST1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
THE CONTRACTOR IS REQUIRED TO PROVIDE ALL LABOR, MATERIALS,
PROGRAMMING, AND TESTING AS REQUIRED FOR THE INSTALLATION AND
INTEGRATION OF ANY NEW FIRE ALARM DEVICES WITH THE EXISTING FIRE
ALARM SYSTEM.
THE FIRE ALARM SCOPE FOR THIS PROJECT INCLUDES MODIFYING THE
EXISTING FIRE ALARM SYSTEM FOR THE EXISTING MAIN COMPUTER ROOM
BUILDING. THE SCOPE ALSO REQUIRES THE MODIFICATION OF THE
EXISTING FIRE ALARM SYSTEM TO ACCOMMODATE THE NEW CLEAN AGENT
RELEASE PANEL.
OTHER SYSTEM MODIFICATION SHALL BE CONSIDERED WITH RESPECT TO
FLOOR PLAN CHANGES.
FIRE ALARM CONTRACTOR IS RESPONSIBLE FOR DEVELOPING
CALCULATIONS AND SHOP DRAWINGS FOR THE NEW MAIN COMPUTER
ROOM BUILDING ONLY.
NEW NOTIFICATION APPLIANCES SHALL MATCH EXISTING MANUFACTURER
AND MODEL OR BE COMPATIBLE WITH THE EXISTING SYSTEM. HORNS AND
STROBES SHALL BE RED FINISH TO MATCH EXISTING DEVICES.
CONTRACTOR SHALL COORDINATE AND VERIFY DEMOLITION OR
RELOCATION OF ITEMS WITH OWNER PRIOR TO COMMENCING WORK TO
PREVENT INTERRUPTION OF SERVICE.
FIRE ALARM INPUT/OUTPUT MATRIX IS PROVIDED FOR NEW CLEAN AGENT
DEVICES LOCATED IN THE PROJECT AREA. ALL OTHER INPUTS SHALL
MATCH EXISTING PANEL.
THE CONTRACTOR MUST PROVIDE BOTH AUDIBLE AND VISUAL ALARMS
THROUGHOUT THE NEW SPACES TO MEET NFPA AND VA REQUIREMENTS.
PROVIDE NEW SMOKE DETECTION IN THE MAIN COMPUTER ROOM IN
ACCORDANCE WITH VA FIRE PROTECTION DESIGN MANUAL SECTION 3.7.C
AND NFPA 72.
ALL NEW FIRE ALARM WIRING AND CLEAN AGENT SYSTEM WIRING IS TO BE
INSTALLED IN STEEL EMT CONDUIT. CONDUIT SHALL BE FACTORY PAINTED
COLOR RED.
FIRE DETECTION AND NOTIFICATION -
GENERAL NOTES
SECTION, DETAIL OR ELEVATION
IDENTIFICATION MARK
PLATE NUMBER WHERE SECTION,
DETAIL OR ELEVATION IS TAKEN
SECTION, DETAIL OR ELEVATION TITLE
PLATE NUMBER WHERE
DETAIL IS DRAWN
DETAIL NUMBER
DETAIL CALLOUT SYMBOL
SECTION CUT SYMBOL
SECTION LETTER
PLATE NUMBER WHERE
SECTION IS DRAWN
VIEW SECTION
DETAIL/SECTION TITLE
XX
X-XXX
XX
X-XXX
XX
X-XXX
DETAIL AND SECTION VIEW LEGEND
CLEAN AGENT SUPPRESSION SYSTEM LEGEND
PS PRESSURE SWITCH
CA CLEAN AGENT SYSTEM MANUAL PULL STATION
SPD SURGE SUPPRESSION DEVICE
BATT SECONDARY POWER SUPPLY (BATTERY)
AIM ADDRESSABLE INPUT MODULE
CA CLEAN AGENT SYSTEM ABORT SWITCH
SOV
SOLENOID VALVE
RSFACU RELEASING SERVICE FIRE ALARM CONTROL UNIT
CLEAN AGENT SYSTEM DISCHARGE RED STROBE
CLEAN AGENT ZONE BOUNDARY
CLEAN AGENT SYSTEM PRE-DISCHARGE AMBER STROBE
KM KEYED MAINTENANCE SWITCH
CT DISCRETE OUTPUT - DRY CONTACT
Z
ZONE SMOKE DETECTOR
VS VALVE SUPERVISORY SWITCH
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
CONTRACTORS FOR SUPPRESSION SYSTEMS ARE REQUIRED TO PROVIDE
CALCULATIONS AND WORKING DRAWINGS FOR THE NEW SPRINKLER
SYSTEM IN THE DATA CENTER.
SPRINKLER SHOP DRAWINGS SHALL BE APPROVED PRIOR TO THE
INSTALLATION OF ANY PIPE. A SET OF APPROVED PLANS SHALL BE
MAINTAINED AT ALL TIMES.
ALL PIPE LOCATIONS ARE TO BE FIELD MEASURED PRIOR TO FABRICATION
AND INSTALLATION BY SPRINKLER CONTRACTOR.
ALL PIPING IS SHOWN FOR SCHEMATIC PURPOSES ONLY. CONTRACTOR TO
PROVIDE PIPING LAYOUT AND ARRANGEMENT ON SHOP DRAWINGS.
ALL PIPES AND HANGERS ARE TO BE INSTALLED PER NFPA 13 (2022).
HANGERS ARE TO BE U.L. LISTED OR F.M. APPROVED.
PROVIDE SEISMIC PROTECTION IN ACCORDANCE WITH NFPA 13.
SEISMICITY OF THE CHILLICOTHE STATION IS LOW IN ACCORDANCE WITH
VA SEISMIC RISK DEFINITIONS, JULY 1, 2023. SPECTRAL RESPONSE
ACCELERATION PARAMETER SS = 0.18, S1 = 0.072. IDENTIFY SEISMIC
PROTECTION ON THE FIRE SPRINKLER SHOP DRAWINGS.
ALL VALVES SHALL HAVE A PERMANENTLY AFFIXED SIGN INDICATING
FUNCTION AND BUILDING PROTECTED.
ALL VALVES CONTROLLING THE WATER SUPPLY FOR AUTOMATIC
SPRINKLER SYSTEMS SHALL BE ELECTRICALLY SUPERVISED BY AN
APPROVED CENTRAL STATION.
SPRINKLER PIPE AND FITTINGS MUST BE METAL.
PIPE JOINTS MUST CONFORM TO NFPA 13
FITTINGS, MECHANICAL COUPLINGS, AND RUBBER GASKETS MUST BE
PRODUCTS OF THE SAME MANUFACTURER.
THE INSTALLER SHALL PERFORM ALL REQUIRED ACCEPTANCE TESTS IN
THE PRESENCE OF THE FIRE INSPECTOR
ALL SYSTEM PIPING SHALL BE HYDROSTATICALLY TESTED AT 200 PSI FOR
TWO HOURS OR AT 50 PSI ABOVE THE SYSTEM OPERATING PRESSURE,
WHICHEVER IS GREATER.
PORTION OF PIPING SERVING THE MAIN COMPUTER ROOM SHALL BE
SLOPED TO ALLOW PIPING TO DRAIN COMPLETELY TO MINIMIZED TRAPPED
WATER.
PROVIDE AIR VENTING AT HIGH POINTS IN THE SYSTEM AS REQUIRED BY
NFPA 13-2022 16.7
ALL NEW SPRINKLER PIPING AND ALL SPRINKLER PIPING EXPOSED BY THE
REMOVAL OF CEILINGS SHALL BE PAINTED RED. DO NOT ALLOW ANY PAINT
ON SPRINKLER HEADS. PAINTED SPRINKLER HEADS MUST BE REPLACED.
FIRE SPRINKLER GENERAL NOTES
FIRE SPRINKLER SYSTEM LEGEND
UPRIGHT SPRINKLER
PENDENT SPRINKLER
FIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA
HAZARD CLASSIFICATION
NOTE 1: IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN MANUAL, ALL SPRINKLERS ARE REQUIRED TO BE FM APPROVED.
NOTE 2: FOR THE TELEPHONE ROOM, PROVIDE UL LISTED MECHANICAL GUARDS. PROVIDE INTERMEDIATE TEMPERATURE, STANDARD RESPONSE, FUSIBLE LINK SPRINKLERS.
NOTE 3: FOR THE DATA CENTER ROOM, PROVIDE UL LISTED MECHANICAL GUARDS. PROVIDE INTERMEDIATE TEMPERATURE, STANDARD RESPONSE, FUSIBLE LINK SPRINKLERS.
MARK
WET
SYSTEM
TYPE
WET
REMOTE
AREA
SQ FT
HOSE
DEMAND
GPM TYPE
SEE NOTES
SEE NOTES
NOTES
1,3
0.10
DENSITY
GPM/SF
0.15
MAXIMUM AREA
PER SPRINKLER
SQ FT
1,2LIGHT HAZARD
ORDINARY HAZARD
(GROUP 1)
SPRINKLER CHARACTERISTICS
K-FACTOR FINISH
5.6
5.6
SEE NOTES
BRASS250
CODE REFERENCES
NFPA 13-2022 Table 10.2.4.2.1(a), Table 19.2.3.1.1, Table 19.2.3.1.2, NFPA 13-2022 Table 10.2.4.2.1(b), Table 19.2.3.1.1, Table 19.2.3.1.2
MAXIMUM
SPRINKLER
SPACING FT
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
1/2
3''
1' -0
1'
1/2
1' -0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/8
1' -0
1/1
6''
1' -0
1/4
1'
-0
1' 2'
1' 1/2
2'
1''
1' -0
3/8
1'
-0
1'
2' 4'
1 1 /2'
1'
-0
1/2
1'
3'
6''
1' -0
1/4
1/2
3/3 2''
1'
-0
8'
4' 4'
10% BASIS OF DESIGN 09-27-2023 CONSULTANT
A/E:11-08-2023
FULLY
SPRINKLERED
FOR OFFICIAL USE ONLY (FOUO)
35% SCHEMATIC DESIGN
04-07-202565% DESIGN DEVELOPMENT
06-12-202595% CONSTRUCTION DOCUMENTS
09-15-202595% CONSTRUCTION DOCUMENTS
STATION 538 - VA CHILLICOTHE HEALTH CARE10-20-2025100% CONSTRUCTION DOCUMENTS
STATION 538
Au to de sk
D oc s:
//2
3-
VA
C hi llic ot he E
H R
M T
2/
-0
_C hi llic ot he E
H R
M -F ire _r
.rv t
00-FP-001
FIRE PROTECTION GENERAL NOTES,
DIAGRAM, AND LEGEND
CD CC
VA CHILLICOTHE (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
17273 STATE ROUTE 104 CHILLICOTHE, OH, 45601-9718
100% CONSTRUCTION
DOCUMENTS
538-21-705
October 20, 2025
GDM-AE, Inc.
