W912EQ-14-C-0028

(b1eccjle16117)

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The total cost of this contract was increased by $1,490.00 from $25,418,500.00 to $25,419,990.00.

CLIN 0030 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0030 1 Lump Sum Install Emergency Lighting Elevation 150

FFP

Install Emergency Lighting Elevation 150 FOB: Destination

PURCHASE REQUEST NUMBER: W38XGR41129999

NET AMT

ACRN AA

CIN: W38XGR411299990030

The following Acceptance/Inspection Schedule was added for CLIN 0030:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

The following Delivery Schedule item has been added to CLIN 0030:

DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

05-APR-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

W912EQ

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

Accounting and Appropriation

Summary for the Payment Office

As a result of this modification, the total funded amount for this document was increased by from to .

CLIN 0030:

Funding on CLIN 0030 is initiated as follows:

ACRN: AA

CIN: W38XGR411299990030

Acctng Data: 96X88620000 082411 323008383K081266 NA 96401

Increase:

Total:

SECTION SF30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

CW005 EMERG LIGHTING EL 150

A. CHANGE IN BIDDING SCHEDULE

Revised Bidding Schedule

ITEM

NO

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Mobilization and Demobilization

1 Job

0002 Environmental Protection 1 Job

Stormwater Pollution

Prevention $0.00

0003AA

Silt Fence/Erosion

Control Berm

4,000 LF

0003AB Check Dams 25 LF

Transportation of

Government Furnished Equipment

1 Job

Existing Conditions –

Division #2 1 Job

0006 Concrete – Division #3 1 Job 0007 Masonry – Division #4 1 Job 0008 Metals – Division #5 1 Job

Wood, Plastics, and

Composites – Division #6

1 Job

Thermal and Moisture

Protection – Division #7 1 Job

0011 Opening – Division #8 1 Job 0012 Finishes – Division #9 1 Job

Specialties – Division

#10 1 Job

0014 Equipment – Division 1 Job

#11

Furnishings – Division

#12 1 Job

0016 Special Construction 1 Job

Conveying Equipment –

Division #14 1 Job

0018 Plumbing – Division #22 1 Job

Heating, Ventilation and

Air Conditioning – Division #23

1 Job

0020 Electrical – Division #26 1 Job

Electronic Safety and

Security – Division #27 1 Job

Earthwork – Division

#31 1 Job

Exterior Improvements –

Division #32 1 Job

0024 Utilities – Division #33 1 Job

Waterway & Marine –

Division #35 1 Job

Process Integration –

Division #40 1 Job

Material Processing and Handling Equipment –

Division #41 1 Job

Storm Water Pollution

Prevention Plan

1 LF

Chipping Concrete for

Inspection

1 LS

Emergency Lighting

Elevation 150

1 LS

Mobilization and Demobilization

1 Job

1002 Environmental Protection 1 Job

Stormwater Pollution

Prevention

1003AA

Silt Fences/Erosion

Control

2,000 LF

1003AB Check Dams 200 LF 1004 Cathodic Protection 1 Job

Discharge Pipe and

Accessories 1 Job

Fiber Optic System (48

Fiber Count) 1 Job

1007 Fencing 1 Job 1008 Thrust Blocks W/ Piling 2 EA

Surge Tanks and

Accessories

2 EA

1010 Clearing and Grubbing 6 AC

1011 Excavation 30,299.99 CY 1012 Compacted Embankment 33,500 CY 1013 Pipe Bedding 11,120 TN

Aggregate Surface

Course

1,250 TN

1015 Geotextile 2,150 SY 1016 Turfing 6 AC

Total Items 0001 through 1016

B. CHANGE IN CONTRACT PRICE

The total contract price is increased by $1,490.00.

NO

SUPPLIES/SERVICES

CHANGE IN

QUANTITY

UNIT PRICE

CHANGE

AMOUNT

Emergency Lighting Elevation

1 LS

Total Change Amount

C. CHANGE IN CONTRACT DRAWINGS

The contract drawings are not changed as a result of this modification.

It is understood and agreed that the contract drawings affected by this Modification will be updated to reflect as-built conditions necessitated by this change, and that cost for such updates are included within this Modification amount.

D. CHANGE IN CONTRACT SPECIFICATION SECTION 01 22 00.00 10 MEASUREMENT AND

PAYMENT

The following is added in full

1.3 LUMP SUM PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.3.1 Emergency Lighting Elevation 150 (CW005 Line Item 0030)

a. Measurement

No measurement will be made for Emergency Lighting Elevation 150. The contractor shall provide three (3) additional Emergency Lighting Fixtures for the pit area on Elevation 150.

