Attachment 6 Drawings.pdf

PDF 1 MB Posted

Attached to
RFP CAST IRON COLUMN STORAGE & CLEAN
Solicitation number
00002481
Issued by
Oregon

About this file

This is a technical drawing document prepared by Portland Parks and Recreation (PP&R) in Portland, Oregon, depicting a Cast Iron Coordination Plan at a 1" = 10' scale. The drawing illustrates the spatial layout and installation locations for cast iron columns and support poles within a park facility bounded by Park Avenue SW, Washington Street SW, and Harvey Milk Street SW. The plan identifies 27 support pole locations (designated P1 through P27) and multiple cast iron column installation points (numbered 43 through 95), with specific notations indicating that certain column numbers are not visible in the warehouse or require identification by PP&R staff. The project, dated October 4, 2024, is overseen by Project Manager Ross Swanson and was prepared by Dan Ryan under the direction of Commissioner Adena Long and Director Darcelle X, representing a 75% submittal phase.

The coordination plan establishes clear delineation of responsibilities between the general contractor and the cast iron contractor. The general contractor is responsible for installing support poles and footings, drilling and finishing connector holes, and grouting at the base if necessary. The cast iron contractor is responsible for delivering refinished cast iron pieces to the site, maneuvering them into place, and installing all connectors and fasteners, with connection collars and fasteners provided by the cast iron contractor. The drawing includes a specific notation that cast iron piece 57, currently installed at N.W. Davis/N.W. Naito, must be removed, finished to match specifications, and replaced with a piece to be identified by PP&R. Close coordination between both contractors regarding fastener hole locations is required to ensure proper installation and project completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SA

W W

W W

W W

W W

W

W SD

PM

E E E E E E E E E E E E E E E E E

E E

E E

E E

E E

E E E

E

E

W

T

T

J

SA

E

E E E E E E E E

E

E

E

E

E

E

E

E E E E E E

E

E

E

E E

E E

E E

E E

E E

E E

E E

W W

W W

W W

W W

T T

T T

T T

T T

T T

T T

T T T T T T

T T

T

T T

T T

T T

T T

SD

T

W

SW PARK AVE.

SW

W

AS

H

IN

G

TO

N

S T.

SW

H

AR

VE

Y M

IL

K

ST

Po rt la nd

P ar ks a nd R ec re at io n

REVISIONS

DATE BYDESCRIPTION

SE

CT

IO

N

DR

AW

N

B Y:

DA

TE

:1 0-

4-

Po rt la nd

, O re go n

PR

O

JE

CT

M

AN

AG

ER

: R os s S w an so n

SC

AL

E:

$F

IL

E$ $D

AT

E$

PL

O

TT

ED

O N

DR

AW

IN

G: NOTE:

SCALE INDICATED ON DRAWING

IS CORRECT IF DRAWING

BORDER IS 22" X 34".

PL

O

TT

ED

B Y:

$U

SE

RN

AM

E$

PL

O

TT

ED

F

RO

M

$C

O M

PU

TE

RN

AM

E$

NALTROP D

&PARKS RECRE ATION

Healthy HealthParks, Portlandy

Da n

Ry an

Co m m iss io ne r

A de na

L on g, D ire ct or

Da rc el le

X V

75% Submittal

CAST IRON COORDINATION PLAN

SCALE: 1" = 10'1

Cast Iron Coordination Plan

SW 9TH AVE.

P9P8P7 P6

P26

P22

P23

P24

P21

P20

P25

P27

5577765657747355

U1

U2

P2 P3 P4 P5

NUMBER NOT

VISIBLE IN

WAREHOUSE -

LIKELY TO BE 93

NUMBER NOT

VISIBLE IN

WAREHOUSE -

SIMILAR TO 75

SUPPORT POLE LOCATION NOT USED

FOR CAST IRON INSTALLATION.

KEY NOTES

1 111

CAST IRON COLUMNS

CAST IRON COLUMN INSTALLATION

LOCATION WITH COLUMN NUMBER.

SEE SCANS OF COLUMNS ON THIS

SHEET.

P27

SUPPORT POLES

SUPPORT POLE LOCATION WITH POLE

NUMBER. SEE SUPPORT POLE

SCHEDULE ON SHEET L2.10 FOR

MORE INFORMATION

STORAGE CONTAINER

SUPPORT POLE AND

FOOTING INSTALLATION BY

GENERAL CONTRACTOR

CONNECTION COLLAR AND

FASTENERS PROVIDED BY

CAST IRON CONTRACTOR

GENERAL CONTRACTOR AND

CAST IRON CONTRACTOR TO

COORDINATE ON LOCATION OF

FASTENER HOLES. GENERAL

CONTRACTOR TO DRILL AND

FINISH CONNECTOR HOLES.

GENERAL CONTRACTOR TO

GROUT AT BASE IF

NECESSARY

CAST IRON CONTRACTOR

TO DELIVER REFINISHED

CAST IRON PIECES TO SITE

AND IS RESPONSIBLE TO

MANEUVER INTO PLACE

AND INSTALL ALL

CONNECTORS AND

FASTENERS.

CAST IRON PIECE 57 IS CURRENTLY INSTALLED AT N.W.

DAVIS/N.W. NAITO. REMOVE AND FINISH THIS PIECE TO

MATCH AND REPLACE WITH CAST IRON PIECE TO BE

IDENTIFIED BY PP&R

ADDITIONAL NOTE

File details come from the government source that posted it. Updated .