1308 NE 134TH ST, SUITE A
VANCOUVER, WA 98685
CONRAD CHANDLER, PE
PH: 541-436-4723
Revisions: Date:
FIRE EXTINGUISHER SIGNAGE REQUIREMENTS1
1.
2.
3.
NOTE: IT IS THE RESPONSIBILITY OF THIS PROJECT'S CONSTRUCTION CONTRACTOR TO PROVIDE NEW SIGNAGE AT ALL LOCATIONS OF CONTRACTOR SUPPLIED FIRE EXTINGUISHERS.
SEE SHEETS 018-FP-102 AND 018-FP-103 FOR PLACEMENT OF FIRE EXTINGUISHERS.
SIGN TYPE SHALL BE 9" HIGH X 9" WIDE, ACRYLIC PLAQUE WITH ALUMINUM BRACKET FOR FLAG MOUNTING. GRAPHIC PROCESS SHALL BE DIRECT DIGITAL PRINT ON SECOND SURFACE OR SILK-SCREENED. TEXT AND SYMBOL SHALL BE WHITE.
BACKGROUND SHALL BE RED. TYPOGRAPHY SHALL BE HELVETICA BOLD. MINIMUM MOUNTING HEIGHT TO THE BOTTOM OF THE SIGN SHALL BE 80". MOUNT CENTERED ABOVE FIRE EXTINGUISHER CABINET. REFER TO VA SIGNAGE DESIGN MANUAL, PG 18-10, SIGN IN-01.31 FOR LAYOUT OF SIGNAGE.
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
1/2
3''
1' -0
1'
1/2
1' -0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/8
1' -0
1/1
6''
1' -0
1/4
1'
-0
1' 2'
1' 1/2
2'
1''
1' -0
3/8
1'
-0
1'
2' 4'
1 1 /2'
1'
-0
1/2
1'
3'
6''
1' -0
1/4
1/2
3/3 2''
1'
-0
8'
4' 4'
10% BASIS OF DESIGN 09-27-2023 CONSULTANT
A/E:11-08-2023
FULLY
SPRINKLERED
FOR OFFICIAL USE ONLY (FOUO)
35% SCHEMATIC DESIGN
04-07-202565% DESIGN DEVELOPMENT
06-12-202595% CONSTRUCTION DOCUMENTS
09-15-202595% CONSTRUCTION DOCUMENTS
STATION 538 - VA CHILLICOTHE HEALTH CARE10-20-2025100% CONSTRUCTION DOCUMENTS
STATION 538
Au to de sk
D oc s:
//2
3-
VA
C hi llic ot he E
H R
M T
2/
-0
_C hi llic ot he E
H R
M -F ire _r
.rv t
00-FP-002
FIRE PROTECTION SIGNAGE
REQUIREMENTS
CD CC
VA CHILLICOTHE (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
17273 STATE ROUTE 104 CHILLICOTHE, OH, 45601-9718
100% CONSTRUCTION
DOCUMENTS
538-21-705
October 20, 2025
GDM-AE, Inc.
1308 NE 134TH ST, SUITE A
VANCOUVER, WA 98685
CONRAD CHANDLER, PE
PH: 541-436-4723
CLEAN AGENT SIGNAGE2
FIRE
CLEAN AGENT
RELEASE IS
IMMINENT WHEN
DEVICE IS ACTIVE.
EXIT AREA.
PRE-DISCHARGE STROBES
CLEAN AGENT
DISCHARGE
DISCHARGE STROBES
THIS SPACE IS PROTECTED BY A
CLEAN AGENT FIRE EXTINGUISHING
SYSTEM.
