Attachment 2 Drawings.pdf
PDF 21 MB Posted
- Attached to
- Z2NB--674-23-255 NRM Improve RO-DI Recirculation
- Solicitation number
- 36C25726R0024
About this file
This document is a set of 100% construction documents for a federal project at the Olin E. Teague Veterans Medical Center in Temple, Texas. The project, designated VAMC Project #674-23-255, involves improving the reverse osmosis-deionized (RO-DI) water recirculation system in Building 163. The construction documents are prepared by Valhalla Engineering Group LLC, located at 750 W Hampden Ave, Suite 300, Englewood, CO 80110, with a document date of September 25, 2024.
The scope of work encompasses structural, architectural, plumbing, mechanical, and electrical systems across basement and three occupied levels. Key elements include demolition of existing RO-DI equipment and piping, installation of new water treatment equipment (RO and DI systems with storage tanks approximately 9,000 lbs filled capacity), relocation of compressors, new ductwork and piping distribution to multiple laboratory and surgical areas, and electrical power connections. The project is divided into six construction phases coordinated to minimize disruption to ongoing facility operations, with work scheduled primarily for weekends and nights (Friday 5 PM through Sunday 8 AM). New structural columns and floor slab reinforcement using carbon fiber polymer are specified for Level 1. Temporary construction barriers and infection control measures are required throughout. The plumbing design includes connection schedules for 17 pieces of equipment requiring RO water at varying connection sizes from 3/4-inch to 2.5-inch diameter. The electrical work provides new dedicated 20-amp circuits for the RO/DI system with BAS (Building Automation System) monitoring and control integration. General contractor responsibilities include equipment removal coordination, site-specific shop drawing submission, special inspection compliance, and means and methods planning subject to VHA Contracting Officer Representative approval.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25726R0024 0004.docx | DOCX document | |
| 36C25726R0024 0003.docx | DOCX document | |
| 36C25726R0024 0002.docx | DOCX document | |
| Consolidated RFI for 26R0024.docx | DOCX document | |
| Site visit sign in sheet_02252026.pdf | ||
| 36C25726R0024 0001.docx | DOCX document | |
| Attachment 4 PCRA.pdf | ||
| Attachment 6 Site Visit map.pdf | ||
| Attachment 5 Price Breakout.xlsx | XLSX spreadsheet | |
| Attachment 3 ICRA.pdf | ||
| Attachment 1 Specifications.pdf | ||
| 36C25726R0024_1.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA OF WORK
P la n N or th
True North
BUILDING 163
BUILDING 163
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
A ut od es k D oc s:
//2 4.
_T em pl e_ T
X _R ec irc ul at io n/
.0
1_ A
R C
H _R
.r vt 9/
/2
3:
:0
P M
GI001
COVER IMPROVE RO-DI RECIRCULATION
1901 VETERANS MEMORIAL DRIVE, TEMPLE TEXAS
674-23-255
RL AV
100% CONSTRUCTION
DOCUMENTS
VEG 24.01
OLIN E. TEAGUE VETERANS MEDICAL CENTER
1901 VETERANS MEMORIAL DRIVE, TEMPLE TEXAS
VAMC PROJECT #: 674-23-255
IMPROVE RO-DI RECIRCULATION
SHEET NUMBER SHEET NAME
GENERAL
GI001 COVER
GI002 GENERAL ABBREVIATIONS, NOTES, & SYMBOLS
GI111 EQUIPMENT REMOVAL PATH - LEVEL 1
GI112 PHASING PLAN
STRUCTURAL
S-001 GENERAL NOTES
S-601 STRUCTURAL SPECIAL INSPECTIONS SCHEDULE
SB100 FOUNDATION PLAN
SB101 FLOOR SLAB PLAN - BASEMENT
SB111 FLOOR SLAB PLAN - LEVEL 1
SF501 FLOOR DETAILS
ARCHITECTURAL
A-001 ARCHITECTURAL ABBREVIATIONS, NOTES, & SYMBOLS
AD111 DEMOLITION PLAN - BASEMENT LEVEL
AD112 DEMOLITION PLAN - LEVEL 1
AD113 DEMOLITION PLAN - LEVEL 2
AD121 DEMOLITION REFLECTED CEILING PLAN - BASEMENT LEVEL
AD122 DEMOLITION REFLECTED CEILING PLAN - LEVEL 1
AD123 DEMOLITION REFLECTED CEILING PLAN - LEVEL 2
AE111 FLOOR PLAN - BASEMENT LEVEL
AE112 FLOOR PLAN - LEVEL 1
AE113 FLOOR PLAN - LEVEL 2
AE121 REFLECTED CEILING PLAN - BASEMENT LEVEL
AE122 REFLECTED CEILING PLAN - LEVEL 1
AE123 REFLECTED CEILING PLAN - LEVEL 2
AE611 DOOR SCHEDULE
PLUMBING
P-001 PLUMBING ABBREVIATIONS, SYMBOLS, & LEGENDS
PQ601 EQUIPMENT & FIXTURE SCHEDULES
PD111 DEMOLITION PLAN - BASEMENT
PD112 DEMOLITION PLAN - LEVEL 1
PD113 DEMOLITION PLAN - LEVEL 2
PP111 PIPING PLAN - BASEMENT
PP112 PIPING PLAN - LEVEL 1
PP113 PIPING PLAN - LEVEL 2
PI601 CONTROL DIAGRAMS
PK501 TYPICAL DETAILS
ELECTRICAL
E-001 ELECTRICAL ABBREVIATIONS AND GENERAL NOTES
E-002 ELECTRICAL SYMBOLS
ED111 DEMOLITION PLAN - LEVEL 1
EP111 POWER PLAN - LEVEL 1
EP601 POWER ONE-LINE DIAGRAM & PANEL SCHEDULE
EK501 TYPICAL DETAILS
SHEET INDEXRENDERED IMAGEAREA OF WORK
Number: Revision: Date:
0 100% CONSTRUCTION DOCUMENTS 09/25/2024
AVillarruel Snapshot
ROOM NAME
VIEW TITLE EXAMPLE
ELEVATION CALLOUT EXAMPLE
ENLARGED CALLOUT EXAMPLE
SECTION CALLOUT EXAMPLE
SECTION OR DETAIL SYMBOL IDENTIFIERS
DETAIL NAME
DRAWING NUMBER
DESIGNATOR ON SHEET
DRAWING SEQUENCE
NUMBER INDICATES
WHERE DRAWING IS
LOCATED
TWO CHARACTER
DISCIPLINE DESIGNATOR
AE101
TO OBJECT
CENTER
COLUMN
BUBBLE
ROOM TAG
MATCH LINE
DETAIL NUMBER
ON SHEET
SHEET NUMBER
DETAIL NUMBER
ON SHEET
SHEET NUMBER
NEW LINE TYPE
EXISTING LINE TYPE
DEMOLITION LINE TYPE
AREA OF DEMOLITION
VIEW NAME
1/8" = 1'-0"
F1
AE101
F1
AE101
F1
AS101
SYMBOLS LEGEND
F1
AE101
EXTERIORINTERIOR
## SHEET KEYNOTE
REVISION TAG
DRAWING SCALE
REFERENCE
KEYNOTE
DETAIL NUMBER
ON SHEET
SHEET NUMBER
######-A######-A
F1F1
TO OBJECT
FACE OR OTHER
GEOMETRY
F1
AE101
F1
AE101
NOT IN CONTRACT
PROPOSED TEMPORARY
CONSTRUCTION BARRIER
DETAIL NUMBER
ON SHEET
DETAIL / WALL SECTION
BUILDING SECTION
1-HR FIRE
2-HR FIRE
3-HR FIRE
4-HR FIRE
1-HR FIRE/SMOKE
2-HR FIRE/SMOKE
3-HR FIRE/SMOKE
4-HR FIRE/SMOKE
0-HR SMOKE 0.5-HR SMOKE
FIRE RESISTIVE RATED PARTITIONS
GENERAL ABBREVIATIONS
ABBREVIATIONS LISTED BELOW ARE GENERAL ABBREVIATIONS ACROSS ALL DISCIPLINES. DISCIPLINE SPECIFIC ABBREVIATIONS MAY SUPERSEDE GENERAL ABBREVIATIONS. REFER TO DISCIPLINE SPECIFIC ABBREVIATIONS SHEETS. A. WORK SHALL CONFORM WITH PROJECT SPECIFICATIONS.
B. CONTRACTOR SHALL BECOME FULLY ACQUAINTED WITH CONDITIONS
RELATED TO THE WORK. QUESTIONS WILL BE DIRECTED TO VHA COR.
C. CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR THE MEANS, METHODS
AND SEQUENCES OF CONSTRUCTION AND THE SAFETY OF CONSTRUCTION
PERSONNEL AND VISITORS.
D. DRAWINGS CONTAINED IN THIS SET SHALL NOT BE REPRODUCED FOR SHOP
DRAWINGS. COPIES OF THESE DRAWINGS SUBMITTED AS SHOP DRAWINGS
WILL BE REJECTED AND RETURNED TO THE CONTRACTOR. REFER TO
SPECIFICATION SECTION 01 33 23.
E. EXAMINE SUBSTRATE AND/OR CONDITIONS UNDER WHICH THE WORK WILL
BE INSTALLED AND REPORT TO THE VHA COR, IN WRITING, CONDITIONS
DETRIMENTAL TO THE PROPER AND TIMELY EXECUTION OF THEIR WORK. DO
NOT PROCEED UNTIL UNSATISFACTORY CONDITIONS ARE CORRECTED.
COMMENCING WITH INSTALLATION WILL CONSTITUTE ACCEPTANCE OF THE
SUBSTRATE AND/OR CONDITIONS.
F. DO NOT SCALE DRAWINGS: FOLLOW WRITTEN DIMENSIONS AND NOTES.
CONTACT VHA COR FOR CLARIFICATIONS, IF REQUIRED.
G. "TYPICAL", AS USED IN THESE DOCUMENTS, MEANS THAT THE CONDITION OR
DIMENSION IS REPRESENTATIVE OF, OR THE SAME, FOR SIMILAR
CONDITIONS THROUGHOUT.
H. IF THERE IS A DISCREPANCY BETWEEN SMALL SCALE AND LARGE SCALE
DRAWINGS, (PLAN, SECTION, & DETAIL DRAWINGS, ETC), CONTACT VHA CO
FOR CLARIFICATION.
I. IF THERE IS A DISCREPANCY BETWEEN THE DRAWINGS AND THE
SPECIFICATIONS, SPECIFICATIONS GOVERN. CONTACT VHA CO FOR
CLARIFICATION.
J. DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL CONDITIONS SHALL
BE REPORTED TO THE VHA CO, IN WRITING, FOR RESOLUTION PRIOR TO
PROCEEDING WITH THE WORK.
K. DISCREPANCIES SHALL BE REPORTED TO THE VHA CO IN WRITING FOR
RESOLUTION, PRIOR TO PROCEEDING WITH THE WORK. NO CHANGE
ORDERS OR EXTENSIONS OF TIME WILL BE ALLOWED OR ACCEPTED FOR
PROCEEDING WITH THE WORK WITHOUT THE CONTRACTING OFFICER'S
WRITTEN DIRECTION AND APPROVAL. ALSO, CONTRACTOR SHALL REPAIR
AND/OR REPLACE UNAUTHORIZED WORK, AS INDICATED BY THE VHA COR,
AT NO ADDITIONAL COST TO THE VHA.
L. DISSIMILAR METAL MATERIALS SHALL BE ISOLATED WITH AN APPROVED
NONMETAL ISOLATION MATERIAL IN ACCORDANCE WITH SPECIFICATIONS.
M. CONTRACTOR SHALL VERIFY THE LOCATIONS OF EXISTING UNDERGROUND
UTILITIES AND THEIR SERVICE CONNECTIONS WITH THE PROPER UTILITY
COMP, COORDINATE ISSUES WITH VHA COR.
N. CONTRACTOR SHALL COORDINATE SIZE, LOCATIONS AND NUMBER OF ROOF
OPENINGS AND ROOF ACCESSORIES WITH OTHER TRADES. REFER TO THE
ARCHITECTURAL, STRUCTURAL, PLUMBING, MECHANICAL AND ELECTRICAL
DRAWINGS FOR REFERENCE AND SPECIFICATIONS FOR REQUIREMENTS.
O. LOCATIONS AND SIZES OF CONCRETE MECHANICAL AND ELECTRICAL
EQUIPMENT PADS SHALL BE COORDINATED WITH THE SELECTED
EQUIPMENT MANUFACTURER AND/OR SUPPLIER. LOCATIONS ARE TO BE
APPROVED BY THE VHA COR PRIOR TO PROCEEDING WITH THE WORK.
P. AT TELECOMMUNICATION ROOMS: PROVIDE 3/4" X 8'-0" HIGH FIRE-
RETARDANT-TREATED PLYWOOD SHEATHING OVER TYPE X GYPSUM BOARD.
BOTTOM TO BE LOCATED AT 4" AFF VERIFY LENGTHS AND LOCATIONS WITH
ELECTRICAL DRAWINGS. REFER TO SPECIFICATION SECTION 06 10 00.
Q. PROVIDE INDEPENDENT FRAMING AND ATTACHMENTS TO THE STRUCTURE,
ADEQUATE TO SUPPORT THE CEILING SYSTEM, LIGHT FIXTURES, DUCTS,
DIFFUSERS, SPRINKLER PIPING AND BUS DUCTS.
R. CONTRACTOR TO INSTALL WOOD BLOCKING AND PLYWOOD AS REQUIRED
FOR THE MOUNTING OF TOILET ACCESSORIES, MILLWORK, CASEWORK, AV
EQUIPMENT, MEP ITEMS AND RADIOLOGY EQUIPMENT, ETC. REFER TO
SPECIFICATIONS.
S. PROPRIETARY PRODUCTS SHOWN ON THE DRAWINGS SHALL MEET
SPECIFICATION REQUIREMENTS.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
A ut od es k D oc s:
//2 4.
_T em pl e_ T
X _R ec irc ul at io n/
.0
1_ A
R C
H _R
.r vt 9/
/2
3:
:0
P M
GI002
GENERAL ABBREVIATIONS, NOTES,
& SYMBOLS
IMPROVE RO-DI RECIRCULATION
1901 VETERANS MEMORIAL DRIVE, TEMPLE TEXAS
674-23-255
MVP AV
100% CONSTRUCTION
DOCUMENTS
VEG 24.01
A
ABA ARCHITECTURAL BARRIERS ACT
AC AIR CONDITIONING
AD AREA DRAIN
ADJ ADJUSTABLE / ADJACENT
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECT / ARCHITECTURAL
ATTEN ATTENUATION
AUTO AUTOMATIC
AV AUDIO / VISUAL
AVG AVERAGE
B
BD BOARD
BLDG BUILDING
BM BENCH MARK / BEAM
BO BOTTOM OF
BOC BACK OF CURB
BOT BOTTOM
BRG BEARING
BRK BRICK
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BVL BEVELED
C
CAP CAPACITY
CB CATCH BASIN
CCTV CLOSED CIRCUIT TV
CF CUBIC FEET
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CIP CAST-IN-PLACE
CL CENTER LINE
CLG CEILING
CLR CLEAR / CLEARANCE
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMB COMBINATION
CONC CONCRETE
CONN CONNECTION / CONNECT
CONST CONSTRUCT / CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR / CORRUGATED
CP CONCRETE PIPE
CS COUNTERSINK
CU CUBIC
CW COLD WATER
D
DBL DOUBLE
DEMO DEMOLISH / DEMOLITION
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DN DOWN
DR DOOR
DTL DETAIL
DWG DRAWING
E
E EAST
EA EACH
EF EXHAUST FAN
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EM EMERGENCY
EP ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATE
ETR EXISTING TO REMAIN
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXT EXTERIOR
F
FA FIRE ALARM
FB FACE BRICK
FBO FURNISHED BY OWNER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FF FINISH FLOOR
FF&E FIXTURES, FURNITURE & EQUIPMENT
FFE FINISH FLOOR ELEVATION
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIXT FIXTURE
FLR FLOOR
FLUOR FLUORESCENT
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RATED
FRMG FRAMING
FRR FIRE RESISTANCE RATING
FS FLOOR SINK
FT FOOT/ FEET
FTG FOOTING
FUT FUTURE
G
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GOVT GOVERNMENT
GPM GALLON PER MINUTE
H
H HIGH
HB HOSE BIBB
HC HOLLOW CORE
HORIZ HORIZONTAL
HR HOUR
HS HIGH STRENGTH
HT HEIGHT
HTG HEATING
HTR HEATER
HVAC HEATING / VENTILATING / AIR
CONDITIONING
HW HOT WATER
HYD HYDRANT
I
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IN INCH
INCL INCLUDE (D), (ING)
INFO INFORMATION
INST INSTALL / INSTALLATION
INSUL INSULATE / INSULATION
INT INTERIOR
INV INVERT
J
JAN JANITOR
JB JUNCTION BOX
JST JOIST
JT JOINT
K
KIT KITCHEN
KO KNOCKOUT
L
L LONG / LENGTH
LAB LABORATORY
LAV LAVATORY
LBS POUNDS
LF LINEAR FOOT (FEET)
LH LEFT HAND
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LPT LOW POINT
LRG LARGE
LT LIGHT
LTG LIGHTING
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
M
MAS MASONRY
MAX MAXIMUM
MBR MEMBER
MECH MECHANICAL
MED MEDIUM
MFG MANUFACTURING
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MOD MODULAR
MTD MOUNTED
MTG MOUNTING
MTL METAL
N
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NSF NET SQUARE FEET
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD / OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
OZ OUNCE
P
PA PUBLIC ADDRESS
PB PUSH BUTTON
PC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PERF PERFORATE (D)
PERM PERMANENT
PERP PERPENDICULAR
PL PLATE / PROPERTY LINE
PLUMB PLUMBING
PNL PANEL
PR PAIR
PREFAB PREFABRICATE (D)
PREFIN PREFINISHED
PRELIM PRELIMINARY
PREP PREPARE (D)
PROJ PROJECT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE
PVG PAVING
Q
QTY QUANTITY
R
R RISER / RADIUS
RA RETURN AIR
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RE REFER TO / REFERENCE
REINF REINFORCE (D), (ING)
REQD REQUIRED
REV REVISED/ REVISION
RH RIGHT HAND
RM ROOM
ROW RIGHT OF WAY
RR RESTROOM
RTU ROOF TOP UNIT
S
S SOUTH
SAN SANITARY SEWER
SCH SCHEDULE
SCRN SCREEN
SECT SECTION
SF SQUARE FOOT (SQFT)
SHT SHEET
SIM SIMILAR
SOG SLAB ON GRADE
SPEC SPECIFICATION (S)
SPKLR SPRINKLE
SPKR SPEAKER
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURE / STRUCTURAL
SUSP SUSPENDED
SY SQUARE YARD (SQ YD)
SYM SYMMETRICAL / SYMBOL
SYS SYSTEM
T
TEL TELEPHONE
TEMP TEMPORARY / TEMPERED
THK THICK (NESS)
THRU THROUGH
TO TOP OF
TOC TOP OF CURB / CONCRETE
TOD TOP OF DECK
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOR TOP OF ROOF
TOS TOP OF STEEL
TOW TOP OF WALL
TRANSF TRANSFORMER
TV TELEVISION
TYP TYPICAL
U
UH UNIT HEATER
UL UNDERWRITERS LABORATORIES
UNO UNLESS NOTED OTHERWISE
V
VERT VERTICAL
VEST VESTIBULE
VHA VETERANS HEALTH ADMINISTRATION
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
W
W WEST, WIDTH, WIDE
W/ WITH
W/IN WITHIN
W/O WITHOUT
WC WATER CLOSET
WH WALL HYDRANT / WATER HEATER
WT WEIGHT
X, Y, Z, MISC
& AND
@ AT
YD YARD
Number: Revision: Date:
0 100% CONSTRUCTION DOCUMENTS 09/25/2024
UP
DN
UP
UP
UP
BUILDING 204
BUILDING 163
MECHANICAL ROOM
NOT IN CONTRACT
LEGEND
A. REFER TO GI002 AND A-001 FOR ADDITIONAL GENERAL NOTES.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
True North
BLDG 163
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
A ut od es k D oc s:
//2 4.
_T em pl e_ T
X _R ec irc ul at io n/
.0
1_ A
R C
H _R
.r vt 9/
/2
3:
:0
P M
GI111
EQUIPMENT REMOVAL PATH -
LEVEL 1
IMPROVE RO-DI RECIRCULATION
1901 VETERANS MEMORIAL DRIVE, TEMPLE TEXAS
674-23-255
163 / 204
MVP AV
100% CONSTRUCTION
DOCUMENTS
VEG 24.01
1/16" = 1'-0"
EQUIPMENT REMOVAL PATH - LEVEL 1
F4
1. EQUIPMENT REMOVAL PATH
Number: Revision: Date:
0 100% CONSTRUCTION DOCUMENTS 09/25/2024
DN
DN
UP
DN
UP
CB-21
CORRIDOR
SPS PREP AREA
MECHANICAL
AUTO CART
WASHER
MEDIVATOR
SPS DECON
SPS M CHANGE RM
ELEVATOR LOBBY
ALL WORK IN PHASE 1
TO BE DONE UNDER
BASEMENT LEVEL
MECHANICAL ROOM
MICROBIOLOGY HISTOLOGY CYTOLOGY
PROCESS/GROSSMICROBIOLOGIST
SUPERVISOR
OFF
DARK
ROOM
SUPERVISOR
OFF
CORRIDOR CORRIDOR
PREP ROOM
TEMPORARY
CONSTRUCTION BARRIER
TEMPORARY CONSTRUCTION
BARRIER AND DOOR
TEMPORARY LATCH DOOR
CLOSED DURING
CONSTRUCTION
ESTABLISH CIRCULATION
PATH FOR TANK REMOVAL IN
THE MECHANICAL ROOM.
TEMPORARY
CONSTRUCTION
BARRIER
TEMPORARY
CONSTRUCTION BARRIER
AND DOOR
MECHANICAL ROOM
CORRIDOR
BUILDING 204
TEMPORARY LATCH
DOOR CLOSED DURING
CONSTRUCTION
BREAKROOM
CORRIDOR
BLOOD
DW
STATION
HEMATOLOGY CHEMISTRY STORAGE
SPECIAL CHEM
ELE.
TEMPORARY
CONSTRUCTION
BARRIER
FLOW LAB
TEMPORARY
CONSTRUCTION
BARRIER
IN ORDER TO LIMIT DISRUPTION OF FACILITY OPERATIONS AND CONTAIN AIR-
BORNE DUST & CONTAMINATION FROM CONSTRUCTION ACTIVITIES, WORK
UNDER THIS CONTRACT SHALL BE DIVIDED INTO AREAS AS IDENTIFIED IN
PHASING PLAN DRAWINGS. AN INFECTION CONTROL RISK ASSESSMENT SHALL
BE PERFORMED TO DETERMINE EXTENTS OF CONSTRUCTION ACTIVITIES
CONTAINMENT BARRIERS.
THE CONTRACTOR SHALL PERFORM WORK IN SEQUENCE AS SHOWN. SCOPED
WORK WITHIN PROJECT PHASE MUST BE COMPLETED AND APPROVED BY VHA
COR PRIOR TO START OF WORK IN THE SUBSEQUENT PHASE.
EXACT SEQUENCING OF DEMOLITION AND CONSTRUCTION ACTIVITIES WITHIN
PROJECT PHASES SHALL BE DETERMINED BY THE CONTRACTOR AND AS SUCH
ARE TO BE CONSIDERED MEANS AND METHODS. THE EXTENTS AND
SEQUENCING OF CONSTRUCTION ACTIVITIES SHALL BE CONFIRMED AND
COORDINATED WITH THE VHA COR. ASSOCIATED MEP, FIRE, LOW
VOLTAGE/COMMUNICATIONS ITEMS TO BE COORDINATED BY CONTRACTOR
WITH VHA COR.
SPS PREP AREA
MECHANICAL
AUTO CART
WASHER
MEDIVATOR
SPS DECON
SPS M CHANGE RM
ELEVATOR LOBBY
TEMPORARY
CONSTRUCTION
BARRIER
MECHANICAL ROOM
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
P la n N or th
True North
BLDG 163
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
A ut od es k D oc s:
//2 4.
_T em pl e_ T
X _R ec irc ul at io n/
.0
1_ A
R C
H _R
.r vt 9/
/2
3:
:1
P M
GI112
PHASING PLAN IMPROVE RO-DI RECIRCULATION
1901 VETERANS MEMORIAL DRIVE, TEMPLE TEXAS
674-23-255
163 / 204
MVP AV
100% CONSTRUCTION
DOCUMENTS
VEG 24.01
1/16" = 1'-0"
PHASE 1
B1
1/16" = 1'-0"
PHASE 4
E1
PHASE 1 PIPE BASEMENT LEVEL
DEMO EXISTING PIPING
PHASE 1 PIPE BASEMENT LEVEL
CONSTRUCT BASEMENT PIPING
CONSTRUCT NEW COLUMN
PRIOR TO START OF PHASE 2
• ENSURE THE VHA STAFF HAS VACATED THE SPACE. COORDINATE WITH VHA COR.
PHASE 2 BASEMENT LEVEL
DEMO EXISTING MEDIVATOR, MECHANICAL, AND SPS
PHASE 2 BASEMENT LEVEL
CONSTRUCT IN MEDIVATOR, MECHANICAL, AND SPS
NOTE
• ALL WORK TO BE DONE OVER WEEKENDS AND NIGHTS - FRIDAY AFTER 5PM AND BEFORE 8AM SUNDAY
1/16" = 1'-0"
PHASE 3
B7
PHASE 3 LEVEL 1
DEMO EXISTING MECHANICAL ROOM AND CORRIDOR
PHASE 3 LEVEL 1
CONSTRUCT IN MECHANICAL ROOM AND CORRIDOR
CONSTRUCT NEW COLUMN AND SLAB REINFORCEMENT
PRIOR TO START OF PHASE 4
• ENSURE THE VHA STAFF HAS VACATED THE SPACE. COORDINATE WITH VHA COR
NOTE
• ALL WORK TO BE DONE OVER WEEKENDS AND NIGHTS - FRIDAY AFTER 5PM AND BEFORE 8AM
SUNDAY
PHASE 4 LEVEL 1
DEMO EXISTING PREP ROOM, MICROBIOLOGY, HISTOLOGY, CYTOLOGY AND PROCESS/GROSS
PHASE 4 LEVEL 1
CONSTRUCT IN PREP ROOM, MICROBIOLOGY, HISTOLOGY, CYTOLOGY AND PROCESS/GROSS
PRIOR TO START OF PHASE 5
• ENSURE THE VHA STAFF HAS VACATED THE SPACE. COORDINATE WITH VHA COR.
NOTE
• ALL WORK TO BE DONE OVER WEEKENDS AND NIGHTS - FRIDAY AFTER 5PM AND BEFORE 8AM
SUNDAY
1/16" = 1'-0"
PHASE 5
E4
PHASE 5 LEVEL 1
DEMO EXISTING HEMATOLOGY, CHEMISTRY, STORAGE, AND SPECIAL CHEM
PHASE 5 LEVEL 1
CONSTRUCT IN HEMATOLOGY, CHEMISTRY, STORAGE, AND SPECIAL CHEM
NOTE
ALL WORK TO BE DONE OVER WEEKENDS AND NIGHTS - FRIDAY AFTER 5PM AND BEFORE 8AM SUNDAY
1/16" = 1'-0"
PHASE 6
E7
PHASE 6 LEVEL 2
DEMO EXISTING COORIDOR AND FLOW LAB
PHASE 6 LEVEL 2
CONSTRUCT IN COORIDOR AND FLOW LAB
PROJECT PHASING
1/16" = 1'-0"
PHASE 2
B4
Number: Revision: Date:
0 100% CONSTRUCTION DOCUMENTS 09/25/2024
1. Concrete work shall conform to all requirements of the International Building Code and ACI 318, Building Code Requirements for Structural Concrete, latest approved editions.
2. Prepare concrete mix designs for each type and strength of concrete, using either laboratory trial batch or field experience methods as specified in ACI 301. If trial batch method is used, use an independent testing facility acceptable to COR for preparing and reporting of proposed mix designs.
3. Submit written reports to COR of each proposed mix design at least 15 days prior to start of work. Do not begin concrete production until COR has reviewed mix designs.
CONCRETE COVER
Clear concrete coverage for reinforcing bars shall be as follows unless noted otherwise:
Concrete exposed to earth without forms..................................................................... 3" Concrete poured in forms but exposed to earth or weather:
#5 bars or smaller.................................................................................................. 1 1/2" Bars larger than #5................................................................................................ 2"
CONCRETE PLACEMENT
1. All concrete shall be consolidated by vibration, spading, rodding, or forking so that concrete is thoroughly worked around the reinforcement and embedded items and into corners of forms without segregation of materials.
FORMWORK AND SHORING
1. The Contractor shall design all forms and supporting shores in conformance with ACI 347. Design shall include rate and method of placing concrete and construction loads, including vertical, horizontal, and impact loads. Forms shall be substantial and sufficiently tight to prevent leakage of mortar and properly braced or tied to maintain position and shape.
2. Forms shall be removed in such a manner as not to impair safety and serviceability of the structure. All concrete to be exposed by form removal shall have sufficient strength not to be damaged thereby.
CONCRETE
DESIGN CRITERIA
CONSTRUCTION
PRODUCTS AND MATERIALS
2. Portland Cement shall conform to ASTM C150, Type I / II. Blended Cements, if used, shall conform to ASTM C595 Type IL, or ASTM C1157 (GU). Aggregate for normal weight concrete shall conform to all requirements and tests of ASTM C33.
Aggregate for lightweight concrete shall conform to all requirements and tests of ASTM C330. Concrete mixing operations, etc., shall conform to ASTM C94 and ACI 304.
3. Non-shrink grout shall conform to ASTM C1107.
4. Water-reducing admixtures shall conform to ASTM C494, and be used in strict accordance with the manufacturer's recommendations. An air-entraining agent conforming to the ASTM C260 shall be used in all concrete mixes for work which is exposed to weather.
5. Use accelerating admixtures in cold weather only when approved by COR. Use of admixtures will not relax cold weather placement requirements. Do not use calcium chloride. Use set retarding admixtures during hot weather only when approved by COR.
6. For concrete mix types with Exposure Class F3, supplementary cementitious materials shall have a maximum percentage of total cementitious materials by mass equal to 25% for fly ash or natural pozzolans per ASTM C618, 50% for slag cement per ASTM C989, 10% for silica fume per ASTM C1240, 35% for total of fly ash or natural pozzolans and silica fume, and 50% for total of fly ash or natural pozzolans, slag cement, and silica fume.
CONCRETE TOLERANCES
Concrete tolerances shall be as specified in ACI 117 and as follows:
Plan alignment............................................................................................................. 1/2" in 20 feet, 1" maximum total Cross-sectional dimension.......................................................................................... -1/4", +1/2"
1. All work shall conform to the minimum standards of the International Building Code, 2021 edition and any other regulatory agencies that have authority over any portion of the work.
2. Design Loads Dead Loads
Floor superimposed dead load 30 psf Mechanical equipment actual weight
Live Loads Floor
Mechanical Room 150 psf
Risk Category IV
1. Special inspection, in accordance with the International Building Code or as required by the construction documents, shall be performed by a qualified inspector from an approved agency. Reports shall be issued to the COR and the COR at the completion of each type of work stating whether the work was performed in conformance with the approved plans and specifications. See inspection schedules for specific requirements.
2. Any item that is listed as a discrepancy by the independent testing agency shall be kept in a log by the General Contractor throughout the project. the log shall include the discrepancy number, date of discrepancy, and description of discrepancy. The General Contractor shall contact the COR in a timely manner to address each discrepancy and keep a record of the required corrections. The letter of substantial completion cannot be released until every item listed in the discrepancy log has been addressed and resolved.
GENERAL NOTES
DESIGN CRITERIA
SHOP DRAWINGS AND SUBMITTALS
1. The Contractor shall coordinate, review and submit shop drawings that identify all penetrations for all trades through structural walls, slabs, beams, and columns. A single drawing of each portion of the structure identifying locations and sizes of all cores shall be submitted for review and approval three weeks prior to coring through these structural elements. Cores not shown on the approved shop drawings will not be permitted in the field. Prior approval must be obtained from COR for all coring of concrete not specifically detailed and shall be reviewed on a case-by-case basis.
2. Shop drawings and calculations for all informational and action submittals as noted in project specifications shall be submitted to the COR for approval prior to fabrication or construction of all structural items including the following: structural steel.
3. The general contractor shall submit any substitution request to the COR prior to making any changes. The request shall include all information required for the COR to fully evaluate the substitution and determine any required compensation for the evaluation.
4. Design, materials, equipment, and products other than those described below or indicated on the drawings may be considered for use, provided prior approval is obtained from the COR, and the applicable governing code authority.
SPECIAL INSPECTIONS
1. All omissions or conflicts between the various elements of the working drawings and/or specifications shall be brought to the attention of the COR before proceeding with any work so involved.
2. A detail, section, or elevation reference may be indicated only once on a structural construction drawing, but is to be used at all like and similar conditions.
3. No modification shall be made to any structural member without the approval of the COR. This also applies to any openings for plumbing, electrical, and mechanical trades.
4. Contractor must check all dimensions, framing conditions, and site conditions before starting work. COR shall be notified immediately of any discrepancies or possible deficiencies.
5. The structural drawings have been completed using the available information regarding existing conditions. It is the responsibility of the General Contractor to field verify the existing conditions and notify the COR of any discrepancies before proceeding with work.
6. The Contractor shall be responsible for all excavation procedures and protection of adjacent property, structures, utilities, etc. in accordance with all VA guidance, and applicable codes.
7. All mechanical and electrical equipment purchases shall be coordinated with the structural drawings by the General Contractor. This includes equipment size, weight, openings, required support, etc. Any discrepancies shall be brought to the COR's and COR's attention prior to equipment purchase.
8. The contractor shall not stockpile any building materials or equipment in a manner that will exceed the load carrying capacity, cause damage, or create excessive deflection to any structural element. The contractor shall contact the COR for evaluation of locations where it may be necessary for heavy equipment or building material stockpiles prior to placement of these items on any structural element.
9. Nothing contained within the contract documents shall relieve the general contractor and the subcontractors of:
a. responsibility to determine any aspect of how the work is to be performed
b. dealing with matters of safety of personnel
c. safety of property
d. superintending of the work
e. construction means and methods
CONSTRUCTION
1. All foundation excavations, compaction, fill material, testing and inspection of foundation bearing strata shall be performed under supervision of a licensed Geotechnical Engineer. Inspections shall be performed prior to placement of reinforcement and pouring of concrete.
2. Contractor shall provide for de-watering of excavations to remove water from any source prior to pouring concrete.
3. Do not place concrete for foundation on frozen soil.
SPREAD FOOTING FOUNDATIONS
DESIGN CRITERIA
1. Foundation design is based upon owner's accepted recommendations for spread footings. The spread footings are designed based upon the presumptive load-bearing values provided in Table 1806.2 in the 2021 IBC.
2. Allowable bearing pressure used in design is 1500 psf.
CONSTRUCTION
1. Reinforcing steel shall conform to ASTM A615, Grade 60. Reinforcing to be welded or field bent shall be ASTM A706, Grade 60.
2. Reinforcing to be welded or field bent shall be ASTM A706, Grade 60. Welding of reinforcing steel shall conform to AWS D1.4, using proper low hydrogen electrodes.
3. Epoxy-coated reinforcing steel shall conform to ASTM A775 and shall be coated prior to fabrication.
4. Welded wire reinforcement (WWR) shall conform to ASTM A1064, Fy=65 ksi. WWR must lap one full mesh plus 2" at side and end laps, but not less than 6" and shall be wired together. WWR shall be placed in the center of slabs-on-grade or in the center of the concrete thickness above the deck for slabs on form deck, unless noted otherwise.
5. Studrail shear reinforcing shall be made of Low Carbon Steel, C1015 in accordance with ASTM A1044, ASTM A36, and ASTM A29 with a minimum yield of 50,000 psi and a minimum tensile strength of 60,000 psi and a maximum 20% elongation in 2" as manufactured by Decon or Suncoast. The complete and finished studrail shall be ICBO evaluated and all welding must take place in an ICC approved and audited facility.
REINFORCING STEEL
PRODUCTS AND MATERIALS
REINFORCING DEVELOPMENT AND SPLICES
1. All bars in concrete shall be lapped in accordance with Tension Lap Splice Length (Class B) per ACI 318 unless specifically noted otherwise.
2. Extend and anchor all horizontal bars at corners and intersections to fully develop the bar. All top reinforcing shall terminate with standard hooks at ends of slabs, construction joints, beams, walls, and foundations unless noted otherwise.
3. Continuous bars in walls, beams and grade beams shall be spliced as follows:
a. Top bars - at midspan
b. Bottom bars - over supports
SHOP DRAWINGS
1. Detail reinforcing elements in accordance with the latest editions of the ACI Detailing Manual and ACI Building Code Requirements for Structural Concrete.
CONSTRUCTION
REINFORCING AT OPENINGS
1. Provide 2- #5 bars (1 each face) with 2'-0" projection around all openings greater than 10" in any dimension in concrete slabs and walls, unless noted otherwise.
2. Provide 2- #5 bars at all reentrant and opening corners.
GENERAL REINFORCING REQUIREMENTS
1. All reinforcing bar bends shall be made cold with a bar bender at the ACI 318 specified minimum radius. Do not use added heat to bend bars.
2. Dowels for walls and columns shall be the same size and spacing as the wall/column reinforcing, unless noted otherwise.
3. Corner bars shall be provided at each mat of horizontal wall reinforcing and shall match horizontal bar size and spacing.
4. All stirrups shall have a minimum of 2- #4 horizontal reinforcing bars provided as spacers when no other horizontal reinforcing is provided.
5. Provide all accessories necessary to support reinforcing at positions shown on the plan.
1. Mechanical and adhesive anchors in concrete and masonry shall be as specified by the contract documents.
2. All post-installed anchors shall meet ICC-ES compliance for each type of application.
3. If requested, ICC ES reports indicating conformance with ICC-ES Acceptance Criteria shall be provided.
4. The contractor shall arrange for onsite installation training from a manufacturer’s representative who is certified in accordance with the ACI/CRSI Adhesive Anchor Installer certification program. If requested, the contractor shall submit certificates of the on-site personnel who will be installing the anchors to the COR.
5. All post-installed anchors in concrete shall be approved for use in seismic and cracked concrete applications.
6. Drill and install post-installed anchors and rebar per manufacturer's printed installation instructions and on-site training.
7. Unless otherwise specified, do not drill holes in concrete or masonry until concrete, mortar, or grout has achieved full design strength, or a minimum age of 21 days, whichever is longer.
POST-INSTALLED ANCHORS AND REBAR
Footnotes:
1. Normal weight concrete unless noted otherwise.
2. Testing age is 28 days unless noted otherwise.
3. Slump to be determined by Contractor and Mix Supplier with final approval by COR. Recommended slump of 5-8" for drilled piers.
4. CO2e content shall be documented by a product specific Type III Environmental Product Declaration for each unique mix design. Maximum CO2e shall be achieved through use of accepted practices that might include but are not limited to: approved blended cements (see below), supplemental cementitious materials such as fly ash, slag, or natural pozzolans, and injected carbon products or the like. Added products shall be included in Concrete mix designs and shall include product information and qualified test data for review.
Exposure Class Required
Admixtures
Maximum CO2e
(kg/m3)4
1"
Maximum Aggregate
Size
Compressive Strength3
4500psi (56-day)
Footings
Intended Use of Concrete
CONCRETE MIX MATRIX1,2
A
Mix Type
1. Design mixes shall provide concrete with the following properties as indicated on drawings and schedules:
F0 S2 W1 C2 409
1. Square and rectangular hollow structural sections (HSS) shall be ASTM A500 Grade C (50 ksi).
2. Plates shall be ASTM A36 unless noted otherwise. Plates used for any type of moment connection shall be ASTM A572-50.
3. All welding electrodes shall conform to ASTM E70XX. The minimum fillet weld size shall be 3/16", unless noted otherwise.
4. Headed anchor studs shall conform to ASTM A108 (60 ksi).
5. Anchor rods and unfinished rods shall conform to ASTM F1554, Grade 36.
6. All structural steel shall be shop coated with an approved rust inhibitive primer. Do not prime beams that are to receive fireproofing.
STRUCTURAL STEEL
PRODUCTS AND MATERIALS
SHOP DRAWINGS
CONSTRUCTION
1. Shop drawings for all structural steel indicated on the structural drawings shall be submitted for review to the COR prior to fabrication.
2. Connections shall be as shown in schedules and sections in the drawings. Any changes to the connections proposed by the contractor shall be submitted with the structural steel shop drawings. This connection submittal shall include calculations stamped and signed by the contractor's COR.
FABRICATION AND ERECTION
1. All fabrication and erection shall conform to the latest edition of the AISC Manual of Steel Construction.
2. All members are to be erected with natural mill camber or induced camber up, unless noted otherwise on the plans.
HOLES AND OPENINGS
1. No holes other than those specifically detailed shall be allowed through structural steel members. No cutting or burning of structural steel shall be permitted without written consent from the COR.
WELDING
1. A Certified Welder approved by the authority having jurisdiction in accordance with AWS, Structural Welding Code D1.1, shall perform all welding.
BOLTING
1. All high-strength bolts in bearing type connections shall be snug tight. The snug tight condition is defined as the tightness that exists when all plies in a joint are in firm contact. A few impacts of an impact wrench or the full effort of a man using an ordinary spud wrench may attain this. All high-strength bolts shown on the drawings as slip critical or subject to tension loads shall be tightened to a bolt tension not less than that given in Table 8.1 for the RCSC Specification for Structural Joints using High-Strength Bolts. Tightening shall be done by the turn-of-nut method, by a direct tension indicator, or by properly calibrated wrenches. Provide hardened washers under the nut or bolt head, whichever is the element turned in tightening. Bolts not indicated as slip critical shall not be pre-tensioned.
2. For slip-critical bolted assemblies the assembly surface, including those adjacent to the washer, shall be free of mill scale, oil, paint or other coatings.
MISCELLANEOUS STRUCTURAL STEEL
1. Miscellaneous structural steel includes any steel that is not specifically included in the framing of the building superstructure. Superstructure steel may include beams, columns, trusses, girders, joists, braces, frames, and any associated connections, parts, and subparts.
2. The structural steel supplier shall supply all necessary steel items, whether indicated on the drawings or not, that fulfill the structural design and architectural design intent for the structure. These items may include edge angles, closure angles, deck support, miscellaneous plates, etc.
STANDARD ABBREVIATIONS
AB
ACI
ADD'L
AFF
ALT
APA
ARCH
ASD
B
BETW
BF
BL
BLDG
BLKG
BRG
BW
CFS/CFMF
CIP
CJ
CJP
CLR
CMU
CONC
CONST
CONT
CNNX
DBA
DBS
DL
DN
DT
DWG
EA
EF
EJ
EL
ELEV
EQ
ETC
EW
EXP
EXT
(E)
FD
FDN
FS
FT
FTG
FV
GALV
GC
GET
GL
GT
GYP
HAS
HDR
HORIZ
HSS
HGT
HT
IBC
IF
JT
k
LL
LLBB
LLH
LLV
LONG
LSL
LVL
MAT'L
MAX
MECH
MF
MFR
MIN
MISC
MR
MTL
(N)
NTS
OC
OH
OPNG
PAF
PC
PJP
PL
PSL
PT
QTY
R
RD
REINF
REQ'D
RO
RT
SCHED
SHTG
SIM
SLBB
SOG
SP
SPECS
STD
STF'R
STL
STR
SYM
TC
TF
THK
TL
TM
TP
TS
T&B
TRANS
TYP
UNO
VERT
VT
W/
WP
WWR
Ø
ANCHOR BOLT
AMERICAN CONCRETE INSTITUTE
ADDITIONAL
ABOVE FINISH FLOOR
ALTERNATE
AMERICAN PLYWOOD ASSOCIATION
ARCHITECT / ARCHITECTURAL
ALLOWABLE STRESS DESIGN
BOTTOM
BETWEEN
BOTTOM OF FOOTING
BRICK LEDGE
BUILDING
BLOCKING
BEARING
BOTTOM OF WALL
COLD FORMED STEEL/COLD FORMED METAL FRAMING
CAST-IN-PLACE
CONTROL JOINT, CONSTRUCTION JOINT
COMPLETE JOINT PENETRATION
CLEAR
CONCRETE MASONRY UNIT
CONCRETE
CONSTRUCTION
CONTINUOUS
CONNECTION
DEFORMED BAR ANCHOR
DOWEL BAR SUBSTITUTE
DEAD LOAD
DOWN
DRAG TRUSS
DRAWING
EACH
EACH FACE
EXPANSION JOINT
ELEVATION
ELEVATOR
EQUAL
ECTETERA
EACH WAY
EXPANSION
EXTERIOR
EXISTING
FLOOR DRAIN
FOUNDATION
FAR SIDE
FLOOR TRUSS
FOOTING
FIELD VERIFY
GALVANIZED
GENERAL CONTRACTOR
GABLE END TRUSS
GLULAM
GIRDER TRUSS
GYPSUM
HEADED ANCHOR STUD
HEADER
HORIZONTAL
HOLLOW STRUCTURAL SECTION
HEIGHT
HIP TRUSS
INTERNATIONAL BUILDING CODE
INSIDE FACE
JOINT
KIPS
LIVE LOAD
LONG LEG BACK-TO-BACK
LONG LEG HORIZONTAL
LONG LEG VERTICAL
LONGITUDINAL
LAMINATED STRAND LUMBER
LAMINATED VENEER LUMBER
MATERIAL
MAXIMUM
MECHANICAL
MOMENT FRAME
MANUFACTURER
MINIMUM
MISCELLANEOUS
MILD REINFORCING
METAL
NEW
NOT TO SCALE
ON-CENTER
OPPOSITE HAND
OPENING
POWDER-ACTUATED FASTENER
PRECAST
PARTIAL JOINT PENETRATION
PLATE
PARALLEL STRAND LUMBER
POST-TENSION
QUANTITY
RADIUS
ROOF DRAIN
REINFORCING
REQUIRED
ROUGH OPENING
ROOF TRUSS
SCHEDULE
SHEATHING
SIMILAR
SHORT LEGS BACK-TO-BACK
SLAB-ON-GRADE
SPACE(S)
