Attachment 5 Drawing Set- GAOA East Animas DM.pdf

PDF 12 MB Posted

Attached to
GAOA East Animas Bunkhouses Deferred Maintenance
Solicitation number
1123781
Issued by

About this file

The document provided is Attachment 5 Drawing Set for the GAOA East Animas Deferred Maintenance (DM) construction project. This project will address multiple facility needs at two bunkhouses at the East Animas property. The federal contract opportunity is a Solicitation with ID b7e52b5d4ca3482f9ceefa58af0ef99f, Solicitation Number 1123781, issued by the Department of Agriculture Forest Service. The drawings detail the construction requirements for the bunkhouse facilities, including site plans, building layouts, and mechanical, electrical, and plumbing systems. This attachment is part of the overall solicitation package for this deferred maintenance project.

View the file

Other files

File Type Posted
A003 SOI_GAOA East Animas DM.xlsx XLSX spreadsheet
A0003.pdf PDF
A0004.pdf PDF
1282B124R0042 A0002.pdf PDF
1282B124R0042 A0001.pdf PDF
East Animas DM- Pre-bid Meeting Q and A.docx DOCX document
Attachment 2 Wage determination.pdf PDF
Attachment 3 Technical Specifications-GAOA East Animas DM.pdf PDF
Attachment 4 Past Performance Questionnaire.pdf PDF
Attachment 1 SOW.pdf PDF
1282B124R0042.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST LOCATION MAP

PROJECT LOCATION MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture

Forest Service

GAOA EAST ANIMAS BUNKHOUSES

FROM DURANGO, COLORADO HEAD NORTH ON HIGHWAY 550 FOR 8.3 MILES. TURN RIGHT ONTO

COUNTY ROAD 252 AND CONTINUE FOR 0.9 MILES. TURN RIGHT ON COUNTY ROAD 250 AND CONTINUE

FOR 1.2 MILES. TURN INTO HAFLIN CREEK TRAILHEAD AND CONTINUE ON DIRT ROAD 500 YARDS TO

THE BUNKHOUSES LOCATED AT 5372 COUNTY ROAD 250, DURANGO,COLORADO 81301.37.367646, -107.839194. CO23 T36N R9W SN22 SWSE

DEFERRED MAINTENANCE

RECOMMENDED BY:

APPROVED:

CIVIL ENGINEER

FOREST ENGINEER DATE

DATE

FOREST ENGINEER DATE

DISTRICT RANGER DATE

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

COLORADO

LA PLATA COUNTY

(R02) ROCKY MOUNTAIN REGION

SAN JUAN NATIONAL FOREST

COLUMBINE RANGER DISTRICT

INDEX OF SHEETS

SHEET SHEET TITLE DATE

G-00 COVERSHEET 3/7/2024

G-01 PROJECT OVERVIEW 3/7/2024

C-01 SITE BASE ITEM OVERVIEW 3/7/2024

C-02 EA BUNKHOUSE INTERIOR BASE ITEM OVERVIEW 3/7/2024

C-03 EA BUNKHOUSE EXTERIOR OVERVIEW 3/7/2024

C-04 EA MODULAR INTERIOR BASE ITEM OVERVIEW 3/7/2024

C-05 EA BUNKHOUSE AND MODULAR ROOF OVERVIEW 3/7/2024

C-06 TANK AND WATERLINE DETAILS 3/7/2024

C-07 TANK LOCATION AND VENT PICTURES 3/7/2024

C-08 EA BUNKHOUSE EXTERIOR PICTURES 3/7/2024

C-09

EA BUNKHOUSE DECK AND FILTER PLUMBING/ELECTRICAL

PICTURES

3/7/2024

C-10 EA BUNKHOUSE TOILET PICTURES 3/7/2024

C-11 EA MODULAR TOILET AND SHOWER PICTURES 3/7/2024

C-12 EA MODULAR FLOORING PICTURES 1 /3 3/7/2024

C-13 EA MODULAR FLOORING PICTURES 2 /3 3/7/2024

C-14 EA MODULAR FLOORING PICTURES 3 /3 3/7/2024

C-15 SITE OPTIONAL ITEM OVERVIEW 3/7/2024

C-16 EA BUNKHOUSE OPTIONAL ITEM OVERVIEW 3/7/2024

C-17 EA MODULAR OPTIONAL ITEM OVERVIEW 3/7/2024

C-18 EA BUNKHOUSE AND MODULAR HOT WATER HEATER PICTURES 3/7/2024

C-19 EA MODULAR LIGHTING PICTURES 3/7/2024

C-20 EA BUNKHOUSE LIGHTING PICTURES 3/7/2024

C-21 HOT WATER HEATER AND LIGHT ENCLOSURE DETAILS 3/7/2024

SUMMARY OF WORK OVERIVEW:

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

PROJECT OVERVIEW

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

G-01 002 23

· DO NOT SCALE DRAWINGS.

· FIELD VERIFY ALL DIMENSIONS AND CONDITIONS. NOTIFY COR IMMEDIATELY

SHOULD CONDITIONS BE FOUND CONTRADICTORY TO THESE DRAWINGS.

· EXISTING BUILDING CONDITIONS THAT ARE DAMAGED OR DISTURBED DUE TO

WORK SHALL BE REPAIRED, REPLACED SUCH THAT THEY CANNOT BE

DISTINGUISHED FROM THE NEW OR ADJACENT EXISTING SURFACES & FINISHES.

· OBTAIN CONTRACTING OFFICER REPRESENTATIVE APPROVAL OF ANY

ELECTRICAL POWER OUTAGES NECESSITATED BY CONSTRUCTION

· PATCH/REPAIR/REPLACE PAVED SURFACES AND LANDSCAPE MATERIALS THAT

ARE INDICATED TO REMAIN THAT ARE DAMAGED AS A RESULT OF

CONSTRUCTION ACTIVITIES.

GENERAL NOTES:

CIVIL/UTILITY SYMBOLOGY

HOW TO READ AND USE GENERAL SYMBOLS IN THIS SHEET SET

GENERAL SYMBOLOGY

READ THE CONTRACT PACKAGE ATTACHED SCOPE OF WORK FOR FULL LENGTH SCOPE INFORMATION. DRAWING SHEETS CONTINUE

EXTRA DETAILS AND INFORMATION THAT ARE REFERENCED IN THE CONTRACT ATTACHED SCOPE OF WORK . THIS SUMMARY OF WORK

GIVES A BRIEF OVERVIEW OF ALL WORK.

BACKGROUND :

THE SAN JUAN NATIONAL FOREST HAS TWO BUNKHOUSES LOCATED ON THE "EAST ANIMAS" PROPERTY. THESE BUNKHOUSES ARE

UTILIZED BY SEASONAL STAFF FOR HOUSING FOR 6 MONTHS OUT OF THE YEAR. THE BUILDINGS HAVE GONE WITH MINIMAL MAINTENANCE

AND ARE IN NEED OF MODIFICATIONS TO CONTINUE TO SERVE AFFORDABLE AND WELL KEPT GOVERNMENT HOUSING. SEE SCOPE OF

WORK (SOW) AND TECHNICAL SPECIFICATIONS FOR MORE DETAILED INFORMATION REGARDING THIS PROJECT.

THIS PROJECT CONSISTS OF THE FOLLOWING ELEMENTS.

SITE WORK-BASE

MOBILIZATION

THE CONTRACTOR IS REQUIRED TO MOVE PERSONNEL, EQUIPMENT, MATERIAL, AND INCIDENTALS TO THE PROJECT BEFORE

BEGINNING WORK AT THE PROJECT SITE. ALL PROJECT STAGING LOCATIONS ON SITE FOR MATERIALS AND EQUIPMENT MUST BE

DISCUSSED AND AGREED UPON AS SEEN IN DRAWINGS.

CISTERN REPLACEMENT

INSTALL NEW 5025-GALLON UNDERGROUND WATER TANK ACCORDING TO MANUFACTURER'S SPECS AND SPECS INCLUDED IN THIS

CONTRACT.

BUNKHOUSE BUILDING WORK-BASE

BUNKHOUSE ROOF REPLACEMENT

DEMOLISH AND REMOVE APPROXIMATELY 2050 SQFT OF EXISTING ROOFING, UNDERLAYMENT, GUTTERS, DOWNSPOUTS, AND

FLASHING.

INSTALL APPROXIMATELY 2050 SQFT OF NEW STANDING SEAM METAL ROOFING PANELS ALONG WITH DRIP EDGE, RIDGE CAP, AND

FLASHING COMPONENTS ASSOCIATED WITH THE ROOF.

TOILET REPLACEMENT

INSTALL FOUR NEW TOILETS WITH CONCEALED TRAP WAYS (SMOOTH SIDED) TO MANUFACTURER'S SPECS AND SPECS LAID OUT IN

THIS CONTRACT.

EXTERIOR STAINING

REFINISH APPROXIMATELY 2500SQFT OF STAINED CEDAR SIDING, EVES, AND TRIM FINISHES.

DECK REPAIR AND REFINISHING

REFINISH APPROXIMATELY 250 SQFT OF PAINTED DECK, RAILING, AND TRIMS.

FILTER PLUMBING AND ELECTRICAL

INSTALLATION OF A SINGLE OUTLET IN WATER CONTROL CLOSET TO ALLOW FOR UV FILTER SYSTEM POWER.

PLUMBING SHALL BE MODIFIED TO FORCE ALL WATER THOUGH THE UV FILTER SYSTEM BEFORE EXITING THE ROOM.

MODULAR BUILDING WORK-BASE

ROOFING MAINTENANCE

MAINTENANCE APPROXIMATELY 2500 SQFT OF EXISTING ROOFING.

TOILET REPLACEMENT

INSTALL FOUR NEW TOILETS WITH CONCEALED TRAP WAYS (SMOOTH SIDED) TO MANUFACTURER'S SPECS AND SPECS LAID OUT IN

THIS CONTRACT.

VINYL TILE REPLACEMENT

REMOVE AND REPLACE APPROXIMATELY 878 SQFT OF VINYL TILE FLOORING AND 322 LF OF TRIM FROM THE MODULAR ENTRANCE

AREAS, KITCHEN, LAUNDRY ROOM, APPLIANCE CLOSET AND BATHROOMS ACCORDING TO MANUFACTURER'S SPECS.

CARPET FLOORING REPLACEMENT

REMOVE AND REPLACE APPROXIMATELY 588 SQFT OF CARPET AND PADDING FROM THE MODULAR BEDROOMS WITH CARPET TILES

ACCORDING TO MANUFACTURER'S SPECS.

BROKEN SHOWER UNIT REPLACEMENT

REMOVE AND REPLACE TWO BROKEN SHOWER UNITS, ONE IN EACH BATHROOM.

· SHOWER UNITS ARE TO FIT WITHIN EXISTING FRAMING (APPROX. 34” WIDE X 72” TALL X 35” DEEP).

SITE WORK-OPTIONAL

PARKING LOT RESURFACING

RESURFACE APPROXIMATELY 1235 SQUARE YARDS OF GRAVEL PARKING AREA.

BUNKHOUSE BUILDING WORK-OPTIONAL

REMOVAL AND INSTALL OF RECESSED LIGHTING AND EMERGENCY SIGNS

REMOVE 20 IDENTIFIED OVERHEAD LIGHTING FIXTURES AND INSTALL NEW OVERHEAD RECESSED LIGHTS.

INSTALL TWO EMERGENCY LED EXIT SIGNS ABOVE BOTH FRONT AND REAR DOOR.

INSTALLATION OF INSTANT HOT WATER HEATERS

REMOVE AND RECYCLE 2 EXISTING NATURAL GAS 50-GALLON HOT WATER HEATERS.

INSTALL 2 HIGH EFFICIENCY CONDENSING TANKLESS NG WATER HEATERS ACCORDING TO MANUFACTURER'S SPECIFICATIONS.

MODULAR BUILDING WORK-OPTIONAL

CERAMIC TILE INSTALL INSTEAD OF VINYL TILE

INSTALL APPROXIMATELY 878 SQFT OF CERAMIC TILE FLOORING AND 322 LF OF RUBBER TRIM FROM THE MODULAR ENTRANCE AREAS, KITCHEN, LAUNDRY ROOM, APPLIANCE CLOSET AND BATHROOMS ACCORDING TO MANUFACTURER'S SPECS.

REMOVAL AND INSTALL OF RECESSED LIGHTING AND EMERGENCY SIGNS

REMOVE 20 IDENTIFIED OVERHEAD LIGHTING FIXTURES AND INSTALL NEW OVERHEAD RECESSED LIGHTS.

REMOVE 8 IDENTIFIED WALL MOUNTED VANITY LIGHTS AND INSTALL NEW WALL MOUNTED LED VANITY LIGHTS.

INSTALL TWO EMERGENCY LED EXIT SIGNS ABOVE BOTH FRONT AND REAR DOOR.

INSTALLATION OF INSTANT HOT WATER HEATERS

REMOVE AND RECYCLE 2 EXISTING NATURAL GAS 50-GALLON HOT WATER HEATERS.

INSTALL 2 HIGH EFFICIENCY CONDENSING TANKLESS NG WATER HEATERS.

EXTRA SHOWER UNIT REPLACEMENT

REPLACE THE TWO UNDAMAGED SHOWER UNITS WITH MATCHING MODELS AS THE TWO BASE BID REPLACEMENT SHOWER UNITS.

SITE LOCATION

X

OE

COMMENT DETAIL NUMBER

ARROW POINTING NORTHNORTH ARROW

DETAIL MARKER xxxx

IMAGE NUMBER

IMAGE NUMBER

SHEET WHERE IMAGE IS LOCATED

SHEET WHERE IMAGE IS LOCATED

IMAGE/ITEM TITLE

IMAGE/ITEM

DIRECTION MARKER

VIEWING DIRECTION

W

G

S

E

EAST ANIMAS MODULAR

BUILDING

EAST ANIMAS

BUNKHOUSE BUILDING

EAST ANIMAS WAREYARD

C

O

U

N

T

Y

R

O

A

D

POSSIBLE STAGING LOCATIONS

HOW TO READ AND USE CIVIL/UTILITY SYMBOLS IN THIS SHEET SET

UNDERGROUND SEWER LINE

UNDERGROUND GAS LINE

UNDERGROUND WATER LINE

UNDERGROUND ELECTRIC

OVERHEAD ELECTRIC

FENCE

BUILDING OUTLINE

N

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text X

AutoCAD SHX Text

XXX

AutoCAD SHX Text X

AutoCAD SHX Text

XXX

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

G

G

G

G

G

G

G

G

G

G

G

G

G

G

S

S

S

S

S

S

S

S

S

S

S

S

X

X

X

X

X

X

X

X

W

W W

W

W

W

W W

W W

W

W

W

W

W

W

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

SITE BASE ITEM

OVERVIEW

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

C-01 03 23

LEGEND

X

OE

W

G

S

E

UNDERGROUND SEWER LINE

UNDERGROUND GAS LINE

UNDERGROUND WATER LINE

UNDERGROUND ELECTRIC

OVERHEAD ELECTRIC

FENCE

BUILDING OUTLINE

GENERAL LOCATION OF NEW TANK TO BE INSTALLED

EXISTING

TREATMENT BUILDING

EXISTING STORAGE SHED

SEPTIC TANK

EXISTING WATER TANK

EAST ANMAS

BUNKHOUSE

EAST ANIMAS

MODULAR

PARKING AREA

REPLACEMENT OF EXISTING UNDERGROUND WATER TANK

· REMOVE EXISTING PUMP AND COMPONENTS FROM CURRENT CISTERN TANK.

· EXCAVATE AND REMOVE EXISTING TANK WITHOUT DAMAGING ANY

COMPONENTS OR THE TANK.

· PLACE OLD STORAGE TANK IN A COR DESIGNATED AREA FOR FUTURE USE.

INSTALL NEW 5025-GALLON UNDERGROUND WATER TANK ACCORDING TO

MANUFACTURER SPECS AND SPECS INCLUDED IN THIS CONTRACT.

· TANK TO BE “5025 GALLON NORWESCO UNDERGROUND WATER TANK #44877”

OR APPROVED EQUIVALENT

· REINSTALL PUMP AND NECESSARY PLUMBING COMPONENTS.

· CLEAN TANK AND WATERLINES ACCORDING TO DISINFECTION OF WATER

SUPPLY GUIDELINES.

· PROVE TANK HAS NO LEAKS WITH A 12-HOUR LEAK TEST FOR ALL FITTINGS

BEFORE BACKFILLING BEGINS.

· FILL TANK TO FULL CAPACITY WITH WATER SUPPLY TRUCK AFTER COR

APPROVES OF PLUMBING.

· FOLLOW DISINFECTION OF WATER SUPPLY WELL GUIDANCE PROVIDED.

· SEE TANK DETAIL SHEET FOR MORE INFORMATION

DESIGN NOTES:

EAST ANIMAS SITE OVERVIEW

CURB STOP PLUMBING TO

BE LEFT IN PLACE

UNLESS MODIFICATIONS

ARE REQUIRED

N

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text W

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text C07

AutoCAD SHX Text

AutoCAD SHX Text C07

AutoCAD SHX Text

AutoCAD SHX Text C07

AutoCAD SHX Text

C07

27'-3"

5'

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

EA BUNKHOUSE

INTERIOR BASE ITEM

OVERVIEW

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

C-02 04 23

EAST ANIMAS BUNKHOUSE BASE ITEMS:

TOILET REPLACEMENT:

REMOVE AND DISPOSE OF FOUR EXISTING TOILETS.

· REPLACE WAX RING AND OTHER DISPOSABLE INSTALL PRODUCTS ON ALL TOILET FLANGES.

· REPLACE OTHER CONNECTION HARDWARE WHEN APPLICABLE IF BROKEN OR SHOWING SIGNS OF EXCESSIVE WEAR.

INSTALL FOUR NEW TOILETS WITH CONCEALED TRAP WAYS (SMOOTH SIDED)

· TOILETS SHALL BE “CADET 3 FLOWISE 2-PIECE 1.28 GPF SINGLE FLUSH RIGHT HEIGHT ROUND FRONT TOILET WITH CONCEALED TRAPWAY IN WHITE” OR COR APPROVED EQUIVALENT.

· TOILETS SHALL MEET ABA REQUIREMENTS IN THERE ENTIRETY

DECK REPAIR AND REFINISHING:

REFINISH APPROXIMATELY 250 SQFT OF PAINTED DECK, RAILING, AND TRIMS.

· PREPARE ALL PAINTED DECK, RAILING, AND TRIMS EXTERIOR SURFACES UTILIZING CORN COB GRIT BLASTING, OR APPROVED EQUIVALENT, TO REMOVE ALL OLD PAINT FROM THE

BUNKHOUSE BUILDING.

· PAINT ALL DECK, RAILING, AND TRIM EXTERIOR SURFACES WITH EXTERIOR HEAVY-DUTY PAINT SO ALL SURFACES ARE MATCHING IN COLOR WITH AT LEAST 2 COATS OF PAINT.

·· PAINT SHALL BE SEMITRANSPARENT “SHERWIN WILLIAMS SUPERDECK EXTERIOR WATERBORNE SOLID COLOR DECK STAIN” OR APPROVED EQUIVALENT.

·· COLOR TO BE SELECTED BY COR DURING SUBMITTALS “MOCK-UPS” BEFORE WORK BEGINS.

·· PAINT SHALL BE APPLIED FOLLOWING MANUFACTURER'S SPECS

· PROTECTION OF ALL VINYL WINDOWS, DOORS, AND VENTS SHALL BE USED WHILE STAINING AND BLASTING IS IN PROGRESS.

REPAIR ANY SECTION OF DECKING THAT IS DAMAGED DUE TO HEAVY TRAFFIC WITH “GREEN BOARD” GROUND RATED TIMBER.APPROXIMATELY 25 SQFT

FILTER PLUMBING AND ELECTRICAL:

INSTALLATION OF A SINGLE OUTLET IN WATER CONTROL CLOSET TO ALLOW FOR UV FILTER SYSTEM POWER.

OUTLET MUST BE ABLE TO POWER UV LAMP FILTRATION SYSTEM AND BE GFCI RATED.

· FILTER SYSTEM IS VIQUA IHS22-E4 COMMERCIAL UV SYSTEM WITH PRE-FILTRATION, 22 GPM

· POWER CONSUMPTION 83 WATTS 120VOLTS 60HZ

· OUTLET MUST BE LABELED ON FACEPLATE FOR BREAKER PANEL NUMBER..

PLUMBING SHALL BE MODIFIED TO FORCE ALL WATER THOUGH THE UV FILTER SYSTEM BEFORE EXITING THE ROOM.

· PLUMBING SHALL BE COPPER FITTINGS TO MATCH EXISTING INSTALLATION.

DESIGN NOTES:

BUNKHOUSE DOWNSTAIRS AND MAIN FLOOR LAYOUTBUNKHOUSE UPSTAIRS LAYOUT

N

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text C09

AutoCAD SHX Text

AutoCAD SHX Text C09

AutoCAD SHX Text

AutoCAD SHX Text C09

AutoCAD SHX Text

AutoCAD SHX Text C09

AutoCAD SHX Text

AutoCAD SHX Text C08

AutoCAD SHX Text

AutoCAD SHX Text C08

AutoCAD SHX Text

AutoCAD SHX Text C08

AutoCAD SHX Text

AutoCAD SHX Text C08

AutoCAD SHX Text

C10

24'-11

52'

29'-11"

26'-5

8'-5

29'-11"

6'-10

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

EA BUNKHOUSE

EXTERIOR OVERVIEW

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

C-03 05 23

EAST ANIMAS BUNKHOUSE BASE ITEMS:

EXTERIOR STAINING:

PREPARE ALL EXTERIOR SURFACES, APPROXIMATELY 2500SQFT, UTILIZING CORN COB GRIT BLASTING, OR APPROVED EQUIVALENT, TO REMOVE ALL OLD STAIN FROM THE BUNKHOUSE BUILDING.

· ENSURE ALL WASTE MATERIALS ARE PROPERLY DISPOSED OF ACCORDING TO MANUFACTURER.

RE-STAIN ALL WOODEN EXTERIOR SURFACES, APPROXIMATELY 2500SQFT, WITH OIL-BASED STAIN SO ALL SURFACES ARE MATCHING COLOR.

· STAIN SHALL BE SEMITRANSPARENT “SHERWIN WILLIAMS SUPERDECK LOG HOME & DECK STAIN”, “PENOFIN ULTRA-PREMIUM RED LABEL” OR APPROVED EQUIVALENT.

· COLOR TO BE SELECTED BY COR DURING SUBMITTALS “MOCK-UPS” BEFORE WORK BEGINS.

· PROTECTION OF ALL VINYL WINDOWS, DOORS, AND VENTS SHALL BE USED WHILE STAINING AND BLASTING IS IN PROGRESS.

STAIN SHALL BE APPLIED IN A MINIMUM OF 2 COATS ACCORDING TO MANUFACTURE SPECIFICATIONS FOR APPLICATION IN EXTREME WEATHER ENVIRONMENTS.

DESIGN NOTES:

NORTH ELEVATION EAST ELEVATION

WEST ELEVATION SOUTH ELEVATION

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

11'-3"

11'-6

1'-9"

8'-8"

3 4

14'-7" 5'-6

" 3'-5

3'-2" 3'-6" 8'-5

" 22'-4"

9'-6"

2'

11'-6

LEGEND

CARPET REPLACEMENT AREA

TILE REPLACEMENT AREA

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

EA MODULAR INTERIOR

BASE ITEM OVERVIEW

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

C-04 06 23

EAST ANIMAS MODULAR BASE ITEMS:

TOILET REPLACEMENT:

REMOVE AND DISPOSE OF FOUR EXISTING TOILETS.

· REPLACE WAX RING AND OTHER DISPOSABLE INSTALL PRODUCTS ON ALL TOILET FLANGES.

· REPLACE OTHER CONNECTION HARDWARE WHEN APPLICABLE IF BROKEN OR SHOWING SIGNS OF EXCESSIVE WEAR.

INSTALL FOUR NEW TOILETS WITH CONCEALED TRAP WAYS (SMOOTH SIDED)

· TOILETS SHALL BE “CADET 3 FLOWISE 2-PIECE 1.28 GPF SINGLE FLUSH RIGHT HEIGHT ROUND FRONT TOILET WITH CONCEALED TRAPWAY

IN WHITE” OR COR APPROVED EQUIVALENT.

TOILETS SHALL MEET ABA REQUIREMENTS IN THERE ENTIRETY

VINYL TILE REPLACEMENT:

REMOVE APPROXIMATELY 878 SQFT OF VINYL TILE FLOORING FROM THE MODULAR

PREP SUB FLOORS BY REMOVING ALL LEFTOVER GLUE AND ADHESIVE, LEVELING THE SURFACE, AND SEALING ALL EXPOSED FASTENERS.

· SUB FLOOR SHOULD INDEPENDENTLY BE WATERPROOF.

· REPLACE ANY WATER DAMAGED SUB FLOORING.

INSTALL NEW VINYL TILES ACCORDING TO MANUFACTURER'S SPECS.

· VINYL TILES SHALL BE “ INTERFACE TEXTURED STONES 50CM X 50CM 4.5 MM SOUND CHOICE BACKING MEDIUM CONCRETE.A00309”

· SUPPLY AN EXTRA 10% (APPROXIMATELY 88 SQFT) UNINSTALLED OR OPENED VINYL TILES FOR FUTURE REPLACEMENT NEEDS.

· ADHESIVE SHALL BE THE MANUFACTURER SPECIFIED “ADH.XL BRANDS 2000 PLUS 4GL”

· NO GAPS OR CRACKS SHALL BE PRESENT IN FINAL PRODUCT.

· SAMPLES SHALL BE PROVIDED BEFORE INSTALLATION OF PRODUCT.

INSTALL APPROXIMATELY 322 LF OF WATERPROOF RUBBER WALL BASE IN MATCHING HEIGHT AND COLOR TO TRIM THE NEW FLOORING.

· WATERPROOF RUBBER TRIM SHALL BE INSTALLED ACCORDING TO MANUFACTURER SPECS.

· COLOR TO BE SELECTED BY COR DURING SUBMITTALS “MOCK-UPS” BEFORE WORK BEGINS.

· SAMPLES SHALL BE PROVIDED BEFORE INSTALLATION OF PRODUCT.

CARPET FLOORING REPLACEMENT:

REMOVE APPROXIMATELY 588 SQFT OF CARPET, PADDING, AND TACK STRIPS FROM THE MODULAR BUILDING BEDROOMS.

· PREP SUBFLOORS BY REMOVING ALL ADHESIVES, LEVELING THE SURFACE, AND SEALING ALL EXPOSED FASTENERS AND CRACKS.

· REPLACE ANY DAMAGED SUBFLOORING

INSTALL APPROXIMATELY 588 SQFT NEW CARPET TILES ACCORDING TO MANUFACTURER'S SPECS.

· CARPET TILES SHALL BE “INTERFACE CUBIC 50CM X 50CM GLASBAC COLOR VERTEX.10607 6

· SUPPLY AN EXTRA 10% (APPROXIMATELY 59SQFT) UNINSTALLED OR OPENED CARPET TILES FOR FUTURE REPLACEMENT.

· ADHESIVE SHALL BE THE MANUFACTURER SPECIFIED “ADH.XL BRANDS 2000 PLUS 4GL”

· FLOORING SHALL BE INSTALLED IN IDENTICAL LAYING AND CUTTING PATTERN BETWEEN ALL ROOMS

· NO GAPS OR CRACKS SHALL BE PRESENT IN FINAL FLOOR.

· SAMPLES SHALL BE PROVIDED BEFORE INSTALLATION OF PRODUCT.

BROKEN SHOWER UNIT REPLACEMENT:

REMOVE TWO BROKEN SHOWER UNITS FROM BATHROOMS IN MODULAR BUILDING.

· ONE SHOWER UNIT FROM EACH BATHROOM

· REMOVE THE UNIT WITHOUT CAUSING UNNECESSARY DAMAGE TO DRYWALLING, SHOWER HARDWARE, OR INTERNAL PLUMBING.

REPAIR OR REPLACE ANY WATER DAMAGED INSULATION, FRAMING OR SUBFLOOR ONCE SHOWER IS REMOVED.

INSTALL A NEW SHOWER UNIT THAT FITS WITH EXISTING FRAMING OF APPROXIMATELY 34” WIDE X 72” TALL X 35” DEEP.

· SHOWER UNIT SHALL BE “EVERYDAY 35-1/4 X 34 X 73-1/4 IN. ALCOVE SHOWER UNIT IN WHITE” OR APPROVED EQUIVALENT

· IF NECESSARY, MODIFY DRAIN AND SHOWER PLUMBING TO FIT NEW UNIT

· INSTALL SHOWER UNIT TO MANUFACTURER'S SPECS.

INSTALL NEW SHOWER HARDWARE THAT IS STAINLESS STEEL IN FINISH.

· REPAIR ALL DRYWALL SECTIONS AND TRIM TO MATCH IN COLOR AND FINISH STYLE OF THE REST OF THE BATHROOM.

DESIGN NOTES:

KITCHEN FLOOR APPROX. 292 SQFT, 75.7 LF

LAUNDRY ROOM

FLOOR APPROX. 126

SQFT, 58.5 LF

ENTRANCE FLOOR

APPROX. 47.5

SQFT,29 LF

ENTRANCE FLOOR

APPROX. 97 SQFT, 44 LF

BATHROOM FLOORS

APPROX. 270 SQFT,

118 LF

APPLIANCE CLOSET

FLOORS APPROX. 46

SQFT, 27 LF

BEDROOM 2 FLOOR

APPROX. 181 SQFT

BEDROOM 3 FLOOR

APPROX. 136 SQFT

BEDROOM 4 FLOOR

APPROX. 136 SQFT

BEDROOM 1 FLOOR

APPROX. 133 SQFT

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text C11

AutoCAD SHX Text

AutoCAD SHX Text C11

AutoCAD SHX Text

AutoCAD SHX Text C12

AutoCAD SHX Text

AutoCAD SHX Text C12

AutoCAD SHX Text

AutoCAD SHX Text C12

AutoCAD SHX Text

AutoCAD SHX Text C12

AutoCAD SHX Text

AutoCAD SHX Text C13

AutoCAD SHX Text

AutoCAD SHX Text C13

AutoCAD SHX Text

AutoCAD SHX Text C13

AutoCAD SHX Text

AutoCAD SHX Text C14

AutoCAD SHX Text

AutoCAD SHX Text C14

AutoCAD SHX Text

AutoCAD SHX Text C14

AutoCAD SHX Text

AutoCAD SHX Text C14

AutoCAD SHX Text

C13

16'16'

76'

6'

29'-11"

1 2

24'-5

29'-4

6'

24'-11

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

EA BUNKHOUSE AND

MODULAR ROOF

OVERVIEW

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

C-05 07 23

EAST ANIMAS MODULAR BASE ITEMS:

ROOF MAINTENANCE:

MAINTENANCE APPROXIMATELY 2500 SQFT OF EXISTING ROOFING.

WORK SHALL INCLUDE REPLACEMENT OF MISSING HARDWARE (I.E. SCREWS, RUBBER PIPE BOOTS, CAULKING)

· TIGHTEN ANY PROTRUDING ROOFING SCREWS THAT HAVE AN INTACT RUBBER WASHER.

·· IF THE WASHER IS MISSING OR CRACKED REPLACE THE ENTIRE SCREW.

· REPLACE ANY ROOF PROTRUDING FLASHING BOOTS WITH PROPER BOOTS IF SIGNS OF CRACKING OR LEAKING ARE PRESENT.

· CAULK ALL FLASHING PANELS IN WHICH WATER COULD PENETRATE THE METAL ROOFING ONTO THE SHEATHING.

· RESET ANY MISALIGNED ROOFING PANELS.

EAST ANIMAS BUNKHOUSE BASE ITEMS:

ROOF REPLACEMENT:

DEMOLISH AND REMOVE APPROXIMATELY 2050 SQFT OF EXISTING ROOFING, UNDER LAYMENT, GUTTERS, DOWNSPOUTS, AND FLASHING.

· REPLACE ANY DETERIORATED OR DAMAGED ROOF SHEATHING.

· REMOVE OLD WOOD FIREPLACE CHIMNEY STACK AND SEAL SHEATHING IN PREVIOUS ROOF PENETRATION.

INSTALL APPROXIMATELY 2050 SQFT OF ICE AND WATER SHIELD RUBBER UNDERLAYMENT TO ENTIRE ROOFING SURFACE.

· TWO NEW LAYERS OF ICE AND WATER SHIELD ARE REQUIRED ON TOP OF SHEATHING.

· ROOF SHALL BE "STANDING SEAM HORIZON-LOC " OR APPROVED EQUIVALENT

· COLOR TO BE SELECTED BY COR DURING SUBMITTALS “MOCK-UPS” BEFORE WORK BEGINS.

· SAMPLES SHALL BE PROVIDED BEFORE INSTALLATION OF PRODUCT.

INSTALL NEW ALL NEW VENT BOOTS AROUND ANY EXISTING OR NEW ROOF PENETRATION POINTS.

INSTALL NEW STANDING SEAM METAL ROOFING PANELS ALONG WITH DRIP EDGE, RIDGE CAP, AND FLASHING COMPONENTS.

· ROOF SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S RECOMMENDATION AND SPECS INCLUDING IN THIS CONTRACT.

DESIGN NOTES:

BUNKHOUSE ROOF LAYOUT MODULAR ROOF LAYOUT

DIMENSIONS SHOULD BE FIELD VERIFIED BEFORE ORDERING

DIMENSIONS SHOULD BE FIELD VERIFIED BEFORE ORDERING

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

3'-6"

* MINIMUM BURY DEPTH FOR UTILITIES

WHICHEVER IS DEEPER

ELECTRIC - 24" (610mm) OR SAME DEPTH AS WATER, WATER - 32" (610mm) OR DEEPER TO DRAIN

12"

ELECTRIC

WATER LINE

FINE GRAVEL BEDDING MATERIAL

FINE GRAVEL INITIAL BACKFILL

EXCAVATED SOIL SUBSEQUENT BACKFILL

AGGREGATE SURFACE

ONLY FOR ROADS

WATER LINE OR

ELECTRICAL

DETECTION TAPE

IN AREAS OUTSIDE OF ROADWAY,

MOUND BACKFILL 3" (75MM) ABOVE

ORIGINAL GRADE. FOR ROADS PLACE 4"

(100MM) OF AGGREGATE SURFACING.

8'-6"

2'

1 4

24" TANK MANHOLE

EXTENSION

2'

17'-7"

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

TANK AND WATERLINE

DETAILS

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

C-06 08 23

TANK END PROFILE DETAIL

NOT TO SCALE

CONCRETE CURB STOP DETAIL

NOT TO SCALE

TANK SIDE PROFILE DETAIL

NOT TO SCALE

WATERLINE TRENCH DETAIL

NOT TO SCALE

EXCAVATION

· EXCAVATE TO A DEPTH THAT WILL PROVIDE A MINIMUM OF 6" AND A MAXIMUM OF 24" OF COVER OVER THE TOP OF THE TANK.

· ALLOW 18" TO 24" ON BOTH SIDES AND BOTH ENDS OF THE TANK.

· BED THE TANK IN WELL-COMPACTED SAND – 6" MINIMUM IN SOIL TERRAIN, 12" MINIMUM IN ROCK TERRAIN.

CONNECTIONS TO TANK

· INSTALL FITTINGS IN ANY LOCATION REQUIRED FOR HOLDING TANK USE.

· CONTACT FACTORY FOR APPROVAL IF MULTIPLE FITTINGS ARE INSTALLED IN CLOSE PROXIMITY.

· TANK MUST BE VENTED.

· FOR WATER-TIGHT SEAL, LID SHOULD BE SEALED WITH SILICONE OR URETHANE CAULKING. RE-US STAINLESS STEEL SCREWS SUPPLIED WITH LID TO

RE-ATTACH LID TO TANK.

MANHOLE EXTENSION

· INSTALL MANHOLE EXTENSION BEFORE YOU BACKFILL.

· NORWESCO MANHOLE EXTENSIONS ARE SUPPLIED WITH GASKETS AND SCREWS. RE-USE THE STAINLESS STEEL SCREWS TO ATTACH THE LID AT THE

TOP OF THE MANHOLE EXTENSION.

DESIGN NOTES:

CURB STOP BOX WITH ARCH

CURB STOP BRASS FITTING

BACKFILLING EXTERIOR

· BACKFILL WITH 12" LAYERS AND COMPACT EACH LAYER. ALWAYS COMPACT ENDS FIRST.

· EACH OF THE INTERIOR SUPPORT CONES MUST BE FILLED AND COMPACTED IN 6" LAYERS; THE BOTTOM HALF OF THE CONES ARE TAPERED AND MUST HAVE

THE SOIL COMPACTED TO PROVIDE STRUCTURAL SUPPORT. SEE DIAGRAM.

· MAXIMUM BACKFILL OVER THE TOP OF THE TANK IS 24". MOUND SOIL OVER THE TOP TO PROVIDE POSITIVE DRAINAGE

BACKFILL MATERIALS

· THE PREFERRED MATERIAL FOR BACKFILLING, SURROUNDING AND COVERING THE TANK IS A SAND AND GRAVEL MIXTURE–100% SMALLER THAN 1½" AND

APPROXIMATELY 50% SMALLER THAN ¼".

· ALL FILL MUST BE FREE OF ANY WOOD, MASONRY DEBRIS, SILT OR CLAY. SHARP OBJECTS MUST NOT COME IN CONTACT WITH THE WALL OF THE TANK.

· THE TOPSOIL CAN BE MOUNDED ONTOP OF THE TANK WITH APPROVED SEED MIX ADDED

BACKFILL INTERIOR CONES AT 12"

STEPS WITH COMPACTION INBETWEEN

12" BACKFILL PREFERRED

(MIN. 6" - MAX. 24")

18" TO 24" EXCAVATION

BEYOND TANK WALLS

WATER INLET

WATER OUTLET

PVC VENT PIPE AND

ELECTRICAL JUNCTION BOX

SIDE BY SIDE

1' DEEP LEVELED

SAND BED

FINE GRAVEL BACKFILL

SURROUNDING ENTIRE TANK

VENT AT LEAST

24" OFF THE GROUND

REUSE EXISTING CONCRETE CURBSTOP SET UP

· IF CURBSTOPS ARE DAMAGED BY THE CONTRACTOR IT

SHALL REBUILD ACCORDING TO THESE DETAILS

DESIGN NOTES:

WIRE MESH TO BE INSTALLED

AROUND VENT OPENING

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

TANK LOCATION AND

VENT PICTURES

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

C-07 09 23

TANK GENERAL LOCATION FACING SOUTH EXISTING TANK OUTLETS , CURBSTOPS IN CONCRETE

EXISTING TANK LID AND VENT TANK GENERAL LOCATION FACING NORTH

TANK LOCATION

CONCRETE CURB STOP PAD

TO BE LEFT INTACT

TANK LOCATION

VENT, MANHOLE, AND ELECTRICAL

ALL TO BE REPLICATED WITH NEW TANK

BUNKHOUSE VALVE

MODULAR VALVE

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text C-01

AutoCAD SHX Text

AutoCAD SHX Text C-01

AutoCAD SHX Text

AutoCAD SHX Text C-01

AutoCAD SHX Text

C-01

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

EA BUNKHOUSE

EXTERIOR PICTURES

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

C-08 10 23

FRONT OF EA BUNKHOUSE (NORTH ELEVATION) WEST SIDE OF EA BUNKHOUSE (EAST ELEVATION)

EAST SIDE OF EA BUNKHOUSE (WEST ELEVATION)BACK OF EA BUNKHOUSE (SOUTH ELEVATION)

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text C-02

AutoCAD SHX Text

AutoCAD SHX Text C-02

AutoCAD SHX Text

AutoCAD SHX Text C-02

AutoCAD SHX Text

C-02

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

EA BUNKHOUSE DECK

AND FILTER

PLUMBING/ELECTRICAL

PICTURES

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

C-09 11 23

FRONT ENTRANCE CLOSE UP REAR DECK CLOSE UP

FILTER PLUMBING STRAIGHT ON FILTER PUMPING FROM OVERHEAD

FRONT DECK TO

BE REPAIRED

DECK SHALL BE ONE

CONTINUOUS HEIGHT FROM

DOOR TO CONCRETE PATH

(RAMP TO DOOR)

GENERAL LOCATION OF

NEW GFCI OUTLET

TEE TO BE REMOVED

TIE THIS LINE INTO FILTER EXIT

ALL WATER LINES EXITING THIS ROOM

NEED TO HAVE PASSED THROUGH THE

FILTER STATION. MULTIPLE SOLUTIONS

EXIST. DRAWINGS ONE SHOW ONE

POSSIBILITY

WATER FROM WELL

INSTALL A NEW

SHUTOFF VALVE

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text C-02

AutoCAD SHX Text

AutoCAD SHX Text C-02

AutoCAD SHX Text

AutoCAD SHX Text C-02

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

EA BUNKHOUSE TOILET

PICTURES

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

C-10 12 23

UPSTAIRS TOILET STALLS TOILET BACKSET MEASURMENTS

TOILET WIDTH MEASUREMENTS

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text C-02

AutoCAD SHX Text

AutoCAD SHX Text C-02

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

EA MODULAR TOILET

AND SHOWER PICTURES

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

C-11 13 23

BROKEN SHOWER OVERVIEW DAMAGED TRIM AROUND SHOWER ENCLOSURE

TOILET BACKSET MEASURMENTS

BASE BID ITEM

SHOWER TO REPLACE

OPTIONAL BID ITEM

SHOWER TO REPLACE

SHOWERS IN BOTH

BATHROOMS ARE

IDENTICALLY LAID OUT

DRYWALL TO BE REPLACED

WITH NEW SHOWER INSTALL

TRIM AND FLOORING TO

BE REPLACED

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text C-04

AutoCAD SHX Text

AutoCAD SHX Text C-04

AutoCAD SHX Text

C-04

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

EA MODULAR FLOORING

PICTURES

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

C-12 14 23

MAIN ENTRANCE VINYL TILES SIDE ENTRANCE VINYL TILES

LAUNDRY ROOM VINYL TILESKITCHEN VINYL TILES

CONTRACTOR MUST REMOVE

AND REINSTALL ALL APPLIANCES

DURING REFLOORING

CONTRACTOR MUST REMOVE

AND REINSTALL ALL APPLIANCES

DURING REFLOORING

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text C-04

AutoCAD SHX Text

AutoCAD SHX Text C-04

AutoCAD SHX Text

AutoCAD SHX Text C-04

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

EA MODULAR FLOORING

PICTURES

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

C-13 15 23

UTILITY ROOM VINYL TILES FURNACE AND HOT WATER HEATERS ROOM VINYL TILES

BATHROOM SHOWER AREA VINYL TILESBATHROOM MAIN AREA VINYL TILES

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text C-04

AutoCAD SHX Text

AutoCAD SHX Text C-04

AutoCAD SHX Text

AutoCAD SHX Text C-04

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

EA MODULAR FLOORING

PICTURES

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

C-14 16 23

BEDROOM 1 CARPET BEDROOM 2 CARPET

BEDROOM 4 CARPETBEDROOM 3 CARPET

CONTRACTOR MUST REMOVE

AND REINSTALL ALL FURNITURE

DURING REFLOORING

CONTRACTOR MUST REMOVE

AND REINSTALL ALL FURNITURE

DURING REFLOORING

CONTRACTOR MUST REMOVE

AND REINSTALL ALL FURNITURE

DURING REFLOORING

CONTRACTOR MUST REMOVE

AND REINSTALL ALL FURNITURE

DURING REFLOORING

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text C-04

AutoCAD SHX Text

AutoCAD SHX Text C-04

AutoCAD SHX Text

AutoCAD SHX Text C-04

AutoCAD SHX Text

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

SITE OPTIONAL ITEM

OVERVIEW

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

C-15 17 23

LEGEND

X

FENCE

BUILDING OUTLINE

RESURACING AREA

SITE OPTIONAL ITEMS:

PARKING LOT RESURFACING

· PLACE 1 INCH MINUS ROAD BASE IN TWO 4" LIFTS OVER APPROXIMATELY 1235

SQUARE YARDS (309 ESTIMATED TONS)

GRADING SHALL INCLUDE:

· PARKING LOT AREA SHALL BE GRADED SITTING ON TWO 4" LIFTS OF 1 INCH

MINUS ROAD BASE FOR A FINAL SURFACE ELEVATION.

· THE PARKING LOT SHALL MAINTAIN ITS CURRENT SLOPE FOR DRAINAGE

· ALL SURFACES SHALL FOLLOW COMPACTION STANDARDS LAID OUT IN FP-14

SECTION 204.11 MODIFIED BY FSSS.

· ENTRANCE ROAD SHALL HAVE A 4-6% CROWN FOR DRAINING

DESIGN NOTES:

APPROXIMATELY 1,235 SQUARE YARDS

EAST ANMAS

BUNKHOUSE

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

27'-3"

5'

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

EA BUNKHOUSE

OPTIONAL ITEM

OVERVIEW

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

C-16 18 23

EAST ANIMAS BUNKHOUSE OPTIONAL ITEMS:

REMOVAL AND INSTALL OF RECESSED LIGHTING AND EMERGENCY SIGNS :

REMOVE 20 IDENTIFIED OVERHEAD LIGHTING FIXTURES.

PREP AND INSTALL 20 NEW RECESSED 6" CANLESS LED OVERHEAD LIGHTS

· LIGHTS SHALL BE “ JUNO CS JPDZ6JB 6" PODZ CANLESS LED DOWNLIGHTS“ OR APPROVED EQUIVALENT

· EACH FIXTURE MUST BE FULLY FUNCTIONAL, OPERATIONAL, AND CONTROLLED AT THE PRE-EXISTING WALL

SWITCHES CURRENTLY DEPLOYED IN THE CIRCUIT.

· EACH LIGHT SHALL BE FRAMED OUT AND SEALED IN ATTIC SPACE TO ELIMINATE DRAFTING AND ELECTRICAL FIRE

HAZARDS.

· ENSURE A CLEAN FINISH ON DRYWALL AND LIGHTING FIXTURES.