DO NOT ENTER WITHOUT
AUTHORIZATION DURING OR AFTER
DISCHARGE
DATA CENTER DOOR SIGNAGE
WARNING
ACTUATION OF THIS DEVICE WILL
CAUSE FIRE SUPPRESSION GAS TO
DISCHARGE. BEFORE ACTUATING,
ENSURE THAT PERSONNEL ARE
CLEAR OF THE AREA
MANUAL ACTIVATION
CLEAN AGENT
SYSTEM RELEASE
PUSH AND HOLD TO ABORT CLEAN
AGENT RELEASE.
MANUAL ABORT
CLEAN AGENT
SYSTEM ABORT
1. SEE SECTION 21 22 00 CLEAN AGENT FIRE SUPPRESSION SYSTEMS FOR SIGNAGE REQUIREMENTS
CLEAN AGENT RELEASE AND ABORT SIGNAGE3
PROVIDE CLEAN AGENT SYSTEM ABORT SIGNAGE AT EXISTING TO
REMAIN ABORT STATION.
PROVIDE CLEAN AGENT SYSTEM RELEASE SIGNAGE AT
EXISTING TO REMAIN RELEASE STATION.
HH
C
A
C A
EXISTING
FIRE ALARM
PANEL(FACP)
M
M
HD
F
P
H
M
M
EXISTING WET FIRE
SPRINKLER RISER
TAMPER SWITCHES
EXISTING WET FIRE
SPRINKLER RISER
FLOW SWITCHES
EXISTING DEDICATED 120V
CIRCUITS.
GROUNDING
EXISTING BATTERY
CABINET
EXISTING FIRE ALARM NETWORK.
FIRE ALARM SLC LOOP
DEVICES AND DETECTORS
AUDIO/VISUAL ALARM CIRCUIT(TYPICAL)
FIRE/SMOKE DAMPER CIRCUIT
PROVIDE AND CONNECT
TO 120V POWER
NEW MONITOR MODULES - GASEOUS SUPPRESSION SYSTEM
CONTROL
RELAY
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
NOTES:
PROVIDE ALL J-BOXES, CONDUIT, WIRING & CONNECTIONS TO ALL DEVICES FOR A
COMPLETEI INSTALLATION. (NO OPEN WIRING)
ALL DEVICES WILL BE MOUNTED IN AN ACCESSIBLE SPACE AND AT THE ELEVATION
PER NFPA 72, ADA, AND AHJ CODES.
PROVIDE FLUSH MOUNT BACK BOXES FOR ALL DEVICES IN ALL FINISHED SPACE.
PROVIDE COMPLETE GROUNDING TO EQUIPMENT PER MANUFACTURERS
RECOMMENDATION.
SEE FIRE ALARM SPECIFICATION FOR COMPLETE DETAILS.
PROVIDE SHUT DOWN CONNECTIONS FOR CRAC UNITS.
SET ALL VISUAL DEVICES TO PROVIDE THE RIGHT COVERAGE OF CANDELA FOR THE
SPACE PER NFPA 72.
SET ALL AUDIO DEVICES TO TEMPORAL AND TO BE 15dB ABOVE AMBIENT SOUND
LEVEL OF THE ROOM PER NFPA 72.
ALL AUDIO AND VISUAL DEVICE WILL BE SYNC PER NFPA 72.
PROVIDE COMPLETE REPROGRAMMING OF SYSTEM TO UPDATE ALL ZONES,
ADDRESSES, AND DIALER MONITORING BY POINTS.
PROVIDE COMPLETE SHOP PLANS FOR INSTALLATION AND AS-BUILT SET OF THESE
PLANS NEXT TO FIRE ALARM PANEL ON COMPLETION.
PROVIDE CD-ROM OR DVD OF PROGRAM DATA IN FIRE ALARM PANEL AS REQUIRED
BY NFPA 72.
PROVIDE PLENUM RATED FIRE CABLE FOR ALL NAC HORN/STROBE CIRCUITS
MINIMUM 2#14 AND SLC LOOP MINIMUM 2#16.
PROVIDE NAC BOOSTER POWER SUPPLIES AS REQUIRED FOR THE NOTIFICATION
DEVICE COUNTS AND DEMAND LOAD CALCULATIONS FOR A COMPLETE
OPERATIONAL SYSTEM.
ALL NEW FIRE ALARM WIRING IS TO BE INSTALLED IN STEEL EMT CONDUIT. CONDUIT
SHALL BE FACTORY PAINTED COLOR RED.
R RL RL RL
M M
M
NEW SUPERVISED
VALVE FOR FIRE
SPRINKLER SERVICE
TO DATA CENTER
ROOM
NEW CLEAN AGENT RFSCU
HD
F
FAA
P
FIRE ALARM CONTROL PANEL
HEAT DETECTOR
DUCT SMOKE DETECTOR
FIRE ALARM MANUAL PULL STATION
FIRE ALARM HORN/STROBE
SMOKE DETECTOR
H
TS DETECTOR, TAMPER SWITCH
DETECTOR, FLOW SWITCH
FIRE ALARM LEGEND
CONTROL RELAY
STROBE ONLY
RL
R
SF
AC
U
PROVIDE DUCT SMOKE DETECTION FOR
CRAC UNITS 1, 2, AND 3.
