Attachment 593-24-102_Combined Drawings.pdf
PDF 8 MB Posted
- Solicitation number
- 36C26124R0058
About this file
This document is a set of architectural drawings for a project to upgrade the entrance doors at Buildings 6 and 7 of the VA Southern Nevada Healthcare System in North Las Vegas, NV (Project No. 593-24-102). The key details include:
The project involves replacing the existing entrance door assemblies with new automatic door systems, connecting the new doors to the existing fire alarm system, and installing new card readers and hand wave devices. Additional work includes demolishing portions of the existing concrete and sidewalk, installing a new concrete gutter, and providing protective canopies over the entrances. The drawings indicate that deferred submittals and shop drawings are required for the new door assemblies, steel entry canopy, fabric shade canopy, and patio canopy. The project is subject to a Davis-Bacon wage determination.
The related federal contract opportunity is a Task Order Proposal Request (TOPR) under the VISN 21 Multiple Award Construction Contract (MACC) for Group 1 contractors. Proposals will only be accepted from VISN 21 MACC awardees. The TOPR solicitation number is 36C26124R0058.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ISON IAHP1 LED.pdf | ||
| IMG 0206.jpeg | JPEG file | |
| 100264 EP 301B.pdf | ||
| RFI finalized.docx | DOCX document | |
| 36C26124R0058 0003.docx | DOCX document | |
| 087113.pdf | ||
| 100264 EP 301A.pdf | ||
| Hanbook 0023.pdf | ||
| SOW Revised.pdf | ||
| VA Signage Info.pdf | ||
| 36C26124R0058 0002.docx | DOCX document | |
| 36C26124R0058 0001.docx | DOCX document | |
| Attachment WMC Form Ktr Employee Sponsor Request.pdf | ||
| Attachment ENG_FORM_4288-R.pdf | ||
| Attachment 240117_SOP for PIV Badging Process.docx | DOCX document | |
| Attachment Badging Checklist-sample.xlsx | XLSX spreadsheet | |
| Attachment 593-24-102 SOW.pdf | ||
| Attachment FM1A_Contract Security Service Request.pdf | ||
| Attachment 593-24-102 Combined Specifications.pdf | ||
| Attachment 5 List of Bid Items.pdf | ||
| Attachment Card reader install notes Eshop.pdf | ||
| Attachment Price Proposal_Breakdown.docx | DOCX document | |
| 36C26124R0058_1 Solicitation.docx | DOCX document | |
| Attachment VSC FM OF 306 Declaration of Fed Empl.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Poject No. 593-24-102 | Upgrade Entrance Doors at Building 6 & 7
DEPARTMENT OF VETERANS AFFAIRS
VA Southern Nevada Healthcare Systems
6900 N. Pecos Rd., North Las Vegas, NV 89086
D ra w in g Ti tle
A pp ro ve d:
R e vi s io n s:
D a te
S ca le
A pp ro ve d:
Jo na th an
G . S an ch ez , C hi ef
E ng in ee r W ill ia m J
. C ar on , P
T, M
H A
, F A
C H
E, M ed ic al C en te r D ire ct or
N o t to
S c a le
P ro je ct
T itl e
D at e
Lo ca tio n
C he ck ed
B ui ld in g N um be r
P ro je ct
N um be r
D ra w in g N um be r
D ra w n
D w g.
of
N o rt h
L a s V e g a s N
V
U
PG
R
AD
E_
EN
TR
_D
O O
R S
-2
-1
T
IT
LE
_S H
E E
T
/1
/2
_7
D N
H M
S
Bldg 1
Bldg 2
Bldg 3
Bldg 4
Bldg 5
Bldg 6 Bldg 7
Bldg 8
Bldg
Bldg 6
1/2
1/2
1H120
VESTIBULE
1H120
VESTIBULE
General Notes:
A. Provide fire stopping and caulking at fire rated walls and ceiling assemblies to maintain the integrity of fire rated constructions. See reference plans for fire rated walls and ceilings.
B. Contractor shall provide personnel certified for installation of sliding glass doors.
Key Notes
1. Provide and install new automatic door assembly.
2. Provide connection of automatic openers to existing Fire Alarm System per NFPA 101.
When fire alarm is activated, the doors shall be able to be opened without the use of automatic openers. Coordinate exact rough-in location and requirements with door opener manufacturer and interlock with existing and new card readers.
3. New card reader to match existing. Contractor to verify new equipment can be integrated and serviced with existing VA system.
4. Existing column to remain.
5. Demolish portion of existing concrete to allow for new card reader and wiring
6. Existing card reader to remain
7. New handwave device
8. Existing door assembly, frame, and threshold to be demolished
9. Limit of construction
Deferred Submittals/Shot Drawings Required
- New Door Assemblies
- Steel Entry Canopy
- Fabric Shade Canopy
9 8
6 3
1, 2
7 9
D ra w in g Ti tle
A pp ro ve d:
R e vi s io n s:
D a te
S ca le
A pp ro ve d:
Jo na th an
G . S an ch ez , C hi ef
E ng in ee r W ill ia m J
. C ar on , P
T, M
H A
, F A
C H
E, M ed ic al C en te r D ire ct or
N o t to s c a le
P ro je ct
T itl e
D at e
Lo ca tio n
C he ck ed
B ui ld in g N um be r
P ro je ct
N um be r
D ra w in g N um be r
D ra w n
D o rt h
L a s V e g a s N
V
U
PG
R
AD
E_
EN
TR
_D
O O
-2
-1
N O
R T
H
E N
T R
A N
C E
_A R
C H
_D E
M O
/1
/2
D N
H M
S
M
MM
FH
F H
P P
P P
P
P
P
P
P
P
P
P
PP
W
W
W
W
W
W
U G
E
UGE
UGE
UGE
UGE
UG
E
W
W
W
W
W
W
W
W
W
UGE
UGE
UGE
UGE
UGE W
W
W
W
W
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
U G
E
U G
E
U G
E U
G E
U G
E
UGE
UGE
U G
E
U G
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
Sanitary Manhole Rim Elevation 2062.10
Sanitary Manhole Rim Elevation 2062.20Communication Manhole
Rim Elevation 2060.30
Communication Manhole Rim Elevation 2064.40
Communication Manhole Rim Elevation 2062.20
Communication Manhole Rim Elevation 2060.10
COMM
COMM
COMM
COMM
COMM
U
G E
U G
E
U G
E
UGE
UGE
U G
E
UGE
UGE
UGE
UGE
U G
E
U G
E
UGE
UGE
UGE
U G
E
COMM
COMM
COMM
UGE
UGE
UGE
UGE
U G
E
U G
E
COMM
COMM
COMM
COMM
COMM
COMM
W
W
W
W
W
UGE
UGE
UGE
UGE
UGE
UGE
Communication Manhole Rim Elevation 2060.60
U G
E
10511 2066.87
Communication Manhole Rim Elevation 1973.36
U G
E
U G
E
U G
E
UG
E UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
BUILDING 6
B4
AE511
Project Location
Project Location
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M M
M
M
M
M
M
M M
M
M
M M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
MM
M
M M M
M
MM
M
M
M
M
M
M
M
M
M
M
M M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
V
V
V
V
V
V
V V
V
V
V
V
V
V
V
V
V
V
V
V
V
V V
V
V
V
V
VV
V
V
V V
V
V V
V
V
V
V
V
VV
V
V
V
VV
V
V
V
V
V V
V
V V
V V V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
F H
FH
FH
FH
F H
F H
FH
FH
F H
FH
F H
FH
FH
F H
F H
F H
FH
F H
FH
F H
F H
FH
P
P
P P
P
P
P
P
P
P
P
P
P
PP
P
P
P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P P
P
P
P P P P
P
P
PP
P
P
P
P P
P P
P
P
P
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P
P
P
P
P
PP
P
P
P
P
P
P P P P
P
P
P
P
P
P
P
P P P
P
P
P
P
P P
P
P
P
P
P
P
P
P
P
P
P P
P
P
P
P
PP
P
P
PPPPPPP
P
P
P
P
P
P
P
P
P
P
PP
PP
P
P
PP
P
P
P
P
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PP
P
P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
Sanitary Manhole Rim Elevation 2058.60
Sanitary Manhole Rim Elevation 2058.70
Sanitary Manhole Rim Elevation 2061.70
Fiber Optic Manhole Rim Elevation 2080.90
Fiber Optic Manhole Rim Elevation 2077.30
GAS
Communication Manhole Rim Elevation 2071.50
Communication Manhole Rim Elevation 2069.90
Communication Manhole Rim Elevation 2077.20
Communication Manhole Rim Elevation 2073.80
Communication Manhole Rim Elevation 2071.10
WW
U G
E
Sanitary Manhole Rim Elevation 2062.10
Sanitary Manhole Rim Elevation 2067.20
Sanitary Manhole Rim Elevation 2066.50
Sanitary Manhole Rim Elevation 2068.40
Sanitary Manhole Rim Elevation 2056.70
Sanitary Manhole Rim Elevation 2062.20
Communication Manhole Rim Elevation 2058.80
Communication Manhole Rim Elevation 2060.30
Sanitary Manhole Rim Elevation 2068.40
Sanitary Manhole Rim Elevation 2068.00
Sanitary Manhole Rim Elevation 2069.30
Communication Manhole Rim Elevation 2066.10
Communication Manhole Rim Elevation 2064.20
Communication Manhole Rim Elevation 2064.70
Sanitary Manhole Rim Elevation 2054.50
Sanitary Manhole Rim Elevation 2062.10
Sanitary Manhole Rim Elevation 2067.20
Sanitary Manhole Rim Elevation 2068.20
Sanitary Manhole Rim Elevation 2068.10
Sanitary Manhole Rim Elevation 2069.20
Communication Manhole Rim Elevation 2064.40
Communication Manhole Rim Elevation 2062.20
Communication Manhole Rim Elevation 2060.10
Communication Manhole Rim Elevation 2068.60
Communication Manhole Rim Elevation 2051.00
Communication Manhole Rim Elevation 2065.50
Communication Manhole Rim Elevation 2065.60
Sanitary Manhole Rim Elevation 2078.10
Sanitary Manhole Rim Elevation 2080.30
FO
Communication Manhole Rim Elevation 2060.60
Communication Manhole Rim Elevation 2068.60
Communication Manhole Rim Elevation 2044.60
Sanitary Manhole Rim Elevation 2048.80
Sanitary Manhole Rim Elevation 2049.80
Sanitary Manhole Rim Elevation 2049.70
Sanitary Manhole Rim Elevation 2049.80
Sanitary Manhole Rim Elevation 2048.70
Sanitary Manhole Rim Elevation 2048.50
Sanitary Manhole Rim Elevation 2048.60
Sanitary Manhole Rim Elevation 2045.50
Sanitary Manhole Rim Elevation 2048.80
Sanitary Manhole Rim Elevation 2048.20
10511 2066.87
Communication Manhole Rim Elevation 2064.64
Communication Manhole Rim Elevation 1976.61
Drainage Manhole Rim Elevation 1976.67
Communication Manhole Rim Elevation 1973.36
Sanitary Manhole Rim Elevation 1980.23
Drainage Manhole Rim Elevation 1965.30
Communication Manhole
Rim Elevation 1978.64
Sanitary Manhole Rim Elevation 2067.98
WW
VAN
VAN
VAN
VAN
VAN
VAN
VAN
VAN
M
OPEN
TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
BLDG 5
BUILDING 6
OPEN
TO
BELOW
B4
AE511
D ra w in g Ti tle
A pp ro ve d:
R e vi s io n s
D a te
S ca le
A pp ro ve d:
Jo na th an
G . S an ch ez , C hi ef
E ng in ee r W ill ia m J
. C ar on , P
T, M
H A
, F A
C H
E , M ed ic al C en te r D ire ct or
N o t to
S c a le
P ro je ct
T itl e
D at e
Lo ca tio n
C he ck ed
B ui ld in g N um be r
P ro je ct
N um be r
D ra w in g N um be r
D ra w n
D o f
N o rt h
L a s V e g a s
N V
U
PG
R
AD
E_
EN
TR
_D
O O
-2
4-
U
PG
R
AD
D
E_
AC
C
ES
S_ D
O O
R S
2/
/2
D N
H M
S
Proj ec t L oc ati on
S:
\F
M S\
P ro je ct s\
Pr oj ec ts
S ta ff Fo ld er s\ 1-
Ra eL yn n' s F ol de r\
P ro je ct s T en ta tiv e
Fo ld er L ay ou t\
St af f F ol de rs \0
8F
Da ni el \U pg ra de E nt ra nc es
D oo rs \U pg ra de E nt ra nc e
Do or s.
dw g, /8 /2
:3
9:
A M
AutoCAD SHX Text
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text
SHADOW
AutoCAD SHX Text
SHADOW
AutoCAD SHX Text
SHADOW
AutoCAD SHX Text
SHADOW
AutoCAD SHX Text
AREA U/C
AutoCAD SHX Text
AREA U/C
AutoCAD SHX Text
SHELLEY BERKLEY ROAD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 2084.88
AutoCAD SHX Text 2081.77
AutoCAD SHX Text 2072.42
AutoCAD SHX Text 2044.82
AutoCAD SHX Text 2045.67
AutoCAD SHX Text S
AutoCAD SHX Text
PECOS ROAD
AutoCAD SHX Text
DEER SPRINGS WAY
AutoCAD SHX Text
ALUMINUM CAP PLS 10598
AutoCAD SHX Text
ALUMINUM CAP PLS 10598
AutoCAD SHX Text
BRASS CAP IN WELL PLS 10598
AutoCAD SHX Text
ALUMINUM CAP PLS 7755
AutoCAD SHX Text
BRASS CAP IN CONCRETE PLS 16224
AutoCAD SHX Text
BRASS CAP IN CONCRETE PLS 11174
AutoCAD SHX Text CP #2 ALUMINUM CAP IN CURB PLS 21263 N:26805124.1800' E:799473.2680' ELEV:2051.60'
AutoCAD SHX Text CP #1 3" ALUMINUM CAP PLS 9389 BEHIND BUILDING 8 N:26806701.2100' E:800308.7580' ELEV:2083.95'
AutoCAD SHX Text BM #1 ALUMINUM CAP IN CONCRETE COLLAR OF SEWER MANHOLE PLS 21263 N:26806275.2200' E:801425.4300' ELEV:2077.43'
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text
WV
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text C
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text O
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text
WV
AutoCAD SHX Text W
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text
CO
AutoCAD SHX Text
IV
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text
WV
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text M
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
WV
AutoCAD SHX Text S
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
EQUIPMENT PAD - ELEVATION =35'-8"
AutoCAD SHX Text
EQUIPMENT PAD - ELEVATION =35'-8"
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
1H113A
VESTIBULE
1H113A
VESTIBULE
Slope
Slope
General Notes:
A. Provide fire stopping and caulking at fire rated walls and ceiling assemblies to maintain the integrity of fire rated constructions. See reference plans for fire rated walls and ceilings.
B. Contractor shall provide personnel certified for installation of sliding glass doors.
Key Notes
1. Provide and install new automatic door assembly.
2. Provide connection of automatic openers to existing Fire Alarm System per NFPA 101.
When fire alarm is activated, the doors shall be able to be opened without the use of automatic openers. Coordinate exact rough-in location and requirements with door opener manufacturer and interlock with existing and new card readers.
3. New card reader to match existing. Contractor to verify new equipment can be integrated and serviced with existing VA system.
4. Existing column to remain.
5. New card reader
6. New handwave device
7. Existing door assembly, frame, and threshold to be demolished
8. limits of work
9. Concrete to be demolished-Contractor to verify full extent 10.New concrete walkway per VA specifications.
11.New drainage channel.
12.Existing roof drain leaders 13.Demolish portion of sidewalk to allow for drainage gutter-provide and install new galvanized steel pedestrian rated plate with non slip surface 14.New canopy post-Size and location to be determined
Deferred Submittals/Shop Drawings Required
- New Door Assemblies
- Steel Entry Canopy
- Fabric Shade Canopy
- Patio Canopy
4 4
1, 2
D ra w in g Ti tle
A pp ro ve d:
R e vi s io n s:
D a te
S ca le
A pp ro ve d:
Jo na th an
G . S an ch ez , C hi ef
E ng in ee r W ill ia m J
. C ar on , P
T, M
H A
, F A
C H
E, M ed ic al C en te r D ire ct or
N o t to
S c a le
P ro je ct
T itl e
D at e
Lo ca tio n
C he ck ed
B ui ld in g N um be r
P ro je ct
N um be r
D ra w in g N um be r
D ra w n
D o rt h
L a s V e g a s N
V
U
PG
R
AD
E_
EN
TR
_D
O O
-2
-1
/1
/2
D N
H M
S
S O
U T
H
E N
T R
A N
C E
_A R
C H
_D E
M O
D ra w in g Ti tle
A pp ro ve d:
R e vi s io n s:
D a te
S ca le
A pp ro ve d:
Jo na th an
G . S an ch ez , C hi ef
E ng in ee r W ill ia m J
. C ar on , P
T, M
H A
, F A
C H
E, M ed ic al C en te r D ire ct or
N o t to
S c a le
P ro je ct
T itl e
D at e
Lo ca tio n
C he ck ed
B ui ld in g N um be r
P ro je ct
N um be r
D ra w in g N um be r
D ra w n
D o rt h
L a s V e g a s N
V
U
PG
R
AD
E_
EN
TR
_D
O O
-2
-1
G
R A
P H
IC
A
L
R E
P R
E S
E N
T
IV
E S
/1
/2
_7
D N
H M
S
Conceptual Perspective 2 - South East view2
Conceptual Perspective 1 - North West View1 existing Site 23
Existing Site 14
File details come from the government source that posted it. Updated .