Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).
Approved Disapproved
1 HazMat Questionnaire SOW sect 4.4 3 3 3 5 Days Prior to Start Date
2 HazMat MSDS SOW sect 4.4 3 3 3 5 Days Prior to Start Date
3 Hazmat Reporting Entry Form SOW sect 4.4 3 3 3 5 Days Prior to Start Date
4 Hazmat Reporting Entry Form SOW sect 4.4 3 3 3 End of Contract
5 Recycling and Landfill Report SOW sect 4.1 3 3 3 End of Contract
6 Asbestos Abatement Report SOW sect 4.7.3 3 3 3 End of Contract
7 Warranty (Contractor's) SOW sect 5.2 3 3 3 End of Contract
8 AF3065 Project Schedule SOW sect 3.4.1 3 3 3 Within 7 days of NTP, updated weekly Identify NTP, Work Start & End Dates, and End of Contract
AHU-1N, AHU-2S SOW Appendix B GOVENERMENT FURNISHED EQUIPMENT
BOILER SOW Appendix C GOVENERMENT FURNISHED EQUIPMENT
Mini-Split AC unit in Server Rm
DWG M10.0
SOW 3.2.4.1.D
1 1 1 1 1 1 Within 30 days of notice to proceed
Mini-Split AC unit in Lobby
DWG M10.0
SOW 3.2.4.3.J
1 1 1 1 1 1 Within 30 days of notice to proceed
Refrigerant Piping (Copper) SOW Appendix F 1 1 1 Within 10 days of notice to proceed
Condensate Drain Piping (PVC) SOW Appendix E 1 1 1 Within 10 days of notice to proceed
12 Refrigerant Vaccuum Test, Charge, Leak Test Report SOW Appendix F 3 3 3 Days After Test
Start-Up Operational Test Report
SOW sect 5.2 SOW Appendix F
3 3 3 3 Days After Test 3-hard copy, 3-digital copy
Mini-Split AC Operation & Maintenance Manuals
SOW sect 5.2 SOW Appendix F
3 End of Contract 3-hard copy, 3-digital copy
15 Natural Gas Piping & Fittings DWG M13.0, E2.0 1 1 1 1 Within 10 days of notice to proceed
16 Natural Gas Boiler Pressure Reg Valve DWG M13.0 1 1 1 1 Within 10 days of notice to proceed
Item or Description of Item
Contract Reference
Type of Submittal
Re tu rn S us pe ns e
D at e
Te ch ni ca l D at a
Te st
R ep or ts
D at e to
C iv il En gi ne er in g
Sa m pl es
Co lo r S el ec tio n
M an uf ac tu re r's R ec om m en da tio n
W ar ra nt y- M an uf ac tu re r a nd /o r W or km an sh ip
Ca ta lo g
D at a
Project Number:
MAHG21-1048
Project Title:
REPLACE 2 AHUs & DUCTS, B2901 Solicitation / Contract Number:
NOT AVAILABLE YET
Remarks
(To be completed by Project Engineer)
Li ne
N um be r
Re qu ire d
Su bm is si on D at e
Ce rt ifi ca te o f C om pl ia nc e
Sh op
D ra w in gs
Date Contractor Notified
(To be completed by Contract Administrator)
Su bm itt al
N um be rs
Co nt ra ct or R es ub m itt al
Fi na l A pp ro va l
Number of Copies Required (if not electronically submitted)
D at e Re ce iv ed in
C on tr ac tin g
Fi el d Re po rt s
O pe ra tin g In st ru ct io ns
Sc he du le s, Li st in gs , R ep or ts , P la ns