PROVIDE SHUTDOWN RELAYS.
MONITORING AND SHUTDOWN TO BE
PERFORMED BY CLEAN AGENT RELEASE
PANEL. COORDINATE LOCATION WITH
MECHANICAL DRAWINGS.
PROVIDE NEW CLEAN AGENT RELEASE PANEL.
PROVIDE MONITORING BY BUILDING FIRE
ALARM CONTROL PANEL IN BASEMENT ROOM
14 VIA NEW CONDUIT AND CLASS X CIRCUIT.
PROVIDE POWER SUPPLY. PROVIDE SMOKE
DETECTION ABOVE RSFACU.
LOCATION OF EXISTING FIRE
SPRINKLER RISER,
SUPERVISED VALVE, AND
FLOW SWITCH.
SEE CLEAN AGENT PLAN 018-FP-105
FOR CLEAN AGENT ALARM DEVICES
PLACED IN THIS AREA.
COMPUTER EQ
SEE CLEAN AGENT PLAN 018-FP-105
FOR DEMOLITION OF CLEAN AGENT ALARM DEVICES IN THIS AREA.
COMPUTER EQ
TOILET
WEB ADMIN
APPS
OIT OFFICE
TELECOM
CUST SUP
BUSS SYS
APPS
MECH
CORR
EXISTING BUILDING FIRE ALARM NOTIFICATION DEVICES TO REMAIN.
A.
a.
b.
B.
a.
b.
c.
C.
a.
b.
c.
D.
a.
b.
E.
a.
b.
c.
F.
a.
B.
THE GENERAL SCOPE OF WORK FOR THE FIRE-ALARM IMPROVEMENTS ARE RELATED TO THE INTEGRATION OF THE CLEAN AGENT SYSTEM INTO THE EXISTING BUILDING FIRE ALARM SYSTEM. OTHER BUILDING-WIDE FIRE-ALARM IMPROVEMENTS ARE NOT WITHIN THE APPROVED FUNDING OR SCOPING OF THIS PROJECT.
FOR THE NEW RELEASING SERVICE FIRE ALARM CONTROL UNIT (RSFACU):
FURNISH AND INSTALL A UL-LISTED RSFACU IN ACCORDANCE WITH VA MASTER SPECIFICATION 21 22 00.
PROVIDE CABINET, POWER SUPPLY, CHARGER, AND BATTERIES SIZED FOR 24-HOUR STANDBY + 5-MINUTE ALARM OPERATION.
FOR INTEGRATION WITH THE EXISTING SIMPLEX 4010ES BUILDING FIRE ALARM CONTROL PANEL (FACP):
CONNECT THE RSFACU TO THE BUILDING FACP VIA ADDRESSABLE RELEASING INTERFACE MODULES TO TRANSMIT ALARM, SUPERVISORY, AND TROUBLE SIGNALS.
PROVIDE A NEW COPPER BACKBONE AND CONDUIT RUN BETWEEN THE NEW RSFACU AND THE EXISTING BUILDING FACP. INSTALL A CLASS X SIGNALING-LINE CIRCUIT (SLC) IN ¾-INCH MINIMUM FACTORY FINISHED RED EMT BETWEEN THE DATA-CENTER RSFACU AND THE BUILDING FACP IN BASEMENT ROOM 14.
UPDATE 4010ES PROGRAMMING AND GRAPHICS TO DISPLAY THE CLEAN-AGENT PROTECTED AREA AND ALL RSFACU STATUS POINTS
FOR AUTOMATIC CONTROL FUNCTIONS REQUIRED BY NFPA 75 9.4.2.1:
PROVIDE RSFACU RELAY OUTPUTS TO SHUT DOWN CRAC UNITS AND OTHER HVAC EQUIPMENT SERVING THE DATA CENTER.
PROVIDE RSFACU RELAY OUTPUTS TO DE-ENERGIZE PROTECTED ELECTRONIC EQUIPMENT THROUGH THE EXISTING EMERGENCY POWER-OFF (EPO) CIRCUIT OR PDU
SHUNT-TRIP BREAKERS.
MONITOR AND ANNUNCIATE RETURN STATUS (CLOSED/SHUT DOWN) FOR EACH CONTROLLED DEVICE.
FOR CLEAN-AGENT INITIATION AND NOTIFICATION DEVICES IN THE DATA CENTER:
INSTALL NEW SMOKE DETECTION, INTEGRATE MANUAL RELEASE STATIONS, ABORT SWITCHES, DISCHARGE PRESSURE SWITCHES, AND SUPERVISORY TAMPER/LOW-
PRESSURE SWITCHES AS REQUIRED.
INSTALL NEW PRE-DISCHARGE HORN/STROBES AND DISCHARGE STROBES; NO OTHER BUILDING NOTIFICATION APPLIANCES SHALL BE MODIFIED.
FOR TESTING, COMMISSIONING, AND TRAINING:
PROGRAM AND FUNCTIONALLY TEST ALL RSFACU I/O, FACP INTEGRATION, NOTIFICATION, AND SHUTDOWN SEQUENCES.
CONDUCT AN INTEGRATED ACCEPTANCE TEST WITNESSED BY THE VA COR AND VA DESIGNATED FIRE LIFE SAFETY PERSONNEL.
PROVIDE HANDS-ON TRAINING SESSION COVERING NORMAL OPERATION, ABORT PROCEDURES, DISABLING/REENABLING, AND ROUTINE INSPECTION TASKS IN
ACCORDANCE WITH THE REQUIREMENTS OF
FOR SUBMITTALS AND CLOSE-OUT DOCUMENTATION:
SUBMIT SHOP DRAWINGS, WIRING DIAGRAMS, BATTERY CALCULATIONS, AND DETAILED SEQUENCE OF OPERATIONS FOR APPROVAL.
PROVIDE FINAL AS-BUILT DRAWINGS (PDF & CAD), O&M MANUALS, AND COMPLETED TEST/INSPECTION FORMS.
FIRE ALARM MODIFICATIONS SCOPE OF WORK
12" = 1'-0"1 FIRE ALARM ONE LINE DIAGRAM
FIRE ALARM GENERAL NOTES
1. PROVIDE ALL REQUIRED APPURTENANCES, PROGRAMMING, J-BOXES,
RACEWAY/CONDUIT, CABLING, MOUNTING HARDWARE AS REQUIRED
FOR A COMPLETE OPERATION.
2. PROVIDE HANGERS, SUPPORTS, PENETRATIONS, CUTTING, PATCHING,
AND SEALING AS REQUIRED.
3. ALL FIRE ALARM DETECTORS ARE TO BE 3-FEET AWAY FROM HVAC
DIFFUSERS. COORDINATE LOCATIONS WITH MECHANICAL
CONTRACTOR.
4. PROVIDE DUCT SMOKE DETECTOR(S) FOR EACH UNIT GREATER THAN
2,000 CFM. ELECTRICAL CONTRACTOR SHALL PROVIDE DUCT SMOKE
DETECTORS, MECHANICAL CONTRACTOR SHALL INSTALL DUCT SMOKE
DETECTORS, AND ELECTRICAL CONTRACTOR SHALL PROVIDE ALL
RACEWAY/WIRE AND MAKE CONNECTIONS FOR THE COMPLETE
OPERATION. COORDINATE LOCATIONS AND REQUIREMENTS WITH
MECHANICAL CONTRACTOR AND AHJ.
5. INITIATING DEVICE CIRCUITS(IDC) SHALL BE CLASS B.
6. SIGNAL LINE CIRCUITS(SLC) SHALL BE CLASS B.
7. NOTIFICATION APPLIANCE CIRCUITS(NAC) SHALL BE CLASS B.
8. COMMUNICATIONS BETWEEN BUILDING FIRE ALARM CONTROL PANELS
AND RSFACU SHALL BE CLASS X.
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
1/2
3''
1' -0
1'
1/2
1' -0
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/8
1' -0
1/1
6''
1' -0
1/4
1'
-0
1' 2'
1' 1/2
2'
1''
1' -0
3/8
1'
-0
1'
2' 4'
1 1 /2'
1'
-0
1/2
1'
3'
6''
1' -0
1/4
1/2
3/3 2''
1'
-0
8'
4' 4'
10% BASIS OF DESIGN 09-27-2023 CONSULTANT
A/E:11-08-2023
FULLY
SPRINKLERED
FOR OFFICIAL USE ONLY (FOUO)
35% SCHEMATIC DESIGN
04-07-202565% DESIGN DEVELOPMENT
06-12-202595% CONSTRUCTION DOCUMENTS
09-15-202595% CONSTRUCTION DOCUMENTS
STATION 538 - VA CHILLICOTHE HEALTH CARE10-20-2025100% CONSTRUCTION DOCUMENTS
STATION 538
Au to de sk
D oc s:
//2
3-
VA
C hi llic ot he E
H R
M T
2/
-0
_C hi llic ot he E
H R
M -F ire _r
.rv t
018-FP-101
FIRST FLOOR FIRE ALARM PLAN - MCR
CD CC
VA CHILLICOTHE (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
17273 STATE ROUTE 104 CHILLICOTHE, OH, 45601-9718
100% CONSTRUCTION
DOCUMENTS
538-21-705
October 20, 2025
GDM-AE, Inc.
1308 NE 134TH ST, SUITE A
VANCOUVER, WA 98685
CONRAD CHANDLER, PE
PH: 541-436-4723
3/16" = 1'-0"3 FIRST FLOOR FIRE ALARM INITIATING DEVICE NEW PLAN - MCR
RL
3/16" = 1'-0"2 FIRST FLOOR FIRE ALARM INTITIATING DEVICE DEMOLITION PLAN - MCR
RL
RL
FIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA
HAZARD CLASSIFICATION
NOTE 1: IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN MANUAL, ALL SPRINKLERS ARE REQUIRED TO BE FM APPROVED.
NOTE 2: FOR THE TELEPHONE ROOM, PROVIDE UL LISTED MECHANICAL GUARDS. PROVIDE INTERMEDIATE TEMPERATURE, STANDARD RESPONSE, FUSIBLE LINK SPRINKLERS.
NOTE 3: FOR THE DATA CENTER ROOM, PROVIDE UL LISTED MECHANICAL GUARDS. PROVIDE INTERMEDIATE TEMPERATURE, STANDARD RESPONSE, FUSIBLE LINK SPRINKLERS.
MARK
WET
SYSTEM
TYPE
WET
REMOTE
AREA
SQ FT
HOSE
DEMAND
GPM TYPE
SEE NOTES
SEE NOTES
NOTES
1,3
0.10
DENSITY
GPM/SF
0.15
MAXIMUM AREA
PER SPRINKLER
SQ FT
1,2LIGHT HAZARD
ORDINARY HAZARD
(GROUP 1)
SPRINKLER CHARACTERISTICS
K-FACTOR FINISH
5.6
5.6
WHITE
BRASS250
CODE REFERENCES
NFPA 13-2022 Table 10.2.4.2.1(a), Table 19.2.3.1.1, Table 19.2.3.1.2, NFPA 13-2022 Table 10.2.4.2.1(b), Table 19.2.3.1.1, Table 19.2.3.1.2
MAXIMUM
SPRINKER
SPACING FT
DEMOLISH ALL EXISTING PENDENT FIRE
SPRINKLERS, BRANCH LINES AS NECESSARY
TO CONVERT THIS SYSTEM TO UPRIGHT
SPRINKLERS WITH LIGHT HAZARD
CLASSIFICATION.
TELE BATTERIES
012D
TELEPHONE
EQUIPMENT
012A
TOILET
012C
WATCH / CMDR.
012B
CORRIDOR
012G
WORK ROOM
011C ROOM
012I
CORRIDOR
ROOM
INTERVIEW /
CONFG.
011G
MECHANICAL
EQUIPMENT
011F
WORK ROOM
011B
WORK ROOM
011AHOLDING CELL
011D
EXISTING 2" FIRE SPRINKLER FEEDMAIN.
RELOCATE EXISTING
CEILING-MOUNTED SMOKE
DETECTORS TO THE
STRUCTURAL DECK UPON
REMOVAL OF THE
ACOUSTICAL CEILING.
SD
SD
DEMOLISH ABANDONED DUCT
SMOKE DETECTOR.
ASSOCIATED DUCTWORK HAS
BEEN REMOVED BUT THE
DETECTOR REMAINS IN PLACE.
REMOVE DETECTOR AND
ASSOCIATED CONDUCTORS
BACK TO THE NEAREST
ACCESSIBLE JUNCTION BOX.
UPDATE FIRE ALARM CONTROL
PANEL PROGRAMMING TO
DELETE THE ASSOCIATED
DEVICE ADDRESS AND
FUNCTION.
EXISTING DUCT DETECTOR TO
REMAIN.
TELE BATTERIES
012D
Tele ops
WATCH / CMDR.
012B
TOILET
012C
CORRIDOR
012H
WORK ROOM
011D
OPERATIONS
DESK
011C
CORRIDOR
HOLDING CELL
011D
INTERVIEW /
CONFG.
011G
MECHANICAL
011F
EVIDENCE
011B
PROVIDE NEW UPRIGHT FIRE SPRINKLERS, BRANCH
LINES, AND CROSSMAINS AS NECESSARY TO PROVIDE
UPRIGHT FIRE SPRINKLERS. FIRE SPRINKLER HAZARD
CLASSIFICATION SHALL BE LIGHT HAZARD.
Telephone Room 012A
EXISTING 4" FIRE SPRINKLER RISER LOCATION
RELOCATE EXISTING CEILING-MOUNTED SMOKE
DETECTORS TO THE STRUCTURAL DECK UPON REMOVAL
OF THE ACOUSTICAL CEILING.
SD
EXISTING DUCT DETECTOR TO REMAIN.
PROVIDE CLEAN AGENT TYPE:
UL-RATED 2-A: 10-B:C, 10-LB
NOMINAL CAPACITY SURFACE MOUNTED FIRE
EXTINGUISHER.
FEC
EXISTING 2" FIRE SPRINKLER FEEDMAIN.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
THE TELEPHONE ROOM HAS AN EXISTING DROP CEILING THAT IS BEING REMOVED DUE TO THIS SCOPE OF WORK, NEW UPRIGHT
SPRINKLERS ARE REQUIRED TO BE PROVIDED TO MATCH THE DECK HEIGHT ABOVE.
