Assumptions Assume all apply but LDs will be revised

01 22 00.00 10 MEASUREMENT AND PAYMENT

01 30 00.00 11 DESCRIPTION OF NEW WORK

01 32 17.00 20 NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00.00 SUBMITTAL PROCEDURES

01 42 00.00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 02.00 11 QUALITY CONTROL SYSTEM (QCS)

01 45 04.00 11 CONTRACTOR QUALITY CONTROL

01 45 35.00 SPECIAL INSPECTIONS

01 57 20.00 11 ENVIRONMENTAL PROTECTION

01 57 25.00 11 STORM WATER POLLUTION PREVENTION PLAN

01 58 01.00 11 PROJECT SIGN

01 78 02.00 10 CLOSEOUT SUBMITTALS

01 78 23.00 OPERATION AND MAINTENANCE DATA

02 87 00.00 FLOOD SEDIMENT REMOVAL Assume no work but for in progress and final cleaning (3.1.1)

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

03 45 33.00 PRECAST PRESTRESSED STRUCTURAL CONCRETE

04 20 00.00 MASONRY Assume installed correctly but for missing PTA 422

05 12 00.00 STRUCTURAL STEEL

05 21 19.00 OPEN WEB STEEL JOIST FRAMING

05 30 00.00 STEEL DECKS

05 50 13.00 MISCELLANEOUS METAL FABRICATIONS

05 50 14.00 STRUCTURAL METAL FABRICATIONS

05 51 00.00 METAL STAIRS

05 51 33.00 METAL LADDERS

05 52 00.00 METAL RAILINGS

06 10 00.00 ROUGH CARPENTRY

06 61 16.00 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

06 73 01.00 FIBERGLASS REINFORCED PLASTIC (FRP) GRATING

07 14 00.00 FLUID-APPLIED WATERPROOFING

07 21 13.00 BOARD AND BLOCK INSULATION

07 22 00.00 ROOF AND DECK INSULATION

07 51 13.00 BUILT-UP ASPHALT ROOFING

07 60 00.00 FLASHING AND SHEET METAL

07 84 00.00 FIRESTOPPING

07 92 00.00 JOINT SEALANTS

07 95 13.00 EXPANSION JOINT COVERS

08 11 13.00 STEEL DOORS AND DOOR FRAMES

08 14 00.00 WOOD DOORS

08 33 23.00 OVERHEAD COILING DOORS

08 34 73.00 SOUND CONTROL DOOR ASSEMBLIES

08 41 13.00 ALUMINUM-FRAMED ENTRANCES AND

08 51 13.00 ALUMINUM WINDOWS

08 71 00.00 DOOR HARDWARE

08 81 00.00 GLAZING

08 91 00.00 METAL WALL LOUVERS Assume all installed and function properly but for the identified deficiencies

Assume all installed and function properly but for the identified deficiencies:

concrete finish.

DIVISION 04 - MASONRY

DIVISION 05 - METALS

Assume all installed and function properly but for the identified deficiencies

Assume Railings in Pump Gallery at El 190 and the interior stairs going to office roof were installed and function properly

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

No Assumptions

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

Assume all installed and function properly but for the identified deficiencies

Division/Spec Section

No Assumptions - Include all in Bid

DIVISION 02 - EXISTING CONDITIONS

DIVISION 01 - GENERAL REQUIREMENTS

DIVISION 03 - CONCRETE

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

No Assumptions

DIVISION 08 - OPENINGS

No Assumptions

DIVISION 09 - FINISHES

09 06 90.00 COLOR SCHEDULE

09 51 00.00 ACOUSTICAL CEILINGS

09 65 00.00 RESILIENT FLOORING

09 90 00.00 PAINTS AND COATINGS Assume paint in Pump Gallery and Office Areas were applied properly

09 97 02.00 PAINTING: HYDRAULIC STRUCTURES Assume all installed and function properly but for the identified deficiencies

10 21 13.00 TOILET COMPARTMENTS

10 28 13.00 TOILET ACCESSORIES

10 44 16.00 FIRE EXTINGUISHERS Assume Installed Cabinets are done correctly

10 71 13.00 EXTERIOR WEATHER CONTROL DEVICES: METAL CANOPY No Assumptions

11 10 00.00 TRANSPORTATION OF GOVERNMENT-FURNISHED EQUIPMENT Assume Complete

11 20 00.00 INSTALLATION OF GOVERNMENT-FURNISHED EQUIPMENT

Assume small pumps are level; Assume sole plates for the large pumps will need to be leveled;

12 32 00.00 MANUFACTURED WOOD CASEWORK No Assumptions

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

13 48 00.00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

14 24 00.00 ELEVATOR: LOW RISE TRACTION Deleted from Contract. See Modification

22 00 00.00 PLUMBING, GENERAL PURPOSE

22 14 29.00 40 SUMP PUMPS

23 00 00.00 AIR SUPPLY, DISTRIBUTION, VENT., & EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 07 00.00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 9.00 METAL-ENCLOSED BUSWAY

26 05 13.00 40 MEDIUM-VOLTAGE CABLES

26 05 19.00 10 INSULATED WIRE AND CABLE

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 18 23.00 40 MEDIUM-VOLTAGE SURGE ARRESTERS

26 19 36.00 MEDIUM-VOLTAGE MOTOR STARTERS

26 20 00.00 INTERIOR DISTRIBUTION SYSTEM

26 24 16.00 40 PANELBOARDS

26 24 19.00 40 MOTOR CONTROL CENTERS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 28 21.00 40 AUTOMATIC TRANSFER SWITCHES

26 32 15.00 10

DIESEL-GENERATOR SET STATIONARY 100-

2500 KW, WITH AUXILIARIES

Assume Equipment will work. No commissioning or testing has occurred

26 41 00.00 40 LIGHTNING PROTECTION SYSTEM No Assumptions

26 42 15.00 10

CATHODIC PROTECTION SYSTEM FOR STEEL

PRESSURE PIPE

Assume Installed and Functions properly

26 51 00.00 40 INTERIOR LIGHTING

26 56 00.00 EXTERIOR LIGHTING

28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE No Assumptions

31 05 19.03 12 GEOTEXTILE SEPARATOR UNDER ROADS

31 23 16.16 11 EXCAVATION, FILL, BACKFILL & EMBANKMENT FOR STRUCTURES

31 23 19.00 11 DEWATERING

32 15 00.00 11 AGGREGATE SURFACE COURSE

32 17 24.00 10 PAVEMENT MARKINGS

32 31 13.00 CHAIN LINK FENCES AND GATES

32 92 19.00 11 SEEDING AND FERTILIZING

33 71 02.00 20 UNDERGROUND ELECTRICAL DISTRIBUTION No Assumptions

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

Earthwork deleted from Contract but for language in Modification.

DIVISION 32 - EXTERIOR IMPROVEMENTS

DIVISION 31 - EARTHWORK

DIVISION 22 - PLUMBING

DIVISION 10 - SPECIALTIES

No Assumptions; some material on site

No Assumptions; some stored material

No Assumptions; some material on site

DIVISION 11 - EQUIPMENT

DIVISION 12 - FURNISHINGS

DIVISION 13 - SPECIAL CONSTRUCTION

No Assumptions

DIVISION 14 - CONVEYING EQUIPMENT

No Assumptions

DIV 23 - HEATING, VENTILATING, & AIR CONDITIONING

Assume the Roof Vents are installed and will function properly. Assume A/C unit on office roof was installed and will function properly, but for identified deficiencies

No Assumptions; some material on site

DIVISION 26 - ELECTRICAL

Exterior Improvements deleted from Contract. See Modification.

DIVISION 33 - UTILITIES

35 20 14.00 STOPLOGS AND TRASHRACKS

35 20 16.53 VERTICAL LIFT GATES

35 20 23.13 11 INLET CHANNEL EXCAVATION

35 31 19.00 11 STONE PROTECTION

40 05 13.96 WELDING PROCESS PIPING

40 05 13.00 PIPELINES, LIQUID PROCESS PIPING

40 95 00.00 PROCESS CONTROL No Assumptions

41 22 13.13 BRIDGE CRANES No Assumptions

1001 MOBILIZATION AND DEMOBILIZATION No Assumptions

1002 ENVIRONMENTAL PROTECTION

1003 STORMWATER POLLUTION PREVENTION

1003AA SILT FENCES / EROSION CONTROL

1003AB CHECK DAMS

1004 CATHODIC PROTECTION Assume Installed and Functions properly

1005 DISCHARGE PIPE AND ACCESSORIES Assume Correct but for deficencies noted

1006 FIBER OPTIC SYSTEM No Assumptions

1007 FENCING Assume Correct but for deficencies noted

1008 THRUST BLOCKS W/PILING Assume Installed and Functions properly

1009 SURGE TANKS AND ACCESSORIES Assume Correct but for deficencies noted

1010 CLEARING AND GRUBBING

1011 EXCAVATION

1012 COMPACTED EMBANKMENT

1013 PIPE BEDDING

1014 AGGREGATE SURFACE COURSE

1015 GEOTEXTILE

1016 TURFING Assume Installed and Functions properly

DIVISION 41-MATERIAL PROCESSING & HANDLING EQUIP.

Assume No Requirements

Assume Installed and Functions properly

Deleted from Contract. See Modification

Assume function properly. Address any deficencies noted.

Deleted from Contract. See Modification

DIVISION 40 - PROCESS INTEGRATION

Assume all installed and function properly but for the identified deficiencies