This is a Price Schedule Breakdown template for a fixed-price construction contract related to Project 674-23-255, "Improve RO-DI (Reverse Osmosis Deionization) Recirculation," issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 under Solicitation Number 36C25726R0024. The template uses the Construction Specification Institute (CSI) divisional breakdown structure to organize pricing across multiple construction categories, including General Requirements, Facility Construction (Divisions 1-14), Facility Services (Divisions 21-28), Site & Infrastructure (Divisions 31-35), and Process Equipment (Divisions 40-48). The pricing structure accommodates line-item costs for each division, with additional cost categories for insurance and bonds, taxes and fees, operations and maintenance manuals and red-line drawings, overhead, subcontract mark-up, and profit.
The template emphasizes that awardees are responsible for ensuring formula accuracy for subtotals and contract totals, and that all pricing submitted is fixed-price. The template notes that field office overhead and general conditions are considered equivalent cost categories and will be applied only once to the contract and any changes. The contract line-item price breakdown is identified as being for information purposes only and does not constitute separate billable deliverables. All line items in the provided template currently show $0.00 values, indicating this is a blank template awaiting contractor pricing input.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25726R0024 0004.docx | DOCX document | |
| 36C25726R0024 0003.docx | DOCX document | |
| 36C25726R0024 0002.docx | DOCX document | |
| Consolidated RFI for 26R0024.docx | DOCX document | |
| Site visit sign in sheet_02252026.pdf | ||
| 36C25726R0024 0001.docx | DOCX document | |
| Attachment 6 Site Visit map.pdf | ||
| Attachment 3 ICRA.pdf | ||
| Attachment 2 Drawings.pdf | ||
| Attachment 4 PCRA.pdf | ||
| Attachment 1 Specifications.pdf | ||
| 36C25726R0024_1.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE SCHEDULE BREAKDOWN INSTRUCTIONS | |
| INSTRUCTIONS | |
| 1 | Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary |
| 2 | The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record. |
| 3 | The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables. |
| 4 | Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable. |
| 5 | All pricing is fixed price. |
Proposal Price Schedule
| PRICE SCHEDULE BREAKDOWN |
| 674-23-255 |
NRM Improve Reverse Osmosis-Deionization Recirculation
| CLIN 0001 | ||
| Rates | Base Item | |
| General Requirements & Facility Construction | Price | |
| Division Item 1 General Requirements | N/A | $0.00 |
| Division Item 2 Existing Conditions | N/A | $0.00 |
| Division Item 3 Concrete | N/A | $0.00 |
| Division Item 4 Masonry | N/A | $0.00 |
| Division Item 5 Metals | N/A | $0.00 |
| Division Item 6 Woods, Plastic and Composites | N/A | $0.00 |
| Division Item 7 Thermal and Moisture Protection | N/A | $0.00 |
| Division Item 8 Openings | N/A | $0.00 |
| Division Item 9 Finishes | N/A | $0.00 |
| Division Item 10 Specialties | N/A | $0.00 |
| Division Item 11 Equipment | N/A | $0.00 |
| Division Item 12 Furnishes | N/A | $0.00 |
| Division Item 13 Special Construction | N/A | $0.00 |
| Division Item 14 Conveying Equipment | N/A | $0.00 |
| Facility Services Subgroup | N/A | $0.00 |
| Division Item 21 Fire Suppression | N/A | $0.00 |
| Division Item 22 Plumbing | N/A | $0.00 |
| Division Item 23 Heating, Ventilating and A/C | N/A | $0.00 |
| Division Item 25 Integrated Automation | N/A | $0.00 |
| Division Item 26 Electrical | N/A | $0.00 |
| Division Item 27 Communications | N/A | $0.00 |
| Division Item 28 Electronic Safety & Security | N/A | $0.00 |
| Site & Infrastructure Subgroup | ||
| Division Item 31 Earthwork | N/A | $0.00 |
| Division Item 32 Exterior Improvments | N/A | $0.00 |
| Division Item 33 Utilities | N/A | $0.00 |
| Division Item 34 Transportation | N/A | $0.00 |
| Division Item 35 Waterway & Marine Construction | N/A | $0.00 |
| Process Equipment Subgroup | $0.00 | |
| Division Item 40 Process Interconnections | N/A | $0.00 |
| Division Item 41 Material Processing & Handling Equipment | N/A | $0.00 |
| Division Item 42 Process Heating, Cooling, & Drying Equipment | N/A | $0.00 |
| Division Item 43 Process Gas & Liquid Handling | N/A | $0.00 |
| Division Item 44 Pollution & Waste Control Equipment | N/A | $0.00 |
| Division Item 45 Industry Specific Mfg. Equipment | N/A | $0.00 |
| Division Item 46 Water & Wastewater Equipment | N/A | $0.00 |
| Division Item 48 Electrical Power Generation | N/A | $0.00 |
TOTAL DIVISIONS $0.00
| Insurance / Bonds | $0.00 |
| Taxes / Other Fees (provide itemized list) | $0.00 |
| O&M Manuals and Red Line Drawings | $0.00 |
| Overhead | $0.00 |
| SubContract Mark-Up | $0.00 |
| Profit | $0.00 |
| SubTotals | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00
| CONTRACT TOTALS | $0.00 | |
| TOAL | $0.00 |