Attachment 4 Calc. of Self Performed Work.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C24926R0013
About this file
This is a calculation template for demonstrating self-performed work requirements for specialty trade contractors bidding on federal construction projects. The template is specifically designed for offerors with NAICS code 23xxxxx (specialty trade contractors) and requires that at least 25 percent of the contract performance cost for personnel be performed by the prime contractor's own employees rather than subcontractors.
The template provides a structured format for breaking down costs by specification division, distinguishing between prime contractor and subcontractor work while identifying whether vendors are small businesses. Offerors must populate personnel costs and material/equipment costs in designated gray areas, then calculate subtotals before adding home office overhead, profit/fee, and bond costs to arrive at a grand total. The calculation of self-performed personnel costs requires offerors to subtract all subcontractor personnel costs from total personnel costs to determine the percentage of work being self-performed; this percentage must meet or exceed the 25 percent minimum threshold. Personnel costs are defined to include laborers, mechanics, tradesmen, and office personnel directly charged to the project, including project managers, superintendents, administrative staff, and estimators. The template concludes with a certification statement requiring an authorized representative's signature, typed name, title, and date to attest to the accuracy of the representations provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24926R0013 0003.docx | DOCX document | |
| 621-22-108 - Replace Site Underground Chilled Water Piping _ RFI Updated Responses 3-5-2026.pdf | ||
| 13.09_4_119-M100 Layout1_Revised.pdf | ||
| 13.08_4_119-MD100 Layout1_Revised.pdf | ||
| 621-22-108 - Replace Site Underground Chilled Water Piping _ RFI Responses.pdf | ||
| 36C24926R0013 0002.docx | DOCX document | |
| Project 621-22-108 _ Pre-Bid Sign-In Sheet - 02-13-2026.pdf | ||
| 36C24926R0013 0001.docx | DOCX document | |
| Attachment 6 Past Performance Questionnaire.docx | DOCX document | |
| Attachment 5 General Condition Breakdown.docx | DOCX document | |
| Attachment 2 Drawings.pdf | ||
| 36C24926R0013_1.docx | DOCX document | |
| Attachment 8 Request For Information Form.docx | DOCX document | |
| Attachment 9 Wage Determination - TN20250191 - Modification 0 - 01-02-2026.pdf | ||
| Attachment 7 Contractor EMR Certification Form.docx | DOCX document | |
| Attachment 3 Pricing Schedule.xlsx | XLSX spreadsheet | |
| Attachment 1 Specifications.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK | ||||||
| Offerors for All Other Specialty Trade Contractors (NAICS code 23xxxxx) must provide | ||||||
| at least 25 percent of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format. | ||||||
| Specification Division | SB Vendor (Y or N) | Personnel Cost | Material/Equipment Costs | |||
| Prime | Y | $0.00 | $0.00 | Change SB Vendor to Y or N based on vendor size. Add costs to gray areas only. | ||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| (Add additional lines as necessary for each Division applicable to this project) | $ | $ | ||||
| $ - 0 | $0.00 |
| $ | $ | ||||
| Sub Total (Personnel Costs, Material/Equipment Costs) | $ | 0.00 | Add percentage to gray areas only. | ||
| Percentage | 0 | Profit | $ | 0.00 | |
| Percentage | 0 | Home Office Overhead | $ | 0.00 | |
| Percentage | 0 | Bond | $ | 0.00 | |
| Grand Total | $ | 0.00 | |||
| Calculation of self-performed personnel costs: | |||||
| 1. Total personnel costs * both prime and all subcontractors: | $0.00 | ||||
| 2. Subtract all subcontractor personnel costs* companies that will perform work | |||||
| on this contract: | $0.00 | ||||
| 3. Remainder is ‘Total amount of work to be self-performed under the | |||||
| Contract’: | $0.00 | ||||
| 4. Self-performed work = Line 3/Line 1 x 100 = | ERROR:#DIV/0! |
| *personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to |
| the project (includes project manager, job superintendent, administrative, estimators, etc.) |
| I certify the above representations are true and correct to the best of my knowledge. |
(Signature and Typed Name of Authorized Representative) Date
(Title of Authorized Representative)
File details come from the government source that posted it. Updated .