Attachment_7-_Bid_Schedule.pdf

PDF 116 KB Posted

Attached to
Replacement of Kettles 7A & 7B
Solicitation number
140FC126R0028
Issued by

About this file

This is a Bids Sheet for the Inks Dam Kettles 7A & 7B construction project. The form requests contractors to provide pricing for 18 line items and associated overhead, profit, bonds, and insurance costs to calculate a total base bid amount. Line items include mobilization and demobilization; demolition of existing kettles; excavation, grading, and fill work; concrete placement including thrust blocks and deadmen; installation of 12-inch PVC drain pipe and 8-inch PVC supply pipes; connection of pipes to existing infrastructure; pressure testing; supply valves (butterfly and gate types); a 12-inch sluice gate assembly; screens and metal grating; guard rails/fencing; materials testing; and excess material hauling. Contractors are required to determine quantities independently from project drawings and specifications, then enter estimated quantities, unit prices, and estimated amounts for each line item. The form includes rows for calculating the subtotal, overhead and profit (OH&P), bonds and insurance, and final base bid total. No estimated quantities are pre-populated, indicating this is an open bid solicitation where contractors must perform their own quantity takeoff.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIDS SHEET

ITEM

NO. COST ITEMS

ESTIMATED

QUANTITY UNIT UNIT PRICE

ESTIMATED

AMOUNT

1 Mobilization & Demobilization Job

2 Demolition Existing Kettles Hrs

3 Excavate & Grade CY

4 Compact Subgrade SF

5 Compacted fill CY

6 Concrete, including thrust blocks & deadmen CY

7 12" PVC Drain Pipe LF

8 Connect Drain Pipe to Existing Job

9 8" PVC Supply Pipes LF

10 Connect Supply Pipe to Existing Job

11 Pressure test pipes Job

12 8" Supply Valves, Butterfly & Gate Ea

13 Sluice Gate Assembly, 12" Ea

14 Screens SF

15 Metal Grating SF

16 Guard Rails/fence LF

17 Materials Testing Days

18 Haul Excess Material CY

Subtotal

OH&P

Bonds & Insurance

BASE BID TOTAL

INKS DAM KETTLES 7A & 7B

Contractor shall take off quantities from drawings and specifications. Provide breakdown of pricing