The additional fixtures shall be installed in the same manner as those shown on Drawing E-303 and shall be the same type as originally specified by the contract for the Elevation 173 level.

b. Payment

Payment for Emergency Lighting Elevation 150 as specified in this section will be made at the contract lump sum price for “Emergency Lighting Elevation 150”, which price and payment shall constitute full compensation for furnishing all materials, equipment and labor needed to install the three additional lighting fixtures. This includes all other operations incidental thereto.

c. Unit of Measure, Lump Sum: LS

D. CHANGE IN CONTRACT TIME

The contract completion date shall remain unchanged by this modification.

E. CLOSING STATEMENT

It is understood and agreed that pursuant to the above, the contract time is not affected, and the contract price is increased as stated above, which reflects all credits due the Government and all debits due the contractor. It is further understood and agreed that this adjustment constitutes compensation in full on behalf of the Contractor and its Subcontractors and suppliers for all costs and markps directly or indirectly attributable for the change ordered, for all delays related thereto, for all extended overhead costs and for performance of the change within the timeframe stated.

(End of Summary of Changes)

(b1covcdb16163)

The total cost of this contract was increased by $17,665.00 from $25,418,956.00 to $25,436,621.00.

CLIN 1017 is added as follows:

1017 1 Lump Sum Cathodic Protection Repair - CW004

FFP

Repair of Cathodic Protection System

CIN: W38XGR4112299991017

The following Acceptance/Inspection Schedule was added for CLIN 1017:

The following Delivery Schedule item has been added to CLIN 1017:

DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

05-APR-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

Summary for the Payment Office

CLIN 1017:

Funding on CLIN 1017 is initiated as follows:

ACRN: AA

CIN: W38XGR4112299991017

Acctng Data: 96X88620000 082411 323008383K081266 NA 96401

CATHODIC PROTECTION REPAIR

A. CHANGE IN BIDDING SCHEDULE

Revised Bidding Schedule

NO

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Mobilization and Demobilization

1 Job

0002 Environmental Protection 1 Job

0003AA

Silt Fence/Erosion

Control Berm

4,000 LF

0003AB Check Dams 25 LF

Transportation of

Government Furnished Equipment

1 Job

Existing Conditions –

Division #2 1 Job

0006 Concrete – Division #3 1 Job 0007 Masonry – Division #4 1 Job 0008 Metals – Division #5 1 Job

Wood, Plastics, and

Composites – Division #6

1 Job

Thermal and Moisture

Protection – Division #7 1 Job

0011 Opening – Division #8 1 Job 0012 Finishes – Division #9 1 Job 0013 Specialties – Division 1 Job

#10

Equipment – Division

#11 1 Job

Furnishings – Division

#12 1 Job

0016 Special Construction 1 Job

Conveying Equipment –

Division #14 1 Job

0018 Plumbing – Division #22 1 Job

Heating, Ventilation and

Air Conditioning – Division #23

1 Job

0020 Electrical – Division #26 1 Job

Electronic Safety and

Security – Division #27 1 Job

Earthwork – Division

#31 1 Job

Exterior Improvements –

Division #32 1 Job

0024 Utilities – Division #33 1 Job

Waterway & Marine –

Division #35 1 Job

Process Integration –

Division #40 1 Job

Material Processing and Handling Equipment –

Division #41 1 Job

Storm Water Pollution

Prevention Plan

1 LF

Chipping Concrete for

Inspection

1 LS

Emergency Lighting

Elevation 150

1 LS

Mobilization and Demobilization

1 Job

1002 Environmental Protection 1 Job

Control

2,000 LF

1003AB Check Dams 200 LF 1004 Cathodic Protection 1 Job

Discharge Pipe and

Accessories 1 Job

Fiber Optic System (48

Fiber Count) 1 Job

1007 Fencing 1 Job 1008 Thrust Blocks W/ Piling 2 EA 1009 Surge Tanks and 2 EA

Accessories 1010 Clearing and Grubbing 6 AC 1011 Excavation 30,299.99 CY 1012 Compacted Embankment 33,500 CY 1013 Pipe Bedding 11,120 TN

Aggregate Surface

Course

1,250 TN

1015 Geotextile 2,150 SY 1016 Turfing 6 AC

Cathodic Protection

Repair

CW004

Total Items 0001 through 1017

B. CHANGE IN CONTRACT PRICE

The total contract price is increased by

NO

SUPPLIES/SERVICES

CHANGE IN

QUANTITY

UNIT PRICE

CHANGE

AMOUNT

Cathodic Protection Repair

CW004

Total Change Amount

C. CHANGE IN CONTRACT DRAWINGS

It is understood and agreed that the contract drawings affected by this Modification will be updated to reflect as-built conditions necessitated by this change, and that cost for such updates are included within this Modification amount.

D. CHANGE IN CONTRACT SPECIFICATION SECTION 01 22 00.00 10 MEASUREMENT AND

PAYMENT

The following is added in full

1.3 LUMP SUM PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.3.2 Cathodic Protection Repair (CW004 Line Item 1017)

a. Measurement

No measurement will be made for Cathodic Protection Repair. The contractor shall repair the broken negative wire from Rectifier 1on Segment 1 to the 10 foot diameter discharge pipe that no longer has continuity and replace the damaged terminal blocks in all four (4) Segment #1 cathodic test stations. The contractor shall energize all 3 rectifiers along the length of the discharge pipe, adjust all resistors to obtain proper voltage at all test stations, and submit a report on results and findings. If current resistors are not sufficient to reduce voltage and/or current limits defined in the contract specifications, then new resistors will be added.

b. Payment

Payment for Cathodic Protection Repair as specified in this section will be made at the contract lump sum price for “Cathodic Protection Repair”, which price and payment shall constitute full compensation for furnishing all materials, equipment and labor needed to perform all repairs detailed in CW004 for the Cathodic Protection System. This includes all other operations incidental thereto.

c. Unit of Measure, Lump Sum: LS

It is understood and agreed that pursuant to the above, the contract time is not affected, and the contract price is increased as stated above, which reflects all credits due the Government and all debits due the contractor. It is further understood and agreed that this adjustment constitutes compensation in full on behalf of the Contractor and its Subcontractors and suppliers for all costs and markps directly or indirectly attributable for the change ordered, for all delays related thereto, for all extended overhead costs and for performance of the change within

Digitally signed by

HAMILTON.LOY.A.1230818416

DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=HAMILTON.LOY.A.12308184 Date: 2017.03.28 08:28:06 -05'00'

(b1eccjle17338)

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION SF30 - BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The total cost of this contract was increased by $24,046.00 from $25,436,621.00 to $25,460,667.00.

CLIN 1018 is added as follows:

1018 1 Job

Electrical Conduit to Pump Station

FFP

Electrical Conduit to Pump Station

CIN: W38XGR411299991018

The following Acceptance/Inspection Schedule was added for CLIN 1018:

N/A N/A N/A Government

The following Delivery Schedule item has been added to CLIN 1018:

DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

13-APR-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983 FOB: Destination

W912EQ

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

Summary for the Payment Office

CLIN 1018:

Funding on CLIN 1018 is initiated as follows:

ACRN: AA

CIN: W38XGR411299991018

Acctng Data: 96X88620000 082411 323008383K081266 NA 96401

Increase:

Total:

SECTION SF30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

CP002 ELECTRICAL CONDUIT

A. CHANGE IN BIDDING SCHEDULE

Revised Bidding Schedule

ITEM

NO

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Mobilization and Demobilization

1 Job

0002 Environmental Protection 1 Job

0003AA

Silt Fence/Erosion

Control Berm

4,000 LF

0003AB Check Dams 25 LF

Transportation of

Government Furnished Equipment

1 Job

Existing Conditions –

Division #2 1 Job

0006 Concrete – Division #3 1 Job 0007 Masonry – Division #4 1 Job 0008 Metals – Division #5 1 Job

Wood, Plastics, and

Composites – Division #6

1 Job

Thermal and Moisture

Protection – Division #7 1 Job

0011 Opening – Division #8 1 Job 0012 Finishes – Division #9 1 Job 0013 Specialties – Division 1 Job

#10

Equipment – Division

#11 1 Job

Furnishings – Division

#12 1 Job

0016 Special Construction 1 Job

Conveying Equipment –

Division #14 1 Job

0018 Plumbing – Division #22 1 Job

Heating, Ventilation and

Air Conditioning – Division #23

1 Job

0020 Electrical – Division #26 1 Job

Electronic Safety and

Security – Division #27 1 Job

Earthwork – Division

#31 1 Job

Exterior Improvements –

Division #32 1 Job

0024 Utilities – Division #33 1 Job

Waterway & Marine –

Division #35 1 Job

Process Integration –

Division #40 1 Job

Material Processing and Handling Equipment –

Division #41 1 Job

Storm Water Pollution

Prevention Plan

1 LF

Chipping Concrete for

Inspection

1 LS

Emergency Lighting

Elevation 150

1 LS

Mobilization and Demobilization

1 Job

1002 Environmental Protection 1 Job

Control

2,000 LF

1003AB Check Dams 200 LF 1004 Cathodic Protection 1 Job

Discharge Pipe and

Accessories 1 Job

Fiber Optic System (48

Fiber Count) 1 Job

1007 Fencing 1 Job 1008 Thrust Blocks W/ Piling 2 EA 1009 Surge Tanks and 2 EA

Accessories 1010 Clearing and Grubbing 6 AC 1011 Excavation 30,299.99 CY 1012 Compacted Embankment 33,500 CY 1013 Pipe Bedding 11,120 TN

Aggregate Surface

Course

1,250 TN

1015 Geotextile 2,150 SY 1016 Turfing 6 AC

Cathodic Protection

Repair

CW004

1 LS

Electrical Conduit to

Pump Station

1 LS

Total Items 0001 through 1018

B. CHANGE IN CONTRACT PRICE

The total contract price is increased by .

ITEM

NO

SUPPLIES/SERVICES

CHANGE IN

QUANTITY

UNIT PRICE

CHANGE

AMOUNT

Electrical Conduit to Pump

Station

1 LS

Total Change Amount

C. CHANGE IN CONTRACT DRAWINGS

The contract drawings are not changed as a result of this modification.

It is understood and agreed that the contract drawings affected by this Modification will be updated to reflect as-built conditions necessitated by this change, and that cost for such updates are included within this Modification amount.

D. CHANGE IN CONTRACT SPECIFICATION SECTION 01 22 00.00 10 MEASUREMENT AND

PAYMENT

The following is added in full

1.3 LUMP SUM PAYMENT ITEMS

1.3.2 Electrical Conduit to Pump Station

a. Measurement

No measurement will be made for Electrical Conduit to Pump Station. The contractor shall provide the additional conduit necessary to connect the Entergy provided power pole to the

Contractor provided transformer of approximately 200 LF.

b. Payment

Payment for Electrical Conduit to Pump Station as specified in this section will be made at the contract lump sum price for “Electrical Conduit to Pump Station”, which price and payment shall constitute full compensation for furnishing all materials, equipment and labor needed to install the required conduit. This includes all other operations incidental thereto.

c. Unit of Measure, Lump Sum: LS

D. CHANGE IN CONTRACT TIME

The contract completion date shall remain unchanged by this modification.

E. CLOSING STATEMENT

It is understood and agreed that pursuant to the above, the contract time is not affected, and the contract price is increased as stated above, which reflects all credits due the Government and all debits due the contractor. It is further understood and agreed that this adjustment constitutes compensation in full on behalf of the Contractor and its Subcontractors and suppliers for all costs and markps directly or indirectly attributable for the change ordered, for all delays related thereto, for all extended overhead costs and for performance of the change within

13 Jun 2017

HAMILTON.L

OY.A.1230818

Digitally signed by

HAMILTON.LOY.A.1230818416

DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=HAMILTON.LOY.A.123081841 Date: 2017.06.13 09:32:46 -05'00'

06 Jul 2017

HAMILTON.LOY.A.1230818416

DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=HAMILTON.LOY.A.123081841 Date: 2017.07.06 08:59:27 -05'00'

Provide and install supports for the grate beams at the openings for the small discharge pipe butterfly valves located on EL 190 as detailed in the attached drawing, and provide new grate beams to attach to the supports as shown in the provided drawing. All aspects of this operation shall comply with the applicable contract specifications.

Addition of attached detail modification. The contract time or completion date is not changed as a result of this modification.

In consideration of the modification agreed to herein as complete equitable adjustments for the Contractor's costs for plant, material, labor, equipment, subcontracts, impacts to any other work, overhead and profit associated with the grate supports at El 190 "proposal(s) for adjustment," the Contractor hereby releases the Government from any and all liability under this contract for further equitable adjustments attributable to such facts or circumstances giving rise to the "proposal(s) for adjustment".

WYNNE AREA OFFICE

1932 NORTH FALLS BLVD

WYNNE AR 72396

W38XGR41129999 W912EQ-14-B-0010

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This Contract is for Grand Prairie Pumping Station Superstructure and Installation of Equipment (Base Bid) and Installation of Discharge Pipe Station 13+50 to 22+00 (Optional Work) at Prairie County, Arkansas.

1. Tw o Part Modification, Stoplogs, Part I of II.

Continued on Page 2

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Jul-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code)

9B. DATED (SEE ITEM 11)

X W912EQ-14-C-0028

10B. DATED (SEE ITEM 13)

X

9A. AMENDMENT OF SOLICITATION NO.

15-Sep-2014

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

See Schedule

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

X

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

FAR 52.243.4 CHANGES

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor X is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

P00012

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Jul-2017

CODE

US ARMY ENGINEER DISTRICT, MEMPHIS

167 N MAIN STREET B202

MEMPHIS TN 38103-1894

W912EQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912EQ

HUFFMAN CONSTRUCTION, LLC

JAMES K. HUFFMAN

1450 ROWE PKWY

POPLAR BLUFF MO 63901-1518

FACILITY CODE5B1B6CODE

Loy.A.Hamilton@mvm02.usace.army.milEMAIL:901-544-3851TEL:

LOY A HAMILTON / ADDED BY SUMI

Modification Control Number: b1cow lah17587

P00012

The total cost of this contract was increased by $10,000.00 from $25,499,472.00 to $25,509,472.00.

CLIN 0033 is added as follows:

0033 1 Job Stoplog Modifications

FFP

Two Part Mod

ACRN AB

CIN: W38XGR411299990033

The following Acceptance/Inspection Schedule was added for CLIN 0033:

Summary for the Payment Office

As a result of this modification, the total funded amount for this document was increased by from to .

CLIN 0033:

Funding on CLIN 0033 is initiated as follows:

ACRN: AB

CIN: W38XGR411299990033

Acctng Data: 96X31120000 082411 3230C94LGB081266 NA 96401

CONTINUATION PAGE

A. SCOPE OF WORK

I. This Part I change hereby issues you notice to proceed with the

FABRICATION AND INSTALLATION OF THE SILL PLATES PORTION OF THIS CHANGE

ONLY, prior to full and final Definitization of entire modification described hereafter, effective upon receipt of this change. Details can be found on the revised stoplog sill detail D/S-705, which is part of the change described herein.

A supplemental Part II agreement will be issued to definitize any time and pricing adjustments related to this partial direction to proceed, along with the remaining work associated with the remaining scope of work described below, upon mutual agreement. A 14 day period for submittal of your full proposal of price and time, broken down and itemized as required by Contract Clause 252.236-7000, Modification Proposals - Price Breakdown, to perform the following work will begin upon receipt of this unpriced change order. Failure to submit a proposal within this time frame may result in a unilateral action.

The obligation of the Government for the work under this directive shall not exceed the price stated herein for CLIN 0033.

The “not to exceed” price stated in this modification does not necessarily represent the Government's estimate of the cost of the work to be performed as a result of this modification, but is merely an amount administratively obligated so that work can proceed.

DEFINITIZATION SCHEDULE

Proposal Receipt - July 28, 2017 Finalize Negotiations - August 18, 2017 Issuance of Definitization of Modification - August 25, 2017

II. Description of Change:

Pursuant to the clause of this contract entitled, "Changes", the contractor shall furnish all plant, labor, and material, and perform all work necessary to accomplish the following:

Modification to this contract is necessary to provide for fabrication, delivery, installation, and trial operation of new stoplogs and lifting beams, new sill plates at El 143, and additions to the current storage rack. This work includes but is not limited to changes in the specifications and contract drawings, fabrication, delivery, and trial operation of the new stoplogs and lifting beams, new sill plates at El 143, and additions to the current storage rack.

B. CHANGE IN DRAWINGS

1. The current plan set of the Grand Prairie Pumping Station project shall be modified to add the following sheets:

S-704R - STOP LOGS STRUCTURAL NOTES

S-705R - STOP LOGS - LARGE BAYS - ELEVATIONS AND SECTIONS

S-706R - STOP LOGS - SMALL BAYS - ELEVATIONS AND SECTIONS

S-707R - STOP LOG SECTIONS

S-708R - STOP LOGS - MISCELLANEOUS DETAILS

S-709R - LIFTING BEAM STRUCTURAL NOTES

S-710R - LIFTING BEAM - LARGE BAYS - SECTIONS AND DETAILS

S-711R - LIFTING BEAM - SMALL BAYS - SECTIONS AND DETAILS

S-712R - LIFTING BEAM - SECTIONS AND DETAILS

S-705 shall be renamed to S-713 AND DETAIL D REPLACED BY ATTACHED DETAIL

2. The current plan set of the Grand Prairie Pumping Station project shall be modified to delete the following sheets and details:

S-704 - STRUCTURAL - STOP LOG - DETAILS I

WHEEL DETAIL ON S-705

WHEEL BOLT DETAIL ON S-705

PLAN - PUMP INTAKE STOPLOG (TYP) DETAIL ON S-705

DELETE ANY REFERENCE TO STOPLOG STRUCTURE SHOWN IN DETAIL A ON S-705

REPLACE S-1307 WITH S-1307R

It is understood and agreed that the contract drawings affected by this Modification will be updated to reflect as-built conditions necessitated by this change, and that cost for such updates are included within the Modification amount.

C. CHANGE IN CONTRACT SPECIFICATIONS

Specs will be revised as a result of this change.

The performance duration of the overall contract shall remain 1,263 calendar days, as established by Modification P00008. Additional contract time may be added upon final Definitization of this modification, if required.

Your proposal shall be submitted to this office within 14 calendar days of the date this SF30 is executed by the Government. Your legal completion date for this contract has not been changed as a result of this change. Your work schedule and proposal should be prepared accordingly. The obligation of the Government for this change is as stated and is subject to further negotiation. This change will be formalized by a subsequent PART II Supplemental Agreement signed by the Contracting Officer containing the final price and time adjustment, as well as additional details of the change if required.

2 REQ'D. (SMALL BAYS)

4 REQ'D. (LARGE BAYS)

D STOP LOG SILL DETAIL

S-705

M

IN

5/16 TYP

WITH STD. HEX. NUTS AND WASHERS

2 - 3/4"Ø ANCHOR BOLTS @ 3'-0" O.C.

V E

R

IF

Y

F

IE

L D

10'-2" (SMALL BAYS)

16'-8" (LARGE BAYS)

3/8" x 7" C.R.S. FLAT BAR

10'-2" (SMALL BAYS)

W5 x 16 x 16'-8" (LARGE BAYS)

AFTER SEAL PLATE HAS BEEN ALIGNED

FILL EXISTING POCKET WITH CONCRETE

FIELD VERIFY

1/4

2 - 13/16"Ø HOLES

PL 3" x 6" x 3/8" WITH

2 3/4"

EL. 143.81

EXPOXY OR EQUIVALENT (TYP)

ANCHORS SPACED AT 24" O.C. USING SIMPSON AT-XP

" Ø NELSON DEFORMED BAR4

3DRILL AND EXPOXY

11"

SPACED AT 24" O.C.

" DEFORMED BAR ANCHORS OR EQUAL4

OVER EXISTING SEAL PLATE USING NELSON

" GALVANIZED STEEL PLATE2

1INSTALL NEW

SCALE: NOT TO SCALE

(b1eccslr17646)

The total cost of this contract was increased by from to

CLIN 0034 is added as follows:

0034 1 Job Motor Oil Transportation and Handling

FFP

CIN: W38XGR411299990034

The following Acceptance/Inspection Schedule was added for CLIN 0034:

The following Delivery Schedule for CLIN 0034 has been added:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

Summary for the Payment Office

CLIN 0034:

Funding on CLIN 0034 is initiated as follows:

ACRN: AB

CIN: W38XGR411299990034

Acctng Data: 96X31120000 082411 3230C94LGB081266 NA 96401

A. SCOPE OF WORK

Drain oil from each of the Government furnished motors prior to transportation from the storage area (approximately 1000 gallons). Oil shall be drained into containers normally used to store/transport oil.

Transport oil to the pump station with the motors, and then pump from the containers into the motors. Pump shall have a screw, car-type oil filter in the discharge line to filter oil. A new filter shall be used for each motor. Containers used to transport oil will become property of the Government and left onsite at the pump station in a location determined by the Contracting Officer’s Representative.

B. CHANGE IN CONTRACT DRAWINGS

The contract specifications are not changed as a result of this

The contract completion date shall remain unchanged by this modification.

It is understood and agreed that pursuant to the above, the contract time is not affected, and the contract price is increased as stated above, which reflects all credits due the Government and all debits due the Contractor. It is further understood and agreed that this adjustment constitutes compensation in full on behalf of the Contractor and its Subcontractors and Suppliers for all costs and markups directly or indirectly attributable for transportation and handling of the motor oil including draining, tranporting, filtering, and reintroducing, for all delays related thereto, for all extended overhead costs, and for performance of the change within the time frame stated.

18 Sep 2017

HAMILTON.LOY.A.1230818416

DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=HAMILTON.LOY.A.1230818416 Date: 2017.09.18 13:30:41 -05'00'

Clean and prepare exterior concrete surface of the pumpstation wall along Grid Line 4 from underside of the bridge deck to the Formed Suction Intake. Apply a waterproof coating such as MasterSeal 581 or approved equal. Cleaning, preparation, and application to be done in accordance with the manufacturer's instructions.

The contract completion date shall be extended by 52 calendar days by reason of this modification. The time for completion of this contract is extended 52 calendar days from 1,329 calendar days, as established by Modification No. P00013, to 1,381 calendar days. The contract completion date is extended from 18 June 2018, as established by Modification No.P00013, to 09 August 2018.

It is understood and agreed that pursuant to the above, the contract time is extended 52 calendar days, and the contract price is increased which reflects all credits due the Government and all debits due the Contractor. It is further understood and agreed that this adjustment constitutes compensation in full on behalf of the Contractor and its Subcontractors and Suppliers for all costs and markups directly or indirectly attributable to waterproofing, for all delays related thereto, for all extended overhead costs, and for performance of the change within the time frame stated.

(b1eccslr1828)

The total cost of this contract was increased by from to

The contractor period of performance end date has increased by 127 days from 1413 days to 1540 days.

CLIN 0036 is added as follows:

Stoplog Modification Part 2 of 2

FFP

SUBCLIN 0036AA is added as follows:

0036AA 1 Job Stoplog Modification Part 2 of 2 Federal

FFP

CIN: W38XGR411299990036AA

SUBCLIN 0036AB is added as follows:

0036AB 1 Job Stoplog Modification Part 2 of 2 Non-Fed

FFP

CIN: W38XGR411299990036AB

The following Acceptance/Inspection Schedule was added for CLIN 0036:

N/A N/A N/A N/A

The following Acceptance/Inspection Schedule was added for SUBCLIN 0036AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0036AB:

The following Delivery Schedule item for CLIN 0001 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

To:

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0002 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for SUBCLIN 0003AA has been changed from:

CAGE

18-JUN-2018 4,000 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

15-JAN-2019 4,000 WYNNE AREA OFFICE

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for SUBCLIN 0003AB has been changed from:

CAGE

18-JUN-2018 25 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 25 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0004 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0005 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0006 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0007 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0008 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0009 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0010 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0011 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0012 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0013 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0014 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0015 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0016 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0017 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0018 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0019 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0020 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0021 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0022 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0023 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0024 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0025 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0026 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0027 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0028 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0029 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0030 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0031 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0032 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule for CLIN 0033 has been added:

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0034 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 0035 has been changed from:

09-AUG-2018 1 WYNNE AREA OFFICE

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule for SUBCLIN 0036AA has been added:

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule for SUBCLIN 0036AB has been added:

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 1001 has been changed from:

18-JUN-2018 1 WYNNE AREA OFFICE

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 1002 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for SUBCLIN 1003AA has been changed from:

18-JUN-2018 2,000 WYNNE AREA OFFICE

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 2,000 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for SUBCLIN 1003AB has been changed from:

CAGE

18-JUN-2018 200 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 200 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 1004 has been changed from:

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 1005 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 1006 has been changed from:

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 1007 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 1008 has been changed from:

18-JUN-2018 2 WYNNE AREA OFFICE

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 2 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 1009 has been changed from:

CAGE

18-JUN-2018 2 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 2 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 1010 has been changed from:

18-JUN-2018 6 WYNNE AREA OFFICE

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 6 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 1011 has been changed from:

CAGE

18-JUN-2018 30,299 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 30,299 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 1012 has been changed from:

18-JUN-2018 33,500 WYNNE AREA OFFICE

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 33,500 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 1013 has been changed from:

CAGE

18-JUN-2018 11,120 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 11,120 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 1014 has been changed from:

18-JUN-2018 1,250 WYNNE AREA OFFICE

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1,250 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 1015 has been changed from:

CAGE

18-JUN-2018 2,150 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 2,150 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 1016 has been changed from:

18-JUN-2018 6 WYNNE AREA OFFICE

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 6 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 1017 has been changed from:

CAGE

18-JUN-2018 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

The following Delivery Schedule item for CLIN 1018 has been changed from:

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

CAGE

15-JAN-2019 1 WYNNE AREA OFFICE

LOY A. HAMILTON

1932 NORTH FALLS BLVD

WYNNE AR 72396

870-238-7983

Summary for the Payment Office

As a result of this modification, the total funded amount for this document was increased by from to .

SUBCLIN 0036AA:

Funding on SUBCLIN 0036AA is initiated as follows:

ACRN: AB

CIN: W38XGR411299990036AA

Acctng Data: 96X31120000 082411 3230C94LGB081266 NA 96401

Increase:

Total:

SUBCLIN 0036AB:

Funding on SUBCLIN 0036AB is initiated as follows:

ACRN: AA

CIN: W38XGR411299990036AB

Acctng Data: 96X88620000 082411 323008383K081266 NA 96401

A. SCOPE OF WORK

CP008-2 Stoplogs Two Part Mod

This Contract modification finalizes part one, Modification P00012.

Pursuant to the clause of this contract entitled, "Changes", the contractor shall furnish all plant, labor, and material, and perform all work necessary to accompl0ish the attached scope. This work includes but is not limited to changes in the specifications and contract drawings, fabrication, delivery, and trial operation of the new stoplogs and lifting beams, and new sill plates at El 143.

In addition to the attached scope, remove the existing storage rack steel and cut off the embedded bolts. The steel will remain the property of the Government and be stored with the old Stoplogs. Provide a quantity of 60, 4x4 pressure treated timbers 4.5' long. The Stoplogs will be stored horizontal on the remaining, existing concrete pad with the skin plate side up using 5 timbers as spacers between each. Provide four (4) Crosby G-213 (2 ton) Shackles (or approved equal), four (4) 7/16" Diameter 6x19 Galvanized Wire Ropes (at least 5 ft in length), four (4) Heavy duty thimbles for wire ropes, and four (4) Steel Sleeves for wire ropes. When placing into and removing from the stored position, the shackles will be attached to the lifting pins on the lifting beam. One end of the wire rope is attached to the pin of the shackle, while the other end is attached to the lifting hook.

B. CHANGE IN CONTRACT DRAWINGS

1. The current plan set of the Grand Prairie Pumping Station project shall be modified to add the following sheets:

S-704R - STOP LOGS STRUCTURAL NOTES

S-705R - STOP LOGS - LARGE BAYS - ELEVATIONS AND SECTIONS

S-706R - STOP LOGS - SMALL BAYS - ELEVATIONS AND SECTIONS

S-707R - STOP LOG SECTIONS

S-708R - STOP LOGS - MISCELLANEOUS DETAILS

S-709R - LIFTING BEAM STRUCTURAL NOTES

S-710R - LIFTING BEAM - LARGE BAYS - SECTIONS AND DETAILS

S-711R - LIFTING BEAM - SMALL BAYS - SECTIONS AND DETAILS

S-712R - LIFTING BEAM - SECTIONS AND DETAILS

S-705 shall be renamed to S-713 AND DETAIL D REPLACED BY ATTACHED

DETAIL

2. The current plan set of the Grand Prairie Pumping Station project shall be modified to delete the following sheets and details:

S-704 - STRUCTURAL - STOP LOG - DETAILS I

WHEEL DETAIL ON S-705

WHEEL BOLT DETAIL ON S-705

PLAN - PUMP INTAKE STOPLOG (TYP) DETAIL ON S-705

DELETE ANY REFERENCE TO STOPLOG STRUCTURE SHOWN IN DETAIL A ON S-705

It is understood and agreed that the contract drawings affected by this Modification will be updated to reflect as-built conditions necessitated by this change, and that cost for such updates are included within the Modificaiton amount.

The current specifications of the Grand Prairie Pumping Station project shall be modified as described in the attached scope.

The contract completion date shall be extended by 127 calendar days by reason of this modification.

The time for completion of this contract is extended 127 calendar days from 1413 calendar days, as established by Modification No. P00016, to 1540 calendar days. The contract completion date is extended from 10 September 2018, as established by Modification No.P00016, to 15 January 2019.

It is understood and agreed that pursuant to the above, the contract time is extended 127 calendar days, and the contract price is increased as indicated above, which reflects all credits due the Government and all debits due the Contractor related to fabrication, delivery, trial operation, and storage of the new stoplogs and installation of the sill plates.