Attachment 5 - National Total Bare Cost Example.pdf

PDF 270 KB Posted

Attached to
Joint Base San Antonio Non-Complex Construction (NC2) Indefinite Delivery Indefinite Quantity (IDIQ) Federal contract opportunity
Solicitation number
FA301620R0015
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document contains a federal contract opportunity solicitation and related file. The solicitation, number FA301620R0015, is a request for proposal from the Department of the Air Force Air Education and Training Command for a multiple award indefinite delivery, indefinite quantity contract to provide non-complex construction services at various facilities across Joint Base San Antonio in Texas. Task orders will be for real property maintenance, repair, alteration, and minor construction support. The related file is an attachment that provides examples of how total bare construction costs are calculated using RS Means data with and without equipment costs. No response or award dates, pricing terms, set asides, or incumbent information are included.

View the file

Other files for this federal contract opportunity

Other files attached to Joint Base San Antonio Non-Complex Construction (NC2) Indefinite Delivery Indefinite Quantity (IDIQ), newest first.
File Type Posted
Solicitation Amendment FA301620R00150004 SF30.pdf PDF
Non-Complex Construction (NC2) Solicitation Questions Answers CLARIFIED.pdf PDF
Attachment 17 Past Performance Information Sheet (PPI).docx DOCX document
Attachment 1 NC2 IDIQ Base Contract Specifications 20200416.pdf PDF
Attachment 24 B2792 Site Pictures - Building Facing South.pdf PDF
Attachment 25 B2792 Site Pictures - Building Facing West.pdf PDF
Attachment 13 NC2 IDIQ Seed Project Spec 20200416.pdf PDF
Solicitation Amendment FA301620R00150003 SF 30.pdf PDF
Attachment 22 B2792 Site Pictures - Building Facing East.pdf PDF
Attachment 23 B2792 Site Pictures - Building Facing North.pdf PDF
Attachment 26 Historical As Built - B2792.pdf PDF
Attachment 27 NC2 IDIQ Project - B2792 Dimension Drawing.pdf PDF
Attachment 14 NC2 IDIQ Seed Project Submittal Register 20200416.pdf PDF
Non-Complex Construction (NC2) Solicitation Questions and Answers.pdf PDF
Attachment 12 - Section M Evaluation Factors for Award 20200331.pdf PDF
Attachment 11 - Section L Instructions to Offerors 20200331.pdf PDF
Solicitation Amendment FA301620R00150002 SF 30.pdf PDF
Solicitation Amendment FA301620R00150001 SF 30.pdf PDF
Attachment 11 - Section L Instructions to Offerors 21 March 20.pdf PDF
Attachment 21 - Subcontractor Consent Letter.docx DOCX document
Attachment 17 - Past Performance Information Sheet (PPI).pdf PDF
Attachment 11 - Section L Instructions to Offerors.pdf PDF
Attachment 14 - NC2 IDIQ Seed Project Submittal Register.pdf PDF
Attachment 8 - Progress Payment Request.xlsx XLSX spreadsheet
Attachment 4 - AF 3052 Construction Cost Estimate Breakdown.xls XLS spreadsheet
Attachment 7 - Material Approval Letter (AF3000).pdf PDF
Solicitation - FA301620R0015.pdf PDF
Attachment 10 - Warranty Call Worksheet.pdf PDF
Attachment 18 - Past Performance Questionnaire.pdf PDF
Attachment 13 - NC2 IDIQ Seed Project Specifications.pdf PDF
Attachment 2 - Contract Progress Schedule.pdf PDF
Attachment 3 - Contract Insurance Compliance Notification.pdf PDF
Attachment 6 - Contract Progress Report (AF 3065).pdf PDF
Attachment 1 - NC2 IDIQ Base Contract Specifications.pdf PDF
Attachment 19 - Climatology Report.pdf PDF
Attachment 12 - Section M Evaluation Factors for Award.pdf PDF
Attachment 20 -Seed Project Wage Determination TX20200231.pdf PDF
Attachment 16 - NC2 IDIQ Seed Project HAZMAT Report.pdf PDF
Attachment 9 - Base Access Request Form.pdf PDF
Attachment 15 - NC2 IDIQ Project Drawing B2792.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

13 Jan 2020

Figure 1: RS MEANS (National) Total Bare Cost Example shows how the (National) total bare cost is calculated when there are no equipment costs.

Figure 2: RS MEANS (National) Total Bare Cost Example shows (National) total bare cost when material labor and equipment are added.