Attachment 6 - Generator usage log (CLIN 0001).pdf
PDF 1 MB Posted
- Attached to
- CONSTRUCTION-AUTEC HVAC
- Solicitation number
- N6660426Q0043
About this file
This appears to be an Adobe Reader placeholder page indicating a PDF loading issue. The document contains standard troubleshooting instructions for resolving PDF display problems, including recommendations to upgrade Adobe Reader for Windows, Mac, or Linux. The page provides download links for the latest version of Adobe Reader and includes trademark information for Windows, Mac, and Linux operating systems. No substantive contract, solicitation, or business content is present in this document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Page of
NUWCDIVNPT 5090/8 (NOV-2024)
UNCLASSIFIED
Select Classification from drop-down list.
UNCLASSIFIED
NUWC DIVISION NEWPORT CONTRACTOR MONTHLY FUEL USAGE LOG FOR GENERATORS
This log is due each month no later than the 10th day of the following month, or promptly at the completion of the project, whichever comes first.
If the generator is equipped with an hour meter, please provide hour meter readings. If the generator is not equipped with an hour meter please provide total monthly fuel usage.
Month Year Hour Meter Readings (Preferred, if available) Total Monthly Fuel Usage in Gallons (If not Metered) Meter Start Meter End January February March April May June July August September October November December Notes: (1) Recordkeeping is required under NUWC's Air Emissions Cap Permit Issued by the Department of Environmental Management's Office of Air Resources. (2) Non-road engines that intend to, or have been onsite, for longer than 12 months are considered stationary and require a permit if greater than 50 horsepower. (3) This log is not required for tracking self-propelled mobile non-road engines.
11.0.0.20130303.1.892433.887364
| CurrentPage: |
| PageCount: |
| F1: |
| F2: |
| F3: |
| TextField1: |
| TextField3: |
| TextField4: |
| TextField5: |
| TextField6: |
| TextField7: |
| TextField2: |
| Cell2: |
| Cell5: |
| Cell3: |
| Cell4: |
File details come from the government source that posted it. Updated .