Sheep Creek Bridge Attachment.pdf
PDF 836 KB Posted
- Solicitation number
- 1282B123R0004
- Issued by
-
Department of Agriculture Forest Service
About this file
This solicitation is for a Multiple-Award Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide road maintenance and reconstruction services on Forest Service lands in Colorado. The IDIQ will have a one year base period and four one-year options, and will be set aside for small businesses only. Task orders will be issued on a firm fixed price basis for maintenance, repair, and reconstruction work located in Arapaho and Roosevelt National Forests and Pawnee National Grassland. Responses are due within 30 days of the amendment releasing on May 15, 2023, and awards will be made to multiple awardees by July 15, 2023 to establish the IDIQ contracts.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BEARING PREPARATION INSTRUCTIONS
· ALL BEARING PLATES, ELASTOMERIC LEVELING OR BEARING PADS AND ANCHOR PLATES (IF
REQUIRED) WILL BE DELIVERED LOOSE ALONG WITH THE BRIDGE. THE BEARING PLATES WILL HAVE
HOLES FOR THE FIXED END AND SLOTS FOR THE EXPANSION END OF THE BRIDGE WHICH SHOULD BE
CENTERED ON THE ANCHOR BOLTS TO ALLOW FOR PROPER EXPANSION.
· FOR ABUTMENT APPLICATIONS PLACE THE ELASTOMERIC LEVELING OR BEARING PAD ALONG WITH A
BEARING PLATE DIRECTLY ON THE ABUTMENT SEAT AT EACH BEARING LOCATION. FOR PRECAST SILL
APPLICATIONS, AN ANCHOR PLATE MUST BE POSITIONED ON THE EMBEDDED SILL PLATE OR RISER
PRIOR TO PLACING THE ELASTOMERIC PAD AND BEARING PLATE.
· ASSURE THAT ALL BEARING PLATES ARE AT THE CORRECT ELEVATION, AND THAT THERE IS GOOD
BEARING BETWEEN THE ABUTMENT AND THE LEVELING OR BEARING PAD. IF NECESSARY, SHIM THE
PLATE OR USE NON-SHRINK GROUT UNDER THE ENTIRE BEARING PAD IN ORDER TO ASSURE 100%
BEARING AND PROPER FINAL ELEVATION.
· WHEN LAYERED ELASTOMERIC PADS ARE SPECIFIED, THEY WILL BE SUPPLIED WITHOUT ANCHOR
BOLT HOLES AND THE BEARING PLATES WILL INCLUDE WELDED KEEPER BARS TO CAPTURE THE PAD.
WHEN POSITIONING THE PADS, BE SURE TO CENTER THEM BETWEEN BOTH THE BEARING PLATE
KEEPER BARS AND ANCHOR BOLTS.
· REFER TO THE CONTECH PROJECT SPECIFIC PLANS FOR ANY SPECIAL INSTRUCTIONS RELATED TO
BEARINGS.
GENERAL NOTES:
· THE INFORMATION PROVIDED IN THIS GUIDE IS FOR REFERENCE ONLY AND PROVIDES
PROVEN PROCEDURES FOR FIELD ASSEMBLY AND INSTALLATION OF CONTECH BIG R
BRIDGES THAT WILL NOT RESULT IN DAMAGE TO THE STRUCTURE. CONTECH ENGINEERED
SOLUTIONS IS NOT RESPONSIBLE FOR THE MEANS, METHODS AND EQUIPMENT USED FOR
FIELD ASSEMBLY AND INSTALLATION OF THE BRIDGE STRUCTURES. CONTECH ENGINEERED
SOLUTIONS WILL NOT BE HELD LIABLE FOR ANY ISSUES THAT ARISE DUE TO FIELD ASSEMBLY
AND INSTALLATION OF THE BRIDGE STRUCTURES.
· THIS GUIDE IS A GENERIC DOCUMENT FOR THE INSTALLATION OF OUR TYPICAL BRIDGES. THE
CONTECH PROJECT SPECIFIC PLANS SHOULD BE REFERENCED FOR PROJECT SPECIFIC
DETAILS AND FOR ADDITIONAL INFORMATION.
· CONTECH ENGINEERED SOLUTIONS IS NOT RESPONSIBLE FOR PROJECT SPECIFIC ERECTION
PLANS.
· ON PAINTED, GALVANIZED OR METALIZED BRIDGES, CONTRACTOR IS RESPONSIBLE FOR ALL
FINAL FINISH TOUCH UP OR REPAIRS. THIS INCLUDES BUT IS NOT LIMITED TO ALL BOLTS,
NUTS, WASHERS AND ANY FINISH DAMAGE DUE TO SHIPPING, HANDLING, ASSEMBLY AND
INSTALLATION. WHEN INSTALLING BRIDGES CARE MUST BE TAKEN TO MINIMIZE DAMAGE TO
THE FINISH DURING INSTALLATION. PADDING SHOULD BE USED TO PROTECT THE FINISH
FROM CHAIN, CHOKER OR SLING. FOR PAINTED BRIDGES A NOMINAL AMOUNT OF TOUCH UP
PAINT WILL BE SUPPLIED. THIS IS OFTEN AN EPOXY SYSTEM AND ATTENTION WILL NEED TO
BE GIVEN TO MIXING THE PAINT. TOUCH UP MUST BE APPLIED TO BLEND WITH FACTORY
APPLICATION AS MUCH AS POSSIBLE.
· FOR ADDITIONAL INFORMATION PLEASE CONTACT CONTECH ENGINEERED SOLUTIONS AT:
PHONE: 1-800-338-1122
WEBSITE: www.ContechES.com
PLEASE INCLUDE THE CONTECH PROJECT NUMBER IN ANY CORRESPONDENCE.
SILL PLACEMENT INSTRUCTIONS (WHEN REQUIRED)
· THE PLACEMENT AREA OF THE SILLS SHALL BE DETERMINED BY THE CONTRACTOR BASED
ON THE RELATIVE POSITION OF EACH SILL TO EACH OTHER PER THE ANCHOR BOLT LAYOUT
AND ANCHOR BOLT ELEVATION DETAILS SHOWN ON THE CONTECH PROJECT SPECIFIC
PLANS.
· THE BEARING CAPACITY OF THE SOIL AT THE PLACEMENT AREA OF THE SILLS SHALL MEET
OR EXCEED THE REQUIRED LOAD AT SILL PER THE CONTECH PROJECT SPECIFIC PLANS. THE
ULTIMATE LOAD IS DETERMINED BASED ON FULLY FACTORED LOADS AND THE SERVICE LOAD
IS DETERMINED BASED ON UNFACTORED LOADS. IT IS UP TO THE CONTRACTOR TO ASSURE
THAT PROPER BEARING CAPACITY IS ACHIEVED AND TO DO ANY SOIL IMPROVEMENT
NECESSARY TO ACHIEVE THAT.
· THE PLACEMENT AREA OF THE SILLS SHALL BE GRADED FLAT AND SMOOTH AND AT THE
PROPER ELEVATIONS.
· THE SILLS SHALL BE LIFTED FROM THE FOUR RECESSED SPREAD ANCHORS WITH
ADEQUATELY SIZED RIGGING HARDWARE AND PLACED ON THE PREPARED SILL PLACEMENT
AREAS.
· THE SILLS SHALL BE POSITIONED RELATIVE TO EACH OTHER AS SHOWN ON THE CONTECH
PROJECT SPECIFIC PLANS.
BEAM SPLICE ASSEMBLY INSTRUCTIONS (WHEN REQUIRED)
· DURING THE SHOP FABRICATION PROCESS BEAM SPLICES ARE TYPICALLY SHOP FIT TO ASSURE
THAT MODULES WILL FIT TOGETHER IN THE FIELD. IF DURING THE SPLICE ASSEMBLY PROCESS
ANY MISALIGNMENT APPEARS TO OCCUR, STOP, REMOVE OR LOOSEN ALL SPLICE BOLTS, SHIFT
MODULES AROUND UNTIL PROPER ALIGNMENT OCCURS AND PROCEED WITH ASSEMBLY.
· THE FIRST PART OF THE BRIDGE MODULE SHALL BE SET ON A RELATIVELY FLAT SURFACE WITH
THE SPLICED END CRIBBED UP IN THE AIR AS NEEDED TO ALIGN THE SPLICED PART OF THE
MODULE.
· THE SECOND PART OF THE BRIDGE MODULE SHALL BE LINED UP WITH THE FIRST PART AND THE
SPLICE PLATES INSTALLED WITH ALL BOLTS FINGER TIGHT. ENSURE THAT THE CORRECT BOLT
LENGTH AND DIAMETER PER THE CONTECH BRIDGE PROJECT SPECIFIC PLANS IS BEING USED. IT
MAY BE NECESSARY TO USE DRIFT PINS AND COME-A-LONGS TO GET THE MODULES PROPERLY
ALIGNED AND ALL BOLTS IN PLACE.
· AFTER ALL BOLTS ARE IN PLACE, THEY SHOULD BE BROUGHT TO SNUG TIGHT CONDITION TO
INSURE THAT PLATES AND THE BEAMS ARE BROUGHT INTO GOOD CONTACT WITH EACH OTHER.
· IF THE TOP FLANGES REQUIRE FIELD WELDING, THAT SHOULD BE DONE NEXT PER THE DETAILS IN
THE CONTECH PROJECT SPECIFIC PLANS.
· CONTECH RECOMMENDS NOT TENSIONING BOLTS UNTIL AFTER ALL MODUELS ARE SET AND FULLY
ASSEMBLED BUT IF ACCESS TO THE SPLICES IS NOT POSSIBLE AFTER ERECTION OF THE BRIDGE
MODULES, THE SPLICE BOLTS MAY BE TENSIONED BEFORE SETTING BUT ADDITIONAL WORK MAY
BE REQUIRED TO ALIGN AND ASSEMBLE BRIDGE MODULES TOGETHER. ALL BOLT TENSIONING TO
BE DONE PER THE BOLT TENSIONING INSTRUCTIONS ON SHEET 2 OF THIS GUIDE.
· REFER TO CONTECH PROJECT SPECIFIC PLANS FOR ANY SPECIAL INSTRUCTIONS RELATED TO
BEAM SPLICES.
UNLOADING INSTRUCTIONS
· BRIDGE MODULES WILL ARRIVE ON OVER THE ROAD TRUCKING AND BE DELIVERED AS CLOSE
TO THE BRIDGE LOCATION AS POSSIBLE. THE CONTRACTOR WILL BE RESPONSIBLE FOR
UNLOADING THE BRIDGE. OCCASIONALLY, IT MAY BE NECESSARY TO UNLOAD OTHER
CONTECH MATERIAL TO REACH THE BRIDGE. THE CONTRACTOR WILL NEED TO RELOAD SAID
MATERIAL IN THIS EVENT.
· LOOSE ITEMS SUCH AS BEARING PLATES AND BOLTS WILL ARRIVE WITH THE BRIDGE. THE
CONTRACTOR SHOULD MAKE SURE ALL LOOSE ITEMS ARE UNLOADED WITH THE BRIDGE.
REFER TO THE BILL OF LADING.
HEAVY HEX BOLT DIAMETERS AND WRENCH SIZE
BOLT DIAMETER (IN) WRENCH OR SOCKET SIZE (IN)
1/2 7/8
5/8 1 1/16
3/4 1 1/4
7/8 1 7/16
1 1 5/8
1 1/4 2
B-U2
BACK GOUGE
F
A X
S t a e
H i g h w a y
N o r t h
A l e x a n d r i a
M
N
7/13/2020
DATE:
APPROVED:
SLJ
CHECKED:
SHEET:
I B
R I D
G E
C
O N
T I N
E N
T A
L B
R I D
G E
D
E P
A R
T M
E N
T E
N G
I N
E E
R I N
G B
I G
R
N
S T
A L
L A
T I O
N
G
U I D
E S
R
E V
I S
E D
T
O
C
O N
T E
C H
B
B
I D
L
L E
D
G
I R
D E
R
I N
S T
A L
L A
T I O
N
G
U I D
E
M
O D
U L
A
W
T
H
X
B
R I D
P
L A
K
C
K D
P
M
OF
CMA
DRAWN:DESIGNED:
SLJ
SEQUENCE No.:
PROJECT No.:
R E
V I S
I O
N
D
E S
C R
I P
T I O
N D
A T
E M
A R
K
Y
F O U N D E D 19 2 1
AM
ER
IC
A N
INS
TIT
UTE OF STEEL CONST RUCTION
x
B
R I D
A
C
K
I N
S T
A L
L A
T I O
N
G
U I
M
D
U L
A R
R O
L L
R
D E
R
B
R I D
G E
T h e d e s i g n a n d f o r m a t i o n s h o w n o n t h i s d r a w i n g i s p r o v i d a s r v i c o h e p r o j e c t o w n e r e n g i n e e r a n d c o n t r a c t o r b y
C o n t e g i n e e r e d
S o l u t i o n s
L
L C
C o n t e c h i t h e r t h i s d r a w i n g n o r a n y p a r t t h e r e o f m a y b e u s e d r e p r o d u c e d o r m o d i f i e d y m a n n e r w i t h o u t t p r i o r w r i t t e n c o n s e n t o f
C o n t e c
F i l u r e t o c o m p l y i s d o n e a t t h e u s e r s o w s k a
C n t e c h e x p r e s s l y d i s c l a i m s a n y l i a b i l i t y o r r e s p o n s i b i l i t y f o r s u u e
I f d i s c r e p a n c i e s b e t w e e n t h e s u p p l i e d i n f o r m a t i o n u p i c h t h e d r a w i n g i s b a s t u a l f i e l d c o n d i t i o n s a c o u n t e r e d a s s i r k p r o g r e s s e s t h e s e d i s c r e p a n c i e s m u s t b e r e p o r t e d n t e c h i m m e d i a t e l y f o r r e e v a l u a t i o n o f t h e d e s i g n t e c h a c c e p t s n o l i a b i l i y f r d e s i g n s b a s m i s s i n g i n c o m p l e i n a c c u r a f o r m a t i o n s u p p l i e d b y o t h e r s w w w C o n t e c h
E S c o m
CONCRETE ABUTMENT
ELASTOMERIC
LEVELING OR
BEARING PAD
BEARING PLATE
PRECAST CONCRETE SILL
ELASTOMERIC
LEVELING OR
BEARING PAD
BEARING PLATE
ANCHOR PLATE
BEARING PLATE
ANCHOR BOLTS
CONCRETE ABUTMENT
ELASTOMERIC
LEVELING OR
BEARING PAD
TYPICAL ABUTMENT DETAIL
TYPICAL PRECAST SILL DETAIL
PRECAST CONCRETE SILL
ELASTOMERIC
LEVELING OR
BEARING PAD
BEARING PLATE
ANCHOR PLATE
SILL PLATE
LAYERED ELASTOMERIC PAD DETAIL
LAYERED
ELASTOMERIC PAD
BEARING PLATE
w / KEEPER BARS
ANCHOR BOLTS
PRECAST CONCRETE SILL
TYPICAL PRECAST SILL LIFTING DETAIL
SILL PLATE
RECESSED LIFTING ANCHORS
ASTM A325 WEB
SPLICE BOLT w/
NUT & WASHER
TYPICAL STRINGER SPLICE DETAIL
TOP FLANGE WELDED
ASTM A325
FLANGE SPLICE
BOLT w/ NUT &
WASHER
WEB SPLICE PLATE
INSIDE FLANGE
SPLICE PLATE
OUTSIDE FLANGE
SPLICE PLATE
℄ SPLICE
LOOSE BRIDGE PLANK
PIECES FIELD WELDED
AFTER SPLICE ASSEMBLY
SECTION
ASTM A325 WEB
SPLICE BOLT w/ NUT &
WASHER
ASTM A325 FLANGE
SPLICE BOLT w/ NUT &
WASHER
ASTM A325 FLANGE
SPLICE BOLT w/ NUT &
WASHER
TYPICAL STRINGER SPLICE DETAIL
ALL BOLTED
INSIDE FLANGE
SPLICE PLATE
OUTSIDE FLANGE
SPLICE PLATE
WEB SPLICE PLATE
TOP FLANGE SPLICE
PLATE
℄ SPLICE
SECTION
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
RAIL ASSEMBLY INSTRUCTIONS (WHEN REQUIRED)
· THESE INSTRUCTIONS ARE FOR TYPICAL W-BEAM AND THRIE-BEAM GIRDER
MOUNTED RAILS SYSTEMS. IF OTHER SYSTEMS ARE USED PLEASE REFERENCE
CONTECH PROJECT SPECIFIC PLANS FOR ADDITIONAL INFORMATION.
· THE BRIDGE RAIL AND POSTS WILL BE DELIVERED LOOSE ALONG WITH THE
BRIDGE MODULES AND MAY BE INSTALLED PRIOR TO, OR AFTER SETTING THE
BRIDGE MODULES. THE JOB SITE WILL DETERMINE WHICH METHOD IS
PREFERABLE.
· EACH BRIDGE RAIL POST SHALL BE FASTENED TO A BRIDGE MODULE POST BLOCK
WITH HEX HEAD BOLTS. EACH OF THE FOUR HOLE LOCATIONS ON THE LOWER
END OF THE POST WILL RECEIVE ONE BOLT, ONE WASHER, AND ONE NUT.
ENSURE THAT THE CORRECT BOLT LENGTH AND DIAMETER PER THE CONTECH
PROJECT SPECIFIC PLANS IS BEING USED.
· THE BRIDGE RAIL IS ATTACHED TO THE POSTS WITH EITHER ONE BUTTON HEAD
BOLT FOR W-BEAM RAIL OR TWO BUTTON HEAD BOLTS FOR THRIE-BEAM RAIL.
EACH HOLE LOCATIONS WILL RECEIVE ONE BUTTON HEAD OVAL SHOULDERED
BOLT, ONE PLATE WASHER, AND ONE RECESSED NUT. ONE REFLECTOR AT EACH
POST SHALL BE INSTALLED AS SHOWN ON THE CONTECH PROJECT SPECIFIC
PLANS. ENSURE THAT THE CORRECT BOLT LENGTH PER THE CONTECH PROJECT
SPECIFIC PLANS IS BEING USED.
· THE OVERLAPPING RAIL SPLICE AND FLARED END SECTIONS SHALL BE FASTENED
TOGETHER WITH BUTTON HEAD BOLTS. EACH HOLE LOCATION, EIGHT EACH FOR
W-BEAM AND TWELVE EACH FOR THRIE-BEAM, SHALL RECEIVE ONE BUTTON
HEAD OVAL SHOULDERED BOLT AND ONE RECESSED NUT. ENSURE THAT THE
CORRECT BOLT LENGTH PER THE CONTECH PROJECT SPECIFIC PLANS IS BEING
USED. IT MAY BE NECESSARY TO WORK MATERIAL AND OR USE DRIFT PINS TO
GET HOLES IN PROPER ALIGNMENT.
· REFER TO THE CONTECH PROJECT SPECIFIC PLANS FOR ANY SPECIAL
INSTRUCTIONS RELATED TO BRIDGE RAIL.
NUT ROTATION FROM SNUG TIGHT CONDITION
BOLT LENGTH (AS MEASURED FROM UNDERSIDE OF HEAD TO
OUTSIDE FACE OF THE NUT PLUS 5/16 INCH)
DISPOSITION OF OUTER FACES OF BOLTED PARTS
BOTH FACES NORMAL TO BOLT AXIS
NOT MORE THAN 4 DIAMETERS 1/3 TURN
MORE THAN 4 DIAMETERS BUT NOT MORE THAN 8 DIAMETERS 1/2 TURN
MORE THAN 8 DIAMETERS BUT NOT MORE THAN 12 DIAMETERS 2/3 TURN
BEARING ASSEMBLY INSTRUCTIONS
· FIELD WELD ALL BEARING PLATES TO THE BRIDGE GIRDERS. WHEN PRECAST SILLS ARE INCLUDED FIELD
WELD ANCHOR PLATES TO THE EMBEDDED SILL PLATE. WELD SIZE AND LENGTHS SHALL BE AS DIRECTED IN
THE CONTECH PROJECT SPECIFIC PLANS.
· ON PAINTED, GALVANIZED OR METALIZED BRIDGES, THE FINISHES WILL BE DAMAGED DUE TO THE FIELD
WELDING AND WILL REQUIRE REPAIR. IT WILL BE THE RESPONSIBILITY OF THE ONSITE CONTRACTOR TO
PERFORM ALL FINISH REPAIR.
· CARE SHOULD BE TAKEN TO AVOID OVERHEATING THE LEVELING OR BEARING PAD DURING WELDING. THIS
IS TYPICALLY NOT AN ISSUE WHEN GOOD WELDING PRACTICES ARE USED BUT IF IT IS A CONCERN HEAT
CONTROL CRAYONS CAN BE USED TO MONITOR HEAT IN THE STEEL WHERE IT CONTACTS THE PAD. IT IS
RECOMMENDED TO KEEP THE HEAT AT THE PAD AT 200 F OR LESS.
· EACH ANCHOR BOLT WILL RECEIVE (1) WASHER AND (2) NUTS. ONE END OF THE BRIDGE IS DESIGNED TO BE
FIXED AND THE NUTS ARE TO BE INSTALLED TIGHT. THE EXPANSION END WILL HAVE THE FIRST NUT
TIGHTENED FINGER TIGHT TO THE WASHER PLACED ON THE BEARING PLATE. THE SECOND NUT WILL BE
INSTALLED TIGHT TO THE FIRST. REFER TO THE CONTECH PROJECT SPECIFIC PLANS TO DETERMINE WHICH
END OF THE BRIDGE IS TO BE THE FIXED OR EXPANSION END.
BRIDGE MODULE LIFTING AND SETTING INSTRUCTIONS
· EACH BRIDGE MODULE TO BE LIFTED FROM THE PRE-INSTALLED LIFTING LUGS WITH
ADEQUATELY SIZED RIGGING HARDWARE AND PLACED ON THE PREPARED BEARINGS.
· IF BRIDGE HAS MORE THAN 2 MODULES OR MODULES THAT ARE NOT IDENTICAL, MODULES
ARE TO BE SET IN NUMERICAL ORDER AS SHOWN ON THE CONTECH PROJECT SPECIFIC
PLANS.
· AFTER PLACING THE BRIDGE, ADJUST STRUCTURE ON THE FOUNDATIONS SO THAT SPACING
IS EQUAL AT BOTH ENDS OR AS DIRECTED IN THE CONTECH PROJECT SPECIFIC PLANS. THE
EXPANSION END GAP DESIGNATED IN THE CONTECH PROJECT SPECIFIC PLANS MUST
MAINTAINED FOR PROPER EXPANSION. IF THE BRIDGE HAS AN ELEVATION DIFFERENCE, BE
SURE TO SET THE HIGH END OF THE BRIDGE ON THE HIGHER FOUNDATION. BEARING
PLATES MUST BE FULLY COVERED BY THE GIRDER FLANGE UNLESS SHOWN OTHERWISE IN
CONTECH PROJECT SPECIFIC PLANS. REFER TO THE CONTECH PROJECT SPECIFIC PLANS
FOR CORRECT ALIGNMENT.
· DIAPHRAGM SPLICE PLATES AND CENTER SPLICE PLATES SHALL BE CONNECTED WITH PASS
THROUGH BOLTS. EACH OF THE HOLE LOCATION ON THE SPLICE PLATES WILL RECEIVE
ONE BOLT, ONE WASHER, AND ONE NUT.
· BRING ALL BOLTS TO A 'SNUG TIGHT' CONDITION TO INSURE THAT THE PARTS OF THE JOINT
ARE BROUGHT INTO GOOD CONTACT WITH EACH OTHER. SNUG TIGHT IS DEFINED AS THE
TIGHTNESS ATTAINED BY A FEW IMPACTS OF AN IMPACT WRENCH OR THE FULL EFFORT OF
A MAN USING AN ORDINARY SPUD WRENCH.
· WHEN INSTALLING BRIDGES CARE MUST BE TAKEN TO MINIMIZE DAMAGE TO THE FINISH
DURING INSTALLATION. PADDING SHOULD BE USED TO PROTECT THE FINISH FROM CHAIN,
CHOKER OR SLING.
BOLT TENSIONING INSTRUCTIONS
· AFTER BRIDGE IS SET AND ASSEMBLED, ALL BOLTS SHALL BE TENSIONED.
· TIGHTENING OF THE BOLTS SHALL BE IN ACCORDANCE WITH THE “SPECIFICATION FOR STRUCTURAL JOINTS
USING HIGH-STRENGTH BOLTS” BY RCSC. CONTECH RECOMMENDS USING THE TURN-OF-NUT PROCEDURE
DESCRIBED BELOW:
BRING ALL BOLTS TO A 'SNUG TIGHT' CONDITION TO INSURE THAT THE PARTS OF THE JOINT ARE
BROUGHT INTO GOOD CONTACT WITH EACH OTHER. SNUG TIGHT IS DEFINED AS THE TIGHTNESS
ATTAINED BY A FEW IMPACTS OF AN IMPACT WRENCH OR THE FULL EFFORT OF A MAN USING AN
ORDINARY SPUD WRENCH. FOLLOWING THIS INITIAL OPERATION, ALL BOLTS SHALL THEN BE
TIGHTENED ADDITIONALLY BY THE APPLICABLE AMOUNT OF NUT ROTATION AS SPECIFIED IN THE TABLE
BELOW, WITH THE TIGHTENING PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID PART OF THE
JOINT TO ITS FREE EDGES. DURING THIS OPERATION, THERE SHALL BE NO ROTATION OF THE PART
NOT TURNED BY THE WRENCH.
NUT ROTATION IS RELATIVE TO BOLT, REGARDLESS OF THE ELEMENT (NUT OR BOLT) BEING TURNED. FOR
BOLTS INSTALLED BY ½ TURN AND LESS, THE TOLERANCE SHOULD BE PLUS OR MINUS 30°; FOR BOLTS
INSTALLED BY 2/3 TURN AND MORE, THE TOLERANCE SHOULD BE PLUS OR MINUS 45°.
§ IF ANY BOLTS OR NUTS DO NOT SMOOTHLY ENGAGE UP TO SNUG-TIGHT THERE MAY BE AN OBSTRUCTION
WITHIN THE TREADS. THE BOLT OR NUT SHOULD BE REMOVED, THE THREADS ON THE BOLT AND NUT
CLEANED AND RETAPPED IF NECESSARY TO ALLOW SMOOTH INSTALLATION.
WEARING SURFACE INSTRUCTIONS
· TYPE AND INSTALLATION OF THE WEARING SURFACE IS NOT CONTECH RESPONSIBILITY.
· BIG R 4.25 INCH STEEL BRIDGE DECKIPLANKS ARE THE STRUCTURAL DECKING SYSTEM. THE WEARING SURFACE
IS ONLY TO PROVIDE A SMOOTH RUNNING SURFACE AND NOT REQUIRED STRUCTURALLY.
· TYPICAL WEARING SURFACE LOAD OF 80 PSF WILL ACCOMMODATE UP TO 5 1/4” OF GRAVEL BASE (130 PCF) OR 4
1/4" OF CONCRETE OR ASPHALT (150 PCF) SURFACING ABOVE THE STEEL BRIDGE DECK CORRUGATIONS.
· IF GRAVEL WEARING SURFACE IS TO BE USED, THE GRAVEL SHALL BE PLACED ON THE DECK AND GRADED
TO THE PROPER THICKNESS.
· REFERENCE CONTECH PROJECT SPECIFIC PLANS FOR RECOMMENDATIONS FOR ASPHALT OR CONCRETE
WEARING SURFACES.
· TIMBER WEARING SURFACES ARE TYPICALLY INSTALLED BY CONTECH DURING FABRICATION, SEE CONTECH
PROJECT SPECIFIC PLANS FOR ADDITIONAL DETAILS.
· OTHER WEARING SURFACE TYPES MAY BE USED AS LONG AS THE TOTAL WEARING SURFACE LOAD IS NOT
GREATER THAN THE WEARING SURFACE LOAD PER THE CONTECH PROJECT SPECIFIC PLANS.
F
A X
S a
H g h w a y
N o r t h
A l e x a n d r i a
M
N
7/13/2020
DATE:
APPROVED:
SLJ
CHECKED:
SHEET:
I B
R I D
G E
C
O N
T I N
E N
T A
L B
R I D
G E
D
E P
A R
T M
E N
T E
N G
I N
E E
R I N
G B
S T
A L
L A
T I O
N
G
U I D
E S
R
E V
I S
T
C
O N
T E
C H
B
I D
L
L E
D
G
I R
D E
R
I N
S T
A L
L A
T I O
N
G
U I D
E
M
O D
U L
A
T
H
X
B
R I D
A
C
K D
P
M
OF
CMA
DRAWN:DESIGNED:
SEQUENCE No.:
PROJECT No.:
R E
V I S
I O
N
D
E S
C R
I P
T I O
N D
A T
E M
A R
K
Y
F O U N D E D 19 2 1
AM
ER
IC
A N
INS
TIT
UTE OF STEEL CONST RUCTION
x
B
R I D
A
C
K
I N
S T
A L
L A
T I O
N
G
U I
M
D
U L
A R
R O
L L
R
D E
R
B
R I D
G E
T h e d e s i g n a f o r m a t i o n s h o w n o n t h i s d r a w i n g i s p r o v i d r v i e p r o j e c t o w n e r e n g i n e e r a n d c o n t r a c t o r b y
C o n t e g i n e e r e d
S o l u t i o n s
L
L C
C o n t e c h i t h e r t h i s d r a w i n g n o r a n y p a r t t h e r e o f m a y b e u s e d r e p r o d u c e d o r m o d i f i e d y m a n n e r w i t h o u t t p i o r w r i t t e n c o n s e n t o f
C o n t e c
F i l u r e t o c o m p l y i s d o n e a t t h e u s e r s o s k a n t e c h e x p r e s s l y d i s c l a i m s a n y l i a b i l i t y o r r e s p o n s i b i l i t y f o r s u u e
I f d i s c r e p a n c i e s b e t w e e n t h e s u p p l i e d i n f o r m a t i o n u p i c h t h e d r a w i n g i s b a s t u a l f i e l d c o n d i t i o n s a c o u n t e r e d a s s i r k p r o g r e s s e s t h e s e d i s c r e p a n c i e s m u s t b e r e p o r t e d n t e c h i m m e d i a t e l y f o r r e e v a l u a t i o n o f t h e d e s i g n t e c h a c c e p t s n o l i a b i l i y f r d e s i g n s b a s m i s s i n g i n c o m p l e i n a c c u r a f o r m a t i o n s u p p l i e d b y o t h e r s w w w C o n t e c h
E S c o m
PRE-INSTALLED
LIFTING LUG
BRIDGE RAIL POST
POST BLOCK
7/8"Ø x 2 1/4" BOLT w / NUT & WASHER
(TYPICAL AT EACH
CENTER PLATE HOLE)
7/8"Ø x 2 1/4" BOLT w / NUT & WASHER
(4 PER. DIAPHRAGM)
7/8"Ø x 2 1/4" BOLT w / NUT & WASHER
(TYPICAL 4 PER. POST)
5/8"Ø x 1 1/4" OR 2" BUTTON HEAD BOLT w / NUT
8 EACH - W-BEAM RAIL
12 EACH THRIE-BEAM RAIL
REFLECTOR
PLATE WASHER
5/8"Ø x 2" OR 3 1/2" BUTTON
HEAD BOLT w / NUT
1 EACH - W-BEAM RAIL
2 EACH THRIE-BEAM RAIL
FLARED END
SECTION
TYPICAL BRIDGE RAIL ASSEMBLY
STRINGER
DIAPHRAGM & PLATE
CENTER SPLICE PLATE
TYPICAL DIAPHRAGM AND DECK
SPLICE
AutoCAD SHX Text
° F OR LESS.
| Sheets and Views |
| Big R Bridge Rolled Girder - Installation Guide - Modular with 12x4.25 Bridge Plank Deck-1 |
| Big R Bridge Rolled Girder - Installation Guide - Modular with 12x4.25 Bridge Plank Deck-2 |
File details come from the government source that posted it. Updated .