SPECIFICATIONS
STANDARD
STIFFENER
STEEL
STRUCTURAL
SYMMETRICAL
TOP OF CONCRETE
TOP OF FOOTING
THICKNESS
TOP OF LEDGE
TOP OF MASONRY
TOP OF PLATE
TOP OF STEEL
TOP AND BOTTOM
TRANSVERSE
TYPICAL
UNLESS NOTED OTHERWISE
VERTICAL
VALLEY TRUSS
WITH
WORK POINT
WELDED WIRE REINFORCEMENT
POUNDS
DIAMETER
CARBON FIBER POLYMER REINFORCEMENT
PRODUCTS AND MATERIAL
1. Carbon fiber polymer reinforcment fabric material shall be Sikawrap HEX 103C.
2. Epoxy resin saturant shall be Sikadur 300 and primer shall be Sikadur 330.
CONSTRUCTION
1. The notes below are to provide a synopsis of the installation procedure for the carbon fiber polymer reinforcment materials. They shall be read and followed in conjunction with all material manufacturer's instructions.
2. All materials shall be protected from moisture during installation.
3. All cut edges shall be sealed with epoxy.
4. Material shall be prepared and installed per manufacturer's specifications. Contractor shall be approved by manufacturer to install FRP product.
5. No metal may be in direct contact with carbon fiber materials. epoxy and glass fiber, or approved material, Insulating layer must be between carbon and metals to act as electrical bond breaker.
6. Note all dimensions may vary, Contractor shall verify in field prior to any fabrication.
7. For additional information and locations, see project drawings.
SUBSTRATE REPAIR
1. Concrete surface shall be in good condition and free of defects. Repair surface defects per the project specific repair procedures. inspect concrete surface to receive carbon fiber polymer reinforcment material and remove all incipient spalls and loose concrete. Patch all locations where concrete has been removed or previously fallen out, restore to approximate original surface profile.
2. Grind any concrete fins or high spots.
3. Fill-in any dished areas including mortar joints using Sika 30 epoxy mixed with clean dry sand as directed on the container or Sika 31.
4. Major patching shall be performed with materials specified in project repair documents and allowed to cure sufficiently.
Prior to installation of carbon fiber polymer reinforcment materials over patched areas, perform a moisture test to confirm required moisture level. If patching material is Sikatop 123 or 1000 repair mortar cured as directed on the manufacturer's written instructions, no moisture test is required.
5. Minor patching can be performed using Sika 30 epoxy mixed with clean dry sand as directed on the container or Sika 31.
SURFACE PREPARATION
1. Water blasting in conjunction with mechanical abrasive cleaning or mechanically remove all dirt, debris, dust and laitance and previous coatings. blast clean, shotblast or use other approved mechanical means to provide an open roughened texture.
CARBON FIBER POLYMER REINFORCEMENT FABRIC INSTALLATION
1. Store, mix and apply all epoxy and carbon fiber polymer reinforcment products in accordance with the manufacturer’s written instructions.
2. Coat area to receive carbon fiber polymer reinforcment material with Sika 330 two-component, medium viscosity structural epoxy adhesive immediately prior to installing carbon fiber material. In no case shall the pot life time be exceeded prior to the installation of fabric. if primer sets, at COR's discretion, it shall be removed or coated over.
3. Wet-layup method A. Pre-saturate Sika HEX 103C carbon fiber polymer reinforcment fabric with Sika Sikadur 300 two-component, low viscosity structural epoxy saturant resin and apply saturated material to prepared slab. Use j-roller or other suitable means and methods to ensure intimate contact, adequate bond and roll-out any air bubbles. Fabric shall be applied with all laps, joints and gaps as shown on engineered details provided by the manufacturer.
4. Second layer A. If required, install second layer while epoxy for first layer is still wet/tacky. install Sika HEX103C saturated onto previous layer (no primer required) . Use j-roller or other suitable means and methods to ensure intimate contact, adequate bond and roll-out any air bubbles. Apply additional Sikadur hex300 as required to ensure fully saturated material.
INSPECTION
1. Manufacturer's representative shall inspect the work:
A. After surfaces have been prepared but prior to installation of FRP.
B. During the application of first ply of the carbon fiber polymer reinforcment .
C. Upon completion of work.
2. Small penetrations less than 2 in2 are permissible as long as the penetrations are less than 5% of the total laminate area and there are no more than 10 such penetrations per 10ft2. For additional steps on addressing installation issues, contact manufacturer.
8490 E Crescent Parkway, Suite 250
Greenwood Village, CO 80111
303.839.1963 main
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
A ut od es k D oc s:
//2 4.
_T em pl e_ T
X _R ec irc ul at io n/
.0
1_ S
T R
U C
_R
.rv t
9/
/2
1:
:3
P
M
S-001
GENERAL NOTES IMPROVE RO-DI RECIRCULATION
1901 VETERANS MEMORIAL DRIVE, TEMPLE TEXAS
674-23-255
JDB MAR
100% CONSTRUCTION
DOCUMENTS
VEG 24.01Number: Revision: Date:
0 100% CONSTRUCTION DOCUMENTS 09/25/2024
09-19-24
ACI 318: Ch. 20, 25.2, 25.3, 26.6.1-26.6.3
1. Inspect reinforcment, including prestressing tendons, and verify placement.
TYPE
CONTINUOUS
SPECIAL INSPECTION
PERIODIC SPECIAL
INSPECTION
IBC
REFERENCE
REFERENCED
STANDARD
REQUIRED THIRD PARTY SPECIAL INSPECTIONS AND TESTS OF
CONCRETE CONSTRUCTION - 2021 IBC
X-
2. Reinforcing bar welding:
ACI 318: 17.8.2
3. Inspect anchors cast in concrete.
-X-
4. Inspect anchors post-installed in hardened concrete members.
5. Verifying use of required design mix. X- 1904.1, 1904.2, ACI 318: Ch. 19, 26.4.3, 26.4.4
6. Prior to concrete placement, fabricate specimens for strength tests, perform slump and air content tests, and determine the temperature of the concrete. 1908.10-X
ASTM C 172
ASTM C 31
ACI 318: 26.5, 26.12
7. Inspect concrete and shotcrete placement for proper application techniques.
-X ACI 318: 26.5
8. Verify maintenance of specified curing temperature and techniques.
X- ACI 318: 26.5.3-26.5.5
10. Inspect erection of precast concrete members. X- -ACI 318: Ch. 26.9
13. Verify in-situ concrete strength, prior to stressing of tendons in post-tensioned concrete and prior to removal of shores and forms from beams and structural slabs. -X- ACI 318: 26.11.2
14. Inspect formwork for shape, location and dimensions of the concrete member being formed.
-X- ACI 318: 26.11.1.2 (b)
AWS D1.4
ACI 318: 26.6.4
a. Verify weldability of reinforcing bars other than ASTM A706.
-X-
b. Inspect single-pass fillet welds, maximum 5/16"; and -X
c. Inspect all other welds.
--X
ACI 318: 17.8.2.4
a. Adhesive anchors installed in horizontally or upwardly inclined orientatations to resist sustained tension loads.
-X -
ACI 318: 17.8.2
b. Mechanical anchors and adhesive anchors not defined in 4.a.
X -
9. Inspect prestressed concrete for:
a. Application of prestressing forces; and
--X ACI 318: 26.10
b. Grouting of bonded prestressing tendons.
--X
AWS D1.4
ACI 318: 26.6.4
AWS D1.4
ACI 318: 26.6.4
AWS D1.4
ACI 318: 26.6.4
ACI 318: 26.10
11. For precast concrete diaphragm connections for reinforcement at joints classified as moderate or high deformability elements (MDE HDE) in structures assigned to Seismic Design Category C,D,E or F, inspect such connections and reinforcement in the field for :
a. Installation of the embedded parts
b. Completion of the continuity of reinforcement across joints.
c. Completion of connections in the field
-X
ACI 318: Ch. 26.13.1.3
12. Inspect installation tolerances of precast concrete diaphragm connctions for compliance with ACI 550.5
- X ACI 318: 26.13.1.3 -
-X -X
ACI 550.5
1. Verify materials below shallow foundations are adequate to achieve the design bearing capacity.
TYPE
CONTINUOUS
SPECIAL INSPECTION
PERIODIC
SPECIAL INSPECTION
REQUIRED THIRD PARTY SPECIAL INSPECTIONS AND TESTS
OF SOILS - 2021 IBC TABLE 1705.6
X-
2. Verify excavations are extended to proper depth and have reached proper material. X-
3. Perform classification and testing of compacted fill materials. X-
4. During fill placement, verify use of proper materials and procedures in accordance with the provisions of the approved geotechnical report. Verify densities and lift thicknesses during placement and compaction of compacted fill.
-X
5. Prior to placement of compacted fill, inspect subgrade and verify that site has been prepared properly. X-
INSPECTION TASKS PRIOR TO WELDING
QUALITY
CONTROL[1]
QUALITY
ASSURANCE[2]
REFERENCED
STANDARD
Welder qualification records and continuity records
WPS available
Manufacturer certifications for welding consumables available
Material identification (type/grade)
Welder identification system [5]
Fit-up of groove welds (including joint geometry)
Fit-up of CJP groove welds of HSS T-, Y- and K-joints without backing (including joint geometry)
Configuration and finish of access holes
Fit-up of fillet welds
P
O[4]
NOTES:
1. QUALITY CONTROL (QC) AS SPECIFIED IN THIS CHAPTER SHALL BE PROVIDED BY THE FABRICATIOR AND ERECTOR.
2. QUALITY ASSURANCE (QA) AS SPECIFIED IN THIS CHAPTER SHALL BE PROVIDED BY OTHERS WHEN REQUIRED BY THE AUTHORITY HAVING JURISDICTION (AHJ), APPLICABLE BUILDING CODE, PURCHASER, OWNER OR ENGINEER OF RECORD
(EOR).
3. OBSERVE(O): THE INSPECTOR SHALL OBSERVE THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED TO BE DELAYED PENDING THESE INSPECTIONS.
4. PERFORM (P): THESE TALKS SHALL BE PERFORMED FOR EACH WELDED JOINT OR MEMBER.
5. THE FABRICATOR OR ERECTOR, AS APPLICABLE, SHALL MAINTAIN A SYSTEM BY WHICH A WELDER WHO HAS WELDED A JOINT OR MEMBER CAN BE IDENTIFIED. STAMPS, IF USED, SHALL BE THE LOW STRESS TYPE.
6. WHEN WELDING OF DOUBLER PLATES, CONTINUITY PLATES OR STIFFENERS HAS BEEN PERFORMED IN THE k-AREA, VISUALLY INSPECT THE WEB k-AREA FOR CRACKS WITHIN 3" OF THE WELD.
7. AFTER ROLLED HEAVY SHAPES (PER AISC 360 SECTION A3.1c) AND BUILT-UP HEAVY SHAPES (PER AISC 360 SECTION A3.1d) ARE WELDED, VISUALLY INSPECT THE WELD ACCESS HOLES FOR CRACKS.
INSPECTION TASKS DURING WELDING
Control and handling of welding consumables
No welding over cracked tack welds
Environmental conditions
WPS followed
Welding techniques
AISC 360 TABLE N5.4-2
INSPECTION TASKS AFTER WELDING
Welds cleaned
Size, length and location of welds
Welds meet visual acceptance criteria
Arc strikes k-area [6]
Weld access holes in rolled heavy shapes and built-up heavy shapes [7]
Backing removed and weld tabs removed (if required)
Repair activities
Document acceptance or rejection of welded joint or member
No prohibited welds have been added without the approval of the EOR
INSPECTION TASKS PRIOR TO BOLTING
Manufacturer's certifications available for fastener materials
Fasteners marked in accordance with ASTM requirements
Correct fasteners selected for the joint detail (grade, type, bolt length if threads are to be excluded from shear plane)
Correct bolting procedure selected for joint detail
Connecting elements, including the appropriate faying surface condition and hole preparation, if specified, meet applicable requirements
Pre-installation verification testing by installation personnel observed and documented for fastener assemblies and methods used
Protected storage provided for bolts, nuts, washers and other fastener components
INSPECTION TASKS DURING BOLTING
Fastener assemblies placed in all holes and washers and nuts are positioned as required
Joint brought to the snug-tight condition prior to the pretensioning operation
Fastener component not turned by the wrench prevented from rotating
Fasteners are pretensioned in accordance with the RCSC Specification, progressing systematically from the most rigid point toward the free edges
INSPECTION TASKS AFTER BOLTING
Document acceptance or rejection of bolted connections
P[3]
TASK
P
P P
O O
O O
O O
P O
O O
O O
Placement and installation of steel headed stud anchors
Check welding equipment O -
AISC 360 TABLE N5.4-1
AISC 360 TABLE N5.4-1
AISC 360 TABLE N5.4-1
AISC 360 TABLE N5.4-1
AISC 360 TABLE N5.4-1
AISC 360 TABLE N5.4-1
AISC 360 TABLE N5.4-1
AISC 360 TABLE N5.4-1
AISC 360 TABLE N5.4-1
AISC 360 TABLE N5.4-1
AISC 360 TABLE N5.4-2
AISC 360 TABLE N5.4-2
AISC 360 TABLE N5.4-2
AISC 360 TABLE N5.4-2
AISC 360 TABLE N5.4-2
O[4]O
O O
O O
O O
O O
P[3] P
O[4]O AISC 360 TABLE N5.4-3
P[3] P AISC 360 TABLE N5.4-3
AISC 360 TABLE N5.4-3
AISC 360 TABLE N5.4-3
AISC 360 TABLE N5.4-3
AISC 360 TABLE N5.4-3
AISC 360 TABLE N5.4-3
AISC 360 TABLE N5.4-3
AISC 360 TABLE N5.4-3
AISC 360 TABLE N5.4-3
PP
PP
PP
PP
PP
PP
PP
O O
O P
O[4]O
O O
O O
O O
P[3] O
O O
AISC 360 TABLE N5.6-1
AISC 360 TABLE N5.6-1
AISC 360 TABLE N5.6-1
AISC 360 TABLE N5.6-1
AISC 360 TABLE N5.6-1
AISC 360 TABLE N5.6-1
AISC 360 TABLE N5.6-1
O[4]O
O O
O O
O O
AISC 360 TABLE N5.6-2
AISC 360 TABLE N5.6-2
AISC 360 TABLE N5.6-2
AISC 360 TABLE N5.6-2
P[3] P AISC 360 TABLE N5.6-3
REQUIRED THIRD PARTY VERIFICATION AND INSPECTION
FOR STEEL CONSTRUCTION - 2021 IBC
STATEMENT OF SPECIAL INSPECTIONS - 2021 IBC
1. SPECIAL INSPECTIONS AND STRUCTURAL TESTING SHALL BE PROVIDED BY A THIRD PARTY AGENCY EMPLOYED BY THE OWNER.