Attachment 6 Price Proposal Template 80KSC024R0010-Draft.xlsx
XLSX spreadsheet 198 KB Posted
- Attached to
- Draft Request For Proposal (DRFP) for NASA Agency-wide Supply of Liquid and Gaseous Helium
- Solicitation number
- 80KSC024R0010
About this file
This is a draft price proposal template spreadsheet attached to a pre-solicitation notice for NASA's Agency-wide Supply of Liquid and Gaseous Helium contract (Solicitation #80KSC024R0010).
The template is associated with a requirement to supply helium to multiple NASA facilities including Columbia Scientific Balloon Facilities (CA, TX, NM, OR), Glenn Research Center, Goddard Space Flight Center, Jet Propulsion Laboratory, Johnson Space Center, Kennedy Space Center, Langley Research Center, Michoud Assembly Facility, Marshall Space Flight Center, Stennis Space Center, and White Sands Test Facility. While no proposals are being requested at this time, NASA is holding a virtual pre-solicitation conference on December 6, 2024 at 11:00 AM ET (registration required by December 5). Industry comments on the draft RFP are due by December 12, 2024 at 4:30 PM ET and should be submitted via email to KSC-Helium-Info@mail.nasa.gov.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover Sheet
Instructions
NASA Agency-wide Supply of Gaseous and Liquid Helium Pricing Template Instructions:
General Instructions:
1. The price template instructions listed below are provided to assist the Offeror in completing each worksheet tab. The Offeror will be responsible for submitting a complete and mathematically accurate file submission to the Government.
2. The Offeror shall complete Attachment 2 Gaseous and Liquid Helium Price Proposal Template in the native format. The Offeror shall comply with the instructions contained within the pricing template “Instruction” tab. The pricing template Unit Prices shall include all fixed, variable, and incremental costs to refine and prepare product for Government inspection and acceptance.
3. The potential Gaseous and Liquid Helium Ordering Periods are Five years, which consists of two base period years and three one-year option periods as follows: Base Period 1: 10/01/25 - 09/30/26; Base Period 2: 10/01/26 - 09/30/27; Option Period 1: 10/01/27-09/30/28; Option Period 2: 10/01/28-09/30/29: and Option Period 3: 10/01/29-09/30/30
4. The Excel workbook provided by the Government contains formulas (cells with white background) to accurately summarize the Offeror inputs for evaluation purposes.
5 For the complete name and location (city and state) for each delivery location acronymn listed in this template see Section 2.8 of the SF 1449 - Continuation page-DRAFT.
| Pricing Template Preparation by Worksheet Tab: (Green font denotes worksheet tab Offeror input is required) | |
| Cover Sheet | |
| Instructions | |
| Helium Price | |
| Delivery Charge | |
| Other Pricing | |
| Total Evaluated Price Summary |
Each Offeror shall develop and complete the following worksheet tabs [Helium Price, Delivery Charge and Other Pricing]. Keep all added data within the table so that the summary table will populate all of the proposed information.
