Attachment 5 - ES7034 Rework Repair.pdf
PDF 81 KB Posted
- Attached to
- Rocket Assisted Take Off (RATO) motors and initiators for the BQM-167A Aerial Target Drone
- Solicitation number
- FA821324RB011
About this file
The provided document is an attachment titled "Attachment 5 - ES7034 Rework Repair" that outlines the rework and repair procedures for nonconforming materials under a federal contract.
The key details are:
- Rework is defined as reprocessing nonconforming material to completely meet specifications, while repair is reprocessing to reduce but not eliminate nonconformances.
- Rework procedures must be documented by the contractor and submitted to the Government Quality Assurance Representative (QAR) for review and approval prior to implementation. Repair procedures must be submitted to the Contracting Officer for written approval via a Request for Deviation/Waiver.
- Submissions for rework or repair must include the cause of the nonconformance and actions to prevent recurrence.
- Reworked or repaired items require reinspection to ensure they meet requirements, taking precedence over the original Technical Data Package.
- Rework and repair requirements flow down to the contractor's suppliers, vendors, and subcontractors.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment #5
(ES7034)
REWORK AND REPAIR OF NONCONFORMING MATERIAL
Jan 2012 (version)
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
(End of attachment)