ATTACHMENT 11 - Price Breakout.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Y1NB--SOLICITATION CONSTRUCTION REPLACE BOILERS AND BOILER PLA Central Texas Veterans Health System, Temple, TX
Solicitation number
36C25724R0077
Issued by

About this file

This document is a Price Schedule Breakdown template for a federal construction contract opportunity to replace boilers and a boiler plant at the Central Texas Veterans Health System in Temple, TX. The template provides instructions for completing the price breakdown across various construction divisions and facility services categories. It requires the offeror to provide fixed-price amounts for the general requirements, existing conditions, specific construction divisions, facility services, site work, process equipment, and other cost elements. The total contract price must be calculated and broken out across these elements. The related federal contract opportunity is Solicitation Number 36C25724R0077, issued by the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 17. The solicitation seeks construction services to replace the boilers and boiler plant, with a site visit scheduled for November 7, 2024.

View the file

Other files

File Type Posted
CD-100.pdf PDF
CD-101.pdf PDF
36C25724R0077 0007.pdf PDF
36C25724R0077 0006.pdf PDF
36C25724R0077 0005.pdf PDF
36C25724R0077 0004.pdf PDF
36C25724R0077 0003.pdf PDF
36C25724R0077 RFI continuation sheet 20241126.xlsx XLSX spreadsheet
2021-624 Georeport_Final.pdf PDF
36C25724R0077 0002.pdf PDF
Pre-Bid RFI 20_Existing Fuel Tank details.pdf PDF
36C25724R0077 0001.pdf PDF
Pre-Bid RFI 24 and 48_ALUCOBOND Dry Reveal Specification.pdf PDF
Specifications_VOLUME 4.pdf PDF
36C25724R0077 Pre-Bid Sign-in Sheet.pdf PDF
ATTACHMENT 12 - PCRA_674-19-101 Replace Boilers and Boiler Plant.pdf PDF
ATTACHMENT 1 - SOW - Boiler Plant_rev02.pdf PDF
ATTACHMENT 7 - Wage Determination TX20240230 7.12.24.pdf PDF
ATTACHMENT 10 - Contractor Rules Of Behavior.pdf PDF
ATTACHMENT 4 - Specifications_VOLUME 3_01.pdf PDF
Solicitation 36C25724R0077.pdf PDF
ATTACHMENT 8 - S02 Self-Performed Work Calculations.docx DOCX document
ATTACHMENT 6 - 12-21-2022 Final Contract Documents Full Set_01.pdf PDF
ATTACHMENT 3 - Specifications_VOLUME 2_01.pdf PDF
ATTACHMENT 13 - Notice to SB Joint Venture.docx DOCX document
ATTACHMENT 2 - Specifications_VOLUME 1_01.pdf PDF
ATTACHMENT 9 - Past Performance Questionnaire.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN
674-19-101

Replace Boilers and Boiler Plant

CLIN 0001
RatesBase Item
General Requirements & Facility ConstructionPrice
Division Item 1 General RequirementsN/A$0.00
Division Item 2 Existing ConditionsN/A$0.00
Division Item 3 ConcreteN/A$0.00
Division Item 4 MasonryN/A$0.00
Division Item 5 MetalsN/A$0.00
Division Item 6 Woods, Plastic and CompositesN/A$0.00
Division Item 7 Thermal and Moisture ProtectionN/A$0.00
Division Item 8 OpeningsN/A$0.00
Division Item 9 FinishesN/A$0.00
Division Item 10 SpecialtiesN/A$0.00
Division Item 11 EquipmentN/A$0.00
Division Item 12 FurnishesN/A$0.00
Division Item 13 Special ConstructionN/A$0.00
Division Item 14 Conveying EquipmentN/A$0.00
Facility Services SubgroupN/A$0.00
Division Item 21 Fire SuppressionN/A$0.00
Division Item 22 PlumbingN/A$0.00
Division Item 23 Heating, Ventilating and A/CN/A$0.00
Division Item 25 Integrated AutomationN/A$0.00
Division Item 26 ElectricalN/A$0.00
Division Item 27 CommunicationsN/A$0.00
Division Item 28 Electronic Safety & SecurityN/A$0.00
Site & Infrastructure Subgroup
Division Item 31 EarthworkN/A$0.00
Division Item 32 Exterior ImprovmentsN/A$0.00
Division Item 33 UtilitiesN/A$0.00
Division Item 34 TransportationN/A$0.00
Division Item 35 Waterway & Marine ConstructionN/A$0.00
Process Equipment Subgroup$0.00
Division Item 40 Process InterconnectionsN/A$0.00
Division Item 41 Material Processing & Handling EquipmentN/A$0.00
Division Item 42 Process Heating, Cooling, & Drying EquipmentN/A$0.00
Division Item 43 Process Gas & Liquid HandlingN/A$0.00
Division Item 44 Pollution & Waste Control EquipmentN/A$0.00
Division Item 45 Industry Specific Mfg. EquipmentN/A$0.00
Division Item 46 Water & Wastewater EquipmentN/A$0.00
Division Item 48 Electrical Power GenerationN/A$0.00

TOTAL DIVISIONS $0.00

Insurance / Bonds$0.00
Taxes / Other Fees (provide itemized list)$0.00
O&M Manuals and Red Line Drawings$0.00
Overhead$0.00
SubContract Mark-Up$0.00
Profit$0.00
SubTotals$0.00

Other Items not Requested Above (provide itemized list) $0.00

CONTRACT TOTALS$0.00
TOAL$0.00