ATTACHMENT 6 MODERNIZATION DRAWINGS SET 2.pdf
PDF 34 MB Posted
- Attached to
- BARC Elevator Assessment and Modernization Federal contract opportunity
- Solicitation number
- 12305B24R0033
About this file
This document is a set of modernization drawings related to a federal contract opportunity for the Elevator Modernization at the Beltsville Agricultural Research Center (BARC) in Beltsville, MD. The associated federal contract opportunity, Solicitation 12305B24R0033, is a Request for Proposals (RFP) issued by the United States Department of Agriculture (USDA) Agricultural Research Service (ARS) Northeast Area. The requirement is for elevator modernization at the BARC facility, with a construction magnitude between $1,000,000 to $5,000,000. The period of performance is 275 days for one elevator or 520 days if multiple elevators are awarded, with the start of each additional elevator overlapping the previous by 2 months. The solicitation is a total small business set-aside with NAICS code 238290. Offerors are encouraged to attend a site visit on August 8, 2024 to observe existing conditions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BARC Elevator Assessment and Modernization QA_8.22.pdf | ||
| 12305B24R0033_amendment 001.pdf | ||
| ATTACHMENT 5 BARC DESIGN ANALYSIS.pdf | ||
| ATTACHMENT 7 MODERNIZATION SPECIFICATIONS 2.pdf | ||
| ATTACHMENT 1 Site Investigation Report R.pdf | ||
| ATTACHMENT 4 MODERNIZATION SPECIFICATIONS.pdf | ||
| 12305B24R0033_SOLICITATION.pdf | ||
| ATTACHMENT 9 Davis Bacon Act WD_MD20240054.pdf | ||
| ATTACHMENT 8 SOW_BARC Elevator Modernization.pdf | ||
| ATTACHMENT 3 MODERNIZATION DRAWINGS.pdf | ||
| ATTACHMENT 2 BARC Map.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIRD FLOOR PLAN
SCALE: 1/16"=1'-0"
PLAN
NORTH
M-105
0' 2' 4' 8' 12'
SCALE: 1/4"=1'-0"
ELEVATOR MACHINE ROOM
SCALE: 1/4"=1'-0"
PLAN
NORTH
M-105
M-105
ELEVATOR
ELEVATOR EQUIPMENT
0' 48'
SCALE: 1/16"=1'-0"
16'8' 32'
PPM
REVISIONS
DESCRIPTION
SHEET
DATE
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
SUSDA
BY
OF
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
EPM
USDA ARS
NORTHEAST AREA
BELTSVILLE, MARYLAND
Agricultural
Service Research
USDA AGRICULTURAL RESEARCH SERVICE
BELTSVILLE AGRICULTURAL RESEARCH CENTER (BARC)
ELEVATOR MODERNIZATION - BELTSVILLE, MD
SME
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
P.A.
FIRMJohnson-McAdamsTHE
CLR
JGM
7523-A
--- 04/30/24
DATE
PROJECT NO.
A-E FIRM
ELEVATOR 005 | BUILDING 007 | #1
MECHANICAL PLAN
M-105
IDU-5
1. ALL PENETRATIONS OF FLOORS, WALLS, AND
CEILING FOR REFRIGERANT PIPING AND
CONTROLS WIRING SHALL BE SEALED WITH
2-HOUR MINIMUM FIRESTOPPING.
GENERAL NOTES
1. INSTALL CONDENSING UNIT IN EXISTING
MECHANICAL ROOM.
2. INSTALL WALL-MOUNTED UNIT 6'-8" ABOVE
FINISH FLOOR.
KEYED NOTES
EXIST.
SERVICE SINK
ROUTE 3/4" CONDENSATE ALONG EXISTING
I-BEAM BEFORE ROUTING DOWN WALL TO
CONNECTION TO EXISTING SANITARY PIPING.
CU-5
LEGEND:
POINT OF CONNECTION
THERMOSTAT
PPM
REVISIONS
DESCRIPTION
SHEET
DATE
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
SUSDA
BY
OF
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
EPM
USDA ARS
NORTHEAST AREA
BELTSVILLE, MARYLAND
Agricultural
Service Research
USDA AGRICULTURAL RESEARCH SERVICE
BELTSVILLE AGRICULTURAL RESEARCH CENTER (BARC)
ELEVATOR MODERNIZATION - BELTSVILLE, MD
SME
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
P.A.
FIRMJohnson-McAdamsTHE
CLR
JGM
7523-A
--- 04/30/24
DATE
PROJECT NO.
A-E FIRM
BUILDING 007 MECHANICAL DETAILS
M-501
MIN
MIN
3.5"
2" MIN
6.5"
DRAIN PAN
UNION
PITCH DOWN TOWARD FLOOR
DRAIN. SPILL AT FLOOR DRAIN.
UNION FOR DRAINING
CLEAN OUT
DRAIN LINE SHALL BE AT LEAST THE
SAME SIZE AS THE NIPPLE ON THE
DRAIN PAN. SEE PLANS FOR SIZES.
SCALE:
CONDENSATE DRAIN P-TRAP DETAIL
NOT TO SCALE
M-501
PLAN
ELEVATION
SCALE:
DUCTLESS WALL MOUNT UNIT DETAIL
NOT TO SCALE
M-501
BACK LEFT PIPE
BOTTOM LEFT
PIPE
BACK RIGHT
PIPE
BOTTOM RIGHT
PIPE
GROUNDING TERMINAL
AIR OUTLET
PIPING AND WIRING INTAKE
DRAIN HOSE
LIQUID PIPE
GAS PIPE
LEFT SIDE PIPE
CONNECTION
HOLE
FRONT GRILLE
PIPING AND WIRING INTAKE
3-1/8Ø HOLE
FULL OPEN FRONT PANEL
FIELD INSTALLED
CONDENSATE PUMP
EQUAL TO
RECTORSEAL 83939
FIELD INSTALLED
CONDENSATE PUMP
EQUAL TO
RECTORSEAL 83939
GROUNDING TERMINAL
POWER CORD ROUTING HOLE
(KNOCK-OUT
HOLE)
SCALE:
CONDENSING UNIT DETAIL
NOT TO SCALE
M-501
CONCRETE PAD (MIN. 6" THICK
AND MIN. 6" WIDER THAN
EQUIPMENT EACH END AND 12"
WIDER FRONT AND BACK)
REFRIGERANT PIPING
1/2" CHAMFER
ALL SIDES
WALL COVER INLET FASTENED TO
WALL PER MANUFACTURER'S
INSTALLATION INSTRUCTIONS
REFRIGERANT PIPING AND
WIRING INSTALLED IN LINE SET
COVER
WALL COVER BASE WITH TOP PVC
COVER REMOVED
COUPLINGS USED TO
LENGTHEN AND EXTEND
TUBES (TYP.)
OUTDOOR PVC (WEATHER AND
UV RESISTANT) LINE SET
COVERING SECURED TO
BUILDING EXTERIOR WALL PER
MANUFACTURER'S INSTALLATION
INSTRUCTIONS
90 DEGREE ELBOWS AS
REQUIRED (TYP.)
END SOCKET USED TO
ACCOMMODATE VARIOUS LINE
SET COMBINATIONS. ROUTE TO
WITH 12" OF OUTDOOR
CONDENSING UNIT.
REFRIGERANT PIPING AND
WIRING TO OUTDOOR
CONDENSING UNIT.
SCALE:
TYPICAL REFRIGERANT PIPING LINE SET
OUTSIDE INSTALLATION DETAIL
NOT TO SCALE
M-501
CONCRETE PAD (MIN. 6" THICK
AND MIN. 6" WIDER THAN
EQUIPMENT EACH END AND 12"
WIDER FRONT AND BACK)
NOTE:
INSULATE ALL CONDENSATE PIPING.
PPM
REVISIONS
DESCRIPTION
SHEET
DATE
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
SUSDA
BY
OF
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
EPM
USDA ARS
NORTHEAST AREA
BELTSVILLE, MARYLAND
Agricultural
Service Research
USDA AGRICULTURAL RESEARCH SERVICE
BELTSVILLE AGRICULTURAL RESEARCH CENTER (BARC)
ELEVATOR MODERNIZATION - BELTSVILLE, MD
SME
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
P.A.
FIRMJohnson-McAdamsTHE
CLR
JGM
7523-A
--- 04/30/24
DATE
PROJECT NO.
A-E FIRM
BUILDING 007 MECHANICAL
SCHEDULES AND CONTROLS
DIAGRAM
M-601
INDOOR HVAC UNIT SCHEDULE
MARK
ELEVATOR
MACHINE ROOM
SERVED
BASIS OF DESIGN
SYSTEM
TYPE
NOMINAL
TONNAGE TYPE OUTDOOR
UNIT
SUPPLY FAN
AIR FLOW RATE
(CFM)
COOLING CAPACITY DIMENSIONS
H x W x D
(INCHES)
WEIGHT
(LB) NOTES
MANUFACTURER MODEL NO. TOTAL
BTU/HR
SENSIBLE
BTU/HR
ENTERING AIR
DB (°F ) WB (°F )
IDU-5 005 DAIKIN FTKB09AXVJU 1 ZONE
MINISPLIT 0.75 WALL MOUNT CU-5 330 8,800 7,165 80 67 11-11/16 x 35-1/16 x
8-1/4 20 ALL
AIR-COOLED CONDENSING UNIT SCHEDULE
MARK
BASIS OF DESIGN
SYSTEM
TYPE
NOMINAL
TONNAGE
COOLING CAPACITY REFRIGERANT DATA SYSTEM ELECTRICAL DATA
DIMENSIONS
HxWxD
(INCHES)
WEIGHT
(LB) SEER / EER NOTES
MANUFACTURER MODEL
NO. BTU/HR
AMBIENT
DESIGN
DRY BULB
(°F)
TYPE
FACTORY
CHARGE
(LB)
ADD'L
CHARGE
(LB)
VOLTAGE MCA MOP
CU-5 DAIKIN RKB09AXVJU 1 ZONE
MINISPLIT 0.75 8,800 95 R410A 1.625 N/A 208-230V/1 6.95 15 21-5/8 x 25-15/16 x 10-3/4 53 17 / 11 ALL
NOTES
1. MANUFACTURER MUST BE CERTIFIED, LISTED, AND LABELED PER AHRI 1230.
2. SYSTEM RATING DATA BASED ON DESIGN AMBIENT CONDITIONS FOR COOLING AND FOR HEATING.
3. MODULATING INVERTER COMPRESSORS.
4. MANUFACTURER'S SUBMITTAL MUST INCLUDE REFRIGERANT PIPING DIAGRAM WITH PIPE DIAMETERS, LENGTHS, AND REFRIGERANT VOLUME.
