This document is a Pacific Gas and Electric (PG&E) company specification manual titled "Requirements for Customer-Owned Poles" for electric service installations. The 17-page document provides comprehensive technical standards and detailed guidelines for customers who need to install, set up, and maintain service poles for electrical connections, covering both temporary and permanent installations.

Key specifications include requirements for pole materials (wood or metal), setting depths, ground clearances, guying/bracing, service entrance conductors, and electrical equipment mounting. The document specifies detailed technical requirements such as pole length (minimum 20-25 feet), setting depths based on soil type, vertical clearance minimums (16-18 feet), and specific guidelines for temporary and permanent poles. It also outlines requirements for grounding, conduit installation, meter socket placement, and safety considerations for both residential and commercial service pole installations. The manual was last revised on 6/30/2023 and is intended to ensure safe and standardized electrical service pole installations for PG&E customers.

View the file

Other files

File Type Posted
Attachment 1 BOM.xlsx XLSX spreadsheet
Attachment 3 Supplemental SOW Ruby Bluff.pdf PDF
Attachment 2 Shelter PWS.pdf PDF
Attachment 4 PGE Requirements COSP.pdf PDF
Competition Requirement_Redacted.pdf PDF
RFQ 12760425Q0086.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASCE Hazards Report Address:

No Address at This Location

Standard: ASCE/SEI 7-22 Latitude: 39.511386

Risk Category: II Longitude: -120.845064

Soil Class: C - Very Dense Soil and Soft Rock

Elevation: 5698.928014140625 ft

(NAVD 88)

Wind

Results:

Wind Speed 95 Vmph

10-year MRI 66 Vmph

25-year MRI 72 Vmph

50-year MRI 77 Vmph

100-year MRI 81 Vmph

300-year MRI 89 Vmph

700-year MRI 95 Vmph

1,700-year MRI 101 Vmph

3,000-year MRI 106 Vmph

10,000-year MRI 115 Vmph

100,000-year MRI 132 Vmph

1,000,000-year MRI 150 Vmph

Data Source: ASCE/SEI 7-22, Fig. 26.5-1B and Figs. CC.2-1–CC.2-4, and Section 26.5.2

Date Accessed: Thu Jan 11 2024

Page 1 of 3https://ascehazardtool.org/ Thu Jan 11 2024 https://ascehazardtool.org/

Value provided is 3-second gust wind speeds at 33 ft above ground for Exposure C Category, based on linear interpolation between contours. Wind speeds are interpolated in accordance with the 7-22 Standard. Wind speeds correspond to approximately a 7% probability of exceedance in 50 years (annual exceedance probability = 0.00143, MRI = 700 years). Values for 10-year MRI, 25-year MRI, 50-year MRI and 100-year MRI are Service Level wind speeds, all other wind speeds are Ultimate wind speeds.

Site is not in a hurricane-prone region as defined in ASCE/SEI 7-22 Section 26.2.

Page 2 of 3https://ascehazardtool.org/ Thu Jan 11 2024

Ice

Results:

Data Source:

Date Accessed:

Ice Thickness: N/A

Concurrent Temperature: N/A

3-s Gust Speed N/A

Standard ASCE/SEI 7-22, Figs. 10-2 through 10-8

Thu Jan 11 2024

Ice thicknesses on structures in exposed locations at elevations higher than the surrounding terrain and in valleys and gorges may exceed the mapped values.

Values provided are equivalent radial ice thicknesses due to freezing rain for 250, 500, 1,000, and 1,400-year mean recurrence intervals along with concurrent 3-s gust speeds and concurrent air temperatures. The shading indicates special icing regions, with elevations above 2,100 ft (640 m) in the east, 6,000 ft (1829 m) in the west, and 1,600 ft (488 m) in Alaska, with sparse weather station data for determining design ice loads. In these regions, as well as in regions with complex terrain causing unusual icing conditions and regions where snow or in-cloud icing results in larger loads, the mapped values should be adjusted based on a combination of local historical records and experience, reanalysis data, and numerical weather prediction systems.

The ASCE Hazard Tool is provided for your convenience, for informational purposes only, and is provided “as is” and without warranties of any kind. The location data included herein has been obtained from information developed, produced, and maintained by third party providers; or has been extrapolated from maps incorporated in the ASCE standard. While ASCE has made every effort to use data obtained from reliable sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability, currency, or quality of any data provided herein. Any third-party links provided by this Tool should not be construed as an endorsement, affiliation, relationship, or sponsorship of such third-party content by or from ASCE.

ASCE does not intend, nor should anyone interpret, the results provided by this Tool to replace the sound judgment of a competent professional, having knowledge and experience in the appropriate field(s) of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the contents of this Tool or the ASCE standard.

In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers, directors, employees, members, affiliates, or agents be liable to you or any other person for any direct, indirect, special, incidental, or consequential damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data provided by the ASCE Hazard Tool.

Page 3 of 3https://ascehazardtool.org/ Thu Jan 11 2024

OH: Services Greenbook

EMWP

Rev. #21: 6/30/2023 025055 Page 1 of 17

Daniel Jantz (DWJ7)

Electric Distribution

025055

Function:Asset Type:

Issued by: Date: 6/30/2023

Rev. #21: This document replaces PG&E Document 025055, Rev. #20. For a description of the changes, see Page 17.

REQUIREMENTS FOR CUSTOMER-OWNED POLES

Prepared by: SXZO

Construction

This document is also included in the following manuals:

• Electric and Gas Service Requirements Manual (Greenbook)

• Electric Meter Work Practices

Purpose and Scope

Equipment installed on service poles as shown in this document will also meet the requirements of the California Building Standards Code - Electrical Regulations. These requirements have been established by the state of California in the interest of safety to the public and to workers and are applicable to all customer-owned service poles. PG&E cannot establish service to poles that do not meet these minimum requirements. The maintenance of customer-owned service poles in conformity with these requirements is the sole responsibility of the customer.

Local ordinances may include wiring requirements in addition to those shown in this document. Consult local inspection authorities for these requirements and for city or county permits and inspections that may be required before service can be connected.

References Location Document Methods of Attaching Services to Customers Premises OH: Services 025202 Dead-End and Angle Attachments for Aluminum Conductors - Distribution Lines OH: Conductors 028851 Connectors for Aluminum Conductors on Distribution Lines OH: Conductors 028852 Temporary Underground Electric Service Single-Phase, 120/240 Volt 200 Amps Maximum UG-1: Services/Greenbook 036670 Conductors for Overhead Lines OH: Conductors 059626 Overhead and Underground Panel Board Construction OH Services/UG-1 Services/Greenbook 065374 Utility Standard TD-2325S, “Wood Pole Inspection, Testing, and Maintenance” TIL TD-2325S

Temporary Service Pole Installation

1. The use of temporary service poles must be restricted to installations of a temporary nature, such as building construction, temporary sales locations, etc., where the period of service is estimated to be 1 year or less.

2. Temporary service poles must be furnished and installed by the customer and may be wooden or metallic.

The minimum length must be 20 feet (set 4 feet in the ground). A longer pole may be necessary to provide the required clearance from the ground (see Note 9 on Page 4) or to supply the customer’s overhead line (see Figure 3 on Page 8).

3. A temporary, wood service pole may be rectangular or circular in cross section and must be solid (not laminated). Rectangular poles must have a minimum cross sectional area equal to or greater than 36 inches squared when measured. With only one side measured to no less than 5.5 inches. Circular poles must meet the requirements for permanent service poles specified in Note 7 on Page 2 except that the minimum length may be 20 feet providing the required clearances are maintained.

4. The butt of the temporary, wood service pole must be installed in the ground, and must at least be painted with creosote or other approved preservative. However, it is recommended that these poles be full-length treated with a suitable preservative in order to obtain the maximum useful life of the pole and to provide increased http://www/techlib/default.asp?body=manuals/greenbook/ http://www/techlib/default.asp?body=manuals/elec_meter_work_practices/ http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981550066 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981550066 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981550066 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981550066 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981530081 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981530081 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981530081 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981530081 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981530082 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981530082 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981530082 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981530082 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981900042 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981900042 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981900042 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981900042 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981530089 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981530089 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981530089 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981600031 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981600031 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981600031 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981600031 http://www/techlib/default.asp?body=manuals/uo_standards/s2325.htm http://www/techlib/default.asp?body=manuals/uo_standards/s2325.htm http://www/techlib/default.asp?body=manuals/uo_standards/s2325.htm http://www/techlib/default.asp?body=manuals/uo_standards/s2325.htm

EMWP

Requirements for Customer-Owned Poles

Rev. #21: 6/30/2023025055 Page 2 of 17 safety to workers and to the public. The permanent service pole specified in Note 6 below is approved for temporary installations. It will usually be the more economical pole for repeated use.

5. A metal pole may not be used for temporary service.

Permanent Pole Installation

6. A permanent wood or metal service pole must be used when it is estimated that the installation will remain for a period longer than 1 year. Permanent wood service poles, as specified in Note 7, must be furnished and installed by the customer. PG&E will, however, furnish and install the pole (wood or metal) exclusive of wiring and service entrance equipment, at the customer’s expense, if the customer is unable to have the pole installed by a private contractor.

7. Customer Owned Wood Poles:

A. Customer-owned, permanent wood poles must meet all pertinent requirements of ANSI O5.1.2008, “Wood

Poles − Specifications and Dimensions,” and American Wood Protection Association Standards T1-10 and U1-10, as modified or described in Engineering Material Specification 57, “Preservative Treated Wood Poles and Stubs for Overhead Lines.”

B. Approved pole suppliers and treatments are shown in Table 1 and Table 2 of this document.

C. For poles that will have a final height greater than 20 feet above ground level, the Federal Aviation Administration (FAA) may require the applicant to file a notice a minimum of 45 days prior to the installation of the pole. The FAA may issue a determination of hazard to air navigation and recommend actions to mitigate or eliminate that hazard. Please contact your PG&E project coordinator for additional information

D. When planning to install a new customer owned service pole prior to inspection by PG&E personnel see the section, Verifying Depth of Customer Owned Poles, on Page 6 and Figure 18, “Pole Depth Verification”, on page 17.

After setting the pole(s), with the butt (greater diameter and treated) of the wood service pole installed in the ground, the customer/contractor must notify the local PG&E inspector who will look at the pole(s) to verify that they meet the requirements stated within this note (Note 7).

E. Customer-owned, permanent wood poles must be of circular cross section, minimum Class 6, with a minimum length of 25 feet (See Setting Depths in Table 3 on Page 3). A longer pole may be necessary to obtain the required clearance from the ground. Consult PG&E before ordering. Exception: minimum length may be 20 feet providing the required clearances are maintained.

F. The pole brand must remain visible and readable at all times. The customer−owner shall not install the disconnect switch or breaker enclosure, meter panel, panelboard, conduit runs, or other equipment over the brand.

G. Used poles may be installed provided they are inspected and accepted by PG&E before installation.

H. Applicants must obtain a certificate of treatment or a letter from a supplier indicating that the pole was treated in accordance with the American Wood Protection Association (AWPA) and ANSI requirements. PG&E should receive a copy of this certificate before accepting the pole.

I. Do not notch, cut, chip, or damage the pole in any way. As this affects the integrity of the pole.

8. Do not install a metal pole. Customer metal poles typically do not have steps and would not be climbable.

http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=003769642 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=003769642

EMWPRequirements for Customer-Owned Poles

Rev. #21: 6/30/2023 025055 Page 3 of 17

Table 1 Approved Suppliers for Permanent Wood Poles (Table 5, Item 2 on Page 7) 1

Service Poles 35 Feet and Shorter Distribution Poles Taller than 35 Feet Koppers

Stella Jones − SJC / McFarland Cascade − MCF (Tacoma, WA. or Eugene, OR. Yards only)

Stella Jones − SJC / McFarland Cascade − MCF Thunderbolt Wood Treating 1 Customer owned service poles are sold to lumberyard/hardware companies.

Table 2 Approved Service Pole Treatments 1

Species

Treatment Dichloro-

Octyl- Isothia-zolin

(DCOI or DA)

Penta-A Pressure (Oil-Penta)

(PA)

Ammoniacal Copper

Zinc Arsenate (ACZA or SZ)

Creosote

(C)

Chromated Copper Arsenate

(CCA or SK)

Western Red Cedar X X X X X Douglas-Fir X X X X −

1 All poles must be full-length treated, except Western Red Cedar may be butt treated with oil pentachlorophenol.

Table 3 Pole Setting Depths

Pole Length (feet) Setting Depth (feet)

Firm Soil Rock 25 1 5-1/2 3 30 6 3 35 6−1/2 3-1/2 40 7 3-1/2 45 7−1/2 4

1 Do not use a 25 foot pole when the service crosses a street, road, or traveled dirt thoroughfare in agricultural areas. Use a taller pole that allows the minimum clearances to be met.

Table 4 Customer’s Service Attachment Location 1, 2

Panel Rating (amps)

Weatherhead Distance From Top of Pole (inches)

PG&E Service Attachment

(type)Minimum Maximum

�� 225 18 20 Service Knob

226-400 (1-Phase) 3 34 36 3 Spool & Clevis 4, 5, 6

226-400 (3-Phase) 3 42 44 4 Spool & Clevis 4, 5, 6

1 All open wire services require vertical construction. See Figure 7 on Page 11 and Figure 4 on Page 9.

2 A taller pole may be necessary to obtain the required service clearances from the ground. See note 9D on Page 4.

3 See Note 26 on Page 6.

4 See Figure 7 on Page 11. PG&E service must be insulated wire.

5 The installation of extended rack brackets is not allowed. Use Vertical construction.

6 A properly installed and PG&E approved crossarm may be allowed instead of spool and clevis attachments.

EMWP

Requirements for Customer-Owned Poles

Rev. #21: 6/30/2023025055 Page 4 of 17

Vertical Clearance for Service Poles

9. Conductors to service poles must have a minimum ground clearance as follows:

A. Over the center portion of the street, 18’ 0” minimum. For conductor height over trolleys, railroad tracks, telephone lines, etc., consult PG&E.

B. At the curb or outer limits of possible vehicular traffic, 16’ 0” minimum.

C. Over private driveways, lanes, or other areas accessible to vehicles used for industrial, commercial, or agricultural purposes, 16’ 0” minimum.

D. If required clearances cannot be obtained with a minimum-length service pole and the constructions illustrated on Pages 7 through 9, the required clearances should be obtained by using a longer (taller) pole. The setting depth for a 25-foot and longer pole must be followed as specified in Table 3 on Page 3.

12’ 0” Min.

Figure 1 Clearances for Service Poles

Street or Road

Sidewalk

10’ 0” Minimum (from surface of Company pole, lines, or equipment) Consult PG&E for Maximum Distance (see Note 21 on Page 5)

Power Company

Pole

Service Drop (see Note 21 on Page 5)

12’ 0” Min.

See Note 22 on

See Note 9C

16’ 0” Min.

(see Note 9B)

18’ 0” Min.

(see Note 9A)

Service Entrance Conductors

10. The customer must furnish, install, and maintain the service entrance wiring and service equipment beyond the point of attachment to PG&E’s service wires. The service entrance wires must be continuous and must be of a size and type that will provide not less than the minimum standard of safety as specified in local city and county ordinances or, where there is no local ordinance, as specified in the current issue of the National Electrical Code (NEC).

11. The neutral conductor of 2-wire, 120 V and 3-wire, 120/240 V (or 120/208 V) services must be securely connected to the neutral terminal of the meter socket and extended through to the neutral terminal of the service entrance switch. It must be continuous (without splice) from the service head to the service entrance switch.

12. At least 18 inches of service entrance conductors must be provided outside the service head.

13. Weatherproof wire is not permitted in conduit.

EMWPRequirements for Customer-Owned Poles

Rev. #21: 6/30/2023 025055 Page 5 of 17

Service Entrance and Load Side Conduit and Conduit Covering

14. Service entrance and load side conduit and conduit covering requirements must comply with applicable codes and local requirements. G.O. 95 requires that any conduit installed below the 8-foot level on the pole must be treated as a riser; in which case, the conduit must be either rigid galvanized steel or 2-inch minimum diameter Schedule 40 PVC.

Exception: Conduit that enters the top of an enclosure is considered to be “protected” by the enclosure and need not be treated as a riser unless installed below the 6-foot level. Conduit installed above the 6-foot or 8-foot level (whichever height applies) must be either: (1) galvanized rigid steel conduit, (2) rigid aluminum conduit,

(3) electrical metallic tubing, (4) IMC, or (5) PVC plastic conduit having a minimum wall thickness of 0.15 inches (Schedule 40 for 2-inch PVC conduit or larger, Schedule 80 for 1-1/2-inch or smaller). All fittings must be rain-tight.

If PVC plastic conduit is used, it need not be covered. If rigid steel or other approved metallic conduit is used, it must be enclosed with PVC “U” shaped molding for a minimum distance of 8 feet below the lowest open service entrance conductor. The covering must be fastened to the pole at intervals not greater than 3 feet (see Page 11).

15. Wood Block:

A. A wood block must be attached directly over the service head in the following situations:

(1) On a service pole where electrical metallic tubing, rigid steel, or IMC is used.

(2) On a wood pole with plastic conduit installation when the service head is metallic and the neutral service entrance conductor is not insulated.

B. A wood block over the service head is not required in the following instances:

(1) On a service pole with plastic conduit installation except as noted in Note 15, A. above.

(2) On a metallic pole, provided the pole is effectively grounded and provided all metallic conduits are adequately bonded to the metal pole with approved clamps or connectors.

C. Attach wood blocks as shown on Pages 8 through 10.

16. All conduit and fittings must be rain-tight.

17. Water pipe and fittings are not permitted for use as electrical conduit.

Service Entrance Switch

18. Main switch, receptacles, and other equipment on the load side of the meter must be of weatherproof design or protected by weatherproof enclosures. Such equipment must comply with local ordinances and must also comply with the California Building Standards Code - Electrical Regulations.

19. The switch cover must be locked if the enclosure contains exposed live parts.

Grounding

20. The customer must be responsible for bonding and grounding all exposed, non-current-carrying metal parts.

Grounding and bonding must be in accordance with NEC and local ordinances. PG&E prefers, but does not require, the grounding electrode conductor wire to be protected against physical damage by rigid steel conduit or armored cladding (see Pages 8 and 10 for additional details).

Pole Location

21. Poles must be located so that the vertical clearances specified in Note 9 and Figure 1 on Page 4 can be obtained. A service pole must not be located less than 10 feet from the surface of the PG&E pole, or pole-mounted equipment, or within 10 feet of the vertical plane of a PG&E line.

Poles must be located so that there is at least one quadrant of climbing space that is 36” x 36” from grade up to the top of the pole for PG&E personnel to access and climb the pole. The quadrant must be free of equipment and obstructions.

PG&E must be consulted for maximum span lengths, as they can vary depending on wire type and size, loading area, clearances, and suitable guying. The maximum span length of PG&E’s service drop to a temporary pole must not exceed 100 feet, and if 4/0 conductor is necessary, not more than 80 feet. The maximum span length for a permanent type installation may vary from 80 feet to 150 feet upward depending on the variables mentioned.

The pole must also be positioned so that the pole brand will not be hidden by the disconnect switch or breaker enclosure, meter panel, panelboard, conduit runs or other equipment.

http://www/techlib/default.asp?body=manuals/go95/

EMWP

Requirements for Customer-Owned Poles

Rev. #21: 6/30/2023025055 Page 6 of 17

Guying or Bracing

22. Where conductors cross, a public or private paved street or road, a traveled dirt thoroughfare in agricultural areas, or poles set in areas with soft soil, as determined by PG&E, the customer’s pole must be guyed or braced against the pull of conductors as follows:

A. Temporary Poles: Anchor guy as shown in Figure 13 on Page 12, or with wood braces not smaller than 2” x 4” timber and securely bolted to the pole as per Figure 14 on Page 12. See Figure 2 on Page 8 for the correct placement of guy or brace.

B. Permanent Service Poles: Anchor guy only as shown in Figure 13 on Page 12. See Figure 5 on Page 10 for the correct placement of guy.

C. The guy strain insulator is to be located in a zone: 8 feet or more above the ground; and 8 feet or more below the level of the lowest supply conductor, or 6 feet or more from the surface of the pole and 1 foot or more below the level of the lowest supply conductor.

Metering Requirements

23. Meters must be furnished by PG&E. See Greenbook sections 5, 6, and 7 for meter panel and additional metering requirements.

24. For residential installations, meter sockets without test bypass facilities must be furnished, installed, and wired by the customer as shown on Page 12.

25. For commercial and industrial applications, meter sockets with PG&E-approved test bypass facilities must be furnished, installed, and wired by the customer.

26. Customer−owned poles for residential use are limited to only one meter panel rated at 225 amps (continuous) or less. Poles for non−residential applications are limited to only one meter panel rated at 200 amps or less.

Residential and Non−residential installations with more than one meter, or a meter panel with a greater ampacity must be installed on panelboard construction as shown in Document 065374.A main service disconnect or main breaker is required to be within 10’ of the meter panel. See Greenbook Section 5.7.1. Main Service Disconnects.

Verifying Depth of Customer Owned Poles

Applicants who plan to install a new customer−owned service pole prior to inspection by PG&E personnel can use following method for PG&E inspectors to verify the setting depth of newly installed poles that have already been set in the ground. See notes below and Figure 18, “Pole Depth Verification”, on page 17. These installations will be approved at the discretion of the PG&E Electrical inspector.

27. Install 3/4−inch diameter PVC Schedule 40 conduit from the bottom of the pole to 12 inches above grade level.

28. Place a removable cap on the top of the conduit and a permanent cap on the bottom of the conduit.

29. Attach the conduit to the pole using three heavy duty pipe straps and 10D galvanized nails. Place one pipe strap towards the top of the conduit below the removable cap. Place the second strap in the middle of the conduit and the third strap at the bottom of the conduit just above the permanent cap.

30. Install a PG&E approved pole to, at least, the minimum required setting depth. Refer to Table 3 Pole Setting Depths on page 3.

31. Ensure the PVC conduit is not broken and remains free of soil, equipment, or other obstacles, throughout the conduit. The conduit will be used to verify the pole setting depth.

32. Backfill and compact the soil around the pole to 90% of maximum density. Determine the maximum density and the in−place density by the California Test Method No. 216−6, Parts I and II respectively, or by ASTM D−1556 and D−1557 respectively. A copy of the test results may be required by PG&E.

33. Call for inspection after the installation of the customer owned pole is complete.

http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981600031

EMWPRequirements for Customer-Owned Poles

Rev. #21: 6/30/2023 025055 Page 7 of 17

Table 5 Materials to Be Furnished and Installed by the Customer Item Description

1 Pole, 6” x 6” Timber, Class 6 Round, or Equivalent Metal (length as required, see Note 2 on Page 1)

2 Pole, Wood, or Equivalent Metal (see Note 6, Note 7, and Note 8 on Page 2). (See Table 1 on Page 3 for approved list of wood pole suppliers.)

3 Meter Socket, Main Service Switch 4 Conduit, Service (see Note 14 on Page 5) 5 Conduit, Load Side (see Note 14 on Page 5) 6 Conduit Fitting, Threaded, With Cover and Gasket 7 1 Covering, PVC Conduit, or PVC Moulding (see Page 9) 8 1 Wood Block (4” x 4” x 6” or two 2” x 4” x 6” nailed together) 9 Service Head

10 Service Knob 11 Wire, Insulated (size as required) (18” minimum extension from service head) 12 Bolt, Machine, 5/8 or 3/4, (as required), Galvanized 13 Washer, Curved, 3” x 3” (for 5/8” Bolt) or 4” x 4” (for 3/4” Bolt), Galvanized 14 Guy Hook or Guy Pole Plate and Thimble Assembly 15 Guy Strand Cable, 7/32” or 1/4“ Minimum Galvanized Steel or Equivalent 16 Insulator, Guy Strain (10,000 lbs. minimum) 17 Guy Grip, Preform, (as required) 18 Anchor Rod, 5/8” x 6’ 0” Minimum, and Fittings (as required) 19 Anchor, 16” Cross Plate, or 8” Expanding 20 Guy Marker 21 Push Brace, 2” x 4” Minimum Timber (securely bolted to pole). See Figure 14 on Page 12.

22 Grounding by Customer (see Pages 8 and 10)

1 Omit conduit covering, Item 7, and wood block, Item 8, on a metal pole or on a wood pole with plastic conduit (see Note 15 on Page 5). Exception: The wood block is required for a wood pole with plastic conduit when the service head is metallic and the neutral service entrance conductor is uninsulated (see Note 15 on Page 5).

Table 6 Materials to Be Furnished and Installed by PG&E Items Description Document

23 Vertical Construction − 24 Spool and Clevis 022439 25 Meter, Watthour (as required) − 26 Service Wire (as required) 059626 27 Insulator, for Service Wire (as required) 025202 28 Connectors, Service Sleeve (as required) 028852 29 Preformed Grip, Dead-End (as required) 028851 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981530080 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981530089 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981550066 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981530082 http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981530081

EMWP

Requirements for Customer-Owned Poles

Rev. #21: 6/30/2023025055 Page 8 of 17

Temporary Installations

Notes

1. Locate the guy in line with the service drop. The guy must be maintained taut.

2. Grounding and bonding, by the customer, must be in accordance with NEC and local ordinances, (see Note 20 on Page 5). The ground rod must be located no less than 12 inches from the pole surface.

3. Customer’s equipment must not be installed in the climbing space or over the pole brand. See Note 20 on Page 5 for grounding requirements.

4. For customer-owned poles, span lengths are limited to 100 feet. The vertical separation between conductors in vertical construction is 8 inches minimum.

5. If the poles are to be set in firm soil, use the setting depths from the “Firm Soil” column of Table 3 on Page 3. If the poles are to be set in rock, use the setting depths from “Rock” column of Table 3 on Page 3. If the poles are to be set in soft soil, the poles must be set deeper than the depths shown in Table 3. Consult the PG&E project coordinator for the other approved methods for soft soil.

12 ” Min.

See Alternate Locations

Customer’s Line

PG&E

Line

See Alternate Locations

See Note 14 on Page 5

Ground Level

PG&E

Insulated Line

Ground Level

Figure 2 Service Drop Cable to Receptacles

Figure 3 Service Drop Cable to Overhead Line

See Note 3

See Note 2 or

See Note 22.C on Page 6

See Note 14 on Page 5

See Note 3

See Note 2

29 26

6” min.

6” min.

8 ” Min.

15 16

25 Meter25

48” Min.

48” Min.

75” Max.

66” Preferred

48” Min.

Meter

See Table 4

’ 0

M in im um (s ee N ot e on

P ag e 1)

’ 0

M in im um (s ee N ot e on

P ag e 1)

See Table 4

75” Max.

66” Preferred

48” Min.

See Figure 15, Page 13 14 17

Figure 13 or Figure 14 on

EMWPRequirements for Customer-Owned Poles

Rev. #21: 6/30/2023 025055 Page 9 of 17

Temporary Installations (continued)

PG&E Insulated Line

12” Min.

Alternate Locations for Service Drop and Guy (see Note 1 on Page 8)

Guy

Guy

Service Drop

Figure 4 Open Insulated Wire Construction

(For use when the load requires a larger service drop conductor)

Detail A See Figure 16 on Page 14

8”

8”

8”

See Table 4

6” Min.

EMWP

Requirements for Customer-Owned Poles

Rev. #21: 6/30/2023025055 Page 10 of 17

Permanent Installations Notes

1. Locate the guy in line with the service drop. The guy must be maintained taut.

2. Grounding and bonding, by the customer, must be in accordance with NEC and local ordinances (see Note 20 on

Page 5), The ground rod must be located no less than 12 inches from the pole surface.

3. Customer’s equipment must not be installed in the climbing space or over the pole brand. See Note 20 on Page 5 for grounding requirements.

4. For customer-owned poles, span lengths are limited to 150 feet. The vertical separation between conductors in vertical construction is 8 inches minimum.

5. If the poles are to be set in firm soil, use the setting depths from the “Firm Soil” column of Table 3 on Page 3. If the poles are to be set in rock, use the setting depths from “Rock” column of Table 3 on Page 3. If the poles are to be set in soft soil, the poles must be set deeper than the depths shown in Table 3 on Page 3. Consult the PG&E project coordinator for the other approved methods for soft soil.

27 29

See Alternate Locations

PG&E

Line

Ground Level

Figure 5 Service Drop Cable to Underground Line

Figure 6 Service Drop Cable to Overhead Line

Meter Meter

See Alternate Locations

To Load

Customer’s Line

PG&E

Insulated Line

See Note 3

See Note 2

See Note 3

See Note 2

See Note 14 on Page 5 See Note 14 on Page 5

6” Min.

6” Min.

8” Min.

Ground Level

(see Table 3 on Page 3)

(see Table 3 on Page 3)

75” Max.

66” Preferred

48” Min.

75” Max.

66” Preferred

48” Min.

Note 22.C on Page 6

See Table 4

12” min

23 29

See Table 4

Figure 15, 15 16

’ 0

M in

(s ee

N ot e on P ag e

’ 0

M in

(s ee

N ot e on P ag e

Figure 13 on

22 22

EMWPRequirements for Customer-Owned Poles

Rev. #21: 6/30/2023 025055 Page 11 of 17

Permanent Installations (continued)

Figure 7 Open Insulated Wire Construction

(for use when the load requires a larger service drop conductor)

Guy (see Note 1 on Page 10)

Guy

Guy Service Drop

Alternate Locations for Service Drop and Guy

Detail B See Figure 5 and Figure 6 on Page 10

PG&E Insulated Line

12”

8”

8”

8”

6” m in

See Table 4

Note 4

Method of Covering Metal Conduits and Attaching Coverings on Wood Poles

Notes

1. Strap PVC conduit to the pole with 2−hole heavy duty pipe straps or galvanized perforated plumber’s tape spaced not more than 3 feet apart (see Figure 8).

2. Attach PVC molding to the poles with 1/4” x 2-1/2” galvanized washer-head lag screws.

Figure 8 PVC Conduit (see Note 1)

Figure 9 PVC Molding (see Note 2)

EMWP

Requirements for Customer-Owned Poles

Rev. #21: 6/30/2023025055 Page 12 of 17

Meter Connections

1. For test bypass facilities, see Note 25 on Page 6.

2. All wiring material on the load side of the meter socket must be in accordance with applicable electrical codes, city and county ordinances, and must comply with the California Building Standards Code − Electrical Regulations. Unless threaded connections are used, adequate bonding of all sections of the service equipment must be provided.

Details of Anchors, Guying Materials, and Brace

6” Approx.

Steel Anchor

Bolted to Stake

Service Pole

4” x 4” Min.

Stake

2” x 4” Min. Wood Brace 20-Foot

Length Approx.

Bolted to Pole5/8” Diameter x 72” Galvanized Steel

Anchor Rod (minimum size)

Weatherproof Receptacles (see Notes 18 and 19 on

Page 5)

Weatherproof Service Switch. Cover Must Be

Locked if Enclosure Contains Exposed Live Parts.

Ground Wire (see Note 20 on Page 5)

Lock

4-Terminal Meter Socket (see Note 1)

Threaded Conduit Hub

Figure 10 120/240 V, 3-Wire

With WHM, Service Switch, and Receptacle in

Weatherproof Cabinet (see Note 2)

Figure 11 120/240 V, 4-Wire Delta

With Weatherproof Service Switch and Receptacles

(see Note 2)

Figure 12 120/240 V, 3-Wire

With Weatherproof Service Switch and Receptacles

(see Note 2)

Figure 13 Steel Anchor

Figure 14 Wood Brace

(for use with temporary pole only)

Threaded Conduit Hub

4-Terminal Meter Socket (see Note 1)

45°

36” Min.

8”

17 18 19 20

Note: Use 1/2 Galvanized Machine Bolts, and 1” x 1” Diameter Curved Washers to attach wood brace to stake and pole.

EMWPRequirements for Customer-Owned Poles

Rev. #21: 6/30/2023 025055 Page 13 of 17

Figure 15 Guying Materials

Temporary Commercial Service to Non-Substantial Portable Structure

Notes

1. Temporary Service Attachment

Temporary services will not be directly attached to any structure considered by PG&E to be of inadequate strength. The structure must, in all cases, be substantial (see Note 2) and capable of supporting the service span, as well as the force of the ladder and worker against the service mast.

2. Portable Buildings (Figure 16 on Page 14 and Figure 17 on Page 16)

Portable buildings, such as small sheds, combined office/toilet structures, etc., are not considered to be substantial structures unless they are staked in place in the manner shown in Figure 17 on Page 16.

Furthermore, periscopes must be installed and adequately braced in accordance with Figure 17 on Page 16 and the “Electric Service: Overhead” Section of the Electric and Gas Service Requirements Manual (Greenbook).

3. Temporary Poles (Figure 16 on Page 14)

Customer-owned temporary poles are required for support of PG&E’s overhead service wires if the temporary building to be served is considered by PG&E as not substantial.

4. Method of Serving

Non-substantial structures that have been approved for the attachment of metering equipment and service periscopes may be served in the manner shown on Page 14. However, if desired, the metering equipment may be removed from the structure and placed on the temporary pole as shown in Figure 2 on Page 8.

5. The distance from the centerline of the periscope service mast to the pole face must not exceed 24 inches.

6. A portable structure must not obstruct the climbing space of a temporary pole.

7. The working space in front of the meter must not be obstructed.

8. The minimum distance from the surface of a PG&E pole to a customer’s pole is 10 feet.

9. The maximum permitted span to a PG&E pole is 100 feet and may be only 80 feet in some cases (see Note 21 on Page 5).

http://www/techlib/default.asp?body=manuals/greenbook/

EMWP

Requirements for Customer-Owned Poles

Rev. #21: 6/30/2023025055 Page 14 of 17

Temporary Commercial Service to Non-Substantial Portable Structure (continued)

PG&E Pole

PG&E Line

Customer’s Portable Building

Customer’s Pole (see Note 6 on Page 11)

Guy

36” x 36” Working Space (see Note 7 on Page 11)

Figure 16 Portable Structure (non-substantial)

(see Note 2 on Page 11)

Customer’s Temporary Pole (for details, see Note 1 on Page 8 and Detail A on Page 9)

Service Drop

Customer Service Entrance

PG&E

Meter

10 Feet Minimum (see Note 8 on Page 13) 100 Feet Maximum (see Note 9 on Page 13)

24” Maximum (see Note 5 on Page 13)

36” Minimum 75” Maximum

12 Feet Minimum Above Ground

EMWPRequirements for Customer-Owned Poles

Rev. #21: 6/30/2023 025055 Page 15 of 17

Temporary Commercial Service to Substantial Portable Structure

Notes

1. Substantial Building

See Note 2 on Page 13 for an explanation of a “substantial” portable building.

2. Structure Anchoring

To prevent overturning, the structure is required to be securely anchored in place using one of the following methods:

A. Four 2” x 4” minimum wood stakes driven a minimum of 24 inches into the ground and attached to the framework of the structure using 1/4-inch minimum bolts or lag screws.

B. Four steel stakes having strength equivalent to 3/4-inch rigid steel pipe driven a minimum of 24 inches into the ground and attached to the framework of the structure using 1/4-inch minimum bolts or lag screws.

C. Four steel stakes having strength equivalent to a 3/4-inch rigid steel pipe driven a minimum of 24 inches into the ground with a cross member of each stake firmly contacting the upper surface of the timber used as a base or skid for the structure.

Note: Methods 2A and 2B above describe the preferred methods of attaching the stakes to the structure framework. However, four 16d (8-gauge, 3-1/2-inch) common nails per stake may be used in lieu of the bolts or lag screws, providing the wood is in good enough condition to permit a secure attachment.

3. Periscope Mast Bracing

Two galvanized steel braces, securely bolted or lagged to the structure’s framework with approximately a 90° spread, must be installed. Use 3/4-inch galvanized rigid steel pipe or 1-1/4” x 1-1/4” x 1/8” galvanized steel angle (minimum size).

4. Service Disconnection

When initial service is disconnected, sufficient service drop cable should be left connected to the service entrance cable to permit the future splicing of service cable from the ground level. This practice will limit the need for placement of ladders against the periscope mast when the structure is moved to a new location.

5. The working space in front of the meter must not be obstructed.

6. For temporary underground commercial service to substantial portable structures, see Document 036670.

http://wwwedm3/cgi-bin/getdocTDM.asp?itemid=981900042

EMWP

Requirements for Customer-Owned Poles

Rev. #21: 6/30/2023025055 Page 16 of 17

Temporary Commercial Service to Substantial Portable Structure (continued)

36” Minimum 75” Maximum

Customer’s Portable Building

36” x 36” Working Space (see Note 5 on Page 13)

Customer Service Entrance

PG&E

Meter

See Note 2 on Page 15

1-1/4” Rigid Steel or 2” Aluminum IPS (minimum)

Service Drop

Figure 17 Portable Structure - Substantial

(see Note 2 on Page 13)

Braces Securely Bolted or Lagged to Structure Framework

Bracing (see Note 3 on Page 15)

18” Max.

16’ 0” Minimum

24” Approx.

EMWPRequirements for Customer-Owned Poles

Rev. #21: 6/30/2023 025055 Page 17 of 17

Figure 18 Pole Depth Verification

Secure the Conduit to the Pole Using Three Heavy Duty Pipe Straps and 10D Galvanized Nails. One at the Top, One in the Middle, and One at the Bottom of the Conduit.

Removable Cap on the Top of the Conduit

Grade Level

3/4 − inch Schedule 40 PVC Conduit with Caps

Permanent Cap on the Bottom of the Conduit

Backfill and Compact to 90% of Maximum Density

PG&E Approved Pole

12” Above Grade

Bottom of Pole

See Table 3 on

Pole Setting Depths

Revision Notes Revision 21 has the following changes:

1. Updated Note 3 and Note 4 on Page 1.

2. Updated Note 5, Note 7.D. and Note 7.F., and Note 8 on Page 2.

3. Updated Table 1 and Footnote 1 on Page 3 regarding approved pole suppliers.

4. Revised Table 2 on Page 3 with new pole treatment and pole species.

5. Revised Footnote 2 in Table 4 on Page 3.

6. Revised Note 21 on Page 5.

7. Revised Note 26 on Page 6.

8. Corrected Figure 2 and Figure 3 on Page 8.

9. Corrected Figure 5 and Figure 6 on Page 10.

20230807_171708
1000000982
1000000983
ASCEDesignHazardsReport
IMG_0470 (1)
IMG_0471
IMG_0472
IMG_0473
IMG_0474
IMG_0475
IMG_0476
PG&E Requirements COSP
Power Lines

File details come from the government source that posted it. Updated .