This document is a Statement of Work (SOW) Appendix A containing project overview maps for the Mount Rainier National Park Longmire Conduit Installation Project managed by the National Park Service. The project maps are detailed geographical representations of the conduit installation work across three main sections within the Longmire area of the park.
The project encompasses the installation of conduit systems connecting multiple locations, organized into three primary sections: Section 1 runs from L-216 (Emergency Operations Center) to L-678 (Water Lab); Section 2 extends from L-678 (Water Lab) to L-006 (Community Building); and Section 3 connects L-006 (Community Building) to Vault 8 at the Water Plant Road Intersection. The work involves installing new 1x3-inch conduit across paved, gravel, and transitional surfaces, as well as maintaining existing 1x2-inch conduit sections. Eight vaults (handholes) are identified across the project area, with Vaults 1, 2, 3, 5, and 7 being existing structures and Vaults 4, 6, and 8 being new installations or requiring updates. A 1x2-inch stub-up at the Water Lab (L-678) connects to the existing 2-inch water supply line at the Water Plant, located approximately 50 to 100 feet away. The maps indicate the specific conduit types, paths through roads and trails, and the locations of Longmire structures, trees, and campground features throughout the installation route.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L-209
L-229
L-154
L-138
L-202
L-205
L-210
L-214
L-101
L-006
L-215
L-201
L-211 L-212
L-119
L-136
L-135 L-155
L-236
L-118
L-203
L-208
L-213
L-221
L-678
L-120
L-010
L-207
L-159
L-206
L-216
L-678
1x2" Stub-up at Water Lab (L678)
Connect to Existing 2" to Water Plant
(approx 50-100 feet)
Section 3 (new
1x3")
Section 2 (new 1x3")
Section 1 (new 1x3")
Section 2 (existing 1x2")
Existing path to Water Plant
Vault 1 (existing, EOC)
Vault 2 (RoadBore
West)
Vault 3 (RoadBore East)
Vault 4 (Water Lab)
Vault 5 (Bridge South)
Vault 6 (unknown location)
Vault 7 (existing, Community Building)
Vault 8 (new)
Microsoft, Vantor, Park Tiles Team
Legend
Handholes Existing Handhole
New Handhole
Conduit Path 1x3" Conduit - NEW
1x2" Conduit -
EXISTING
1x2" Conduit - NEW
Trees
Longmire Structures
Roads and Paths
TYPE
Path Path
Road Road
Trails
Section 1 Section 2
Section 3
National Park Service Mount Rainier National Park Longmire Conduit Installation Project
SOW APPENDIX A
PROJECT OVERVIEW MAP
L-209
L-119
L-136
L-155
L-118
L-208
L-678
L-207
L-206
L-216
1x2" Stub-up at Water Lab (L678)
Section 2 (new 1x3")
Section 1 (new 1x3")
Section 1 (new 1x3")
Vault 1 (existing, EOC)
Vault 2 (RoadBore West)
Vault 3 (RoadBore East)
Vault 4 (Water Lab)
Microsoft, Vantor, Park Tiles Team
Legend
Handholes Existing Handhole
New Handhole
Conduit Path 1x3" Conduit - NEW
1x2" Conduit -
EXISTING
1x2" Conduit - NEW
Trees
Longmire Structures
Roads and Paths
TYPE
Path Path
Road Road
Trails
National Park Service Mount Rainier National Park Longmire Conduit Installation Project
SOW APPENDIX A - PROJECT MAP
SECTION 1: L-216 (EOC) to L-678 (Water Lab)
Paved
Paved Gravel
L-678
1x2" Stub-up at Water Lab (L678)
Section 2 (existing 1x2")
Section 1 (new 1x3")
Section 2 (new 1x3")
Section 2 (new 1x3")
Section 2 (new 1x3")
Vault 4 (Water Lab)
Vault 5 (Bridge South)
Vault 6 (unknown location)
Microsoft, Vantor, Park Tiles Team
Longmire Suspension Bridge
Legend
Handholes Existing Handhole
New Handhole
Conduit Path 1x3" Conduit - NEW
1x2" Conduit -
EXISTING
1x2" Conduit - NEW
Trees
Longmire Structures
Roads and Paths
TYPE
Path Path
Road Road
Trails
National Park Service Mount Rainier National Park Longmire Conduit Installation Project
SOW APPENDIX A - PROJECT MAP
SECTION 2A: L-678 (Water Lab) to L-006 (Community Building)
Paved
Paved
Gravel
Transition Under Bridge
L-229
L-138
L-210
L-006
L-236
L-213
L-010 L-216
Section 2 (new 1x3")
Section 3 (new 1x3")
Section 2 (existing 1x2")
Section 2 (existing 1x2")
Vault 6 (unknown location)
Vault 7 (existing, Community Building)
Microsoft, Vantor, Park Tiles Team
Legend
Handholes Existing Handhole
New Handhole
Conduit Path 1x3" Conduit - NEW
1x2" Conduit -
EXISTING
1x2" Conduit - NEW
Campground Features Fire Pit Fire Pit
Food Storage Food Storage
Hydrants Hydrants
Picnic Tables Picnic Tables
Trash Cans Trash Cans
Water Spigots Water Spigots
Trees
Longmire Structures
Roads and Paths
TYPE
Path Path
Road Road
Trails
National Park Service Mount Rainier National Park Longmire Conduit Installation Project
SOW APPENDIX A - PROJECT MAP
SECTION 2B: L-678 (Water Lab) to L-006 (Community Building)
Paved
Paved
L-006
Connect to Existing 2" to Water Plant
(approx 50-100 feet)
Section 2 (existing 1x2")
Existing path to Water Plant
Section 3 (new 1x3")
Section 3 (new 1x3")
Vault 7 (existing, Community Building)
Vault 8 (new)
Microsoft, Vantor, Park Tiles Team
Legend
Handholes Existing Handhole
New Handhole
Conduit Path 1x3" Conduit - NEW
1x2" Conduit -
EXISTING
1x2" Conduit - NEW
Trees
Longmire Structures
Roads and Paths
TYPE
Path Path
Road Road
Trails
National Park Service Mount Rainier National Park Longmire Conduit Installation Project
SOW APPENDIX A - PROJECT MAP
SECTION 3: L-006 (Community Building) to Vault 8 (Water Plant Road Intersection)
| Project Overview Map |
| Project Layout - Section 1 |
| Project Layout - Section 2A |
| Project Layout - Section 2B |
| Project Layout - Section 3 |
File details come from the government source that posted it. Updated .