Attachment 4 - MAHG 11-1042 Bryan Hall - Drawings - Vol 2 - 08042022.pdf

PDF 36 MB Posted

Attached to
Renovate Bryan Hall Federal contract opportunity
Solicitation number
FA301023R0001
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Bryan Hall, newest first.
File Type Posted
Attachment 14 - MAHG 11-1042 Specifications 26 36 26.pdf PDF
Attachment 13 - MAHG 11-1042 Renovate Bryan Hall QA3 Amendment 5 Addendum 3.pdf PDF
Solicitation Amendment FA301023R00010005 SF 30.pdf PDF
Solicitation Amendment FA301023R00010004 SF 30.pdf PDF
Solicitation Amendment FA301023R00010003 SF 30.pdf PDF
Attachment 12 - 01 45 00.00 20 Quality Control ADD-2 Rev1.pdf PDF
Attachment 11 - MAHG 11-1042 Renovate Bryan Hall QA2 Amendment 3 Addendum 2.pdf PDF
Solicitation Amendment FA301023R00010002 SF 30.pdf PDF
Attachment 9 - MAHG11-1042 Repair Bryan Hall - QA 20230306.pdf PDF
Attachment 10 - MAHG11-1042 Repair Bryan Hall_Addendum 1.pdf PDF
Solicitation Amendment FA301023R00010001 SF 30.pdf PDF
MAHG 111042 Bryan Hall - PreBid Overview.pdf PDF
MAHG111042 Site Visit Sign In 20220207.pdf PDF
Solicitation - FA301023R0001.pdf PDF
Attachment 5 - MAHG 11-1042 Bryan Hall - Submittal Registrar - 11022022.xlsx XLSX spreadsheet
Attachment 1 - MAHG 11-1042 Bryan Hall - Specs - Vol 1 - 11172022.pdf PDF
Attachment 8 - Past Performance Reference List - 11292022.pdf PDF
Attachment 2 - MAHG 11-1042 Bryan Hall - Specs - Vol 2 - 02182022.pdf PDF
Attachment 3 - MAHG 11-1042 Bryan Hall - Drawings - Vol 1 - 08042022.pdf PDF
Attachment 6 - Wage Det MS20230050 - 01062023.pdf PDF
Attachment 7 - Past Performance Questionnaire - 11292022.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPROVEDDRAWN

AIR EDUCATION AND TRAINING

COMMAND

DATEREVISION

UNITED STATES AIR

FORCE

MISSISSIPPI

FACILITY NUMBER:

SHEET OF

DRAWING NUMBER:

BILOXI

RECOMMENDED:

(Chief ofEngineering)

SUBMITTED:

(Chief of Contracts Design)

SHEET NAME:PROJECT NUMBER:

CHECKED: DATE:

DRAWN:

OFFICE OF CIVIL

ENGINEERS

KEESLER AIR FORCE BASE

A. MARASCA G. REED

876543

D

E

B

C

A

87654321

G

F

E

D

C

B

A

G

F

A R C H I T E C T S

1091 TOMMY MUNRO DR.

BILOXI, MS 39532

Telephone: 228.594.2323 www.egh.ms

STAMPENGINEERARCHITECT

100% SUBMITTAL

KEESLER AFB, BILOXI, MISSISSIPPI

PROJECT NUMBER: MAHG 11−1042

EGH PROJECT # 21−006

REPAIR BRYAN HALL B6901

CIVIL & STRUCTURAL

ENGINEER:

LIVE OAK ENGINEERING

MECHANICAL,

ELECTRICAL, &

TELECOMM ENGINEER:

DELL CONSULTING

KTC

KLK 02.18.2022

MAHG11-1042

MAHG111042 BRYAN HALL

RENOVATION

TITLE SHEET G008

02.18.2022

VOLUME 2 OF 2

ATTACHMENT 4

SOLICITATION FA301023R0001

1557824398E Text Box

1557824398E Text Box

1557824398E Text Box

1557824398E Text Box

REV A - 08/04/2022

Parking

Parking

Parking Parking

Parking

Parking

Parking

"L" ST.

"I" ST

GATE 7

GATE 8

GATE 2

GATE 3

GATE 9

GATE 1

IN

ST

RUM

EN

T

RU

NW

AY

Parking

"H" ST

Parking

M

EA

DO

W S

DR

IV

E

HANGAR ROAD

Gas Metering Station

R O D E N B E R G

A V E N U E

G A

LA

X Y

S

TR

E E T

Dia. #4

PLOESTI DRIVE

PHANTOM STREET

THUNDERBOLT STREET

EA

GL

E

ST

R

EE

T

ILS

Softball Dia. #5 Softball

Auto Wash Rack

OVE

R

RUN

FALCON STREET

B A

#5 Tank

Parking

Tr oo p Wa lk

HERC

ULES STREET

Review Stand

NW

-SE RUNWAY (DISUSED)

TA

XI

W

AY

Pa rk in g

TAXIWAY # 3

AIRCRAFT PARKING APRON #1

TAXIW

AY #

BAY RIDGE

CAPEHART

HOUSING

C

UR

TIS

D

RI

VE

A R N O

LD

Gas Reg. & Metering Sta.

CABELL STREET

SH

AD

YLA

WN

SHADOWLAWN

WHERRY HOUSING

M

IT

C

HE

LL

C

IR

CL

E

PINELAWN

POWER CIRCLE

GRASSLAWN

ORVILLE WRIGHT

Substation

PA

TR

IC

K

DR

IV

E

PATTON AVEHA

RM

ON

C

IR

C

LE

HA

RM

ON

C

IR

C

LE

FE

C

HE

T

DR

IV

E

FE

C

HE

T

DR

IV

E

VAN

DEN

BER

G

DRIVE

CHANNEL

CIRCLE

Measuring Set Temp. & Humidity

Tower

Parking

NE

-S

W R

UN

W

AY

0' X

TAXIWAY # 4

TA

XI

W

AY

AI

RC

RA

FT

P

AR

KI

NG

A

PR

ON #2

TAXIWAY # 5

AREA

STORAGE

AMMO

Fire

Area Training

PLAYGROUND

MARINA

PARK

S

IX

TH

S T

"D" ST

HOUSING

PINEHAVEN

"B" STREET

"C" STREET

"A" STREET

"M"

ST

MS Power Easement

"C" ST

Parking

Tennis Courts

Track Cinder

"Z " S

T "Z

" S T

"X S T

"E " S

T

Substation Power

"D" ST

Parking

S E C O N D

S T

FI

FT

H S

T

CHAPPIE JAMES AVE

Parking

Parking

"L" ST

Parking

Parking

1516 14

Parking

Rec Pad

P a rk in g

Rec Pad

Parking

03 0504

Monument

Parking

Parking

Parking

"C" Street Ditch

S

IX

TH

S

TR

E E T

"D" STREET

S COURT ST SOUTH

D E

VO

N

W

AY

"G" ST

MEADOWS DR

SERVICE DR

"H" ST

Parking

F

IR

S T S

TR

E E T

Parking

Parking

Water Tower

Parking

TA

XI

W

AY

AI

RC

RA

FT

P

AR

KI

NG

A

PR

ON #2

Parking Parking

FI

FT

H S

T

LA

R C H E R

B

LV

D

P a rk in g

Parking

Monument

TH

IR

D

S T

Parking

"E" STParking

Parking

BAYVIEW STREET

YORKSHIRE ROAD

B A U G H M A N

B

LV

D

Parking

Water Tank #6

Parking

B E N

AV

O N

R O

AD

M

IN

D

EN

R O

AD

K E N S

IN

G

TO

N

D R

IV

E CONCORD CIRCLE

Parking

Tennis Courts

S COURT ST NORTH

N COURT ST

Storage Boat

Tower Water

XX

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X

X

X

X

X

XX

X X

XX

X

XX

X

XX XX

X

X

X

X

X

X

X X X

X

X X

XX

X

X

X X

X X

XX

X

X X

XX

X

X

X

X

X

X X

X X

X

X

X

XX

XX

X X

X X

X

X

X

X

X X

X

X

X

X X

XX

XX

XX

XX

XX

X

XXXX

XXXX

XX

XXXX

XXXX

XX

XXXX

XXXX

XX

XX

X

XXX

"Z " S

T

XXX

XXXX

XXXX

XXX

XXXX

XXXX

XX

XXXX

X

XXXX

XX

XX

X

X

XXXX

XX

XXXX

XX

X

"E " S

T

Rec Pad

X

XX

Parking

Z E R O

S

TR

E E T

X X

XX

XX

XX

XXXX

XX XX

Z E R O

S

TR

E E T

XX

XX

XX

XX

XX

XXXX

XXXX

XX XX

XXXX

XX

XX XX

XXX

XX X

GULFPORT

BILOXI

KEESLER AIR FORCE BASE OCEAN

SPRINGS

BAY ST. LOUIS 20 MI.

NEW ORLEANS LA. 100 MI.

INTERSTATE 10

INTERSTATE 110

US ROUTE 90

MISSISSIPPI SOUND

BILOXI BACK BAY

PASS ROAD

PASCAGOULA 20 MI.

MOBILE AL. 50 MI.

US ROUTE 90

INTERSTATE 10

US

ROUTE

DESIGN TEAM

ARCHITECT

ELEY GUILD HARDY ARCHITECTS, PA

1091 TOMMY MUNRO DRIVE

BILOXI, MS 39532

228.594.2323

KYLE KISH, AIA, CDT, P.I.C.

EMAIL: kkish@egh.ms

DANIEL HAMBURG, AIA, LEED AP

EMAIL: dhamburg@egh.ms

JOSEPH CRAIN, AIA

EMAIL: jcrain@egh.ms

TAYLOR CLAUSSEN, AIA, NCIDQ

EMAIL: tclaussen@egh.ms

HEIDI SCHATTIN, AIA, LEED AP

EMAIL: hschattin@egh.ms

CIVIL ENGINEER

LIVE OAK ENGINEERING

955-B HOWARD AVENUE

BILOXI, MS 39530

228.207.0070

LLOYD "LES" SEYMOUR, P.E.

EMAIL: les@liveoakengineering.com

STRUCTURAL ENGINEER

LIVE OAK ENGINEERING

955-B HOWARD AVENUE

BILOXI, MS 39530

228.424.6455

CHARLES CHAPMAN, P.E.

EMAIL: charles@liveoakengineering.com

MECHANICAL ENGINEER

DELL CONSULTING

129 EAST GOVERNMENT STREET

PENSACOLA, FL32502

850.332.5687 x103

JASON MATIACIO, P.E., BCxP, BEMP, LEED AP BD+C EMAIL: Jason@DellConsultingLLC.com

ELECTRICAL ENGINEER

DELL CONSULTING

129 EAST GOVERNMENT STREET

PENSACOLA, FL32502

850.332.5687 x103

HAL DELL, P.E., RCDD, LEED AP BD+C

EMAIL: Hal@DellConsultingLLC.com

TELECOMMUNICATIONS

DELL CONSULTING

129 EAST GOVERNMENT STREET

PENSACOLA, FL32502

850.332.5687 x103

HAL DELL, P.E., RCDD, LEED AP BD+C

EMAIL: Hal@DellConsultingLLC.com

ABBREVIATIONS

& AND

@ AT

< ANGLE

A/C AIR CONDITIONING

ACT ACOUSTICAL CEILING TILE

ADDT'L ADDITIONAL

ADJ ADJUSTABLE

AF ACCESS FLOORING

AFD AUTOMATIC FIRE DAMPER

AFF ABOVE FINISH FLOORING

ALUM ALUMINUM

ALT ALTERNATE

ARCH ARCHITECT

BET BETWEEN

BIT BITUMEN

BJ BAR JOIST

BLDG BUILDING

BLK BLOCK

BLK'G BLOCKING

BLT BUILT

BM BEAM

BO BOTTOM OF

BOT BOTTOM

B.R. BACKER ROD

CAP CAPACITY

CB CATCH BASIN

C/C CENTER TO CENTER

CCTV CLOSED CIRCUIT ELEVATION

CFH CUBIC FEET/HOUR

CFM CUBIC FEET/MINUTE

CI. CAST IRON

C.J. CONTROL JOINT

CL CLEAR

CLG CEILING

CLO CLOSET

CLR COLOR

CMU CONCRETE MASONRY UNIT

CONTR. CONTRACTOR

COL COLUMN

COMP COMPRESSION/COMPRESSED

CONC CONCRETE

COND CONDENSATE

CONST CONSTRUCTION

CONT CONTINUOUS

CPLING COUPLING

CPT CARPET

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTR CENTERS

C CENTER LINE

C.W. COLD WATER

D/DIA DIAMETER

DB DRY BULB

DBL DOUBLE

DEFL DEFLECTION

DEPT. DEPARTMENT

DET/DTL DETAIL

DISP. DISPENSER

DK DARK

DN DOWN

D.P. DAWNPROOFING

DS DOWNSPOUT

DWG(S) DRAWING(S)

EA EACH

EDF ELECTRIC DRINKING FOUNTAIN

EF EXHAUST FAN

EFC EACH FACE

EJ EXPANSION JOINT

ELEC. ELECTRICAL

EL/ELEV ELEVATION

EMBED EMBEDDED

ENGR. ENGINEER

ENT ENTERING/ENTRY

EOP EXISTING OVERHEAD PRIMARY

EQ EQUAL

EQUIP. EQUIPMENT

ES EXPOSED STRUCTURE

ESP EXTERNAL STATIC PRESSURE

EXH EXHAUST

EXPAN EXPANSION

EXT EXTERIOR

FA FIRE ALARM

FAC FIRE ALARM CABINET

FD FLOOR DRAIN

FAR FIRE ALARM REMOTE

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FFE FINISH FLOOR ELEVATION

FH FIRE HYDRANT

FIN FINISH

FLR FLOOR

F.O.C. FACE OF CONCRETE

F.O.B. FACE OF BRICK

FR FRAME

FS FLOW SWITCH

FT FOOT/FEET

FTG FOOTING

GA GAUGE

GALV GALVANIZED

G.C. GENERAL CONTRACTOR

G.F. CMU GROUND FACE CMU

GL GLASS

GPM GALLONS PER MINUTE

GYP.BD GYPSUM BOARD

HB HOSE BIBB

HC HANDICAP

HD/WR HARDWARE

HM HOLLOW METAL

HDN. HAND

HP HIGH POINT

HORIZ. HORIZONTAL

HR HOUR

HT HEIGHT

H.W. HOT WATER

HVAC. HEATING, VENTILATION,

AIR CONDITIONING

IC INTERCOM

INSUL INSULATION

INT INTERIOR

INV INVERT

JAN JANITOR

JT JOINT

JST JOIST

L LENGTH, LONG

LAM LAMINATED(D)

L.A.T. LAY-IN ACOUSTICAL CEILING

LAV LAVATORY

LF LINEAR FEET

LG LEG

LP LIGHT POLE

MA MIXED AIR

MAS. MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFR/MFGR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

M.O. MANSONRY OPENING

MOD. MODIFIED

MRV MOISTURE RELEASE VENT

M.T. METAL THRESHOLD

MTD MOUNTED

MTL METAL

N/A NOT APPLICABLE

NF NATURAL FINISH

NIC NOT IN CONTRACT

NO./# NUMBER

NOM NOMINAL

NR NARROW RIB

NS NOT SHOWN

NTS NOT TO SCALE

OA OUTSIDE AIR

O.C. ON CENTER

OCEW ON CENTER EACH WAY

OH OVERHEAD

OPN'G OPENING

OPP. OPPOSITE

OZ. OUNCE

+/-.± PLUS OR MINUS

P/PT PAINT

PART'N PARTITION

PDI WATER HAMMER ARRESTOR

PF PREFINISH(ED)

PL PLATE

?? PROPERTY LINE

PLAS. PLASTIC LAMINATE

PLYWD. PLYWOOD

PNL PANEL

PP POWER POLE

PR PAIR

PREFAB PREFABRICATED

PROJ PROJECTION

PSF POUNDS/SQUARE FOOT

PSI POUNDS/SQUARE INCH

P.T.D. PAPER TOWEL DISPENSER

PVC POLYVINYL CHLORIDE

QT QUARRY TILE

QTB QUARRY TILE BASE

QTY QUANTITY

R/RAD RADIUS

RA RETURN AIR

RB RUBBER BASE

RD ROOF DRAIN

REF REFERENCE

REINF REINFORCED

REQ'D REQUIRED

RET RETURN

RM ROOM

RPM REVOLUTIONS PER MINUTE

RTU ROOF-TOP UNIT

SA SUPPLY AIR

SAN SANITARY

SCWD SOLID CORE WOOD

SD SPLITTER DAMPER

SECT SECTION

SF STOREFRONT/SQUARE FEET

SHT SHEET

SIM SIMILAR

SL SLOPE

SP SPACING

SPEC SPECIFIED/SPECIFICATIONS

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

STL STEEL

STRUCT. STRUCTURAL

SUP SUPPLY

SUSP SUSPENDED

SYN SYNTHETIC

T&B TOP AND BOTTOM

TBM TEMPORARY BENCH MARK

TEL TELEPHONE

T&G TOUNGE AND GROOVE

TH/THK THICK

THRESH. THRESHOLD

TLT TOILET

T.O. TOP OF

T.O.B. TOP OF BEAM

TOS TOP OF STRUCTURE

TP TOILET PAPER HOLDER

TRTD TREATED

TYP TYPICAL ALL SIMILAR

CONDITIONS

U.C. UNDER COUNTER

U.L. UNDERWRITER'S LABORATORY

UNO UNLESS NOTED OTHERWISE

VAR VARIES

VD VOLUME DAMPER

VERT VERTICAL

V.C.T. VINYL COMPOSITION TILE

VTR VENT-THRU-ROOF

V.W.C. VINYL WALL COVERING

W. WIDE, WIDTH

W/ WITH

WCO WALL CLEANOUT

WD WOOD

WG WATER GAUGE

WGVP WATER GAUGE VISION PANEL

WH WATER HEATER

WP WATERPROOFING

WV WATER VAUVE

WMF WELDED WIRE FABRIC

DRAWING INDEX

GRAPHIC LEGEND

WOOD BLOCKING

CONT BATT INSULATION /

ACOUSTICAL BATTS

FLOOR DRAIN

ROOM DESIGNATION

DOOR OPENING

WINDOW TYPE

COLUMN GRID LINE

DETAIL

ELEVATION

BUILDING SECTION / DETAIL

100A

ROOM NAME

A300

XX

A

6.2

WALL PARTITION TYPE

A200

A520

DOO3 PHOTO DESIGNATION

LOCATION

X

X

XX

X

X DEMO KEYNOTES

RENOVATION KEYNOTES

MATERIAL LEGEND

EARTH

CONCRETE IN

SECTION/PLAN

WOOD DOOR

METAL IN SECTION

GRASS

FINISH WOOD

ROUGH WOOD

CONSTRUCTION

IN SECTION

RIGID INSULATION

CAST STONE

PROJECT MAP

BASE CONTRACTING

BLDG 4605

VECTRUS

BLDG 4705

MAIN GATE / VISITORS CENTER

(WHITE AVE VIA HWY 90)

SECURITY

POLICE

BLDG 3524

CONTRACTOR'S

TRUCK ROUTE

BLDG 6901

NOTE: CONTRACTOR TO

FINALIZE LAYDOWN AREAS

AND TRUCK ROUTES AFTER

AWARD. INFORMATION GIVEN

IS FOR PRICING ONLY.

VICINITY MAP

1. ALL DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO QUANTIFY THE

MATERIALS SPECIFIED AND INDICATE THEIR INTENDED RELATIONSHIP TO EACH

OTHER. THE DRAWINGS ARE NOT TO BE SCALED. THE VARIOUS SCALES USED ON

THE DRAWINGS MAY NOT ALLOW FOR ALL THE FITTINGS, OFFSETS, AND

ACCESSORIES THAT MAY BE REQUIRED TO COMPLETE THE WORK. THE

CONTRACTOR SHALL CAREFULLY INVESTIGATE THE CONDITIONS THAT WOULD

AFFECT THE WORK TO BE PERFORMED AND SHALL ARRANGE SUCH WORK AS

NECESSARY TO COMPLY WITH THE INTENT OF THE CONSTRUCTION CONDITIONS.

2. THIS PROJECT CONTAINS ASBESTOS MATERIAL IN THE CONSTRUCTION AREA-

SEE ASBESTOS REPORT FOR MORE INFORMATION.

3. THIS PROJECT CONTAINS LEAD BASE PAINT MATERIAL IN THE CONSTRUCTION

AREA- SEE LEAD BASED PAINT REPORT FOR MORE INFORMATION.

GENERAL NOTES

APPROVEDDRAWN

AIR EDUCATION AND TRAINING

COMMAND

DATEREVISION

UNITED STATES AIR

FORCE

MISSISSIPPI

FACILITY NUMBER:

SHEET OF

DRAWING NUMBER:

BILOXI

RECOMMENDED:

(Chief ofEngineering)

SUBMITTED:

(Chief of Contracts Design)

SHEET NAME:PROJECT NUMBER:

CHECKED: DATE:

DRAWN:

OFFICE OF CIVIL

ENGINEERS

KEESLER AIR FORCE BASE

A. MARASCA G. REED

876543

D

E

B

C

A

87654321

G

F

E

D

C

B

A

G

F

A R C H I T E C T S

1091 TOMMY MUNRO DR.

BILOXI, MS 39532

Telephone: 228.594.2323 www.egh.ms

STAMPENGINEERARCHITECT

CIVIL & STRUCTURAL

ENGINEER:

LIVE OAK ENGINEERING

MECHANICAL,

ELECTRICAL, &

TELECOMM ENGINEER:

DELL CONSULTING

KTC

KLK 02.18.2022

MAHG11-1042

MAHG111042 BRYAN HALL

RENOVATION

DRAWING INDEX &

PROJECT INFORMATION G009

VOLUME 1 VOLUME 2

INDEX - GENERAL (VOL 1)

G000 TITLE SHEET

G001 DRAWING INDEX & PROJECT INFORMATION

G002 PHASING PLAN

G003 EXISTING CONDITIONS - TOPO PAGE 1

G004 EXISTING CONDITIONS - TOPO PAGE 2

G005 EXISTING CONDITIONS - TOPO PAGE 3

G006 EXISTING CONDITIONS - TOPO PAGE 4

G007 STRUCTURE TABLE

INDEX - LIFE SAFETY

LS100 CODE INFORMATION

LS101 1ST FLOOR LIFE SAFETY PLAN

LS102 2ND FLOOR LIFE SAFETY PLAN

INDEX - CIVIL

C100 DEMOLITION PLAN

C200 CIVIL SITE PLAN

C201 DETAIL SHEET

C400 SITE UTILITY PLAN

C500 SITE DETAILS

INDEX - STRUCTURAL

S000 GENERAL NOTES

S001 GENERAL NOTES CONT.

S101 FIRST FLOOR REFERENCE PLAN

S102 2ND FLOOR REFERENCE PLAN

S103 ROOF REFERENCE PLAN

S104 ENLARGED REFERENCE PLANS

S105 ENLARGED REFERENCE PLANS

S201 TYPICAL DETAILS

S202 TYPICAL DETAILS

S203 TYPICAL DETAILS FOR SLAB ENCLOSURE & OPENINGS

S204 TYPICAL DETAILS FOR SLAB ENCLOSURE & OPENINGS

S301 SECTIONS

S401 ENLARGED SECTIONS

INDEX - DEMOLITION

AD001 DEMO SITE PLAN

AD002 HAZARDOUS MATERIALS PLAN

AD100 DEMO CRAWL SPACE PLAN

AD101 DEMO 1ST FLOOR - OVERALL

AD102 DEMO 2ND FLOOR - OVERALL

AD103 DEMO 1ST FLOOR - PART A

AD104 DEMO 1ST FLOOR - PART B

AD105 DEMO 1ST FLOOR - PART C

AD106 DEMO 1ST FLOOR - PART D

AD107 DEMO 2ND FLOOR - PART A

AD108 DEMO 2ND FLOOR - PART B

AD109 DEMO 2ND FLOOR - PART C

AD110 DEMO 2ND FLOOR - PART D

AD111 INTERIOR DEMOLITION PHOTOS

AD112 EXTERIOR DEMOLITION PHOTOGRAPHS

AD130 DEMO ROOF PLAN

AD131 EXISTING ROOF PHOTOS

AD132 ROOF DEMO DETAILS

AD133 CANOPY DEMO DETAILS

AD200 DEMO ELEVATIONS

INDEX - ARCHITECTURAL

A001 NEW SITE PLAN

A002 SITE DETAILS

A100 CRAWL SPACE PLAN

A101 FIRST FLOOR - OVERALL

A102 2ND FLOOR - OVERALL

A103 1ST FLOOR - PART A

A104 1ST FLOOR - PART B

A105 1ST FLOOR - PART C

A106 1ST FLOOR - PART D

A107 2ND FLOOR - PART A

A108 2ND FLOOR - PART B

A109 2ND FLOOR - PART C

A110 2ND FLOOR - PART D

A120 RCP - 1ST FLOOR - OVERALL

A121 RCP - 2ND FLOOR - OVERALL

A122 1ST FLOOR RCP - PART A

A123 1ST FLOOR RCP - PART B

A124 1ST FLOOR RCP - PART C

A125 1ST FLOOR RCP - PART D

A126 2ND FLOOR RCP - PART A

A127 2ND FLOOR RCP - PART B

A128 2ND FLOOR RCP - PART C

A129 2ND FLOOR RCP - PART D

A130 ROOF PLAN

A200 ELEVATIONS

A400 ENLARGED FLOOR PLANS

A401 PLAN DETAILS

A402 NEW ROOF DETAILS

A403 CANOPY DETAILS

A410 ENLARGED STAIR PLANS

A411 ENLARGED STAIR PLANS

A412 ENLARGED STAIR SECTIONS

A600 PARTITION TYPES

A601 CRAWL SPACE & 1ST FLOOR OPENING

SCHEDULE

A602 2ND FLOOR OPENING SCHEDULE

A603 FRAME TYPES/ HJS DETAILS

A604 HJS DETAILS

INDEX - INTERIORS

I100 FIRST FLOOR - FINISH PLAN - OVERALL

I101 SECOND FLOOR - FINISH PLAN - OVERALL

I102 FIRST FLOOR - FURNITURE PLAN - OVERALL

I103 SECOND FLOOR - FURNITURE PLAN - OVERALL

I104 FIRST FLOOR - SIGNAGE PLAN - OVERALL

I105 SECOND FLOOR - SIGNAGE PLAN - OVERALL

I400 ENLARGED FINISH FLOOR PLANS

I401 ENLARGED FINISH FLOOR PLANS

I402 ENLARGED MILLWORK PLANS & ELEVATIONS

I403 MILLWORK DETAILS & INTERIOR RENDERINGS

I404 ENLARGED MILLWORK PLANS & ELEVATIONS

I405 ENLARGED MILLWORK PLANS & ELEVATIONS

I406 INTERIOR ELEVATIONS

I410 ENLARGED FURNITURE PLANS

I600 1ST FLOOR FINISH SCHEDULE & KEY

I601 2ND FLOOR FINISH SCHEDULE

INDEX - GENERAL (VOL 2)

G008 TITLE SHEET

G009 DRAWING INDEX & PROJECT INFORMATION

INDEX - FIRE PROTECTION

FP001 LEGENDS, NOTES & ABBREVIATIONS

FP111 1ST FLOOR OVERALL PLAN - FIRE PROTECTION

FP112 2ND FLOOR OVERALL PLAN - FIRE PROTECTION

INDEX - MECHANICAL

M001 LEGENDS, NOTES & ABBREVIATIONS

M100 SITE PLAN - MECHANICAL

MD100 CRAWLSPACE OVERALL PLAN - DEMOLITION

MD101 1ST FLOOR OVERALL PLAN - DEMOLITION

MD102 2ND FLOOR OVERALL PLAN - DEMOLITION

MD103 1ST FLOOR PART A PLAN - DEMOLITION

MD104 1ST FLOOR PART B PLAN - DEMOLITION

MD105 1ST FLOOR PART C PLAN - DEMOLITION

MD106 1ST FLOOR PART D PLAN - DEMOLITION

MD107 2ND FLOOR PART A PLAN - DEMOLITION

MD108 2ND FLOOR PART B PLAN - DEMOLITION

MD109 2ND FLOOR PART C PLAN - DEMOLITION

MD110 2ND FLOOR PART D PLAN - DEMOLITION

MD130 ROOF PLAN - DEMOLITION

M603 SCHEDULES

M604 SCHEDULES

M605 SCHEDULES

M606 CHILLED WATER PIPING DIAGRAM

M607 HEATING HOT WATER PIPING DIAGRAM

M701 CONTROLS

M702 CONTROLS

M703 CONTROLS

M704 CONTROLS

M705 CONTROLS

M706 CONTROLS

M707 CONTROLS

M110 CRAWLSPACE PLAN

M111 1ST FLOOR OVERALL PLAN - DUCTWORK

M112 2ND FLOOR OVERALL PLAN - DUCTWORK

M113 1ST FLOOR PART A PLAN - DUCTWORK

M114 1ST FLOOR PART B PLAN - DUCTWORK

M115 1ST FLOOR PART C PLAN - DUCTWORK

M116 1ST FLOOR PART D PLAN - DUCTWORK

M117 2ND FLOOR PART A PLAN - DUCTWORK

M118 2ND FLOOR PART B PLAN - DUCTWORK

M119 2ND FLOOR PART C PLAN - DUCTWORK

M120 2ND FLOOR PART D PLAN - DUCTWORK

M131 1ST FLOOR OVERALL PLAN - PIPING

M132 2ND FLOOR OVERALL PLAN - PIPING

M161 ROOF PLAN

M401 ENLARGED PLANS & ELEVATIONS

M402 ENLARGED PLANS & ELEVATIONS

M403 ENLARGED PLANS & ELEVATIONS

M404 ENLARGED PLANS & ELEVATIONS

M405 ENLARGED PLANS & ELEVATIONS

M406 ENLARGED PLANS & ELEVATIONS

M407 ENLARGED PLANS & ELEVATIONS

M408 ENLARGED PLANS & ELEVATIONS

M409 ENLARGED PLANS & ELEVATIONS

M410 ENLARGED PLANS & ELEVATIONS

M411 ENLARGED PLANS & ELEVATIONS

M412 ENLARGED PLANS & ELEVATIONS

M413 ENLARGED PLANS & ELEVATIONS

M501 DETAILS

M502 DETAILS

M601 SCHEDULES

M602 SCHEDULES

INDEX - PLUMBING

P001 LEGENDS, NOTES & ABBREVIATIONS

PD100 CRAWLSPACE OVERALL PLAN - DEMOLITION

PD101 1ST FLOOR OVERALL PLAN - DEMOLITION

PD102 2ND FLOOR OVERALL PLAN - DEMOLITION

PD130 ROOF PLAN - DEMOLITION

PD401 1ST FLOOR ENLARGED PLANS - DEMOLITION

PD402 1ST FLOOR PART C PLAN - DEMOLITION

P111 1ST FLOOR OVERALL PLAN - WASTE & VENT

P112 2ND FLOOR OVERALL PLAN - WASTE & VENT

P130 CRAWLSPACE OVERALL PLAN - DOMESTIC

WATER

P131 1ST FLOOR OVERALL PLAN - DOMESTIC WATER

P132 2ND FLOOR OVERALL PLAN - DOMESTIC WATER

P161 ROOF PLAN - STORM & VENT

P401 1ST FLOOR REST ROOM ENLARGED PLANS -

WASTE & VENT

P402 2ND FLOOR REST ROOM ENLARGED PLANS -

WASTE & VENT

P403 1ST FLOOR REST ROOM ENLARGED PLANS -

DOMESTIC WATER

P404 2ND FLOOR REST ROOM ENLARGED PLANS -

DOMESTIC WATER

P405 1ST FLOOR MECHANICAL ENLARGED PLANS

P406 2ND FLOOR MECHANICAL ENLARGED PLANS

P501 DETAILS

P502 DETAILS

P503 DETAILS

P601 SCHEDULES

P901 WASTE & VENT RISER DIAGRAMS

P902 WASTE & VENT RISER DIAGRAMS

P903 WASTE & VENT RISER DIAGRAMS

P904 DOMESTIC WATER RISER DIAGRAMS

P905 DOMESTIC WATER RISER DIAGRAMS

P906 DOMESTIC WATER RISER DIAGRAMS

INDEX - ELECTRICAL

E001 LEGEND AND NOTES

E002 ABBREVIATIONS

E100 SITE PLAN- ELECTRICAL

ED100 CRAWLSPACE FLOOR PLAN - DEMOLITION

ED101 1ST FLOOR OVERALL PLAN - DEMOLITION

ED102 2ND FLOOR OVERALL PLAN - DEMOLITION

ED103 ROOF OVERALL PLAN - DEMOLITION

ED130 ROOF PLAN - DEMOLITION

E708 SCHEDULES

E709 SCHEDULES

E710 SCHEDULES

E711 SCHEDULES

E712 SCHEDULES

E713 SCHEDULES

E714 SCHEDULES

E715 SCHEDULES

E716 SCHEDULES

E717 SCHEDULES

E718 SCHEDULES

E719 SCHEDULES

E720 -- NOT USED --

E721 -- NOT USED --

E110 CRAWLSPACE FLOOR PLAN - LIGHTING

E111 1ST FLOOR OVERALL PLAN - LIGHTING

E112 2ND FLOOR OVERALL PLAN - LIGHTING

E113 1ST FLOOR PART A PLAN - LIGHTING

E114 1ST FLOOR PART B PLAN - LIGHTING

E115 1ST FLOOR PART C PLAN - LIGHTING

E116 1ST FLOOR PART D PLAN - LIGHTING

E117 2ND FLOOR PART A PLAN - LIGHTING

E118 2ND FLOOR PART B PLAN - LIGHTING

E119 2ND FLOOR PART C PLAN - LIGHTING

E120 2ND FLOOR PART D PLAN - LIGHTING

E131 1ST FLOOR OVERALL PLAN - POWER

E132 2ND FLOOR OVERALL PLAN - POWER

E133 1ST FLOOR PART A PLAN - POWER

E134 1ST FLOOR PART B PLAN - POWER

E135 1ST FLOOR PART C PLAN - POWER

E136 1ST FLOOR PART D PLAN - POWER

E137 2ND FLOOR PART A PLAN - POWER

E138 2ND FLOOR PART B PLAN - POWER

E139 2ND FLOOR PART C PLAN - POWER

E140 2ND FLOOR PART D PLAN - POWER

E143 1ST FLOOR PART A PLAN - MECHANICAL POWER

E144 1ST FLOOR PART B PLAN - MECHANICAL POWER

E145 1ST FLOOR PART C PLAN - MECHANICAL POWER

E146 1ST FLOOR PART C PLAN - MECHANICAL POWER

E147 2ND FLOOR PART A PLAN - MECHANICAL POWER

E148 2ND FLOOR PART B PLAN - MECHANICAL POWER

E149 2ND FLOOR PART C PLAN - MECHANICAL POWER

E150 2ND FLOOR PART D PLAN - MECHANICAL POWER

E161 ROOF PLAN - MECHANICAL POWER

E171 1ST FLOOR OVERALL PLAN - FIRE ALARM

E172 2ND FLOOR OVERALL PLAN - FIRE ALARM

E173 1ST FLOOR PART A PLAN - FIRE ALARM

E174 1ST FLOOR PART B PLAN - FIRE ALARM

E175 1ST FLOOR PART C PLAN - FIRE ALARM

E176 1ST FLOOR PART D PLAN - FIRE ALARM

E177 2ND FLOOR PART A PLAN - FIRE ALARM

E178 2ND FLOOR PART B PLAN - FIRE ALARM

E179 2ND FLOOR PART C PLAN - FIRE ALARM

E180 2ND FLOOR PART D PLAN - FIRE ALARM

E190 ROOF PLAN - LIGHTNING PROTECTION

E501 DETAILS

E502 DETAILS

E503 DETAILS

E504 DETAILS

E505 DETAILS

E506 DETAILS

E507 DETAILS

E601 SINGLE LINE DIAGRAM

E602 SINGLE LINE DIAGRAM

E701 SCHEDULES

E702 SCHEDULES

E703 SCHEDULES

E704 SCHEDULES

E705 SCHEDULES

E706 SCHEDULES

E707 SCHEDULES

INDEX - TELECOM

T001 LEGEND, NOTES & ABBREVIATIONS

T100 SITE PLAN - TELECOMMUNICATIONS

T110 CRAWLSPACE FLOOR PLAN -

TELECOMMUNICATIONS

T111 1ST FLOOR OVERALL FLOOR PLAN -

TELECOMMUNICATIONS

T112 2ND FLOOR OVERALL FLOOR PLAN -

TELECOMMUNICATIONS

T113 1ST FLOOR PART A FLOOR PLAN -

TELECOMMUNICATIONS

T114 1ST FLOOR PART B FLOOR PLAN -

TELECOMMUNICATIONS

T115 1ST FLOOR PART C FLOOR PLAN -

TELECOMMUNICATIONS

T116 1ST FLOOR PART D FLOOR PLAN -

TELECOMMUNICATIONS

T117 2ND FLOOR PART A FLOOR PLAN -

TELECOMMUNICATIONS

T118 2ND FLOOR PART B FLOOR PLAN -

TELECOMMUNICATIONS

T119 2ND FLOOR PART C FLOOR PLAN -

TELECOMMUNICATIONS

T120 2ND FLOOR PART D FLOOR PLAN -

TELECOMMUNICATIONS

T401 ENLARGED PLANS - TELECOMMUNICATIONS

T402 ENLARGED PLANS - TELECOMMUNICATIONS

T403 ENLARGED PLANS - TELECOMMUNICATIONS

T404 ENLARGED PLANS - TELECOMMUNICATIONS

T501 DETAILS

T502 DETAILS

T503 DETAILS

T504 DETAILS

T505 DETAILS

T601 RISER DIAGRAMS

T602 RISER DIAGRAMS

T603 RISER DIAGRAMS

T604 RISER DIAGRAMS

T605 RISER DIAGRAMS

FIRE PROTECTION LEGEND

ACT ACOUSTIC CEILING TILE

AHJ AUTHORITY HAVING JURISDICTION

BFP BACKFLOW PREVENTER

BOD BASIS OF DESIGN

FDC FIRE DEPARTMENT CONNECTION

FPS FEET PER SECOND

GAL GALLONS

GPM GALLONS PER MINUTE

IAW IN ACCORDANCE WITH

IBC INTERNATIONAL BUILDING CODE

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NICET NATIONAL INSTITUTE FOR CERTIFICATION IN

ENGINEERING TECHNOLOGIES

PIV POST INDICATOR VALVE

PSI POUNDS PER SQUARE INCH

SF SQUARE FEET

FIRE PROTECTION ABBREVIATIONS

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

ALL FIRE PROTECTION AND SPRINKLER WORK SHALL BE PERFORMED

BY A LICENSED FIRE SPRINKLER CONTRACTOR IN THE STATE OF

MISSISSIPPI. ALL WORK SHALL BE IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS, APPLICABLE CODES AND

STANDARDS, AND NFPA 13. RE-CERTIFY SYSTEM AS REQUIRED BY

NFPA 13.

SYSTEM SHALL BE DESIGNED BY A NICET LEVEL III (OR HIGHER)

SPRINKLER SYSTEM TECHNICIAN WHO IS IN THE FULL TIME

EMPLOYMENT OF THE INSTALLING CONTRACTOR. SHOP/DESIGN

DRAWINGS AND HYDRAULIC CALCULATIONS SHALL BE REVIEWED BY A

PROFESSIONAL ENGINEER LICENSED IN MISSISSIPPI WITH AT LEAST

FIVE (5) YEARS DOCUMENTED FIRE PROTECTION EXPERIENCE.

FIRE PROTECTION WORK CONSISTS OF THE ADDITION OF A NEW WET

PIPE SPRINKLER SYSTEM TO AN EXISTING TWO-STORY BUILDING. NO

SPRINKLER SYSTEM CURRENTLY EXISTS.

CONTRACTOR SHALL OBTAIN A RECENT FIRE FLOW TEST PRIOR TO

BID. IN THE EVENT THAT A RECENT (WITHIN 6 MONTHS OF BID DATE)

FLOW TEST IS NOT AVAILABLE, THE CONTRACTOR SHALL CONDUCT

OR WITNESS A FLOW TEST PRIOR TO BID.

MAXIMUM WATER FLOW VELOCITY AS CALCULATED IN HYDRAULIC

CALCULATIONS SHALL NOT EXCEED 16 FPS.

CONTRACTOR SHALL VISIT THE SITE TO DETERMINE CONNECTION

POINTS AND PIPE ROUTING FOR THE REQUIRED SPRINKLER SYSTEM

INSTALLATION PRIOR TO BID.

COORDINATE HEAD LOCATIONS WITH REFLECTED CEILING PLANS AND

WORK OF OTHER TRADES.

PROVIDE FIRE STOPPING FOR ALL PIPING PENETRATING RATED

FLOORS, WALLS, PARTY WALLS AND CEILINGS. FIRE STOPPING

METHODS SHALL BE PER CODE REQUIREMENTS.

SPRINKLER HEADS LOCATED IN ACOUSTIC CEILING TILES SHALL BE IN

THE CENTER OF TILE.

ALL AREAS ARE LIGHT HAZARD UNLESS OTHERWISE NOTED

FIRE PROTECTION GENERAL NOTES

NAME OF FACILITY: BRYAN HALL

LOCATION: KEESLER AFB, MS

TYPE OF CONSTRUCTION: NON-COMBUSTIBLE

OWNER: KEESLER AFB FIRE MARSHAL

AUTHORITY HAVING JURISDICTION: KEESLER AFB, MS

GENERAL BUILDING HAZARD: LIGHT HAZARD

FIRE PROTECTION DESIGN CRITERIA

FLOW TEST DATE: JULY 12, 2021

FLOW TEST CONDUCTED BY: KEESLER AFB UTILITIES AUTHORITY

SOURCE OF WATER SUPPLY: MUNICIPAL, GRAVITY

STATIC PRESSURE: 68 PSIG

RESIDUAL PRESSURE: 55 PSIG

FLOW: 1278 GPM

PRELIMINARY FIRE FLOW TEST DATA

LIGHT HAZARD - WET SYSTEM

REMOTE AREA: 3000 SF

MAXIMUM AREA PER SPRINKLER: 225 SF

MINIMUM WATER FLOW DENSITY: 0.1 GPM/SF

PRELIMINARY SPRINKLER DEMAND: 390 GPM

HOSE STREAM: 250 GPM

ORDINARY HAZARD GROUP I - WET SYSTEM

REMOTE AREA: 3000 SF

MAXIMUM AREA PER SPRINKLER: 130 SF

MINIMUM WATER FLOW DENSITY: 0.15 GPM/SF

PRELIMINARY SPRINKLER DEMAND: 585 GPM

HOSE STREAM: 500 GPM

ORDINARY HAZARD GROUP II - WET SYSTEM

REMOTE AREA: 375 SF

MAXIMUM AREA PER SPRINKLER: 130 SF

MINIMUM WATER FLOW DENSITY: 0.2 GPM/SF

PRELIMINARY SPRINKLER DEMAND: 100 GPM

PRELIMINARY HYDRAULIC ANALYSIS

NEW PIPING

PIPE UP

PIPE DOWN

MEP Engineering

129 E. Government Street Pensacola, FL 32502

P: 850-332-5687 F:850-332-6629

APPROVEDDRAWN

AIR EDUCATION AND TRAINING

COMMAND

DATEREVISION

UNITED STATES AIR

FORCE

MISSISSIPPI

FACILITY NUMBER:

SHEET OF

DRAWING NUMBER:

BILOXI

RECOMMENDED:

(Chief ofEngineering)

SUBMITTED:

(Chief of Contracts Design)

SHEET NAME:PROJECT NUMBER:

CHECKED: DATE:

DRAWN:

OFFICE OF CIVIL

ENGINEERS

KEESLER AIR FORCE BASE

A. MARASCA G. REED

876543

D

E

B

C

A

87654321

G

F

E

D

C

B

A

G

F

A R C H I T E C T S

1091 TOMMY MUNRO DR.

BILOXI, MS 39532

Telephone: 228.594.2323 www.egh.ms

STAMPENGINEERARCHITECT

Mississippi Certificate Number E-1969

Dell Consulting project:21-072 Jason A. Matiacio 30457

IGL

JAM 02.18.2022

MAHG11-1042

MAHG111042 BRYAN HALL

RENOVATION

LEGENDS, NOTES &

ABBREVIATIONS FP001

R. R.

A

B

C

D

E

F

G

H

I

J

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

MECH

A126

MECH

D101

BOILER ROOM

D100

STAIR

D105

STAIR

B109

COMM

B115

COMM

A115

STOR

B127

COMM

C109

FILING

A104

INSTRUCT 5

(PIPELINE)

A100

INSTRUCT 4

(PIPELINE)

A101

INSTRUCT 3

(PIPELINE)

A102COPY

A103

INSTRUCT 2

(PIPELINE)

A105

INSTRUCT 1

(PIPELINE)

A106

FILING

B105

TLT

A107

CMNDR

A120

FILING

A116

SUPER TASK

A112

FILING

B116

STOR

B119

FILING

B120 CHIEF

B122

OFFICE

B126

OFFICE

B130

OFFICE

B131

OFFICE

B125

FILING

C110

INSTRUCT

(ADVANCED)

A109

SUPER WAITING

A110

INSTRUCT

(SUPERVISORS)

A111

HALL

A113

ELEC

A114

BLDG CONF

A117

SENIOR NCO

A119

WAITING

A118

MEN

B110

WOMEN

B111

INSTRUCT 6

(PIPELINE)

B108

INSTRUCT 7

(PIPELINE)

B107

INSTRUCT 8

(PIPELINE)

B106 COPY

B104

INSTRUCT 9

(PIPELINE)

B103

INSTRUCT 10

(PIPELINE)

B102

TLT

B101

BREAK ROOM

B112

ELEC

B114

HALL

B113

PERSONNEL

B118 WAITING AREA

B117

ADMIN

B121

TRASH

B123

CLASSROOM 1

A124

CLASSROOM 2

A123

JAN

A122

RESERVE WAITING

B128

STOR

B129 LIASON WAITING

B124

SERVER ROOM

D104

CLASSROOM 3

C103

CLASSROOM 4

C102

JAN

C101

CORRIDOR

1-2

CORRIDOR

1-6

CLASSROOM 7

C112

STOR

C111

ELEC

C108

HALL

C107

CLASSROOM 6

C106

CLASSROOM 5

C105

STUDENT BREAK

ROOM

(ADVANCED)

D115

STUDENT BREAK

ROOM (PIPELINE)

C113

STOR

C114CLASSROOM 9

C115

CLASSROOM 8

C116

MECH

C117

CORRIDOR

1-4

COMM/NODE

A125

MECH

C104

MECH

D112

CORRIDOR

1-5

CORRIDOR

1-7

MECH

B100

VENDING

B134

CORRIDOR

1-1

MECH

A108

WOMEN

A121

CORRIDOR

1-3

MEN

C100

COMM

D109

FILING

D110

LAB 1

B133

LAB 2

B132

LAB 3

D103

LAB 4

D102

SHELTER

STORAGE

D111

HALL

D107

ELEC

D108LAB 5

D106

LAB 7

D113

LAB 6

D114

PROVIDE COMPLETE FIRE SPRINKLER

COVERAGE IAW NFPA-13, NFPA-20, UFC

3-600-01, THE SPECIFICATIONS, AND AHJ.

1 2

1 1

4" FIRE LINE TO REMOTE FDC. COORDINATE

WITH CIVIL FOR CONTINUATION.

6" FIRE LINE TO SITE BFP. COORDINATE

WITH CIVIL FOR CONTINUATION.

LOBBY

1-0

6" FIRE LINE UP TO B200 MECHANICAL.

FP111

1ST FLOOR

30'-0"

2ND FLOOR

44'-0"

CRAWL SPACE

23'-10"

A

1ST FLOOR

30' - 0"

2ND FLOOR

44' - 0"

CRAWL SPACE

23' - 10"

4"-FIRE LINE TO

REMOTE FDC

6"-FIRE LINE TO

SITE BFP

MEP Engineering

129 E. Government Street Pensacola, FL 32502

P: 850-332-5687 F:850-332-6629

APPROVEDDRAWN

AIR EDUCATION AND TRAINING

COMMAND

DATEREVISION

UNITED STATES AIR

FORCE

MISSISSIPPI

FACILITY NUMBER:

SHEET OF

DRAWING NUMBER:

BILOXI

RECOMMENDED:

(Chief ofEngineering)

SUBMITTED:

(Chief of Contracts Design)

SHEET NAME:PROJECT NUMBER:

CHECKED: DATE:

DRAWN:

OFFICE OF CIVIL

ENGINEERS

KEESLER AIR FORCE BASE

A. MARASCA G. REED

876543

D

E

B

C

A

87654321

G

F

E

D

C

B

A

G

F

A R C H I T E C T S

1091 TOMMY MUNRO DR.

BILOXI, MS 39532

Telephone: 228.594.2323 www.egh.ms

STAMPENGINEERARCHITECT

Mississippi Certificate Number E-1969

Dell Consulting project:21-072 Jason A. Matiacio 30457

IGL

JAM 02.18.2022

MAHG11-1042

MAHG111042 BRYAN HALL

RENOVATION

1ST FLOOR OVERALL

PLAN - FIRE

PROTECTION

FP111

1/16" = 1'-0"FP111FP111

1 1ST FLOOR OVERALL PLAN - FIRE PROTECTION

SHEET NOTES

1 ORDINARY HAZARD GROUP I.

2 ORDINARY HAZARD GROUP II.

3 PROVIDE ALL PIPING WITHIN 5'-0" OF THE BUILDING FOOTPRINT. COORDINATE

WITH CIVIL FOR DEPTH OF COVER AND CONNECTION TO UNDERGROUND SITE

PIPING.

4 PROVIDE FLOOR CONTROL VALVE ASSEMBLY AND DRAIN RISER TO SERVE EACH

FLOOR LEVEL. PROVIDE TAMPER SWITCH AND FLOW SWITCH AND COORDINATE

WITH FIRE ALARM.

N

1/8" = 1'-0"FP111FP111

2 FIRE RISER SECTION

R.

A

B

C

D

E

F

G

H

I

J

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

STAIR

D204

JAN

D205

STAIR

B204

JAN

B205

FILING

A209

COMM

A208

FILING

D210

FILING

C210

COMM

C209

STOR

A212

STOR

B217

VENDING

B221

OFFICE

B219

MECH

D200

MECH

B200

MULTIPURPOSE

B203

CLASSROOM 12

A200

CLASSROOM 11

A201

CLASSROOM 10

A202

MECH

A203

STOR/TRASH

B214

CLASSROOM 15

A211

STOR

A210ELEC

A207

HALL

A206

CLASSROOM 14

A205

CLASSROOM 13

A204

MECH

B215

DRILL

B216CLASSROOM

B218

CUBE FARM

B220

CLASSROOM 17

A215

CLASSROOM 16

A216

MECH

A217

MECH

C204 CLASSROOM 18

C203

CLASSROOM 19

C202

CONFERENCE

ROOM

D203

LAB 12

D202 LAB 13

D201

CLASSROOM 27

D211

LAB 14

D206

CLASSROOM 22

C213

STOR

C211

ELEC

C208

HALL

C207

CLASSROOM 21

C206

CLASSROOM 20

C205

MECH

C218 CLASSROOM 23

C217

CLASSROOM 24

C216

CLASSROOM 25

C215

CLASSROOM 26

D215

LAB 15

D214

LAB 16

D213

MECH

D212

LACTATION

B222

CORRIDOR

2-2

CORRIDOR

2-6

CORRIDOR

2-4

JAN

A214

JAN

C201

STOR

B208

CORRIDOR

2-1

CORRIDOR

2-5

STOR

C214

CORRIDOR

2-7

CORRIDOR

2-3

WOMEN

A213

MEN

C200

MEN

B206

WOMEN

B207

FILING

B212

COMM

B211

COMM

D209

ELEC

D208

LAB 10

B201

LAB 9

B202

LAB 11

B213

HALL

B209

ELEC

B210

HALL

D207

PROVIDE COMPLETE FIRE SPRINKLER

COVERAGE IAW NFPA-13, NFPA-20, UFC

3-600-01, THE SPECIFICATIONS, AND AHJ.

1 1 1

1 1

STORAGE

B202.1

6" FIRE LINE DOWN TO B100 MECHANICAL.

FP111

MEP Engineering

129 E. Government Street Pensacola, FL 32502

P: 850-332-5687 F:850-332-6629

APPROVEDDRAWN

AIR EDUCATION AND TRAINING

COMMAND

DATEREVISION

UNITED STATES AIR

FORCE

MISSISSIPPI

FACILITY NUMBER:

SHEET OF

DRAWING NUMBER:

BILOXI

RECOMMENDED:

(Chief ofEngineering)

SUBMITTED:

(Chief of Contracts Design)

SHEET NAME:PROJECT NUMBER:

CHECKED: DATE:

DRAWN:

OFFICE OF CIVIL

ENGINEERS

KEESLER AIR FORCE BASE

A. MARASCA G. REED

876543

D

E

B

C

A

87654321

G

F

E

D

C

B

A

G

F

A R C H I T E C T S

1091 TOMMY MUNRO DR.

BILOXI, MS 39532

Telephone: 228.594.2323 www.egh.ms

STAMPENGINEERARCHITECT

Mississippi Certificate Number E-1969

Dell Consulting project:21-072 Jason A. Matiacio 30457

IGL

JAM 02.18.2022

MAHG11-1042

MAHG111042 BRYAN HALL

RENOVATION

2ND FLOOR OVERALL

PLAN - FIRE

PROTECTION

FP112

1/16" = 1'-0"FP111FP112

1 2ND FLOOR OVERALL PLAN - FIRE PROTECTION

SHEET NOTES

1 ORDINARY HAZARD GROUP I.

2 PROVIDE FLOOR CONTROL VALVE ASSEMBLY AND DRAIN RISER TO SERVE EACH

FLOOR LEVEL. PROVIDE TAMPER SWITCH AND FLOW SWITCH AND COORDINATE

WITH FIRE ALARM.

N

M

M

HVAC LEGEND

SUPPLY AIR DUCT UP

SUPPLY AIR DUCT DOWN

RETURN AIR DUCT UP

RETURN AIR DUCT DOWN

EXHAUST AIR DUCT UP

EXHAUST AIR DUCT DOWN

WxH

RECTANGULAR DUCTWORK, SIZES SHOWN ARE INTERNAL

CLEAR DIMENSIONS; FIRST FIGURE IS SIDE SHOWN

ø ø ø

ROUND GALVANIZED STEEL DUCTWORK;

SIZE SHOWN IS SHEET METAL DIAMETER

ROUND BRANCH DUCT TAKEOFF WITH SPIN-IN COLLAR

AND MANUAL VOLUME DAMPER

W xH

WxH RECTANGULAR BRANCH DUCT TAKE OFF WITH 45°

COLLAR AND MANUAL VOLUME DAMPER

EXISTING DUCTWORK

DEMO DUCTWORK

FACTORY FABRICATED/INSULATED FLEXIBLE ROUND DUCT

SQUARE THROAT ELBOW IN RECTANGULAR DUCT

WITH TURNING VANES

LONG RADIUS ELBOW (R = 1.5 x DIAMETER)

RECTANGULAR TO ROUND DUCT TRANSITION

RECTANGULAR TO RECTANGULAR DUCT TRANSITION

AUTOMATIC DAMPER (OPPOSED)

AUTOMATIC DAMPER (PARALLEL)

MANUAL VOLUME DAMPER

FD

FIRE DAMPER

SMOKE DAMPER

SD

FIRE/SMOKE DAMPER

FSD

CEILING DIFFUSER. PROVIDE SURFACE MOUNT STYLE WITH

TRIM RING FOR GYPSUM BOARD CEILING AND LAY-IN TYPE AT T-

BAR CEILING GRID. ROUND NECK SIZE AND AIRFLOW AS

INDICATED. BACK FACE OF DIFFUSER SHALL HAVE INSULATION

BLANKET. "24" = FACE SIZE; "08" = NECK DIAMETER

4-WAY THROW OR AS SHOWN ON PLANS

T THERMOSTAT

CONNECT TO EXISTING

PIPE DOWN

PIPE UP

RETURN AIR GRILLE. PROVIDE SURFACE MOUNT STYLE WITH

TRIM RING FOR GYPSUM BOARD CEILING AND LAY-IN TYPE AT T-

BAR CEILING GRID. PROVIDE REGISTERS WITH FACE-OPERATED

OPPOSED BLADE DAMPER. SIZE, AIRFLOW, DUCT COLLAR AS

INDICATED.

EXHAUST AIR GRILLE. PROVIDE SURFACE MOUNT STYLE WITH

TRIM RING FOR GYPSUM BOARD CEILING AND LAY-IN TYPE AT T-

BAR CEILING GRID. PROVIDE REGISTERS WITH FACE-OPERATED

OPPOSED BLADE DAMPER. SIZE, AIRFLOW, DUCT COLLAR AS

INDICATED.

DEMO PIPING

EXISTING PIPING

NEW PIPING

PIPE CAP

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

BALANCING VALVE

GATE VALVE

INLINE STRAINER VALVE

INLINE STRAINER WITH BLOWDOWN

VALVE AND HOSE BIBB

TWO WAY CONTROL VALVE

AUTOMATIC AIR VENT

PRESSURE REDUCING VALVE

RELIEF VALVE

GAUGE AND COCK

GAUGE TEST PORT (PETE'S PLUG)

THERMOMETER

THERMOWELL

UNION; DIELECTRIC CONNECTION

EQUIPMENT TAG

AHU

FLEXIBLE DUCT CONNECTION

NEW DUCTWORK

0 CD8

200 CFM

10ø

2424x24RG

400 CFM

10ø

2424x24EG

400 CFM

HVAC ABBREVIATIONS

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

INSTALL ALL MECHANICAL EQUIPMENT IN ACCORDANCE WITH MANUFACTURERS' RECOMMENDATIONS, CONTRACT

DOCUMENTS, AND APPLICABLE CODES AND STANDARDS.

CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. PROVIDE ALL FITTINGS, ACCESSORIES, PIPING, DUCTWORK, AND CONTROLS AS REQUIRED

FOR A FULLY FUNCTIONAL SYSTEM TO MEET THE DESIGN INTENT.

THE APPROXIMATE LOCATIONS OF EXISTING UTILITIES ARE SHOWN. THE CONTRACTOR SHALL DETERMINE THE EXACT

LOCATION AND SIZE OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK.

COORDINATE EQUIPMENT CLEARANCES (AS RECOMMENDED BY MANUFACTURER) WITH ALL DISCIPLINES BEFORE

INSTALLATION.

CONCRETE HOUSEKEEPING PADS FOR MECHANICAL EQUIPMENT SHALL BE MINIMUM 4-INCH THICKNESS. PAD SHALL EXTEND

BEYOND THE EQUIPMENT A MINIMUM OF 6 IN. ON ALL SIDES WITH CHAMFERED EDGES.

VERIFY CLEARANCE SPACE AVAILABLE, OFFSETS REQUIRED, STRUCTURAL OPENINGS, AND WORK BY OTHER TRADES PRIOR TO FABRICATION OF DUCTWORK AND PIPING. SUBMIT SHOP DRAWINGS ON DUCTWORK AND PIPING LAYOUT. COORDINATE

WITH STRUCTURE. PRESSURE TEST ALL DUCTWORK AND PIPING FOR LEAKS.

PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS, WHERE REQUIRED, TO SERVICE DAMPERS, VALVES, SMOKE DETECTORS, AND OTHER CONCEALED MECHANICAL EQUIPMENT.

PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL SMOKE DETECTORS, FIRE DAMPERS, VOLUME DAMPERS, COILS, AND OTHER ITEMS LOCATED IN THE DUCTWORK THAT REQUIRE SERVICE AND/OR INSPECTION.

ALL EQUIPMENT, PIPING, DUCTWORK, ETC. SHALL BE SUPPORTED AS DETAILED, SPECIFIED, AND REQUIRED TO PROVIDE A VIBRATION-FREE INSTALLATION. PROVIDE DUCT AND PIPE FLEX CONNECTIONS FOR ALL EQUIPMENT CONNECTIONS. PROVIDE VIBRATION ISOLATORS FOR ALL EQUIPMENT; SEE SPECIFICATIONS AND DETAILS. PROVIDE SEISMIC BRACING AS REQUIRED.

LOCATIONS AND SIZES OF FLOOR, WALL, AND ROOF OPENINGS SHALL BE COORDINATED WITH ALL OTHER TRADES INVOLVED.

ALL EQUIPMENT REQUIRING CONDENSATE DRAIN LINES SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET TO THE NEAREST DISPOSAL POINT AS INDICATED. PROVIDE A TRAP ON ALL DRAIN OUTLETS AND SLOPE PIPING MINIMUM 1/8 IN. PER

FOOT.

PROVIDE AUTOMATIC AIR VENTS AT HIGH POINTS AND DRAIN VALVES AT LOW POINTS ON ALL PIPING.

PIPE INSULATION AND VAPOR BARRIERS SHALL BE CONTINUOUS THROUGH PIPE HANGERS.

ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR DIMENSIONS.

COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH REFLECTED CEILING PLANS, LIGHTING, AND OTHER CEILING

MOUNTED DEVICES.

EXTERIOR LOUVERS ARE INDICATED FOR INFORMATION ONLY. LOUVER DIMENSIONS INDICATED DO NOT INCLUDE FRAME OR

FLANGES.

NO DUCTWORK OR PIPING SHALL RUN PARALLEL WITH AND OVER WALLS. AVOID ROUTING DUCTWORK AND PIPING OVER LIGHTS WHEREVER POSSIBLE. MAINTAIN MINIMUM 6” CLEARANCE BETWEEN HVAC INSULATION TO TOP OF LIGHTS. PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCE AROUND MECHANICAL EQUIPMENT FOR PROPER OPERATION AND ROUTINE

MAINTENANCE.

SEAL ALL DUCT PENETRATIONS OF WALLS AIRTIGHT, REGARDLESS OF WHETHER WALLS ARE FIRE-RATED OR NOT. PROVIDE

SLEEVES AND SEAL ALL PIPE PENETRATIONS OF WALLS AIRTIGHT.

ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC. SHALL BE FIRE-STOPPED WITH AN APPROVED UL-

LISTED PRODUCT.

ALL AIR INTAKE OPENINGS TO EXTERIOR SHALL HAVE A MIN 10'-0” CLEARANCE FROM ANY EXHAUST OPENING TO PREVENT

RECIRCULATION.

MOUNT DUCTWORK AS HIGH AS POSSIBLE WHERE EXPOSED, UNLESS OTHERWISE NOTED.

THERMOSTATS INDICATED ADJACENT TO DOORWAYS SHALL BE LOCATED WITHIN 18" OF JAMB AND MOUNTED AT A HEIGHT

CONSISTENT WITH LIGHT SWITCHES.

ALL EXPOSED CONTROL WIRING (MECHANICAL AND ELECTRICAL ROOMS) SHALL BE IN CONDUIT. ALL REMAINING CONTROL

WIRING SHALL BE PLENUM-RATED CABLE.

COORDINATE CONTROLS WORK WITH EXISTING BUILDING AUTOMATION SYSTEM PROVIDER (JOHNSON CONTROLS). PROVIDE CONSISTENCY WITH EXISTING POINT NAMING, DYNAMIC GRAPHICS, SCHEDULING, AND ALARMS.

EXISTING CONDITIONS ARE BASED ON PREVIOUS AS-BUILT DRAWINGS AND FIELD INVESTIGATIONS, THEREFORE EXISTING

DUCTWORK, PIPING, AND EQUIPMENT SHOWN MAY NOT REFLECT ACTUAL INSTALLATION.

HVAC GENERAL NOTES

GPM GALLONS PER MINUTE

GV GRAVITY VENTILATOR

HD HEAD

HP HORSEPOWER

HR HOUR

HW HEATING HOT WATER

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HZ HERTZ

IAW IN ACCORDANCE WITH

IN. INCH

KW KILOWATT

LAT LEAVING AIR TEMPERATURE

LB POUNDS

LWT LEAVING WATER TEMPERATURE

MAT MIXED AIR TEMPERATURE

MAX MAXIMUM

MBH THOUSANDS OF BTUH

MCA MINIMUM CIRCUIT AMPACITY

MFR MANUFACTURER

MIN MINIMUM

MOCP MAXIMUM OVERCURRENT PROTECTION

N/A NOT APPLICABLE

NC NORMALLY CLOSED

NO NORMALLY OPEN; NUMBER

NTS NOT TO SCALE

OA OUTDOOR AIR

OAL OUTDOOR AIR LOUVER

P PUMP

PD PRESSURE DROP

PH PHASE

PHC PREHEAT COIL

PSI POUNDS PER SQUARE INCH

QTY QUANTITY

R RADIUS; RELAY

RA RETURN AIR

RAT RETURN AIR TEMPERATURE

RG RETURN AIR GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RPM REVOLUTIONS PER MINUTE

RR RETURN AIR REGISTER

SA SUPPLY AIR

SAT SUPPLY AIR TEMPERATURE

SF SQUARE FEET; SUPPLY FAN

SP STATIC PRESSURE

SR SUPPLY AIR REGISTER; SIDEWALL REGISTER

SS STAINLESS STEEL

TG TRANSFER GRILLE

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

UC DOOR UNDERCUT

UH UNIT HEATER

V VOLTS

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

W WATTS

WB WET BULB

WC WATER COLUMN

WG WATER GAUGE

WPD WATER PRESSURE DROP

Φ DIAMETER

A AMPS

AAV AUTOMATIC AIR VENT

ACH AIR CHANGE PER HOUR

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHU AIR HANDLING UNIT

AP ACCESS PANEL

APD AIR PRESSURE DROP

AHRI AIR CONDITIONING, HEATING, AND

REFRIGERATION INSTITUTE

AS AIR SEPARATOR

B BOILER

BHP BRAKE HORSEPOWER

BTU BRITISH THERMAL UNIT

BTUH BTU PER HOUR

C CONDENSATE

CC COOLING COIL

CD CEILING DIFFUSER

CDWP CONDENSER WATER PUMP

CFM CUBIC FEET PER MINUTE

CH CHILLER

CHW CHILLED WATER

CHWP CHILLED WATER PUMP

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CO CLEANOUT

DB DRY BULB

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DELTA-T TEMPERATURE DIFFERENCE

DEMO DEMOLISH

DG DOOR GRILLE

DN DOWN

DP DIFFERENTIAL PRESSURE

EA EACH

EAL EXHAUST AIR LOUVER

EAT ENTERING AIR TEMPERATURE

ECM ELECTRONICALLY COMMUTATED MOTOR

EF EXHAUST FAN

EFF EFFICIENCY

EG EXHAUST AIR GRILLE

ELEC ELECTRICAL

ER EXHAUST AIR REGISTER

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

EWT ENTERING WATER TEMPERATURE

EX. EXISTING

EXH EXHAUST AIR

F/A FIRE ALARM

°F DEGREE FAHRENHEIT

FCU FAN COIL UNIT

FD FIRE DAMPER; FLOOR DRAIN

FLA FULL LOAD AMPS

FLR FLOOR

FMS FLOW MEASURING STATION

FO FLAT OVAL

FPI FINS PER INCH

FPM FEET PER MINUTE

FRG FILTER RETURN GRILLE

FS FLOAT SWITCH; FLOW SWITCH

FSD FIRE AND SMOKE DAMPER

FT FEET

GA GAUGE

GAL GALLONS

THREE WAY CONTROL VALVE

FILTER RETURN AIR GRILLE. PROVIDE SURFACE MOUNT STYLE

WITH TRIM RING FOR GYPSUM BOARD CEILING AND LAY-IN TYPE

AT T-BAR CEILING GRID. ACCOMMODATE 2" MERV 8 FILTER.

24x24FRG

400 CFM

10⌀

W/H FO

FLAT OVAL DUCTWORK, SIZES SHOWN ARE INTERNAL CLEAR

DIMENSIONS; FIRST FIGURE IS SIDE SHOWN

MEP Engineering

129 E. Government Street Pensacola, FL 32502

P: 850-332-5687 F:850-332-6629

APPROVEDDRAWN

AIR EDUCATION AND TRAINING

COMMAND

DATEREVISION

UNITED STATES AIR

FORCE

MISSISSIPPI

FACILITY NUMBER:

SHEET OF

DRAWING NUMBER:

BILOXI

RECOMMENDED:

(Chief ofEngineering)

SUBMITTED:

(Chief of Contracts Design)

SHEET NAME:PROJECT NUMBER:

CHECKED: DATE:

DRAWN:

OFFICE OF CIVIL

ENGINEERS

KEESLER AIR FORCE BASE

A. MARASCA G. REED

876543

D

E

B

C

A

87654321

G

F

E

D

C

B

A

G

F

A R C H I T E C T S

1091 TOMMY MUNRO DR.

BILOXI, MS 39532

Telephone: 228.594.2323 www.egh.ms

STAMPENGINEERARCHITECT

Mississippi Certificate Number E-1969

Dell Consulting project:21-072 Jason A. Matiacio 30457

BGA

JAM 02.18.2022

MAHG11-1042

MAHG111042 BRYAN HALL

RENOVATION

LEGENDS, NOTES &

ABBREVIATIONS M001

D

EX. COOLING TOWER TO REMAIN

BLDG 6901

REMOVE EX. HVAC

SYSTEMS SERVING

GENERATOR BUILDING

IN THEIR ENITRETY.

MEP Engineering

129 E. Government Street Pensacola, FL 32502

P: 850-332-5687 F:850-332-6629

APPROVEDDRAWN

AIR EDUCATION AND TRAINING

COMMAND

DATEREVISION

UNITED STATES AIR

FORCE

MISSISSIPPI

FACILITY NUMBER:

SHEET OF

DRAWING NUMBER:

BILOXI

RECOMMENDED:

(Chief ofEngineering)

SUBMITTED:

(Chief of Contracts Design)

SHEET NAME:PROJECT NUMBER:

CHECKED: DATE:

DRAWN:

OFFICE OF CIVIL

ENGINEERS

KEESLER AIR FORCE BASE

A. MARASCA G. REED

876543

D

E

B

C

A

87654321

G

F

E

D

C

B

A

G

F

A R C H I T E C T S

1091 TOMMY MUNRO DR.

BILOXI, MS 39532

Telephone: 228.594.2323 www.egh.ms

STAMPENGINEERARCHITECT

Mississippi Certificate Number E-1969

Dell Consulting project:21-072 Jason A. Matiacio 30457

BGA

JAM 02.18.2022

MAHG11-1042

MAHG111042 BRYAN HALL

RENOVATION

SITE PLAN -

MECHANICAL M1001/32" = 1'-0"M405M100

1 SITE PLAN - MECHANICAL

N

J

I

H

G

F

E

D

C

B

A

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

REMOVE EX. CHWS&R AND

HWS&R PIPING BACK TO MECH

ROOM WALL PENETRATION. EX.

PIPING INSIDE MECH ROOM

SHALL REMAIN.

REMOVE EX. CHWS&R AND

HWS&R PIPING UP TO MECH

ROOMS ABOVE. PREPARE EX.

FLOOR PENETRATIONS FOR

INSTALLATION OF NEW PIPING.

REMOVE EX. CHWS&R AND

HWS&R PIPING UP TO MECH

ROOMS ABOVE. PREPARE EX.

FLOOR PENETRATIONS FOR

INSTALLATION OF NEW PIPING.

REMOVE EX. CHWS&R AND

HWS&R PIPING UP TO MECH

ROOMS ABOVE. PREPARE EX.

FLOOR PENETRATIONS FOR

INSTALLATION OF NEW PIPING.

REMOVE EX. CHWS&R AND

HWS&R PIPING UP TO MECH

ROOMS ABOVE. PREPARE EX.

FLOOR PENETRATIONS FOR

INSTALLATION OF NEW PIPING.

REMOVE EX. CHWS&R AND

HWS&R PIPING UP TO MECH

ROOMS ABOVE. PREPARE EX.

FLOOR PENETRATIONS FOR

INSTALLATION OF NEW PIPING.

A B

C D

MEP Engineering

129 E. Government Street Pensacola, FL 32502

P: 850-332-5687 F:850-332-6629

APPROVEDDRAWN

AIR EDUCATION AND TRAINING

COMMAND

DATEREVISION

UNITED STATES AIR

FORCE

MISSISSIPPI

FACILITY NUMBER:

SHEET OF

DRAWING NUMBER:

BILOXI

RECOMMENDED:

(Chief ofEngineering)

SUBMITTED:

(Chief of Contracts Design)

SHEET NAME:PROJECT NUMBER:

CHECKED: DATE:

DRAWN:

OFFICE OF CIVIL

ENGINEERS

KEESLER AIR FORCE BASE

A. MARASCA G. REED

876543

D

E

B

C

A

87654321

G

F

E

D

C

B

A

G

F

A R C H I T E C T S

1091 TOMMY MUNRO DR.

BILOXI, MS 39532

Telephone: 228.594.2323 www.egh.ms

STAMPENGINEERARCHITECT

Mississippi Certificate Number E-1969

Dell Consulting project:21-072 Jason A. Matiacio 30457

BGA

JAM 02.18.2022

MAHG11-1042

MAHG111042 BRYAN HALL

RENOVATION

CRAWLSPACE OVERALL

PLAN - DEMOLITION MD100

1/16" = 1'-0"MD100

1 CRAWLSPACE OVERALL PLAN - DEMOLITION

1.

2.

MECHANICAL DEMOLITION SCOPE CONSISTS OF REMOVING ALL EXISTING HVAC

SYSTEMS IN THEIR ENTIRETY INCLUDING ALL DUCTWORK, PIPING, SUPPORTS, AIR

TERMINAL UNITS, DIFFUSERS/GRILLES/REGISTERS, LOUVERS, AND CONTROLS,

UNLESS NOTED OTHERWISE.

PATCH AND SEAL UNUSED WALL AND/OR FLOOR OPENINGS TO MATCH EXISTING,

COORDINATE WITH STRUCTURAL.

GENERAL NOTES

N

N

NOT TO SCALE

KEY PLAN

G

F

E

D

C

B

A

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

EX. CHILLER AND ASSOCIATED PIPING TO

REMAIN

EX. CONDENSER WATER PUMP AND

ASSOCIATED PIPING TO REMAIN

EX. PRIMARY CHILLED WATER PUMP AND

ASSOCIATED PIPING TO REMAIN

EX. AHU-9A EX. AHU-12

EX. AHU-7

EX. AHU-8

EX. AHU-10

EX. BOILER, PRIMARY HEATING HOT

WATER PUMP, AND PRIMARY LOOP

PIPING TO REMAIN

EX. VFD

EX. VFD

EX. VFD

EX. VFD

A B

C D

MEP Engineering

129 E. Government Street Pensacola, FL 32502

P: 850-332-5687 F:850-332-6629

APPROVEDDRAWN

AIR EDUCATION AND TRAINING

COMMAND

DATEREVISION

UNITED STATES AIR

FORCE

MISSISSIPPI

FACILITY NUMBER:

SHEET OF

DRAWING NUMBER:

BILOXI

RECOMMENDED:

(Chief ofEngineering)

SUBMITTED:

(Chief of Contracts Design)

SHEET NAME:PROJECT NUMBER:

CHECKED: DATE:

DRAWN:

OFFICE OF CIVIL

ENGINEERS

KEESLER AIR FORCE BASE

A. MARASCA G. REED

876543

D

E

B

C

A

87654321

G

F

E

D

C

B

A

G

F

A R C H I T E C T S

1091 TOMMY MUNRO DR.

BILOXI, MS 39532

Telephone: 228.594.2323 www.egh.ms

STAMPENGINEERARCHITECT

Mississippi Certificate Number E-1969

Dell Consulting project:21-072 Jason A. Matiacio 30457

BGA

JAM 02.18.2022

MAHG11-1042

MAHG111042 BRYAN HALL

RENOVATION

1ST FLOOR OVERALL

PLAN - DEMOLITION MD101

1/16" = 1'-0"M405MD101

1 1ST FLOOR OVERALL PLAN - DEMOLITION

1.

2.

MECHANICAL DEMOLITION SCOPE CONSISTS OF REMOVING ALL EXISTING HVAC

SYSTEMS IN THEIR ENTIRETY INCLUDING ALL DUCTWORK, PIPING, SUPPORTS, AIR

TERMINAL UNITS, DIFFUSERS/GRILLES/REGISTERS, LOUVERS, AND CONTROLS,

UNLESS NOTED OTHERWISE.

PATCH AND SEAL UNUSED WALL AND/OR FLOOR OPENINGS TO MATCH EXISTING,

COORDINATE WITH STRUCTURAL.

GENERAL NOTES

N

N

NOT TO SCALE

KEY PLAN

H

G

F

E

D

C

B

A

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

EX. AHU-6EX. AHU-3

EX. AHU-5EX. AHU-2

EX. AHU-4EX. AHU-1

EX. AHU-11

EX. ERV-1

EX. SECONDARY

HEATING HOT

WATER PUMP

EX. SECONDARY

CHILLED WATER

PUMP

EX. VFD

EX. EAL

EX. OAL

A B

C D

MEP Engineering

129 E. Government Street Pensacola, FL 32502

P: 850-332-5687 F:850-332-6629

APPROVEDDRAWN

AIR EDUCATION AND TRAINING

COMMAND

DATEREVISION

UNITED STATES AIR

FORCE

MISSISSIPPI

FACILITY NUMBER:

SHEET OF

DRAWING NUMBER:

BILOXI

RECOMMENDED:

(Chief ofEngineering)

SUBMITTED:

(Chief of Contracts Design)

SHEET NAME:PROJECT NUMBER:

CHECKED: DATE:

DRAWN:

OFFICE OF CIVIL

ENGINEERS

KEESLER AIR FORCE BASE

A. MARASCA G. REED

876543

D

E

B

C

A

87654321

G

F

E

D

C

B

A

G

F

A R C H I T E C T S

1091 TOMMY MUNRO DR.

BILOXI, MS 39532

Telephone: 228.594.2323 www.egh.ms

STAMPENGINEERARCHITECT

Mississippi Certificate Number E-1969

Dell Consulting project:21-072 Jason A. Matiacio 30457

BGA

JAM 02.18.2022

MAHG11-1042

MAHG111042 BRYAN HALL

RENOVATION

2ND FLOOR OVERALL

PLAN - DEMOLITION MD102

1/16" = 1'-0"MD102

1 2ND FLOOR OVERALL PLAN - DEMOLITION

N

N

NOT TO SCALE

KEY PLAN

1.

2.

MECHANICAL DEMOLITION SCOPE CONSISTS OF REMOVING ALL EXISTING HVAC

SYSTEMS IN THEIR ENTIRETY INCLUDING ALL DUCTWORK, PIPING, SUPPORTS, AIR

TERMINAL UNITS, DIFFUSERS/GRILLES/REGISTERS, LOUVERS, AND CONTROLS,

UNLESS NOTED OTHERWISE.

PATCH AND SEAL UNUSED WALL AND/OR FLOOR OPENINGS TO MATCH EXISTING,

COORDINATE WITH STRUCTURAL.

GENERAL NOTES

F

D

C

B

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

EX. AHU-8

EX. AHU-7

EX. CHWS&R AND

HWS&R PIPING DN TO

CRAWLSPACE AND UP

TO SECOND FLOOR

EX. CHWS&R AND

HWS&R PIPING DN TO

CRAWLSPACE AND UP

TO SECOND FLOOR

EX. VFD

1 / MD105

/ M

D

1 / MD105

/ M

D

1 / MD106

/ M

D

/ M

D

1 / MD104

A B

C D

MEP Engineering

129 E. Government Street Pensacola, FL 32502

P: 850-332-5687 F:850-332-6629

APPROVEDDRAWN

AIR EDUCATION AND TRAINING

COMMAND

DATEREVISION

UNITED STATES AIR

FORCE

MISSISSIPPI

FACILITY NUMBER:

SHEET OF

DRAWING NUMBER:

BILOXI

RECOMMENDED:

(Chief ofEngineering)

SUBMITTED:

(Chief of Contracts Design)

SHEET NAME:PROJECT NUMBER:

CHECKED: DATE:

DRAWN:

OFFICE OF CIVIL

ENGINEERS

KEESLER AIR FORCE BASE

A. MARASCA G. REED

876543

D

E

B

C

A

87654321

G

F

E

D

C

B

A

G

F

A R C H I T E C T S

1091 TOMMY MUNRO DR.

BILOXI, MS 39532

Telephone: 228.594.2323 www.egh.ms

STAMPENGINEERARCHITECT

Mississippi Certificate Number E-1969

Dell Consulting project:21-072 Jason A. Matiacio 30457

BGA

JAM 02.18.2022

MAHG11-1042

MAHG111042 BRYAN HALL

RENOVATION

1ST FLOOR PART A PLAN

- DEMOLITION MD103

1/8" = 1'-0"M405MD103

1 1ST FLOOR PART A PLAN - DEMOLITION

N

N

NOT TO SCALE

KEY PLAN

# SHEET NOTES

1 REMOVE EXISTING HVAC SYSTEM IN ITS ENTIRETY INCLUDING DUCTWORK, PIPING,

SUPPORTS, AIR TERMINAL UNITS, AND DIFFUSERS/GRILLES/REGISTERS. REMOVE

CHILLED WATER AND HEATING HOT WATER BRANCH PIPING AND ACCESSORIES.

2 PROVIDE A TWO-TON PORTABLE AIR CONDITIONING UNIT TO CONTINUOUSLY

SERVE THE SPACE DURING CONSTRUCTION. PORTABLE UNIT SHALL BE REMOVED

ONCE CONSTRUCTION IS COMPLETE AND FCU-1.5 IS OPERATIONAL AND FULLY

UNDER CONTROL.

3 EXISTING AIR HANDLING UNIT SHALL BE TURNED OVER TO THE BASE IN GOOD

CONDITION. CAREFULLY DISCONNECT AND REMOVE AIR HANDLING UNIT FOR

FUTURE REUSE. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING

OFFICER PRIOR TO DEMOLITION AND MOVE THE AIR HANDLING UNIT TO A

LOCATION ON BASE AS SPECIFIED BY THE CONTRACTING OFFICER.

4 COORDINATE WITH THE BASE CONTRACTING OFFICER AND JOHNSON CONTROLS

PRIOR TO REMOVAL OF ANY HVAC DIRECT DIGITAL CONTROL DEVICES AND

EQUIPMENT. THE FOLLOWING CONTROLS SHALL BE TURNED OVER TO THE BASE

IN GOOD CONDITION FOR FUTURE REUSE: ALL VMA FIELD CONTOLLERS, ALL FEC

FIELD CONTROLLERS, (1x) NAE, (1x) NCE, ALL ZONE DDC THERMOSTATS, AND ALL

DAMPER ACTUATORS.

D

C

B

A

14 15 16 17 18 19 20 21 22 23 24 25 26 27

EX. AHU-10

/ M

D

1 / MD105

/ M

D

1 / MD106

EX. VFD

EX. CHWS&R AND HWS&R

PIPING DN TO CRAWLSPACE

AND UP TO SECOND FLOOR

/ M

D

1 / MD106

1 / MD103

/ M

D

A B

C D

MEP Engineering

129 E. Government Street Pensacola, FL 32502

P: 850-332-5687 F:850-332-6629

APPROVEDDRAWN

AIR EDUCATION AND TRAINING

COMMAND

DATEREVISION

UNITED STATES AIR

FORCE

MISSISSIPPI

FACILITY NUMBER:

SHEET OF

DRAWING NUMBER:

BILOXI

RECOMMENDED:

(Chief ofEngineering)

SUBMITTED:

(Chief of Contracts Design)

SHEET NAME:PROJECT NUMBER:

CHECKED: DATE:

DRAWN:

OFFICE OF CIVIL

ENGINEERS

KEESLER AIR FORCE BASE

A. MARASCA G. REED

876543

D

E

B

C

A

87654321

G

F

E

D

C

B

A

G

F

A R C H I T E C T S

1091 TOMMY MUNRO DR.

BILOXI, MS 39532

Telephone: 228.594.2323 www.egh.ms

STAMPENGINEERARCHITECT

Mississippi Certificate Number E-1969

Dell Consulting project:21-072 Jason A. Matiacio 30457

BGA

JAM 02.18.2022

MAHG11-1042

MAHG111042 BRYAN HALL

RENOVATION

1ST FLOOR PART B PLAN

- DEMOLITION MD104

1/8" = 1'-0"M405MD104

1 1ST FLOOR PART B PLAN - DEMOLITION

N

N

NOT TO SCALE

KEY PLAN

# SHEET NOTES

1 REMOVE EXISTING HVAC SYSTEM IN ITS ENTIRETY INCLUDING DUCTWORK, PIPING,

SUPPORTS, AIR TERMINAL UNITS, AND DIFFUSERS/GRILLES/REGISTERS. REMOVE

CHILLED WATER AND HEATING HOT WATER BRANCH PIPING AND ACCESSORIES.

2 COORDINATE WITH THE BASE CONTRACTING OFFICER AND JOHNSON CONTROLS

PRIOR TO REMOVAL OF ANY HVAC DIRECT DIGITAL CONTROL DEVICES AND

EQUIPMENT. THE FOLLOWING CONTROLS SHALL BE TURNED OVER TO THE BASE

IN GOOD CONDITION FOR FUTURE REUSE: ALL VMA FIELD CONTOLLERS, ALL FEC

FIELD CONTROLLERS, (1x) NAE, (1x) NCE, ALL ZONE DDC THERMOSTATS, AND ALL

H

G

F

2 3 4 5 6 7 8 9 10 11 12 13 14

EX. AHU-9A

EX. CHWS&R AND HWS&R

PIPING DN TO CRAWLSPACE

AND UP TO SECOND FLOOR

/ M

D

1 / MD106

1 / MD103

/ M

D

/ M D

1 / MD104

/ M

D

1 / MD103

1 1

A B

C D

MEP Engineering

129 E. Government Street Pensacola, FL 32502

P: 850-332-5687 F:850-332-6629

APPROVEDDRAWN

AIR EDUCATION AND TRAINING

COMMAND

DATEREVISION

UNITED STATES AIR

FORCE

MISSISSIPPI

FACILITY NUMBER:

SHEET OF

DRAWING NUMBER:

BILOXI

RECOMMENDED:

(Chief ofEngineering)

SUBMITTED:

(Chief of Contracts Design)

SHEET NAME:PROJECT NUMBER:

CHECKED: DATE:

DRAWN:

OFFICE OF CIVIL

ENGINEERS

KEESLER AIR FORCE BASE

A. MARASCA G. REED

876543

D

E

B

C

A

87654321

G

F

E

D

C

B

A

G

F

A R C H I T E C T S

1091 TOMMY MUNRO DR.

BILOXI, MS 39532

Telephone: 228.594.2323 www.egh.ms

STAMPENGINEERARCHITECT

Mississippi Certificate Number E-1969

Dell Consulting project:21-072 Jason A. Matiacio 30457

BGA

JAM 02.18.2022

MAHG11-1042

MAHG111042 BRYAN HALL

RENOVATION

1ST FLOOR PART C PLAN

- DEMOLITION MD105

1/8" = 1'-0"M405MD105

1 1ST FLOOR PART C PLAN - DEMOLITION

N

N

NOT TO SCALE

KEY PLAN

# SHEET NOTES

1 REMOVE EXISTING HVAC SYSTEM IN ITS ENTIRETY INCLUDING DUCTWORK, PIPING,

SUPPORTS, AIR TERMINAL UNITS, AND DIFFUSERS/GRILLES/REGISTERS. REMOVE

CHILLED WATER AND HEATING HOT WATER BRANCH PIPING AND ACCESSORIES.

2 EXISTING AIR HANDLING UNIT SHALL BE TURNED OVER TO THE BASE IN GOOD

CONDITION. CAREFULLY DISCONNECT AND REMOVE AIR HANDLING UNIT FOR

FUTURE REUSE. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING

OFFICER PRIOR TO DEMOLITION AND MOVE THE AIR HANDLING UNIT TO A

LOCATION ON BASE AS SPECIFIED BY THE CONTRACTING OFFICER.

3 COORDINATE WITH THE BASE CONTRACTING OFFICER AND JOHNSON CONTROLS

PRIOR TO REMOVAL OF ANY HVAC DIRECT DIGITAL CONTROL DEVICES AND

EQUIPMENT. THE FOLLOWING CONTROLS SHALL BE TURNED OVER TO THE BASE

IN GOOD CONDITION FOR FUTURE REUSE: ALL VMA FIELD CONTOLLERS, ALL FEC

FIELD CONTROLLERS, (1x) NAE, (1x) NCE, ALL ZONE DDC THERMOSTATS, AND ALL

H

G

F

14 15 16 17 18 19 20 21 22 23 24 25 26 27

EX. CHILLER TO REMAIN

EX. CONDENSER WATER PUMP TO REMAIN

EX. PRIMARY CHILLED WATER PUMP TO REMAIN

EX. AHU-12

EX. BOILER AND PRIMARY HEATING

HOT WATER PUMP TO REMAIN

/ M

D

1 / MD105

/ M

D

EX. VFD

EX. CHWS&R AND HWS&R

PIPING DN TO CRAWLSPACE

AND UP TO SECOND FLOOR

1 / MD103 1 / MD104

1 / MD104

UP TO MEZZANINE ABOVE

EX. EXH DUCT TO EX. EF ON

ROOF FOR HIGH TEMPERATURE

CONTROL TO REMAIN

EX. HIGH TEMPERATURE

CONTROL AND

REFRIGERANT PURGE EXH

DUCT TO REMAIN

2 3

A B

C D

MEP Engineering

129 E. Government Street Pensacola, FL 32502

P: 850-332-5687 F:850-332-6629

APPROVEDDRAWN

AIR EDUCATION AND TRAINING

COMMAND

DATEREVISION

UNITED STATES AIR

FORCE

MISSISSIPPI

FACILITY NUMBER:

SHEET OF

DRAWING NUMBER:

BILOXI

RECOMMENDED:

(Chief ofEngineering)

SUBMITTED:

(Chief of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .