Attachment 5 - MAHG 11-1042 Bryan Hall - Submittal Registrar - 11022022.xlsx

XLSX spreadsheet 48 KB Posted

Attached to
Renovate Bryan Hall
Solicitation number
FA301023R0001
Issued by

View the file

Other files

File Type Posted
Attachment 13 - MAHG 11-1042 Renovate Bryan Hall QA3 Amendment 5 Addendum 3.pdf PDF
Attachment 14 - MAHG 11-1042 Specifications 26 36 26.pdf PDF
Solicitation Amendment FA301023R00010005 SF 30.pdf PDF
Solicitation Amendment FA301023R00010004 SF 30.pdf PDF
Solicitation Amendment FA301023R00010003 SF 30.pdf PDF
Attachment 11 - MAHG 11-1042 Renovate Bryan Hall QA2 Amendment 3 Addendum 2.pdf PDF
Attachment 12 - 01 45 00.00 20 Quality Control ADD-2 Rev1.pdf PDF
Solicitation Amendment FA301023R00010002 SF 30.pdf PDF
Attachment 10 - MAHG11-1042 Repair Bryan Hall_Addendum 1.pdf PDF
Attachment 9 - MAHG11-1042 Repair Bryan Hall - QA 20230306.pdf PDF
Solicitation Amendment FA301023R00010001 SF 30.pdf PDF
MAHG 111042 Bryan Hall - PreBid Overview.pdf PDF
MAHG111042 Site Visit Sign In 20220207.pdf PDF
Attachment 8 - Past Performance Reference List - 11292022.pdf PDF
Attachment 1 - MAHG 11-1042 Bryan Hall - Specs - Vol 1 - 11172022.pdf PDF
Solicitation - FA301023R0001.pdf PDF
Attachment 6 - Wage Det MS20230050 - 01062023.pdf PDF
Attachment 3 - MAHG 11-1042 Bryan Hall - Drawings - Vol 1 - 08042022.pdf PDF
Attachment 4 - MAHG 11-1042 Bryan Hall - Drawings - Vol 2 - 08042022.pdf PDF
Attachment 2 - MAHG 11-1042 Bryan Hall - Specs - Vol 2 - 02182022.pdf PDF
Attachment 7 - Past Performance Questionnaire - 11292022.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
MAHG111042Project Title:
Repair Bryan HallSolicitation / Contract Number & Attachment Number:

FA301023R0001, Attachment 5

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies Required (if not electronically submitted)Remarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationWarranty-Manufacturer and/or WorkmanshipCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission Date

fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

Submittal Numbers fergusog: Enter the Submittal Number

Date Contractor
NotifiedContractor Resubmittal

fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date

(MM/DD/YY)

Approved fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

1HazMat Questionnaire15 Days Prior to Start DateProvide the documents as required per the Environmental packet provided by Keesler AFB.
2HazMat MSDS115 Days Prior to Start DateProvide the documents as required per the Environmental packet provided by Keesler AFB.
3Hazmat Reporting Entry Form1115 Days Prior to Start DateProvide the documents as required per the Environmental packet provided by Keesler AFB.
4Recycling and Landfill Report11End of ContractProvide the documents as required per the Environmental packet provided by Keesler AFB.
5Warranty (Manufacturer's)1End of Contract
61-Year Warranty (Contractor)1End of Contract
702 41 00Existing Conditions, 1.9115 Days Prior to Start Date
802 41 00Demolition Plan, 1.2.1114 Days Prior to Start Date
902 41 00Notification, 1.7.1114 Days Prior to Start Date
1002 82 16.00 20Vacuums, 3.1.4114 days Prior to associated work
1102 82 16.00 20Respirators, 3.1.1.1114 days Prior to associated work
1202 82 16.00 20Amended Water, 1.2.2114 days Prior to associated work
1302 82 16.00 20Glove bag114 days Prior to associated work
1402 82 16.00 20MSDS for all materials15 Days Prior to Start Date
1502 82 16.00 20Encapsulants114 days Prior to associated work
1602 82 16.00 20Clearance Sampling1Once work in section is complete
1702 82 16.00 20Air Sampling1Once work in section is complete
1802 82 16.00 20Asbestos Abatement Plan, 1.3.815 Days Prior to Start Date
1902 82 16.00 20Testing Lab, 1.3.9114 days Prior to associated work
2002 82 16.00 20Private Qualified Person, 1.5.11approval required prior to abatement plan submittal
2102 82 16.00 20Competent Person, 1.5.2114 days Prior to associated work
2202 82 16.00 20Contractor's Permits & License114 days Prior to associated work
2302 82 16.00 20Waste Shipment Records, 1.3.101Once work in section is complete
2402 83 00Competent Person, 1.5.1.1114 Days Prior to Start Date
2502 83 00Training Certification, 1.5.1.2114 Days Prior to Start Date
2602 83 00Occupational and Environmental Assessment Data Report, 1.5.2.3114 Days Prior to Start Date
2702 83 00Medical Examinations, 1.5.2.4114 Days Prior to Start Date
2802 83 00Lead, Cadmium, Chromium Waste Management Plan, 1.5.2.8114 Days Prior to Start Date
2902 83 00Licenses, Permits and Notifications, 1.5.4114 Days Prior to Start Date
3002 83 00Lead, Cadmium, Chromium Compliance Plan, 1.5.2.2, 3.1.1.6114 Days Prior to Start Date
3102 83 00Written Evidence of TSD Approval114 Days Prior to Start Date
3202 83 00Respirators, 1.6.1114 Days Prior to Start Date
3302 83 00Vacuum Filters, 1.6.4114 Days Prior to Start Date
3402 83 00Negative Pressure System, 1.6.7114 Days Prior to Start Date
3502 83 00Materials & Equipment, 2.1114 Days Prior to Start Date
3602 83 00Expendable Supplies, 2.1.1114 Days Prior to Start Date
3702 83 00Local Exhaust System. 3.1.1.5114 Days Prior to Start Date
3802 83 00Pressure Differential Automatic Recording System, 3.1.1.5114 Days Prior to Start Date
3902 83 00Pressure Differential Log, 3.1.1.61114 Days Prior to Start Date
4002 83 00Sampling and Analysis, 1.3.3114 Days Prior to Start Date
4102 83 00Occupational and Environmental Assessment Data Report, 1.5.2.3114 Days Prior to Start Date
4202 83 00Sampling Results, 1.5.2.3114 Days Prior to Start Date
4302 83 00Pressure Differential Recordings For Local Exhaust System, 1.5.3114 Days Prior to Start Date
4402 83 00Testing Laboratory, 1.5.1.3114 Days Prior to Start Date
4502 83 00Notification of the Commencement of [LBP] Hazard Abatement114 Days Prior to Start Date
4602 83 00Clearance Certification, 3.5.1.1114 Days Prior to Start Date
4702 83 00Hazardous Waste Manifest, 3.5.2.1114 Days Prior to Start Date
4802 83 00Turn-In Documents or Weight Tickets114 Days Prior to Start Date
4903 30 00Reinforcing Steel, 1.6.2.1114 Days Prior to Start Date
5003 30 00Formwork, 2.4.5114 Days Prior to Start Date
5103 30 00Curing Materials, 2.3.7114 Days Prior to Start Date
5203 30 00Joint Sealants, 2.3.10114 Days Prior to Start Date
5303 30 00Joint Filler, 2.3.9114 Days Prior to Start Date
5403 30 00Aggregate Materials, 1.7114 Days Prior to Start Date
5503 30 00Cement, 2.3.1114 Days Prior to Start Date
5603 30 00Ready-mix concrete, 2.2.2114 Days Prior to Start Date
5703 30 00Water-vapor barrier subgrade cover, 2.3.6.1114 Days Prior to Start Date
5803 30 00Bonding Materials, 2.5114 Days Prior to Start Date
5903 30 00Floor Finish Materials, 2.6114 Days Prior to Start Date
6003 30 00Liquid Chemical Floor Hardener, 2.6.1114 Days Prior to Start Date
6103 30 00Mix Design, 2.2.1, 1.6.4.11114 Days Prior to Start Date
6203 30 00Compressive strength tests, 3.10.2.3114 Days Prior to Start Date
6303 30 00Unit Weight of Structural Lightweight Concrete, 3.10.2.5114 Days Prior to Start Date
6403 30 00Air Content, 3.10.2.4114 Days Prior to Start Date
6503 30 00Slump, 2.7.4114 Days Prior to Start Date
6603 30 00Air Entrainment, 2.7.1114 Days Prior to Start Date
6703 30 00Curing concrete element, 1.6.3.1114 Days Prior to Start Date
6803 30 00Finishing plan, 1.6.3.3114 Days Prior to Start Date
6903 30 00Fly Ash114 Days Prior to Start Date
7003 30 00Ground Granulated Blast-furnace slag114 Days Prior to Start Date
7103 30 00Steel bar114 Days Prior to Start Date
7205 12 00Erection Plan, 1.4.2.1114 Days Prior to Start Date
7305 12 00Fabrication Drawings, 1.4.1114 Days Prior to Start Date
7405 12 00Shop primer, 2.4114 Days Prior to Start Date
7505 12 00Welding electrodes and rods, 2.3.1114 Days Prior to Start Date
7605 12 00Load indicator bolts and washers114 Days Prior to Start Date
7705 12 00Non-shrink grout, 2.3.2114 Days Prior to Start Date
7805 12 00Class B Coating, 2.4114 Days Prior to Start Date
7905 12 00Bolts, Nuts, and Washers, 2.2114 Days Prior to Start Date
8005 12 00Galvanizing, 2.5114 Days Prior to Start Date
8105 12 00Welding procedures and qualifications, 1.4.2.2114 Days Prior to Start Date
8205 40 00Framing components114 Days Prior to Start Date
8305 40 00Metal Framing Calculations, 1.6.2114 Days Prior to Start Date
8405 50 13Roof hatch, 3.101114 Days Prior to Start Date
8505 50 13Access Doors and Panels, 2.311114 Days Prior to Start Date
8605 50 13Expansion Joint Covers, 2.4111114 Days Prior to Start Date
8705 50 13Floor Gratings, 2.611114 Days Prior to Start Date
8805 52 00Fabrication Drawings, 1.2.1114 Days Prior to Start Date
8905 52 00Aluminum Railings and Handrails, 2.2.211114 Days Prior to Start Date
9005 52 00Anchorage and Fastening Systems, 1.2.11114 Days Prior to Start Date
9105 52 00Welding Procedures, 1.4.1114 Days Prior to Start Date
9205 52 00Welder Qualifications,1.4.2114 Days Prior to Start Date
9306 10 00Self-adhering Membrane114 Days Prior to Start Date
9406 10 00Liquid Applied Membrane Adhesives114 Days Prior to Start Date
9506 20 00Detail Drawings, 1.311114 Days Prior to Start Date
9606 61 16Solid Polymer Material, 2.1111114 Days Prior to Start Date
9706 61 16Fabrications, 2.3114 Days Prior to Start Date
9807 21 16Blanket Insulation, 2.1114 Days Prior to Start Date
9907 22 00Insulation Board Layout, 1.3114 Days Prior to Start Date
10007 22 00Verification of Existing Conditions, 1.3114 Days Prior to Start Date
10107 22 00Insulation, 2.11114 Days Prior to Start Date
10207 22 00Cover Board, 1.471114 Days Prior to Start Date
10307 22 00Fasteners, 2.51114 Days Prior to Start Date
10407 22 00Installer Qualifications, 1.6114 Days Prior to Start Date
10507 22 00Felt Materials, 1.6114 Days Prior to Start Date
10407 22 00Warranty114 Days Prior to Start Date
10607 24 00EIFS Shop Drawings, 3.3114 Days Prior to Start Date
10707 24 00Sheathing Board, 2.12114 Days Prior to Start Date
10807 24 00Thermal Insulation, 2.5114 Days Prior to Start Date
10907 24 00Adhesive, 2.3114 Days Prior to Start Date
11007 24 00Accessories, 2.1111114 Days Prior to Start Date
11107 24 00Base Coat, 2.6114 Days Prior to Start Date
11207 24 00Portland Cement, 2.7114 Days Prior to Start Date
11307 24 00Reinforcing Fabric, 2.8114 Days Prior to Start Date
11407 24 00Finish Coat, 2.911114 Days Prior to Start Date
11507 24 00Joint Sealants, 2.12114 Days Prior to Start Date
11607 24 00Sealant Primer, 2.10114 Days Prior to Start Date
11707 24 00Bond Breaker, 2.13114 Days Prior to Start Date
11807 24 00Backer Rod, 2.14114 Days Prior to Start Date
11907 24 00Insulation Board, 1.4.5, 2.5.2114 Days Prior to Start Date
12007 24 00Warranty, 1.7114 Days Prior to Start Date
12107 24 00Sample Boards & Mock up, 1.2.1.3, 1.2.3.71114 Days Prior to Start Date
1227 24 00Wind load114 Days Prior to Start Date
1237 24 00Moisture Analysis114 Days Prior to Start Date
1247 24 00Abrasion Resistance1.2.3.1114 Days Prior to Start Date
1257 24 00Accelerated Weathering114 Days Prior to Start Date
1267 24 00Impact Resistance114 Days Prior to Start Date
1277 24 00Mildew Resistance114 Days Prior to Start Date
1287 24 00Salt Spray Resistance114 Days Prior to Start Date
1297 24 00Vapor Transmission114 Days Prior to Start Date
1307 24 00Absorption-Freeze-Thaw114 Days Prior to Start Date
1317 24 00Wall Fire Test114 Days Prior to Start Date
1327 24 00Water Penetration114 Days Prior to Start Date
1337 24 00Water Resistance114 Days Prior to Start Date
1347 24 00Surface Burning Characteristics114 Days Prior to Start Date
1357 24 00Radiant Heat114 Days Prior to Start Date
1367 24 00Substrate114 Days Prior to Start Date
1377 24 00Wind Load114 Days Prior to Start Date
1387 24 00Qualifications of EIFS Manufacturer, 1.4.1114 Days Prior to Start Date
1397 24 00Qualifications of EIFS Installer, 1.4.2114 Days Prior to Start Date
1407 24 00Qualifications of Sealant Applicator, 1.4.3114 Days Prior to Start Date
1417 24 00Qualifications of third-party inspector, 1.4.4114 Days Prior to Start Date
1427 24 00Inspection Checklist, 3.5.2114 Days Prior to Start Date
1437 24 00Installation, 3.3114 Days Prior to Start Date
1447 24 00EIFS, 1.7114 Days Prior to Start Date
14507 60 00Gutters, 3.1.7111111114 Days Prior to Start Date
14607 60 00Downspouts, 3.1.8111111114 Days Prior to Start Date
14707 60 00Expansion Joints, 3.1.10111111114 Days Prior to Start Date
14807 60 00Flashings at Roof Penetrations, 3.1.1111111114 Days Prior to Start Date
14907 60 00Copings, 3.1.1311111114 Days Prior to Start Date
15007 84 00Firestopping Materials, 2.11114 Days Prior to Start Date
15107 84 00Inspections, 3.3114 Days Prior to Start Date
15208 11 13Doors, 2.11114 Days Prior to Start Date
15308 11 13Frames, 2.11114 Days Prior to Start Date
15408 11 13Accessories, 2.71114 Days Prior to Start Date
15508 11 16Door and Frame Assembly, 1.5.1, 1.5.2,1111114 Days Prior to Start Date
15608 11 16Calculations, 1.2.2114 Days Prior to Start Date
15708 11 16Air Infiltration, 1.2.3114 Days Prior to Start Date
15808 11 16Water Penetration, 1.2.4114 Days Prior to Start Date
15908 11 16NFRC Project Label Certificates, 1.2.51114 Days Prior to Start Date
16008 11 16Adjustments, Cleaning, and Maintenance, 1.5.4114 Days Prior to Start Date
16108 14 00Doors, 2.111114 Days Prior to Start Date
16208 14 00Accessories, 2.2114 Days Prior to Start Date
16308 14 00Water Resistant Sealer, 2.3.6114 Days Prior to Start Date
16408 14 00Warranty, 1.4114 Days Prior to Start Date
16508 14 00Fire resistance rating, 2.1.2114 Days Prior to Start Date
16608 71 00Hardware schedule, 1.31114 Days Prior to Start Date
16708 71 00Keying system, 2.3.7114 Days Prior to Start Date
16808 71 00Hardware items, 2.31114 Days Prior to Start Date
16908 71 00Hardware Schedule, 1.3114 Days Prior to Start Date
17008 81 00Insulating Glass, 1.6.11111114 Days Prior to Start Date
17108 81 00Glazing Accessories. 1.311114 Days Prior to Start Date
17208 91 00Wall Louvers, 1.4, 1.5, 2.2111114 Days Prior to Start Date
17309 22 00Metal Support systems, 2.111114 Days Prior to Start Date
17409 29 00Sheathing, 2.1.3, 2.1.4114 Days Prior to Start Date
17509 29 00Accessories, 2.1.8114 Days Prior to Start Date
17609 30 00Tile, 2.1111114 Days Prior to Start Date
17709 30 00Mortar, Grout, and Adhesives, 2.41111114 Days Prior to Start Date
17809 51 00Acoustical Ceiling, 1.2, 2.1, 2.1.111111114 Days Prior to Start Date
17909 65 00Resilient Flooring and accessories11111114 Days Prior to Start Date
18009 65 00Rubber Tile1111114 Days Prior to Start Date
18109 65 00Wall Base1111114 Days Prior to Start Date
18209 65 36Static- Resistive Flooring, 2.2.1111111114 Days Prior to Start Date
18309 65 36Adhesives, 2.31114 Days Prior to Start Date
18409 68 00Carpet and adhesives,1.3, 2.1, 3.1, 3.4111111114 Days Prior to Start Date
18509 68 00Moisture and Alkalinity tests, 3.21114 Days Prior to Start Date
18609 69 13Rigid grid Access Flooring, 1.2, 1.2.7, 1.4,11111111114 Days Prior to Start Date
18709 90 00Painting and accessories, 2.11111114 Days Prior to Start Date
18810 10 00Visual Display Boards1114 Days Prior to Start Date
18910 14 02Interior Signage111114 Days Prior to Start Date
19010 21 13Toilet Compartments and accessories11111111114 Days Prior to Start Date
19110 26 13Corner Guards1111114 Days Prior to Start Date
19210 28 13Toilet Accessories11111114 Days Prior to Start Date
19310 44 16Fire Extinguishers, cabinets and accessories11111114 Days Prior to Start Date
19414 24 00Passenger Elevator1111111114 Days Prior to Start Date
19521 13 13Sprinkler - QFPE, Designer, Installer114 Days Prior to Start Date
19621 13 13System and Accessories1111111111114 Days Prior to Start Date
19722 00 00Plumbing Systems111111114 Days Prior to Start Date
19822 00 00Tests, Flushing and Disinfection114 Days Prior to Start Date
19923 05 15Common Piping of HVAC11111111114 Days Prior to Start Date
20023 05 15Coordination Drawings, 1.2114 Days Prior to Start Date
20123 05 48.19Bracing for HVAC1111114 Days Prior to Start Date
20223 05 93TAB for HVAC111114 Days Prior to Start Date
20323 07 00HVAC insulation111114 Days Prior to Start Date
20423 08 00.00 20Commissioning of HVAC & Plumbing Systems111114 Days Prior to Start Date
20523 09 00Instrumentation and control for HVAC11114 Days Prior to Start Date
20623 09 23 .02BACNET DDC111114 Days Prior to Start Date
20723 11 20Facility Gas Piping1111114 Days Prior to Start Date
20823 21 13.00 20LTW Heating System1114 Days Prior to Start Date
20923 30 00HVAC Air Distribution1111111111114 Days Prior to Start Date
21023 64 10Piping System111111114 Days Prior to Start Date
21123 64 26Chilled, Chilled-Hot, and Condenser Water Piping System11111111114 Days Prior to Start Date
21223 73 13.00 40Modular Indoor AHU11111114 Days Prior to Start Date
21323 80 20 .00 10Terminal Heating Units11111114 Days Prior to Start Date
21425 05 11Cybersecurity11111114 Days Prior to Start Date
21526 05 48.00 10Lighting Systems11111114 Days Prior to Start Date
21626 20 00Interior Distribution System111111114 Days Prior to Start Date
21726 24 13Switchboards1111114 Days Prior to Start Date
21826 28 01.00 10Coordinated Power System Protection1114 Days Prior to Start Date
21926 29 23ASD Systems111114 Days Prior to Start Date
22026 32 15.00Generator1111111114 Days Prior to Start Date
22126 36 23ATS and By-Pass/Isolation Switch1111114 Days Prior to Start Date
22226 41 00Lightning Protection System1111114 Days Prior to Start Date
22326 51 00Interior Lighting1111111114 Days Prior to Start Date
22426 56 00Exterior Lighting1111111114 Days Prior to Start Date
22527 05 13 .43Television Distribution System1111111114 Days Prior to Start Date
22627 10 00Telecommunications Cabling111111114 Days Prior to Start Date
22728 31 76Fire Alarm & Mass Notification111111111114 Days Prior to Start Date
22831 00 0 0Earthwork1114 Days Prior to Start Date
22932 16 13Concrete curbs, gutters and walks11114 Days Prior to Start Date
23032 17 24.00 10Pavement Markings11114 Days Prior to Start Date
23132 93 23Sodding111114 Days Prior to Start Date
23233 11 00Water Utility Distribution111111114 Days Prior to Start Date
23333 71 02Underground Electrical1111114 Days Prior to Start Date
23433 82 00Telecommunications OSP11111111114 Days Prior to Start Date
235
236
237
238
239
240

&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).

&P of &N

File details come from the government source that posted it. Updated .