Attachment 5 - Price Matrix.pdf

PDF 70 KB Posted

Attached to
Renovate PM Shop and Replace Aluminum Canopy Roof Section
Solicitation number
36C24825R0035
Issued by

About this file

This is a Base Offer Cost Breakdown template form used for price submissions on a renovation project for a VA PM Shop and Aluminum Canopy Roof replacement. The form is structured to capture detailed cost breakdowns across 24 construction divisions including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood and Plastic, through to Utilities and Transportation. For each division, contractors must itemize Labor Costs, Material Costs, and Total Costs.

The template includes fields for project identification information (Project Number, Title, Location) and offeror details (Name, Street, City, State, Zip). At the bottom, it provides spaces to calculate division subtotals and apply percentage markups for Overhead, Profit, and Bond (all currently shown as 0.00%). The form appears to be blank with no costs filled in, serving as a structured pricing matrix for contractors to submit their detailed cost proposals for the renovation work.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number: Date:

Project Title Project Location Offeror Name Offeror Street Offeror City State Zip

Item Labor Cost Material Cost Total Cost

Division 1 $- $- $-

Division 2 - - - Division 3 - - - Division 4 - - - Division 5 - - - Division 6 - - - Division 7 - - -

Division 8 - - -

Division 9 - - - Division 10 - - - Division 11 - - - Division 12 - - - Division 13 - - -

Division 14 - - -

Division 21 - - - Division 22 - - - Division 23 - - - Division 26 - - - Division 27 - - - Division 28 - - -

Division 31 - - - Division 32 - - -

Division 33 - - -

Wood and Plastic

Base Offer Cost Breakdown

Description

General Requirements

Existing Conditions Concrete Masonry Metals

Electrical

Thermal & Moisture Protect

Doors and Windows

Finishes Specialties Equipment Furnishings Special Construction

Conveying Equipment

Fire Suppression Plumbing

HVAC

Communications Electronic Safety & Security

Earthwork Exterior Improvements

Utilities

Division 34 - - -

Overhead % - Profit % - Bond % -

$- $- $- Total Price

Transportation Subtotal

Division Subtotals :

0.00% 0.00% 0.00%

Overhead/Profit Subtotals :

File details come from the government source that posted it. Updated .