THE CONTRACTOR IS REQUIRED TO PROVIDE A NEW FIRE SPRINKLER LAYOUT, INCLUDING ALL NEW BRANCH LINES, AND SPRINKLERS AS NECESSARY TO CONVERT THE EXISTING PENDENT SPRINKLER SYSTEM TO AN UPRIGHT SPRINKLER SYSTEM WITH A FIRE SPRINKLER HAZARD CLASSIFICATION OF LIGHT HAZARD. THE EXISTING FIRE SPRINKLER LAYOUT MUST BE MODIFIED AS NEEDED FOR
THE NEW CEILING CONFIGURATION AND ANY OBSTRUCTIONS IN ACCORDANCE WITH NFPA 13.
PROVIDE ADDITIONAL SPRINKLER HEADS AND PIPING FOR EXISTING OBSTRUCTIONS AND NEW OBSTRUCTIONS CREATED BY THE MECHANICAL, ELECTRICAL, TELECOMMUNICATION, AND OTHER TRADES SO THAT COMPLIANCE IS MAINTAINED PER THE OBSTRUCTED
CONSTRUCTION REQUIREMENTS OF NFPA 13-2022 CHAPTER 10.
LOCATION AND INSTALLATION OF PIPE SUPPORTS (HANGERS, VERTICAL RESTRAINTS AND GUIDES) MUST MEET THE REQUIREMENTS
OF NFPA 13.
THE EXISTING SPRINKLERS SHALL NOT BE REINSTALLED AFTER REMOVAL.
PROVIDE INTERMEDIATE TEMPERATURE, STANDARD RESPONSE, FUSIBLE LINK SPRINKLERS, AND LISTED MECHANICAL GUARDS.
IT IS NOT PERMITTED TO MIX STANDARD AND QUICK RESPONSE SPRINKLERS WITHIN A COMPARTMENT AS DEFINED BY NFPA 13 SPRINKLER HEAD LAYOUT IS PRELIMINARY ONLY. FINAL DESIGN INCLUDING SPRINKLER LAYOUT AND PIPE SIZING TO BE COMPLETED
BY INSTALLING CONTRACTOR.
THE VA DOES NOT MAINTAIN AS-BUILTS OR SHOP DRAWINGS FOR THIS FIRE SPRINKLER SYSTEM. THE CONTRACTOR SHALL AS-BUILT THE RELEVANT PORTIONS OF THE FIRE SPRINKLER SYSTEM PRIOR TO SUBMITTING SHOP DRAWINGS AND HYDRAULIC
CALCULATIONS.
HYDRAULIC CALCULATIONS TO BE COMPLETED BY INSTALLING CONTRACTOR.
A 10% SAFETY FACTOR MUST BE INCLUDED BY CALCULATING THE DEMAND TO A POINT NO GREATER THAN 10% BELOW THE AVAILABLE WATER SUPPLY CURVE OR SUBTRACT 10% FROM THE AVAILABLE WATER SUPPLY CURVE FOR EACH SPRINKLER DEMAND
INCLUDING THE REQUIRED HOSE STREAMS.
FIRESTOPPING SHALL BE PROVIDED FOR ALL PENETRATIONS OF FIRE-RESISTANT CONSTRUCTION.
A SPRINKLER CABINET IS TO BE PROVIDED WITH THE REQUIRED NUMBER OF SPRINKLER HEADS OF ALL RATINGS AND TYPES INSTALLED, AND A SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER IN ACCORDANCE WITH NFPA 13. LOCATED ADJACENT TO THE
RISER.
INTERRUPTION OF SERVICE: THERE SHALL BE NO INTERRUPTION OF THE EXISTING SPRINKLER PROTECTION, WATER, ELECTRIC, OR
FIRE ALARM SERVICES WITHOUT PRIOR PERMISSION OF THE COR.
CONTRACTOR SHALL DEVELOP AN INTERIM FIRE PROTECTION PROGRAM WHERE INTERRUPTIONS INVOLVE OCCUPIED SPACES.
REQUEST IN WRITING AT LEAST TWO WEEKS PRIOR TO THE PLANNED INTERRUPTION.
ALL DRAINS TO BE PIPED TO THE EXTERIOR OF THE BUILDING. BUILDING DRAINS WILL NOT BE USED.
ALL SPRINKLER PIPING TO BE PAINTED RED.
FIRE SPRINKLER NOTES FOR TELEPHONE ROOM
1.
A.
a.
b.
c.
B.
a.
b.
c.
d.
E.
F.
g.
h.
i.
C.
a.
THE GENERAL SCOPE OF WORK FOR THE FIRE SPRINKLER IMPROVEMENTS INCLUDE:
FOR THE GROUND FLOOR TELECOMMUNICATIONS ROOM
DEMOLISH ALL EXISTING PENDENT FIRE SPRINKLERS, BRANCH LINES AS
NECESSARY TO CONVERT THIS SYSTEM TO UPRIGHT SPRINKLERS WITH
LIGHT HAZARD CLASSIFICATION.
PROVIDE NEW UPRIGHT FIRE SPRINKLERS, BRANCH LINES, AND CROSSMAINS
AS NECESSARY TO PROVIDE UPRIGHT FIRE SPRINKLERS. FIRE SPRINKLER
HAZARD CLASSIFICATION…