This is a Request for Information (RFI) comment matrix spreadsheet for solicitation 36C25724R0077, regarding the replacement of boilers and boiler plant at the Central Texas Veterans Health System in Temple, TX. The document contains directions for submitting feedback and questions about the RFP, with responses required in Microsoft Excel format.

The matrix includes 37 technical questions and VA responses covering various aspects of the construction project, including requests for geotechnical reports, utility as-builts, specifications for eye wash stations, door ratings, railing details, fuel equipment requirements, brick veneer specifications, and structural details. Key clarifications include confirmation that Edwards is the existing fire alarm manufacturer, fuel lines inside the building will run in trenches, and specific details about window types, overhead coiling doors, and gas line installations. The document indicates a site visit was scheduled for November 7, 2024, at 10 AM Central Time at the Olin E. Teague Veterans' Medical Center.

View the file

Other files

File Type Posted
CD-100.pdf PDF
CD-101.pdf PDF
36C25724R0077 0007.pdf PDF
36C25724R0077 0006.pdf PDF
36C25724R0077 0005.pdf PDF
36C25724R0077 0004.pdf PDF
36C25724R0077 0003.pdf PDF
2021-624 Georeport_Final.pdf PDF
36C25724R0077 0002.pdf PDF
Pre-Bid RFI 20_Existing Fuel Tank details.pdf PDF
36C25724R0077 0001.pdf PDF
Pre-Bid RFI 24 and 48_ALUCOBOND Dry Reveal Specification.pdf PDF
Specifications_VOLUME 4.pdf PDF
36C25724R0077 Pre-Bid Sign-in Sheet.pdf PDF
ATTACHMENT 12 - PCRA_674-19-101 Replace Boilers and Boiler Plant.pdf PDF
ATTACHMENT 11 - Price Breakout.xlsx XLSX spreadsheet
ATTACHMENT 1 - SOW - Boiler Plant_rev02.pdf PDF
ATTACHMENT 7 - Wage Determination TX20240230 7.12.24.pdf PDF
ATTACHMENT 10 - Contractor Rules Of Behavior.pdf PDF
ATTACHMENT 4 - Specifications_VOLUME 3_01.pdf PDF
Solicitation 36C25724R0077.pdf PDF
ATTACHMENT 8 - S02 Self-Performed Work Calculations.docx DOCX document
ATTACHMENT 6 - 12-21-2022 Final Contract Documents Full Set_01.pdf PDF
ATTACHMENT 3 - Specifications_VOLUME 2_01.pdf PDF
ATTACHMENT 13 - Notice to SB Joint Venture.docx DOCX document
ATTACHMENT 2 - Specifications_VOLUME 1_01.pdf PDF
ATTACHMENT 9 - Past Performance Questionnaire.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIRECTIONS

TAILORED COMMENT MATRIX

THIS DOCUMENT MUST BE RETURNED IN A MICROSOFT EXCEL FILE FORMAT. DO NOT RETURN YOUR RESPONSES IN ANY DIFFERENT FILE FORMAT.

Directions & Explanation of TAILORED COMMENT MATRIX
This Tailored Comment Matrix is provided in order for potential offerors to provide feedback, comments, and ask questions with regard to the released RFP.

The sheet labeled "DIRECTIONS" explains this document, and provides directions for its use.

The sheet labeled "MATRIX" contains a table with all labeled and numbered elements from the RFP. This table is where potential offerors may respond to the Government with feedback, comments, or ask questions.

Directions and explanation of sheet labeled "MATRIX"
The MATRIX sheet can be reached by clicking the "MATRIX" Tab at the bottom of this spreadsheet. Add rows as necessary under the applicable item.
MATRIX COLUMN DESCRIPTIONS:
Column A:Contains the Item reference number for this item. This number is used for organizational purposes, when referring to this document only.

Column B: Contains the section number that each element is labeled, within their respective documents. The section number relates directly to the item's location in the RFP.

Column C: Contains the written title for the corresponding item/section number.

Column D:Contains a drop down box for selecting the type of comment. Available options are "Critical" "Substantive" or "Administrative".
Critical: Violations of law -or- Unnecessary risks to safety, life & limb, or Material; waste or abuse of VHA appropriations; unreasonable burden on resources.
Substantive: Appears or is potentially unnecessary, incorrect, misleading, confusing, or inconsistent with other sections; disagree with proposed responsibilities, requirements, and/or procedures.
Administrative: Address typographical, grammatical, and formatting errors (grammar, punctuation, style, etc.)

Column E: Contains recieved date of offerors' comments/questions/responses.

Column F: Contains space for potential offerors' comments/questions/responses.

Column G: Contains space for VHA comments/questions/responses.

Column H: Contains response date for VHA comments/questions/responses.

THIS DOCUMENT MUST BE RETURNED IN A MICROSOFT EXCEL FILE FORMAT. DO NOT RETURN YOUR RESPONSES IN ANY DIFFERENT FILE FORMAT.

MATRIX

ITEM #SECTION or ATTACHMENT #DOCUMENT NAMECOMMENT TYPE
(Select from drop down)Received DateQUESTIONS / COMMENTS
(With justification of why considered source selection sensitive if applicable)VA Response
1GeneralGeneralAdministrative11/14/24Please provide the Geotechnical Report referenced as Appendix A in the specifications.Will be in an amendment
2GeneralGeneralAdministrative11/14/24Please provide a current set of site utility as-builts for the project site to include coverage of the route for new Gas lines to be installed..Current set of As-Builts to be provided by VA
3Sheet AS-112First Floor Finish PlanSubstantive11/14/24Please provide details on the work benches located in the Boiler Roomnoted on the floor plan and if they are to be included.These are Owner parovided, Group II Equipment
4Sheet AS-112First Floor Finish PlanSubstantive11/14/24Please provide specifications for the eye wash station located by the Water Test Room 015.Basis of Design: Haws, AXION; Model 8300.158
5GeneralGeneralAdministrative11/14/24Please provide the missing sheets CD-100 - Site Demolition Plan and CD-101 - City Utility Plan.Previously sent. CO to reissue set.if needed
6Specification Section 08 11 13 / AS-610Door & Window SchedulesSubstantive11/14/24Please provide Door Ratings. In Specifications 08 11 13, Page 4 it states 'Fire Ratings: See drawings.' but on the sheet AS-610 - Door Schedule, the fire ratings are not specified. Please clarify the fire rating for each door opening on the door schedule.See previous RFI # 53
7Sheet AS-306Enlarged Floor PlansSubstantive11/14/24Please provide the specifications and sizing for the railing in the Steam Pit Room 021 as detailed on Sheet AS-306.See Specifications 05 51 00
8GeneralGeneralSubstantive11/14/24What existing fuel equipment with be re-installed besides the aboveground fuel tanks?Contractor to provide Shop Drawings to coordinate with new equipment.
9GeneralGeneralAdministrative11/14/24Is there an existing tank gauging and leak detection system?Yes
10Section 23 10 00Facility Fuel Oil SystemsSubstantive11/14/24Does the existing filtration system come with the 100 gallon holding tank and pump as listed in Section 23 10 00 – 2.7 E?No
11GeneralGeneralAdministrative11/14/24Provide Basis of design and specifications for the Brick Veneer exterior finish at the East and West Elevations.See Specifications 04 20 00 for criteria and colors / finishes.
12GeneralGeneralAdministrative11/14/24Please provide the BOD for the exterior metal wall panel systemSee previous RFI # 24 response
13Section 23 10 00Facility Fuel Oil SystemsAdministrative11/14/24Per Section 23 10 00, Page 19, Section 2.7, F, Is there an existing chemical additive system – Sec 23 10 00 – 2.7F?No
14GeneralGeneralSubstantive11/14/24Is all fuel oil piping to be ran aboveground and welded sw sch 40 black steel?Comply with Specificaitons
15GeneralGeneralAdministrative11/14/24Are welded joints to be NDR tested?Comply with Specificaitons
16Sheet MP-101Mechanical 1st Floor New Work Plan - PipingSubstantive11/14/24Mechanical 1st Floor New Work Plan - Piping states, “Taps provided for mobile boiler piping connection”. Please specify what type of cap will be utilized.Blank flanges, bolted
17GeneralGeneralAdministrative11/14/24Please provide a Stormwater Pollution Prevention Plan (SWPPP).See Rfi # 47
18Sheets AS-102 and Sheet AS-302Site Plan/Wall SectionsSubstantive11/14/24Sheets AS-102 and AS-302 indicate a screen wall in front of the Fuel Tanks. No details are found in the Structural drawings (Sheet S200) defining the structure for this wall. Please provide structural details for the screen wall specified.See Civil Sheet C-104
19Sheet AS-610Door & Window SchedulesAdministrative11/14/24Per Sheet AS-610, please provide Door and Frame type(s) for each opening based on the frame and door profiles indicated on the sheet. The Door Schedule does not have this information completed for each opening.Both Door and Frames are designated by Door dimensions in Door Schedule.
20GeneralGeneralAdministrative11/14/24Please advise who the existing manufacturer for the Fire Alarm.Edwards
21GeneralGeneralAdministrative11/14/24Please provide Basis of design for Exterior louvers at the West and South Elevations.Comply with Specifications. Basis of Design is not used. Minish to match AL Window Frames, see RFI # 24.
22GeneralGeneralSubstantive11/14/24Are fuel lines inside the building ran in trenches?Yes
23Sheet C - 100Civil Site PlanSubstantive11/14/24Key Note 3 on Sheet C-100 states to Construct concrete spill containment references Details on Sheet XX. Please provide the missing detail number and sheet reference.See Civil Sheet C-104
24Specification Section 08 51 13Substantive11/14/24Please provide the BOD for the Windows. Specification Section 08 51 13 (Page 4) cross references Specification Section 09 06 00 (Schedule of Finishes) but it is not included in the section.Windows to comply with Specifications 08 51 13. Finish per manufacturer's standard anodized choice selections.
25Specification Section 09 06 00Schedule of FinishesAdministrative11/14/24Please complete Specification Section 09 06 00 - Schedule of FinishesSee Finish Schedules Sheet AS - 610
26GeneralGeneralSubstantive11/14/24Please provide a BOD for the Overhead Coiling Doors.B of D; AMBICO, blast resist steel, OHD per opening and frame reqmts.
27Sheets C - 100 and C - 104Civil Site PlanSubstantive11/14/24The details provided on Sheet C-104 appear to be for the fuel storage containment shown on Sheet C-100, but seem to be incomplete. Detail 2 is a Footing detail with no references found in the plans, Details 3 & 4 are both identified as Section C-C with no correlating plan reference found. Detail 3 appears to be a detail for the Flume but is not identified as such and no notes are provided specifying materials and reinforcing. Detail 4 indicates walls extending vertically above the slab but no dimensions are given. Details 1 & 6 show rectangles with detail symbol referring to 7/F-5 no such plan or detail is found. Please revise this plan as necessary to provide the clarity needed for pricing and construction.See Rfi # 75 and 76
28Sheet AS-610Door & Window SchedulesSubstantive11/14/24Please provide the location for Window Types A & B. No locations are identified on the Bid Documents.See Sheets AS - 105, AS - 310, AS - 303, AS - 304. A Types on West Wall First Floor and West Wall Room 019.
29GeneralGeneralSubstantive11/14/24Specify supply return pump for the genereators.Complly with manufacturer's performance requirements .
30Sheet C-102New Gas Feed LineSubstantive11/14/24Sheet C-102 appears to indicate the design intent for a new Gas line to be installed from the existing Boiler Plant to the new Boiler Plant to be constructed. However, there is no differentiation in line weights or styles between new piping and existing piping to remain. Please clarify the design intent and clearly identify all new Gas piping to be installed.Gas Supplly is to connect with existing supply lines and utilize necessary Shop Drawings to confirm complyance with design intent.
31Sheet C-102New Gas Feed LineAdministrative11/14/24Key Note 1 on Sheet C-102 was left blank. Please provide the missing Key Note.Key note is not used
32Sheet C-103Grading PlanSubstantive11/14/24No asphalt paving details are provided for the restoration and repair of existing asphalt paving that will be necessary to install underground utilities beyond the boundaries the new site plan and for installation of the perimeter concrete curbing and drive lanes. Please define the design intent for new and/or restorative asphalt paving.See RFI # 74
33GeneralGeneralSubstantive11/14/24Please advise if there is supposed to be a back pressure regulator for the fuel loop to the boilers and return pumps for the generators. They are not indicated on the Bid Documents.Comly with the bid documents.
34Sheet S-200Foundation PlanSubstantive11/14/24Please advise if earth forming is acceptable for the installation of the grade beams as shown on Sheet S-200.This is acceptable.
35Sheet AD-100Site Demo PlanSubstantive11/14/24Please identify any trees to be removed during the site demolition process. In addition, please advise if any tree removal permits will be required on this project.Retain only oak trees along Teague Place Road
36GeneralGeneralAdministrative11/14/24Please provide the folowing specification sections and/or divisions that are missing from the Bid Specifications: Division 27 - Communications - 27 11 00, 27 15 00, and 27 51 16, Division 28 - Electronic Safety and Security, Division 31 - Earthwork, Division 32 - Exterior Improvements, and Division 33 - Utilities.See Specification Vol IV
37AS-305Enlarged SectionsSubstantive11/14/24Please provide details for the Railings shown around the steam tunnel pit and stairs on Sheet AS-305See RFI # 7

&"-,Bold"&14Bid Build Replace Boilers and Boiler Plant at Central Texas Health Care System &"-,Bold"S&12olicitation No. 36C25724R0077 Project No. 674-19-101