5. CONTRACTOR TO VERIFY PIPING DIMENSIONS.
6. CONTRACTOR TO FURNISH AND INSTALL INSULATION ON ALL REFRIGERANT PIPING AND FITTINGS.
7. 10 YEARS PARTS WARRANTY.
8. BASIS OF DESIGN: DAIKIN. NOTE: EQUIPMENT SHOWN IN THE SCHEDULE IS SHOWN TO ESTABLISH A STANDARD OF QUALITY, NOT TO LIMIT
COMPETITION. EQUIVALENT EQUIPMENT OF OTHER MANUFACTURERS SHALL BE ACCEPTABLE.
NOTES
1. PROVIDE CONDENSATE PUMP.
2. 10 YEAR PARTS WARRANTY.
3. BASIS OF DESIGN: DAIKIN. NOTE: EQUIPMENT SHOWN IN THE SCHEDULE IS SHOWN TO ESTABLISH A STANDARD OF
QUALITY, NOT TO LIMIT COMPETITION. EQUIVALENT EQUIPMENT OF OTHER MANUFACTURERS SHALL BE ACCEPTABLE.
SCALE:
AIR CONDITIONER CONTROLS
NTS
DDC
ZN-T
ZN-T-SP
ZN-T-HL
ZN-T-LL
FUNCTION
PROOFS
& SAFETIES
NOTES:
1. THE CONTRACTOR SHALL COMPLETE THE POINTS SCHEDULE AS INDICATED IN THE SPECIFICATION AND IN ACCORDANCE WITH THIS DRAWING.
POINT NAME DESCRIPTION
SETTING
(WITH UNITS)
RANGE
(WITH UNITS)
IO
TYPE
ALARM CONDITION
(SEE NOTES)
ALARM
PRIORITY
ALARMING
ZONE TEMPERATURE
CONTROL
ZN-T
ZN-T-SP
ZONE TEMPERATURE
ZONE TEMPERATURE SET POINT
-- 40 TO 100 DEG F AI
AI55 DEG F HEATING (ADJ)
68 DEG F COOLING (ADJ)
ZN-T-HL ZONE TEMPERATURE HIGH LIMIT 80°F 40 TO 100 DEG F AI
ZN-T-LL ZONE TEMPERATURE LOW LIMIT 40 TO 100 DEG F AI45°F
ZONE TEMPERATURE ABOVE HIGH LIMIT
ZONE TEMPERATURE BELOW LOW LIMIT
CRITICAL
CRITICAL
SEQUENCE OF OPERATION
CONTROL OF IDU-5
1. AIR CONDITIONERS SHALL BE AVAILABLE AT ALL TIMES AND SHALL NOT BE
SUBJECT TO ANY OCCUPANCY SCHEDULES.
2. AIR CONDITIONERS SHALL OPERATE BASED ON SPACE THERMOSTAT AND
SHALL SWAP FROM COOLING TO HEATING MODE BASED ON THERMOSTAT
SET POINTS. AIR CONDITIONER SHALL NOT BE CONNECTED TO THE BAS
DIRECTLY BUT SHALL BE MONITORED VIA THE IN ROOM THERMOSTAT.
GENERAL NOTES:
A. INFORMATION SHOWN ON THE DEMOLITION DRAWINGS IS BASED ON
THE BEST INFORMATION AVAILABLE AT THE TIME OF DESIGN.
PERFORM A COMPREHENSIVE SITE SURVEY PRIOR TO SUBMITTING
ELECTRICAL BROCHURES FOR REVIEW, AND MAKE NECESSARY
ADJUSTMENTS TO FACILITATE THE WORK.
B. EACH ELEVATOR IN THIS PROJECT IS CONNECTED TO A TELEPHONE
LINE FOR THE EMERGENCY CALL FUNCTIONALITY. THESE
TELEPHONE LINES SHALL BE DEMOLISHED ALONG WITH ALL
RACEWAYS AND CIRCUITRY BACK TO THE TELEPHONE BACKBOARD
AT WHICH THEY ARE CONNECTED. ALLOW DEMOLITION PRICE OF 300
FEET OF 1" CONDUIT CONTAINING ONE CAT 3 TELEPHONE CABLE FOR
EACH ELEVATOR.
C. DO NOT DEMOLISH ANY CEILINGS TO ACCOMPLISH DEMOLITION OF
RACEWAYS. WHERE RACEWAYS RUN ABOVE HARD CEILINGS,
DEMOLISH THE CABLES AND LEAVE THE CONDUITS ABOVE THE HARD
CEILINGS. REPAIR ALL OPENINGS IN CEILINGS TO MATCH EXISTING
CONSTRUCTION.
D. ALL RECEPTACLES IN ELEVATOR EQUIPMENT ROOMS AND IN
ELEVATOR PITS MUST BE DEMOLISHED UNLESS OTHERWISE NOTED.
PROVIDE NEW AS SHOWN ON NEW WORK DRAWINGS.
E. ALL LIGHT FIXTURES IN ELEVATOR EQUIPMENT ROOMS AND IN
ELEVATOR PITS MUST BE REPLACED WITH NEW FIXTURES AS SHOWN
ON NEW WORK DRAWINGS. ALL EXISTING CIRCUITRY MUST BE
DEMOLISHED BACK TO THE PANELBOARD OR THE NEAREST COMMON
JUNCTION BOX TO OTHER FIXTURES ON THE CIRCUIT.
F. ALL ELEVATOR DISCONNECTS AND POWER CIRCUIT BREAKERS IN
ELEVATOR EQUIPMENT ROOMS MUST BE REPLACED WITH THE NEW
EQUIPMENT SHOWN ON THE NEW WORK DRAWINGS.
G. ALL ELEVATOR PIT LIGHTS, PIT RECEPTACLES, AND SUMP PUMP
CONNECTIONS MUST BE DEMOLISHED. DEMOLISH ALL DEVICES,
BOXES, EQUIPMENT, RACEWAYS, AND CIRCUITRY, AND REPLACE WITH
NEW EQUIPMENT AS SHOWN ON NEW WORK PLANS.
H. ALL UNUSED ELECTRICAL EQUIPMENT, RACEWAYS, AND CIRCUITRY
MUST BE DEMOLISHED FROM ALL ELEVATOR EQUIPMENT ROOMS,
HOISTWAYS, AND PITS BACK TO THE PANEL OF ORIGINATION OR THE
NEAREST COMMON JUNCTION BOX TO OTHER EQUIPMENT ON THAT
CIRCUIT.
I. DEMOLISH ALL CONNECTIONS TO MECHANICAL EQUIPMENT THAT IS
BEING DEMOLISHED, INCLUDING ALL DISCONNECTS, MOTOR
STARTERS, RACEWAYS, CIRCUITRY, ETC. BACK TO THE PANEL OF
ORIGINATION.
J. ALL CONDUIT OPENINGS IN JUNCTION BOXES AND PANELBOARDS
SHALL BE PLUGGED WITH MATERIAL AS SUBSTANTIAL AS THE WALL
OF THE ENCLOSURE IN ACCORDANCE WITH NATIONAL ELECTRICAL
CODE (NEC) REQUIREMENTS.
K. ALL LIGHTING AND RECEPTACLE STYLE PANELBOARDS AFFECTED BY
THE WORK MUST HAVE UPDATED TYPED CIRCUIT DIRECTORIES.
L. ALL SWITCHBOARDS AND POWER STYLE PANELBOARDS AFFECTED BY
THE WORK MUST HAVE NEW ENGRAVED PHENOLIC NAMEPLATES TO
IDENTIFY CIRCUIT CHANGES.
M. ALL PENETRATIONS OF FLOORS, WALLS, AND CEILINGS SHALL BE
SEALED WITH MINIMUM 2-HOUR FIRESTOPPING.
PPM
REVISIONS
DESCRIPTION
SHEET
DATE
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
SUSDA
BY
OF
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
EPM
USDA ARS
NORTHEAST AREA
BELTSVILLE, MARYLAND
Agricultural
Service Research
USDA AGRICULTURAL RESEARCH SERVICE
BELTSVILLE AGRICULTURAL RESEARCH CENTER (BARC)
ELEVATOR MODERNIZATION - BELTSVILLE, MD
GAC
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
P.A.
FIRMJohnson-McAdamsTHE
CLR
JGM
7523-A
--- 04/30/24
DATE
PROJECT NO.
A-E FIRM
"PROFESSIONAL
CERTIFICATION. I HEREBY
CERTIFY THAT THESE
DOCUMENTS WERE
PREPARED OR APPROVED BY
ME, AND THAT I AM DULY
LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO. , EXPIRATION
DATE: 2/24/2025."
ELECTRICAL DEMOLITION LEGEND
ED-000
LEGEND
DISCONNECT (A.K.A. SAFETY SWITCH) TO BE DEMOLISHED. TEXT INDICATES AMPACITY/NUMBER OF POLES/NEMA
ENCLOSURE TYPE.
XX/X/X
ENCLOSED CIRCUIT BREAKER TO BE DEMOLISHED. TEXT INDICATES AMPACITY/NUMBER OF POLES/NEMA ENCLOSURE
TYPE.
S
COMBINATION DISCONNECT AND MAGNETIC MOTOR STARTER TO BE DEMOLISHED.
DUPLEX RECEPTACLE TO BE DEMOLISHED AND REPLACED WITH A NEW GFCI NEMA 5-20R RECEPTACLE CONNECTED TO
EXISTING CIRCUITRY.
SINGLE-POLE SWITCH TO BE DEMOLISHED.
4 FOOT LONG SURFACE OR SUSPENDED LIGHT FIXTURE TO BE DEMOLISHED.
XX
AT
S
T
XX/X/X
WALL-MOUNTED LIGHT FIXTURE TO BE DEMOLISHED.
MOTOR TO BE DEMOLISHED. TEXT INDICATES HORSEPOWER RATING.
OMCS OIL MINDER CONTROL SYSTEM TO REMAIN.
PANELBOARD TO REMAIN. TEXT INDICATES PANELBOARD DESIGNATION.
SWBD SWITCHBOARD TO REMAIN. TEXT INDICATES PANELBOARD DESIGNATION IF LABELED, OR JUST THE ABBREVIATION FOR
SWITCHBOARD "SWBD" IF NOT LABELED WITH A NAME DESIGNATION.
AUTOMATIC TRANSFER SWITCH TO REMAIN.
DISCONNECT (A.K.A. SAFETY SWITCH) TO REMAIN. TEXT INDICATES AMPACITY/NUMBER OF POLES/NEMA ENCLOSURE
TYPE.
TRANSFORMER TO REMAIN.
ENCLOSED CIRCUIT BREAKER TO BE DEMOLISHED. TEXT INDICATES AMPACITY/NUMBER OF POLES/NEMA ENCLOSURE
TYPE.
XX/X/X
TELEPHONE OUTLET TO REMAIN.
COMBINATION TELEPHONE AND DATA OUTLET TO REMAIN.
PANELBOARD TO BE DEMOLISHED AND REPLACED WITH NEW PANELBOARD AS SHOWN ON NEW WORK DRAWINGS. TEXT
INDICATES PANELBOARD NAME DESIGNATION.
XX/X/X
XXX
DATA ROOM
MSB1
SW
BD
S
SPMP
ELEVATOR
EQUIPMENT TO BE
REPLACED
0/
3/
/2
/1
DISC. FOR CAB
LIGHTS &
ELEVATOR
CONTROLS
ELEVATOR
POWER
DISCONNECT
S
30/2/1
EP-2
DISC. FED FROM
EP-2, CIRCUIT #20
ME
LOWEST LEVEL FLOOR PLAN (BASEMENT)
SCALE: 1/8"=1'-0"
PLAN
NORTH
ED-105
0' 2' 4' 8' 12'
SCALE: 1/4"=1'-0"
GENERAL NOTES:
ELEVATOR MACHINE ROOM (IN ATTIC)
SCALE: 1/4"=1'-0"
PLAN
NORTH
ED-105
0' 24'
SCALE: 1/8"=1'-0"
8'4' 16'
PPM
REVISIONS
DESCRIPTION
SHEET
DATE
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
SUSDA
BY
OF
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
EPM
USDA ARS
NORTHEAST AREA
BELTSVILLE, MARYLAND
Agricultural
Service Research
USDA AGRICULTURAL RESEARCH SERVICE
BELTSVILLE AGRICULTURAL RESEARCH CENTER (BARC)
ELEVATOR MODERNIZATION - BELTSVILLE, MD
GAC
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
P.A.
FIRMJohnson-McAdamsTHE
CLR
JGM
7523-A
--- 04/30/24
DATE
PROJECT NO.
A-E FIRM
"PROFESSIONAL
CERTIFICATION. I HEREBY
CERTIFY THAT THESE
DOCUMENTS WERE
PREPARED OR APPROVED BY
ME, AND THAT I AM DULY
LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO. , EXPIRATION
DATE: 2/24/2025."
ELEVATOR 005 | BUILDING 007| #1
ELECTRICAL DEMOLITION PLAN
ED-105
A. CERTAIN PANELS ARE SHOWN FOR GENERAL INFORMATION WHICH
MAY NOT BE AFFECTED BY THIS PROJECT.
KEYED NOTES:
1. THE ELEVATOR IS FED FROM A 200/3 EATON HFDE CIRCUIT BREAKER
IN SECTION 3 OF MSB1 IN ELECTRICAL ROOM 002. RETAIN CONDUIT,
CIRCUITRY, AND BREAKER IN MSB1. DEMOLISH 200/3 DISCONNECT IN
THE ELEVATOR EQUIPMENT ROOM, AND REPLACE IT WITH THE NEW
EQUIPMENT SHOWN ON NEW WORK DRAWINGS.
2. ASSUME FOR BIDDING THAT THE ELEVATOR CAB LIGHTS ARE FED
FROM PANEL P-2. WE WERE UNABLE TO DETERMINE FROM THE SITE
SURVEY AND OLD DRAWINGS THE SOURCE OF THE CIRCUITRY.
DEMOLISH THE CONDUIT AND CIRCUITRY BACK TO PANEL P-2 CUT
OFF THE BREAKER, AND LABEL IT AS SPARE.
3. DEMOLISH DISCONNECT, CONDUIT, AND CIRCUITRY BACK TO PANEL
P-2. CUT OFF THE BREAKER, AND LABEL IT AS SPARE. ALSO
DEMOLISH CONDUIT, CIRCUITRY, AND CONNECTION TO LOADS
DOWNSTREAM OF DISCONNECT.
4. DEMOLISH PIT LIGHT ALONG WITH SWITCH, PIT MAINTENANCE
RECEPTACLE, AND PIT SUMP PUMP RECEPTACLE. DEMOLISH ALL
ASSOCIATED DEVICES, BOXES, CONDUITS, AND CIRCUITRY BACK TO
THE PANEL OF ORIGINATION. CUT OFF THE BREAKER AND LABEL IT
AS SPARE. ASSUME FOR BIDDING THAT THE EQUIPMENT IS FED FROM
PANEL P-2 IN THE ATTIC.
XXX
AT
S
SWBD
LEGEND (EXISTING-TO-REMAIN EQUIPMENT)
SWITCHBOARD
AUTOMATIC TRANSFER SWITCH
PANELBOARD
LEGEND (NEW EQUIPMENT AND CIRCUITRY)
T TRANSFORMER
COMBINATION TELEPHONE AND DATA OUTLET
TELEPHONE OUTLET
XXX PANELBOARD
ED ELEVATOR DISCONNECT POWER MODULE SWITCH. REQUIRED FEATURES ARE DESCRIBED ON SHEET E-001.
CL
30/2/1
30A, 2-POLE, FUSED HEAVY-DUTY SAFETY SWITCH IN NEMA 1 ENCLOSURE CONTAINING ONE 20A FUSE - SERVED BY A
20A, 1-POLE CIRCUIT. "CL" INDICATES THAT IT SERVES THE CAB LIGHTS.
CNTRL
30/2/1
30A, 2-POLE, FUSED HEAVY-DUTY SAFETY SWITCH IN NEMA 1 ENCLOSURE CONTAINING ONE 20A FUSE - SERVED BY A
20A, 1-POLE CIRCUIT. "CNTRL" INDICATES THAT IT SERVES ELEVATOR CONTROLS.
GFI
ME
GROUND FAULT CIRCUIT INTERRUPTER TYPE NEMA 5-20R RECEPTACLE FOR MAINTENANCE IN ELEVATOR EQUIPMENT
ROOM.
GFI
MP GROUND FAULT CIRCUIT INTERRUPTER TYPE NEMA 5-20R RECEPTACLE FOR MAINTENANCE IN ELEVATOR PIT.
GFI
SP GROUND FAULT CIRCUIT INTERRUPTER TYPE NEMA 5-20R RECEPTACLE FOR SUMP PUMP IN ELEVATOR PIT.
30/2/3R 30A, 2-POLE, NON-FUSED HEAVY-DUTY SAFETY SWITCH IN NEMA 3R ENCLOSURE.
XXX/X ENCLOSED CIRCUIT BREAKER. TEXT INDICATES AMPACITY AND
NUMBER OF POLES.
GFI
WP
GROUND FAULT CIRCUIT INTERRUPTER TYPE NEMA 5-20R RECEPTACLE WITH METALLIC
WEATHERPROOF-WHILE-IN-USE COVER (PLASTIC COVERS ARE NOT ACCEPTABLE).
3-POLE, 20A SWITCH USED FOR DISCONNECT AT INDOOR UNITS OF HVAC SYSTEMS.S3P
S 1-POLE 120/277V, 20A SINGLE-THROW LIGHT SWITCH.
S 1-POLE 120/277V, 20A INFRARED VACANCY-SENSOR-TYPE MOTION DETECTOR SWITCHM
MD CEILING-MOUNTED INFRARED OCCUPANCY SENSOR WITH COVERAGE PATTERN SUFFICIENT FOR SPACE IN WHICH IT
IS LOCATED.
PP POWER PACK FOR CEILING-MOUNTED OCCUPANCY SENSOR MATCHED TO SYSTEM VOLTAGE AND OPERATING
PARAMETERS OF OCCUPANCY SENSOR.
SURFACE OR SUSPENDED LINEAR LED FIXTURE. SEE FIXTURE SCHEDULE.
CONDUCTORS IN CONDUIT CONCEALED WITHIN WALL OR CEILING. TIC MARKS INDICATE NUMBER OF CONDUCTORS.
THE EQUIPMENT GROUNDING CONDUCTOR IS NOT SHOWN, BUT SHALL BE PROVIDED. SIZE THE EQUIPMENT GROUNDING CONDUCTOR AND THE CONDUIT PER THE NEC. THE ABSENCE OF TIC MARKS SIGNIFIES THAT TWO CONDUCTORS PLUS AN EQUIPMENT GROUNDING CONDUCTOR SHOULD BE PROVIDED. FOR EXAMPLE, THE MARKINGS TO THE LEFT SIGNIFY THAT THREE CONDUCTORS PLUS AN EQUIPMENT GROUNDING CONDUCTOR SHOULD BE
PROVIDED.
THE TEXT INSIDE THE ARC INDICATES THE AWG SIZE OF THE CONDUCTORS THAT SHALL BE RUN IN THE CONDUIT. THE
ABSENCE OF TEXT SIGNIFIES THAT THE CONDUCTORS SHOULD BE #12 AWG.
CIRCUITRY RUN IN STRAIGHT LINE SEGMENTS SIGNIFIES EXPOSED SURFACE-MOUNTED RACEWAY (SEE
SPECIFICATIONS).
HOMERUN TO PANELBOARD. ARC DENOTES CONCEALED CIRCUITRY. TEXT DENOTES PANELBOARD NAME WITH CIRCUIT NUMBER. DEVICES HAVING CIRCUIT NUMBERS LOCATED BESIDE THEM MAY NOT SHOW THE CIRCUIT
NUMBERS AT THE HOMERUN ARROWS.
LOW VOLTAGE CONDUCTORS USED FOR MOTION DETECTOR CIRCUITRY. SEE MANUFACTURER'S RECOMMENDATIONS
FOR CONDUCTOR REQUIREMENTS.
1" EMT CONDUIT CONTAINING THREE CAT 6 DATA CABLES - ONE FOR EMERGENCY TWO-WAY ELEVATOR COMMUNICATION, ONE FOR ELEVATOR MONITORING SERVICE, AND ONE FOR CONNECTION OF MINI-SPLIT HVAC UNIT TO ENERGY MANAGEMENT SYSTEM. PROVIDE JUNCTION BOXES IN CONDUIT RUN SO THAT BENDS DO NOT EXCEED 180 DEGREE BETWEEN PULL POINTS. ROUTE CONCEALED ABOVE CEILINGS UNLESS NO CEILING EXISTS.
COORDINATE EXACT ROUTING WITH CONTRACTING OFFICER'S REPRESENTATIVE. PROVIDE PROTECTIVE BUSHING ON CONDUIT ENDS. PROVIDE RJ-45 MALE JACKS ON EACH END OF CABLE. CONNECT TO APPROPRIATE EQUIPMENT IN ELEVATOR EQUIPMENT ROOM. COORDINATE WITH GOVERNMENT IT PROFESSIONAL THROUGH THE CONTRACTING
OFFICER FOR EXACT TERMINATION POINTS IN THE DATA ROOM.
WALL-MOUNTED LINEAR VAPORTIGHT LED FIXTURE. SEE FIXTURE SCHEDULE.
PPM
REVISIONS
DESCRIPTION
SHEET
DATE
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
SUSDA
BY
OF
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
EPM
USDA ARS
NORTHEAST AREA
BELTSVILLE, MARYLAND
Agricultural
Service Research
USDA AGRICULTURAL RESEARCH SERVICE
BELTSVILLE AGRICULTURAL RESEARCH CENTER (BARC)
ELEVATOR MODERNIZATION - BELTSVILLE, MD
GAC
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
P.A.
FIRMJohnson-McAdamsTHE
CLR
JGM
7523-A
--- 04/30/24
DATE
PROJECT NO.
A-E FIRM
"PROFESSIONAL
CERTIFICATION. I HEREBY
CERTIFY THAT THESE
DOCUMENTS WERE
PREPARED OR APPROVED BY
ME, AND THAT I AM DULY
LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO. , EXPIRATION
DATE: 2/24/2025."
ELECTRICAL LEGEND AND DETAILS
E-000
GENERAL NOTES:
A. UNLESS OTHERWISE NOTED, WHERE ITEMS ARE SHOWN IN DIM PRINT,
THEY ARE EXISTING-TO-REMAIN. ITEMS SHOWN IN BOLD PRINT ARE
NEW.
B. EXCEPT IN ELEVATOR EQUIPMENT ROOMS, ALL RACEWAYS AND
CIRCUITRY SHALL BE RUN CONCEALED EXCEPT IN AREAS WHERE THE
CEILINGS ARE OPEN WITH EXPOSED STRUCTURE. COORDINATE
EXACT ROUTING OF RACEWAYS AND CIRCUITRY WITH CONTRACTING
OFFICER.
ABBREVIATIONS
CL CAB LIGHTS
CNTRL CONTROLS
ETR EXISTING-TO-REMAIN
GFI GROUND FAULT INTERRUPTER (ALSO CALLED GROUND FAULT
CIRCUIT INTERRUPTER)
NEC NATIONAL ELECTRICAL CODE
SP SUMP PUMP
WP WEATHERPROOF
RR FT
INSTALL TWO HEAT DETECTORS IN THE PIT OF ALL
ELEVATORS WITHIN 24" OF SPRINKLER HEAD. ONE
RATE OF RISE AND ONE FIXED TEMPERATURE.
5 6
LEQ7-8
SUMP PUMP
KEYED NOTES
Mark Description
PROVIDE 3-POLE, ELEVATOR DISCONNECT POWER MODULE UNIT WITH THE FOLLOWING
FEATURES: 100VA CONTROL TRANSFORMER FOR SHUNT TRIP CONTROL POWER; 3-PPOLE
DOUBLE-THROW, 10A, 120V FIRE SAFETY INTERFACE RELAY WITH 120V COIL; RED "ON" PILOT
LIGHT; THREE-POLE FIRE ALARM VOLTAGE MONITORING RELAY TO MONITOR SHUNT TRIP
VOLTAGE; TWO SETS OF NORMALLY-OPEN AND TWO SETS OF NORMALLY-CLOSED AUXILIARY
CONTACTS; SURGE PROTECTIVE DEVICE. COORDINATE VOLTAGE WITH ELEVATOR POWER FEED
FOR EACH BUILDING. CONSULT ELEVATOR VENDOR FOR EXACT FUSE SIZE AND ALL ELEVATOR
ELECTRICAL REQUIREMENTS.
ELEVATOR FEEDER AND EQUIPMENT SIZES ARE BASED ON BEST INFORMATION AVAILABLE AT
THE TIME OF DESIGN. VERIFY ALL ELECTRICAL REQUIREMENTS WITH ELEVATOR VENDOR PRIOR
TO SUBMITTING BROCHURES AND/OR INSTALLING ELECTRICAL GEAR. GROUND WIRE SHALL BE
THE SAME SIZE AS THE PHASE WIRES.
A 120V CONTROL CIRCUIT MUST BE PROVIDED AND ROUTED THROUGH THE CONTACTS OF THE
HEAT DETECTOR AT THE TOP OF THE ELEVATOR SHAFT, THE HEAT DETECTOR IN THE PIT AND THE HEAT DETECTOR IN THE ELEVATOR EQUIPMENT ROOM (ALL SETS OF CONTACTS SHALL BE WIRED IN PARALLEL) TO SHUNT TRIP THE BREAKER UPON AN ALARM CONDITION OF ANY OF THESE HEAT
DETECTORS.
MOUNT SWITCH ADJACENT TO PIT LADDER 48" ABOVE ACCESS FLOOR.
MOUNT RECEPTACLE 18" ABOVE PIT FLOOR.
MOUNT LIGHT FIXTURE 48" ABOVE PIT FLOOR OR AS DIRECTED BY ELEVATOR VENDOR.
CONNECT ELEVATOR EMERGENCY TELEPHONE TO EXISTING TELEPHONE LINE SERVING EXISTING
CONTROL PANEL.
ROUTE TO ELEVATOR CONTROL PANEL FOR ELEVATOR CONTROL CIRCUIT.
ROUTE TO ELEVATOR CONTROL PANEL FOR CAB LIGHTS.
ROUTE TO ELEVATOR CONTROLLER
MOUNT WHERE DIRECTED BY ELEVATOR VENDOR.
VERIFY SUMP PUMP CONNECTION TYPE WITH APPROPRIATE VENDOR.
SEE INDIVIDUAL BUILDING DRAWINGS FOR INFORMATION ON ELEVATOR POWER DISCONNECT AND
CIRCUITRY.
WHERE THE EXISTING CIRCUIT BREAKER HAS A SHUNT TRIP COIL, IT IS PREFERRED TO USE THAT BREAKER'S SHUNT TRIP COIL TO KILL POWER TO THE ELEVATOR UPON ACTIVATION OF A HEAT DETECTOR.
WHERE THE CIRCUIT BREAKER DOES NOT HAVE SHUNT TRIP COIL, USE THE SHUNT TRIP PROVISIONS IN
THE ELEVATOR DISCONNECT POWER MODULE UNIT.
WHERE THE ELEVATOR CIRCUIT BREAKER HAS AUXILIARY CONTACTS FOR MONITORING THE BATTERY LOWERING CIRCUIT, USE THEM. WHERE THE BREAKER DOES NOT HAVE THESE CONTACTS, PROVIDE A YELLOW WARNING LABEL ENGRAVED WITH ¼” HIGH BLACK LETTERS IMMEDIATELY ADJACENT THE BREAKER WITH THE FOLLOWING TEXT: “DO NOT USE AS ELEVATOR DISCONNECT FOR SERVICING THE ELEVATOR. USE THE ELEVATOR DISCONNECT POWER MODULE UNIT IN THE ELEVATOR EQUIPMENT
ROOM.”
15WP
S
EP
DOWN TO PIT LIGHT
INSTALL ONE THERMAL DETECTOR AND ONE SMOKE DETECTOR IN THE
TOP OF THE ELEVATOR SHAFT WITHIN 24" OF SPRINKLER HEAD. IF SHAFT IS
NOT SPRINKLED, ONLY PROVIDE THE THERMAL DETECTOR. COORDINATE
WITH FIRE SUPPRESSION VENDOR.
T
WP
NOTES:
1.
2.
R1 IS A FIRE ALARM SYSTEM RELAY. THE COIL VOLTAGE IS BASED ON THE
OUTPUT OF THE FIRE ALARM CONTROL PANEL. IT SHALL HAVE NORMALLY
OPEN CONTACTS THAT ARE
CLOSED BY THE FACP AFTER AN ALARM SIGNAL FROM ONE OF THE
THERMAL DETECTORS HAS BEEN RECEIVED AND THE TIME DELAY
REQUIRED BY NFPA 72, PARAGRAPH 21.4.3 HAS EXPIRED.
R2 SHALL HAVE A 120V COIL. IT SHALL HAVE NORMALLY-CLOSED
CONTACTS; HOWEVER, UNDER NORMAL OPERATING CONDITIONS, THE
CONTACTS ARE HELD-OPEN WHEN CONTROL VOLTAGE IS PRESENT.
ELEVATOR MOTOR
ELEVATOR
CONTROLLER
NO NC
TO BATTERY LOWERING CIRCUIT IN
ELEVATOR CONTROLLER (IF USED)
EOL
EOL
FIRE ALARM
CONTROL PANEL
T HEAT DETECTOR
IN ELEVATOR PIT
T HEAT DETECTOR TOP
OF SHAFT
H
NSHUNT TRIP
CIRCUIT
(LEQ-2)
T HEAT DETECTOR IN
MACHINE ROOM
120V SHUNT TRIP COIL
ELEVATOR
CIRCUIT
BREAKER
AUX. CONTACTS OF
ELEVATOR BREAKER
FUSED DISCONNECT
WITH AUXILIARY
CONTACTS
3 #12
S
WP
TYPICAL ELEVATOR SHUNT TRIP DETAIL
SCALE: NONE
E-001
TYPICAL TOP OF HOISTWAY CONNECTIONS
SCALE: NONE
E-001
TYPICAL ELEVATOR PIT CONNECTIONS
SCALE: NONE
E-001
T
F-20 30/1/1
F-20 30/1/1
1 2 13
9 GFI
E
TYPICAL ELEVATOR MACHINE ROOM CONNECTIONS
SCALE: NONE
E-001
INSTALL ONE THERMAL DETECTOR AND ONE
SMOKE DETECTOR IN THE MACHINE ROOM WITHIN
24" OF SPRINKLER HEAD.
TO LIGHT IN ELEVATOR
EQUIPMENT ROOM
UP TO LIGHT AT TOP
OF HOISTWAY
LEQ7-6
LEQ7-4
LEQ7-5
S
TO LIGHT IN
ELEVATOR PIT
LEQ7-1
LEQ7-3
PANEL LEQ73
GFI
GFI
WP
ED
LUMINAIRE REQUIREMENTS:
1. HOUSING - DIE-FORMED, COLD ROLLED STEEL, WITH DIFFUSE
ACRYLIC POLYMER LENS.
2. LIGHT SOURCE - HIGH OUTPUT LEDs WITH MINIMUM 50K HOURS
RATED LIFE AT L70, 4000K COLOR TEMPERATURE , EFFICACY OF 119
LUMENS/WATT, WITH A MINIMUM CRI OF 80. INITIAL LUMEN OUTPUT
OF 8,000 LUMENS.
3. DRIVER - OPERATING VOLTAGE OF 120-277V. DIMMABLE TO 1%.
(0-10 VOLT DIMMING)
4. CERTIFICATION - UL 1598, DAMP LOCATION, DLC QUALIFIED, AND
ROHS COMPLIANT. COMPLIES UL 924.
5. MOUNTING - CEILING-SUSPENDED USING AIRCRAFT CABLE AT 10'
AFF.
6. THIS SKETCH IS A NON-PROPRIETARY GRAPHIC REPRESENTATION
OF A LUMINAIRE THAT MAY MEET THE SPECIFICATION
REQUIREMENTS. IT IS NOT INTENDED TO INDICATE A CERTAIN
MANUFACTURER OR PREFERENCE.
7. 10W BATTERY PACK WITH WITH SELF-DIAGNOSTIC TESTING
FEATURE AND 90 MINUTES BATTERY BACKUP.
LUMINAIRE REQUIREMENTS:
1. HOUSING - FIBERGLASS OR FIBERGLASS-REINFORCED POLYESTER
OUTER HOUSING, WITH ALUMINUM COMPONENT TRAY AND HEAT
SINK. OPTIONAL LENGTHS OF 4FT OR 8FT.
2. LENS - IMPACT-RESISTANT ACRYLIC, WITH CONTINUOUS
CLOSED-CELL POLYURETHANE GASKET, SECURED WITH STAINLESS
STEEL OR POLYCARBONATE LATCHES.
3. LIGHT SOURCE - SOLID STATE LEDS WITH MINIMUM 50K HOURS
RATED LIFE AT L70, 4000K CCT UON, MINIMUM 80 CRI, MAXIMUM
4-STEP MCADAM ELLIPSE BINNING TOLERANCE FOR COLOR
CONSISTENCY, AND MINIMUM EFFICACY OF 100 LUMENS/WATT.
INITIAL LUMEN OUTPUT OF 6,000 LUMENS.
4. DRIVER - REPLACEABLE, INTEGRAL, HIGH-EFFICIENCY DRIVER WITH
MINIMUM 0.9 PF, OPERATING VOLTAGE OF 120V, THERMAL
MANAGEMENT, < 20% TOTAL HARMONIC DISTORTION. ON-OFF
CONTROL.
5. CERTIFICATION - UL 1598, WET LOCATION (IP65, IP66, IP67), DLC
QUALIFIED, AND ROHS COMPLIANT. COMPLIES WITH LM79, LM80 AND
TM21 TESTING STANDARDS. UL 924 WHEN EQUIPPED WITH
EMERGENCY BATTERY BACK-UP.
6. MOUNTING - SURFACE-MOUNTED OR SUSPENDED FROM CEILING.
7. 10W EMERGENCY BATTERY PACK WITH SELF-DIAGNOSTIC TESTING
FEATURE AND 90 MINUTES BATTERY BACKUP.
8. THIS SKETCH IS A NON-PROPRIETARY GRAPHIC REPRESENTATION OF
A LUMINAIRE THAT MAY MEET THE SPECIFICATION REQUIREMENTS.
IT IS NOT INTENDED TO INDICATE A CERTAIN MANUFACTURER OR
PREFERENCE.
3 #123 #12
3 #12
1514 GENERAL NOTES:
A. THE PANELBOARD SCHEDULE USED ON THIS SHEET SHALL BE USED
FOR PANELBOARDS IN MULTIPLE BUILDINGS. THE "#" SYMBOL IN THE
PANELBOARD NAME IS REPLACED BY THE BUILDING NUMBER FOR
EACH RESPECTIVE BUILDING. FOR EXAMPLE, IN BUILDING 001, THE
PANELBOARD IS NAMED LEQ1; IN BUILDING 003, THE PANELBOARD IS
NAMES LEQ3. BUILDING 307B MUST HAVE TWO OF THESE PANELS;
THE ONE IN THE BASEMENT IS NAMED LEQ307BB, AND THE ONE ON
THE FIRST FLOOR IS NAMED LEQ307B1.
PPM
REVISIONS
DESCRIPTION
SHEET
DATE
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
SUSDA
BY
OF
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
EPM
USDA ARS
NORTHEAST AREA
BELTSVILLE, MARYLAND
Agricultural
Service Research
USDA AGRICULTURAL RESEARCH SERVICE
BELTSVILLE AGRICULTURAL RESEARCH CENTER (BARC)
ELEVATOR MODERNIZATION - BELTSVILLE, MD
GAC
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
P.A.
FIRMJohnson-McAdamsTHE
CLR
JGM
7523-A
--- 04/30/24
DATE
PROJECT NO.
A-E FIRM
"PROFESSIONAL
CERTIFICATION. I HEREBY
CERTIFY THAT THESE
DOCUMENTS WERE
PREPARED OR APPROVED BY
ME, AND THAT I AM DULY
LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO. , EXPIRATION
DATE: 2/24/2025."
ELECTRICAL DETAILS
E-001
DATA ROOM
MSB1
SW
BD
S
SP
MP
UP TO
ELEVATOR
EQUIPMENT
ROOM
EP3
GFI
GFI
NEW ELEVATOR
EQUIPMENT
/2
/1
ELEVATOR
POWER
DISCONNECT
S
30/2/1
EP-2
GFI
ME
ED
C U
-5
30/2/3R
TO 3P
SWITCH
FOR
DISCONNECT
FOR
IDU-5 IN
ELEVATOR
EQUIPMENT
ROOM
LEQ7-7,9
2 #10, #10(G), 3/4" C.
3 #12, #12(G), 3/4" C.
GFI
WP
LEQ7
CNTRL
CL
DOWN TO
DATA
ROOM IN
BASEMENT
AE
AE
IDU-5S3P
LEQ7-10
2 #10, #10(G), 3/4" C.
LOWEST LEVEL FLOOR PLAN (BASEMENT)
SCALE: 1/8"=1'-0"
PLAN
NORTH
E-105
0' 2' 4' 8' 12'
SCALE: 1/4"=1'-0"
ELEVATOR MACHINE ROOM IN ATTIC (SEE M-105)
SCALE: 1/4"=1'-0"
PLAN
NORTH
E-105
0' 24'
SCALE: 1/8"=1'-0"
8'4' 16'
PPM
REVISIONS
DESCRIPTION
SHEET
DATE
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
SUSDA
BY
OF
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
EPM
USDA ARS
NORTHEAST AREA
BELTSVILLE, MARYLAND
Agricultural
Service Research
USDA AGRICULTURAL RESEARCH SERVICE
BELTSVILLE AGRICULTURAL RESEARCH CENTER (BARC)
ELEVATOR MODERNIZATION - BELTSVILLE, MD
GAC
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
P.A.
FIRMJohnson-McAdamsTHE
CLR
JGM
7523-A
--- 04/30/24
DATE
PROJECT NO.
A-E FIRM
"PROFESSIONAL
CERTIFICATION. I HEREBY
CERTIFY THAT THESE
DOCUMENTS WERE
PREPARED OR APPROVED BY
ME, AND THAT I AM DULY
LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO. , EXPIRATION
DATE: 2/24/2025."
ELEVATOR 005 | BUILDING 007| #1
ELECTRICAL PLANS
E-105
KEYED NOTES:
GENERAL NOTES:
A. SEE SHEET E-001 FOR CIRCUITRY INFORMATION FOR ALL DEVICES
AND EQUIPMENT.
1. THE CONDENSING UNIT IS IN THE MECHANICAL ROOM. SEE SHEET
M-105 FOR MORE DETAILED INFORMATION ON THE LOCATION.
2. CONFIRM EXACT CIRCUITRY REQUIREMENTS WITH EQUIPMENT
VENDOR PRIOR TO BEGINNING CONSTRUCTION.
3. PROVIDE AN IDENTICAL LIGHT FIXTURE (TYPE EP) AND SWITCH AT THE
TOP OF THE HOISTWAY AND CIRCUIT AS SHOWN ON E-001.
EXISTING
SWITCHBOARD
MSB1
NEW PANEL
LEQ7
4 #1, #8(G), 1 1/2" C.
100/3
0' 2' 4' 8' 12'
SCALE: 1/4"=1'-0"
GENERAL NOTES:
0' 24'
SCALE: 1/8"=1'-0"
8'4' 16'
PPM
REVISIONS
DESCRIPTION
SHEET
DATE
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
SUSDA
BY
OF
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
EPM
USDA ARS
NORTHEAST AREA
BELTSVILLE, MARYLAND
Agricultural
Service Research
USDA AGRICULTURAL RESEARCH SERVICE
BELTSVILLE AGRICULTURAL RESEARCH CENTER (BARC)
ELEVATOR MODERNIZATION - BELTSVILLE, MD
GAC
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
P.A.
FIRMJohnson-McAdamsTHE
CLR
JGM
7523-A
--- 04/30/24
DATE
PROJECT NO.
A-E FIRM
"PROFESSIONAL
CERTIFICATION. I HEREBY
CERTIFY THAT THESE
DOCUMENTS WERE
PREPARED OR APPROVED BY
ME, AND THAT I AM DULY
LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO. , EXPIRATION
DATE: 2/24/2025."
SINGLE-LINE DIAGRAM
E-601
A. COORDINATE CONDUIT ROUTING WITH COR.
KEYED NOTES: #
1. USE EXISTING SPARE 100/3 BREAKER.
2. ENSURE THAT LEQ7 HAS PROVISIONS FOR BEING FED FROM THE
BOTTOM OF THE PANEL.
BUILDING 007 PARTIAL SINGLE LINE DIAGRAM
SCALE: NONE
E-601
ELEVATOR LOBBY
MACHINE ROOM
SPRINKLER NO MORE THAN
24" ABOVE PIT FLOOR
ELEVATOR LOBBY
HYDRAULIC PIPING
SD
TO ELEVATOR
SHUNT TRIP TO FIRE RECALL PANEL
SD
ELEVATOR CAB
SD
THIS DETAIL APPLIES TO THE PROTECTION OF HYDRAULIC ELEVATORS IN A SPRINKLERED BUILDING, UNLESS OTHERWISE
INDICATED BY SPECIFIC NOTES FOR A PARTICULAR ELEVATOR / BUILDING.
MACHINE ROOM SPRINKLER LINE WILL HAVE A INDICATING AND MONITORED ISOLATION VALVE, CHECK-VALVE, DOUBLE-POLE
FLOW SWITCH LOCATED OUTSIDE AND ADJACENT TO MACHINE ROOM.
ZERO DELAY ON FLOW SWITCH.
MONITOR SHUNT POWER WITH FIRE ALARM MODULE / RELAY. COORDINATE SHUNTING MEANS WITH SPECIFIC SHUNT BREAKER
CONFIGURATION PROVIDED.
INSPECTOR TEST ROUTED TO EXTERIOR SPLASH BLOCK.
PROVIDE MONITORED ISOLATION VALVE ON ELEVATOR PIT SPRINKLER. MAY BE SERVED FROM MACHINE ROOM ISOLATION
VALVE.
SMOKE DETECTOR IN MACHINE ROOM AND ELEVATOR LOBBIES TO INITIATE RECALL, WATER FLOW SWITCH TO INITIATE POWER SHUNT TO ELEVATOR. NO SMOKE OR HEAT DETECTORS ARE REQUIRED IN THE SHAFT OF HYDRAULIC ELEVATOR WHEN
FOLLOWING THIS CRITERIA.
INSPECTOR TEST WITH
PRESSURE RELIEF FOR
TESTING FLOW SWITCH
OUTSIDE MACHIE ROOM.
SPRINKLER WITH
LISTED GUARD
SMOKE DETECTOR ON
RECALL PANEL (TYP)
EXISTING LOBBY
SPRINKLER
SPRINKLER LINE
SERVING PIT , WITH
MONITORED ISOLATION
VALVE
PROVIDE SURGE
PROTECTION (OUTSIDE
CABINET) FOR 120VAC
FARP
SYSTEM CAPABLE OF A SECOND CLASS "A"
SLC FOR FUTURE EXPANSION WITHOUT
IMPACTING ELEVATOR CIRCUIT
FA-2
SPARE
FA-3
SPARE
FA-4
SPARE
PANEL
"FA"
LOCATION PER
BUILDING
CAPABLE OF
CLASS "A"
NOTIFICATION
CIRCUITS
FA-1
SPARE
MUST INCORPORATE
ABILITY TO ADD A FIBER
NETWORK CARD
CAPABLE OF INTEGRATION
WITH VOICE MNS IN FUTURE
SIGNALING LINE CIRCUIT (SLC DEVICES AS REQUIRED)
PPM
REVISIONS
DESCRIPTION
SHEET
DATE
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
SUSDA
BY
OF
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
EPM
USDA ARS
NORTHEAST AREA
BELTSVILLE, MARYLAND
Agricultural
Service Research
USDA AGRICULTURAL RESEARCH SERVICE
BELTSVILLE AGRICULTURAL RESEARCH CENTER (BARC)
ELEVATOR MODERNIZATION - BELTSVILLE, MD
SWL
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
P.A.
FIRMJohnson-McAdamsTHE
CLR
JGM
7523-A
--- 04/30/24
DATE
PROJECT NO.
A-E FIRM
4/30/24
FIRE PROTECTION GENERAL NOTES
FP001
ACCEPTABLE PRODUCTS:
SEE SPECIFICATIONS FOR ACCEPTABLE MANUFACTURES OF FIRE ALARM
PANELS ALLOWED FOR THIS PROJECT. PROVIDE GOVERNMENT WITH ALL
PASSWORDS AND SOFTWARE TO SERVICE / SUPPORT THE FA PANEL. DO NOT
BID IF NOT GOING TO PROVIDE.
S p
WF TS
MM
H rr
FACU
LEGEND:
EXISTING FIRE ALARM CONTROL UNIT
FIRE ALARM RECALL PANEL, SURGE PROTECTION, AS-BUILT CABINET
WATER FLOW/TAMPER MODULES
MONITOR/CONTROL/RELAY MODULE
PHOTOELECTRIC SMOKE DETECTOR WITH CALIBRATION DIAGNOSTICS
RATE OF RISE HEAT DETECTOR
FARP
FIRE PROTECTION GENERAL NOTES:
1. THIS PROJECT INVOLVES THE MODERNIZATION, REPAIR, OR
REPLACEMENT OF ELEVATORS WITHIN MULTIPLE BUILDINGS.
CONTRACTOR IS RESPONSIBLE TO COORDINATE THE LEVEL OF
WORK WITH EACH DISCIPLINES DRAWINGS.
2. BUILDINGS WILL LIKELY BE BID IN SEPARATE PACKAGES AND/OR
WITH BID ALTERNATES. COORDINATE WITH FRONT-END
DOCUMENTS AND DIRECTION FOR WHICH BUILDING AND ELEVATOR
IS INCLUDED IN SOLICITATIONS.
3. NOTES ON THIS SHEET ARE GENERAL AND APPLY TO THE PROJECT
AS A WHOLE, WITH MULTIPLE ELEVATORS, TYPES, AND CONDITIONS
IDENTIFIED. CONTRACTOR TO REVIEW EACH ELEVATORS FLOOR
PLAN SHEET (FP1##) FOR APPLICABLE CONDITIONS BASED ON THE
TYPE OF ELEVATOR, IF BUILDING IS SPRINKLERED, OR UNIQUE
CONDITIONS FOR THAT ELEVATOR.
4. ALL NEW WORK MUST COMPLY WITH APPLICABLE STANDARDS TO
INCLUDE BUT NOT LIMITED TO:
4.1. NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER
SYSTEMS, 2022.
4.2. NFPA 70 NATIONAL ELECTRICAL CODE, 2023.
4.3. NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE, 2022.
4.4. ASME A17.1 SAFETY CODE FOR ELEVATORS AND ESCALATORS,
AS CURRENTLY ADOPTED BY THE STATE.
5. INFORMATION PROVIDED AS EXISTING IS BASED ON FIELD
OBSERVATION. HOWEVER, NOT ALL AREAS WERE ACCESSIBLE,
INCLUDING SOME HOISTWAYS. INFORMATION IS INDICATED AS
OBSERVED AND ALL INFORMATION MUST BE FIELD VERIFIED.
6. MOST EXISTING FIRE ALARM PANELS WERE IN TROUBLE AT THE TIME
OF EVALUATION. SOME DUE TO PAST STORM DAMAGE, AND OTHERS
APPARENTLY FROM LACK OF MAINTENANCE OR PAST SERVICE LIFE.
IN ORDER TO COMMISSION THE NEW ELEVATOR WORK, A
FUNCTIONAL PANEL WITH RECALL AND SHUNT SERVICE IS
REQUIRED. IT IS NOT THE INTENT OF THE ELEVATOR PROJECT TO
CORRECT BUILDING FIRE ALARM DEFICIENCIES, OR TO BRING
EXISTING FIRE ALARM SYSTEMS UP TO CODE AS WOULD BE
REQUIRED BY PROVIDING A NEW "BUILDING FIRE ALARM PANEL". AS
A RESULT, MANY BUILDINGS WILL INCLUDE NEW "ELEVATOR RECALL
CONTROL AND SUPERVISORY CONTROL UNITS" IN ACCORDANCE
WITH NFPA 72, 21.3.2. THIS WILL BE SPECIFICALLY IDENTIFIED IN
"FIRE PROTECTION NEW WORK NOTES" ON THE RESPECTIVE FIRE
PROTECTION FLOOR PLAN SHEET.
7. UNLESS OTHERWISE INDICATED, THE NEW "ELEVATOR RECALL
CONTROL AND SUPERVISORY CONTROL UNIT" (RECALL PANEL) MUST
BE SIZED TO ACCOMMODATE THE FOLLOWING AT A MINIMUM
(ALLOWING FOR FUTURE BUILDING UPGRADE):
7.1. ANALOG ADDRESSABLE ALLOWING FOR MINIMUM 300
INTELLIGENT DEVICES.
7.2. CAPABLE OF INTEGRATION WITH A MASS NOTIFICATION VOICE
SYSTEM IN THE FUTURE.
7.3. CLASS "A" SLC AND NOTIFICATION CIRCUITS.
7.4. CAPABLE OF A SECOND CLASS A SLC CIRCUIT.
7.5. SMOKE DETECTORS INDICATING SENSITIVITY STATUS.
7.6. DACT / UDACT CAPABILITY.
7.7. ABILITY FOR FIBER OPTIC NETWORK INTEGRATION.
8. CONTRACTOR WILL PROVIDE MODULES AND CONNECT THE NEW
RECALL PANEL WITH THE EXISTING BUILDING FIRE ALARM PANEL.
8.1. ELEVATOR RECALL PANEL WILL REPORT TROUBLE, SPRINKLER
VALVE SUPERVISORY, AND ALARM CONDITIONS TO BUILDING
FIRE ALARM PANEL FOR OFF-SITE REPORTING AND BUILDING
EVACUATION.
8.2. BUILDING FIRE ALARM PANEL WILL NOT REPORT ANY SIGNALS
TO THE ELEVATOR RECALL PANEL.
8.3. ADDRESS OF OLD DEVICES BEING REMOVED CAN BE
REASSIGNED TO NEW MODULES.
9. UNLESS INDICATED OTHERWISE FOR A BUILDING, ALL NEW FIRE
ALARM COMPONENTS ASSOCIATED WITH THE ELEVATOR WILL BE
SERVED BY THE ELEVATOR RECALL PANEL. THIS IS TO INCLUDE:
9.1. LOBBY AND MACHINE ROOM SMOKE DETECTORS.
9.2. MONITOR / CONTROL / RELAY MODULES
9.3. MONITORING OF SPRINKLER FLOW SWITCHES / VALVES
RELATED TO ELEVATOR.
9.4. SHUNT TRIP AND SHUNT POWER MONITORING.
9.5. SMOKE DETECTOR AT PANEL PER NFPA 72.
9.6. HEAT DETECTORS IF SPECIFICALLY IDENTIFIED BY ELEVATOR
PLAN.
10. FIRE ALARM AND SPRINKLER INSTALLERS MUST COORDINATE WITH
FOR EXACT QUANTITY AND LOCATION OF ANY VALVES OR FLOW
SWITCHES TO BE MONITORED, AND ANY HOISTWAY OR MACHINE
ROOM SPRINKLERS NEEDING HEAT DETECTORS WITHIN 12".
