Attachment 5 - Reference Photo Montgomery Dam Gates 9 and 10 Install.pdf
PDF 6 MB Posted
- Attached to
- Montgomery Lift Gate Installation FY20 Federal contract opportunity
- Solicitation number
- W911WN20B8003
About this file
This federal contract opportunity announcement solicits bids for the Montgomery Dam Gate and Control System Installation project in 2020. The U.S. Army Corps of Engineers, Pittsburgh District, requires the removal of existing dam lift gates 9 and 10 and associated components. Additional work includes machinery house modifications, track and sill modifications and concrete repairs, installation of new gates and control systems, cleaning and painting of bulkheads, and gate track repairs. Bids are due by 20 March 2020 through the SAM website. The contract value is estimated between $10-25 million and will be a firm-fixed-price award. The NAICS code is 237990 and the small business size standard is $39.5 million. The work must be completed within 900 calendar days of notice to proceed.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MONTGOMERY DAM GATES 9 AND 10 INSTALL SYSNOPSYS
Work Synopsys The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the installation of new dam lift gates and a new control system at Montgomery Locks and Dam, Ohio River, PA.
This contract is a continuation of the three previous gate replacement contracts. The contract generally includes installation of the last two dam gates, new control/camera systems and other repairs to the dam. The major features of the requirements are identified below:
The contract specifically includes:
a. Removal of existing dam Lift Gates 9 and 10 and associated components;
b. Pier 9, Pier 10, and Pier 11 machinery house modifications;
c. Pier 9, Pier 10, and Pier 11 track and sill modifications and miscellaneous concrete repairs;
d. Installation of new Government-Furnished dam Lift Gates 9 and 10,
e. Including associated lift chains and drive sprockets; repair and lubrication of the gate lifting equipment;
f. Installation of new roofs on all machinery houses;
g. Installation of new gate control and camera systems;
h. Clean and paint of the existing emergency bulkhead units;
i. Perform Gate Track No. 3 repairs.
The work is to be performed using the existing bulkheads stored at the project site. Installation of the new Lift Gates involves heavy lifting of the main gate leaf, end trucks, and associated components from a floating crane. All work will be performed form the contractors floating plant located downstream of the gates being replaced.
Disposal of lift gates and associated parts, concrete rubble, and electrical equipment will be required. Ferrous and all other construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable.
Construction work will occur in close proximity to waterway traffic and operating lock and dam gates. The existing lock chambers are currently operated 24 hours a day, 7 days a week.
Pittsburgh District
Montgomery Locks and Dam
Entrance to Montgomery Locks and Dam Parking area
Looking Downstream at Middle Wall Dam Bridge looking at Machinery House under Construction
Overview of Locks Land Chamber Miter Gate
Walkway along Dam Bridge Abutment Weir
Dam BridgeDam Elevation (Typical Existing Gates to be Removed)
Removal of Existing Dam Lift Gates 9 and 10 and associated components
Machinery House 11 Inside Machinery House 11
Machinery House Typical Machinery and Electric Panels
Removal of Existing Dam Lift Gates 9 and 10 and associated components
Removal of existing dam Lift Gates 9 and 10 and associated components
Machinery House 10 Inside Machinery House 9
Removal of existing Dam Lift Gates 9 and 10 and associated components
Machinery House 9 (side view) Inside Machinery House 9
Removal of existing Dam Lift Gates 9 and 10 and associated components
Floor Grating inside Machinery House 10 Access thru Grating to Platform below Machinery House 10
Pier 9, Pier 10 and Pier 11 Machinery House Modifications
New Machinery House New Machinery House under Construction
Inside a New Machinery House Mezzanine Inside a New Machinery House
Inside a New Machinery House
Pier 9, Pier 10, and Pier 11 Track and Sill Modifications and Miscellaneous Concrete Repairs
Typical Concrete Work Typical Concrete Work
Pier 9, Pier 10, and Pier 11 Track and Sill Modifications and Miscellaneous Concrete Repairs
Typical Concrete Work Typical Pier Elevation
Installation of New Government-Furnished Dam Lift Gates 9 and 10
Top of Dam Gate Side of Dam Gate
Installation of New Government-Furnished Dam Lift Gates 9 and 10
Gate placed in Dam Pier Track Slot End Truck Assembly on Dam Gate
Associated Lift Chains and Drive Sprockets; Repair and Lubrication of the Gate Lifting Equipment
Lift Gate Machinery and Lifting Chain, there are 2 lifting machines in machinery house 10, and 1 lifting machines in machinery houses 9 and 11.
Lifting Chain
Looking Down thru Machinery Slot Lift Chain
Lifting Chain Lifting Chain attached to Machine
Installation of New Roofs on All Machinery Houses
Typical Roof for Machinery Houses
Installation of New Gate Control and Camera Systems
Control Panels inside Machinery House Control Panels inside Machinery House
Conduits entering Machinery House from Bridge Conduits entering Machinery House
Conduits to Machinery Conduits into Panels
Conduits entering Machinery House from Access Platform Lighting on Front of Machinery House
Conduits entering Machinery House from Access Platform Conduits entering Machinery House from Access Platform
Clean and Paint of the Existing Emergency Bulkhead Units
The cleaning of the bulkhead units will take place on the abutment side of the dam. There is limited access to the area from Highland Ave (pickup truck). You will have to drive across railroad tracks. You will not be able to get a vehicle all the way to the cleaning area.
Dirt road from Highland Ave Dirt road from Highland Ave after crossing railroad tracks
Bulkhead appears on right side of picture
Bulkheads cleaning area on abutment side of dam
Bulkheads cleaning area on abutment side of dam
Bulkhead Placed in Cleaning Area Bulkhead Steel Members
Bulkhead Steel Members Bulkhead Before Cleaning
PERFORM GATE TRACK NO. 3 REPAIRS
The Track Rail repair will take place on the left side of pier 3. This work needs to be done before Gate 3 can be put in service.
1. See drawing S-3278 for notes referring to field removal, shop repairs and field replacement of rail. This drawing also gives a suggested weld repair sequence.
2. The photos show the approximate location of repair work. For exact location of track repair work see drawing S-3277.
| Montgomery Dam Gates 9 and 10 Install SYSNOPSYS |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
| Slide Number 23 |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Slide Number 27 |
| Slide Number 28 |
| Slide Number 29 |
| Slide Number 30 |
| Slide Number 31 |
| Perform Gate Track No. 3 repairs |