Attachment 5- Submital Register.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
Design/Build Construct New Fire Training Tower
Solicitation number
FA466421B0002
Issued by

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

SUBMITTAL REGISTERAttachment 5 to FA466421B0002
TITLE AND LOCATION
Construct New Fire Training TowerCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDPARAGRAPHCLASSIFICATION GOV OR A/E REVIEWCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYACTION CODEDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERACTION CODEDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
Design65% DesignG
95% DesignG
100 % DesignG
O&M ManualsG
01 11 00SD-01 Preconstruction Submittals
AF Form 3064, Contract Progress1.3G
Schedule And AF Form 3065,
Contract Progress Report
Work Plan1.4G
March Form 103 Work Clearance Request1.5G
SD-11 Closeout Submittals
Property Control Records1.6
01 30 00SD-01 Preconstruction Submittals
Color Boards1.3G
01 33 00SD-01 Preconstruction Submittals
Submittal Register1.7G
01 50 00SD-01 Preconstruction Submittals
Construction Site Plan1.3G
Traffic Control PlanG
Haul Road PlanG
SD-06 Test Reports
Backflow Preventer Tests
SD-07 Certificates
Backflow Tester Certification1.4
Backflow Preventers Certificate1.4.1
of Full Approval
01 57 19ENVIRONMENTAL GUIDANCE
SD-01 Preconstruction Submittal
Environmental Protection Plan1.3.1G
SD-06 Test Reports
Laboratory Analysis1.3.1.12G
Inspection Reports1.3.1.13G
ENVIRONMENTAL GUIDANCE
Solid Waste Management Report1.3.1.14G
SD-07 Certificates
Permit Applications1.3.1.16G
SD-11 Closeout Submittals
Waste Determination Documentatio1.4.1G
Disposal Documentation for1.4.2G
SUBMITTAL REGISTERAttachment 5 to FA466421B0002
TITLE AND LOCATION
Construct New Fire Training TowerCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDPARAGRAPHCLASSIFICATION GOV OR A/E REVIEWCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYACTION CODEDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERACTION CODEDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
Assembled Employee Training1.4.3G
Solid Waste Management Plan1.4.4G
Contractor Hazardous material1.4.5G
HazardousWaste/Debris MGMT1.4.5G
Regulatory Notifications1.4.5G
As-Built Topographic Survey1.4.5G
(HAZMAT) Usage Totals1.4.5G
Weight Tickets Debris/Recycled1.4.5G
Recovered Materials DeterminationPara BG
Percentage of RMDF content for EPPara DG
Geophysical and soil sampling work plan
01 74 19SD-01 Preconstruction Submittals
Construction Waste Management Plan1.7G
SD-06 Test Reports
Quarterly Reports1.9.2
Annual Report1.9.3
SD-11 Closeout Submittals
Final Construction Waste1.10S
Diversion Report
01 78 00SD-03 Product Data
Warranty Management Plan1.5.1
Warranty Tags1.5.4
Spare Parts Data
SD-08 Manufacturer's Instructions
Posted Instructions
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals3.4G
SD-11 Closeout Submittals
As-Built Drawings3.1G
Record Drawings3.1.2G
As-Built Record of Equipment
and Materials
Final Approved Shop Drawings
Construction Contract Specifications
Certification Of EPA Designated Items2.1G
Certification Of USDA Designated Items2.2G
Transfer And Acceptance Of Military3.5G
Real Property Form DD1354
Base Policy / CAL-OSHACOVID-19 Action PlanG

File details come from the government source that posted it. Updated .