·· SEE LIGHTING DETAILS SHEET

· SUPPLY 4 EXTRA OVERHEAD LIGHTS FOR FUTURE REPLACEMENT.

· SEE LIGHTING DETAILS

INSTALL TWO EMERGENCY LED GREEN EXIT SIGNS ABOVE BOTH FRONT AND REAR DOOR.

· SIGNS SHALL BE “ GLO BRITE EXIT SIGN - 50' VIEWING DISTANCE, SINGLE SIDED, GREEN “ OR APPROVED

EQUIVALENT

· ENSURE A CLEAN FINISH ON DRYWALL AND LIGHTING FIXTURES.

INSTALLATION OF INSTANT HOT WATER HEATERS:

REMOVE AND RECYCLE 2 EXISTING NATURAL GAS 50-GALLON HOT WATER HEATERS.

INSTALL 2 HIGH EFFICIENCY CONDENSING TANKLESS NG WATER HEATERS.

· TANKLESS WATER HEATERS SHALL BE “ECOH200DVELN-3” MODEL OR APPROVED EQUIVALENT.

· TANKLESS WATER HEATER SHALL BE ABLE TO PRODUCE AT LEAST 9 GPM EACH.

· TANKLESS WATER HEATER SHALL BE ABLE TO OPERATE OFF OF EXISTING NATURAL GAS SUPPLY LINES.

INSTALL APPLICABLE VENTING, PLUMBING, AND DRAIN LINES ACCORDING TO MANUFACTURER'S SPECIFICATIONS.

SEE HOT WATER HEATER DETAILS.

DESIGN NOTES:

1 1

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text C18

AutoCAD SHX Text

AutoCAD SHX Text C20

AutoCAD SHX Text

AutoCAD SHX Text C20

AutoCAD SHX Text

AutoCAD SHX Text C20

AutoCAD SHX Text

C20

11'-3"

11'-6

1'-9"

8'-8"

3 4

14'-7" 5'-6

" 3'-5

3'-2" 3'-6" 8'-5

" 22'-4"

9'-6"

2'

11'-6

LEGEND

CARPET REPLACEMENT AREA

TILE REPLACEMENT AREA

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/1 2/2

4 1 3:

B

EN

JA

MI

NG

LE

NN

C :\U

SE

RS

\B

EN

JA

MI

NG

LE

NN

\B

OX

\73

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

-2

PR

OJ

EC

TS

\20

_P

RO

JE

CT

S\

GA

OA

-E

AS

T

AN

IM

AS

B

UN

KH

OU

SE

D M\

DR

AW

IN

GS

\G

AO

A-

EA

ST

A

NI

MA

S

DM

.D W

G;

(R02)

ROCKY MOUNTAIN REGION

GAOA EAST

ANIMAS

BUNKHOUSES

DEFERRED

MAINTENANCE

SAN JUAN NATIONAL

FOREST

COLUMBINE RANGER DISTRICT

EA MODULAR OPTIONAL

ITEM OVERVIEW

01/23/2023

B.GLENN

B.GLENN

T.BOWMAN

C-17 19 23

EAST ANIMAS MODULAR OPTIONAL TEMS:

VINYL TILE REMOVAL AND CERAMIC TILE INSTALL:

REMOVE APPROXIMATELY 878 SQFT OF VINYL TILE FLOORING FROM THE MODULAR

PREP SUB FLOORS BY REMOVING ALL LEFTOVER GLUE AND ADHESIVE, LEVELING THE SURFACE, AND SEALING ALL EXPOSED FASTENERS.

· SUB FLOOR SHOULD INDEPENDENTLY BE WATERPROOF.

· REPLACE ANY WATER DAMAGED SUB FLOORING.

INSTALL NEW CERAMIC TILES ACCORDING TO MANUFACTURER'S SPECS.

· CERAMIC TILES SHALL BE MATCHING EAST ANIMAS BUNKHOUSE KITCHEN/BATHROOM TILES IN COLOR AND SIZE (12”X12”)

O SUPPLY AN EXTRA 10% (APPROXIMATELY 88SQFT) UNINSTALLED OR OPENED CERAMIC TILES FOR FUTURE REPLACEMENT.

· GROUT SHALL BE EPOXY BASED AND GRAY IN COLOR.

· NO GAPS OR CRACKS SHALL BE PRESENT IN FINAL PRODUCT.

· SAMPLES SHALL BE PROVIDED BEFORE INSTALLATION OF PRODUCT.

INSTALL APPROXIMATELY 322 LF OF WATERPROOF RUBBER WALL BASE IN MATCHING HEIGHT AND COLOR TO TRIM THE NEW FLOORING.

· WATERPROOF RUBBER TRIM SHALL BE INSTALLED ACCORDING TO MANUFACTURER SPECS.

· COLOR TO BE SELECTED BY COR DURING SUBMITTALS “MOCK-UPS” BEFORE WORK BEGINS.

SAMPLES SHALL BE PROVIDED BEFORE INSTALLATION OF PRODUCT.

REMOVAL AND INSTALL OF RECESSED LIGHTING,VANITY AND EMERGENCY SIGNS:

REMOVE 20 IDENTIFIED OVERHEAD LIGHTING FIXTURES.

PREP AND INSTALL 20 NEW RECESSED 6" CANLESS LED OVERHEAD LIGHTS

· LIGHTS SHALL BE “ JUNO CS JPDZ6JB 6" PODZ CANLESS LED DOWNLIGHTS“ OR APPROVED EQUIVALENT

· EACH FIXTURE MUST BE FULLY FUNCTIONAL, OPERATIONAL, AND CONTROLLED AT THE PRE-EXISTING WALL SWITCHES CURRENTLY DEPLOYED IN THE

CIRCUIT.

· EACH LIGHT SHALL BE FRAMED OUT AND SEALED IN ATTIC SPACE TO ELIMINATE DRAFTING AND ELECTRICAL FIRE HAZARDS.

· ENSURE A CLEAN FINISH ON DRYWALL AND LIGHTING FIXTURES.

·· SEE LIGHTING DETAILS SHEET

· SUPPLY 4 EXTRA OVERHEAD LIGHTS FOR FUTURE REPLACEMENT.

REMOVE 8 IDENTIFIED WALL MOUNTED VANITY LIGHTING FIXTURES

PREP AND INSTALL 8 NEW WALL MOUNTED VANITY LIGHTS

· VANITY LIGHTS IN KITCHEN SHALL BE “ WAC LIGHTING FLO 36" WIDE LED BATH BAR WITH AN ACRYLIC DIFFUSER“ OR APPROVED EQUIVALENT

· VANITY LIGHTS IN KITCHEN SHALL BE “ WAC LIGHTING FLO 24" WIDE LED BATH BAR WITH AN ACRYLIC DIFFUSER“ OR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .