ATTACHMENT 6 - 12-21-2022 Final Contract Documents Full Set_01.pdf
PDF 36 MB Posted
- Solicitation number
- 36C25724R0077
About this file
The provided document appears to be a set of final contract documents related to a solicitation for the construction to replace boilers and a boiler plant at the Central Texas Veterans Health System in Temple, Texas.
The key details are: The solicitation number is 36C25724R0077, the agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17, and the description indicates this is a solicitation for construction services to replace the boilers and boiler plant. A site visit is scheduled for November 7, 2024 at 10 AM Central Time. The solicitation does not provide specifics on pricing terms, set asides, incumbents, or award dates. This document appears to be the full set of contract documents for the referenced solicitation.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project
Building
Drawing
Project Title
Location
Issue Date Checked Drawn
Drawing
Approve
VA FORM 08 -
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 1
PhasARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 1
FULLY SPRINKLERED
---INTERIORSARCHITECTURE
COX DESIGN ASSOCIATES
PLANNING
Austin 5121 Bee Caves Road, Suite 203 Austin, Texas 78746 www.coxdesignassociates.com T: 512-327-4149
APPROVED: HRC DIRECTOR
APPROVED: VA PROJECT MANAGER
CONSULTANT
5350 W. 94TH TERRACE #102
PRAIRIE VILLAGE, KS 66207
T 913.258.5026 www.rossbar.com
12/05/2022
BI
M
VA
T
EM
PL
E
R
EP
LA
C
E
BO
IL
ER
P
LA
N T/
Te m pl e, R ep la ce
B oi le r P la nt
.rv t
/2
1/
4:
:4
PM
GI-001
FINAL CONTRACT
DOCUMENTS
COVER SHEET REPLACE BOILERS AND
BOILER PLANT
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TEXAS 76504
RHC
674-19-101
CAKP
TEMPLE VA MEDICAL CENTER
1901 VETERANS MEMORIAL DRIVE TEMPLE, TX 76504
REPLACE BOILERS AND BOILER PLANT
PROJECT # 674-19-101
FINAL 100% CONSTRUCTION DOCUMENTS
Revisions: Date:
Project
Building
Drawing
Project Title
Location
Issue Date Checked Drawn
Drawing
Approve
VA FORM 08 -
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 1
PhasARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 1
FULLY SPRINKLERED
---INTERIORSARCHITECTURE
COX DESIGN ASSOCIATES
PLANNING
Austin 5121 Bee Caves Road, Suite 203 Austin, Texas 78746 www.coxdesignassociates.com T: 512-327-4149
APPROVED: HRC DIRECTOR
APPROVED: VA PROJECT MANAGER
CONSULTANT
5350 W. 94TH TERRACE #102
PRAIRIE VILLAGE, KS 66207
T 913.258.5026 www.rossbar.com
12/05/2022
BI
M
VA
T
EM
PL
E
R
EP
LA
C
E
BO
IL
ER
P
LA
N T/
Te m pl e, R ep la ce
B oi le r P la nt
.rv t
/2
1/
4:
:1
PM
GI-002
FINAL CONTRACT
DOCUMENTS
INDEX OF DRAWINGS REPLACE BOILERS AND
BOILER PLANT
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TEXAS 76504
RHC
674-19-101
CAKP
E-601 ELECTRICAL ONE-LINE DIAGRAMS
E-602 ELECTRICAL ONE-LINE DIAGRAMS
E-603 ELECTRICAL SCHEDULES
E-604 ELECTRICAL SCHEDULES
E-605 ELECTRICAL PANEL SCHEDULES
EL-101 ELECTRICAL 1ST FLOOR NEW WORK PLAN - LIGHTING
EL-102 ELECTRICAL MEZZANINE NEW WORK PLAN - LIGHTING
EP-101 ELECTRICAL 1ST FLOOR NEW WORK PLAN - POWER
EP-102 ELECTRICAL MEZZANINE NEW WORK PLAN - POWER
EP-103 ELECTRICAL ROOF NEW WORK PLAN
FIRE ALARM
FA-000 FIRE ALARM LEGEND
FA-101 1ST FLOOR FIRE ALARM PLAN
FA-102 MEZZANINE FIRE ALARM PLAN
FA-601 FIRE ALARM RISER DIAGRAM
TELECOMMUNICATIONS
T-000 TECHNOLOGY LEGEND
T-101 1ST FLOOR COMMUNICATIONS PLAN
T-102 MEZZANINE COMMUNICATIONS PLAN
T-103 1ST FLOOR SECURITY PLAN
T-104 MEZZANINE SECURITY PLAN
T-501 TECHNOLOGY DETAILS
T-601 TECHNOLOGY RISER DIAGRAMS
AS-510 PARTITION TYPES
AS-511 ROOF DETAILS
AS-512 CASEWORK DETAILS
AS-610 DOOR & WINDOW SCHEDULES, DETAILS, AND FINISHES
AS-611 WINDOW DETAILS
AS-620 SIGNAGE INTERIOR / EXTERIOR
FIRE PROTECTION
FP-000 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS
FP-001 FIRE PROTECTION SITE PLAN
FP-101 FIRE PROTECTION 1ST FLOOR NEW WORK PLAN
FP-102 FIRE PROTECTION MEZZANINE FLOOR PLAN
FP-501 FIRE PROTECTION DETAILS
PLUMBING
P-000 PLUMBING SYMBOLS AND ABBREVIATIONS
P-100 PLUMBING UNDERFLOOR NEW WORK PLAN
PL-101 PLUMBING 1ST FLOOR NEW WORK PLAN - WASTE
PL-102 PLUMBING MEZZANINE NEW WORK PLAN - WASTE
PP-101 PLUMBING 1ST FLOOR NEW WORK PLAN - SUPPLY
PP-102 PLUMBING MEZZANINE NEW WORK PLAN - SUPPLY
P-104 PLUMBING ROOF NEW WORK PLAN
P-301 PLUMBING RISER DIAGRAMS
P-302 PLUMBING RISER DIAGRAMS
P-303 PLUMBING RISER DIAGRAMS
P-401 PLUMBING ENLARGED PLANS
P-402 PLUMBING ENLARGED PLANS
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-503 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
MECHANICAL
M-000 MECHANICAL SYMBOLS AND ABBREVIATIONS
MD001 ENLARGED MECHANICAL SITE DEMOLITION PLAN
MH101 MECHANICAL 1ST FLOOR NEW WORK PLAN - DUCTWORK
MP101 MECHANICAL 1ST FLOOR NEW WORK PLAN - PIPING
M-111 CATWALK PLAN
MH102 MECHANICAL MEZZANINE NEW WORK PLAN - DUCTWORK
MP102 MECHANICAL MEZZANINE NEW WORK PLAN - PIPING
M-104 MECHANICAL ROOF NEW WORK PLAN - DUCTWORK
M-201 MECHANICAL FLOW DIAGRAMS
M-202 MECHANICAL FLOW DIAGRAMS
M-203 MECHANICAL FLOW DIAGRAMS
M-301 MECHANICAL SECTIONS
M-302 MECHANICAL SECTIONS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-603 MECHANICAL SCHEDULES
M-701 CONTROLS SYMBOLS & ABBREVIATIONS
M-702 MECHANICAL CONTROLS
M-703 MECHANICAL CONTROLS
M-704 MECHANICAL CONTROLS
M-705 MECHANICAL CONTROLS
M-706 MECHANICAL CONTROLS
M-707 MECHANICAL CONTROLS
M-708 MECHANICAL CONTROLS
ELECTRICAL
E-000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
E-001 ELECTRICAL SITE PLAN
E-002 ELECTRICAL PHASING PLAN
E-401 ELECTRICAL ENLARGED PLANS
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
GENERAL
GI-001 COVER SHEET
GI-002 INDEX OF DRAWINGS
GI-003 GENERAL NOTES
GI-004 PROJECT LOCATION
SURVEY
VF-101 FIELD SURVEY EXISTING CONDITIONS
PHYSICAL SECURITY
PS-100 PHYSICAL SECURITY
CIVIL
C-001 GENERAL INFORMATION
C-100 CIVIL SITE PLAN
C-101 CIVIL UTILITY PLAN
C-102 NEW GAS FEED LINE
C-103 GRADING PLAN
C-104 CIVIL SITE PLAN
C-500 CIVIL SITE DETAILS
C-501 CIVIL DETAILS PLAN THRUST BLOCKS
C-502 CIVIL DETAILS PLAN FENCE & GATES
C-503 CIVIL DETAILS SILT FENCE
C-504 CIVIL DETAILS PLAN INLETS AND MANHOLES
CD-100 CIVIL SITE DEMO PLAN
CD-101 CIVIL UTILITY DEMO PLAN
STRUCTURAL
S-100 GENERAL STRUCTURAL NOTES
S-101 TYPICAL DETAILS
S-200 FOUNDATION PLAN
S-201 MEZZANINE PLAN
S-202 ROOF FRAMING PLAN
S-203 WIND UPLIFT PLAN
S-300 TILT-UP PANEL ELEVATION PLAN
S-301 TILT-UP PANEL ELEVATION PLAN
S-302 TILT-UP PANEL ELEVATIONS
S-400 FOUNDATION DETAILS
S-401 FOUNDATION DETAILS
S-500 FRAMING DETAILS
S-501 FRAMING DETAILS
S-502 FRAMING DETAILS
ARCHITECTURAL
AD-101 SITE DEMO PLAN
AI-100 FIRST FLOOR PLAN LIFE SAFETY PLAN
AI-101 MEZZANINE LIFE SAFETY PLAN
AS-102 SITE PLAN
AS-103 FIRST FLOOR PLAN
AS-104 MEZZANINE FLOOR PLAN
AS-105 CLEARSTORY WINDOW PLAN
AS-106 ROOF PLAN
AS-110 FIRST FLOOR DIMENSION PLAN
AS-111 MEZZANINE DIMENSION PLAN
AS-112 FIRST FLOOR FINISH PLAN
AS-113 MEZZANINE FLOOR FINISH PLAN
AS-130 REFLECTED CEILING PLAN
AS-131 MEZZANINE REFLECTED CEILING PLAN
AS-300 BUILDING SECTIONS
AS-301 BUILDING SECTIONS
AS-302 WALL SECTIONS
AS-303 EXTERIOR ELEVATIONS
AS-304 EXTERIOR ELEVATIONS
AS-305 ENLARGED SECTIONS
AS-400 ENLARGED FLOOR PLANS
AS-401 ENLARGED FLOOR PLANS
AS-402 INTERIOR ELEVATIONS
AS-403 INTERIOR ELEVATIONS
AS-404 INTERIOR ELEVATIONS
UNLESS NOTED AS EXISTING, ALL MATERIALS, EQUIPMENT, MANUFACTURED
ITEMS AND ASSEMBLIES INCORPORATED INTO THE WORK SHALL BE NEW.
1.
UNLESS NOTED TO BE REMOVED AND DISPOSED, ALL EXISTING ITEMS ARE TO
REMAIN. THEY SHALL BE PROTECTED FROM DAMAGE DUE TO CONSTRUCTION
ACTIVITIES. ANY EXISTING ITEMS TO REMAIN THAT BECOME DAMAGED DUE TO
CONSTRUCTION ACTIVITIES SHALL BE REPAIRED OR REPLACED TO MATCH
EXISTING AT NO ADDITIONAL COST TO THE OWNER..
NOTATIONS FOR ITEMS OF WORK APPLY TO EACH AND EVERY GRAPHICAL
INDICATION SHOWN ON THE DRAWINGS, WHETHER OR NOT NOTED.
ALL ITEMS NOTED TO HAVE PAINT FINISH SHALL BE THOROUGHLY CLEANED AND
PROPERLY PREPARED IN ACCORDANCE WITH THE SPECIFICATIONS PRIOR TO
THE APPLICATION OF PRIMER AND PAINT.
THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE
MECHANICAL, ELECTRICAL, AND PLUMBING WORK AND SATISFY THE
REQUIREMENTS FOR SUPPORT, FLOOR, WALL AND ROOF OPENINGS, FLASHINGS
AND CURBS ETC. THE ARCHITECT SHALL BE NOTIFIED OF CONFLICTS OR
DISCREPANCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION.
2.
3.
4.
5.
CONTRACTOR TO ACCURATELY LOCATE ALL SIGNAGE AND LABELS NOTING
RATED WALL ASSEMBLIES AND SMOKE PARTITIONS
THE GENERAL CONTRACTOR SHALL VISIT THE SITE, VERIFY FIELD CONDITIONS
AND CAREFULLY COMPARE SUCH FIELD CONDITIONS AND OTHER INFORMATION
KNOWN TO THE CONTRACTOR WITH CONTRACT DOCUMENTS.
THE GENERAL CONTRACTOR SHALL REPORT ANY UNFORESEEN FIELD
CONDITIONS, ERRORS, INCONSISTENCIES, OR OMISSIONS DISCOVERED AT ANY
TIME DURING THE WORK, UPON SUCH DISCOVERY, THE CONTRACTOR SHALL
IMMEDIATELY CONTACT THE CONTRACT OFFICER FOR CLARIFICATION BEFORE
PROCEEDING OR CONTINUING WITH THAT PORTION OF THE WORK OR ANY
PORTION RELATED THERE TO.
ALL WORK SHALL CONFORM TO ALL APPLICABLE CODES AND STANDARDS
INCLUDING THE INTERNATIONAL BUILDING CODE 2015 EDITION, VA MASTER
SPECIFICATIONS, AND NFPA 101 2015 EDITION.
THE GENERAL CONTRACTOR SHALL NOTIFY THE CONTRACT OFFICER,
CONTRACTING OFFICER'S REPRESENTATIVE, AND ARCHITECT OF ANY
DISCREPANCIES BETWEEN THE DRAWINGS, NOTES AND ACTUAL FIELD
CONDITIONS BEFORE BIDDING AND COMMENCING ANY WORK, AND REQUEST
CLARIFICATION IN WRITING.
WHEN UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS
THAT CONFLICT WITH THE INTENDED FUNCTION OR DESIGN ARE
ENCOUNTERED, INVESTIGATE AND MEASURE THE NATURE AND EXTENT OF THE
CONFLICT. PROMPTLY SUBMIT A WRITTEN REPORT TO THE CONTRACT
OFFICER.
WHERE MOUNTING HEIGHTS ARE NOT INDICATED, INSTALL COMPONENTS USING
MANUFACTURER'S OR INDUSTRY STANDARDS. WHERE STANDARDS DO NOT
EXIST, NOTIFY THE COR FOR CLARIFICATION.
CONTRACTOR SHALL NOT BARRICADE / BARRIER EMERGENCY EGRESS TO OR
FROM THIS AREA. CONTRACTOR SHALL MAINTAIN EXIT TO EXTERIOR DURING
THE WORK PROCESS
PROVIDE ACCESS TO THE WORK AS DIRECTED BY THE C.O.R. SECURE ACCESS
POINT AS SPECIFIED AND DIRECTED BY THE COR PROJECT ENGINEER. PROVIDE
WALK-OFF MATS TO MEET FACILITY INFECTION CONTROL GUIDELINES AT EACH
ACCESS POINT.
CONTRACTOR TO NOTIFY VA 2 WEEKS IN ADVANCE PRIOR TO ANY
MAJOR UTILITY DISRUPTIONS OR OUTAGES. MAJOR OUTAGES
INVOLVING EMERGENCY AND CRITICAL BRANCH, SHALL BE
COORDINATED NOT LESS THAN 21 CALENDAR DAYS.
IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG
THE CONTRACT DOCUMENTS, THE BETTER QUALITY, MORE STRINGENT
REQUIREMENTS OR GREATER QUANTITY OF WORK, AS DETERMINED BY
THE GOVERNMENT, SHALL BE PROVIDED.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
FUEL STORAGE CONTAINMENT
BUILDING AREA 13,700 SF
TEAGUE PLACE
R O
AD
R O
AD
ROAD 9
SPILL CONTAINMENT AREASPILL CONTAINMENT AREA
FUEL STORAGE CONTAINMENT
Project
Building
Drawing
Project Title
Location
Issue Date Checked Drawn
Drawing
Approve
VA FORM 08 -
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 1
PhasARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 1
FULLY SPRINKLERED
---INTERIORSARCHITECTURE
COX DESIGN ASSOCIATES
PLANNING
Austin 5121 Bee Caves Road, Suite 203 Austin, Texas 78746 www.coxdesignassociates.com T: 512-327-4149
APPROVED: HRC DIRECTOR
APPROVED: VA PROJECT MANAGER
CONSULTANT
5350 W. 94TH TERRACE #102
PRAIRIE VILLAGE, KS 66207
T 913.258.5026 www.rossbar.com
12/05/2022
BI
M
VA
T
EM
PL
E
R
EP
LA
C
E
BO
IL
ER
P
LA
N T/
Te m pl e, R ep la ce
B oi le r P la nt
.rv t
/2
1/
4:
:0
PM
GI-003
FINAL CONTRACT
DOCUMENTS
GENERAL NOTES REPLACE BOILERS AND
BOILER PLANT
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TEXAS 76504
RHC
674-19-101
RJP
DRAWINGS FOR THE FOLLOWING DISCIPLINES ARE
CONTAINED IN THE DOCUMENT. THE DISCIPLINES ARE
IDENTIFIED BY THE REFERENCE WHICH IS
INCORPORATED INTO THE SHEET TITLE.
EACH DRAWING IS NUMBERED ACCORDING TO ITS
LOCATION ON THE SHEET. THE DRAWING TITLE
APPEARS ABOVE THE DEMARCATION LINE AND, APPROPRIATE THE
SCALE IS LOCATED BELOW THE DEMARCATION LINE IN THE LOWER
LEFT-HAND QUADRANT OF THE KEY. THE DRAWING CAN BE
REFERENCED BACK TO IT'S ORIGINAL SHEET AND
DRAWING BY THE DRAWING REFERENCE LOCATION IN
THE LOWER RIGHT-HAND QUADRANT.
SHEET NUMBER
DRAWING NUMBER ON SHEET BY LOCATION
REFERENCE
EXCEPT WHERE DIRECTED TO PLACE ITEMS OF THE WORK AT THE
"APPROXIMATE LOCATION SHOWN." DO NOT SCALE DRAWINGS FOR
DIMENSIONAL INFORMATION
1.
ALL ELEMENTS OF THE DOCUMENTS MAY NOT BE DRAWN TO EXACT SCALE.
ALL DIMENSIONS REQUESTED ARE SHOWN (OR MAY BE DERIVED FROM THOSE
SHOWN OR NOTED) ON THE FLOOR PLANS. DETAIL PLANS, ELEVATIONS,
SECTIONS, SCHEDULES, CONFIGURATION DETAILS, AND SPECIFICATIONS. SEE
THE NOTES BELOW AND SYMBOLS FOR DIMENSIONING CONVENTIONS USED
ON THIS PROJECT.
2.
EXCEPT WHERE SPECIFICALLY NOTED TO THE CONTRARY, ALL DIMENSIONS
SHOWN ON THE ARCHITECTURAL DRAWINGS CONFORM TO THE FOLLOWING
CONVENTIONS.
3.
DIMENSIONS UTILIZING THE "CENTERLINE" SYMBOL ARE MEASURED TO:
ꞏ CENTERLINE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED
FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH
WALLS) AT PARTITIONS FRAMED WITH METAL STUDS. REFER TO
"PARTITION SCHEDULE" TO DETERMINE THICKNESS OF EACH
PARTITION TYPE.
ꞏ CENTERLINE OF DOOR, WINDOW, OR LOUVER OPENING.
ꞏ CENTERLINE OF OTHER FEATURES AS INDICATED.
A.
DIMENSIONS UTILIZING THE "FACE OF" SYMBOL ARE MEASURED TO:
ꞏ FACE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED
FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH WALL)
AS DEFINED BY THE PARTITION SCHEDULE. UNLESS NOTED AS A
"FACE OF FINISH" OR "CLEAR" DIMENSION (SEE NOTE "E" BELOW),
DIMENSIONS ARE NOT MEASURED TO THE FACE OF APPLIED FINISH.
REFER TO THE "PARTITION SCHEDULE" TO DETERMINE THE
THICKNESS OF EACH PARTITION TYPE.
B.
WHERE "EQUAL" DIMENSIONS ARE USED ON REFLECTED CEILING PLANS TO
LOCATE CEILING GRID WORK POINTS, MEASURE DIMENSIONS TO:
ꞏ EDGE OF THE INDICATED CEILING AT THE FACE OF THE ADJACENT
APPLIED FINISH MEASURED AT THE PLANE OF THE CEILING.
ꞏ CAUTION: DUE TO THE POSSIBLE APPLICATION OF APPLIED FINISHES -
THICKNESS OF WHICH MAY VARY BETWEEN FLOOR AND CEILING AND
IS NOT ACCOUNTED FOR (EXCEPT AS INDICATED BY "FOF" OR
"CLEAR") BY THE DIMENSION SHOWN ON THE FLOOR PLANS - THE
CONTRACTOR MUST ADJUST AS NECESSARY, THE FLOOR PLAN
DIMENSIONS TO REFLECT THE ACTUAL DIMENSIONS FOUND AT PLANE
OF THE CEILING.
C.
WHERE WALLS AND/OR PARTITIONS OF UNEQUAL THICKNESS ABUT,
ALIGN EXPOSED FACES, UNLESS OTHERWISE NOTED.
4.
ALIGN
DIMENSION, WHEN OCCURS
WHERE OPENINGS IN WALLS (SUCH AS INTERIOR WINDOWS OR DOORS) ARE
NOT DIMENSIONED BUT SHOWN AS BEING IN THE CENTER OF A GIVEN WALL
SURFACE, LOCATE OPENINGS AS GRAPHICALLY REPRESENTED.
5.
DISCIPLINE REFERENCES
DRAWING NUMBERING
DRAWING REFERENCE
GENERAL NOTES
REF. 1/1-A1
BUILDING SECTION
RE: 1/AS-126
SHEET NUMBER
DIMENSIONING CONVENTIONSARCHITECTURAL FLOOR PLAN SYMBOLS
A
COLUMN GRID
NORTH ARROW
REVISION NUMBER AND EXTENT
KEYED NOTE MARK
-SEE CORRESPONDING
NUMBERED KEY NOTE ON SHEET WHERE
REFERENCE OCCURS
REVISION NUMBER - SEE
REVISION HISTORY ON THE
TITLE BLOCK OF EACH SHEET
EXTENT OF CURRENT REVISION
1-A26
1-A26
CL
DEMOLITION LINE
ELEVATION INDICATOR
CENTER LINE INDICATOR
EXISTING TO REMAIN LINE
FEATURES ABOVE LINE INDICATOR
BREAK, ROUND (USER DEFINES SIZE)
BREAK, STRAIGHT (SEE SECTION INDICATORS,
BUILDING, WITH BREAK STANDARDS)
DETAIL INDICATOR
DETAIL INDICATOR
DIMENSION LINE
CENTER LINE
GI GENERAL INFORMATION
AS ARCHITECTURAL
FP FIRE PROTECTION
P PLUMBING
M MECHANICAL
E ELECTRICAL
T TECHNOLOGY
AS-100
DISCIPLINE SHEET NUMBER
LOCATION MAP - NTS
CONSTRUCTION LIMITS
N
EXISTING TO REMAIN
CONCRETE
MASONRY
BUILDING INTERIOR
MATERIAL GRAPHICS
GYP BD RIGID INSULATION
WOOD EARTH
DESIGN MANUALS:
- PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS
- PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES
- PG-18-5 EQUIPMENT LIST GUIDES
- PG-18-8 SEISMIC DESIGN HANDBOOK
- PG-18-10 DESIGN MANUALS
- VA PHYSICAL SECURITY DESIGN MANUAL FOR MISSION CRITICAL FACILITIES
- VA ARCHITECTURAL DESIGN MANUAL
- VA MECHANICAL DESIGN MANUAL
- VA ELECTRICAL DESIGN MANUAL
- VA PLUMBING DESIGN MANUAL
- VA FIRE PROTECTION DESIGN MANUAL
APPLICABLE CODES AND REGULATIONS:
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL CURRENT APPLICABLE CODES AND STANDARDS.
IN ADDITION TO ALL DEPARTMENT OF VETERANS AFFAIRS, LOCAL, AND STATE CODES, ALL WORK SHALL COMPLY WITH THE ACCESSIBILITY REQUIREMENTS OF THE STATE OF TEXAS AND THE DEPARTMENT OF VETERANS AFFAIRS GUIDELINES, ABA
(ARCHITECTURAL BARRIERS ACT) ACCESSIBILITY STANDARD FOR FEDERAL FACILITIES.
APPLICABLE CODES AND STANDARDS (LATEST EDITIONS) INCLUDE:
- ABA ACCESSIBILITY STANDARDS (LATEST EDITION)
- NFPA 101, "LIFE SAFETY CODE" (LATEST EDITION)
- NFPA 10, "PORTABLE FIRE EXTINGUISHERS" (LATEST EDITION)
- NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS" (LATEST EDITION)
- NFPA 70, "NATIONAL ELECTRICAL CODE (NEC)" (LATEST EDITION)
- NFPA 72, "NATIONAL FIRE ALARM CODE" (LATEST EDITION)
- NFPA 90A, "INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS" (LATEST EDITION)
- NFPA 220, "TYPES OF BUILDING CONSTRUCTION" (LATEST EDITION)
- NFPA 241, "STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS" (LATEST EDITION)
- INTERNATIONAL BUILDING CODE (IBC) (LATEST EDITION)
- INTERNATIONAL MECHANICAL CODE (IMC) (LATEST EDITION)
- INTERNATIONAL PLUMBING CODE (IPC) (LATEST EDITION)
- INTERNATIONAL ENERGY CONSERVATION CODE (LATEST EDITION)
CLOSED CELL SPRAY
FOAM INSULATION
KEY PLAN - NTS
PROJECT SUMMARY
S STRUCTURAL
PROJECT
LOCATION
N
N
NEW BOILER PLANT SITE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approve
VA FORM 08 -
A
Office of Construction &
Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 1
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 1
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
INTERIORSARCHITECTURE
COX DESIGN ASSOCIATES
PLANNING
Austin 5121 Bee Caves Road, Suite 203 Austin, Texas 78746 T: 512-327-4149 F: 512-327-7679e www.coxdesignassociates.com
APPROVED: HRC DIRECTOR
APPROVED: VA PROJECT MANAGER
5350 W. 94TH TERRACE #102
PRAIRIE VILLAGE, KS 66207
T 913.258.5026 www.rossbar.com
12/05/2022
BI
M
VA
T
EM
PL
E
R
EP
LA
C
E
BO
IL
ER
P
LA
N T/
Te m pl e, R ep la ce
B oi le r P la nt
.rv t
/2
1/
4:
:1
PM
GI-004
FINAL CONTRACT
DOCUMENTS
PROJECT LOCATION REPLACE BOILERS AND
BOILER PLANT
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TEXAS 76504
RHC
674-19-101
RJP
SCALE: NTS1 CAMPUS SITE PLAN
LEGEND
GENERAL NOTES
222 154
T-164
E
W
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approve
VA FORM 08 -
A
Office of Construction &
Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 1
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 1
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
INTERIORSARCHITECTURE
COX DESIGN ASSOCIATES
PLANNING
Austin 5121 Bee Caves Road, Suite 203 Austin, Texas 78746 T: 512-327-4149 F: 512-327-7679e www.coxdesignassociates.com
APPROVED: HRC DIRECTOR
APPROVED: VA PROJECT MANAGER
5350 W. 94TH TERRACE #102
PRAIRIE VILLAGE, KS 66207
T 913.258.5026 www.rossbar.com
12/05/2022
BI
M
VA
T
EM
PL
E
R
EP
LA
C
E
BO
IL
ER
P
LA
N T/
Te m pl e, R ep la ce
B oi le r P la nt
.rv t
/2
1/
4:
:2
PM
VF-101
PHASE IV PROGRESS SET
(PRE-FINAL)
CONSTRUCTION
DOCUMENTS
FIELD SURVEY EXISTING
CONDITIONS
REPLACE BOILERS AND
BOILER PLANT
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TEXAS 76504
RHC
674-19-101
MAG
SCALE: 1" = 20'-0"1 EXISTING SITE SURVEY
TEAGUE PLACE
R O
AD
R O
AD
ROAD 9
BUILDING AREA 13,700 SF
FUEL STORAGE
CONTAINMENT
STANDOFF DISTANCE
SPILL CONTAINMENT AREASPILL CONTAINMENT AREA
R 8'
- 3
R 14' - 3 5/8"
50'50'
132' - 0"
FUEL STORAGE
CONTAINMENT
LEGEND
PROJECT LIMITS
EXISTING BUILDING
STANDOFF DISTANCE
NEW BUILDING
BOLLARD
SECURITY FENCE
TREES
A. SEE SHEET "AS" SERIES FOR ARCHITECTURAL PLANS.
B REFER TO "AS" SERIES EXTERIOR ELEVATIONS AND WINDOW SCHEDULE FOR
EXTENT OF EXTERIOR GLAZING AND LOUVERS.
C. EXTEND HARDENED FACADE CONSTRUCTION FULL HEIGHT OF EXTERIOR CLOSURE
TO TOP OF PARAPET, TYP. U.O.N.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approve
VA FORM 08 -
A
Office of Construction &
Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 1
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 1
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
INTERIORSARCHITECTURE
COX DESIGN ASSOCIATES
PLANNING
Austin 5121 Bee Caves Road, Suite 203 Austin, Texas 78746 T: 512-327-4149 F: 512-327-7679e www.coxdesignassociates.com
APPROVED: HRC DIRECTOR
APPROVED: VA PROJECT MANAGER
5350 W. 94TH TERRACE #102
PRAIRIE VILLAGE, KS 66207
T 913.258.5026 www.rossbar.com
12/05/2022
BI
M
VA
T
EM
PL
E
R
EP
LA
C
E
BO
IL
ER
P
LA
N T/
Te m pl e, R ep la ce
B oi le r P la nt
.rv t
/2
1/
4:
:2
PM
PS-100
PHASE IV PROGRESS SET
(PRE-FINAL)
CONSTRUCTION
DOCUMENTS
PHYSICAL SECURITY REPLACE BOILERS AND
BOILER PLANT
1901 VETERANS MEMORIAL DRIVE TEMPLE,
TEXAS 76504
MAA
674-19-101
MAA
SCALE: 1/16" = 1'-0"1 SITE PLAN N0 32 48 6416
GRAPHIC SCALE
GENERAL NOTES
GENERAL PROJECT NOTES
1. CONTRACTOR TO MAINTAIN ALL EXISTING UTILITIES TO STAY IN SERVICE DURING CONSTRUCTION.
2. CONTRACTOR SHALL INSTALL EROSION CONTROL MEASURES PER VA REQUIREMENTS PRIOR TO COMMENCING DEMOLITION.
3. ALL EXISTING TREES TO REMAIN SHALL BE PRESERVED AND PROTECTED.
4. CONTRACTOR SHALL COORDINATE ALL WORK ASSOCIATED WITH THE REMOVAL, RELOCATION, AND DEMOLITION OF EXISTING UTILITIES
WITH THE RESPECTIVE UTILITY COMPANY/VA ENGINEERING/COR. A MINIMUM OF 72 HOURS NOTICE SHALL BE GIVEN TO ALL UTILITY
COMPANIES PRIOR TO CONSTRUCTION.
5. CONTRACTOR TO MAINTAIN PROPOER DRAINAGE IN DEMOLITION AREAS.
6. FOR VIEWING CLARITY OF THESE PLANS, THE PIPES OR STRUCTURES MAY NOT BE DRAWN TO SCALE.
7. THE SIZE AND LOCATION OF THE UTILITIES INDICATED ON THESE PLANS ARE APPROXIMATE. UTILITIES INDICATED ON THESE PLANS
MAY NOT BE A COMPLETE INVENTORY OF ALL UTILITIES CURRENTLY ON OR NEAR THE SITE. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR OBTAINING PUBLIC AND/OR PRIVATE UTILITY LOCATING SERVICES PRIOR TO STARTING ANY CONSTRUCTION TO FIELD VERIFY ALL
HORIZONTAL AND VERTICAL LOCATIONS.
8. PROVIDE A MINIMUM OF 72 HOURS NOTICE TO ALL UTILITY COMPANIES PRIOR TO CONSTRUCTION.
9. WHEN CONNECTIONS ARE TO BE MADE TO EXISTING PIPING AND STRUCTURES OR WHERE CONSTRUCTION IS IN THE VICINITY OF
EXISTING PIPING, THE LOCATION AND ELEVATION OF THE EXISTING PIPING AND STRUCTURES SHALL BE FIELD VERIFIED BY THE
CONTRACTOR. IF ANY DISCREPANCIES ARE FOUND, THEN THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY.
10. ALL WORK SHALL BE PERFORMED IN A SAFE MANNER. ALL SAFETY RULES AND GUIDELINES OF O.S.H.A. SHALL BE FOLLOWED. THE
CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ANY INJURIES TO EMPLOYEES AND ANY DAMAGE TO PRIVATE PROPERTY OR
PERSONS DURING THE COURSE OF THIS PROJECT.
11. WATER MAINS THROUGHOUT THE PROJECT SHALL BE INSTALLED WITH AT LEAST 24 INCHES OF COVER TO PROVIDE PROTECTION FROM
FREEZING.
12. HORIZONTAL SEPARATION BETWEEN WATER AND SEWER SHALL BE 10 FEET.
13. VERTICAL SEPARATION BETWEEN WATER AND SEWER SHALL BE 18 INCHES.
14. WATER MAIN ALIGNMENT SHOWN IS BASED ON STANDARD FITTINGS AVAILABLE. JOINT DEFLECTIONS SHALL NOT EXCEED 75 PERCENT
OF MANUFACTURERS RECOMMENDED DEFLECTION.
15. CONTRACTOR SHALL ADJUST WATER MAIN ALIGNMENT AND DEFLECT JOINTS AS NECESSARY TO ACCOMMODATE THE STANDARD
BENDS SHOWN.
16. CONTRACTOR SHALL ENSURE THAT POSITIVE DRAINAGE IN IMPROVED AREAS IS ACHIEVED. CONTRACTOR TO TEST AND CORRECT ANY
"BIRD BATH" CONDITIONS.
17. ALL SLOPES SHALL BE 4:1 OR FLATTER, UNLESS OTHERWISE SHOWN.
18. ALL GRADES AT THE PROJECT BOUNDARY OR PROPERTY LINE SHALL MATCH EXISTING GRADES.
19. BUILDING PAD AREAS AND PAVED AREAS DESIGNATED FOR FILL SHALL BE CONSTRUCTED OF SUITABLE FILL MATERIAL AND
COMPACTED PER SPECIFICATIONS. ALL FILL AREAS ARE TO BE STRIPPED OF TOPSOIL PRIOR TO PLACEMENT OF FILL.
20. ANY EXCESS SOIL MATERIALS SHALL BE EXPORTED FROM THE SITE AFTER CONSTRUCTION IS COMPLETE.
21. CONTOURS ARE SHOWN AS A REFERENCE TO MEET JURISDICTIONAL REQUIREMENTS. CONTRACTOR SHOULD GRADE SITE PER THE
PROPOSED SPOT GRADE ELEVATIONS.
22. EROSION AND SEDIMENTATION CONTROL DEVICES TO BE INSTALLED PRIOR TO BEGINNING CONSTRUCTION.
23. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION
ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS
CEASED, UNLESS ACTIVITY IN THAT PART OF THE SITE WILL RESUME WITHIN TWENTY-ONE (21) DAYS.
24. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY
CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED IMMEDIATELY AFTER THE UTILITY
INSTALLATION.
25. EROSION CONTROL AND SEDIMENTATION CONTROL DEVICES TO BE MAINTAINED SUCH THAT THEN FUNCTION AS INTENDED. AFTER
COMPLETION OF OF THE PROJECT THE CONTRACTOR SHALL REMOVE ALL DEVICES WHERE A GOOD STAND OF GRASS HAS BEEN
ESTABLISHED AND EROSION IS NO LONGER EVIDENT. REMOVAL OF THE REMAINING DEVICES SHALL OCCUR AS OTHER AREAS ARE
ESTABLISHED.
26. EROSION CONTROL MEASURES SHALL BE INSPECTED EVERY SEVEN (7) DAYS OR AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS
ONE-HALF (1/2) INCH. DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED IMMEDIATELY. MAINTAIN RECORDS ON
SITE FOR INSPECTION.
27. ALL AREAS DISTURBED BY GRADING, EXCAVATION, AND GENERAL CONSTRUCTION SHALL BE SEEDED, MULCHED, AND RESTORED IN
ACCORDANCE WITH THE SPECIFICATIONS OR AT VA DIRECTION.
28. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAYS. THE CONTRACTOR
SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED.
29. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS ON THE SITE PRIOR TO CONSTRUCTION, ANY DISCREPANCIES OR CONFLICTS
WHICH BECOME APPARENT BEFORE OR DURING CONSTRUCTION SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OF
RECORD SO THAT REDESIGN OR CLARIFICATION MAY OCCUR.
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved:
APPROVED: HRC DIRECTOR X__________________________
APPROVED: VA PROJECT MANAGER X__________________________
APPROVED: VA CHIEF ENGINEER X__________________________
APPROVED: CTVHCS DIRECTOR X__________________________
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
674-19-10
NOT FOR
CONSTRUCTION
REPLACE BOILERS AND
BOILER PLANT
1901 VETERANS MEMORIAL DRIVE
TEMPLE, TEXAS 76504
INTERIORSARCHITECTURE
COX DESIGN ASSOCIATES
PLANNING
Austin 5121 Bee Caves Road, Suite 203 Austin, Texas 78746 T: 512-327-4149 F: 512-327-7679e info@coxdesignassociates.com
BI
M
VA
T
EM
PL
E
R
EP
LA
C
E
BO
IL
ER
P
LA
N T/
Te m pl e, R ep la ce
B oi le r P la nt
.rv t
4/ 7/
:3
7:
A M
VA FORM 08 - 6231
5350 W. 94TH TERRACE #102
PRAIRIE VILLAGE, KS 66207
T 913.258.5026 www.rossbar.com C-001
GENERAL INFORMATION
RMJr
NJA
nandrews Text Box
FINAL CONTRACT DOCUMENTS
nandrews Text Box 12-05-2022 nandrews Image
NEW BOILER PLANT
R O
A D
R O
A D
ROAD 9
MOBILE
BOILER PAD
6' -0
CONTAINMENT AREA
FUEL STORAGE
CONTAINMENT
SEE MECHANICAL SHEETS
FOR FILL BOXES
9 7
4 1 4 6 5
7 8 7
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved:
APPROVED: HRC DIRECTOR X__________________________
APPROVED: VA PROJECT MANAGER X__________________________
APPROVED: VA CHIEF ENGINEER X__________________________
APPROVED: CTVHCS DIRECTOR X__________________________
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
674-19-101
12-05-2022
FINAL CONTRACT
DOCUMENTS
REPLACE BOILERS AND
BOILER PLANT
PLANNING
Austin 5121 Bee Caves Road, Suite 203 Austin, Texas 78746 T: 512-327-4149 F: 512-327-7679e info@coxdesignassociates.com
BI
M
VA
T
EM
PL
E
R
EP
LA
C
E
BO
IL
ER
P
LA
N T/
Te m pl e, R ep la ce
B oi le r P la nt
.rv t
4/ 7/
:3
7:
A M
VA FORM 08 - 6231
5350 W. 94TH TERRACE #102
PRAIRIE VILLAGE, KS 66207
T 913.258.5026 www.rossbar.com
CIVIL SITE PLAN
GENERAL NOTES:
A. INSTALL SIDEWALK EXPANSION JOINTS
WHERE CONCRETE BUTTS ANY FIXED OBJECT
WALLS, CURBS, AND MANHOLES AND 45" ON
CENTER MAXIMUM OR AS SHOWN ON PLANS.
B. ALL DIMENSIONS ARE TO FACE OF BUILDING,
EDGE OF PAVEMENT, FACE OF CURB OR
WALL, AND CENTERLINE OF ROAD, UNLESS
OTHERWISE NOTED.
C. THE BUILDING OUTLINES SHOWN ARE FOR
REFERENCE PURPOSES ONLY AND SHALL
NOT BE USED FOR STAKING PURPOSES. THE
CONTRACTOR SHALL COORDINATE WITH THE
ARCHITECT AND STRUCTURAL ENGINEER ON
THE STAKING OF A BUILDING.
D. CONTRACTOR SHALL VERIFY LOCATION OF
WORK AND REPORT ANY DISCREPANCIES TO
THE ENGINEER PRIOR TO COMMENCING
WORK.
E. CONTRACTOR TO VERIFY ALL UTILITIES IN
THE FIELD. LOCATIONS SHOWN ARE TO THE
BEST INFORMATION AVAILABLE BUT ARE NOT
GUARANTEED TO BE ACCURATE.
KEYED NOTES
1. CONSTRUCT SPILL CONTAINMENT AREA FOR
FUEL TRUCKS. SLOPE TO SPILL FLUME.
2. CONSTRUCT SPILL FLUME TO DIRECT FUEL
SPILLAGE TO TANK CONTAINMENT AREA.
3. CONSTRUCT CONCRETE SPILL
CONTAINMENT. SEE DETAILS, SHEET XX
4. CONSTRUCT CONCRETE DRIVEWAY WITH
4000 PSI CONCRETE, 6" THICK, #5 REBAR AT
12" O.C. BOTH WAYS. PROVIDE 6" CURB
ALONG SIDES.
5. CONSTRUCT FLARED DRIVE PAD 6" THICK,
4000 PSI CONCRETE FLARE ENDS AND
TRANSITION ENDS TO MATCH SIDEWALK
ELEVATIONS.
6. CONSTRUCT ROLLING DRIVE GATE.
PROVIDE OPENING 2' WIDER THAN
DRIVEWAY WIDTH ON EACH SIDE. PROVIDE
LOCKING MECHANISM.
7. CONSTRUCT SIDEWALK
8. CONSTRUCT PARK BENCH PAD AND
PROVIDE 6' PARK BENCH. ROUTE FENCE
AROUND PAD AS SHOWN.
9. CONSTRUCT 4' WIDE PERSONNEL WALK
GATE WITH LOCKING MECHANISM.
10. INSTALL LOCKING REMOVABLE BOLLARDS
11. CONSTRUCT SCREEN WALL. SEE
STRUCTURAL DRAWINGS.
12. ACCESS LADDER
13. NEW STEAM TUNNEL BELOW. SEE
STRUCTURAL.
14. EXISTING STEAM TUNNEL BELOW.
15. ROLLOVER CURB SEE DETAIL SHEET C-500
NEW BUILDING
BOLLARD
NEW CONCRETE
SIDEWALK
NEW CONCRETE
PAVING
CRUSHED GRAVEL
STANDOFF DISTANCE
PROJECT LIMITS
FIRE DEPARTMENT
CONNECTION
LEGEND
CHAIN LINK FENCE
POST INDICATOR
VALVE
N0 32 48 6416
GRAPHIC SCALE
nandrews Arrow nandrews Arrow nandrews Arrow nandrews Arrow nandrews Arrow nandrews Arrow nandrews Arrow nandrews Image nandrews Text Box C-100
SIG-X
SIG-X
SI
G
-X
SI
G
-X
SI
G -X
SI
G
-X
SI
G -X
SI
G
-X
SI
G -X
SI
G
-X
SI
G -X
SI
G
-X
SI
G
-X
SI
G -X
SI
G
-X
SI
G -X
SI
G
-X
SI
G -X
SI
G
-X
SIG-X SIG-X SIG-X
W -X
W -X
W -X
W -X
W -X
W -X
W-X W-X
TEAGUE PLACE
R O
A D
R O
A D
ROAD 9
W -N
W-N W-N W-N W-N W-N W-N
W -N
W -N
ST
M
-N
ST
M -N
ST
M
-N
ST
M -N
ST
M
-N
ST
M -N
SD
-N
SD
-N
SD
-N
SD-N
SD MH
SD MH-EX
SD MH
SIG-X SIG-X SIG-X SIG-X SIG-X SIG-X SIG-X SIG-X SIG-X SIG-X
SIG
-X
SIG
-X
SIG-X
SIG-X SIG-X
SIG-X
SI
G
-X
SI
G -X
SI
G
-X
SI
G -X
SI
G
-X
STL-X
STL-X
STL-X
ST
L-
X
ST
L- X
STL-X STL-X
STL-X
W-X
W-X
W-X
W -X
W -X
W -X
W -X
W -X
W-X
W -X
W -X
W -X
ST
L-
X
ST
L- X
ST
L-
X
ST
L-
X
W-NW-N
W -N
W -N
W-N
UE-N
U E-N
U E-N
U E-N
UE-N
U E-N
G
AS
-N G
AS
-N
G
AS
-N G
AS
-N
SD
-N
SD
-N
SD-N
SD
-N
SD
-N
SD
-N
W-N
W -N
EX SAS MH
RIM 681.15
INV IN (W) 674.91
INV OUT (N)
673.53
EX SAS MH
RIM 680.14
INV IN (S) 672.02
INV IN (N) 671.24
INV IN (W) 668.73
INV OUT (E) 668.57
NEW SAS MH
RIM
INV IN (S) 668.32
INV IN (W) 668.34
INV OUT (N) 668.31
NEW SAS MH
RIM
INV IN (N)
INV OUT (E)
12 10
EX SAS MH
RIM 674.77
INV IN (S) 668.24
INV OUT (N) 668.20
10 9
8" 8"
12"
12"
15"
R-673.80
R-673.80
24"
12"
6"
12"
6" -1.05
2" -3.93
8" P
VC
2" -1.15'
6"
6" -3.58'
CO
PIV
6" -1.05
12"
PIV
WATER
IRRIGATION
STEAM
COMMUNICATIONS
STORM DRAINS
GAS
STREET LIGHTINGSTL
GAS
SD
SIG
STM
IR
W
SANITARY SEWERSS
POTENTIAL BUILDING
EXISTING BUILDING
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved:
APPROVED: HRC DIRECTOR X__________________________
APPROVED: VA PROJECT MANAGER X__________________________
APPROVED: VA CHIEF ENGINEER X__________________________
APPROVED: CTVHCS DIRECTOR X__________________________
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
674-19-101
12-05-2022
FINAL CONTRACT
DOCUMENTS
REPLACE BOILERS AND
BOILER PLANT
PLANNING
Austin 5121 Bee Caves Road, Suite 203 Austin, Texas 78746 T: 512-327-4149 F: 512-327-7679e info@coxdesignassociates.com
BI
M
VA
T
EM
PL
E
R
EP
LA
C
E
BO
IL
ER
P
LA
N T/
Te m pl e, R ep la ce
B oi le r P la nt
.rv t
4/ 7/
:3
7:
A M
VA FORM 08 - 6231
5350 W. 94TH TERRACE #102
PRAIRIE VILLAGE, KS 66207
T 913.258.5026 www.rossbar.com C-101
RMJr
NA
TRUE NORTH1 UTILITY PLAN
SCALE: 1" = 16'-0"
00 20' 40'
LEGEND
WATER
IRRIGATION
STEAM
COMMUNICATIONS
STORM DRAINS
GAS
STREET LIGHTINGSTL
GAS
SD
SIG
STM
IR
W
SANITARY SEWERSS
UTILITY TO BE REMOVED
OR RE-ROUTED
XXX
NOTE: THE ABOVE WITH -X DENOTES EXISTING
UTILITIES.
EXAMPLE: W-X = EXISTING WATER LINE
GENERAL NOTES
A. INSTALL SIDEWALK EXPANSION JOINTS WHERE CONCRETE ABUTS
ANY FIXED OBJECT, WALLS, CURBS, MANHOLES, AND 45' ON CENTER
MAXIMUM OR AS SHOWN ON PLANS.
B. ALL DIMENSIONS ARE TO FACE OF BUILDING, EDGE OF PAVEMENT,
FACE OF CURB OR WALL, AND CENTERLINE OF ROAD, UNLESS
OTHERWISE NOTED.
C. THE BUILDING OUTLINES ARE SHOWN FOR REFERENCE PURPOSES
ONLY AND SHALL NOT BE USED FOR STAKING PURPOSES. THE
CONTRACTOR SHALL COORDINATE WITH THE ARCHITECT AND
STRUCTURAL ENGINEER ON THE STAKING OF THE BUILDING.
E. EXISTING TREES TO BE PRESERVED AS NOTED. COORDINATE WITH
THE ENGINEER PRIOR TO REMOVING TREES.
F. CONTRACTOR SHALL VERIFY THE LOCATION OF WORK AND REPORT
ANY DISCREPANCIES TO THE ENGINEER PRIOR TO COMMENCING
WORK.
G. INSTALL NEW ISOLATION VALVE AT NEW WATER LINES TIED INTO
EXISTING LINES, WITH NON-RISING STEMS AND CAST IRON VALVE
BOXES.
1. NEW STORM DRAIN MANHOLE.
2. TIE IN NEW WATER LINE TO EXISTING. INSTALL THRUST BLOCKING AT
TIE-IN AND TURNS, VALVES, ETC. PER WATER SHOP.
3. NEW WATER LINE. MATCH EXISTING AND COORDINATE VALVE AND
FITTINGS WITH WATER SHOP.
4. INSTALL NEW STORM DRAIN LINES.
5. INSTALL NEW STORM AND CONDENSATE LINES. COORDINATE WITH
MECHANICAL SHEETS.
6. INSTALL NEW NATURAL GAS LINE. COORDINATE WITH MECHANICAL
SHEETS FOR SIZES AND TIE-IN LOCATIONS.
7. EXTEND IRRIGATION LINES TO REMAINING TREES AND SHRUBS.
8. INSTALL NEW FIRE DEPARTMENT CONNECTION TO MATCH EXISTING
FACILITY TYPES. INSTALL FOUR CONCRETE-FILLED BOLLARDS AROUND
HYDRANT. SEE FP101 NOTE 2.
9. INSTALL NEW POST INDICATOR VALVE (PIV) AND FOUR PROTECTIVE
BOLLARDS. MATCH EXISTING FACILITY TYPES.
10. TIE IN NEW 4" FIRE SERVICE TO BUILDING.
11. INSTALL NEW CURB INLET. TIE TO EXISTING STORM DRAIN PIPE.
12. TIE IN NEW 4" WATER LINE TO BUILDING.
13. INSTALL NEW 4" NATURAL GAS LINE.
14. INSTALL NEW HIGH PRESSURE REGULATOR AND PROTECTIVE
BOLLARDS AND TIE TO INTO BUILDING GAS LINE.
15. INSTALL NEW 4' DIAMETER PRECAST CONCRETE STORM DRAIN
MANHOLE.
16. INSTALL NEW 4' DIAMETER PRECAST CONCRETE SANITARY SEWER
MANHOLE.
17. INSTALL NEW 8" PVC SANITARY SEWER LINE.
18. INSTALL NEW 24" PVC STORM DRAIN LINE.
19. INSTALL NEW 8" PVC STORM DRAIN LINE.
20. INSTALL NEW 6" PVC STORM DRAIN LINE.
21. INSTALL NEW ELECTRIC MANHOLE 11-B. SEE SHEET E-001.
22. INSTALL NEW ELECTRIC MANHOLE 11-A. SEE SHEET E-001.
23. ROUTE ELECTRICAL FROM EXISTING TRANSFORMER T-18 TO NEW EMH
11-B. SEE SHEET E-001.
24. ROUTE ELECTRICAL FROM NEW EMH 11-B TO BUILDING AND TO NEW
EMH 11-A. SEE SHEET E-001
25. ROUTE ELECTRICAL FROM NEW EMH 11-A TO EXISTING EMH 10. SEE
SHEET E-001
26. EXISTING SIGNAL LINES, FIBER, AND MANHOLE TO REMAIN IN SERVICE,
PROTECT AND ADJUST ELEVATION TO MEET NEW GRADES.
KEYED NOTES
VALVE
FIRE DEPARTMENT CONNECTION
POST INDICATOR VALVE
SURFACE CLEANOUT
nandrews
NEW UTILITY PLAN
15 68 1.0
GV
53 67 5.9
GV
G A
S G
A S
G A
S
GAS GAS GAS
GAS GAS
GAS
GAS
GAS
GAS
GAS GAS GAS GAS GAS
GAS GAS
G A
S
GAS GAS
G A
S G
A S
G A
S
G A
S
G A
S
G A
S
G A
S
G A
S
G A
S
G A
S
GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS
G A
S
GAS
G A
S G
A S
G A
S
G A
S G
A S
G A
S
GAS G
A
S
GAS
GAS
G A
S G
A S
GAS
G A
S
GAS
GAS
G A
S
GAS GAS GAS
G A
S
G A
S
G A
S
G A
S
G A
S
GAS GAS GAS GAS GAS GAS
G A
S G
A S
G A
S G
A S
G A
S G
A S
G A
S G
A S
G A
S G
A S
G A
S G
A S
G A
S G
A S
G A
S
G A
S
GA
S
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASG
A
S
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS GAS
G A
S
GAS
G A
S G
A S
G A
S G
A S
G A
S
G A
S G
A S
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
G A
S G
A S
G A
S
GAS GAS
SMH #1
SMH #12
SMH #10
M A
TC
H
LI
N
E
SD
T
FHH
FHH
V
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
GV
GV
GV
GV
GV
WM
GT
GM
W
V
LP
LP
LP
LP
R O
A D
ROAD 9
R O
A D
ROAD 9A
R O
A D
ROAD 4A
R O
A D
RAILROAD TRACKS
TEAGUE PLACE
R O
A D
ROAD 5B
R O
A D
C
SA
FE
TY
BL
DG
T1
CT
WAREHOUSE
BLDG 206
FISH
HOUSE
N O
PA
R
K
IN
G
W
PA
S
53 ENG. SHOPS
ES
M
T #5
M.K. & T.R.R.
/2
B
LD
G
E
- E N
G
U N
D
ER
C O
N
ST
R U
C
TI
O N
- M
EN
TA
L
H
EA
LT
H
BOILER PLANT 59
4 6
U P
K
T-500
LAKE HOUSE
PAVILION
T-257
LAKE HOUSE
RESTROOMS
DN
E
- L O
G
E
- E M
S/
LA
U
N D
R Y
C O
N
ST
R U
C
TI
O N
C O
N
ST
R U
C
TI
O N
6E
R
EC
TH
ER
A
PY
6W
O
C C
H
EA
LT
H
FU
TU
R E
G
EN
ER
A
TO
R
FU
TU
R E
G
EN
ER
A
TO
R
EX
IS
TI
N
G
EM
H
1b
EX
IS
TI
N
G
EM
H
N
EW
A
LT
ER
N
A
TE
O N
C O
R 'P
R
EF
ER
R
ED
PO
D
EX
IS
TI
N
G
ES
M H
#4 /O
A W
G C
U
G R
O U
N D
B A
R
" A
FF
G R
O U
N D
B A
R
" A
FF
N
EW
W
-4 D
U C
TB
A
N K
N
EW
W
-4 D
U C
TB
A
N K
N
EW
W
-4 D
U C
TB
A
N K
N
EW
W
-4 D
U C
TB
A
N K
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: -
5-12-2014 on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s i nc h on e fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Office of Construction and Facilities Management
N
TEMPLE, TX
TEMPLE SITE UTILITY MAPNEW GAS FEED LINE
SCALE: 1" = 100'
TB
LEGEND
GASGAS
GENERAL NOTES
1. -
2. EXISTING GAS METER BY ATOMOS GAS CO
SERVING THE BOILER PLANT
3. INTERCEPT EXISTING 15 - PSIG BOILER
PLANT GAS LINE AND EXTEND NEW PRIVATE
SERVICE LINE TO NEW PLANT UNDER NEW
BOILER PLANT PROJECT. 63,000-MBH LOAD.
4. EXIST. PLANT GAS SERVICE (VERIFY
ACTUAL BUILDING ENTRANCE LOCATION
AND ROUTE.)
5. GAS PRESSURE REGULATOR AND
BOLLARDS.
6. NATURAL GAS SERVICE ENTRANCE TO
BOILER PLANT.
KEYED NOTES
SS
T
G
W
SD
FM
F
GM
WM
GV
E
E
THH
EHH
TSHH
V
CO
SM
FHH
EM
T
GT
CO
WV WATER VAULT
WATER METER
WATER VALVE
FIRE HYDRANT
WATER MH
STEAM MH
STORM CLEANOUT
STORM DRAIN MH
STORM DRAIN INLET
FIBER OPTIC MH
FOC JUNCTION BOX
FOC HAND HOLE
ELECTRIC PEDESTAL
LIGHT POLE
ELECTRIC BOX
ELECTRIC MH
ELECTRIC HAND HOLE
ELECTRIC METER
ELEC TRANSFORMER
GAS MH
GAS METER
GAS VALVE
GAS TEST STATION
CONTINUES OUT
OF SCOPE
UNKNOWN MANHOLE
CAMERA
VAULT BOX
PIPE CAP
BREAK/LINE QUALITY
POWER POLE W/RISER
POWER POLE
TEST HOLE
TELEPHONE HAND HOLE
TELE JUNCTION BOX
TELEPHONE POLE
TELEPHONE PEDESTAL
TELEPHONE MH
CABLE TV PEDESTAL
TRAFFIC HAND HOLE
TRAFFIC LIGHT
TRAFFIC SIGNAL ARM
TRAFFIC PULL BOX
TRAFFIC SIGNAL BOX
FORCE MAIN MH
WASTE CLEAN OUT
SANITARY SEWER MHFIRE DEPT. CONNECT
U
UNKNOWN UTILITYUNK
AutoCAD SHX Text S20°43'57"W 1881.53'
AutoCAD SHX Text 22E
AutoCAD SHX Text 23E
AutoCAD SHX Text 18A
AutoCAD SHX Text 18A
AutoCAD SHX Text 16P
AutoCAD SHX Text 16P
AutoCAD SHX Text 16P
AutoCAD SHX Text 16P nandrews
C-102
NEW BOILER PLANT
R O
A D
R O
A D
ROAD 9
6'
-0
NEW BOILER PLANT
TEAGUE PLACE
R O
A D
R O
A D
ROAD 9
6'
-0
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved:
APPROVED: HRC DIRECTOR X__________________________
APPROVED: VA PROJECT MANAGER X__________________________
APPROVED: VA CHIEF ENGINEER X__________________________
APPROVED: CTVHCS DIRECTOR X__________________________
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
674-19-101
12-05-2022
FINAL CONTRACT
DOCUMENTS
REPLACE BOILERS AND
BOILER PLANT
PLANNING
Austin 5121 Bee Caves Road, Suite 203 Austin, Texas 78746 T: 512-327-4149 F: 512-327-7679e info@coxdesignassociates.com
BI
M
VA
T
EM
PL
E
R
EP
LA
C
E
BO
IL
ER
P
LA
N T/
Te m pl e, R ep la ce
B oi le r P la nt
.rv t
4/ 7/
:3
7:
A M
VA FORM 08 - 6231
5350 W. 94TH TERRACE #102
PRAIRIE VILLAGE, KS 66207
T 913.258.5026 www.rossbar.com C-103
HR
NA
GENERAL NOTES
1. EOP - EDGE OF PAVEMENT
2. TBOC - TOP BACK OF CURB
3. CONC - TOP OF CONCRETE
4. TOW - TOP OF WALL
5. FG - FINISH GRADE
N0 32 48 6416
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
EOP 680.00
AutoCAD SHX Text
AutoCAD SHX Text
EOP 680.1
AutoCAD SHX Text
AutoCAD SHX Text
EOP 680.25
AutoCAD SHX Text
AutoCAD SHX Text
EOP 680.4
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 681.0
AutoCAD SHX Text
AutoCAD SHX Text
CONC 681.21
AutoCAD SHX Text
AutoCAD SHX Text
FG 680.88
AutoCAD SHX Text
AutoCAD SHX Text
EOP 680.8
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 681.21
AutoCAD SHX Text
AutoCAD SHX Text
CONC 681.42
AutoCAD SHX Text
AutoCAD SHX Text
FG 681.09
AutoCAD SHX Text
AutoCAD SHX Text
CONC 681.62
AutoCAD SHX Text
AutoCAD SHX Text
FG 681.29
AutoCAD SHX Text
AutoCAD SHX Text
EOP 681.00
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 681.50
AutoCAD SHX Text
AutoCAD SHX Text
CONC 681.62
AutoCAD SHX Text
AutoCAD SHX Text
EOP 680.00
AutoCAD SHX Text
AutoCAD SHX Text
EOP 681.00
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 681.50
AutoCAD SHX Text
AutoCAD SHX Text
EOP 679.00
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 679.50
AutoCAD SHX Text
AutoCAD SHX Text
CONC 681.62
AutoCAD SHX Text
AutoCAD SHX Text
EOP 678.00
AutoCAD SHX Text
AutoCAD SHX Text
CONC 678.62
AutoCAD SHX Text
AutoCAD SHX Text
EOP 677.00
AutoCAD SHX Text
AutoCAD SHX Text
CONC 677.65
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 678.15
AutoCAD SHX Text
AutoCAD SHX Text
EOP 679.00
AutoCAD SHX Text
AutoCAD SHX Text
EOP 679.00
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 678.50
AutoCAD SHX Text
AutoCAD SHX Text
CONC 678.62
AutoCAD SHX Text
AutoCAD SHX Text
EOP 677.00
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 677.50
AutoCAD SHX Text
AutoCAD SHX Text
CONC 677.62
AutoCAD SHX Text
AutoCAD SHX Text
FG 678.31
AutoCAD SHX Text
AutoCAD SHX Text
EOP 676.00
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 676.50
AutoCAD SHX Text
AutoCAD SHX Text
CONC 676.62
AutoCAD SHX Text
AutoCAD SHX Text
EOP 675.00
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 675.50
AutoCAD SHX Text
AutoCAD SHX Text
CONC 675.62
AutoCAD SHX Text
AutoCAD SHX Text
EOP 674.30
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 674.80
AutoCAD SHX Text
AutoCAD SHX Text
CONC 674.92
AutoCAD SHX Text
AutoCAD SHX Text
FG 674.61
AutoCAD SHX Text
AutoCAD SHX Text
EOP 674.00
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 674.50
AutoCAD SHX Text
AutoCAD SHX Text
CONC 674.62
AutoCAD SHX Text
AutoCAD SHX Text
FG 674.30
AutoCAD SHX Text
AutoCAD SHX Text
CONC 674.42
AutoCAD SHX Text
AutoCAD SHX Text
EOP 673.80
AutoCAD SHX Text
AutoCAD SHX Text
CONC 673.85
AutoCAD SHX Text
AutoCAD SHX Text
EOP 673.90
AutoCAD SHX Text
AutoCAD SHX Text
CONC 674.52
AutoCAD SHX Text
AutoCAD SHX Text
CONC 674.52
AutoCAD SHX Text
AutoCAD SHX Text
EOP 673.95
AutoCAD SHX Text
AutoCAD SHX Text
EOP 674.00
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 674.50
AutoCAD SHX Text
AutoCAD SHX Text
FG 674.29
AutoCAD SHX Text
AutoCAD SHX Text
CONC 674.62
AutoCAD SHX Text
AutoCAD SHX Text
EOP
AutoCAD SHX Text
AutoCAD SHX Text
TBOC
AutoCAD SHX Text
AutoCAD SHX Text
TBOC
AutoCAD SHX Text
AutoCAD SHX Text
EOP
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 677.82
AutoCAD SHX Text
AutoCAD SHX Text
CONC 677.32
AutoCAD SHX Text
AutoCAD SHX Text
FG 676.29
AutoCAD SHX Text
AutoCAD SHX Text
CONC 676.62
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 676.50
AutoCAD SHX Text
AutoCAD SHX Text
EOP 676.00
AutoCAD SHX Text
AutoCAD SHX Text
EOP 675.00
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 675.50
AutoCAD SHX Text
AutoCAD SHX Text
CONC 675.62
AutoCAD SHX Text
AutoCAD SHX Text
FG 675.29
AutoCAD SHX Text
AutoCAD SHX Text
EOP 674.00
AutoCAD SHX Text
AutoCAD SHX Text
CONC 674.62
AutoCAD SHX Text
AutoCAD SHX Text
FG 674.29
AutoCAD SHX Text
AutoCAD SHX Text
EOP 674.20
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 674.70
AutoCAD SHX Text
AutoCAD SHX Text
CONC 674.82
AutoCAD SHX Text
AutoCAD SHX Text
FG 674.49
AutoCAD SHX Text
AutoCAD SHX Text
TBOC
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 681.00
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 680.80
AutoCAD SHX Text
AutoCAD SHX Text
CONC
AutoCAD SHX Text
AutoCAD SHX Text
CONC
AutoCAD SHX Text
AutoCAD SHX Text 680.3
AutoCAD SHX Text
AutoCAD SHX Text 680.4
AutoCAD SHX Text
AutoCAD SHX Text 680.5
AutoCAD SHX Text
AutoCAD SHX Text 680.5
AutoCAD SHX Text
AutoCAD SHX Text 680.4
AutoCAD SHX Text
AutoCAD SHX Text 680.9
AutoCAD SHX Text
AutoCAD SHX Text 680.6
AutoCAD SHX Text
AutoCAD SHX Text 680.7
AutoCAD SHX Text
AutoCAD SHX Text 680.27
AutoCAD SHX Text
AutoCAD SHX Text 680.37
AutoCAD SHX Text
AutoCAD SHX Text 680.17
AutoCAD SHX Text
AutoCAD SHX Text 680.27
AutoCAD SHX Text
AutoCAD SHX Text 680.07
AutoCAD SHX Text
AutoCAD SHX Text 680.07
AutoCAD SHX Text
AutoCAD SHX Text 680.07
AutoCAD SHX Text
AutoCAD SHX Text 680.07
AutoCAD SHX Text
AutoCAD SHX Text 680.27
AutoCAD SHX Text
AutoCAD SHX Text 680.37
AutoCAD SHX Text
AutoCAD SHX Text 680.17
AutoCAD SHX Text
AutoCAD SHX Text 680.27
AutoCAD SHX Text
AutoCAD SHX Text 680.60
AutoCAD SHX Text
AutoCAD SHX Text 680.70
AutoCAD SHX Text
AutoCAD SHX Text 680.27
AutoCAD SHX Text
AutoCAD SHX Text 679.57
AutoCAD SHX Text
AutoCAD SHX Text 679.57
AutoCAD SHX Text
AutoCAD SHX Text 679.57
AutoCAD SHX Text
AutoCAD SHX Text 679.57
AutoCAD SHX Text
AutoCAD SHX Text 676.57
AutoCAD SHX Text
AutoCAD SHX Text 676.60
AutoCAD SHX Text
AutoCAD SHX Text 676.65
AutoCAD SHX Text
AutoCAD SHX Text 676.25
AutoCAD SHX Text
AutoCAD SHX Text 676.37
AutoCAD SHX Text
AutoCAD SHX Text 676.65
AutoCAD SHX Text
AutoCAD SHX Text 676.41
AutoCAD SHX Text
AutoCAD SHX Text 676.47
AutoCAD SHX Text
AutoCAD SHX Text 676.50
AutoCAD SHX Text
AutoCAD SHX Text 676.37
AutoCAD SHX Text
AutoCAD SHX Text 676.65
AutoCAD SHX Text
AutoCAD SHX Text 676.45
AutoCAD SHX Text
AutoCAD SHX Text 679.57
AutoCAD SHX Text
AutoCAD SHX Text 679.57
AutoCAD SHX Text
AutoCAD SHX Text 679.57
AutoCAD SHX Text
AutoCAD SHX Text 676.65
AutoCAD SHX Text
AutoCAD SHX Text
CONC 680.33
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 680.83
AutoCAD SHX Text
AutoCAD SHX Text
CONC 680.23
AutoCAD SHX Text
AutoCAD SHX Text
TBOC 680.73
nandrews
GRADING PLAN
1 BEAM LAYOUT
SCALE: 1" = 5'-0"
2 FOOTING DETAIL
SCALE: NTS
6 SECTION B-B
SCALE: 1" = 4' - 0"
4 SECTION C-C
SCALE: 1" = 3' - 0"3 SECTION C-C
SCALE: NTS
20"
12"
4"
8"
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved:
APPROVED: HRC DIRECTOR X__________________________
APPROVED: VA PROJECT MANAGER X__________________________
APPROVED: VA CHIEF ENGINEER X__________________________
APPROVED: CTVHCS DIRECTOR X__________________________
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
674-19-101
12-05-2022
FINAL CONTRACT
DOCUMENTS
REPLACE BOILERS AND
BOILER PLANT
PLANNING
Austin 5121 Bee Caves Road, Suite 203 Austin, Texas 78746 T: 512-327-4149 F: 512-327-7679e info@coxdesignassociates.com
BI
M
VA
T
EM
PL
E
R
EP
LA
C
E
BO
IL
ER
P
LA
N T/
Te m pl e, R ep la ce
B oi le r P la nt
.rv t
4/ 7/
:3
7:
A M
VA FORM 08 - 6231
5350 W. 94TH TERRACE #102
PRAIRIE VILLAGE, KS 66207
T 913.258.5026 www.rossbar.com
CIVIL SITE PLAN
nandrews Text Box C-104
THREADED CAP
FLUSH WITH CONCRETE OR
4" ABOVE GROUND
8" PVC SCH. 40
LONG SWEEP ELBOW
1 CLEANOUT DETAIL
SCALE: N.T.S.
BACKFILL, 12" LIFTS
NEW PIPE
BED PIPE IN SAND OR
ENGINEERED FILL
2 TRENCH DETAIL
SCALE: N.T.S.
5 PAVEMENT DETAIL
SCALE: N.T.S
6" CONCRETE
10" COMPACTED CRUSHED
LIMESTONE BASE
7" COMPACTED LIME STABILIZED
SUBGRADE 95% MAX DENSITY
6 MOUNTABLE CURB & GUTTER
SCALE: N.T.S.
10"14"
2'1/4" R 10"R
24"
24"
UNDISTURBED EARTH
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved:
APPROVED: HRC DIRECTOR X__________________________
APPROVED: VA PROJECT MANAGER X__________________________
APPROVED: VA CHIEF ENGINEER X__________________________
APPROVED: CTVHCS DIRECTOR X__________________________
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
674-19-101
NOT FOR
CONSTRUCTION
REPLACE BOILERS AND
BOILER PLANT
PLANNING
Austin 5121 Bee Caves Road, Suite 203 Austin, Texas 78746 T: 512-327-4149 F: 512-327-7679e info@coxdesignassociates.com
BI
M
VA
T
EM
PL
E
R
EP
LA
C
E
BO
IL
ER
P
LA
N T/
Te m pl e, R ep la ce
B oi le r P la nt
.rv t
4/ 7/
:3
7:
A M
VA FORM 08 - 6231
5350 W. 94TH TERRACE #102
PRAIRIE VILLAGE, KS 66207
T 913.258.5026 www.rossbar.com C-500
CIVIL SITE DETAILS
RMJr
NJA
nandrews Image nandrews Text Box 12-05-2022 nandrews Text Box
FINAL CONTRACT DOCUMENTS
nandrews Line nandrews Ellipse nandrews Ellipse nandrews Ellipse nandrews Ellipse nandrews Ellipse nandrews Callout
#5 REBAR @ 12"O.C. BOTH WAYS
nandrews Callout
TWO #5 REBAR
PIPE FLOW
1 TYPICAL DETAILS - THRUST BLOCK - 45 DEGREE
SCALE: N.T.S.
PIPE FLOW
2 TYPICAL DETAILS - THRUST BLOCK - 90 DEGREE
SCALE: N.T.S.
PIPE FLOW
3 TYPICAL DETAILS - THRUST BLOCK - DEAD END
SCALE: N.T.S.
PIPE FLOW
4 TYPICAL DETAILS - THRUST BLOCK - ELBOW
SCALE: N.T.S.
PIPE FLOW
5 TYPICAL DETAILS - THRUST BLOCK - TEE/WYE
SCALE: N.T.S. 6 TYPICAL DETAILS - THRUST BLOCK - VALVE
SCALE: N.T.S.
PIPE FLOW
NOTE: VALVE SHALL MAINTAIN CONTACT WITH THRUST BLOCK.
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved:
APPROVED: HRC DIRECTOR X__________________________
APPROVED: VA PROJECT MANAGER X__________________________
APPROVED: VA CHIEF ENGINEER X__________________________
APPROVED: CTVHCS DIRECTOR X__________________________
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
674-19-101
NOT FOR
CONSTRUCTION
REPLACE BOILERS AND
BOILER PLANT
PLANNING
Austin 5121 Bee Caves Road, Suite 203 Austin, Texas 78746 T: 512-327-4149 F: 512-327-7679e info@coxdesignassociates.com
BI
M
VA
T
EM
PL
E
R
EP
LA
C
E
BO
IL
ER
P
LA
N T/
Te m pl e, R ep la ce
B oi le r P la nt
.rv t
4/ 7/
:3
7:
A M
VA FORM 08 - 6231
5350 W. 94TH TERRACE #102
PRAIRIE VILLAGE, KS 66207
T 913.258.5026 www.rossbar.com C-501
CIVIL DETAILS PLAN
THRUST BLOCKS
RMJr
NJA
GENERAL NOTES:
1. THRUST BLOCKS SHALL BE CAST IN PLACE.
2. THRUST BLOCK SHALL ENCASE PIPE A
MINIMUM OF 8 INCHES ON ALL SIDES. THE
THRUST BLOCK DIMENSIONS ON ALL SIDES
EQUALS (=) THE PIPE DIAMETER PLUS (+)
SIXTEEN (16) INCHES.
3. THRUST BLOCKS SHALL BE PLACED AGAINST
UNDISTURBED OR COMPACTED TRENCH WALL.
4. THRUST BLOCKS SHALL BE A MINIMUM OF
COMPRESSIVE STRENGTH OF 3500 PSI
CONCRETE.
nandrews Text Box
FINAL CONTRACT DOCUMENTS
nandrews Text Box 12-05-2022
10 FT. MAX1'-0" 10" MIN. DIA.
BRACE
RAIL
LINE POST
POST TIE WIRES
@15" CENTERS
TOP RAIL
TIE WIRES
@ 24" CENTERS
TOP RAIL
TERMINAL POST
STRETCHER BAR
3/8 IN. DIA. TRUSS ROD
HOOK BOLTS
42" MIN.
1'-0"
36" MIN.
6"
CONCRETE
5'-0"
1 FENCE DETAILS
SCALE: N.T.S.
NOTE: ALL POSTS ARE
7'-6" MIN.
NOTE: LINE POSTS MAY BE DRIVE
SET TO 40" MIN. BELOW GRADE
AND CONCRETE OMITTED.
SHAPE, SIZE AND WEIGHT REQUIREMENTS
FOR FENCE POSTS AND RAILS
ITEM SHAPE OUTSIDE
DIMENSIONS IN.
WEIGHT
LBS./LIN. FT.
TERMINAL POSTS
ROUND
*ROUND
2.375 2.375
3.65 3.12
LINE POSTS ROUND
*ROUND
1.90 1.90
2.72 2.28
TOP & BRACE
RAILS
ROUND
*ROUND
1.66 1.66
2.27 1.84
* GRADE B HIGH STRENGTH STEEL
** INCLUDES END, CORNER, ANGLE, INTERSECTION AND INTERMEDIATE
BRACED POSTS
GATE FRAME MEMBERS
SIZE AND WEIGHT
GATE FRAME
OUTSIDE
DIMENSIONS
INCHES
WEIGHT
LBS. /LIN. FT.
ROUND
*ROUND
1.66 1.66
2.27 1.84
LINE POSTS ROUND
*ROUND
1.90 1.90
* GRADE B HIGH STRENGTH STEEL
GATE POST
SIZE AND WEIGHT
GATE LEAF
WIDTH OF
6 FT. OR LESS
OUTSIDE
DIMENSIONS
INCHES
WEIGHT
LBS. /LIN. FT.
ROUND
*ROUND
2.875 2.875
5.79 4.64
* GRADE B HIGH STRENGTH STEEL
2 VEHICLE GATE DETAILS
SCALE: N.T.S. 3 MAN GATE DETAILS
SCALE: N.T.S.
1 8
5 11
CONCRETE
GATE OPENING ____ FT.
10" DIA.
1'-6"LIGHT
HALF
HEAVY
HALF
1'-0" MIN. DIA.
1'-0" MIN.
2'-6" MIN.
3'-6" MIN. OR AS SPECIFIED
4 11
1'-0" MIN. DIA.
1'-0" MIN.
2'-6" MIN. GATE POST
& END POST
FOR FENCE
CONCRETE
120" 60" 60"
72" 70"
18"
18"
117 34"
9 13/16"
1 1/8" Ø20mm
SOLID
ROD
18 1/2"
30 1/8" 15 3/16"
15 3/16"
Ø33.4mm
HOLLOW ROD
TOP VIEWFRONT VIEW
4 TYPICAL TEMPORARY FENCE DETAIL
SCALE: N.T.S.
MATERIA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .