13.09_4_119-M100 Layout1_Revised.pdf

PDF 832 KB Posted

Attached to
J041--621-22-108 - Replace Site Underground Chilled Water Piping - Pre-Solicitation
Solicitation number
36C24926R0013
Issued by

About this file

This is a technical construction drawing document showing chilled water piping schematics and installation plans for a medical facility project. The document presents multiple building phases (Phase A, Phase B, Phase C, and Phase D) with detailed piping schematic diagrams illustrating the routing and connections of chilled water systems across different construction phases. Each phase diagram uses color-coded lines (green, pink, and purple) to distinguish different piping systems and their connections throughout the building infrastructure.

The drawing includes a ground floor plan showing the physical layout of building sections with chilled water piping installations, including equipment placement and routing details. The document is prepared for the James H. Quillen VA Medical Center project and is designated as a final construction bid document for Building 4 and Building 110, specifically addressing chilled water piping new work. The sheet is marked as fully sprinkled and includes general notes, plan notes, phasing sequences, and deduct alternate notes to guide contractor execution. The document is prepared by FFE Engineering and Heapy Architecture/Engineer of Record, with additional consultant involvement noted in the title block, and is identified as drawing number 4-119-4100.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .