Attachment 6 - Submittal Register.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Repair Airfield Apron Federal contract opportunity
Solicitation number
FA667521R0016
Issued by
Department of the Air Force Reserve Command

About this file

This solicitation is seeking proposals for the repair and alteration of an airfield apron and associated infrastructure improvements at Naval Air Station Fort Worth Joint Reserve Base in Fort Worth, Texas. Key requirements include temporary fencing and gates, pavement markings, full depth pavement restoration including subgrade work, removal of sun shade structures, stormwater improvements, underground ductbanks, directional borings, temporary and permanent aircraft tie-downs, and environmental protection devices. The solicitation number is FA667521R0016. Proposals are due by July 23, 2021. The contract type will be firm fixed price. This is a 100% small business set-aside being conducted by the Department of the Air Force Reserve Command. The NAICS code is 237310 and size standard is $39.5 million. A site visit will take place on July 7, 2021 and base access requirements are specified.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Airfield Apron, newest first.
File Type Posted
Attachment 2 - Drawings 21JUL21.pdf PDF
Solicitation Amendment FA667521R00160002 SF 30.pdf PDF
Attachment 11 - Questions and Answers 21JUL21.pdf PDF
Attachment 10 - Past Perf Questionnaire 20Jul21.pdf PDF
Solicitation Amendment FA667521R00160001 SF 30.pdf PDF
Attachment 7 - RFI.pdf PDF
Attachment 14 - Site Visit Sign In Sheet.pdf PDF
Attachment 11 - Questions and Answers 19JUL21.pdf PDF
Attachment 3 - Specifications - 15JUL21.pdf PDF
Attachment 2 - Drawings - 15JUL21.pdf PDF
Attachment 3 - Specifications - 15JUL21.pdf PDF
Attachment 12 - Additional Details.pdf PDF
Attachment 11 - Questions and Answers.pdf PDF
Attachment 2 - Drawings - 15JUL21.pdf PDF
Attachment 13 - Utility Site Plan.pdf PDF
Attachment 2 - Drawings - 09JUL21.pdf PDF
Attachment 11 - Questions and Answers.pdf PDF
Site Visit Sign In Sheet - FA667521R0016.pdf PDF
Attachment 1 - CLIN 0002 ID SKETCH.pdf PDF
Attachment 11 - Questions and Answers.pdf PDF
Attachment 2 - Drawings.pdf PDF
Attachment 4 - Geotechnical Engineering Study.pdf PDF
Attachment 1 - CLIN ID SKETCH.pdf PDF
Attachment 10 - Past Perf Questionnaire.pdf PDF
Attachment 8 - AF 3000.pdf PDF
Attachment 7 - RFI Form.pdf PDF
Attachment 5 - Storm Sewer Camera Report.pdf PDF
Attachment 9 - DB Wage Rates 01 Jan 2021 Tarrant County.pdf PDF
Solicitation - FA667521R0016.pdf PDF
Attachment 3 - Specifications.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Navy4288

TITLE:Corrected FinalSUBMITTAL REGISTER
JOB NAME:F-35 Apron Infrastructure Improvements
LOCATION:NAS Ft Worth JRB
CONTRACT NO:Contract #FA667520F0008, Solicitation #FA667520R0008
CONTRACTOR:
CONTRACTOR SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITY
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
LineActivity #Transmittal #Specification SectionSD #Submittal DescriptionItem SubmittedParagraph #Classification: GOVT or A/E ReviewerSubmitApproval Needed ByMaterial Needed ByAction CodeDate Of ActionDate FWD to APPR / Auth Date RCD From CONTRDate FWD To Other RevwrDate RCD From Other ReviewerAction CodeDate Of ActionMailed To CONTR/ Date RCD From APPR AuthorityRemarks
101 11 001Preconstruction SubmittalsScheduleG
201 11 001Preconstruction SubmittalsDig Permits1.6.2G
301 11 001Preconstruction SubmittalsPersonnel Vetting DocumentsG
401 14 001Preconstruction SubmittalsContractor RegulationsG RO
501 14 001Preconstruction SubmittalsTransportation of Personnel, Materials, and EquipmentG RO
601 14 001Preconstruction SubmittalsList of Contact Personnel1.4.1.1G RO
701 14 001Preconstruction SubmittalsPersonnel ListG RO
801 20 00.00 201Preconstruction SubmittalsSchedule of Prices1.3G RO
901 30 001Preconstruction SubmittalsView Location Map1.3
1001 30 001Preconstruction SubmittalsProgress and Completion Pictures1.4
1101 31 23.13 201Preconstruction SubmittalsList of Contractor's Personnel1.4.2G RO
1201 32 01.00 101Preconstruction SubmittalsProject Scheduler Qualifications1.3G
1301 32 01.00 101Preconstruction SubmittalsPreliminary Project Schedule3.4.1G
1401 32 01.00 101Preconstruction SubmittalsInitial Project Schedule3.4.2G
1501 32 01.00 101Preconstruction SubmittalsPeriodic Schedule Update3.6.2G
1601 32 17.00 201Preconstruction SubmittalsBaseline NAS1.2.2G
1701 32 17.00 201Preconstruction SubmittalsConstruction Baseline NASG
1801 32 17.00 201Preconstruction SubmittalsDesignated Project Scheduler1.9G
1901 32 17.00 207CertificatesThree-Week Look Ahead Schedule1.3G
2001 32 17.00 207CertificatesMonthly Network Analysis Updates1.4.1G
2101 32 17.00 2011Closeout SubmittalsAs-Built Schedule1.4.2G
2201 33 001Preconstruction SubmittalsSubmittal Register1.8G
2301 35 261Preconstruction SubmittalsAccident Prevention Plan (APP)1.8G
2401 35 261Preconstruction SubmittalsAPP - Construction1.8.1G
2501 35 266Test ReportsMonthly Exposure Reports1.4
2601 35 266Test ReportsNotifications and Reports1.13
2701 35 266Test ReportsAccident Reports1.13.2G
2801 35 266Test ReportsLHE Inspection Reports1.13.3
2901 35 267CertificatesContractor Safety Self-Evaluation Checklist1.5
3001 35 267CertificatesCrane Operators/Riggers1.7.1.4
3101 35 267CertificatesStandard Lift Plan1.8.3.2G
3201 35 267CertificatesCritical Lift Plan1.8.3.3G
3301 35 267CertificatesActivity Hazard Analysis (AHA)1.9
3401 35 267CertificatesConfined Space Entry Permit1.10.1
3501 45 00.00 101Preconstruction SubmittalsContractor Quality Control (CQC) Plan3.2G
3601 45 00.00 106Test ReportsVerification Statement3.9.2
3701 50 001Preconstruction SubmittalsConstruction Site Plan1.3G
3801 50 001Preconstruction SubmittalsTraffic Control Plan3.4.1G
3901 50 001Preconstruction SubmittalsHaul Road Plan2.2.1G
4001 57 191Preconstruction SubmittalsPreconstruction Survey1.5.1
4101 57 191Preconstruction SubmittalsSolid Waste Management Permit1.9G
4201 57 191Preconstruction SubmittalsRegulatory Notifications1.5.2G
4301 57 191Preconstruction SubmittalsEnvironmental Protection Plan1.6G
4401 57 191Preconstruction SubmittalsStormwater Pollution Prevention Plan3.2.1.1G
4501 57 191Preconstruction SubmittalsStormwater Notice of Intent3.2.1.2G
4601 57 191Preconstruction SubmittalsDirt and Dust Control Plan1.6.8.1G
4701 57 191Preconstruction SubmittalsEmployee Training Records1.5.4G
4801 57 196Test ReportsInspection Reports3.2.1.3
4901 57 196Test ReportsMonthly Solid Waste Disposal Report1.9.1G
5001 57 197CertificatesEmployee Training Records1.5.4G
