Attachment 5 Sheep Creek Order.pdf

PDF 15 MB Posted

Attached to
Colorado Forests and Grasslands Road Maintenance IDIQ w/Amendment 0001
Solicitation number
1282B123R0004
Issued by

About this file

This federal contract opportunity solicitation is for road maintenance and reconstruction services within Colorado national forests and grasslands. The Colorado Forests and Grasslands Road Maintenance IDIQ contract will cover requirements in Arapaho and Roosevelt National Forests and Pawnee National Grassland, as well as adjacent Forest Service lands. The Department of Agriculture Forest Service will issue firm fixed price task orders to multiple awardees under the IDIQ for construction projects. This is a 100% small business set-aside solicitation, so only small businesses as defined by the 237310 NAICS code may respond. Interested parties should refer to the solicitation and supporting documents for full details on scope, location, response requirements, and other important information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of Contents

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCHEDULE OF ITEMS

B.2 SCHEDULE NOTES

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

C.2 PROJECT LOCATON

C.3 MAGNITUDE OF CONSTRUCTION PROJECT

C.4 TECHNICAL SPECIFICATIONS

SECTION D--PACKAGING AND MARKING

D.1 and D.2 are included in the Parent CONTRACT

D.3 PACKING AND MARKING

D.4 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE

SECTION E--INSPECTION AND ACCEPTANCE

E.1 CLAUSES

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

F.2 OTHER REQUIREMENTS

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 through G.6 are included in the Parent CONTRACT

G.1 Contracting Staff (Forest Service Addendum to G.1)

G.7 OTHER REQUIREMENTS

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 through H.16 are included in the Parent CONTRACT

H.17 OTHER REQUIREMENTS

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

J.1 ATTACHMENTS

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCHEDULE OF ITEMS

Canyon Lakes Ranger District & Pawnee National Grasslands Arapaho and Roosevelt NF & Pawnee NG

PROJECT TITLE: Sheep Creek Temporary Bridge Installation

Period of Performance: 120 Days After Date of Award

Schedule of Items - SHEEP CREEK

ITEM

NUMBER DESCRIPTION PAY

UNIT

EST

QTY

UNIT

COST TOTAL

151 (01) Mobilization L.S. 1 151 (02) Mobilization (Transporting Bridge) L.S. 1 301 (01) Aggregate Sub Base, Grading F, Compaction B C.Y. 300

558 (01) Government Furnished Pre-Fabricated Bridge Super Structure and Substructure Install Each 1

Sub Total - Base $0.00

*Please use the attached Excel Spreadsheet to fill in quantities and costs.

*See attached plans, specifications, and work items destruction for further details.

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

The purpose of this project is to install a temporary bridge to provide access across Sheep Creek (see specific location below) on the Arapahoe and Roosevelt National Forest.

Work shall include all equipment, labor, and materials necessary to haul the government-furnished temporary bridge from Steamboat Springs, CO to the project location (see specific location below). Prepare sub-grade and install concrete bridge abutments as specified. Construct and install the temporary bridge in the location as staked by the Forest Service. After bridge is installed, contractor shall install approaches on both sides of bridge as specified.

The contractor will be responsible for the purchasing of all concrete abutments and necessary hardware required to construct the bridge. Required hardware is shown on the plans.

An onsite prework meeting will be completed with the contactor to clarify location.

C.2 PROJECT LOCATON

The Project Area is located on the Canyon Lakes Ranger District at the intersection of County Road 80C and National Forest System Road 219, on the Arapaho and Roosevelt National Forest.

The project location is identified on the attached project map.

C.3 MAGNITUDE OF CONSTRUCTION PROJECT

It is estimated that the project will cost between $70,000 to $90,000.

Period of Performance

The contract period is 120 calendar days after the Notice to Proceed effective date. The anticipated period of performance is 01 August 2023 to 30 November 2023.

Wage Determinations: The applicable Wage Determination(s) for this work: WD CO-12, Rev 8, Dated 10.12.2018 (Heavy); WD CO-17, Dated 01.05.2018 (Highway)

Security: Contractor is responsible for the Contractor’s equipment and building materials supplied to the sites.

Performance of the Work All work shall be conducted in a safe and expedient manner and in conformance with the specifications referenced in Section J. Safety should be a priority and OSHA compliance shall be applied on every task order. When applicable, traffic control shall be in accordance with standards set forth in the most current edition of the Manual on Uniform Traffic Control Devices (MUTCD). All work shall be conducted by personnel fully qualified to perform the tasks assigned and shall be supervised by a designated Contractor’s Representative.

Equipment All equipment shall be in good repair, and capable of accomplishing assigned tasks in a safe and environmentally acceptable manner. Where applicable, all equipment shall be fitted with approved spark arrestors. All equipment shall be cleaned of earthen and vegetative materials that may contain weed seed prior to delivery onto National Forest Lands. If using equipment on multiple roads or if there are long mobilization distances between sites on the same road, cleaning of equipment between the project sites is required.

Equipment and Materials Storage and Staging Upon concurrence from the Contracting Officer, certain areas on the National Forests may be used on a case-by- case basis for storage of equipment and/or materials during active maintenance periods. The Contractor shall be responsible for protection of items stored on Government property and shall ensure adequate safety measures are maintained at such sites.

All repairs to equipment under this contract shall be made and paid for by the Contractor. Camping is permitted on National Forest Lands and within Campgrounds, extension permissions may be grant by the Contracting Officer and proper permits may be obtained at the local Ranger District.

Standard Specifications “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14”, U.S. Customary Units, is applicable for this project, and is included by reference only. The requirements contained in these Standard Specifications are hereby made a part of this solicitation and any resulting work. These specifications can be viewed at no cost on the FHWA website, which also gives ordering information:

http://flh.fhwa.dot.gov/resources/specs/

Section J of this contract contains Supplemental Specifications that supplement and/or modify the Standard Specifications. The Standard, Supplemental, and Special Project Specifications shall all be used in conjunction with each other to properly determine the correct specification for each Pay Item in the Schedule of Items.

Government Furnished Property The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract. Unless otherwise agreed upon, any Government-Furnished Property incorporated into the work shall be loaded, transported, and unloaded to the project site(s) by the Contractor. Government will provide official National Forest Maps and specific vicinity maps for each task order issued. Government furnished property will be identified in issued task order(s).

• This project includes one government supplied Big R Temporary Bridge, located at 13th and Evans St, Steamboat Springs, CO. The contractor shall arrange to haul the temporary bridge from this location to the project site, located at the intersection of County Road 80C and NFSR 219 on the Arapaho and Roosevelt National Forest.

Procurement Of Biobased Products The use of biobased products is required in all United States Department of Agriculture Forest Service Construction and Service Contracts. The following list of products has been identified for potential use in the performance of this contract but is not limited to this list: office products, diesel fuel additives, penetrating lubricants, and greases for trucks. To find out more about use of preferred biobased products go to https://www.biopreferred.gov/BioPreferred/.

C.4 TECHNICAL SPECIFICATIONS

Forest Service Supplemental Specifications (FSSS) are included as part of this Task Order and attached in Section J. Standard typical drawings and plans for road work are incorporated in this Task Order and attached in Section J. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) and MUTCD are applicable and included in this Task Order by Reference here. These specifications can be viewed at no cost on the FHWA website, which also gives ordering information: http://flh.fhwa.dot.gov/resources/specs/

SECTION D--PACKAGING AND MARKING

D.1 and D.2 are included in the Parent CONTRACT.

D.3 PACKING AND MARKING

All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.

D.4 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE

The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award. See D.2 in the parent CONTRACT.

https://www.biopreferred.gov/BioPreferred/

SECTION E--INSPECTION AND ACCEPTANCE

E.1 CLAUSES

All inspection clauses are included in the Parent CONTRACT. The inspection clause which applies to this project is:

52.246-4 Inspection of Services – Fix Price (Aug. 1996)

52.246-12 Inspeciton of Constrution (Apr. 1996)

452.246-70 Inspeciton and Accpetance (Feb 1998)

(a) The contracting Officer or the Contracitng Officer’s duly authorized represenatiave will inspect and accept the supplies and/or services to be provided under this contract

(b) Inspeciton and acceptance will be performed on site.

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

The FAR 52.242-14 Suspension of Work (APR 1984) clause is included in the Parent CONTRACT.

52.211-13 Time Extensions (SEP 2000)

52.211-18 Variation in Estimated Quantity (APR 1984)

52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 11/30/2023. The time stated for completion shall include final cleanup of the premises.

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 through G.6 are included in the Parent CONTRACT.

G.1 Contracting Staff (Forest Service Addendum to G.1) All communications pertaining to contractual and/or administrative matters under this contract shall be sent to:

Task Order Contract Specialist (CS) Name: Nolan McDowell Address: N/A Phone: 540-421-3948 Email: nolan.mcdowell@usda.gov

Task Order Contracting Officer (CO) Name: Jeff Black Address: N/A Phone: 832-779-6052 Email: jeffrey.black2@usda.gov

Task Order Contracting Officer's Representative (COR) Name: Steven Wood Address: 2150 Centre Ave., Bldg. E; Fort Collins, CO 80526 Phone: 970-203-4623 Email: steven.wood@usda.gov

G.7 OTHER REQUIREMENTS

Post Award Conference A post award conference with the successful offeror is required. It will be scheduled and held within 30 days after the date of contract award. The conference will be held at TBD.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 through H.16 are included in the Parent CONTRACT

H.17 OTHER REQUIREMENTS

KEY PERSONNEL

(a) The Contractor shall assign to this contract the following key personnel:

Project Superintendent

(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

USE OF PREMISES

(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.

(b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.

ARCHAEOLOGICAL OR HISTORIC SITES

If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.

CONTROL OF EROSION, SEDIMENTATION, AND POLLUTION

(a) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

(b) Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged on the ground; into or nearby rivers, streams, or impoundments; or into natural or man-made channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

(c) Mechanized equipment shall not be operated in flowing streams without written approval by the Contracting Officer.

(d) Do not install concrete abutments on frozen soils.

INSURANCE COVERAGE

Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:

(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.

(b) General Liability. (1) The Contractor shall have bodily injury liability coverage written on a comprehensive form of policy of at least $500,000 per occurrence. (2) The Contractor shall have property damage liability insurance shall be required in the amount of ____*___ per occurrence.

(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.

(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

All Clauses included in the Parent CONTRACT apply to this Task Order, per H.12.2 in the Parent CONTRACT. Clauses included below provide additional clarification pertinent to Forest Service requirements and the specific requirement under this Task Order.

Addendum to 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR) Clauses:

https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52)

Department of Agriculture Acquisition Regulation (AGAR) Clauses:

https://www.acquisition.gov/agar (AGAR clauses begin with 452)

Deviations to clauses may be viewed at:

https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm

52.236-21 Specifications and Drawings for Construction (FEB 1997)

Alternate II (APR 1984)

52.244-6 Subcontracts for Commercial Products and Commercial Services (JAN 2022)

(DEVIATION APR 2020)

52.246-21 Warranty of Construction (MAR 1994)

52.216-32 Task-Order and Delivery-Order Ombudsman (Sep 2019) Alternate I. (Sep 2019)

(d) Contracts used by multiple agencies.

(1) This is a contract that is used by multiple agencies. Complaints from Contractors concerning orders placed under contracts used by multiple agencies are primarily reviewed by the task-order and delivery-order Ombudsman for the ordering activity.

(2) The ordering activity has designated the following task-order and delivery-order Ombudsman for this order:

USDA Forest Service ATTN: Chief, Procurement Policy Branch 1621 N Kent Street, Plaza E, Suite 707 Arlington, VA 22209 707-562-9107 Alfort.belin@usda.gov https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm

(3) Before consulting with the task-order and delivery-order Ombudsman for the ordering activity, the Contractor is encouraged to first address complaints with the ordering activity's Contracting Officer for resolution. When requested by the Contractor, the task-order and delivery-order Ombudsman for the ordering activity may keep the identity of the concerned party or entity confidential, unless prohibited by law or agency procedure.

52.228-1 Bid Guarantee (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds –

(1) To unsuccessful bidders as soon as practicable after the opening of bids, and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $1,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (NOV 2021)

(DEVIATION APR 2020)

(a)[(1) In accordance with 31 U.S.C. 3903 and 10 U.S.C. 2307, upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract [in accordance with the accelerated payment date established], to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, [with a goal of 15 days] after receipt of a proper invoice and all other required documentation from the small business subcontractor [if a specific payment date is not established by contract.

(2) The Contractor agrees to make such payments to its small business subcontractors without any further consideration from or fees charged to the subcontractor].

(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.

(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial products or commercial services.

452.236-70 Emergency Response, Fire Suppression and Liability (OCT 2021)

(a) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). This is considered to be within the general scope of the contract. An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.

(b) Contractor's Responsibility for Fire Fighting. The Contractor, under the provisions of FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents, subcontractors, or employees subject to the fire classifications listed in subsection (c).

(c) Fire Suppression Costs. The Contractor's obligations for cost of fire suppression vary according to three classifications of fires as follows:

(1) Operations Fire. An “operations fire” is a fire caused by the Contractor's operations other than a negligent fire. The Contractor agrees to reimburse the Forest Service for such cost for each operations fire, subject to a maximum dollar amount of ____________[Contracting Officer insert amount]. The cost of the Contractor's actions, supplies, and equipment expended or used on suppressing any such fire, or otherwise provided at the request of Forest Service, shall be credited toward such maximum. If the Contractor's actual cost exceeds the contractor's maximum obligation stated above, the Forest Service shall reimburse the contractor for the excess.

(2) Negligent Fire. A “negligent fire” is a fire caused by the negligence or fault of the Contractor's operations including, but not limited to, one caused by smoking by persons engaged in the Contractor's operations during the course of their employment, or during rest or lunch periods; or if the Contractor's failure to comply with requirements under this contract results in a fire starting or permits a fire to spread. Damages and the cost of suppressing negligent fires shall be borne by the Contractor.

(3) Other Fires on Contract Area. The Forest Service shall pay the Contractor, at firefighting rates common in the area or at prior agreed rates, for equipment or personnel furnished by the Contractor at the request of the Forest Service, on any fire on the contract area other than an operations fire or a negligent fire.

(d) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.

(e) Performance by the Contractor. Where the Contractor's employees, agents, contractors, subcontractors, or their employees or agents perform the Contractor's operations in connection with fire responsibilities, the Contractor’s obligations shall be the same as if performance was by the Contractor.

(f) State Law. The Contractor shall not be relieved by the terms of this contract of any liability to the United States for fire suppression costs recovered in an action based on State law, except for such costs resulting from operations fires. Amounts due to the Contractor for firefighting expenditures on operations fires shall not be withheld pending settlement of any such claim or action based on State law.

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

J.1 ATTACHMENTS

PAGES DESCRIPTION

Schedule of Items Details Bridge Construction Plans

Forest Service Supplemental Specifications (FSSS) Project Location Maps

Wage Grade Determination Big R Bridge Weights

15-25 26-33 34-35 36-51

ITEM

NUMBER

DESCRIPTION

METHOD OF

MEASUREMENT

PAY

UNIT

EST QTY

UNIT

COST

TOTAL

151(01) Mobilization L.S.Q L.S. 1 $0.00 151(02) Mobilization (Transporting Bridge) L.S.Q. L.S. 1 $0.00 301 (01) Aggregate Sub Base, Grading F, Compaction B C.Q. TONS 350 $0.00

558 (01) Government Furnished Pre-Fabricated Bridge Super Structure and Substructure Install

L.S.Q. EA 1 $0.00

Sub Total - Base $0.00

Schedule of Items Canyon Lakes Ranger District & Pawnee National Grasslands

Arapaho and Roosevelt NF & Pawnee NG PROJECT TITLE: Sheep Creek Temporary Bridge Installation

301 - Untreated Aggregate Courses 301.00_nat_03_27_2004

301 Title Change Title. Change the title to: Section 301 Aggregate Courses

301.03_nat_03_24_2004

301.03 General.

Add the following:

Request approval in writing of the roadbed before placing aggregate.

For pit run or grid-rolled material, furnish material smaller than the maximum size. No gradation other than maximum size will be required for pit-run or grid-rolled material. For grid rolling, use all suitable material that can be reduced to maximum size. After processing on the road, remove all oversize material from the road and dispose of it as directed by the CO.

Provide additives or binder, if required, at the proportions specified.

Develop and use Government furnished sources according to Section 105.

If the aggregate is produced and stockpiled before placement, handle and stockpiled according to Section 320. Establish stockpile sites at locations approved by the CO. Clear and grub stockpile sites according to Section 201.

Delete the following segment of the second paragraph:

“along with a representative 300-pound sample”

301.04_nat_03_24_2004

301.04 Mixing and Spreading.

Delete the first sentence of the first paragraph and add the following:

Ensure that aggregate and any required additives, water, mineral filler, and binder are mixed by the specified method except, if crushed aggregate products are being produced and mineral filler, binder, or additives are required, uniformly blend during crushing. Control additive proportions to

0.5 percent dry weight.

Stationary Plant Method. Mix the aggregate with other required materials in an approved mixer.

Add water during the mixing operation in the amount necessary to provide the moisture content for compacting to the specified density. After mixing, transport the aggregate to the jobsite while it contains the proper moisture content, and place it on the roadbed or base course using an aggregate spreader.

Travel Plant Method. After placing the aggregate for each layer with an aggregate spreader or windrow-sizing device, uniformly mix it with other required materials using a traveling mixing plant. During mixing, add water to provide the necessary moisture content for compacting.

Road Mix Method. After placing the aggregate for each layer, mix it with other required materials at the required moisture content until the mixture is uniform throughout. Mix aggregate, water, and all other materials until a uniform distribution is obtained.

Spread the aggregate in a uniform layer, with no segregation of size, and to a loose depth that will provide the required compacted thickness.

When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.

Route and distribute hauling and leveling equipment over the width and length of each layer.

301.05_nat_03_24_2004

301.05 Compacting.

Delete the first and third paragraphs and add the following:

Compact the aggregate using one of the following methods as specified:

(a) Compaction A. Compact the aggregate by operating spreading and hauling equipment.

(b) Compaction B. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a).

(c) Compaction C. Compact each layer of aggregate to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.

(1) Compaction C-1. Compact each layer of aggregate to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O.

Box 7669, Missoula, MT 59807).

(d) Compaction D. Compact each layer of aggregate to a density of at least 95 percent of the maximum density, as determined by AASHTO T 180, method C or D.

(1) Compaction D-1. Compact each layer of aggregate to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O.

Box 7669, Missoula, MT 59807).

(e) Compaction E. Operate rollers and compact as specified in Subsection 204.11(a).

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

301.06_nat_03_24_2004

301.06 Surface Tolerance.

Add the following:

Thickness and Width requirements:

The maximum variation from the compacted specified thickness is ½ inch. The compacted thickness is not consistently above or below the specified thickness and the average thickness of 4 random measurements along the reconstructed road segment is within + ¼ inch of the specified thickness.

The maximum variation from the specified width will not exceed +12 inches at any point. The compacted width is not consistently above the specified width and the average of any four random measurements along the reconstructed road segment is within +4 inches of the specified width.

301.08_nat_03_24_2004

301.08(b) Plasticity Index.

Add the following to the first sentence: “and under Special Contract Requirement 703.05(c)(3)”.

301.09_nat_03_24_2004

301.09 Measurement.

Add the following: Measure aggregate by cubic yard compacted in place when payment is by contract quantities.

301.10 (Payment).

Delete the following:

…”adjusted according to Subsection 106.05”...

Section 558 - Prefabricated, Modular Bridge Superstructure

Description

558.01 Work. Install a prefabricated, modular bridge superstructure, and install Government-furnished prefabricated, modular superstructure and components as DESIGNATED IN THE SCHEDULE OF ITEMS. Construct the length, width, and capacity of the structure, including curbs and railings and the horizontal and vertical alignment, as SHOWN ON THE DRAWINGS.

Also furnish material for, and construct, bridge railing as SHOWN ON THE DRAWINGS or on approved manufacturer’s drawings. Unless components are furnished by the Government, furnish prefabricated, modular bridge superstructure components complete and in place, including deck and railing, when required, to form a bridge superstructure capable of supporting traffic as soon as construction of approaches is complete. Include all incidental materials required to provide a completed structure ready for use.

When there are specific requirements for design, materials, appearance, and/or construction, they shall be SHOWN ON THE DRAWINGS or in the SPECIAL

PROJECT SPECIFICATIONS.

Materials

558.02 Requirements. Furnish materials that meet the requirements specified in the following sections and subsections:

Bridge Railing Hardware & Structural Steel ...................................... 716.02 Precast Concrete Structures ........................................553A Prestressed Concrete Reinforcing Steel Steel Structures Structural Concrete Timber Structures

Concrete compressive strength, structural steel tensile strength, finish, designation, timber species, grade, treatment, and other material specifications shall be as SHOWN ON THE DRAWINGS or in the SPECIAL PROJECT SPECIFICATIONS. If material specifications are not in the contract documents, take them from the manufacturer’s drawings, and have them approved by the CO prior to fabrication.

558.03 Design Requirements. Design in accordance with the AASHTO “Standard Specifications for Highway Bridges,” latest edition and interims, for the HS20–44 loading, including impact, unless otherwise SHOWN ON THE DRAWINGS or in the

SPECIAL PROJECT SPECIFICATIONS.

When design of the structure is required, provide on all the drawings and calculations that are submitted for review the signature and seal of a professional engineer who is currently licensed in the State where the bridge will initially be located.

Use materials that are durable enough to allow removal, transportation, and reinstallation using typical forest logging or construction equipment. Use design techniques and fabrication methods to minimize field erection difficulties. Fabricate primary components from steel unless otherwise SHOWN ON THE DRAWINGS or in the SPECIAL

PROJECT SPECIFICATIONS.

Rig main superstructure components with permanent lifting devices to facilitate efficient installation and removal of these items with equipment common to logging or construction operations. Place lifting devices so as not to interfere with traffic utilizing the structure.

558.04 Design Drawings. When furnishing a prefabricated bridge superstructure, submit design drawings, calculations, and/or shop drawings sufficiently in advance of the start of fabrication to allow time for review by the CO and correction of any changes. Such time shall be proportional to the work, but not less than 21 days. Include plan, elevation, and section views of the modular bridge superstructure, dimensions of all components, welding and connection details, and general and specific notes regarding design and construction.

When Government-furnished prefabricated bridge superstructure components are specified, material lists, erection information, and manufacturer’s instructions will be furnished by the Government.

Construction

558.05 General. Perform excavation, backfill, and embankment work under Sections 203 and 206.

Dispose of all debris resulting from operations in accordance with Section 202.

Perform all construction of substructures, riprap, and signs under Sections 206, 206A, 251, 551, 552, 553A, 554, 555, 557, 564, 602, and 633, as applicable.

558.06 Performance. Provide 2 weeks’ notice prior to delivery and/or installation.

If the prefabricated superstructure is not installed immediately upon delivery to the project site, provide appropriate equipment and labor to unload and stack, support, and store all material at the delivery point. Support and stack all components to prevent damage. Furnish and install blocking such that all components are supported at least 12 inches above the ground.

Furnish all tools, devices, special equipment, and material needed for installation in well-marked watertight containers suitable for long-term, outdoor storage.

558.07 Contractor-Furnished Prefabricated Bridge Superstructure. As applicable, furnish the CO with the following items for approval prior to delivery of the bridge component:

(a) Supplier or inspection agency certification of wood species and grade of all timber and a conformance certificate for all sawn and glued laminated members.

(b) Certification by an approved inspection and testing agency of wood treatment, listing method of treatment, type of preservative, retention, and penetration.

Supplier certification is permitted if each piece is stamped or branded with a legible American Wood Preservers Bureau quality mark.

(c) Certification of structural steel, fasteners, and hardware.

(d) Certification of galvanizing process used.

(e) Steel fabricator certification that steel fabrication and quality control meet the requirements of the AISC Code of Standard Practice; and that all welding meets the requirements of ANSI/AASHTO/AWS D 1.5 Bridge Welding Code.

(f) A complete list of all bridge components, hardware, and fasteners.

(g) Complete erection instructions and drawings. Provide drawings that are black line, on a reproducible mylar media, on ANSI sheet size B or D.

As appropriate to the type of modular bridge, mark each major component of the bridge superstructure with the same serial number. Ensure that the marking is permanent and clearly visible on each component, both when stacked in storage and when erected on a bridge site.

When called for in the SPECIAL PROJECT SPECIFICATIONS, assemble each bridge superstructure prior to delivery to ensure proper fit-up of all components. Notify the CO of the assembly 2 weeks in advance so that inspection of the assembly can be arranged.

558.08 Government-Furnished Prefabricated Bridge Superstructure. When Government-furnished prefabricated bridge units are specified, transport all designated material from the storage site(s) designated in the SPECIAL PROJECT SPECIFICATIONS or SHOWN ON THE DRAWINGS to the bridge site, and install the superstructure complete and in place, including connection of all girders, diaphragms, railings, panels, transoms, and other elements.

Upon taking possession of the Government-furnished units at the storage site, assume all liability for damage resulting from handling, transporting, and/or erecting the units in place, until final acceptance of the project.

Measurement

558.09 Method. Use the method of measurement that is DESIGNATED IN THE

SCHEDULE OF ITEMS.

Measure prefabricated bridge superstructures on a lump sum basis. Include all materials and work necessary to furnish, transport, and install the superstructure, including the deck and railing, as SHOWN ON THE DRAWINGS.

Payment

558.10 Basis. The accepted quantities will be paid for at the contract unit price for each

PAY ITEM DESIGNATED IN THE SCHEDULE OF ITEMS.

Payment will be made under:

Pay Item Pay Unit

558(02) Government-furnished prefabricated bridge superstructure - transport and install ......................................Each

703 - Aggregate 703.05_National_7_18_2017

Delete Subsection 703.05(c)(3) and Replace with the following:

703.05 (c) Surface course aggregate. (3) Plastic Index

(3) Plastic Index, AASHTO T 90

If the percent passing the No. 200 sieve is less than 12% 2 to 9 If the percent passing the No. 200 sieve is greater than 12% Less than 2

703.05_National_3_17_2021

Delete 703.05 and replace with the following:

703.05 Subbase, Base, Surface Course, and Screened Aggregate.

(a) Subbase or base aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-2

(2) Liquid limit, AASHTO T 89 25 max.

(3) Plastic limit, AASHTO T 90 Nonplastic

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 50% min.

(9) Free from organic matter and lumps or balls of clay

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(b) Surface course aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-3

(2) Liquid limit, AASHTO T 89 35 max.

(3) Plastic Index, AASHTO T 90

a) If the percent passing the No. 200 sieve is less than 12% 2 to 9

b) If the percent passing the No. 200 sieve is greater than 12% Less than 2

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 75% min.

(9) Free from organic matter and lumps or balls of clay

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Do not furnish material that contains asbestos fibers.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(c) Screened aggregate – Furnish hard, durable particles or fragments of stone, slag, or gravel conforming the following:

(1) Gradation Table 703-13

(2) Plastic Index, AASHTO T 90 Less than 9

(3) Los Angeles abrasion, AASHTO T 96 55% max.

(4) Free from organic matter and lumps or balls of clay.

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.

Delete Table 703-2 and replace with the following:

T ab le

-2 ar ge t V al ue R an ge s f or

S ub ba se a nd

B as e G ra da tio n

Pe rc en t b y M as s P as si ng D es ig na te d Si ev e

(A A

SH

T

O T an d

T

1)

G ra di ng

D es ig na tio n

E (B as e)

(6

(6

(4

4.

7.

(3

T he v al ue in th e pa re nt he se s i s t he a llo w ab le d ev ia tio n

) f ro m th e ta rg et v al ue s..

D (B

(6

(6

(6

(4

4.

7.

(3

C (B

(6

(6

4.

–7 .0

(3

B (S ub ba se

(8

4.

.0 (4

A (S ub ba se

(7

(6

(4

4.

8.

(3

Si ev e Si ze

2½ in ch

1½

3/

1/

N o.

N o.

Delete Table 703-3 and replace with the following:

ab le

-3 ar ge t V al ue R an ge s f or

S ur fa ce

G ra da tio n

Pe rc en t b y M as s P as si ng D es ig na te d Si ev e

(A A

SH

T

O T an d

T

1) ra di ng

D es ig na tio n

U

(6

(7

(5

8.

.0 (4

T he v al ue in th e pa re nt he se s i s t he a llo w ab le d ev ia tio n

) f ro m th e ta rg et v al ue s.

If th e pl as tic ity in de x

(P I) is gr ea te r t ha n 0, th e

TV

ra ng e fo r t he N o.

si ev e siz e is

-1

(4

(7

(5

8.

.0 (4

S 10

(6

(7

(5

8.

.0 (4

H

(6

(6

(5

9.

.0 (4

(6

(6

(5

.0

6.

F 10

-1

-8

-6

(6

-5

-3

(6

-2

(5

.0

-1 6.

(4

Si ev e Si ze

N o.

N o.

Add Table 703-13:

Table 703-13 Gradation Requirements for Screened Aggregate

Sieve Size

Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

Grading Designation

L M N O P Q R

6 inch 100 100

4 inch 100 100

3 inch 100 100

2 inch 100

No. 4 15-45 15-45 15-45

Item Quantity Girder 84 plf 40 ft 4 13440 lb diaphragm 26 plf 3.8 ft 12 1185.6 lb guardrail post 9 plf 4.9 ft 14 617.4 lb guardrail spacer 9 plf 1.2 ft 14 151.2 lb post block 40 plf 1.5 ft 14 840 lb guardrail 12 plf 40.75 ft 2 978 lb bridge deck 12.6 psf 570.5 sf 1 7188.3 lb wood planks 33 pcf 39.6 cf 2 2613.6 lb total 27014.1 lb add 10% 29715.51 lb

1/2 of bridge 14857.76 lb

Unit weight Size Weight

Attachment 5 Sheep Creek Order
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCHEDULE OF ITEMS
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
C.2 PROJECT LOCATON
C.3 MAGNITUDE OF CONSTRUCTION PROJECT
Performance of the Work
Equipment
Equipment and Materials Storage and Staging
Standard Specifications
Government Furnished Property
Procurement Of Biobased Products
C.4 TECHNICAL SPECIFICATIONS
SECTION D--PACKAGING AND MARKING
D.1 and D.2 are included in the Parent CONTRACT.
D.3 PACKING AND MARKING
D.4 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE
SECTION E--INSPECTION AND ACCEPTANCE
E.1 CLAUSES
SECTION F--DELIVERIES OR PERFORMANCE
F.1 CLAUSES
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 through G.6 are included in the Parent CONTRACT.
G.1 Contracting Staff (Forest Service Addendum to G.1)
G.7 OTHER REQUIREMENTS
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 through H.16 are included in the Parent CONTRACT
H.17 OTHER REQUIREMENTS
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 CLAUSES
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
J.1 ATTACHMENTS
Sheep Creek SOI
Sheep Creek Bridge Const Plans
301 - Untreated Aggregate Courses
301 Title Change
301.03 General.
301.04 Mixing and Spreading.
301.05 Compacting.
301.06 Surface Tolerance.
301.08(b) Plasticity Index.
301.09 Measurement.
301.10 (Payment).
Section 558 - Prefabricated, Modular Bridge Superstructure Description
Materials
Construction
Measurement
Payment
Pay Item Pay Unit
703 - Aggregate
703.05 (c) Surface course aggregate. (3) Plastic Index
703.05 Subbase, Base, Surface Course, and Screened Aggregate.
Sheep Creek Bridge FSSS
Sheep Creek Map Pictures
Sheep Creek WD1
Sheep Creek WD2
Sheep Creek Big R Bridge Weight