| 1. | Helium Price |
| The Offeror shall provide the Helium Unit Product Price to the Government for each contract year [Base Period 1, Base Period 2, and Option Period 1, 2, and 3] for each CLIN proposed in rows highlighted in green. The CLIN is where "X" represents the location. Total Estimated Product Price (white rows) will automatically populate and no Offeror input or modifications are required. |
| 2. | Delivery Charge |
| The Offeror shall provide the proposed price for Delivery Charge per truck/tanker/trailer for Brackets 1-10 for each proposed CLIN highlighted in green. The Offeror shall include all fixed, variable, and incremental costs to deliver the product to the location specified on the tab for Government inspection and acceptance. Bracket 5 will be used for evaluation purposes.The Government will utilize the proposed price for Bracket 5 on the "Delivery Charge" tab for all five years. Bracket 5 was selected for use based on the Government’s analysis of historical retail on-highway diesel fuel prices. The Government will multiply the Best Estimated Delivery Quantity per Year by the proposed price for Bracket 5 ($3.76-$4.25) from the "Delivery Charge" to arrive at the Total Estimated Annual Delivery Price. |
| 3. | Other Pricing: |
| The Offeror shall provide the Helium Unit Product Price to the Government for each contract year [Base Period 1, Base Period 2, and Option Period 1, 2, and 3] for each CLIN proposed in rows highlighted in green. The CLIN is where "X" represents the location. Total Estimated Product Price (white rows) will automatically populate and no Offeror input or modifications are required. |
| 4. | Total Evaluated Price Summary: |
| No Offeror input or modifications are required for this tab. This tab summarizes the Offerors proposed unit prices by Location for Base Period 1, Base Period 2 and Option Period 1, 2, and 3. The summarized data that populates the summary table on this tab will be pulled from each of the green highlighted rows from: [Helium Price, Delivery Charge and Other Pricing]. |
Helium Price
| SOLICITATION 80KSC024R0010-DRAFT |
| Gaseous and Liquid Helium Price |
| Offeror | |||||||||||||||||||
| Offerors shall review Instructions Tab in this Price Proposal Template. Columns A- N will be incorporated into Contract Section 2.2 upon award. | |||||||||||||||||||
| CLIN Base = 00X Option 1 = 10X | Delivery Location | Container | Unit of Measure | Base Period 1 Government Provided BEQ (10/01/25 - 09/30/26) CLIN 00X | Base Period 2 Government Provided BEQ (10/01/26 - 09/30/27) CLIN 00X | Option 1 Government Provided BEQ (10/01/27 - 09/30/28) CLIN 10X | Option 2 Government Provided BEQ (10/01/28 - 09/30/29) CLIN 10X | Option 3 Government Provided BEQ (10/01/29 - 09/30/30) CLIN 10X | Base Period 1 Product Unit Price to the Government (10/01/25 - 09/30/26) CLIN 00X | Base Period 2 Product Unit Price to the Government (10/01/26 - 09/30/27) CLIN 00X | Option Period 1 Product Unit Price to the Government (10/01/27 - 09/30/28) CLIN 10X | Option Period 2 Product Unit Price to the Government (10/01/28 - 09/30/29) CLIN 20X | Option Period 3 Product Unit Price to the Government (10/01/29 - 09/30/30) CLIN 30X | Base Period 1 Estimated Total Price to the Government (10/01/25 - 09/30/26) CLIN 00X | Base Period 2 Estimated Total Price to the Government (10/01/26 - 09/30/27) CLIN 00X | Option Period 1 Estimated Total Price to the Government (10/01/27 - 09/30/28) CLIN 10X | Option Period 2 Estimated Total Price to the Government (10/01/28 - 09/30/29) CLIN 20X | Option Period 3 Estimated Total Price to the Government (10/01/29 - 09/30/30) CLIN 30X | Total Estimated Price to the Government (10/01/25 - 09/30/30) |
| 1 | CSBF TX | Trailer | Scf | 640,000 | 640,000 | 640,000 | 640,000 | 640,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2 | CSBF TX | Dewar | Liter | 7,500 | 7,500 | 7,500 | 7,500 | 7,500 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 3 | CSBF NM | Trailer | Scf | 2,400,000 | 1,920,000 | 1,280,000 | 1,280,000 | 1,280,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 4 | CSBF NM | Dewar | Liter | 12,000 | 12,000 | 12,000 | 12,000 | 12,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 5 | CSBF CA | ISO | Scf | 960,000 | 960,000 | 960,000 | 960,000 | 960,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 6 | CSBF OR | Trailer | scf | 160,000 | 480,000 | 1,120,000 | 1,120,000 | 1,120,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 7 | CSBF OR | Dewar | Liter | 0 | 0 | 3,000 | 3,000 | 6,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 8 | CCSFS (SLC-41) | Tanker | Liter | 440,000 | 440,000 | 440,000 | 440,000 | 440,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 9 | GRC-LF | Trailer | Scf | 490,000 | 490,000 | 490,000 | 490,000 | 490,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 10 | GRC-ATF | Trailer | Scf | 440,000 | 770,000 | 440,000 | 440,000 | 440,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 11 | GSFC | Dewar | Liter | 7,000 | 7,000 | 7,000 | 7,000 | 7,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 12 | JPL | Trailer | Scf | 0 | 0 | 40,000 | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 13 | JPL | Dewar | Liter | 5,500 | 6,000 | 6,500 | 7,000 | 7,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 14 | JSC | Trailer | Scf | 360,000 | 360,000 | 360,000 | 360,000 | 360,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 15 | KSC | Dewar | Liter | 1,400 | 1,400 | 1,400 | 1,400 | 1,400 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 16 | LaRC | Dewar | Liter | 600 | 600 | 600 | 600 | 600 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 17 | MSFC | Trailer | Scf | 4,500,000 | 4,500,000 | 4,500,000 | 4,500,000 | 4,500,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 18 | MSFC | Dewar | Liter | 650 | 650 | 650 | 650 | 650 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 19 | MAF | Trailer | Scf | 540,000 | 360,000 | 720,000 | 540,000 | 540,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 20 | MAF | Dewar | Liter | 40,000 | 40,000 | 40,000 | 40,000 | 40,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 21 | SSC | Trailer | Scf | 9,000,000 | 5,940,000 | 5,940,000 | 5,940,000 | 5,940,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 22 | WSTF | Trailer | Scf | 1,140,000 | 1,140,000 | 1,140,000 | 1,140,000 | 1,140,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Delivery Charge
| SOLICITATION 80KSC024R0010- DRAFT | |||||||||||||||||||||||
| Gaseous and Liquid Helium Delivery Charge | |||||||||||||||||||||||
| Prices proposed in Bracket 5 ($3.76-$4.25) will be utilized for evaluation purposes | |||||||||||||||||||||||
| Offeror | 0 | Delivery Charge by Diesel Fuel Threshold | |||||||||||||||||||||
| Offerors shall review Instructions Tab in this Price Proposal Template. The Columns A- R will be incorporated into Contr Delivery Charges Contract Section 2.3 - Delivery Charge upon award. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | |||||||||||||
| CLIN Base = 00X Option 1 = 10X | Delivery Location | Unit of Measure | Base Period 1 Government Provided BEQ (10/01/25 - 09/30/26) CLIN 00X | Base Period 2 Government Provided BEQ (10/01/26 - 09/30/27) CLIN 00X | Option Period 1 Government Provided BEQ (10/01/27 - 09/30/28) CLIN 10X | Option Period 2 Government Provided BEQ (10/01/28 - 09/30/29) CLIN 20X | Option Period 3 Government Provided BEQ (10/01/29 - 09/30/30) CLIN 30X | $0.00-$2.25 | $2.26-$2.75 | $2.76-$3.25 | $3.26-$3.75 | $3.76-$4.25 | $4.26-$4.75 | $4.76-$5.25 | $5.26-$5.75 | $5.76-$6.25 | $6.26-$6.75 | Base Period 1 Estimated Total Price to the Government (10/01/25 - 09/30/26) CLIN 00X | Base Period 2 Estimated Total Price to the Government (10/01/26 - 09/30/27) CLIN 00X | Option Period 1 Estimated Total Price to the Government (10/01/27 - 09/30/28) CLIN 10X | Option Period 2 Estimated Total Price to the Government (10/01/28 - 09/30/29) CLIN 20X | Option Period 3 Estimated Total Price to the Government (10/01/29 - 09/30/30) CLIN 20X | Total Estimated Price to the Government (10/01/25 - 09/30/30) |
| 1 | CSBF TX | Trailer | 4 | 4 | 4 | 4 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2 | CSBF TX | Dewar | 3 | 3 | 3 | 3 | 3 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 3 | CSBF NM | Trailer | 15 | 12 | 8 | 8 | 8 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 4 | CSBF NM | Dewar | 3 | 3 | 3 | 3 | 3 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 5 | CSBF CA | ISO | 6 | 6 | 6 | 6 | 6 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 6 | CSBF OR | Trailer | 1 | 3 | 7 | 7 | 7 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 7 | CSBF OR | Dewar | 0 | 0 | 2 | 2 | 3 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 8 | CCSFS (SLC-41) | Tanker | 11 | 11 | 11 | 11 | 11 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 9 | GRC-LF | Trailer | 5 | 5 | 5 | 5 | 5 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 10 | GRC-ATF | Trailer | 2 | 4 | 2 | 2 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 11 | GSFC | Dewar | 25 | 25 | 25 | 25 | 25 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 12 | JPL | Trailer | 0 | 0 | 1 | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 13 | JPL | Dewar | 50 | 50 | 50 | 50 | 50 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 14 | JSC | Trailer | 2 | 2 | 2 | 2 | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 15 | KSC | Dewar | 5 | 5 | 5 | 5 | 5 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 16 | LaRC | Dewar | 4 | 4 | 4 | 4 | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 17 | MSFC | Trailer | 30 | 30 | 30 | 30 | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 18 | MSFC | Dewar | 5 | 5 | 5 | 5 | 5 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 19 | MAF | Trailer | 3 | 2 | 4 | 3 | 3 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 20 | MAF | Dewar | 12 | 12 | 12 | 12 | 12 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 21 | SSC | Trailer | 50 | 33 | 33 | 33 | 33 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 22 | WSTF | Trailer | 13 | 13 | 13 | 13 | 13 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Other Pricing
| SOLICITATION 80KSC024R00010- DRAFT |
| Other Pricing |
| Offeror | 0 | ||||||||||||||
| Offerors shall reveiw the Instructions Tab in this Price Proposal Template. Columns A-E and Columns F-J will be incorporated into Contract Section 4 upon award. | |||||||||||||||
| CLIN Base = 00X Option 1 = 10X | Delivery Location | Description | Unit of Measure | Government Provided BEQ Each Period | Base Period 1 Government Provided BEQ (10/01/25 - 09/30/26) CLIN 00X | Base Period 2 Government Provided BEQ (10/01/26 - 09/30/27) CLIN 00X | Option Period 1 Government Provided BEQ (10/01/27 - 09/30/28) CLIN 10X | Option Period 2 Government Provided BEQ (10/01/28 - 09/30/29) CLIN 20X | Option Period 3 Government Provided BEQ (10/01/29 - 09/30/30) CLIN 20X | Base Period 1 Estimated Total Price to the Government (10/01/25 - 09/30/26) CLIN 00X | Base Period 2 Estimated Total Price to the Government (10/01/26 - 09/30/27) CLIN 00X | Option Period 1 Estimated Total Price to the Government (10/01/27 - 09/30/28) CLIN 10X | Option Period 2 Estimated Total Price to the Government (10/01/28 - 09/30/29) CLIN 20X | Option Period 3 Estimated Total Price to the Government (10/01/29 - 09/30/30) CLIN 30X | Estimated Total Price to the Government (10/01/29 - 09/30/30) |
| 1 | CSBF TX | Jumbo (160+ msfc) Trailer Rental | Price Per day | 28 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 1 | CSBF TX | Inability to Accept Delivery | Price Per Mile | 650 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 1 | CSBF TX | One Way Mileage | Price Per Mile | 1,300 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 1 | CSBF TX | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 1 | CSBF TX | Trailer Purge | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 1 | CSBF TX | Demurrage | Price Per Hr | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total CSBF TX | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 2 | CSBF TX | 500 Liter Dewar Rental | Price Per day | 105 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2 | CSBF TX | Inability to Accept Delivery | Price Per Mile | 650 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2 | CSBF TX | One Way Mileage | Price Per Mile | 650 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2 | CSBF TX | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2 | CSBF TX | 500 Liter Dewar Cool Down | Price Per Occurrence | 3 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2 | CSBF TX | Demurrage | Price Per Hr | 3 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total CSBF TX | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 3 | CSBF NM | Jumbo (160+msfc) Trailer Rental | Price Per day | 70 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 3 | CSBF NM | Inability to Accept Delivery | Price Per Mile | 1,450 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 3 | CSBF NM | One Way Mileage | Price Per Mile | 1,450 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 3 | CSBF NM | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 3 | CSBF NM | Trailer Purge | Price Per Occurrence | 3 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 3 | CSBF NM | Demurrage | Price Per Hr | 10 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total CSBF NM | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 4 | CSBF NM | 500 Liter Dewar Rental | Price Per day | 168 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 4 | CSBF NM | Inability to Accept Delivery | Price Per Mile | 725 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 4 | CSBF NM | One Way Mileage | Price Per Mile | 725 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 4 | CSBF NM | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 4 | CSBF NM | 160/500 Liter Dewar Cool Down | Price Per Occurrence | 5 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 4 | CSBF NM | Demurrage | Price Per Hr | 3 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total CSBF NM | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 5 | CSBF CA | ISO Container Rental | Price Per day | 4,380 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 5 | CSBF CA | ISO Trailer Rental | Price Per day | 42 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 5 | CSBF CA | ISO Purge | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 5 | CSBF CA | Inability to Accept Delivery | Price Per Mile | 1,200 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 5 | CSBF CA | One Way Mileage | Price Per Mile | 1,200 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 5 | CSBF CA | Tube removal/replace | Price Per Tube | 6 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 5 | CSBF CA | ISO Module Mobilization | Price Per event | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 5 | CSBF CA | Demurrage | Price Per Hr | 6 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total CSBF CA | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 6 | CSBF OR | Jumbo (160+msfc) Trailer Rental | Price Per day | 35 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 6 | CSBF OR | Inability to Accept Delivery | Price Per Mile | 400 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 6 | CSBF OR | One Way mileage | Price Per Mile | 800 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 6 | CSBF OR | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 6 | CSBF OR | Trailer Purge | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 6 | CSBF OR | Demurrage | Price Per Hr | 5 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total CSBF OR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 7 | CSBF OR | 500 Liter Dewar Rental | Price Per day | 35 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 7 | CSBF OR | Inability to Accept Delivery | Price Per Mile | 400 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 7 | CSBF OR | One Way Mileage | Price Per Mile | 400 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 7 | CSBF OR | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 7 | CSBF OR | 500 Liter Dewar Cool Down | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 7 | CSBF OR | Demurrage | Price Per Hr | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total CSBF OR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 8 | CCSFS (SLC-41) | Driver Delay/Demurrage | Hrs | 11 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 8 | CCSFS (SLC-41) | Tanker Rental | Days | 77 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 8 | CCSFS (SLC-41) | Inability to Accept Delivery | Occurances | 3,200 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 8 | CCSFS (SLC-41) | One Way Mileage | Miles | 35,200 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 8 | CCSFS (SLC-41) | Emergency Delivery | Occurances | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 8 | CCSFS (SLC-41) | Tanker Cooldown | Occurances | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total CCSFS (SLC- 41) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 9 | GRC-LF | Jumbo (160+msfc) Trailer Rental | Price Per day | 7 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 9 | GRC-LF | Non-Jumbo (<160 msfc) Trailer Rental | Price Per day | 7 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 9 | GRC-LF | Inability to Accept Delivery | Price Per Mile | 300 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 9 | GRC-LF | One Way Mileage | Price Per Mile | 300 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 9 | GRC-LF | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 9 | GRC-LF | Trailer Purge | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 9 | GRC-LF | Demurrage | Price Per Hr | 5 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total GRC-LF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 10 | GRC-ATF | Jumbo (160+msfc) Trailer Rental | Price Per day | 120 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 10 | GRC-ATF | Non-Jumbo (<160 msfc) Trailer Rental | Price Per day | 7 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 10 | GRC-ATF | Inability to Accept Delivery | Price Per Mile | 500 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 10 | GRC-ATF | One Way Mileage | Price Per Mile | 1000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 10 | GRC-ATF | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 10 | GRC-ATF | Trailer Purge | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 10 | GRC-ATF | Demurrage | Price Per Hr | 5 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total GRC-ATF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 11 | GSFC | 60 Liter Dewar Rental | Price Per day | 14 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 11 | GSFC | 100 Liter Dewar Rental | Price Per day | 840 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 11 | GSFC | 250 Liter Dewar Rental | Price Per day | 14 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 11 | GSFC | 350 Liter Dewar Rental | Price Per day | 14 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 11 | GSFC | 500 Lite Dewar Rental | Price Per day | 28 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 11 | GSFC | Inability to Accept Delivery | Price Per Mile | 360 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 11 | GSFC | One Way Mileage | Price Per Mile | 360 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 11 | GSFC | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 11 | GSFC | Dewar Cool Down | Price Per Occurrence | 5 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 11 | GSFC | Demurrage | Price Per Hr | 5 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total GSFC | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 12 | JPL | Jumbo (160+msfc) Trailer Rental | Price Per day | 3 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 12 | JPL | Inability to Accept Delivery | Price Per Mile | 60 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 12 | JPL | One Way Mileage | Price Per Mile | 60 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 12 | JPL | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 12 | JPL | Trailer Purge | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 12 | JPL | Demurrage | Price Per Hr | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total JPL | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 13 | JPL | 30 Liter Dewar Rental | Price Per day | 14 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 13 | JPL | 60 Liter Dewar Rental | Price Per day | 7 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 13 | JPL | 100 Liter Dewar Rental | Price Per day | 7 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 13 | JPL | 250 Liter Dewar Rental | Price Per day | 14 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 13 | JPL | Inability to Accept Delivery | Price Per Mile | 60 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 13 | JPL | One Way Mileage | Price Per Mile | 60 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 13 | JPL | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 13 | JPL | Dewar Cool Down | Price Per Occurrence | 5 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 13 | JPL | Demurrage | Price Per Hr | 5 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total JPL | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 14 | JSC | Jumbo (160+msfc) Trailer Rental | Price Per day | 14 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 14 | JSC | Non-Jumbo (<160 msfc) Trailer Rental | Price Per day | 7 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 14 | JSC | Inability to Accept Delivery | Price Per Mile | 80 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 14 | JSC | One Way Mileage | Price Per Mile | 80 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 14 | JSC | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 14 | JSC | Trailer Purge | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 14 | JSC | Demurrage | Price Per Hr | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total JSC | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 15 | KSC | 100 Liter Dewar Rental | Price Per day | 14 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 15 | KSC | 500 Liter Dewar Rental | Price Per day | 28 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 15 | KSC | Inability to Accept Delivery | Price Per Mile | 50 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 15 | KSC | One Way mileage | Price Per Mile | 100 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 15 | KSC | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 15 | KSC | 100/500 Liter Dewar Cool Down | Price Per Occurrence | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 15 | KSC | Demurrage | Price Per Hr | 3 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total KSC | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 16 | LaRC | 100 Liter Dewar Rental | Price Per day | 84 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 16 | LaRC | Inability to Accept Delivery | Price Per Mile | 550 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 16 | LaRC | One Way Mileage | Price Per Mile | 300 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 16 | LaRC | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 16 | LaRC | 60/100 Liter Dewar Cool Down | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 16 | LaRC | Demurrage | Price Per Hr | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total LaRC | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 17 | MSFC | Jumbo (160+msfc) Trailer Rental | Price Per day | 150 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 17 | MSFC | Non-Jumbo (<160 msfc) Trailer Rental | Price Per day | 7 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 17 | MSFC | Inability to Accept Delivery | Price Per Mile | 460 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 17 | MSFC | One Way Mileage | Price Per Mile | 460 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 17 | MSFC | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 17 | MSFC | Trailer Purge | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 17 | MSFC | Demurrage | Price Per Hr | 120 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total MSFC | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 18 | MSFC | 100 Liter Dewar Rental | Price Per day | 120 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 18 | MSFC | 250 Liter Dewar Rental | Price Per day | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 18 | MSFC | Inability to Accept Delivery | Price Per Mile | 460 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 18 | MSFC | One Way Mileage | Price Per Mile | 460 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 18 | MSFC | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 18 | MSFC | 100/250 Liter Dewar Cool Down | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 18 | MSFC | Demurrage | Price Per Hr | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total MSFC | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 19 | MAF | Jumbo (160+msfc) Trailer Rental | Price Per day | 365 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 19 | MAF | Non-Jumbo (<160 msfc) Trailer Rental | Price Per day | 7 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 19 | MAF | Inability to Accept Delivery | Price Per Mile | 650 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 19 | MAF | One Way Mileage | Price Per Mile | 650 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 19 | MAF | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 19 | MAF | Trailer Purge | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 19 | MAF | Demurrage | Price Per Hr | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total MAF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 20 | MAF | 500 Liter Dewar Rental | Price Per day | 7 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 20 | MAF | Inability to Accept Delivery | Price Per Mile | 650 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 20 | MAF | One Way Mileage | Price Per Mile | 650 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 20 | MAF | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 20 | MAF | 500 Liter Dewar Cool Down | Price Per Occurrence | 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 20 | MAF | Demurrage | Price Per Hr | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total MAF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 21 | SSC | Jumbo (160+msfc) Trailer Rental | Price Per day | 5 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 21 | SSC | Non-Jumbo (<160 msfc) Trailer Rental | Price Per day | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 21 | SSC | Inability to Accept Delivery | Price Per Mile | 600 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 21 | SSC | One Way Mileage | Price Per Mile | 600 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 21 | SSC | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 21 | SSC | Trailer Purge | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 21 | SSC | Demurrage | Price Per Hr | 3 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total SSC | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 22 | WSTF | Jumbo (160+msfc) Trailer Rental | Price Per day | 90 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 22 | WSTF | Non-Jumbo (<160 msfc) Trailer Rental | Price Per day | 7 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 22 | WSTF | Inability to Accept Delivery | Price Per Mile | 1100 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 22 | WSTF | One Way Mileage | Price Per Mile | 2720 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 22 | WSTF | Emergency Delivery | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 22 | WSTF | Trailer Purge | Price Per Occurrence | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 22 | WSTF | Demurrage | Price Per Hr | 20 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total WSTF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Total Evaluated Price Summary
| SOLICITATION 80KSC024R0010 - DRAFT |
| Total Evaluated Price Summary |
| Offeror | 0 | |||||||
| Offeror shall review Instructions tab in this proposal template. This tab is for evaluation purposes only and will not be incorporated into the contract upon award. | ||||||||
| CLIN | Delivery Location | Period of Performance | Total Estimated Price For Evaluation Purposes | |||||
| 1 | CSBF TX | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 1 | CSBF TX | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 1 | CSBF TX | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 1 | CSBF TX | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 1 | CSBF TX | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total CSBF TX | $0.00 | 13 | ||||||
| 2 | CSBF TX | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 2 | CSBF TX | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 2 | CSBF TX | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 2 | CSBF TX | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 2 | CSBF TX | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total CSBF TX | $0.00 | 20 | ||||||
| 3 | CSBF NM | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 3 | CSBF NM | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 3 | CSBF NM | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 3 | CSBF NM | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 3 | CSBF NM | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total CSBF NM | $0.00 | 27 | ||||||
| 4 | CSBF NM | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 4 | CSBF NM | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 4 | CSBF NM | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 4 | CSBF NM | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 4 | CSBF NM | Option Period 3 10/01/29 - 09/30/30 | $0.00 | DC | ||||
| Total CSBF NM | $0.00 | 34 | O | I | S | K | ||
| 5 | CSBF CA | Base Period 1 10/01/25 - 09/30/26 | $0.00 | P | J | T | L | |
| 5 | CSBF CA | Base Period 2 10/01/26 - 09/30/27 | $0.00 | Q | K | U | M | |
| 5 | CSBF CA | Option Period 1 10/01/27 - 09/30/28 | $0.00 | R | L | V | N | |
| 5 | CSBF CA | Option Period 2 10/01/28 - 09/30/29 | $0.00 | S | M | W | O | |
| 5 | CSBF CA | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total CSBF CA | $0.00 | 43 | ||||||
| 6 | CSBF OR | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 6 | CSBF OR | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 6 | CSBF OR | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 6 | CSBF OR | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 6 | CSBF OR | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total CSBF OR | $0.00 | 50 | ||||||
| 7 | CSBF OR | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 7 | CSBF OR | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 7 | CSBF OR | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 7 | CSBF OR | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 7 | CSBF OR | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total CSBF OR | $0.00 | 57 | ||||||
| 8 | CCSFS (SLC-41) | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 8 | CCSFS (SLC-41) | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 8 | CCSFS (SLC-41) | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 8 | CCSFS (SLC-41) | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 8 | CCSFS (SLC-41) | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total CCSFS (SLC-41) | $0.00 | 64 | ||||||
| 9 | GRC-LF | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 9 | GRC-LF | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 9 | GRC-LF | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 9 | GRC-LF | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 9 | GRC-LF | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total GRC-LF | $0.00 | 72 | ||||||
| 10 | GRC-ATF | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 10 | GRC-ATF | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 10 | GRC-ATF | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 10 | GRC-ATF | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 10 | GRC-ATF | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total GRC-ATF | $0.00 | 80 | ||||||
| 11 | GSFC | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 11 | GSFC | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 11 | GSFC | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 11 | GSFC | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 11 | GSFC | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total GSFC | $0.00 | 91 | ||||||
| 12 | JPL | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 12 | JPL | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 12 | JPL | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 12 | JPL | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 12 | JPL | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total JPL | $0.00 | 98 | ||||||
| 13 | JPL | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 13 | JPL | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 13 | JPL | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 13 | JPL | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 13 | JPL | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total JPL | $0.00 | 108 | ||||||
| 14 | JSC | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 14 | JSC | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 14 | JSC | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 14 | JSC | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 14 | JSC | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total JSC | $0.00 | 116 | ||||||
| 15 | KSC | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 15 | KSC | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 15 | KSC | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 15 | KSC | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 15 | KSC | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total KSC | $0.00 | 124 | ||||||
| 16 | LaRC | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 16 | LaRC | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 16 | LaRC | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 16 | LaRC | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 16 | LaRC | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total LaRC | $0.00 | 131 | ||||||
| 17 | MSFC | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 17 | MSFC | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 17 | MSFC | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 17 | MSFC | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 17 | MSFC | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total MSFC | $0.00 | 139 | ||||||
| 18 | MSFC | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 18 | MSFC | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 18 | MSFC | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 18 | MSFC | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 18 | MSFC | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total MSFC | $0.00 | 147 | ||||||
| 19 | MAF | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 19 | MAF | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 19 | MAF | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 19 | MAF | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 19 | MAF | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total MAF | $0.00 | 155 | ||||||
| 20 | MAF | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 20 | MAF | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 20 | MAF | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 20 | MAF | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 20 | MAF | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total MAF | $0.00 | 162 | ||||||
| 21 | SSC | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 21 | SSC | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 21 | SSC | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 21 | SSC | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 21 | SSC | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total SSC | $0.00 | 170 | ||||||
| 22 | WSTF | Base Period 1 10/01/25 - 09/30/26 | $0.00 | |||||
| 22 | WSTF | Base Period 2 10/01/26 - 09/30/27 | $0.00 | |||||
| 22 | WSTF | Option Period 1 10/01/27 - 09/30/28 | $0.00 | |||||
| 22 | WSTF | Option Period 2 10/01/28 - 09/30/29 | $0.00 | |||||
| 22 | WSTF | Option Period 3 10/01/29 - 09/30/30 | $0.00 | |||||
| Total WSTF | $0.00 | 178 |
&"Times New Roman,Regular"
Microsoft_Word_Document.docx
NASA Agency-wide
Supply of Gaseous and Liquid Helium
Solicitation #
80KSC024R0010 - DRAFT
Attachment 6
Price Proposal Template image1.emf
File details come from the government source that posted it. Updated .