A0003.pdf
PDF 191 KB Posted
- Attached to
- GAOA East Animas Bunkhouses Deferred Maintenance
- Solicitation number
- 1123781
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is an Amendment to Solicitation No. 1282B124R0042. The key details are:
The purpose of this amendment is to move the due date for proposals out to 7/26/2024 by 1600 Mountain Time. It also updates the bid guarantee provision (52.228-1(c)) to require a 20% bid guarantee. Offerors must acknowledge receipt of this amendment and return a signed copy with their proposal package. The solicitation is for the GAOA East Animas Bunkhouses Deferred Maintenance construction project, which will address multiple facility needs at two bunkhouses at the East Animas property. The contract will be issued by the USDA Forest Service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A003 SOI_GAOA East Animas DM.xlsx | XLSX spreadsheet | |
| A0004.pdf | ||
| 1282B124R0042 A0002.pdf | ||
| 1282B124R0042 A0001.pdf | ||
| East Animas DM- Pre-bid Meeting Q and A.docx | DOCX document | |
| Attachment 5 Drawing Set- GAOA East Animas DM.pdf | ||
| Attachment 2 Wage determination.pdf | ||
| Attachment 3 Technical Specifications-GAOA East Animas DM.pdf | ||
| Attachment 4 Past Performance Questionnaire.pdf | ||
| Attachment 1 SOW.pdf | ||
| 1282B124R0042.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1
1. CONTRACT ID CODE
I
PAGE OF PAGES
1 I 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
0003 05/30/2024 1123781 GAOA Ea
6. ISSUED BY CODE 82Bl 7. ADMINISTERED BY (If other than Item 6) CODE I
USDA FOREST SERVICE
SPOC INTERMOUNTAIN
1400 INDEPENDENCE AVE SW MS-1138
WASHINGTON DC 20250-0001
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
9A. AMENDMENT OF SOLICITATION NO.
1282B124R0042
X
9B. DATED (SEE ITEM 11)
05/30/2024
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
IXI The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers IZl is extended. Dis not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
E. IMPORTANT:
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Contractor Dis not Dis required to sign this document and return ______ _ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this third amendment is to Move the Due date out to 7/26/2024 by 1600
Mountain Time. This amendment is to also update provision 52.228-l(c) to read, "The amount of the bid guarantee shall be 20 percent." Below is the updated 52.228-1 Bid Guarantee.
lastly attached is the SOI that has been updated, please fill the updated SOI out accordingly & return with signed amendment, also review the "Schedule notes" in the original solicitation for instructions.
Contractors must sign and return this amendment on the SF30 and return with their proposal package.
Please send emails to traci.jackson@usda.gov for a copy.
Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 1 0A, as heretofore changed, remains unchanged and in full force and effect . 15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
(Signature of person authorized to sign)
Previous edition unusable
JESSICA LYN H. RASMUSSEN
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
7/26/24 by 1600MT
REFERENCE NO. OF DOCUMENT BEING CONTINUED
CONTINUATION SHEET
1282Bl24R0042/0003
NAME OF OFFEROR OR CONTRACTOR
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
Period of Performance: 10/01/2024 to 11/15/2024
52.228-1 Bid Guarantee (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury
Department regulations, certain bonds or notes of the United
States. The Contracting Officer will return bid guarantees, other than bid bonds -
(1) To unsuccessful bidders as soon as practicable after the opening of bids, and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond( s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
NSN 7540-01-152-8067
QUANTITY UNIT
(C) (D)
UNIT PRICE
(E)
OF
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFRl 53.110
File details come from the government source that posted it. Updated .