Attachment_5_LPTA_Technical_Acceptability_Construction_3_31_26.docx
DOCX document 30 KB Posted
- Attached to
- MACA-REPAIR OF PEDESTRIAN BRIDGE FOUNDAT
- Solicitation number
- 140P5326Q0017
About this file
This file is a Lowest Price Technically Acceptable (LPTA) Technical Acceptability and Price Submission Template for a construction project. It serves as the required submission format for quoters responding to RFQ No. 140P5326Q0017 issued by the National Park Service Southeast Region for the cosmetic repair of a pedestrian bridge foundation at Mammoth Cave National Park, Kentucky.
The template requires quoters to demonstrate technical acceptability across five mandatory evaluation criteria to remain eligible for award. Quoters must provide relevant experience through two completed projects within the past five years involving concrete repair and/or masonry/veneer installation on structural concrete elements, including crack and spall repair, epoxy injection, or stone/block veneer installation. The scope of work includes performing concrete crack and spall repair on approximately 663 square feet of bridge foundation surfaces using epoxy injection and polymer-modified repair mortar per ASTM standards; beneath-bridge substructure repairs with epoxy-coated rebar dowels and 5,000 psi low-shrink concrete; installation of sandstone veneer and retaining wall blocks matching existing materials per ASTM C1780 and NPS historical standards; development of a site-specific Accident Prevention Plan complying with OSHA requirements; and coordination of utility locates and temporary protections with completion within 180 calendar days from Notice to Proceed. Additionally, quoters must identify any specialized subcontractors, confirm compliance with all SOW/specifications requirements through a detailed checklist, submit a proposed construction schedule demonstrating completion within 165 calendar days, and certify their agreement to maintain continuous pedestrian access with ABA/ADA compliance and implement fall protection systems to prevent debris displacement onto infrastructure below.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 5 — LPTA TECHNICAL ACCEPTABILITY & PRICE SUBMISSION TEMPLATE (CONSTRUCTION)
Project Name: Cosmetic Repair of Pedestrian Bridge Foundation Park Location: Mammoth Cave National Park, Kentucky RFQ No.: 140P5326Q0017
INSTRUCTIONS (READ FIRST):
Quoter shall complete and submit this template with its quotation. To be rated Technically Acceptable (PASS), the quotation must include all required entries below. Omission of any required entry will result in Technically Unacceptable (FAIL) and ineligibility for award. The Government will make award on a Lowest Price Technically Acceptable (LPTA) basis; no tradeoffs. Evaluation will be on the basis established in the solicitation.
1) Quoter Information (Required)
· Legal name: Click or tap here to enter text.
· UEI (if applicable): Click or tap here to enter text.
· CAGE (if applicable): Click or tap here to enter text.
· Primary POC (name/title): Click or tap here to enter text.
· Email / Phone: Click or tap here to enter text.
2) Relevant Experience (PASS/FAIL) —
Offerors shall submit two (2) completed projects completed within the last five (5) years that demonstrate relevant experience. To be considered relevant, each project must involve:
· Concrete repair and/or masonry/veneer installation on a bridge, retaining wall, or similar structural concrete element; and
· One or more of the following: crack and spall repair, epoxy injection, and/or installation of stone or block veneer on structural concrete.
Offerors must complete all fields below for each project. Failure to submit two projects meeting the relevance criteria, or failure to complete all required fields, will result in a FAIL rating for this factor.
Complete all fields:
Project 1
· Customer/Owner:Click or tap here to enter text.
· Location (city/state): Click or tap here to enter text.
Relevance (check):
☐ Concrete crack/spall repair ☐ Structural concrete repair with dowels/formwork ☐ Stone/block veneer on structural concrete ☐ Other (explain): Click or tap here to enter text.
Brief scope (1–3 sentences):Click or tap here to enter text.
Timing evidence (required):
☐ Month/Year–Month/Year ☐ Year completed; Enter: Click or tap here to enter text.
Contract/PO No. (if applicable): Click or tap here to enter text.
POC name/title + email/phone: Click or tap here to enter text.
Project 2
· Customer/Owner: Click or tap here to enter text.
· Location (city/state): Click or tap here to enter text.
Relevance (check):
☐ Concrete crack/spall repair ☐ Structural concrete repair with dowels/formwork ☐ Stone/block veneer on structural concrete ☐ Other (explain): Click or tap here to enter text.
Brief scope (1–3 sentences):Click or tap here to enter text.
Timing evidence (required):
☐ Month/Year–Month/Year ☐ Year completed; Enter: Click or tap here to enter text.
Contract/PO No. (if applicable):Click or tap here to enter text.
POC name/title + email/phone: Click or tap here to enter text.
3) Key Subcontractor Identification (PASS/FAIL) — As applicable Will specialized work be subcontracted (e.g., masonry/stone veneer, concrete testing)? ☐ Yes ☐ No If yes, identify subcontractor(s) and role(s):
Subcontractor name: Click or tap here to enter text.
Trade/role: Click or tap here to enter text.
City/state + phone/email:Click or tap here to enter text.
(Repeat as needed.)
4) SOW/Specs Compliance Checklist (PASS/FAIL) Mark one box per row (no blanks). Notes optional.
| Minimum requirement (from SOW/specs) |
| Comply |
| Does Not Comply |
| Notes |
| Perform concrete crack and spall repair on approximately 663 SF of pedestrian bridge foundation surfaces using epoxy injection and polymer-modified repair mortar in accordance with ASTM C881, ASTM C928, and ACI 308. |
| ☐ |
| ☐ |
| Click or tap here to enter text. |
| Perform beneath-bridge substructure repairs including scarification, installation of epoxy-coated rebar dowels, formwork, and placement of 5,000 psi low-shrink concrete to match existing retaining wall dimensions. |
| ☐ |
| ☐ |
| Click or tap here to enter text. |
| Install sandstone veneer (hotel side) and retaining wall blocks (visitor center side) matching existing materials in pattern, thickness, and texture, using ANSI A118.4-compliant adhesive or mechanical anchors, and in accordance with ASTM C1780 and NPS historical standards. |
| ☐ |
| ☐ |
| Click or tap here to enter text. |
| Provide and implement a site-specific Accident Prevention Plan (APP), including JHAs for concrete/overhead work and epoxy injection, and ensure all work complies with OSHA 29 CFR 1926 and NPS safety requirements. |
| ☐ |
| ☐ |
| Click or tap here to enter text. |
| Coordinate utility locates, comply with park access/staging restrictions, provide all temporary protections (fencing, erosion control BMPs), and complete all work within 180 calendar days from Notice to Proceed. |
| ☐ |
| ☐ |
| Click or tap here to enter text. |
5) Proposed Schedule (Required)
Quoter shall provide a proposed construction schedule that demonstrates completion within 165 calendar days from Notice to Proceed. At a minimum, include anticipated start date, major milestones, and completion date.
· Anticipated start date (on-site mobilization): Click or tap here to enter text.
· Major milestones (e.g., concrete repairs, veneer installation, substantial completion):Click or tap here to enter text.
· Proposed final completion date: Click or tap to enter a date.
Known or anticipated schedule constraints or dependencies (e.g., material lead times, weather, access restrictions): Click or tap here to enter text.
6) Quoter Certification (Required) The quoter acknowledges and agrees to the following mandatory project requirements:
· Continuous Pedestrian Access: The pedestrian bridge shall remain open and accessible to the public for the duration of the project. The Contractor shall maintain a safe, unobstructed walkway in compliance with ABA/ADA requirements and implement phased construction, barriers, and signage as required.
· Protection of Infrastructure Below: The Contractor shall ensure that all tools, materials, and equipment are secured and always protected to prevent falling or displacement from the bridge onto the infrastructure, walkways, or areas below. Appropriate containment systems (e.g., debris netting, toe boards, tethering) shall be installed and maintained Authorized representative name/title: Click or tap here to enter text.
Signature: _______________________________________________ Date: Click or tap to enter a date.
The quoter acknowledges the period of performance and agrees to complete all work required by the Statement of Work within 180 calendar days from the date of Notice to Proceed.
Authorized representative name/title: Click or tap here to enter text.
Signature: _______________________________________________ Date: Click or tap to enter a date.