36C25726R0024_1.docx
DOCX document 124 KB Posted
- Attached to
- Z2NB--674-23-255 NRM Improve RO-DI Recirculation
- Solicitation number
- 36C25726R0024
About this file
This is a Request for Proposal (RFP) for construction services to improve the Reverse Osmosis Deionization (RO-DI) recirculation system at the Olin E. Teague Veterans Medical Center in Temple, Texas. The project is 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns and has an estimated value between $1,000,000 and $2,000,000. The contractor must provide all labor, supervision, materials, and equipment to demolish and replace existing plumbing fixtures, lines, tanks, and related systems across three floors of building 163. The work includes reconfiguration of electrical, mechanical, plumbing, and other systems, with the new RO system producing a minimum of 4 gallons per minute. The project must be completed within 180 calendar days after Notice to Proceed, with phased work conducted one floor at a time to minimize disruption to the 24/7 healthcare facility. Performance and payment bonds are required within 10 calendar days of award. The principal NAICS code is 238220 (Plumbing, Heating, and Air-Conditioning Contractors).
Proposals are due March 12, 2026, by 9:00 AM CDT and must be submitted via email in four separate volumes: Technical Acceptability (5 pages maximum), Past Performance (40 pages maximum), Price, and Solicitation/Offer documents. A mandatory site visit is scheduled for February 17, 2026, at 9:30 AM CST at Engineering Building 46E. Requests for Information are due February 23, 2026, by 8:00 AM CST. The contractor must provide a superintendent who cannot be subcontracted, obtain a Contractor Quality Control Plan approved within 30 days of Notice to Proceed, submit a Safety Plan within 15 days, and furnish Operations and Maintenance manuals, training (two formal sessions), and a minimum 3-year warranty. Evaluation will prioritize past performance over price, with offerors requiring an Experience Modification Rating (EMR) of 1.00 or less to be considered technically acceptable. The government will make award based on the highest past performance rating with lowest price approach among those receiving a substantial confidence rating. Invoicing must be submitted through the Tungsten Network system, with monthly payments in arrears.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25726R0024 0004.docx | DOCX document | |
| 36C25726R0024 0003.docx | DOCX document | |
| 36C25726R0024 0002.docx | DOCX document | |
| Consolidated RFI for 26R0024.docx | DOCX document | |
| Site visit sign in sheet_02252026.pdf | ||
| 36C25726R0024 0001.docx | DOCX document | |
| Attachment 4 PCRA.pdf | ||
| Attachment 1 Specifications.pdf | ||
| Attachment 6 Site Visit map.pdf | ||
| Attachment 5 Price Breakout.xlsx | XLSX spreadsheet | |
| Attachment 3 ICRA.pdf | ||
| Attachment 2 Drawings.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C25726R0024 X 01-16-2026
TBA
674-23-255 Department of Veterans Affairs Network Contracting Office NCO17 1901 Veterans Memorial Dr. Building #171 Temple TX 76504 Department of Veterans Affairs Network Contracting Office NCO17 1901 Veterans Memorial Dr. Building 171 Temple TX 76504 Eileen Myers 254-987-0201
This is a Request for Proposal (RFP) for Project 674-23-255 Improve RO-DI (Reverse Osmosis Deionization Recirculation Description: Project 674-23-255 Improve Reverse Osmosis Deionization Recirculation (RO-DI) System.
Place of Performance: Olin E Teague VAMC 1901 Veterans Memorial Drive, Temple, TX 76504
The Contractor shall provide all labor, supervision, materials, equipment, to complete all required project work in accordance with the provided Statement of Work (SOW), specifications, and drawings.
The magnitude of the construction project is between $1,000,000 and $2,000,000. In accordance with VAAR 836.204.
The applicable NAICS 238220 Plumbing, Heating, and Air-Conditioning Contractors.
This solicitation is 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside.
In accordance with FAR 28.102-1(a) performance and payment bonds are required.
Site Visit shall be held on February 17, 2026, @ 09:30AM CST. All interested contractors shall meet at the Engineering Building 46E (see attached site map). Garrett Cooper, COR will be your POC.
Request for Information (RFI(s) due: February 23, 2026, @ 08:00AM CST. All RFI(s) must be in word format, and sent via email to Eileen.Myers@va.gov and Rhonda.Richardson5@va.gov.
