Attachment 5 - Price Matrix.pdf
PDF 70 KB Posted
- Solicitation number
- 36C24825R0035
About this file
This is a Base Offer Cost Breakdown template form used for price submissions on a renovation project for a VA PM Shop and Aluminum Canopy Roof replacement. The form is structured to capture detailed cost breakdowns across 24 construction divisions including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood and Plastic, through to Utilities and Transportation. For each division, contractors must itemize Labor Costs, Material Costs, and Total Costs.
The template includes fields for project identification information (Project Number, Title, Location) and offeror details (Name, Street, City, State, Zip). At the bottom, it provides spaces to calculate division subtotals and apply percentage markups for Overhead, Profit, and Bond (all currently shown as 0.00%). The form appears to be blank with no costs filled in, serving as a structured pricing matrix for contractors to submit their detailed cost proposals for the renovation work.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number: Date:
Project Title Project Location Offeror Name Offeror Street Offeror City State Zip
Item Labor Cost Material Cost Total Cost
Division 1 $- $- $-
Division 2 - - - Division 3 - - - Division 4 - - - Division 5 - - - Division 6 - - - Division 7 - - -
Division 8 - - -
Division 9 - - - Division 10 - - - Division 11 - - - Division 12 - - - Division 13 - - -
Division 14 - - -
Division 21 - - - Division 22 - - - Division 23 - - - Division 26 - - - Division 27 - - - Division 28 - - -
Division 31 - - - Division 32 - - -
Division 33 - - -
Wood and Plastic
Base Offer Cost Breakdown
Description
General Requirements
Existing Conditions Concrete Masonry Metals
Electrical
Thermal & Moisture Protect
Doors and Windows
Finishes Specialties Equipment Furnishings Special Construction
Conveying Equipment
Fire Suppression Plumbing
HVAC
Communications Electronic Safety & Security
Earthwork Exterior Improvements
Utilities
Division 34 - - -
Overhead % - Profit % - Bond % -
$- $- $- Total Price
Transportation Subtotal
Division Subtotals :
0.00% 0.00% 0.00%
Overhead/Profit Subtotals :
File details come from the government source that posted it. Updated .