Attachment 6 - 668-25-105 - Price Breakout.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Z1DA--668-25-105 Replace Grease Traps Federal contract opportunity
- Solicitation number
- 36C26026R0109
About this file
This is a Price Schedule Breakdown template for a construction project to replace grease traps at Mann-Grandstaff VA Medical Center in Spokane, Washington (Project 668-25-105). The template provides a comprehensive pricing structure organized by Construction Specification Institute (CSI) divisions across four subgroups: General Facility Construction (Divisions 1-14), Facility Services (Divisions 21-28), Site & Infrastructure (Divisions 31-35), and Process Equipment (Divisions 40-48). All line items in the template currently show N/A quantities and $0.00 pricing, indicating this is a blank template awaiting contractor input.
The instructions establish that awardees are responsible for calculating accurate subtotals and contract totals, with all pricing submitted on a fixed-price basis. The template notes that contract line item price breakdowns are for information purposes only and do not constitute separate billable deliverables. Field office overhead and general conditions are to be applied only once to the contract and any future changes. The price schedule includes sections for total divisions, insurance/bonds, taxes/fees, O&M manuals and red line drawings, overhead, subcontract mark-up, profit, and other non-requested items, with a final contract totals line at the bottom.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26026R0109 Amendment 0003.docx | DOCX document | |
| 668-25-105 Pre-Bid Site Visit Sign-In Sheet 08-18-26.pdf | ||
| 36C26026R0109 Grease Traps RFI Questions and Answers.pdf | ||
| 36C26026R0109 Amendment 0002.docx | DOCX document | |
| 36C26026R0109 Amendment 0001.docx | DOCX document | |
| Attachment 9 - VA Site Visit Campus Map - Bldg 5.pdf | ||
| Attachment 4 - 668-25-105 - Past Performance Questionnaire.docx | DOCX document | |
| Attachment 3 - 668-25-105 - Wage Determination Spokane.pdf | ||
| RFP 36C26026R0109.docx | DOCX document | |
| Attachment 8 - VA Specific Special Contract Clause.docx | DOCX document | |
| Attachment 7 - 668-25-105 - Environmental Report.pdf | ||
| Attachment 5 - 668-25-105 - Contractor Rules of Behavior.pdf | ||
| Attachment 1 - 668-25-105 - SOW.pdf | ||
| Attachment 2 - 668-25-105- Specs.pdf | ||
| 36C26026R0109.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE SCHEDULE BREAKDOWN INSTRUCTIONS | |
| INSTRUCTIONS | |
| 1 | Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary |
| 2 | The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record. |
| 3 | The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables. |
| 4 | Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable. |
| 5 | All pricing is fixed price. |
Proposal Price Schedule
| PRICE SCHEDULE BREAKDOWN |
| Project 668-25-105 |
Replace Grease Traps Mann-Granstaff VA Medical Center, Spokane, WA
| Site & Infrastructure Subgroup | ||
| Rates | Base Item | |
| General Requirements & Facility Construction | Price | |
| Division Item 1 General Requirements (furnish and install) | N/A | $0.00 |
| Division Item 2 Existing Conditions (furnish and install) | N/A | $0.00 |
| Division Item 3 Concrete (furnish and install) | N/A | $0.00 |
| Division Item 4 Masonry (furnish and install) | N/A | $0.00 |
| Division Item 5 Metals (furnish and install) | N/A | $0.00 |
| Division Item 6 Woods, Plastic and Composites (furnish and install) | N/A | $0.00 |
| Division Item 7 Thermal and Moisture Protection (furnish and install) | N/A | $0.00 |
| Division Item 8 Openings (furnish and install) | N/A | $0.00 |
| Division Item 9 Finishes (furnish and install or state included in Division 5) | N/A | $0.00 |
| Division Item 10 Specialties (furnish and install) | N/A | $0.00 |
| Division Item 11 Equipment (furnish and install) | N/A | $0.00 |
| Division Item 12 Furnishes (furnish and install) | N/A | $0.00 |
| Division Item 13 Special Construction (furnish and install) | N/A | $0.00 |
| Division Item 14 Conveying Equipment (furnish and install) | N/A | $0.00 |
| Facility Services Subgroup | ||
| Division Item 21 Fire Suppression (furnish and install) | N/A | $0.00 |
| Division Item 22 Plumbing (furnish and install) | N/A | $0.00 |
| Division Item 23 Heating, Ventilating and A/C (furnish and install) | N/A | $0.00 |
| Division Item 25 Integrated Automation | N/A | $0.00 |
| Division Item 26 Electric | N/A | $0.00 |
| Division Item 27 Communications | N/A | $0.00 |
| Division Item 28 Electronic Safety & Security | N/A | $0.00 |
| Site & Infrastructure Subgroup | ||
| Division Item 31 Earthwork | N/A | $0.00 |
| Division Item 32 Exterior Improvments | N/A | $0.00 |
| Division Item 33 Utilities | N/A | $0.00 |
| Division Item 34 Transportation | N/A | $0.00 |
| Division Item 35 Waterway & Marine Construction | N/A | $0.00 |
| Process Equipment Subgroup | $0.00 | |
| Division Item 40 Process Interconnections | N/A | $0.00 |
| Division Item 41 Material Processing & Handling Equipment | N/A | $0.00 |
| Division Item 42 Process Heating, Cooling, & Drying Equipment | N/A | $0.00 |
| Division Item 43 Process Gas & Liquid Handling | N/A | $0.00 |
| Division Item 44 Pollution & Waste Control Equipment | N/A | $0.00 |
| Division Item 45 Industry Specific Mfg. Equipment | N/A | $0.00 |
| Division Item 46 Water & Wastewater Equipment | N/A | $0.00 |
| Division Item 48 Electrical Power Generation | N/A | $0.00 |
TOTAL DIVISIONS $0.00
| Insurance / Bonds | $0.00 |
| Taxes / Other Fees (provide itemized list) | $0.00 |
| O&M Manuals and Red Line Drawings | $0.00 |
| Overhead | $0.00 |
| SubContract Mark-Up | $0.00 |
| Profit | $0.00 |
| SubTotals | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00
| CONTRACT TOTALS | $0.00 | |
| TOAL | $0.00 |