Attachment 5 General Condition Breakdown.docx

DOCX document 13 KB Posted

Attached to
J041--621-22-108 - Replace Site Underground Chilled Water Piping - Pre-Solicitation
Solicitation number
36C24926R0013
Issued by

About this file

This is a general conditions cost breakdown template for a construction project. The document outlines three primary cost categories for general contractor expenses: Project Management, Bonds and Insurance, and Site Conditions. The Project Management section includes staffing costs for key personnel such as superintendents, safety managers, CPM schedulers, quality assurance/control staff, project managers, field engineers, and support personnel. The Bonds and Insurance category covers builder's risk insurance, general liability insurance, and security, payment, and performance bonds for the general contractor. The Site Conditions section is the most comprehensive, detailing temporary facilities and services required throughout the construction duration, including temporary utilities (power, water, sewer, electrical, telephone, and internet), fire protection, heating and cooling, fencing, traffic control measures, lighting, sanitary facilities, and security systems. Additional items encompassed in site conditions are pre-construction and progress photography documentation, temporary protective measures for adjacent structures, and site restoration upon completion.

This breakdown template is associated with a Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 pre-solicitation for replacing site underground chilled water piping. The template serves as a standardized format for contractors to present their general conditions costs in response to this federal construction opportunity, ensuring consistent pricing presentation across competing bids.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Management:

Superintendent(s)

Safety Manager

CPM Scheduler

Quality Assurance/Quality Control

Project Manager (s)

Project Executive

Field Office Engineer

Field Office Support Staff

Project Expeditor

Assistant Superintendent (s)

Project Manager Subtotal

Bonds and Insurance (excluding any for Subcontractors):

Builder’s Risk Insurance

General Liability Insurance

Security, Payment & Performance Bonds

Bonds and Insurance Subtotal:

Site Conditions:

Temporary Power Consumption (Offices)

Temporary Power Consumption (General Site Use)

Temporary Water and Sewer Consumption

Temporary Water Hookup, Distribution & Meters

Temporary Electrical Hookup, Distribution & Meters

Temporary Telephone & Network System Installation

Temporary Telephone & Internet Consumption Fees

Temporary Fire Protection

Temporary Heating & Cooling

Temporary Fencing

Temporary Covered Walkways

SWPPP Measures

Temporary Entries and Truck Washes

Street Cleaning (by G.C.)

Traffic Control Measures

Temporary Barricades & Signage

Temporary Roads & Walkways (install & maintenance)

Temporary Lighting

Temporary Partitions & Covered Floor Openings

Temporary Toilets/Sanitary Measures

Temporary Laydown (prep and restoration)

Security System/Watchman

Pre-construction Photo Documentation

Progress Photos

Temporary Protection (in place work/adjacent structures)

File details come from the government source that posted it. Updated .