Attachment 5_SOW.pdf

PDF 918 KB Posted

Attached to
FM9 DSL Upgrade Federal contract opportunity
Solicitation number
FA527023QA039
Issued by
Department of the Air Force Pacific Air Forces

About this file

This statement of work outlines requirements for upgrading an intrusion detection system at a munitions storage area on Kadena Air Base in Okinawa, Japan. The contractor will replace three network switches, install fifty-two Vindicator 1500 panel boards and one hundred four DSL modems along with associated wiring and programming. The contractor must also integrate the new equipment with existing system components and furnish property provided by the government. Additional requirements include verification testing, training personnel, and providing support through acceptance testing and interim support if required. The contractor must purchase, deliver, install and test all equipment and services in accordance with specifications in the statement of work and listed in appendices within 120 days of award.

The related federal contract opportunity is a solicitation from the Department of the Air Force Pacific Air Forces for the scope of work defined in the statement of work to upgrade the DSL system at Kadena Air Base. Offerors must meet requirements for equipment replacement and installation services in the statement of work and provide items identified in the minimum purchase list in Appendix B.

View the file

Other files for this federal contract opportunity

Other files attached to FM9 DSL Upgrade, newest first.
File Type Posted
Attachment 9_Answers to Questions.pdf PDF
Attachment 6_Chapter 9 AFI31-101.pdf PDF
Attachment 7_PACAFSUP.pdf PDF
Attachment 1_Price list.xlsx XLSX spreadsheet
Attachment 8_CMD.pdf PDF
23QA039-0005_SF30.pdf PDF
0004_Extension due date.pdf PDF
0003 - Move the Site Visit.pdf PDF
0002_QA extension.pdf PDF
0001 - Site Visit.pdf PDF
Attachment 3_DFAS Japan AF EFT Submission (NEW DEAMS 202201).pdf PDF
Attachment 1_Price list.xlsx XLSX spreadsheet
FA527023QA039_COMBO_Final.pdf PDF
Attachment 4_Brand Name Justification_Redacted.pdf PDF
Attachment 2_DEAMS EFT Enrollment Form Updated 10_2022.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work For

Munition Storage Area Digital Subscriber Line Intrusion Detection System Upgrade.

Kadena AB, Okinawa, Japan

18 SFS, Kadena AB

Section Page

1.0 PURPOSE

1.1 Scope

2.0 APPLICABLE DOCUMENTS

2.1 General

2.2 Government Documents

2.2.1 Specifications, Standards, and Handbooks

2.2.2 Other Government Documents, Drawings, and Publications

2.2.3 Order of Precedence

3.0 SUMMARY REQUIREMENTS

3.1 SPECIFIC REQUIREMENTS

3.1.1 Existing Equipment

3.1.2 Government Furnished Property/Equipment (GFP/GFE)

3.1.3 DSL Modem Requirements

3.1.4 Network Switch Requirements

4.0 GOVERNMENT-FURNISHED PROPERTY AND SERVICES

5.0 GENERAL INFORMATION

6.0 CONTRACTOR PERSONNEL REQUIREMENTS

1.0. Purpose.

The purpose of this acquisition is to upgrade the Intrusion Detection System (IDS) field equipment and network infrastructure in the Munitions Storage Area (MSA) by replacing the IDS field and network components that have degraded beyond repair and are no longer supported by the OEM. Ultimately ensuring the current operational security standards are met and assist in the pursuit of IDBSS AFSFC certification.

1.1. Scope of Work.

The scope of work includes the replacement of three network switches, installation of 52 Vindicator 1500 panel boards, and installation of 104 DSL modems, all required hard wired and optical fiber work, and programming of field and server devices. This includes tasks such as:

Contractor management; system design; purchase of Commercial Off-the-Shelf (COTS) and ancillary equipment and necessary supporting infrastructure; installation of all Contractor provided equipment and infrastructure; systems integration of Contractor provided equipment/infrastructure with existing system components and infrastructure and Government Furnished Property/Equipment (GFP/GFE), if applicable; support of GFP/GFE, if applicable, and existing equipment and infrastructure; Contractor Verification Testing (CVT); Contractor production qualification and acceptance testing of non-approved IDS Equipment List (IDSEL) equipment and support of Government operational testing of non-IDSEL equipment when such equipment is proposed by the contractor; Contractor training of site personnel; site support; and Contractor support of Government acceptance testing. Interim Contractor Support (ICS) of the installed and integrated system is also included if ordered by the Government. The contractor will at a minimum install and program all items listed on Appendix B. All network equipment must have proper licensing, functionality, and approvals for Windows 10 operating system. All termination and programming of IDS will be completed by US nationals with appropriate clearance and certifications to install and repair specified equipment.

1.1.1. All equipment purchased and installed must be on the Non-Nuclear Intrusion Detection System (IDS) Equipment Approval Memo 13 May 23 or approved by appropriate authorities at all levels. Services must be performed by Vindicator certified technicians. All equipment must be configured for operation on Windows 10.

1.1.2. The certification of the technician on Vindicator devices and equipment is required due to the systems currently installed on Kadena AB, which could be compromised and rendered nonfunctional if the work is not performed by certified technicians.

1.1.3. Procure, install, and programming two network switches at building 44702; 52 Vindicator 1500 panel boards, one at each currently active IDS facility in the MSA; 104 DSL modems, one at each currently active IDS facility in the MSA, and 52 at building 44702.

1.1.4. perform all required hard wired and optical fiber work and programming of field and server devices.

1.1.5. The contractor will be responsible for loading and transporting all debris generated from the installation of security system and associated work to and from Kadena AB. The contractor will dispose of it in any way they see fit in accordance with local laws and regulations.

1.1.6. The contractor will provide one-year warranty on parts and labor.

1.1.7. The contractor will provide contact service information and warranty forms.

1.1.8. The contractor will do a full functional test to ensure all installed equipment communicates properly.

1.1.9 The contractor will complete all required work within a 120 day performance period after the contract has be awarded.

1.1.10 The contractor may conduct a site visit during the specified time set by 18 Cons.

1.1.10.1 The POC for the site visit will be 18 SFS/S5E: DSN: 6343279 Email:

18SFS.S5E.IDSTESTING

1.2. CLEANING AND PROTECTION

1.2.1. Maintain Walk Through - The contractor must maintain common walk-through areas to allow proper evacuation of the building in the case of emergencies.

1.2.2. Remove Rubbish - The contractor must remove rubbish, wrapping paper, salvages and scrap. The contractor must not leave waste material inside or outside of the facility overnight, or for a prolonged period of time, when work is not done. Remove and dispose of waste materials only at authorized off base locations, daily.

1.2.3. Vacuum Carpets - The contractor will vacuum the government area that they were working at the end of each day.

1.2.4. Final Cleaning - The contractor must remove packing material, boxes, broken items, spots, smears, and other foreign matter.

2.0. APPLICABLE DOCUMENTS

2.1. General

The following documents are applicable to this SOW to the extent specified herein.

While every effort has been made to ensure the completeness of this list, the Contractor will meet all specified requirements in this SOW whether or not they are listed in this section. Where not specifically cited below, the Contractor is responsible for compliance with applicable host nation, federal, state, and local laws and base codes and regulations as well as applicable base and industry architectural and construction standards during performance of orders.

2.2. Government Documents

2.2.1. Specifications, Standards, and Handbooks. The following specifications, standards, and handbooks, of the exact revision listed below, form a part of this document to the extent specified herein.

1 Oct 13 UFC 4-021-02 Change 1

Electronic Security Systems 11 Sep 19

(Copies of above documents are available at: http://www.wbdg.org)

EIA-649B 1 Apr 11 SAE International Technical Report, Configuration Management Standard (Adopted by DoD 01 Feb 99)

(Copies of above document are available through: http://standards.sae.org/eia649b/)

MIL-STD-130N 16 Nov 12 w/Change 1 validated

MIL-STD-461G 11 Dec 15

DoD Standard Practice, Identification Marking of US Military Property 26 Aug 19

Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment

(Copies of above documents are available at: http://quicksearch.dla.mil/

2.2.2 Other Government Documents, Drawings, and Publications. The following other Government documents, drawings, and publications, of the exact revision level shown, form a part of this document to the extent specified herein.

DEPARTMENT OF DEFENSE

DoDI 8510.01 27 Sep 18

14 Mar 14

Risk Management Framework for DoD Information Technology

Cybersecurity DoDI 8500.01 Incorporating Change 1 7 Oct 19 http://www.wbdg.org/ http://standards.sae.org/eia649b/ http://quicksearch.dla.mil/

5 Oct 20

19 Dec 05

DoDD 8140.01

DOD 8570.01-M

Incorporating Change 4 10 Nov 15

Cyberspace Workforce Management

Information Assurance Workforce Improvement Plan

(Copies of above documents are available at: http://www.dtic.mil/whs/directives/)

CNSSI 1253 27 Mar 14 Security Categorization and Control Selection for National Security Systems

(Copies of above document is available at: https://www.cnss.gov)

AIR FORCE

Integrated Defense

Integrated Defense, Pacific Air Forces Supplement

IDS Equipment List (IDSEL)

DAFI 31-101_DAFGM2022-01 25 Mar 22

AFI31-101, PACAF SUP-O 31 Oct 20

Non-Nuclear Intrusion Detection 31 May 22 System (IDS) Equipment Approval

(Copies of above document are available from 18 SFS/S5P, NCOIC of Plans upon request with proper authority for release)

1 Nov 02 AFH36-2235, VOL 10, Section A

DoDI5000.83_DAFI63-113 8 Mar 22

Information for Designers of Instructional Systems Application to Education

Technology and Program Protection to Maintain Technological Advantage

(Copies of above documents are available at: http://www.e-publishing.af.mil)

TO-00-35D-54 1 Sep 15 Technical Manual, USAF Deficiency Reporting, Investigation, and Resolution

(Copies of the above document is available at:

https://www.tinker.af.mil/Portals/106/Documents/Technical%20Orders/AFD-082216-00-35D- 54.pdf )

AF LIFE CYCLE MANAGEMENT CENTER (AFLCMC), HANSCOM AFB

http://www.dtic.mil/whs/directives/ https://www.cnss.gov/ http://www.e-publishing.af.mil/ https://www.tinker.af.mil/Portals/106/Documents/Technical%20Orders/AFD-082216-00-35D-54.pdf https://www.tinker.af.mil/Portals/106/Documents/Technical%20Orders/AFD-082216-00-35D-54.pdf

ESE-SIT-0023 22 Jun 21 Electronic Security System Master Installation Acceptance Test and Turnover Plan

IBDSS SSPs Current IBDSS System Security Plans Command Control Display Equipment (Applicable CCDE and VMS Annex.)

Kadena Architectural Current Kadena AB Architectural Compatibility Standards & Design Guide

(Copies of above document are available from 18 SFS/S5P, NCOIC of Plans upon request with proper authority for release)

2.2.3. Order of Precedence.

In the event of a conflict between this document and the references cited herein, the more stringent requirement will take precedence, unless directed otherwise by the Contracting Officer.

3.0. SUMMARY REQUIREMENTS

The Contractor will procure, install, integrate, deliver, and test a upgrade Intrusion Detection Systems (IDS) in the MSA through the replacement of three network switches, 52 Vindicator 1500 panel boards, installation of 104 DSL modems, all required hard wired and optical fiber work, and programming of field and server devices that meets the physical security compliance requirements of DAFI31-101V2 for the protection of AA&E assets and the requirements of this SOW, SSPD, and ESE-SIT-0001. At a minimum the contractor will supply, install, and program: three network switches, 52 Vindicator 1500 panel boards, and 104 DSL modems. The Contractor will provide all necessary infrastructure and infrastructure upgrades to support system operations and will integrate required existing equipment and infrastructure and approved Government Furnished Property/Equipment (GFP/GFE), as defined in section 3.1. of this Delivery Order, into the system. The Contractor will manage the effort to ensure delivery of an IDS that meets specified requirements. The Contractor will also provide ancillary equipment, materials and/or supplies needed for the installation and associated infrastructure. The Contractor will perform Contractor Verification Testing of the system and subsystems, including Cybersecurity verification, and stability testing; validate Contractor supplements to commercial technical manuals, and support all phases of Government acceptance testing and provide site-specific training. The Contractor will also provide Interim Contractor Support (ICS) if ordered by the Government. The contractor will at a minimum install and program all items listed on Appendix B.

The contractor will ensure that the system delivered under this contract consists of either already proven (qualified) commercial off-the-shelf (COTS) equipment from the Non-Nuclear Intrusion Detection System (IDS) Equipment List (hereafter referred to as the “IDSEL”) installed in the approved and tested configuration or non-IDSEL COTS IDS equipment (if proposed by the contractor) qualified and accepted (approved) by the Government as satisfying system requirements. The Contractor will provide equipment production qualification test and acceptance testing, support Government operational evaluation for non-IDSEL equipment (when such equipment is proposed by the contractor) in accordance with SOW requirements. Non-IDSEL COTS equipment may have to be proposed due to the unique issues associated with the age of the current IDBSS equipment and the requirements of this SOW. All termination and programming of IDS equipment will be completed by US nationals with appropriate clearance and certifications to install and repair specified equipment.

The contractor will program the network switches to meet all specified standards and, in a manner, to ensure proper operation with existing equipment. The contractor will move all current IDS MSA facilities to the newly installed network switches and ensure intranet operation through testing.

3.1. Specific Requirements

3.1.1. Existing Equipment

The contractor will upgrade the field panel equipment located at all IDS MSA facilities and program the newly installed equipment into the upgraded IDBSS switches. The contractor will install a DSL modem at each end of the copper phone lines being used for communication from building 44702 and the IDS facility. The contractor will program all current sensor points into the IDBSS server.

3.1.2. Government Furnished Property/Equipment (GFP/GFE)

The contractor may utilize the provided communication cabinet located in the communication room of building 44702 for the network switches, DSL modems, and uninterrupted power supplies.

3.1.3. DSL Modem Requirement

All DSL modems will be of the same make and model. All DSL Modems will meet specifications as listed in Appendix C. All DSL Modems will meet or exceed the specifications of the Westermo ddw-120 series.

3.1.3. Network Switch Requirement

All network switches will be of the same make and model. All network switches will meet or exceed the specifications of the CISCO 9300 series.

4.0. GOVERNMENT-FURNISHED PROPERTY AND SERVICES

4.1. Utilities. The government will provide water and electricity, when available.

4.2. Conservation of Utilities. The contractor will instruct employees in utilities conservation practices. The contractor will be responsible for operating under conditions, which prelude the waste of utilities, which will include:

4.3. Lights will be used only in areas where and when work is being performed.

4.4. Water faucets or valves must be turned off after the required usage has been accomplished.

4.5. Government telephones will not be used for personal reasons or for any toll or long-distance calls.

5. GENERAL INFORMATION.

5.1. HOURS OF OPERATION.

The contractor must perform the on- site services required under this contract during the following hours: 0800 - 1700, Monday through Friday, except on U.S. holidays specified in section 3.2. of this SOW and PACAF Family days. No on-site work will be scheduled or performed on holidays unless previously approved or directed by the Contracting Officer and Project Manager. If the contractor desires to work on non-scheduled workdays, he must submit a written request to the POCs for approval.

5.2. Holidays - The contractor is not required to provide service, except as noted on the following days:

Day Holiday First day of January New Year’s Day* Third Monday of January Martin Luther King, Jr. Birthday Third Monday of February President’s Day Last Monday of May Memorial Day Fourth of July Independence Day First Monday of September Labor Day Second Monday of October Columbus Day 11 November Veteran’s Day Last Thursday of November Thanksgiving Day 25 December Christmas Day

If holiday falls on a Saturday, it will be observed on the preceding Friday. If it falls on a Sunday it will be observed on the following Monday.

5.3. SECURITY REQUIREMENTS - The contractor must be responsible for safeguarding all contractor-controlled government property at the close of each work period.

5.3.1. Pass and ID - The contractor must obtain and ensure employees have the necessary identification and gate passes in accordance with U.S. military installation regulations prior to the start of this contract. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, and valid vehicle insurance certificate to obtain a vehicle pass.

5.3.2. Safety and Fire - The contractor must comply with applicable government published safety requirements and regulations which will be available upon request by the contractor.

5.3.3. Contractor will abide with all 18th Wing security requirements which will be available to the contractor for review.

6.1. CONTRACTOR PERSONNEL REQUIREMENTS.

6.1.1. Contract Manager - The contractor must provide a contract manager who will be responsible for the performance of the work. The name of this person, and an alternate(s), who will act for the contractor when the contract manager is absent, must be designated in writing to the CO 5 working days prior to start of projects. The contract manager or alternate will have full authority to act for the contractor on all contract matter relating to the daily operation of this contract. The contract manager or alternate will be available during normal duty hours with sixty

(60) minutes to meet on the installation with the government personnel (designated by the Contracting Officer) to discuss problem areas. After normal duty hours, the manager or alternate must be available within two (2) hours. The contract manager or alternate(s) must be able to read, write, speak, and understand English.

6.1.2. Contractor Personnel - Contractor personnel must present a neat appearance and be easily recognized as contractor employees. This will be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contains the company and employee name in English. Contractor personnel must use protective clothing whenever they are performing tasks that could cause harm to the employees or damage to property.

6.1.3. The contractor must not employ persons to work on this contract if such person is identified to the contractor by the Government as a potential threat to the health, safety, security, general wellbeing or operational mission of the installation and its population.

6.1.4. Smoking – Smoking is not permitted in any government building or work area.

6.1.5. Employees – The contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station, change in duty hours, or deployment. Military Reservists and National Guard members may be subject to recall to active duty. The abrupt of these personnel could adversely affect the contractor’s ability to perform.

Their absence at any time will not constitute an excuse for nonperformance under this contract.

APPENDIX A

GOVERNMENT SERVICES

1. Government Services. The Government will provide water and electrical power when available to the contractor.

2. The government will provide two communication racks: one in the communication room in building 44702.

3. The following Kadena Air Base telephone numbers are furnished to the Contractor.

Emergency Number for cell phone dialing

098-934-5911

Emergency Number for base dialing

Fire Protection 634-6011 Security Police 634-1880

APPENDIX B

Minimum Purchase List

Item Quantity

AES-1500 FIELD PANEL 52

48 PORT SWITCH 2

NETWORK SWITCH ONA LICENSEANO SFP 2

ETHERNET SHOSL EXTENDER 104

POWER SUPPLY 4

DIAGNOSTICCABLE 2

PANEL CABINET 1

UNINTERRUPTIBLE POWER SUPPLY WITH 12HRS BACK UP POWER

SUPPLY

UPS EXTERNAL BATTERY 2

TERMINAL BLOCK 1

566, 3' 25-PAIRFEMALECABLE 4

66 BLOCKFUSE 52

MGBGROUND RAILS 4

SURGE SUPPRESSOR 52

25 PAIR COPPER CABLE 500

2 STRAND SINGLE MODE FIBEROPTICCABLE 100

CAT 6 CABLE UTP 2

42RUCABINET

TERMINATION/PROGRAMMING BY CLEARED/CERTIFIED US CITIZEN

Any additional equipment and hardware to installation the above listed equipment.

Installation of all above listed equipment and hardware by certified individuals in each respective field.

APPENDIX C

Minimum Specifications of DSL Modems

• Up to 15.3 Mbit/s Ethernet over twisted pair cables

• Simple to use – no software configuration

• Up to 15 km point-to-point solution

• Dual 10 – 60 VDC power input

• Total galvanic isolation

• TBU – transient blocking unit

• 1.180,000 hours MTBF to MIL-HDBK-217K

• –40 to +70°C (–40 to +158°F) with no moving parts

• Industrial EMC, shock and vibration testing

• Transparent to industrial protocols

• Line data information and cable simulator software

• Link fault forward function

3.0. SUMMARY REQUIREMENTS

File details come from the government source that posted it. Updated .