11. DO NOT PROVIDE SMOKE OR HEAT DETECTORS THAT ARE NOT
SPECIFICALLY REQUIRED BY EITHER CURRENT NFPA 13 OR 72, OR
SPECIFICALLY INDICATED ON THAT ELEVATORS FIRE PROTECTION
FLOOR PLAN. IF SPRINKLER IS NOT PROVIDED AT TOP OF HOISTWAY
THAN NO DETECTION IS REQUIRED. NO DETECTION IS REQUIRED IN
PIT WHEN SPRINKLER IS PROPERLY LOCATED.
CIRCUIT NOTES:
1. FIRE ALARM RECALL PANELS MUST BE PROVIDED WITH EXTERNAL
120VAC SURGE PROTECTION ON A DEDICATED FIRE ALARM CIRCUIT
WITH RED LOCK PER NEC 760 AND NFPA 72. COORDINATE WITH
ELECTRICAL DRAWINGS FOR CIRCUITS.
2. ALL NEW FIRE ALARM CONDUIT TO BE FACTORY RED CONDUIT,
MINIMUM 3/4", WITH COMPRESSION FITTINGS.
3. JUNCTION BOXES ARE TO BE RED UNLESS LOCATED IN A FINISHED
AREA IN WHICH CASE THEY ARE TO BE PAINTED TO MATCH THE
FINISHED SURFACE. IF PANTED OTHER THAN RED, THE INSIDE OF
COVER IS TO BE LABELED "FA ELEVATOR".
4. ELEVATOR RELATED CONDUIT MUST INCLUDE ADDITIONAL LABELS,
SUCH AS FROM LABEL MAKER, THAT INDICATES IT SERVES THE
ELEVATOR. THIS IS SO IT IS NOT ACCIDENTALLY DEMOLISHED
DURING FUTURE FIRE ALARM UPGRADES.
5. LABEL CONDUIT AT LEAST EVERY 20 FEET "ELEVATOR FIRE ALARM".
6. CONDUIT IS TO BE CONCEALED IN WALLS / CEILINGS UNLESS
OTHERWISE APPROVED OR IN A MECHANICAL SPACE.
7. ALL CIRCUITS ARE TO BE CLASS "A" PER USDA CRITERIA. T-TAPS
ARE NOT ALLOWED.
8. CIRCUITS MUST BE PULLED DEVICE-TO-DEVICE WITHOUT SPLICES.
9. WIRE NUTS ARE PROHIBITED. IF REQUIRED, TERMINAL STRIPS ARE
TO BE USED.
10. ALL CONDUCTORS ARE TO BE LABELED WITHIN 4" OF TERMINATION
WITH A MACHINE GENERATED SHRINK-WRAPPED LABEL CLEARLY
INDICATING CIRCUIT FUNCTION. ANY COLOR OF WIRE OTHER THAN
RED / BLACK MUST BE LABELED AS TO POLARITY UNDER NORMAL
OPERATION.
11. MONITOR/CONTROL/RELAY MODULES MUST BE WITHIN 3' OF DEVICE
BEING CONTROLLED UNLESS CIRCUIT IS SUPERVISED.
12. NEW DEVICES REQUIRE NEW WIRE. REMOVE ALL OLD DEVICES AND
WIRING. REMOVE OLD CONDUIT / BOXES NOT RE-USED.
EVALUATE & MAINTAIN EXISTING SYSTEMS:
1. EXISTING FIRE ALARM SYSTEMS ARE TO BE EVALUATED AND ANY
ABNORMAL CONDITIONS DOCUMENTED AND SUBMITTED TO
CONTRACTING OFFICER PRIOR TO STARTING WORK. THIS WILL
SERVE AS A BENCHMARK FOR EXISTING VS NEW CONDITIONS.
2. CONTRACTOR IS RESPONSIBLE FOR OBTAINING SERVICES OF
QUALIFIED TECHNICIANS TO MODIFY PROGRAMMING OF EXISTING
FIRE ALARM PANELS AS APPROPRIATE. AT MINIMUM, BUT NOT
LIMITED TO:
2.1. REMOVE ADDRESSES OF EXISTING DETECTORS, MODULES,
ETC.
2.2. REMOVE PROGRAM FUNCTIONS UPON ACTIVATION OF SUCH
DEVICES.
2.3. REPROGRAM TO MONITOR TROUBLE, SUPERVISORY, AND
ALARM CONDITIONS OF RECALL PANEL TO INITIATE BUILDING
ALARM AS APPROPRIATE AND NOTIFY OFF-SITE MONITORING
OF CONDITIONS.
2.4. PROVIDE NEW MODULES AS NEEDED TO MONITOR NEW RECALL
PANELS.
2.5. THIS WILL REQUIRE SERVICES AT BEGINNING TO DISABLE
THESE DEVICES, AND FOR FINAL TESTING / COMMISSIONING /
VERIFICATION OF MONITORING.
3. EXISTING SMOKE DETECTORS, HEAT DETECTORS, MODULES,
RELAYS, ETC. ARE CONNECTED TO THE EXITING BUILDING FIRE
ALARM PANELS, AND MOST WILL BE REPLACED WITH NEW RECALL
PANEL DEVICES.
4. CONTRACTOR IS TO REMOVE / DISCONNECT THESE
ELEVATOR-RELATED COMPONENTS FROM THE EXISTING SYSTEMS
WITHOUT IMPACTING THE REST OF THE BUILDING FIRE ALARM
SYSTEMS. THIS WILL REQUIRE FIELD EVALUATION OF EACH
BUILDING FOR VARYING CONDITIONS.
5. EXISTING SLC'S PASSING THROUGH AN ELEVATOR RELATED
JUNCTION BOX MAY REMAIN WITH A TERMINAL STRIP ONLY IF
SERVING EQUIPMENT BEYOND THE ELEVATORS. CIRCUITS MUST BE
LABELED TO IDENTIFY FUNCTION AND PANEL CONNECTED TO.
6. EXISTING CIRCUITS THAT TERMINATE AT ELEVATOR DEVICES MUST
BE REMOVED BACK TO PREVIOUS NON-ELEVATOR DEVICE /
JUNCTION.
SUBMITTALS:
1. SHOP DRAWINGS ARE REQUIRED TO BE SUBMITTED AND APPROVED
PER NFPA 72, NFPA 13, AND SPECIFICATIONS.
2. SHOP DRAWINGS MUST INCLUDE ENGINEERS NOTES FROM THIS
SHEET AND SPECIFIC BUILDING SHEET RELATED TO INSTALLATION
AND SYSTEM PERFORMANCE.
3. PROVIDE AS-BUILT DRAWINGS IN AN APPROVED AS-BUILT CABINET
ADJACENT TO NEW FA PANEL.
4. PROVIDE GOVERNMENT WITH ALL USER MANUALS.
BATTERIES:
1. BATTERIES MUST HAVE MANUFACTURER DATE PER NFPA 72.
2. PROVIDE LABEL INSIDE BATTERY SPACE INDICATING WHAT SIZE
BATTERIES ARE REQUIRED BASED ON SYSTEM DEMAND PER NFPA
72. THIS IS TO ENSURE PROPER BATTERIES ARE PROVIDED IN THE
FUTURE.
ADDITIONAL SPRINKLER NOTES:
1. SEE OTHER SPRINKLER NOTES AND CRITERIA ON THIS SHEET
INTEGRATED WITH OTHER CRITERIA, IN SPECIFICATIONS, AND ON
FIRE PROTECTION FLOOR PLANS FOR EACH ELEVATOR.
2. FIELD EVALUATE AND ADJUST / ADD / REMOVE SPRINKLERS AND
PIPING AS INDICATED.
2.1. ENSURE ALL PIT SPRINKLERS ARE WITHIN 24" OF THE BOTTOM
OF THE PIT.
2.2. REMOVE ANY SPRINKLERS FROM TOP OF HOISTWAY IN A
HYDRAULIC ELEVATOR HOISTWAY.
2.3. ADD NEW SPRINKLERS WHERE INDICATED OR REQUIRED
BASED ON TYPE OF ELEVATOR BEING INSTALLED.
2.4. ADD MONITORED ISOLATION VALVE TO EXISTING PIT
SPRINKLERS TO REMAIN THAT DON'T HAVE A VALVE.
3. IF REMOVING, REMOVE ALL PIPE, HANGERS, AND RELATED
EQUIPMENT BACK TO BRANCH LINE OR MAIN AS APPROPRIATE.
4. IF ADDING NEW SPRINKLER COMPONENTS, SYSTEM IS TO COMPLY
WITH INDICATED CODES AND THE FOLLOWING:
4.1. PIPE TO BE SCHEDULE 40, BLACK STEEL.
4.2. ISOLATION VALVES TO BE BUTTERFLY WITH TAMPER
MONITORED BY RECALL ALARM PANEL.
4.3. ANY PIT SPRINKLERS TO BE LESS THAN 24" ABOVE FLOOR OF
PIT AND HAVE AN ISOLATION VALVE LOCATED OUTSIDE THE PIT.
4.4. PROVIDE SIGNAGE FOR ALL VALVES INDICATING FUNCTION
AND NORMALLY OPEN/CLOSED.
4.5. IF PROVIDING WATER FLOW FOR SHUNTING, WATER FLOW
SWITCH MUST HAVE NO TIME DELAY, INCORPORATE A CHECK
VALVE BEFORE THE FLOW SWITCH, BUTTERFLY VALVE, AN
INSPECTOR TEST TO EXTERIOR, AND HAVE PRESSURE RELIEF
DOWNSTREAM OF CHECK VALVE.
4.6. PIT SPRINKLERS TO BE SIDEWALL WITH GUARD, STANDARD
RESPONSE, INTERMEDIATE TEMPERATURE (MINIMUM).
5. DO NOT PROVIDE SPRINKLERS IN HOISTWAY UNLESS SPECIFICALLY
REQUIRED BY CURRENT NFPA 13, 9.3.6 (PIT FOR HYDRAULIC, TOP /
BOTTOM OF HOISTWAY FOR COMBUSTIBLE BELTS).
HYDRAULIC ELEVATOR IN SPRINKLERED BUILDING
NTS
FP001
ELEVATOR RECALL AND CONTROL PANEL GENERAL CRITERIA
NTS
FP001
LOWEST LEVEL FLOOR PLAN (BASEMENT)
SCALE: 1/16"=1'-0"
PLAN
NORTH
FP105
HIGHEST LEVEL FLOOR PLAN (THIRD)
SCALE: 1/16"=1'-0"
PLAN
NORTH
FP105
ELEVATOR SHAFT
SCALE: 1/4"=1'-0"
FP105
- 1
5'- 0"
(F
IE
LD
V
ER
IF
Y)
- 1 5'-
0" (F
IE
LD
V
ER
IF
Y)
- 1
5'- 0"
(F
IE
LD
V
ER
IF
Y)
EX
IS
TI
NG
P
IT
D
EP
TH
(F
IE
LD
V
ER
IF
Y)
EX
IS
TI
NG
O
VE
RH
EA
D
CL
EA
RA
NC
E (F
IE
LD
V
ER
IF
Y)
THIS IS A TRACTION
ELEVATOR WITH
MECHANICAL ROOM
OVER HOISTWAY.
BASEMENT LEVEL
FIRST LEVEL
SECOND LEVEL
THIRD LEVEL
TOP OF SHAFT
BOTTOM OF PIT
ELEVATOR MACHINE ROOM
SCALE: 1/4"=1'-0"
PLAN
NORTH
FP105
FP105
FP105
ELEVATOR
ELEVATOR
MACHINE
ROOM
TOP OF ELEVATOR
SHAFT IN ATTIC
ELEVATOR EQUIPMENT
PPM
REVISIONS
DESCRIPTION
SHEET
DATE
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
SUSDA
BY
OF
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
EPM
USDA ARS
NORTHEAST AREA
BELTSVILLE, MARYLAND
Agricultural
Service Research
USDA AGRICULTURAL RESEARCH SERVICE
BELTSVILLE AGRICULTURAL RESEARCH CENTER (BARC)
ELEVATOR MODERNIZATION - BELTSVILLE, MD
SWL
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
P.A.
FIRMJohnson-McAdamsTHE
CLR
JGM
7523-A
--- 04/30/24
DATE
PROJECT NO.
A-E FIRM
4/30/24
FP105
REMOVE ANY EXISTING
SMOKE OR HEAT
DETECTORS FROM PIT.
REPLACE EXISTING
SMOKE DETECTOR
WITH NEW ON RECALL
PANEL
MACHINE ROOM OVER
HOISTWAY IN ATTIC.
DATA SERVICE
LOCATION
(ROOM 690)
ELECTRICAL SERVICE
LOCATION (ROOM 123)
FIRE PROTECTION EXISTING CONDITIONS:
1. BELOW INFORMATION IS BASED ON FIELD OBSERVATION OF AREAS THAT COULD BE ACCESSED.
2. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS.
3. "TBD" INDICATES THIS ITEM COULD NOT BE VERIFIED AT TIME OF REVIEW.
4. BUILDING SPRINKLERED: YES
5. MACHINE ROOM HAS SPRINKLERS: NO
6. MACHINE ROOM ISOLATION VALVE: NO
9. SHUNT TRIP BREAKER: NO
10. FLOW SWITCH FOR POWER SHUNT: NO
11. HEAT DETECTOR(S) USED FOR POWER SHUNT BREAKER: NO
12. MACHINE ROOM SMOKE / HEAT DETECTOR: YES, SMOKE
13. ELEVATOR PIT SMOKE / HEAT DETECTOR: TBD
14. TOP OF HOISTWAY SMOKE / HEAT DETECTOR: TBD
15. ELEVATOR PIT SPRINKLER: TBD
16. ELEVATOR PIT SPRINKLER IS < 24" ABOVE BOTTOM OF PIT: TBD
17. TOP OF HOISTWAY SPRINKLER: TBD
18. TOP OF HOISTWAY SPRINKLER ISOLATION VALVE: TBD
19. EXISTING LOBBY SMOKE DETECTORS: YES
20. WERE ANY RECALL / HELMET MODULES IDENTIFIED: NO, RELAY OPERATED ELEVATOR
21. EXISTING BUILDING FIRE ALARM PANEL: NOTIFIER AFP-400 CONTROLLING OLDER CIRCUITS FROM
OLD FCI CONVENTIONAL PANEL.
22. TROUBLES / FAULTS ON EXISTING FIRE ALARM SYSTEM: YES
23. WILL EXISTING FIRE ALARM PANEL BE USED FOR NEW ELEVATOR WORK: NO, PAST USEFUL LIFE
SPAN.
24. TYPE OF ELEVATOR: CABLE SUSPENSION
FIRE PROTECTION NEW WORK NOTES:
1. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS TO ESTABLISH IF THERE ARE
ANY EXISTING CONDUITS THAT CAN BE RE-USED WITH FULL WARRANTY TO ACHIEVE INTENDED
LEVEL OF PROTECTION.
2. PROVIDE NEW ELEVATOR RECALL FIRE ALARM PANEL: YES
3. BUILDING SPRINKLERED: YES
4. MACHINE ROOM SPRINKLER PROTECTION: NO, NOT REQUIRED PER NFPA 13, 9.3.6.3. A NEW RATED
DOOR WILL BE REQUIRED (SEE ARCHITECTURAL).
5. MACHINE ROOM ISOLATION VALVE: NO
6. SHUNT TRIP BREAKER: ONE WILL BE PROVIDED, BUT NOT REQUIRED AT THIS TIME DUE TO NO
SPRINKLERS IN HOISTWAY.
7. FLOW SWITCH FOR POWER SHUNT: NO
8. HEAT DETECTOR(S) USED FOR POWER SHUNT BREAKER: NO
9. MACHINE ROOM SMOKE / HEAT DETECTOR: YES, PROVIDE NEW SMOKE ON RECALL PANEL
10. ELEVATOR PIT SMOKE / HEAT DETECTOR: NO, REMOVE ANY EXISTING.
11. TOP OF HOISTWAY SMOKE / HEAT DETECTOR: NO, REMOVE ANY EXISTING.
12. ELEVATOR PIT SPRINKLER: NO, REMOVE IF EXISTING
13. TOP OF HOISTWAY SPRINKLER: NO, REMOVE IF EXISTING.
14. ELEVATOR LOBBY SMOKE DETECTORS: PROVIDE NEW ON NEW RECALL PANEL
15. PROVIDE MODULES FOR PRIMARY & SECONDARY RECALL, HELMET LAMP
16. SEE PLANS FOR PROPOSED LOCATION OF NEW RECALL PANEL. FIELD COORDINATE FOR BEST
LOCATION ENSURING: MINIMUM 36" CLEARANCE IN FRONT PER NEC; DO NOT LOCATE INSIDE
ELEVATOR MACHINE ROOM; DO NOT LOCATE IN CORRIDOR, LOBBY, OFFICE, LAB, OR OTHER
SIMILAR WORK SPACE OR PUBLIC SPACE UNLESS SHOWN ON THIS SHEET OR OTHERWISE
APPROVED. FINAL LOCATION MUST BE APPROVED BY CONTRACTING OFFICER BEFORE FINAL
SELECTION AND MOUNTING. GOOD LOCATION WOULD ALLOW FOR ADDITIONAL FUTURE PANELS
(AMPLIFIERS / NAC'S, ETC.) WITH FIRE ALARM UPGRADE.
17. EXISTING CONDUIT MAY BE RE-USED IF PROVIDED WITH 3/4" RED BANDS ON EACH SECTION AND
NOT MORE THAN 5' APART, AND FULLY WARRANTED AGAINST ANY GROUND FAULTS.
18. ANY JUNCTION BOXES / CONDUIT TO BE RE-USED MUST BE LOCATED TO COMPLY WITH CONTRACT
REQUIREMENTS AND CODE. (I.E. RELOCATING AS NECESSARY.)
19. MONITOR NEW ELEVATOR RECALL PANEL WITH BUILDING PANEL.
FIRE PROTECTION GENERAL NOTES:
1. SEE FP001 FIRE PROTECTION GENERAL NOTES FOR TYPICAL CRITERIA RELATED TO ELEVATOR
MODERNIZATION PROJECT.
2. THIS DRAWING OUTLINES SPECIFIC INFORMATION RELATED TO THIS BUILDING / ELEVATOR AND
WILL SUPERCEDE GENERAL CRITERIA ON FP001 OR SPECIFICATIONS IF THERE IS A CONFLICT.
S p
S p
S p
S p
S p
S p
S p
REMOVE ANY EXISTING
SMOKE OR HEAT
DETECTORS FROM TOP OF
HISTWAY.
S p
VERIFY IF DETECTOR OUTSIDE HOISTWAY IN ATTIC IS
CONNECTED FOR ELEVATOR FUNCTION OR BUILDING. NOT
REQUIRED FOR ELEVATOR IF THERE IS NO DOOR HERE.
THERE IS A MONITOR MODULE ABOVE
CEILING BY LIGHT THIS AREA. IDENTIFY
IF GOING INTO HOISTWAY AND FUNCTION.
FARP
MM MM
MM MM
MMMMMM
MM
S p
ELEVATOR 005 | BUILDING 007 | #1
FIRE PROTECTION
0' 2' 4' 8' 12'
SCALE: 1/4"=1'-0"
0' 48'
SCALE: 1/16"=1'-0"
16'8' 32'
S p
WF TS
MM
H rr
FARP
LEGEND:
EXISTING FIRE ALARM CONTROL UNIT
FIRE ALARM RECALL PANEL
WATER FLOW/TAMPER MODULES
MONITOR/CONTROL MODULE
PHOTOELECTRIC SMOKE DETECTOR
RATE OF RISE HEAT DETECTOR
FACU
EXISTING FACU
NTS
FP105
EXISTING FACU
NTS
FP105
FACU
EXISTING FACU
EVALUATE SPACE FOR NEW FARP
FIRESTOPPING:
INSTALLING A NEW RECALL PANEL WILL REQUIRE RUNNING NEW CONDUIT INCLUDING WALL/FLOOR PENETRATIONS
THAT ARE TO BE SEALED PER THE LISTED ASSEMBLY BASED ON THE MANUFACTURES DETAIL SHEET.
FLOOR PENETRATIONS THROUGH FLOORS ARE TO BE A MINIMUM 1-HOUR.
PENETRATIONS THROUGH MECHANICAL / ELEVATOR SHAFTS ARE TO BE 2-HOURS WHEN CONNECTING FOUR OR
MORE FLOORS, OR 1-HOUR WHEN CONNECTING UP TO THREE FLOORS.
FOR OTHER THAN SPECIFIC FIRE SERVICE ELEVATORS, MACHINE ROOMS THAT ARE ADJACENT TO AND HAVE ANY PENETRATIONS TO A HOISTWAY ARE TO HAVE AT LEAST THE SAME RATING OF THE HOISTWAY. WHEN THE MACHINE
ROOM DOES NOT ABUT OR HAVE OPENINGS TO THE HOISTWAY, THE MINIMUM RATING IS TO BE 1-HOUR.
SEE SPECIFIC FIRE STOP SPECIFICATIONS FOR ADDITIONAL CRITERIA.
File details come from the government source that posted it. Updated .