5101 57 197CertificatesErosion and Sediment Control Inspector1.5.4
5201 57 1911Closeout SubmittalsStormwater Pollution Prevention Plan Compliance Notebook3.2.1.4G
5301 57 1911Closeout SubmittalsStormwater Notice of Termination3.2.1.5G
5401 57 1911Closeout SubmittalsWaste Determination Documentation3.6.1G
5501 57 1911Closeout SubmittalsAssembled Employee Training Records1.5.4G
5601 57 1911Closeout SubmittalsSolid Waste Management Permit1.9G
5701 57 1911Closeout SubmittalsProject Solid Waste Disposal Documentation Report3.6.2.1G
5801 57 1911Closeout SubmittalsRegulatory Notifications1.5.2G
5901 57 1911Closeout SubmittalsContractor Certification3.6.2.1
6001 57 1911Closeout SubmittalsAs-Built Topographic Survey
6101 58 002Shop DrawingsSign PlanG
6201 74 191Preconstruction SubmittalsConstruction Waste Management Plan1.7G
6301 78 0011Closeout SubmittalsAs-Built Drawings3.1G
6401 78 0011Closeout SubmittalsRecord Drawings3.2G
6501 78 0011Closeout SubmittalsAs-Built Record of Materials
6601 78 0011Closeout SubmittalsFinal Approved Shop Drawings
6703 30 001Preconstruction SubmittalsConcrete Curing Plan1.5.3.1G
6803 30 001Preconstruction SubmittalsQuality Control Plan1.5.5G
6903 30 001Preconstruction SubmittalsQuality Control Personnel Certifications1.5.6G
7003 30 001Preconstruction SubmittalsQuality Control Organizational Chart1.5.6G
7103 30 001Preconstruction SubmittalsLaboratory Accreditation1.5.8G
7203 30 001Preconstruction SubmittalsForm Removal Schedule1.5.2.1G
7303 30 001Preconstruction SubmittalsSampling Plan3.3.1.1G
7403 30 002Shop DrawingsReinforcing Steel1.5.2.2G
7503 30 003Product DataJoint SealantsG
7603 30 003Product DataJoint FillerG
7703 30 003Product DataConcrete Curing Materials2.5.1G
7803 30 003Product DataReinforcement2.7G
7903 30 003Product DataAdmixtures2.4.4
8003 30 003Product DataBase Course MaterialG
8103 30 005Design DataConcrete Mix Design1.5.1.1G
8203 30 006Test ReportsFly Ash
8303 30 006Test ReportsPozzolan
8403 30 006Test ReportsSlag Cement
8503 30 006Test ReportsAggregates1.5.4.1G
8603 30 006Test ReportsTolerance Report
8703 30 006Test ReportsCompressive Strength TestsG
8803 30 006Test ReportsSlump Tests3.13.2.1
8903 30 006Test ReportsWater2.4.2
9003 30 007CertificatesReady Mix PlantG
9103 30 007CertificatesField Testing Technician and Testing Agency1.5.6.2
9231 00 001Preconstruction SubmittalsShoring3.2G
9331 00 006Test ReportsTesting3.8
9431 05 224SamplesGeotextiles2.2.1
9531 05 226Test ReportsGeotextiles2.2.1
9631 05 226Test ReportsSite Verification2.2.2
9731 05 227CertificatesGeotextiles2.2.1
9831 05 227CertificatesNeedle Punched Geotextile2.2.1.3
9932 01 11.511Preconstruction SubmittalsSchedule of work1.2G
10032 01 11.511Preconstruction SubmittalsPaint Removal Process Plan3.1G
10132 01 11.511Preconstruction SubmittalsWaste Collection, Identification and Disposal Plan3.4G
10232 01 11.513Product DataMechanical paint removal equipment1.4
10332 01 11.513Product DataChemical paint removal equipment1.5
10432 01 11.513Product DataPaint Removal Detergents or Chemicals2.1G
10532 01 11.516Test ReportsTest Section Results1.6
10632 01 19.613Product DataSealants2.1G
10732 01 19.613Product DataManufacturer's Recommendations3.5.2
10832 01 19.614SamplesSealants2.1
10932 01 19.614SamplesBlocking Media/Backup Materials2.3.1
11032 01 19.614SamplesBacker Rod3.3.4.1
11132 01 19.616Test ReportsSealants2.1
11232 01 19.617CertificatesEquipment List3.1G
11332 01 19.618Manufacturer’s InstructionsSealants2.1G
11432 11 23.236Test ReportsInitial Tests1.4.3.1G
11532 11 23.236Test ReportsIn-Place Tests1.4.3.2G
11632 11 23.236Test ReportsTest Section Construction Report
11732 13 14.133Product DataDowels2.9.1G
11832 13 14.133Product DataDowel Bar Assemblies2.9.2G
11932 13 14.133Product DataEquipment2.11
12032 13 14.133Product DataProposed Techniques3.1.2G
12132 13 14.135Design DataPreliminary Proposed Proportioning2.13.2G
12232 13 14.135Design DataProportioning Studies2.13.2G
12332 13 14.136Test ReportsSampling and Testing2.1.3.1G
12432 13 14.136Test ReportsConcrete TestsG
12532 13 14.137CertificatesLaboratory Accreditation and Validation1.4.2
12632 13 14.137CertificatesCommercial Laboratory1.4.2.3G
12732 13 14.137CertificatesNRMCA Certificate of Conformance2.11
12832 17 233Product DataApplication Equipment List2.1.2G
12932 17 233Product DataExterior Surface Preparation3.2
13032 17 233Product DataWaterborne Paint2.2.1G
13132 17 236Test ReportsWaterborne Paint2.2.1G
13232 17 236Test ReportsTest Reports3.4.1
13332 17 237CertificatesQualifications1.3.2G
13432 17 237CertificatesWaterborne Paint2.2.1
13532 17 237CertificatesVolatile Organic Compound1.3.1G
13632 17 238Manufacturer’s InstructionsWaterborne Paint2.2.1G
13733 05 231Preconstruction SubmittalsBoring Plan1.3G
13833 05 231Preconstruction SubmittalsStatement of Contractor Qualifications1.3G
13933 05 235Design DataAccess Shaft Construction Plan3.1.1G
14033 05 236Test ReportsMonitoring Survey3.5.1.1G
14133 05 238Manufacturer’s InstructionsInstallation3.3G
14233 05 238Manufacturer’s InstructionsSafety Data Sheets1.7.1.2G
14333 05 2311Closeout SubmittalsRecord Drawings3.6.3G
14433 05 2311Closeout SubmittalsDaily Work Logs of installation operations3.6.3G
14533 40 002Shop DrawingsReinforced Concrete PipeG
14633 40 002Shop DrawingsPerforated Drainage PipeG
14733 40 007CertificatesOil Resistant Gasket
14833 40 007CertificatesLeakage Test3.9.1.2
14933 40 007CertificatesHydrostatic Test on Watertight Joints3.9.1.1
15033 40 007CertificatesFrame and Cover for Gratings2.3.4
15133 40 007CertificatesPost-Installation Inspection Report3.9.2.1.2
15233 40 007CertificatesPlacing Pipe3.3
15333 46 164SamplesGeotextile2.2
15433 46 164SamplesPipe and Pipe Fittings2.1
15533 46 166Test ReportsGeotextile JP-4 Fuel Resistance Test2.4.1
15633 46 167CertificatesGeotextile2.2
15733 46 167CertificatesPipe and Pipe Fittings2.1
15833 71 022Shop DrawingsPrecast underground structures1.4.1G
15933 71 023Product DataPrecast concrete structures2.4.1.1G
16033 71 023Product DataSealing Material2.4.1.4
16133 71 023Product DataPulling-In Irons3.2.2
16233 71 023Product DataManhole frames and covers2.4.2G
16333 71 023Product DataFrames and Covers for Airfield Facilities2.4.3G
16433 71 023Product DataCable supports2.5G
16533 71 026Test ReportsField Acceptance Checks and Tests3.6.1G
16633 71 026Test ReportsCable Installation Plan and ProcedureG
16733 71 027CertificatesCable splicer/terminator1.4.2G
16833 71 027CertificatesCable Installer Qualifications1.4.3G
16933 71 027CertificatesCertificate of Conformance1.4.4G
4/7/21 14:55

File details come from the government source that posted it. Updated .