Proposals due: Send all proposals via email to Eileen.Myers@va.gov., and Rhonda.Richardson5@va.gov Include the solicitation no. and title on the subject line:36C25726R0024 Improve RO-DI Recirculation.
Awardee will be required to provide a Superintendent at all times work is being performed on the projects in accordance with FAR Clause 52.236-6. The Superintendent is considered a key position and SHALL NOT be subcontracted and must work directly for the prime contractor.
X X 52.211-10 X 09:00
CDT
03-12-2026 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building 171 Temple TX 76504 This is accomplished through the Tungsten Network located at:
http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.
(877) 353-9791
(512) 460-5540
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| A.3 PRICE/COST SCHEDULE | 5 |
| ITEM INFORMATION | 5 |
| STATEMENT OF WORK | 5 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 12 |
| A.4 INSTRUCTIONS TO OFFERORS | 12 |
| PROPOSAL PREPARATION INSTRUCTIONS | 12 |
| EVALUATION FACTORS FOR AWARD | 15 |
| FAR DEVIATION FEB 2025 Instructions: | 19 |
| INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-75) | 20 |
| 2.1 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION) | 21 |
| 2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION) | 21 |
| 2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 21 |
| V.T.C.A. Tax Code §151.311 | 22 |
| 52.233-2 Service of Protest (DEVIATION NOV 2025) | 23 |
| 2.4 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION) | 23 |
| 2.5 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 27 |
| (End of Provision) | 28 |
| REPRESENTATIONS AND CERTIFICATIONS | 28 |
| 3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 28 |
| 3.2 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021) | 29 |
| GENERAL CONDITIONS | 31 |
| 4.1 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025) | 31 |
| 4.2 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022) | 34 |
| 4.3 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION) | 39 |
| 4.4 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 49 |
| 4.5 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020) | 49 |
| 4.6 SUPPLEMENTAL INSURANCE REQUIREMENTS | 49 |
| 4.7 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 50 |
| WAGE DETERMINATION | 54 |
| ATTACHMENTS | 62 |
| SOLICITATION DESCRIPTION | 62 |
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
The Contractor shall provide all labor, supervision, materials, equipment, to complete all required project work in accordance with the provided Statement of Work (SOW), specifications, and drawings.
PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: Z2NZ - Repair or Alteration of Other Utilities
| 1.00 |
| EA |
| __________________ |
| __________________ |
Performance and Payment Bonds
| GRAND TOTAL |
| __________________ |
STATEMENT OF WORK
Statement of Work Improve RO-DI Recirculation Project # 674-23-205
PROJECT OVERVIEW
1.1 PURPOSE: The Contractor shall provide all labor, material, equipment and testing services as required to construct project Improve RO-DI Recirculation in accordance with all Contract Documents. The project is located in the basement, first, and second floor of building 163 at the Olin E. Teague Veterans’ Medical Center located at 1901 Veterans Memorial Drive, Temple, Texas 76504.
This project shall demo and replace all plumbing fixtures, lines, tanks, etc. that are related to the existing RO-DI System. The project is multi-phased, taking place on three floors of building 163.
The project will include the reconfigurations of the electrical, mechanical, plumbing, and other systems as called for in the Construction Documents.
SCOPE OF WORK
2.1 GENERAL: This project will improve the RO-DI recirculation lines from the basement floor to the second floor of the main clinical building (163). The current RO system shall be replaced with a new, like RO system that produces a minimum of 4 gallons per minute. Since this is a 24-hours 7 days a week healthcare facility, some elements of the work shall require after-hour and weekend work. The work will need to be phased and completed one floor at a time.
Work shall include:
The base portion of the project will include all labor, material, equipment and supervision to perform the task described in the construction documents. A site visit is highly encouraged prior to bidding.
Normal hours of operation for VA sites are 8:00AM to 4:00 PM Monday through Friday except for Federal Holidays. If the Contractor desires to work on Saturday, Sunday, holidays, or outside the project site’s normal working hours the contractor must submit a written request for approval to the VA-COR at least five (5) working days prior to the proposed start of such work.
2.2 DESCRIPTION OF WORK
A. Existing Conditions
a. Before disabling any of the following systems, the contractor needs to coordinate with COR at least 10 working days in advance. Contractor shall be responsible for relocating and temporary installing all utilities and controls, including, but not limited to, telephone, data, electrical, emergency power, AV alarms, smoke detectors, sprinklers heads, card readers, isolation monitor, etc. It is the contractor’s responsibility to immediately repair any tampered with system at no additional cost to the government.
b. Contractor will coordinate all work with existing work to remain and existing conditions.
c. Contractor shall be responsible for complying with all the construction documents and applicable Department of Veterans Affairs Master Specifications as part of this project.
d. Contractor must also comply with all applicable city, county, state, and federal regulations / codes and applicable OSHA standards project. Construction shall also comply with Infection Control Risk Assessment (ICRA), attached, and IC standards delineated in the specifications.
e. Demolition and renovation shall take place with minimal disruption to adjacent workspaces.
f. Demolition debris shall be recycled to the best ability of the contractor. Reports of weight and deposition of all waste are to accompany the monthly progress payments (C&D Waste Form attached). Form also included in corresponding specification.
g. Any item damage during removal is the contractor’s responsibility to replace with no additional cost to the government.
h. All work shall be in accordance with VA specifications. All costs shall be included in the base bid. All work shall be coordinated with the VA prior to any demolition work being performed.
i. There will be no contractor parking allowed outside of designated areas and the contractor’s limits of construction.
j. All work shall be in accordance with VA specifications. All costs shall be included in the base bid. All work shall be coordinated with the VA prior to any demolition work being performed.
B. Additional Requirements
a. Housekeeping - Accumulation of trash, paper, wood shavings, sawdust, excelsior, boxes and other packing materials will be cleaned up as often as necessary and at the end of each workday.
b. False Alarms – Fire Department response fees for false alarms caused by the contractor will be paid by the contractor. To avoid this, dust covers for smoke detectors and alarms are required to be used while construction work is ongoing. These covers shall be removed at the end of the construction work shift to keep them operational.
c. Fire Watch - Provide fire watch for impairments more than 4 hours in a 24-hour period. Request interruptions in accordance with Article, OPERATIONS AND STORAGE AREAS, and coordinate with COR and facility safety officer. All existing or temporary fire protection systems (fire alarms, sprinklers) located in construction areas shall be tested as coordinated with the medical center. Parameters for the testing and results of any tests performed shall be recorded by the medical center and copies provided to the COR.
d. Smoking is strictly prohibited in all facilities, near flammable liquids, highly combustible materials. Smoking is only authorized in designated smoking areas.
e. Security – Contractors will wear security badge in plain sight above the waist at all times. Contractors found without a badge will be immediately removed from VA property by VA Police.
f. Parking - There will be no contractor parking allowed outside of designated areas and the contractor’s limits of construction.
g. Tuberculosis (TB) – Contractor is responsible for ensuring that if contracted construction worker(s) have been determined to be at risk for transmission of TB based upon the TB pre-construction risk assessment. The contractor must provide written certification, within 24 hours upon request, to the COR that all contract employees assigned to the work site have had a pre-placement tuberculin screening within 90 days prior to assignment to the work site and been found to be free of active TB. Refer to the contract documents for this requirement.
h. Infection Control and Prevention (ICP) - Contractor is to comply with all infection control requirements including particulate counts every 8 hours, 7 days a week at the HEPA filter discharge.
i. Invoicing-Submit the proper documentation and reports to receive payment on this service. See information below:
Payment to be made monthly, in arrears, following satisfactory performance by Contractor’s personnel and upon receipt of a properly prepared invoice. Contractor shall be required to invoice through the Tungsten System at http://www.tungstennetwork.com/us/en/veterans-affairs/. Additional information regarding Tungsten shall be provided upon award. The contract shall have current registration in the System for Award Management (SAM) for this solicitation; URL: www.sam.gov. The invoice MUST be itemized to include the following information. Any information listed below, and not provided on an invoice, will render that invoice incomplete and the invoice will be returned for immediate correction:
| 1. Time period being invoiced for |
| 2. Description of services performed. |
| 3. Unit Cost billed. |
| 4. Extended amount due. |
| 5. Invoice number, date, and |
| 6. Contract and obligation numbers. |
j. Government Holidays:
a. The Government hereby provides notice, and Contractor hereby acknowledges receipt that Government personnel observe the listed days as holidays:
New Year's Day January 1st Martin Luther King's Birthday Third Monday in January Washington’s Birthday Third Monday in February Memorial Day Last Monday in May Juneteenth June 19th Independence Day July 4th
| Labor Day |
| First Monday in September |
| Columbus Day |
| Second Monday in October |
| Veterans Day |
| November 11th |
| Thanksgiving Day |
| Fourth Thursday in November |
| Christmas |
| December 25th |
j. All construction and installation work shall comply with VA specifications for material and workmanship, NEC, NFPA and all applicable city, county, state, and federal regulations and codes and OSHA standards. Refer construction drawings and specs for requirements.
k. All incidental work associated with the installation and construction works in the exterior and interior of the building shall be included in the base bid.
l. Conduct work as to interfere as least as possible with facility operations. All coordination for utilities shutdown shall be coordinated at least 72 hours prior to event with COR. For major utility system shutdowns, coordination shall be done at least 2 weeks in advance.
m. Construction sign and copy of IC permit shall be posted in the project site at all times. All IC and dust control measures shall be implemented at all times. All construction workers shall have a current IC training sticker attached to their badges at all times. If this requirement is not met, workers will be removed from construction site. Refer to construction documents for additional information.
n. All fire and smoke wall penetrations shall be fireproofed according to corresponding wall rating. These shall be through a sleeve and sealed with fire barrier compound to be approved by VA.
2.3 OTHER DELIVERABLES
A. Period of Performance: 180 calendar days after Notice to Proceed B. Performance and Payment bonds: Due 10 Calendar days after Notice of Award C. Proof of Insurance: Due 10 Calendar days after Notice of Award D. Contractor Quality Control Plan (CQCP): The contractor shall develop a quality control plan and shall furnish to VA for review no later than 30 calendar days after the receipt of notice to proceed. The plan shall identify personnel, procedures, control, instructions, tests, records, and forms to be used. VA will consider an interim plan for the first 45 calendar days of operation. Installation will be allowed to begin only after acceptance of the CQCP or acceptance of an interim plan applicable to the particular feature of the work to be started. Work outside of the features of the work included in an accepted interim plan will not be permitted to begin until acceptance of a CQCP or another interim plan containing the additional features of the work to be started. After acceptance of the CQCP, the Contractor shall notify the Contracting Officer Representative (COR) in writing of any proposed change. Proposed changes are subject to acceptance by the Contracting Officer.
E. Safety Plan: Contractor shall develop and implement a Comprehensive safety plan to eliminate injuries occurring relative to providing the design and installation services for this project. Contractor shall furnish to VA for review no later than 15 calendar days after the receipt of notice to proceed. The plan shall also describe how final system installation will meet all applicable requirements of NFPA30 and NFPA30A. Construction/Renovation work will be allowed to begin only after VA’s acceptance of the Safety Plan. Contractor is responsible for providing enough project lead time to allow for VA review of Safety Plan before acceptance. The Department of Labor OSHA requires that all Contractors involved in installation on VA owned or leased property comply with the Incorporation of General Industry Safety and Health Standards applicable to Installation Work and Technical Amendments, Final Rule 29 CFR Parts 1910 and 1926 as published in the Federal Register Volume 58, No. 124, June 30, 1993. In addition, any Contractor that performs construction type work on any VA project as defined by the Scope of the referenced regulation is required to; (1) Provide and maintain his own protective equipment and devices, etc; and (2) Require all sub-contractors used on site to follow these same provisions in the regulation.
F. Submittals CD: As part of the closeout documentation, the contractor shall provide the COR, 3 CDs containing all the approved submittals.
G. Operations and Maintenance Manuals (O&M): The Contractor shall provide three (3) complete sets of O&M manuals including a recommended spare parts list identifying components adequate for competitive supply procurement for operation and maintenance of the system. The O&M Manuals shall include maintenance and inspection for all equipment. A three-ring binder containing all of the O&M and electronic files on CD-ROM shall be provided within the binder.
H. Submittals CD: As part of the closeout documentation, the contractor shall provide the COR, 4 CDs containing all the approved submittals.
I. Operations and Maintenance Training: The Contractor shall provide on-site O&M training for the location which will consist of two (2) formal on-site training sessions during a 30 day period to including but not limited to system operation, corrective and preventive maintenance and inspections.
The contractor shall provide training manuals that include the hands-on exercises, O&M data and troubleshooting guides necessary for personnel to assume full O&M responsibility for the system after completion of the training. The contractor shall provide a written training syllabus for the topics and detailed training content for review and approval by the COR at least 30 days prior to the scheduled training. The contractor will coordinate with the COR the scheduling of any training classes in advance. The COR may require the classes to be provided on non-consecutive days at the convenience of the VA Staff. The Contractor shall video tape this training for official use and forward CD (3 copies) including those training videos.
J. Warranty: Contractor shall provide a minimum three (3) year warranty, unless specified otherwise in the specs, from both the manufacturer and installer including parts and labor to include normal, premium or holidays hours. The Warranty period shall start on the date of Substantial Completion.
2.4 ACCEPTANCE
A. For the purposes of Warranty and payment for the work performed at a location, government “Acceptance” will be provided by the VA upon the completion of all of the following:
a. The Contractor has demonstrated/ verified that the implemented ECMs function as intended at commissioning. All punch list items identified during the commissioning have been resolved.
b. The Contractor has provided O&M manuals.
c. The Contractor has provided Record drawings to include a CD with all as builds CAD files, one full set, one half set and one Mylar full set.
2.5 CONFIDENTIALITY AND NONDISCLOSURE
A. The preliminary and final deliverables and all associated working papers, application source code, and other material deemed relevant by the VA which has been generated by the contractor in the performance of this Order are the exclusive property of the U.S. Government and shall be submitted to the VA-COR at the conclusion of the contract.
B. The Contracting Officer will be the sole authorized official to release verbally or in writing, any data, the draft deliverables, the final deliverables, or any other written or printed materials pertaining to this contract. No information shall be released by the contractor. Any request for information relating to this contract presented to the contractor shall be submitted to the CO for response.
C. Press releases, marketing material or any other printed or electronic documentation related to this project, shall not be publicized without the written approval of the CO.
D. To the extent that the work under this contract requires that the contractor be given access to proprietary business, technical or financial information belonging to the Government or other companies, the contractor shall treat such information as proprietary business sensitive and agrees not to appropriate such information to its own use or to disclose such information to third parties unless specifically authorized by the CO in writing. A mutually agreed to agreement for exchange of sensitive information or nondisclosure agreement may be required.
E. General Requirements for Privacy Information:
· Information Systems Officer, Information Protection: The contractor will not have access to VA Desktop computers, nor will they have access to online resources belonging to the government while conducting services.
· Privacy Officer: The contractor will not have access to Patient Health Information (PHI) nor will they have the capability of accessing patient information during the services provided to the VA.
· Records Manager: There will be no federal records created, maintained, used or dispositioned with this contract; regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.].
End of Section
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
A.4 INSTRUCTIONS TO OFFERORS
PROPOSAL PREPARATION INSTRUCTIONS
1. Introduction: These instructions prescribe the format of proposals along with the development and presentation of the proposal data. These instructions are designed to ensure the proper submission of information necessary to provide for comprehensive evaluation of proposals. Offerors shall carefully review this section prior to commencing proposal preparation and take the necessary measures to ensure that the information submitted is factual, accurate, and complete.
2. Notice: For a proposal to be considered, offerors must strictly comply with all instructions outlined in this solicitation. Furthermore, all solicitation amendments (if any) must be acknowledged in accordance with FAR Clause 52.215-1- Instructions to Offerors. Failure to furnish proposals that comply with all instructions and include complete copies of required documents, at the predetermined due date for submission, shall result in elimination from consideration for the award.
3. Submission instructions: Offers must be submitted by email to the Contracting Officer, Rhonda Richardson, by email at Rhonda.richardson5@va.gov and Contract Specialist, Eileen Myers, by email Eileen.Myers@va.gov Proposals may not be submitted by fax. Offers must be submitted on or before the due date and time listed on page one, block thirteen.
Proposals must be submitted in four volumes:
a. Technical Acceptability-Vol. I
b. Past Performance-Vol. II
c. Price-Vol. III
d. Solicitation, Offer, & Award Documents-Vol. IV
Offerors may submit their proposals in one to four emails. Volumes I through IV must be submitted as separate, searchable PDFs. Each volume must be submitted as attachments to their submission email(s). Proposals submitted by any other method, including hyperlinks or drop boxes, will not be considered. The subject of each email shall be in the following format, specifying which volume(s) are included: “36C25726R0024 NRM Improve RO-DI Recirculation, Project 674-23-255”– Company Name, Volume I”. Each email must clearly indicate how many total emails the Offeror will be sending.
4. Format Instructions: Proposals must be clearly indexed and logically assembled. Each volume must have a clear title at the top of the first page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date, and solicitation number in the header and/or footer.
Proposal page limitations are applicable to this procurement. The table below indicates the maximum page count for each volume:
| Volume Number |
| Factor |
| File Name |
| Page Limitations |
| Volume I |
| Technical Acceptability |
| Tech.pdf |
| 5 pages |
| Volume II |
| Past Performance |
(One Sanitized Copy)
| Past Perf.pdf |
| 40 pages |
| Volume III |
| Price/Cost |
| Price.docx |
| Complete A.3, Price/Cost Schedule for Project Pricing |
| Volume IV |
| Solicitation, Amendments, Offer & Award Documents, Certifications & Representations |
| OfrRep.pdf |
| None |
If the Offeror submits annexes, documentation, attachments, or the like, such will count against the Offeror’s page limitations unless otherwise indicated in this solicitation. The page count will be determined by counting the pages in the order they come up in the print layout view. Pages in violation of these instructions, including those that exceed the total page limit for a particular volume, will not be evaluated. Proposals must be in at least 12-point font and have at least 1” margins.
If an offeror includes a table of contents or a glossary of terms or abbreviations, those pages will not be included in the page count of that volume. However, substantive information included in the table of contents or glossary pages will not be considered.
1. Content Instructions: Information must be confined to the appropriate volume. The Offeror shall confine submissions to essential matters sufficient to define the proposal and provide an adequate basis for evaluation. Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of each proposal. All proprietary information shall be clearly and properly marked.
2. Volume Specific Submittal Instructions:
a. Volume I – Technical Acceptability: Provide proof of Experience Modification Rating (EMR). Each Offeror shall provide their current EMR, or verifiable equivalent, from their insurance company or from their state, based on the offeror’s state of incorporation’s EMR requirements. The Government will consider the most recent timeframe corresponding to the Offeror’s insurance coverage period. If an offeror submits an EMR older than 12 months, using a three-year average at the time of proposal submittal, that offer shall be deemed unacceptable and cause the offeror to be removed from competition. An EMR less than or equal to 1.00 will be considered technically acceptable. If the NCCI cannot issue an EMR because the Offeror lacks insurance history, the Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that it has assigned Offeror a Unity Rating of 1.0
b. Volume II – Past Performance (also provide a sanitized copy)
i. Sub-Factor 1: Past Performance Project History
1. Offerors are encouraged to submit information relating to up to three projects, each with a minimum value of $1 million, that have been completed or is in the process of completing within the last three (3) years. If submitting such information, offerors must provide a detailed summary of these projects, including:
a. Owner Government Agency/Company who awarded contract
b. Location (physical address)
c. Project Name
d. Project Description (Details of construction renovation requirements, challenges, and solutions)
e. Project Cost and Cost Control Measures (original and final contract costs, contract mods, cost containment measures, value engineering, etc.)
f. Project Performance Period (Initial/Actual, schedule impacts and efficiencies)
g. Owner POC (Name, Title, Telephone Number, Email)
h. Subcontractors (Roles, Responsibilities, Percent of work)
i. A narrative description of the project that includes whether the project involved work is on campus. The narrative must also address the complexity and magnitude of the project, any challenges faced and how the offeror responded to those challenges, whether the project stayed on schedule, whether any unforeseen site conditions were encountered, any other unusual factors, and the degree of success obtained. Offerors are encouraged to include supporting documents such as photographs that support the narrative.
c. Volume III – Price: Complete Price/Cost Schedule
(1) Complete the price offer schedule in section A.3
(2) Price shall be addressed using the attached price breakdown worksheet, which is included in Attachment 5.
(3) Provide supporting documentation showing quotes/price breakdowns for both prime and subcontractors.
NOTE: Price breakdown shall be indicative of showing at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns in accordance with VAAR 852.219-73(d)(3).
d. Volume IV - Solicitation, Offer, & Award Documents-Vol. IV
i. Certifications and Representations. An authorized official of the offeror shall sign the SF 1442 and all certifications requiring original signature. Volume IV must contain the following:
1. Solicitation Section A – Standard Form SF 1442 and Acknowledgement of Amendments, if any.
2. Any proposed exceptions to solicitation terms and conditions. Any Offeror-imposed terms and conditions which deviate from the Government’s material terms and conditions established by the Solicitation, may render the Offeror’s proposal Unacceptable and thus ineligible for award.
3. Completed and signed 852.219-75, VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction.
4. Any offeror submitting a proposal as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture:
a. have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR § 128.402; and
b. will perform the contract in compliance with the joint venture agreement. Failure to submit the certification with the offeror’s proposal will render the offeror ineligible for award.
5. Self-Performed Work Calculation Worksheet
6. Bid bond - The Offeror must furnish a bid guarantee (see FAR 52.228-1). The bid guarantee must be provided on SF 24. The offeror shall ensure all bonding comes from the Bureau of the Fiscal Service (BFS), Surety Bonds, List of Certified Companies found at: https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html. In addition, at time of award offeror shall provide performance and payment bonds IAW FAR 28.102-1(a) for the proposed amount of the project.
SDVOSB Certification: Offerors are required to be SDVOSB certified with the Small Business Administration (SBA). Offerors must register their businesses at MySBA Certifications, https://certifications.sba.gov/. Verification of the offerors’ SDVOSB certification will be conducted using SBA Small Business Search, https://search.certifications.sba.gov/. Offerors must have an active registration in the System for Award Management (SAM), including completed and annually validated representations and certifications. Verification of offerors active SDVOSB registration will be conducted using SAM.gov.
EVALUATION FACTORS FOR AWARD
1. Source Selection Process Overview. All proposals shall be subject to evaluation by a team of Government personnel. Proposals will be evaluated strictly in accordance with their written content. Subjective judgment by the government is implicit in the evaluation process.
a. The Government will first review proposals to determine whether they are complete and comply with the instructions set forth in this solicitation. The Government will eliminate all proposals that were submitted late and not subject to an applicable exception, fail to comply with all instructions, or are incomplete. A complete proposal is one that includes all required information and documentation, including any applicable representations, forms, or clauses requiring information or signatures from offerors. Proposals which merely restate a requirement or state that a requirement will be met, without providing supporting rationale, will be deemed incomplete and not considered.
b. Next, the Government will evaluate each remaining offeror’s Volume I Technical Capability. The Government will eliminate any proposals that are not technically acceptable.
c. The Government will then conduct a tradeoff process with all remaining offerors. The Government will consider Volume II Past Performance and Volume III Price in this tradeoff process. In using this source selection process, the Government intends to make an award based on which offeror provides the best value to the Government considering and comparing the past performance and price of each remaining offeror. Past Performance is significantly more important than price in this process.
d. The Highest Past Performance Rated, Lowest Price approach will best achieve the objective of awarding a contract with expertise and qualities that are most important to VISN 17. The Government will make an award to the contractor that obtains a substantial confidence rating for the past performance factor. The Government reserves the right to award to a contractor who obtains a satisfactory confidence if deemed necessary.
e. The Government will strictly enforce all the proposal submission requirements outlined in the solicitation. Failure to comply with these requirements will result in an Offeror's proposal being rejected as being incomplete or non-conforming to solicitation requirements.
f. A contract will be awarded to the offeror who presents the best value to the Government considering Past Performance and Price.
2. Evaluation Factors
a. Technical Acceptability-EMR Experience Modification Rating (EMR)
i. The Offeror shall provide their current EMR. Any EMR older than 12 months, at the time of proposal submittal shall be deemed unacceptable and cause the offeror to be removed from competition. An EMR less than or equal to 1.00 is considered Technically Acceptable.
ii. The Offeror shall provide their EMR or verifiable equivalent, from their insurance company or from their state, based off the offeror’s state of incorporation’s EMR requirements. The EMR, or equivalent, shall be newer than 12 months, at time of proposal receipt. It is understood that EMRs may have a future forecasted start date due to how the company who generates EMRs assigns EMRs. As such, EMRs provided with a future start date will be deemed acceptable, if an EMR is not more than three months from the date of solicitation close date. A letter that states there isn’t enough work experience to have EMR will automatically constitute a numbered rating of “1.0”. Any stated equivalents shall be explained thoroughly to the Government. A lack of sufficient detail may deem this Factor as “Unacceptable”.
iii. Any Offeror who receives a rating of Unacceptable as part of the technical acceptability review will be eliminated from consideration for award.
b. Past Performance
i. The Government will assess the relative risks associated with an Offeror's likelihood of success in fulfilling the solicitation's requirements as indicated by that Offeror's record of past performance. In this context, “Offeror” refers to the proposed prime contractor. A joint venture will be assessed on the combined performance of each or as a team of the joint venture offerors.
ii. The Government will conduct a performance risk assessment based on the quality, relevancy, and recency of the Offeror's past performance, as well as that of its major subcontractors, as it relates to the probability of successful accomplishment of the required effort. Offerors are cautioned that the Government will review available past performance data available in the Contractor Performance Assessment Reporting System (CPARS). The Government reserves the right to consider past performance information from any available source and may contact customers other than those identified by the Offeror when evaluating past performance. Since the Government may not necessarily interview all the sources provided by the Offerors, it is incumbent upon the Offerors to explain the relevance of any data provided. Offerors are reminded that the burden of proving low performance risk rests with the Offerors.
Per FAR 15.202(c)(1), “in the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance.”
The Government intends to use the following rating system to guide its analysis:
Past Performance Rating Key
| Rating |
| Definition |
| Substantial Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort. |
| Satisfactory Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort. |
| Limited Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has little expectation that the offeror will be able to successfully perform the required effort. |
| No Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has no expectations that the offeror will be able to successfully perform the required effort. |
| Unknown Confidence (Neutral) |
| No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. |
The Government intends to use the following rating system to guide its evaluation of the relevance of past performance information:
Past Performance Relevancy Rating Key
| Rating |
| Definition |
| Very Relevant |
| Present/Past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires. |
An example would be a renovation construction project $1M or greater, with the VA on campus (internal/external). *Note, $1M is used as a benchmark based off the project’s magnitude Between $1,000,000 and $2,000,000.
| Relevant |
| Past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires. |
An example would be a plumbing/RO-DI project $1M or greater, with other Government agencies on campus. (internal/external).
| Somewhat Relevant |
| Past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires. |
An example would be a plumbing/RO-DI project worth less than $1M on campus. (internal/external).
| Not Relevant |
| Past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires. |
An example would be a plumbing/RO-DI project less than $1M not on campus.
c. Price: Fixed Price. The Government will evaluate offers by adding the total of all line-item prices. The Total Evaluated Price will be that sum. The Government will evaluate the total proposed price of all Offerors who are not eliminated after the tradeoff process stage as an indicator of the value the Offeror will provide on project. The Government will also evaluate the Total Evaluated Price to determine whether proposals are fair and reasonable. Price to determine whether proposals are fair and reasonable. Offerors are advised that an offeror who is not found to have at least an overall Satisfactory Confidence for Factor 2 Past Performance, will not be evaluated for fair and reasonable pricing.
FAR DEVIATION FEB 2025 Instructions:
“System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.”
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-75)
OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS
At the time of proposal Offeror’s are required to complete.
a) Offeror’s total proposed price: $ __________
b) Cost of Materials : $ __________
c) Total excluding materials (a-b) $___________
d) Amount projected to be paid on Non-VetCert (SBA.gov) SDVOSBs $__________ (not including materials)
e) Offeror’s percentage of estimated Non-VetCert work (d/c X 100 = %) _________%
f) Offeror’s percentage of estimated self-performed work (100 – e = %) _________%
A/E-Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed VOSBs.
General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
Special trade contractors. In the case of a contract for special trade contractors, it will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSB.
2.1 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION) (a)(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror must request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
V.T.C.A. Tax Code §151.311 Offerors are hereby notified that in accordance with V.T.C.A., Tax Code §151.311, the purchase of tangible personal property for use in the performance of a contract for an organization exempted under Section 151.309 or 151.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .